Form 10-Q
Table of Contents

 

 

UNITED STATES SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-Q

 

x QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the Quarterly Period Ended June 30, 2014

or

 

¨ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

Commission

File Number

  

Name of Registrant; State of Incorporation;

Address of Principal Executive Offices; and

Telephone Number

   IRS  Employer
Identification

Number
 

1-16169

  

EXELON CORPORATION

     23-2990190   
  

(a Pennsylvania corporation)

10 South Dearborn Street

P.O. Box 805379

Chicago, Illinois 60680-5379

(312) 394-7398

  

333-85496

  

EXELON GENERATION COMPANY, LLC

     23-3064219   
  

(a Pennsylvania limited liability company)

300 Exelon Way

Kennett Square, Pennsylvania 19348-2473

(610) 765-5959

  

1-1839

  

COMMONWEALTH EDISON COMPANY

     36-0938600   
  

(an Illinois corporation)

440 South LaSalle Street

Chicago, Illinois 60605-1028

(312) 394-4321

  

000-16844

  

PECO ENERGY COMPANY

     23-0970240   
  

(a Pennsylvania corporation)

P.O. Box 8699

2301 Market Street

Philadelphia, Pennsylvania 19101-8699

(215) 841-4000

  

1-1910

  

BALTIMORE GAS AND ELECTRIC COMPANY

     52-0280210   
  

(a Maryland corporation)

2 Center Plaza

110 West Fayette Street

Baltimore, Maryland 21201-3708

(410) 234-5000

  

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.    Yes   x    No  ¨

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).    Yes  x    No  ¨

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer or a smaller reporting company. See definition of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

 

     Large Accelerated Filer    Accelerated Filer    Non-accelerated Filer    Smaller
Reporting
Company

Exelon Corporation

   x         

Exelon Generation Company, LLC

         x   

Commonwealth Edison Company

         x   

PECO Energy Company

         x   

Baltimore Gas and Electric Company

         x   

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).    Yes  ¨    No    x

The number of shares outstanding of each registrant’s common stock as of June 30, 2014 was:

 

Exelon Corporation Common Stock, without par value

   859,197,443

Exelon Generation Company, LLC

   not applicable

Commonwealth Edison Company Common Stock, $12.50 par value

   127,016,914

PECO Energy Company Common Stock, without par value

   170,478,507

Baltimore Gas and Electric Company Common Stock, without par value

   1,000

 

 

 

 


Table of Contents

TABLE OF CONTENTS

 

    Page No.  
FILING FORMAT     7   
FORWARD-LOOKING STATEMENTS     7   
WHERE TO FIND MORE INFORMATION     7   
PART I.  

FINANCIAL INFORMATION

    8   
ITEM 1.  

FINANCIAL STATEMENTS

    8   
 

Exelon Corporation

 
 

Consolidated Statements of Operations and Comprehensive Income

    9   
 

Consolidated Statements of Cash Flows

    10   
 

Consolidated Balance Sheets

    11   
 

Consolidated Statement of Changes in Shareholders’ Equity

    13   
 

Exelon Generation Company, LLC

 
 

Consolidated Statements of Operations and Comprehensive Income

    14   
 

Consolidated Statements of Cash Flows

    15   
 

Consolidated Balance Sheets

    16   
 

Consolidated Statement of Changes in Equity

    18   
 

Commonwealth Edison Company

 
 

Consolidated Statements of Operations and Comprehensive Income

    19   
 

Consolidated Statements of Cash Flows

    20   
 

Consolidated Balance Sheets

    21   
 

Consolidated Statement of Changes in Shareholders’ Equity

    23   
 

PECO Energy Company

 
 

Consolidated Statements of Operations and Comprehensive Income

    24   
 

Consolidated Statements of Cash Flows

    25   
 

Consolidated Balance Sheets

    26   
 

Consolidated Statement of Changes in Shareholders’ Equity

    28   
 

Baltimore Gas and Electric Company

 
 

Consolidated Statements of Operations and Comprehensive Income

    29   
 

Consolidated Statements of Cash Flows

    30   
 

Consolidated Balance Sheets

    31   
 

Consolidated Statement of Changes in Shareholders’ Equity

    33   
 

Combined Notes to Consolidated Financial Statements

    34   
 

1. Basis of Presentation

    34   
 

2. New Accounting Pronouncements

    35   
 

3. Variable Interest Entities

    35   
 

4. Mergers, Acquisitions, and Dispositions

    41   
 

5. Regulatory Matters

    42   
 

6. Investment in Constellation Energy Nuclear Group, LLC

    57   
 

7. Impairment of Long-Lived Assets

    61   
 

8. Fair Value of Financial Assets and Liabilities

    63   

 

1


Table of Contents
    Page No.  
 

9. Derivative Financial Instruments

    86   
 

10. Debt and Credit Agreements

    102   
 

11. Income Taxes

    107   
 

12. Nuclear Decommissioning

    110   
 

13. Retirement Benefits

    114   
 

14. Severance

    118   
 

15. Changes in Accumulated Other Comprehensive Income

    120   
 

16. Common Stock

    124   
 

17. Earnings Per Share and Equity

    125   
 

18. Commitments and Contingencies

    126   
 

19. Supplemental Financial Information

    143   
 

20. Segment Information

    149   
 

21. Subsequent Events

    154   
ITEM 2.  

MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

    155   
 

Exelon Corporation

    155   
 

General

    155   
 

Executive Overview

    156   
 

Critical Accounting Policies and Estimates

    175   
 

Results of Operations

    176   
 

Liquidity and Capital Resources

    204   
 

Contractual Obligations and Off-Balance Sheet Arrangements

    215   
ITEM 3.  

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

    216   
ITEM 4.  

CONTROLS AND PROCEDURES

    224   
PART II.  

OTHER INFORMATION

    226   
ITEM 1.  

LEGAL PROCEEDINGS

    226   
ITEM 1A.  

RISK FACTORS

    226   
ITEM 4.  

MINE SAFETY DISCLOSURES

    230   
ITEM 6.  

EXHIBITS

    230   
SIGNATURES     233   
 

Exelon Corporation

    233   
 

Exelon Generation Company, LLC

    233   
 

Commonwealth Edison Company

    234   
 

PECO Energy Company

    234   
 

Baltimore Gas and Electric Company

    234   
CERTIFICATION EXHIBITS     232   
 

Exelon Corporation

    235, 245   
 

Exelon Generation Company, LLC

    237, 247   
 

Commonwealth Edison Company

    239, 249   
 

PECO Energy Company

    241, 251   
 

Baltimore Gas and Electric Company

    243, 253   

 

2


Table of Contents

GLOSSARY OF TERMS AND ABBREVIATIONS

 

Exelon Corporation and Related Entities

Exelon

   Exelon Corporation

Generation

   Exelon Generation Company, LLC

ComEd

   Commonwealth Edison Company

PECO

   PECO Energy Company

BGE

   Baltimore Gas and Electric Company

BSC

   Exelon Business Services Company, LLC

Exelon Corporate

   Exelon in its corporate capacity as a holding company

CENG

   Constellation Energy Nuclear Group, LLC

Constellation

   Constellation Energy Group, Inc.

Antelope Valley

   Antelope Valley Solar Ranch One

Exelon Transmission Company

   Exelon Transmission Company, LLC

Exelon Wind

   Exelon Wind, LLC and Exelon Generation Acquisition Company, LLC

Ventures

   Exelon Ventures Company, LLC

AmerGen

   AmerGen Energy Company, LLC

BondCo

   RSB BondCo LLC

PEC L.P.

   PECO Energy Capital, L.P.

PECO Trust III

   PECO Capital Trust III

PECO Trust IV

   PECO Energy Capital Trust IV

PETT

   PECO Energy Transition Trust

Registrants

   Exelon, Generation, ComEd, PECO and BGE, collectively

Other Terms and Abbreviations

Note “—” of the Exelon 2013 Form 10-K

   Reference to specific Combined Note to Consolidated Financial Statements within Exelon’s 2013 Annual Report on Form 10-K

1998 restructuring settlement

   PECO’s 1998 settlement of its restructuring case mandated by the Competition Act

Act 11

   Pennsylvania Act 11 of 2012

Act 129

   Pennsylvania Act 129 of 2008

AEC

   Alternative Energy Credit that is issued for each megawatt hour of generation from a qualified alternative energy source

AEPS

   Pennsylvania Alternative Energy Portfolio Standards

AEPS Act

   Pennsylvania Alternative Energy Portfolio Standards Act of 2004, as amended

AESO

   Alberta Electric Systems Operator

AFUDC

   Allowance for Funds Used During Construction

ALJ

   Administrative Law Judge

AMI

   Advanced Metering Infrastructure

AMP

   Advanced Metering Program

ARC

   Asset Retirement Cost

ARO

   Asset Retirement Obligation

ARP

   Title IV Acid Rain Program

ARRA of 2009

   American Recovery and Reinvestment Act of 2009

Block contracts

   Forward Purchase Energy Block Contracts

CAIR

   Clean Air Interstate Rule

CAISO

   California ISO

CAMR

   Federal Clean Air Mercury Rule

CERCLA

   Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended

CFL

   Compact Fluorescent Light

 

3


Table of Contents

GLOSSARY OF TERMS AND ABBREVIATIONS

 

Other Terms and Abbreviations

Clean Air Act

   Clean Air Act of 1963, as amended

Clean Water Act

   Federal Water Pollution Control Amendments of 1972, as amended

Competition Act

   Pennsylvania Electricity Generation Customer Choice and Competition Act of 1996

CPI

   Consumer Price Index

CPUC

   California Public Utilities Commission

CSAPR

   Cross-State Air Pollution Rule

CTC

   Competitive Transition Charge

D.C. Circuit Court

   United States Court of Appeals for the District of Columbia Circuit

DOE

   United States Department of Energy

DOJ

   United States Department of Justice

DSP

   Default Service Provider

DSP Program

   Default Service Provider Program

EDF

   Electricite de France SA

EE&C

   Energy Efficiency and Conservation/Demand Response

EGS

   Electric Generation Supplier

EIMA

   Energy Infrastructure Modernization Act (Illinois Senate Bill 1652 and Illinois House Bill 3036)

EPA

   United States Environmental Protection Agency

ERCOT

   Electric Reliability Council of Texas

ERISA

   Employee Retirement Income Security Act of 1974, as amended

EROA

   Expected Rate of Return on Assets

ESPP

   Employee Stock Purchase Plan

FASB

   Financial Accounting Standards Board

FERC

   Federal Energy Regulatory Commission

FRCC

   Florida Reliability Coordinating Council

FTC

   Federal Trade Commission

GAAP

   Generally Accepted Accounting Principles in the United States

GHG

   Greenhouse Gas

GRT

   Gross Receipts Tax

GSA

   Generation Supply Adjustment

GWh

   Gigawatt hour

HAP

   Hazardous air pollutants

Health Care Reform Acts

   Patient Protection and Affordable Care Act and Health Care and Education Reconciliation Act of 2010

IBEW

   International Brotherhood of Electrical Workers

ICC

   Illinois Commerce Commission

ICE

   Intercontinental Exchange

Illinois Act

   Illinois Electric Service Customer Choice and Rate Relief Law of 1997

Illinois EPA

   Illinois Environmental Protection Agency

Illinois Settlement Legislation

   Legislation enacted in 2007 affecting electric utilities in Illinois

IPA

   Illinois Power Agency

IRC

   Internal Revenue Code

IRS

   Internal Revenue Service

ISO

   Independent System Operator

ISO-NE

   ISO New England Inc.

ISO-NY

   ISO New York

kV

   Kilovolt

kW

   Kilowatt

 

4


Table of Contents

GLOSSARY OF TERMS AND ABBREVIATIONS

 

Other Terms and Abbreviations

kWh

   Kilowatt-hour

LIBOR

   London Interbank Offered Rate

LILO

   Lease-In, Lease-Out

LLRW

   Low-Level Radioactive Waste

LTIP

   Long-Term Incentive Plan

MATS

   U.S. EPA Mercury and Air Toxics Rule

MBR

   Market Based Rates Incentive

MDE

   Maryland Department of the Environment

MDPSC

   Maryland Public Service Commission

MGP

   Manufactured Gas Plant

MISO

   Midcontinent Independent System Operator, Inc.

mmcf

   Million Cubic Feet

Moody’s

   Moody’s Investor Service

MOPR

   Minimum Offer Price Rule

MRV

   Market-Related Value

MW

   Megawatt

MWh

   Megawatt hour

NAAQS

   National Ambient Air Quality Standards

n.m.

   not meaningful

NAV

   Net Asset Value

NDT

   Nuclear Decommissioning Trust

NEIL

   Nuclear Electric Insurance Limited

NERC

   North American Electric Reliability Corporation

NGS

   Natural Gas Supplier

NJDEP

   New Jersey Department of Environmental Protection

Non-Regulatory Agreements Units

   Nuclear generating units or portions thereof whose decommissioning-related activities are not subject to contractual elimination under regulatory accounting

NOV

   Notice of Violation

NPDES

   National Pollutant Discharge Elimination System

NRC

   Nuclear Regulatory Commission

NSPS

   New Source Performance Standards

NWPA

   Nuclear Waste Policy Act of 1982

NYMEX

   New York Mercantile Exchange

OCI

   Other Comprehensive Income

OIESO

   Ontario Independent Electricity System Operator

OPEB

   Other Postretirement Employee Benefits

PA DEP

   Pennsylvania Department of Environmental Protection

PAPUC

   Pennsylvania Public Utility Commission

PGC

   Purchased Gas Cost Clause

PHI

   Pepco Holdings, Inc.

PJM

   PJM Interconnection, LLC

POLR

   Provider of Last Resort

POR

   Purchase of Receivables

PPA

   Power Purchase Agreement

Price-Anderson Act

   Price-Anderson Nuclear Industries Indemnity Act of 1957

PRP

   Potentially Responsible Parties

PSEG

   Public Service Enterprise Group Incorporated

PURTA

   Pennsylvania Public Realty Tax Act

 

5


Table of Contents

GLOSSARY OF TERMS AND ABBREVIATIONS

 

Other Terms and Abbreviations

PV

   Photovoltaic

RCRA

   Resource Conservation and Recovery Act of 1976, as amended

REC

   Renewable Energy Credit which is issued for each megawatt hour of generation from a qualified renewable energy source

Regulatory Agreement Units

   Nuclear generating units whose decommissioning-related activities are subject to contractual elimination under regulatory accounting

RES

   Retail Electric Suppliers

RFP

   Request for Proposal

Rider

   Reconcilable Surcharge Recovery Mechanism

RGGI

   Regional Greenhouse Gas Initiative

RMC

   Risk Management Committee

RPM

   PJM Reliability Pricing Model

RPS

   Renewable Energy Portfolio Standards

RTEP

   Regional Transmission Expansion Plan

RTO

   Regional Transmission Organization

S&P

   Standard & Poor’s Ratings Services

SEC

   United States Securities and Exchange Commission

Senate Bill 1

   Maryland Senate Bill 1

SERC

   SERC Reliability Corporation (formerly Southeast Electric Reliability Council)

SERP

   Supplemental Employee Retirement Plan

SGIG

   Smart Grid Investment Grant

SGIP

   Smart Grid Initiative Program

SILO

   Sale-In, Lease-Out

SMPIP

   Smart Meter Procurement and Installation Plan

SNF

   Spent Nuclear Fuel

SOS

   Standard Offer Service

SPP

   Southwest Power Pool

Tax Relief Act of 2010

   Tax Relief, Unemployment Insurance Reauthorization and Job Creation Act of 2010

Upstream

   Natural gas exploration and production activities

VIE

   Variable Interest Entity

WECC

   Western Electric Coordinating Council

 

6


Table of Contents

FILING FORMAT

This combined Form 10-Q is being filed separately by the Registrants. Information contained herein relating to any individual Registrant is filed by such Registrant on its own behalf. No Registrant makes any representation as to information relating to any other Registrant.

FORWARD-LOOKING STATEMENTS

This Report contains certain forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 that are subject to risks and uncertainties. The factors that could cause actual results to differ materially from the forward-looking statements made by Exelon Corporation, Exelon Generation Company, LLC, Commonwealth Edison Company, PECO Energy Company and Baltimore Gas and Electric Company (Registrants) include those factors discussed herein, as well as the items discussed in (1) Exelon’s 2013 Annual Report on Form 10-K in (a) ITEM 1A. Risk Factors, (b) ITEM 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations and (c) ITEM 8. Financial Statements and Supplementary Data: Note 22; (2) this Quarterly Report on Form 10-Q in (a) Part II, Other Information, ITEM 1A. Risk Factors, (b) Part 1, Financial Information, ITEM 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations and (c) Part I, Financial Information, ITEM 1. Financial Statements: Note 18; and (3) other factors discussed in filings with the SEC by the Registrants. Readers are cautioned not to place undue reliance on these forward-looking statements, which apply only as of the date of this Report. None of the Registrants undertakes any obligation to publicly release any revision to its forward-looking statements to reflect events or circumstances after the date of this Report.

WHERE TO FIND MORE INFORMATION

The public may read and copy any reports or other information that the Registrants file with the SEC at the SEC’s public reference room at 100 F Street, N.E., Washington, D.C. 20549. The public may obtain information on the operation of the Public Reference Room by calling the SEC at 1-800-SEC-0330. These documents are also available to the public from commercial document retrieval services, the website maintained by the SEC at www.sec.gov and the Registrants’ websites at www.exeloncorp.com. Information contained on the Registrants’ websites shall not be deemed incorporated into, or to be a part of, this Report.

 

7


Table of Contents

 

PART I. FINANCIAL INFORMATION

Item 1.    Financial Statements

 

 

 

 

 

8


Table of Contents

EXELON CORPORATION AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE INCOME

(Unaudited)

 

    Three Months Ended
June 30,
    Six Months Ended
June 30,
 
(In millions, except per share data)       2014           2013       2014     2013  

Operating revenues

  $ 6,024     $ 6,141     $ 13,261     $ 12,223  

Operating expenses

       

Purchased power and fuel

    2,346       2,132       6,352       4,795  

Purchased power and fuel from affiliates

    66       287       400       605  

Operating and maintenance

    2,166       1,892       4,024       3,656  

Depreciation and amortization

    590       533       1,154       1,076  

Taxes other than income

    288       271       580       548  
 

 

 

   

 

 

   

 

 

   

 

 

 

Total operating expenses

    5,456       5,115       12,510       10,680  
 

 

 

   

 

 

   

 

 

   

 

 

 

Equity in losses of unconsolidated affiliates

          (21     (20     (30

Gain on consolidation of CENG

    261             261        
 

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

    829       1,005       992       1,513  
 

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

       

Interest expense

    (228     (246     (445     (863

Interest expense to affiliates, net

    (10     (6     (20     (13

Other, net

    243       (17     348       155  
 

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

    5       (269     (117     (721
 

 

 

   

 

 

   

 

 

   

 

 

 

Income before income taxes

    834       736       875       792  

Income taxes

    277       239       224       294  
 

 

 

   

 

 

   

 

 

   

 

 

 

Net income

    557       497       651       498  

Net income attributable to non-controlling interests, preferred security dividends and redemption and preference stock dividends

    35       7       39       12  
 

 

 

   

 

 

   

 

 

   

 

 

 

Net income attributable to common shareholders

    522       490       612       486  
 

 

 

   

 

 

   

 

 

   

 

 

 

Comprehensive income, net of income taxes

       

Net income

    557       497       651       498  

Other comprehensive income (loss), net of income taxes

       

Pension and non-pension postretirement benefit plans:

       

Prior service benefit reclassified to periodic benefit cost

    (6           (6     1  

Actuarial loss reclassified to periodic cost

    38       50       72       100  

Pension and non-pension postretirement benefit plans valuation adjustment

    258       2       246       77  

Deferred compensation unit valuation adjustment

          10             10  

Unrealized loss on cash flow hedges

    (48     (65     (73     (123

Unrealized gain on equity investments

           8       11       36  

Unrealized gain (loss) on foreign currency translation

    4       (5     (1     (6

Unrealized gain (loss) on marketable securities

    1             1       (1

Reversal of CENG equity method AOCI

    (116           (116      
 

 

 

   

 

 

   

 

 

   

 

 

 

Other comprehensive income

    131             134       94  
 

 

 

   

 

 

   

 

 

   

 

 

 

Comprehensive income

  $ 688     $ 497     $ 785     $ 592  
 

 

 

   

 

 

   

 

 

   

 

 

 

Average shares of common stock outstanding:

       

Basic

    860       856       860       856  

Diluted

    864       860       863       859  
 

 

 

   

 

 

   

 

 

   

 

 

 

Earnings per average common share:

       

Basic

  $ 0.61     $ 0.57     $ 0.71     $ 0.57  

Diluted

  $ 0.60     $ 0.57     $ 0.71     $ 0.57  
 

 

 

   

 

 

   

 

 

   

 

 

 

Dividends per common share

  $ 0.31     $ 0.31     $ 0.62     $ 0.84  
 

 

 

   

 

 

   

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

9


Table of Contents

EXELON CORPORATION AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENTS OF CASH FLOWS

(Unaudited)

 

     Six Months Ended
June 30,
 
(In millions)    2014     2013  

Cash flows from operating activities

    

Net income

   $ 651     $ 498  

Adjustments to reconcile net income to net cash flows provided by operating activities:

    

Depreciation, amortization, depletion and accretion, including nuclear fuel and energy contract amortization

     1,925       1,972  

Gain on consolidation of CENG

     (268      

Deferred income taxes and amortization of investment tax credits

     133       (468

Net fair value changes related to derivatives

     751       (28

Net realized and unrealized gains on nuclear decommissioning trust fund investments

     (168     (27

Other non-cash operating activities

     567       576  

Changes in assets and liabilities:

    

Accounts receivable

     48       131  

Inventories

     (150     (18

Accounts payable, accrued expenses and other current liabilities

     (358     (583

Option premiums received (paid), net

     21       (10

Counterparty collateral posted, net

     (606     (259

Income taxes

     (16     705  

Pension and non-pension postretirement benefit contributions

     (499     (284

Other assets and liabilities

     (280     133  
  

 

 

   

 

 

 

Net cash flows provided by operating activities

     1,751       2,338  
  

 

 

   

 

 

 

Cash flows from investing activities

    

Capital expenditures

     (2,501     (2,518

Proceeds from termination of direct financing lease investment

     335        

Proceeds from nuclear decommissioning trust fund sales

     4,219       1,448  

Investment in nuclear decommissioning trust funds

     (4,238     (1,565

Acquisition of business

     (66     (3

Proceeds from sale of long-lived assets

     32       4  

Cash consolidated from CENG

     129        

Change in restricted cash

     (40     22  

Other investing activities

     (57     63  
  

 

 

   

 

 

 

Net cash flows used in investing activities

     (2,187     (2,549
  

 

 

   

 

 

 

Cash flows from financing activities

    

Changes in short-term borrowings

     293       662  

Issuance of long-term debt

     2,100       509  

Retirement of long-term debt

     (1,191     (616

Redemption of preferred securities

           (93

Distributions to non-controlling interest of consolidated VIE

     (415      

Dividends paid on common stock

     (533     (716

Proceeds from employee stock plans

     18       32  

Other financing activities

     (83     (62
  

 

 

   

 

 

 

Net cash flows provided by (used in) financing activities

     189       (284
  

 

 

   

 

 

 

Decrease in cash and cash equivalents

     (247     (495

Cash and cash equivalents at beginning of period

     1,609       1,486  
  

 

 

   

 

 

 

Cash and cash equivalents at end of period

   $ 1,362     $ 991  
  

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

10


Table of Contents

EXELON CORPORATION AND SUBSIDIARY COMPANIES

CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

(In millions)    June 30,
2014
     December 31,
2013
 
     (Unaudited)         
ASSETS      

Current assets

     

Cash and cash equivalents

   $ 1,362      $ 1,609  

Restricted cash and investments

     207        167  

Accounts receivable, net

     

Customer

     2,973        2,981  

Other

     1,005        1,175  

Mark-to-market derivative assets

     629        727  

Unamortized energy contract assets

     264        374  

Inventories, net

     

Fossil fuel

     409        276  

Materials and supplies

     1,041        829  

Deferred income taxes

     426        573  

Regulatory assets

     732        760  

Other

     775        666  
  

 

 

    

 

 

 

Total current assets

     9,823        10,137  
  

 

 

    

 

 

 

Property, plant and equipment, net

     51,747        47,330  

Deferred debits and other assets

     

Regulatory assets

     5,545        5,910  

Nuclear decommissioning trust funds

     10,437        8,071  

Investments

     839        1,165  

Investments in affiliates

     22        22  

Investment in CENG

            1,925  

Goodwill

     2,674        2,625  

Mark-to-market derivative assets

     482        607  

Unamortized energy contracts assets

     593        710  

Pledged assets for Zion Station decommissioning

     402        458  

Other

     1,092        964  
  

 

 

    

 

 

 

Total deferred debits and other assets

     22,086        22,457  
  

 

 

    

 

 

 

Total assets(a)

   $ 83,656      $ 79,924  
  

 

 

    

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

11


Table of Contents

EXELON CORPORATION AND SUBSIDIARY COMPANIES

CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

(In millions)    June 30,
2014
    December 31,
2013
 
     (Unaudited)        
LIABILITIES AND SHAREHOLDERS’ EQUITY     

Current liabilities

    

Short-term borrowings

   $ 621     $ 341  

Long-term debt due within one year

     2,047       1,509  

Accounts payable

     2,633       2,484  

Accrued expenses

     1,382       1,633  

Payables to affiliates

     38       116  

Deferred income taxes

     17       40  

Regulatory liabilities

     368       327  

Mark-to-market derivative liabilities

     228       159  

Unamortized energy contract liabilities

     239       261  

Other

     994       858  
  

 

 

   

 

 

 

Total current liabilities

     8,567       7,728  
  

 

 

   

 

 

 

Long-term debt

     18,133       17,623  

Long-term debt to financing trusts

     648       648  

Deferred credits and other liabilities

    

Deferred income taxes and unamortized investment tax credits

     13,192       12,905  

Asset retirement obligations

     7,054       5,194  

Pension obligations

     1,804       1,876  

Non-pension postretirement benefit obligations

     1,419       2,190  

Spent nuclear fuel obligation

     1,021       1,021  

Regulatory liabilities

     4,670       4,388  

Mark-to-market derivative liabilities

     262       300  

Unamortized energy contract liabilities

     260       266  

Payable for Zion Station decommissioning

     264       305  

Other

     2,133       2,540  
  

 

 

   

 

 

 

Total deferred credits and other liabilities

     32,079       30,985  
  

 

 

   

 

 

 

Total liabilities(a)

     59,427       56,984  
  

 

 

   

 

 

 

Commitments and contingencies

    

Shareholders’ equity

    

Common stock (No par value, 2,000 shares authorized, 894 shares and 857 shares outstanding at June 30, 2014 and December 31, 2013, respectively)

     16,651       16,741  

Treasury stock, at cost (35 shares at June 30, 2014 and December 31, 2013, respectively)

     (2,327     (2,327

Retained earnings

     10,435       10,358  

Accumulated other comprehensive loss, net

     (1,906     (2,040
  

 

 

   

 

 

 

Total shareholders’ equity

     22,853       22,732  

BGE preference stock not subject to mandatory redemption

     193       193  

Noncontrolling interest

     1,183       15  
  

 

 

   

 

 

 

Total equity

     24,229       22,940  
  

 

 

   

 

 

 

Total liabilities and shareholders’ equity

   $ 83,656     $ 79,924  
  

 

 

   

 

 

 

 

(a)

Exelon’s consolidated assets include $7,765 million and $1,755 million at June 30, 2014 and December 31, 2013, respectively, of certain VIEs that can only be used to settle the liabilities of the VIE. Exelon’s consolidated liabilities include $3,111 million and $658 million at June 30, 2014 and December 31, 2013, respectively, of certain VIEs for which the VIE creditors do not have recourse to Exelon. See Note 3 — Variable Interest Entities.

See the Combined Notes to Consolidated Financial Statements

 

12


Table of Contents

EXELON CORPORATION AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENT OF CHANGES IN SHAREHOLDERS’ EQUITY

(Unaudited)

 

(In millions, shares

in thousands)

  Issued
Shares
    Common
Stock
    Treasury
Stock
    Retained
Earnings
    Accumulated
Other
Comprehensive
Loss, net
    Non-controlling
Interest
    Preferred and
Preference
Stock
    Total
Equity
 

Balance, December 31, 2013

    892,034     $ 16,741     $ (2,327   $ 10,358     $ (2,040   $ 15     $ 193     $ 22,940  

Net income

                      612             33       6       651  

Long-term incentive plan activity

    1,408       32                             32  

Employee stock purchase plan issuances

    499       14                                     14  

Allocation of tax benefit from member

          (5               (5

Acquisition of non-controlling interest

                                  2             2  

Common stock dividends

                      (535                       (535

Preferred and preference stock dividends

                                        (6     (6

Fair value of financing contract payments

          (131                                   (131

Non-controlling interest established upon consolidation of CENG

                                  1,548             1,548  

Consolidated VIE dividend to non-controlling interest

                                  (415           (415

Reversal of CENG equity method AOCI, net of income taxes of $77

                            (116                 (116

Other comprehensive income, net of income taxes of $(159)

                            250                   250  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance, June 30, 2014

    893,941     $ 16,651     $ (2,327   $ 10,435     $ (1,906   $ 1,183     $ 193     $ 24,229  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

13


Table of Contents

EXELON GENERATION COMPANY, LLC AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE INCOME

(Unaudited)

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
(In millions)        2014             2013             2014             2013      

Operating revenues

        

Operating revenues

   $ 3,588     $ 3,718     $ 7,644     $ 6,859  

Operating revenues from affiliates

     201       352       535       744  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total operating revenues

     3,789       4,070       8,179       7,603  
  

 

 

   

 

 

   

 

 

   

 

 

 

Operating expenses

        

Purchased power and fuel

     1,766       1,656       4,774       3,503  

Purchased power and fuel from affiliates

     69       290       417       611  

Operating and maintenance

     1,255       1,041       2,194       2,007  

Operating and maintenance from affiliates

     158       148       305       295  

Depreciation and amortization

     254       210       466       424  

Taxes other than income

     118       101       223       194  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total operating expenses

     3,620       3,446       8,379       7,034  
  

 

 

   

 

 

   

 

 

   

 

 

 

Equity in losses of unconsolidated affiliates

     (1     (21     (20     (30

Gain on consolidation of CENG

     261             261        
  

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

     429       603       41       539  
  

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

        

Interest expense

     (74     (77     (147     (142

Interest expense to affiliates, net

     (12     (16     (25     (34

Other, net

     228       (33     318       95  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

     142       (126     146       (81
  

 

 

   

 

 

   

 

 

   

 

 

 

Income before income taxes

     571       477       187       458  

Income taxes (benefit)

     199       149       (1     148  
  

 

 

   

 

 

   

 

 

   

 

 

 

Net income

     372       328       188       310  

Net income (loss) attributable to noncontrolling interests

     32       (2     33       (1
  

 

 

   

 

 

   

 

 

   

 

 

 

Net income attributable to membership interest

     340       330       155       311  
  

 

 

   

 

 

   

 

 

   

 

 

 

Comprehensive income, net of income taxes

        

Net income

     372       328       188       310  

Other comprehensive income (loss), net of income taxes

        

Unrealized loss on cash flow hedges

     (45     (137     (70     (267

Unrealized gain on equity investments

            8       11       36  

Unrealized gain (loss) on foreign currency translation

     4       (5     (1     (6

Unrealized gain (loss) on marketable securities

     2             (1     (1

Reversal of CENG equity method AOCI

     (116           (116      
  

 

 

   

 

 

   

 

 

   

 

 

 

Other comprehensive loss

     (155     (134     (177     (238
  

 

 

   

 

 

   

 

 

   

 

 

 

Comprehensive income

   $ 217     $ 194     $ 11     $ 72  
  

 

 

   

 

 

   

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

14


Table of Contents

EXELON GENERATION COMPANY, LLC AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENTS OF CASH FLOWS

(Unaudited)

 

     Six Months Ended
June 30,
 
(In millions)    2014     2013  

Cash flows from operating activities

    

Net income

   $ 188     $ 310  

Adjustments to reconcile net income to net cash flows provided by operating activities:

    

Depreciation, amortization, depletion and accretion, including nuclear fuel and energy contract amortization

     1,242       1,358  

Gain on consolidation of CENG

     (268      

Deferred income taxes and amortization of investment tax credits

     (15     (44

Net fair value changes related to derivatives

     760       (21

Net realized and unrealized gains on nuclear decommissioning trust fund investments

     (168     (27

Other non-cash operating activities

     209       315  

Changes in assets and liabilities:

    

Accounts receivable

     63       88  

Receivables from and payables to affiliates, net

     (20     (29

Inventories

     (170     (38

Accounts payable, accrued expenses and other current liabilities

     (273     (426

Option premiums received (paid), net

     21       (10

Counterparty collateral paid, net

     (633     (303

Income taxes

     72       265  

Pension and non-pension postretirement benefit contributions

     (210     (120

Other assets and liabilities

     (56     (168
  

 

 

   

 

 

 

Net cash flows provided by operating activities

     742       1,150  
  

 

 

   

 

 

 

Cash flows from investing activities

    

Capital expenditures

     (1,103     (1,277

Proceeds from nuclear decommissioning trust fund sales

     4,219       1,448  

Investment in nuclear decommissioning trust funds

     (4,238     (1,565

Acquisition of business

     (66      

Proceeds from sale of long-lived assets

     32        

Change in restricted cash

     (17     (11

Changes in Exelon intercompany money pool

     44        

Cash consolidated from CENG

     129        

Other investing activities

     (14     27  
  

 

 

   

 

 

 

Net cash flows used in investing activities

     (1,014     (1,378
  

 

 

   

 

 

 

Cash flows from financing activities

    

Change in short-term borrowings

     46       288  

Issuance of long-term debt

     300       209  

Retirement of long-term debt

     (538     (458

Changes in Exelon intercompany money pool

     190       263  

Distribution to member

     (235     (474

Distributions to non-controlling interest of consolidated VIE

     (415      

Other financing activities

     (29     (49
  

 

 

   

 

 

 

Net cash flows used in financing activities

     (681     (221
  

 

 

   

 

 

 

Decrease in cash and cash equivalents

     (953     (449

Cash and cash equivalents at beginning of period

     1,258       671  
  

 

 

   

 

 

 

Cash and cash equivalents at end of period

   $ 305     $ 222  
  

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

15


Table of Contents

EXELON GENERATION COMPANY, LLC AND SUBSIDIARY COMPANIES

CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

(In millions)    June 30,
2014
     December 31,
2013
 
     (Unaudited)         
ASSETS      

Current assets

     

Cash and cash equivalents

   $ 305      $ 1,258  

Restricted cash and cash equivalents

     88        71  

Accounts receivable, net

     

Customer

     1,733        1,689  

Other

     441        353  

Mark-to-market derivative assets

     629        727  

Receivables from affiliates

     67        108  

Receivable from Exelon intercompany pool

            44  

Unamortized energy contract assets

     264        374  

Inventories, net

     

Fossil fuel

     328        164  

Materials and supplies

     872        671  

Deferred income taxes

     476        475  

Other

     524        505  
  

 

 

    

 

 

 

Total current assets

     5,727        6,439  
  

 

 

    

 

 

 

Property, plant and equipment, net

     23,743        20,111  

Deferred debits and other assets

     

Nuclear decommissioning trust funds

     10,437        8,071  

Investments

     432        400  

Investment in CENG

            1,925  

Goodwill, net

     49         

Mark-to-market derivative assets

     464        600  

Prepaid pension asset

     1,888        1,873  

Pledged assets for Zion Station decommissioning

     402        458  

Unamortized energy contract assets

     593        710  

Other

     687        645  
  

 

 

    

 

 

 

Total deferred debits and other assets

     14,952        14,682  
  

 

 

    

 

 

 

Total assets(a)

   $ 44,422      $ 41,232  
  

 

 

    

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

16


Table of Contents

EXELON GENERATION COMPANY, LLC AND SUBSIDIARY COMPANIES

CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

(In millions)    June 30,
2014
     December 31,
2013
 
     (Unaudited)         
LIABILITIES AND EQUITY      

Current liabilities

     

Short-term borrowings

   $ 53      $ 22  

Long-term debt due within one year

     52        561  

Long-term debt to affiliates due within one year

     563         

Accounts payable

     1,508        1,322  

Accrued expenses

     819        976  

Payables to affiliates

     108        181  

Borrowings from Exelon intercompany money pool

     190         

Deferred income taxes

     1        25  

Mark-to-market derivative liabilities

     215        142  

Unamortized energy contract liabilities

     233        249  

Other

     473        389  
  

 

 

    

 

 

 

Total current liabilities

     4,215        3,867  
  

 

 

    

 

 

 

Long-term debt

     5,944        5,645  

Long-term debt to affiliate

     948        1,523  

Deferred credits and other liabilities

     

Deferred income taxes and unamortized investment tax credits

     6,334        6,295  

Asset retirement obligations

     6,907        5,047  

Pension obligations

     125         

Non-pension postretirement benefit obligations

     941        850  

Spent nuclear fuel obligation

     1,021        1,021  

Payables to affiliates

     2,917        2,740  

Mark-to-market derivative liabilities

     135        120  

Unamortized energy contract liabilities

     260        266  

Payable for Zion Station decommissioning

     264        305  

Other

     761        811  
  

 

 

    

 

 

 

Total deferred credits and other liabilities

     19,665        17,455  
  

 

 

    

 

 

 

Total liabilities(a)

     30,772        28,490  
  

 

 

    

 

 

 

Commitments and contingencies

     

Equity

     

Member’s equity

     

Membership interest

     8,895        8,898  

Undistributed earnings

     3,533        3,613  

Accumulated other comprehensive income, net

     37        214  
  

 

 

    

 

 

 

Total member’s equity

     12,465        12,725  

Noncontrolling interest

     1,185        17  
  

 

 

    

 

 

 

Total equity

     13,650        12,742  
  

 

 

    

 

 

 

Total liabilities and equity

   $ 44,422      $ 41,232  
  

 

 

    

 

 

 

 

(a)

Generation’s consolidated assets include $7,711 million and $1,695 million at June 30, 2014 and December 31, 2013, respectively, of certain VIEs that can only be used to settle the liabilities of the VIE. Generation’s consolidated liabilities include $2,855 million and $362 million at June 30, 2014 and December 31, 2013, respectively, of certain VIEs for which the VIE creditors do not have recourse to Generation. See Note 3 — Variable Interest Entities.

See the Combined Notes to Consolidated Financial Statements

 

17


Table of Contents

EXELON GENERATION COMPANY, LLC AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

(Unaudited)

 

    Member’s Equity              
(In millions)   Membership
Interest
    Undistributed
Earnings
    Accumulated
Other
Comprehensive
Income, net
    Non-controlling
Interest
    Total
Equity
 

Balance, December 31, 2013

  $ 8,898     $ 3,613     $ 214     $ 17     $ 12,742  

Net income

          155             33       188  

Acquisition of non-controlling interest

                      2       2  

Allocation of tax benefit from member

    (3                       (3

Distribution to member

          (235                 (235

Non-controlling interest established upon consolidation of CENG

                      1,548       1,548  

Consolidated VIE dividend to non-controlling interest

                      (415     (415

Reversal of CENG equity method AOCI, net of income taxes of $77

                (116           (116

Other comprehensive loss, net of income taxes of $35

                (61           (61
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance, June 30, 2014

  $ 8,895     $ 3,533     $ 37     $ 1,185     $ 13,650  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

18


Table of Contents

COMMONWEALTH EDISON COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE INCOME

(Unaudited)

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
(In millions)        2014             2013             2014             2013      

Operating revenues

        

Operating revenues

   $ 1,128     $ 1,080     $ 2,261     $ 2,238  

Operating revenues from affiliates

                 1       1  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total operating revenues

     1,128       1,080       2,262       2,239  
  

 

 

   

 

 

   

 

 

   

 

 

 

Operating expenses

        

Purchased power

     204       127       416       364  

Purchased power from affiliate

     65       121       173       266  

Operating and maintenance

     316       319       603       611  

Operating and maintenance from affiliate

     39       40       78       76  

Depreciation and amortization

     174       170       347       337  

Taxes other than income

     72       71       149       145  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total operating expenses

     870       848       1,766       1,799  
  

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

     258       232       496       440  
  

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

        

Interest expense

     (76     (72     (153     (422

Interest expense to affiliates, net

     (4     (4     (7     (7

Other, net

     5       6       10       11  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

     (75     (70     (150     (418
  

 

 

   

 

 

   

 

 

   

 

 

 

Income before income taxes

     183       162       346       22  

Income taxes

     72       66       137       8  
  

 

 

   

 

 

   

 

 

   

 

 

 

Net income

     111       96       209       14  
  

 

 

   

 

 

   

 

 

   

 

 

 

Comprehensive income

   $ 111     $ 96     $ 209     $ 14  
  

 

 

   

 

 

   

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

19


Table of Contents

COMMONWEALTH EDISON COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENTS OF CASH FLOWS

(Unaudited)

 

       Six Months Ended  
June 30,
 
(In millions)        2014             2013      

Cash flows from operating activities

    

Net income

   $ 209     $ 14  

Adjustments to reconcile net income to net cash flows provided by operating activities:

    

Depreciation, amortization and accretion

     347       337  

Deferred income taxes and amortization of investment tax credits

     63       (226

Other non-cash operating activities

     99       39  

Changes in assets and liabilities:

    

Accounts receivable

     (83     18  

Receivables from and payables to affiliates, net

     (46     (26

Inventories

     (4     (11

Accounts payable, accrued expenses and other current liabilities

     27       20  

Income taxes

     5       240  

Pension and non-pension postretirement benefit contributions

     (236     (119

Other assets and liabilities

     48       217  
  

 

 

   

 

 

 

Net cash flows provided by operating activities

     429       503  
  

 

 

   

 

 

 

Cash flows from investing activities

    

Capital expenditures

     (747     (711

Proceeds from sales of investments

     7       4  

Purchases of investments

     (3     (3

Change in restricted cash

     (2     (3

Other investing activities

     14       20  
  

 

 

   

 

 

 

Net cash flows used in investing activities

     (731     (693
  

 

 

   

 

 

 

Cash flows from financing activities

    

Changes in short-term borrowings

     314       374  

Issuance of long-term debt

     650        

Retirement of long-term debt

     (617     (125

Contributions from parent

     112        

Dividends paid on common stock

     (153     (110

Other financing activities

     (2      
  

 

 

   

 

 

 

Net cash flows provided by financing activities

     304       139  
  

 

 

   

 

 

 

Increase (Decrease) in cash and cash equivalents

     2       (51

Cash and cash equivalents at beginning of period

     36       144  
  

 

 

   

 

 

 

Cash and cash equivalents at end of period

   $ 38     $ 93  
  

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

20


Table of Contents

COMMONWEALTH EDISON COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

(In millions)    June 30,
2014
     December 31,
2013
 
     (Unaudited)         
ASSETS      

Current assets

     

Cash and cash equivalents

   $ 38      $ 36  

Restricted cash

     4        2  

Accounts receivable, net

     

Customer

     516        451  

Other

     428        584  

Inventories, net

     112        109  

Regulatory assets

     304        329  

Other

     32        29  
  

 

 

    

 

 

 

Total current assets

     1,434        1,540  
  

 

 

    

 

 

 

Property, plant and equipment, net

     15,121        14,666  

Deferred debits and other assets

     

Regulatory assets

     850        933  

Investments

     1        5  

Investments in affiliates

     6        6  

Goodwill

     2,625        2,625  

Receivables from affiliates

     2,606        2,469  

Prepaid pension asset

     1,626        1,583  

Other

     275        291  
  

 

 

    

 

 

 

Total deferred debits and other assets

     7,989        7,912  
  

 

 

    

 

 

 

Total assets

   $ 24,544      $ 24,118  
  

 

 

    

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

21


Table of Contents

COMMONWEALTH EDISON COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

(In millions)    June 30,
2014
     December 31,
2013
 
     (Unaudited)         
LIABILITIES AND SHAREHOLDERS’ EQUITY      

Current liabilities

     

Short-term borrowings

   $ 498      $ 184  

Long-term debt due within one year

     260        617  

Accounts payable

     505        449  

Accrued expenses

     274        307  

Payables to affiliates

     37        83  

Customer deposits

     130        133  

Regulatory liabilities

     164        170  

Deferred income taxes

     117        16  

Mark-to-market derivative liability

     13        17  

Other

     82        72  
  

 

 

    

 

 

 

Total current liabilities

     2,080        2,048  
  

 

 

    

 

 

 

Long-term debt

     5,448        5,058  

Long-term debt to financing trust

     206        206  

Deferred credits and other liabilities

     

Deferred income taxes and unamortized investment tax credits

     4,080        4,116  

Asset retirement obligations

     100        99  

Non-pension postretirement benefits obligations

     284        381  

Regulatory liabilities

     3,686        3,512  

Mark-to-market derivative liability

     121        176  

Other

     841        994  
  

 

 

    

 

 

 

Total deferred credits and other liabilities

     9,112        9,278  
  

 

 

    

 

 

 

Total liabilities

     16,846        16,590  
  

 

 

    

 

 

 

Commitments and contingencies

     

Shareholders’ equity

     

Common stock

     1,588        1,588  

Other paid-in capital

     5,304        5,190  

Retained earnings

     806        750  
  

 

 

    

 

 

 

Total shareholders’ equity

     7,698        7,528  
  

 

 

    

 

 

 

Total liabilities and shareholders’ equity

   $ 24,544      $ 24,118  
  

 

 

    

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

22


Table of Contents

COMMONWEALTH EDISON COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENT OF CHANGES IN SHAREHOLDERS’ EQUITY

(Unaudited)

 

(In millions)    Common
Stock
     Other Paid-
In Capital
     Retained Deficit
Unappropriated
    Retained
Earnings
Appropriated
    Total
Shareholders’
Equity
 

Balance, December 31, 2013

   $ 1,588      $ 5,190      $ (1,639   $ 2,389     $ 7,528  

Net income

                   209             209  

Appropriation of retained earnings for future dividends

                   (209     209        

Common stock dividends

                         (153     (153

Contribution from parent

            112                    112  

Parent tax matter indemnification

            2                    2  
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Balance, June 30, 2014

   $ 1,588      $ 5,304      $ (1,639   $ 2,445     $ 7,698  
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

23


Table of Contents

PECO ENERGY COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE INCOME

(Unaudited)

 

       Three Months Ended  
June 30,
    Six Months Ended
June 30,
 
(In millions)    2014     2013     2014     2013  

Operating revenues

        

Operating revenues

   $ 656     $ 672     $ 1,648     $ 1,567  

Operating revenues from affiliates

                 1        
  

 

 

   

 

 

   

 

 

   

 

 

 

Total operating revenues

     656       672       1,649       1,567  
  

 

 

   

 

 

   

 

 

   

 

 

 

Operating expenses

        

Purchased power and fuel

     193       161       570       426  

Purchased power from affiliate

     48       97       135       238  

Operating and maintenance

     160       155       416       319  

Operating and maintenance from affiliates

     24       26       48       50  

Depreciation and amortization

     59       56       117       113  

Taxes other than income

     38       39       80       80  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total operating expenses

     522       534       1,366       1,226  
  

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

     134       138       283       341  
  

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

        

Interest expense

     (25     (25     (50     (51

Interest expense to affiliates, net

     (3     (3     (6     (6

Other, net

     1             3       3  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

     (27     (28     (53     (54
  

 

 

   

 

 

   

 

 

   

 

 

 

Income before income taxes

     107       110       230       287  

Income taxes

     23       32       57       87  
  

 

 

   

 

 

   

 

 

   

 

 

 

Net income

     84       78       173       200  

Preferred security dividends and redemption

           6             7  
  

 

 

   

 

 

   

 

 

   

 

 

 

Net income attributable to common shareholder

     84       72       173       193  
  

 

 

   

 

 

   

 

 

   

 

 

 

Comprehensive income

   $ 84     $ 78     $ 173     $ 200  
  

 

 

   

 

 

   

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

24


Table of Contents

PECO ENERGY COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENTS OF CASH FLOWS

(Unaudited)

 

     Six Months Ended
June 30,
 
(In millions)        2014             2013      

Cash flows from operating activities

    

Net income

   $ 173     $ 200  

Adjustments to reconcile net income to net cash flows provided by operating activities:

    

Depreciation, amortization and accretion

     117       113  

Deferred income taxes and amortization of investment tax credits

     6       25  

Other non-cash operating activities

     50       50  

Changes in assets and liabilities:

    

Accounts receivable

     34       55  

Receivables from and payables to affiliates, net

     (21     (18

Inventories

     22       27  

Accounts payable, accrued expenses and other current liabilities

     30       35  

Income taxes

     54       39  

Pension and non-pension postretirement benefit contributions

     (11     (10

Other assets and liabilities

     (114     (49
  

 

 

   

 

 

 

Net cash flows provided by operating activities

     340       467  
  

 

 

   

 

 

 

Cash flows from investing activities

    

Capital expenditures

     (308     (254

Changes in intercompany money pool

           (263

Change in restricted cash

           (1

Other investing activities

     6       4  
  

 

 

   

 

 

 

Net cash flows used in investing activities

     (302     (514
  

 

 

   

 

 

 

Cash flows from financing activities

    

Dividends paid on common stock

     (160     (166

Dividends paid on preferred securities

           (1

Redemption of preferred securities

           (93

Other financing activities

     (2     1  
  

 

 

   

 

 

 

Net cash flows used in financing activities

     (162     (259
  

 

 

   

 

 

 

Decrease in cash and cash equivalents

     (124     (306

Cash and cash equivalents at beginning of period

     217       362  
  

 

 

   

 

 

 

Cash and cash equivalents at end of period

   $ 93     $ 56  
  

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

25


Table of Contents

PECO ENERGY COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

(In millions)    June 30,
2014
     December 31,
2013
 
     (Unaudited)         
ASSETS      

Current assets

     

Cash and cash equivalents

   $ 93      $ 217  

Restricted cash and cash equivalents

     2        2  

Accounts receivable, net

     

Customer

     304        360  

Other

     107        107  

Inventories, net

     

Fossil fuel

     34        60  

Materials and supplies

     25        21  

Deferred income taxes

     80        83  

Prepaid utility taxes

     78        3  

Regulatory assets

     29        17  

Other

     51        36  
  

 

 

    

 

 

 

Total current assets

     803        906  
  

 

 

    

 

 

 

Property, plant and equipment, net

     6,545        6,384  

Deferred debits and other assets

     

Regulatory assets

     1,495        1,448  

Investments

     23        23  

Investments in affiliates

     8        8  

Receivable from affiliates

     490        447  

Prepaid pension asset

     359        363  

Other

     38        38  
  

 

 

    

 

 

 

Total deferred debits and other assets

     2,413        2,327  
  

 

 

    

 

 

 

Total assets

   $ 9,761      $ 9,617  
  

 

 

    

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

26


Table of Contents

PECO ENERGY COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

(In millions)    June 30,
2014
     December 31,
2013
 
     (Unaudited)         
LIABILITIES AND SHAREHOLDERS’ EQUITY      

Current liabilities

     

Long-term debt due within one year

   $ 250      $ 250  

Accounts payable

     298        285  

Accrued expenses

     167        106  

Payables to affiliates

     37        58  

Customer deposits

     50        49  

Regulatory liabilities

     88        106  

Other

     32        37  
  

 

 

    

 

 

 

Total current liabilities

     922        891  
  

 

 

    

 

 

 

Long-term debt

     1,947        1,947  

Long-term debt to financing trusts

     184        184  

Deferred credits and other liabilities

     

Deferred income taxes and unamortized investment tax credits

     2,545        2,487  

Asset retirement obligations

     30        29  

Non-pension postretirement benefits obligations

     292        286  

Regulatory liabilities

     671        629  

Other

     92        99  
  

 

 

    

 

 

 

Total deferred credits and other liabilities

     3,630        3,530  
  

 

 

    

 

 

 

Total liabilities

     6,683        6,552  
  

 

 

    

 

 

 

Commitments and contingencies

     

Shareholder’s equity

     

Common stock

     2,415        2,415  

Retained earnings

     662        649  

Accumulated other comprehensive income, net

     1        1  
  

 

 

    

 

 

 

Total shareholder’s equity

     3,078        3,065  
  

 

 

    

 

 

 

Total liabilities and shareholders’ equity

   $ 9,761      $ 9,617  
  

 

 

    

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

27


Table of Contents

PECO ENERGY COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENT OF CHANGES IN SHAREHOLDER’S EQUITY

(Unaudited)

 

(In millions)    Common
Stock
     Retained
Earnings
    Accumulated
Other
Comprehensive
Income, net
     Total
Shareholder’s
Equity
 

Balance, December 31, 2013

   $ 2,415      $ 649     $ 1      $ 3,065  

Net income

            173              173  

Common stock dividends

            (160            (160
  

 

 

    

 

 

   

 

 

    

 

 

 

Balance, June 30, 2014

   $ 2,415      $ 662     $ 1      $ 3,078  
  

 

 

    

 

 

   

 

 

    

 

 

 

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

28


Table of Contents

BALTIMORE GAS AND ELECTRIC COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE INCOME

(Unaudited)

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
(In millions)        2014             2013             2014             2013      

Operating revenues

        

Operating revenues

   $ 651     $ 649     $ 1,689     $ 1,525  

Operating revenues from affiliates

     2       4       18       8  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total operating revenues

     653       653       1,707       1,533  
  

 

 

   

 

 

   

 

 

   

 

 

 

Operating expenses

        

Purchased power and fuel

     183       189       592       501  

Purchased power from affiliate

     85       99       205       212  

Operating and maintenance

     163       139       326       266  

Operating and maintenance from affiliates

     25       21       50       37  

Depreciation and amortization

     89       82       197       175  

Taxes other than income

     53       54       113       109  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total operating expenses

     598       584       1,483       1,300  
  

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

     55       69       224       233  
  

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

        

Interest expense

     (23     (28     (47     (58

Interest expense to affiliates, net

     (4     (4     (8     (8

Other, net

     5       4       9       9  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

     (22     (28     (46     (57
  

 

 

   

 

 

   

 

 

   

 

 

 

Income before income taxes

     33       41       178       176  

Income taxes

     14       16       72       70  
  

 

 

   

 

 

   

 

 

   

 

 

 

Net income

     19       25       106       106  

Preference stock dividends

     3       3       6       6  
  

 

 

   

 

 

   

 

 

   

 

 

 

Net income attributable to common shareholder

     16       22       100       100  
  

 

 

   

 

 

   

 

 

   

 

 

 

Comprehensive income

   $ 19     $ 25     $ 106     $ 106  
  

 

 

   

 

 

   

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

29


Table of Contents

BALTIMORE GAS AND ELECTRIC COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENTS OF CASH FLOWS

(Unaudited)

 

     Six Months Ended
June  30,
 
(In millions)        2014             2013      

Cash flows from operating activities

    

Net income

   $ 106     $ 106  

Adjustments to reconcile net income to net cash flows provided by operating activities:

    

Depreciation, amortization and accretion

     197       175  

Deferred income taxes and amortization of investment tax credits

     47       98  

Other non-cash operating activities

     89       61  

Changes in assets and liabilities:

    

Accounts receivable

     44       (58

Receivables from and payables to affiliates, net

     (12     (11

Inventories

           4  

Accounts payable, accrued expenses and other current liabilities

     (74     (28

Counterparty collateral received, net

     27        

Income taxes

     (14     (33

Pension and non-pension postretirement benefit contributions

     (8     (11

Other assets and liabilities

     8       63  
  

 

 

   

 

 

 

Net cash flows provided by operating activities

     410       366  
  

 

 

   

 

 

 

Cash flows from investing activities

    

Capital expenditures

     (313     (264

Change in restricted cash

     (30     3  

Other investing activities

     11       4  
  

 

 

   

 

 

 

Net cash flows used in investing activities

     (332     (257
  

 

 

   

 

 

 

Cash flows from financing activities

    

Changes in short-term borrowings

     (65      

Issuance of long-term debt

           300  

Retirement of long-term debt

     (35     (33

Dividends paid on preference stock

     (6     (6

Other financing activities

     12       (2
  

 

 

   

 

 

 

Net cash flows (used in) provided by financing activities

     (94     259  
  

 

 

   

 

 

 

Increase (decrease) in cash and cash equivalents

     (16     368  

Cash and cash equivalents at beginning of period

     31       89  
  

 

 

   

 

 

 

Cash and cash equivalents at end of period

   $ 15     $ 457  
  

 

 

   

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

30


Table of Contents

BALTIMORE GAS AND ELECTRIC COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

(In millions)    June 30,
2014
     December 31,
2013
 
     (Unaudited)         
ASSETS      

Current assets

     

Cash and cash equivalents

   $ 15      $ 31  

Restricted cash and cash equivalents

     58        28  

Accounts receivable, net

     

Customer

     419        480  

Other

     102        114  

Income taxes receivable

     44        30  

Inventories, net

     

Gas held in storage

     48        53  

Materials and supplies

     33        28  

Deferred income taxes

     11        2  

Prepaid utility taxes

            57  

Regulatory assets

     178        181  

Other

     8        7  
  

 

 

    

 

 

 

Total current assets

     916        1,011  
  

 

 

    

 

 

 

Property, plant and equipment, net

     6,030        5,864  

Deferred debits and other assets

     

Regulatory assets

     499        524  

Investments

     4        5  

Investments in affiliates

     8        8  

Prepaid pension asset

     396        423  

Other

     24        26  
  

 

 

    

 

 

 

Total deferred debits and other assets

     931        986  
  

 

 

    

 

 

 

Total assets(a)

   $ 7,877      $ 7,861  
  

 

 

    

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

31


Table of Contents

BALTIMORE GAS AND ELECTRIC COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED BALANCE SHEETS

(Unaudited)

 

(In millions)    June 30,
2014
     December 31,
2013
 
     (Unaudited)         
LIABILITIES AND SHAREHOLDERS’ EQUITY      

Current liabilities

     

Short-term borrowings

   $ 70      $ 135  

Long-term debt due within one year

     72        70  

Accounts payable

     205        270  

Accrued expenses

     95        111  

Deferred income taxes

     39        27  

Payables to affiliates

     55        55  

Customer deposits

     87        76  

Regulatory liabilities

     63        48  

Other

     61        35  
  

 

 

    

 

 

 

Total current liabilities

     747        827  
  

 

 

    

 

 

 

Long-term debt

     1,904        1,941  

Long-term debt to financing trust

     258        258  

Deferred credits and other liabilities

     

Deferred income taxes and unamortized investment tax credits

     1,814        1,773  

Asset retirement obligations

     17        19  

Non-pension postretirement benefits obligations

     215        217  

Regulatory liabilities

     202        204  

Other

     65        67  
  

 

 

    

 

 

 

Total deferred credits and other liabilities

     2,313        2,280  
  

 

 

    

 

 

 

Total liabilities(a)

     5,222        5,306  
  

 

 

    

 

 

 

Commitments and contingencies

     

Shareholders’ equity

     

Common stock

     1,360        1,360  

Retained earnings

     1,105        1,005  
  

 

 

    

 

 

 

Total shareholder’s equity

     2,465        2,365  
  

 

 

    

 

 

 

Preference stock not subject to mandatory redemption

     190        190  
  

 

 

    

 

 

 

Total equity

     2,655        2,555  
  

 

 

    

 

 

 

Total liabilities and shareholders’ equity

   $ 7,877      $ 7,861  
  

 

 

    

 

 

 

 

(a)

BGE’s consolidated assets include $31 million and $31 million at June 30, 2014 and December 31, 2013, respectively, of BGE’s consolidated VIE that can only be used to settle the liabilities of the VIE. BGE’s consolidated liabilities include $234 million and $269 million at June 30, 2014 and December 31, 2013, respectively, of BGE’s consolidated VIE for which the VIE creditors do not have recourse to BGE. See Note 3 — Variable Interest Entities.

See the Combined Notes to Consolidated Financial Statements

 

32


Table of Contents

BALTIMORE GAS AND ELECTRIC COMPANY AND SUBSIDIARY COMPANIES

CONSOLIDATED STATEMENT OF CHANGES IN SHAREHOLDERS’ EQUITY

(Unaudited)

 

(In millions)    Common
Stock
     Retained
Earnings
    Total
Shareholders’
Equity
    Preference stock
not subject to
mandatory
redemption
     Total Equity  

Balance, December 31, 2013

   $ 1,360      $ 1,005     $ 2,365     $ 190      $ 2,555  

Net income

            106       106              106  

Preference stock dividends

            (6     (6            (6
  

 

 

    

 

 

   

 

 

   

 

 

    

 

 

 

Balance, June 30, 2014

   $ 1,360      $ 1,105     $ 2,465     $ 190      $ 2,655  
  

 

 

    

 

 

   

 

 

   

 

 

    

 

 

 

See the Combined Notes to Consolidated Financial Statements

 

33


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(Dollars in millions, except per share data, unless otherwise noted)

1.    Basis of Presentation (Exelon, Generation, ComEd, PECO and BGE)

Exelon is a utility services holding company engaged through its principal subsidiaries in the energy generation and energy distribution businesses. On April 1, 2014, Generation assumed the operating licenses and corresponding operational control of CENG’s nuclear fleet. As a result, Exelon and Generation consolidated CENG’s financial position and results of operations into their businesses. Prior to April 1, 2014, Exelon and Generation accounted for CENG as an equity method investment. Refer to Note 6 — Investment in CENG for further information regarding the integration transaction.

The energy generation business includes:

 

   

Generation:    Physical delivery and marketing of owned and contracted electric generation capacity and provision of renewable and other energy-related products and services, and natural gas exploration and production activities. Generation has six reportable segments consisting of the Mid-Atlantic, Midwest, New England, New York, ERCOT and Other regions.

The energy delivery businesses include:

 

   

ComEd:    Purchase and regulated retail sale of electricity and the provision of distribution and transmission services in northern Illinois, including the City of Chicago.

 

   

PECO:    Purchase and regulated retail sale of electricity and the provision of distribution and transmission services in southeastern Pennsylvania, including the City of Philadelphia, and the purchase and regulated retail sale of natural gas and the provision of distribution services in the Pennsylvania counties surrounding the City of Philadelphia.

 

   

BGE:    Purchase and regulated retail sale of electricity and the provision of distribution and transmission services in central Maryland, including the City of Baltimore, and the purchase and regulated retail sale of natural gas and the provision of distribution services in central Maryland, including the City of Baltimore.

Each of the Registrant’s Consolidated Financial Statements includes the accounts of its subsidiaries. All intercompany transactions have been eliminated.

Certain prior year amounts in the Exelon, Generation and BGE Consolidated Statement of Operations have been reclassified between line items for comparative purposes and correction of prior period classification errors identified in 2013. The reclassifications did not affect any of the Registrants’ net income or cash flows from operating activities. Exelon corrected the presentation of Purchased power and fuel from affiliates of $287 million and $605 million on its Statements of Operations and Comprehensive Income for the three and six months ended June 30, 2013, respectively. Generation corrected the presentation of Purchased power and fuel from affiliates of $290 million and $611 million on its Statements of Operations and Comprehensive Income for the three and six months ended June 30, 2013, respectively. Generation also corrected the presentation of Interest expense to affiliates, net of $16 million and $34 million on its Statement of Operations and Comprehensive Income for the three and six months ended June 30, 2013, respectively. BGE corrected its presentation of Interest expense to affiliates, net of $4 million and $8 million on the Statement of Operations and Comprehensive Income for the three and six months ended June 30, 2013, respectively.

The accompanying consolidated financial statements as of June 30, 2014 and 2013 and for the six months then ended are unaudited but, in the opinion of the management of each Registrant include all adjustments that are considered necessary for a fair statement of the Registrants’ respective financial statements in accordance with GAAP. All adjustments are of a normal, recurring nature, except as otherwise disclosed. The December 31, 2013 Consolidated Balance Sheets were obtained from audited financial statements. Financial results for interim

 

34


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

periods are not necessarily indicative of results that may be expected for any other interim period or for the fiscal year ending December 31, 2014. These Combined Notes to Consolidated Financial Statements have been prepared pursuant to the rules and regulations of the SEC for Quarterly Reports on Form 10-Q. Certain information and note disclosures normally included in financial statements prepared in accordance with GAAP have been condensed or omitted pursuant to such rules and regulations. These notes should be read in conjunction with the Notes to Combined Consolidated Financial Statements of all Registrants included in ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA of their respective 2013 Form 10-K Reports.

2.    New Accounting Pronouncements (Exelon, Generation, ComEd, PECO and BGE)

The following recently issued accounting standards were adopted by or are effective for the Registrants during 2014.

Presentation of Unrecognized Tax Benefits When Net Operating Loss Carryforwards, Similar Tax Losses or Tax Credit Carryforwards Exist

In July 2013, the FASB issued authoritative guidance requiring entities to present unrecognized tax benefits as a reduction to deferred tax assets for losses or other tax carryforwards that would be available to offset the uncertain tax positions at the reporting date. This guidance was effective for the Registrants for periods beginning after December 15, 2013 and was required to be applied prospectively. The adoption of this standard had an immaterial effect on the presentation of deferred tax assets at Exelon and Generation and no effect on ComEd, PECO and BGE. There was no effect on the Registrants’ results of operations or cash flows.

The following recently issued accounting standards are not yet required to be reflected in the combined financial statements of the Registrants.

Revenue from Contracts with Customers

In May 2014, the FASB issued authoritative guidance that changes the criteria for recognizing revenue from a contract with a customer. The new guidance replaces existing guidance on revenue recognition, including most industry specific guidance, with a five step model for recognizing and measuring revenue from contracts with customers. The objective of the new standard is to provide a single, comprehensive revenue recognition model for all contracts with customers to improve comparability within industries, across industries and across capital markets. The underlying principle is that an entity will recognize revenue to depict the transfer of goods or services to customers at an amount that the entity expects to be entitled to in exchange for those goods or services. The guidance also requires a number of disclosures regarding the nature, amount, timing and uncertainty of revenue and the related cash flows. The guidance is effective for the Registrants for the first interim period within annual reporting periods beginning on or after December 15, 2016. Early adoption is not permitted. The guidance can be applied retrospectively to each prior reporting period presented (full retrospective method) or retrospectively with a cumulative effect adjustment to retained earnings for initial application of the guidance at the date of initial adoption (modified retrospective method). The Registrants are currently assessing the impacts this guidance may have on their financial positions, results of operations, cash flows and disclosures as well as the transition method that they will use to adopt the guidance.

3.     Variable Interest Entities (Exelon, Generation, ComEd, PECO and BGE)

Under the applicable authoritative guidance, a VIE is a legal entity that possesses any of the following characteristics: an insufficient amount of equity at risk to finance its activities, equity owners who do not have

 

35


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

the power to direct the significant activities of the entity (or have voting rights that are disproportionate to their ownership interest), or equity owners who do not have the obligation to absorb expected losses or the right to receive the expected residual returns of the entity. Companies are required to consolidate a VIE if they are its primary beneficiary, which is the enterprise that has the power to direct the activities that most significantly affect the entity’s economic performance.

At June 30, 2014 and December 31, 2013, Exelon, Generation, and BGE collectively consolidated six and four VIEs or VIE groups, respectively, for which the applicable Registrant was the primary beneficiary (see detail by Registrant below). As of June 30, 2014 and December 31, 2013, the Registrants had significant interests in nine and eight other VIEs, respectively, for which the Registrants do not have the power to direct the entities’ activities and, accordingly, were not the primary beneficiary.

Through March 31, 2014, CENG was operated as a joint venture with EDFI and was governed by a board of ten directors, five of which were appointed by Generation and five by EDF. CENG was designed to operate under joint and equal control of Generation and EDFI; therefore, CENG was not subject to VIE guidance. Accordingly, Generation’s 50.01% interest in CENG was accounted for as an equity method investment. On April 1, 2014, Generation, CENG, and subsidiaries of CENG executed the NOSA pursuant to which Generation now conducts all activities associated with the operations of the CENG fleet and provides corporate and administrative services to CENG for the remaining life of the CENG nuclear plants as if they were a part of the Generation nuclear fleet, subject to the CENG member rights of EDFI. As a result of executing the NOSA, CENG now qualifies as a VIE due to the disproportionate relationship between Generation’s 50.01% equity ownership interest and its role in conducting the operational activities of CENG conveyed through the NOSA. Further, since Generation is conducting the operational activities of CENG, Generation qualifies as the primary beneficiary of CENG and, therefore, is required to consolidate the financial position and results of operations of CENG. On April 1, 2014, Exelon and Generation derecognized Generation’s equity method investment in CENG and reflected all assets, liabilities, and the EDFI non-controlling interest in CENG at fair value on the consolidated balance sheets of Exelon and Generation, resulting in the recognition of a $261 million gain in their respective consolidated statements of operations and comprehensive income for the three and six months ended June 30, 2014. For additional information on this transaction refer to Note 6 — Investment in Constellation Energy Nuclear Group, LLC.

In March 2014, Generation began consolidating retail power VIEs for which Generation is the primary beneficiary as a result of energy supply contracts that give Generation the power to direct the activities that most significantly affect the economic performance of the entities. Generation does not have an equity ownership interest in these entities. These entities are included in Generation’s consolidated financial statements and the consolidation of the VIEs did not have a material impact on Generation’s financial results or financial condition.

Consolidated Variable Interest Entities

Exelon, Generation and BGE’s consolidated VIEs consist of:

 

   

BondCo, a special purpose bankruptcy remote limited liability company formed by BGE to acquire, hold, and issue and service bonds secured by rate stabilization property,

 

   

a retail gas group formed by Generation to enter into a collateralized gas supply agreement with a third-party gas supplier,

 

   

a group of solar project limited liability companies formed by Generation to build, own and operate solar power facilities,

 

   

several wind project companies designed by Generation to develop, construct and operate wind generation facilities,

 

36


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

   

certain retail power companies for which Generation is the sole supplier of energy, and

 

   

Constellation Energy Nuclear Group, Inc. (CENG).

As of June 30, 2014 and December 31, 2013, ComEd and PECO do not have any material consolidated VIEs.

As of June 30, 2014 and December 31, 2013, Exelon, Generation, and BGE provided the following support to the consolidated VIEs:

 

   

In the case of BondCo, BGE is required to remit all payments it receives from all residential customers through non-bypassable, rate stabilization charges to BondCo. During the three and six months ended June 30, 2014, BGE remitted $21 million and $42 million, respectively, to BondCo. During the three and six months ended June 30, 2013, BGE remitted $17 million and $39 million, respectively, to BondCo.

 

   

Generation provides operating and capital funding to the solar entities for ongoing construction, operations and maintenance of the solar power facilities and provides limited recourse related to the Antelope Valley project.

 

   

Generation and Exelon, where indicated, provide the following support to CENG (See Note 25 — Related Party Transactions of the Exelon 2013 Form 10-K and Note 6 — Investment in Constellation Energy Nuclear Group, LLC for additional information regarding Generation and Exelon’s transactions with CENG).

 

   

under the Nuclear Operating Services Agreement (NOSA), Generation conducts all activities related to the operation of the CENG nuclear generation fleet owned by CENG subsidiaries (the CENG fleet) and provides corporate and administrative services for the remaining life of the CENG nuclear plants as if they were a part of the Generation nuclear fleet, subject to the CENG member rights of EDF Inc. (EDFI) (a subsidiary of EDF),

 

   

under the Power Services Agency Agreement (PSAA), Generation provides scheduling, asset management, and billing services to CENG fleet for the remaining life of the CENG nuclear plants,

 

   

under power purchase agreements with CENG, Generation will purchase 85% of the available output generated by CENG nuclear plants for the remainder of 2014 and 50.01% from 2015 through the end of the life of each respective plant under power purchase agreements with CENG,

 

   

Generation provided a $400 million loan to CENG,

 

   

Generation executed an Indemnity Agreement pursuant to which Generation agreed to indemnify EDF and its affiliates against third-party claims that may arise from any future nuclear incident (as defined in the Price Anderson Act) in connection with the CENG nuclear plants or their operations. Exelon guarantees Generation’s obligations under this indemnity. (See Note 18 — Commitments and Contingencies for more details),

 

   

in connection with CENG’s severance obligations, Generation has agreed to reimburse CENG for a total of approximately $6 million of the severance benefits paid or to be paid in 2013 through 2016. As of June 30, 2014, the remaining obligation is approximately $4 million (See Integration-Related Severance under Note 14 — Severance for additional details),

 

   

Generation and EDFI share in the $637 million of contingent payment obligations for the payment of contingent retrospective premium adjustments for the nuclear liability insurance (See Note 18 — Commitments and Contingencies for more details),

 

37


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

   

Generation provides a $7 million guarantee associated with hazardous waste management facilities and underground storage tanks. In addition, EDFI executed a reimbursement agreement that provides reimbursement to Exelon for 49.99% of any amounts paid by Generation under this guarantee,

 

   

Generation and EDFI are the members-insured with Nuclear Electric Insurance Limited and have assigned the loss benefits under the insurance and the NEIL premium costs to CENG and guarantee the obligations of CENG under these insurance programs in proportion to their respective member interests (See Note 18 — Commitments and Contingencies for more details), and

 

   

Exelon has executed an agreement to provide up to $245 million to support the operations of CENG as well as a $165 million guarantee of CENG’s cash pooling agreement with its subsidiaries.

 

   

Generation provides approximately $4 million in credit support for the retail power companies, and

 

   

Generation provides a $75 million parental guarantee to the third-party gas supplier in support of its retail gas group.

For each of the consolidated VIEs, except as otherwise noted:

 

   

The assets of the VIEs are restricted and can only be used to settle obligations of the respective VIE;

 

   

Exelon, Generation and BGE did not provide any additional material financial support to the VIEs;

 

   

Exelon, Generation and BGE did not have any material contractual commitments or obligations to provide financial support to the VIEs; and

 

   

the creditors of the VIEs did not have recourse to Exelon’s, Generation’s or BGE’s general credit.

The carrying amounts and classification of the consolidated VIEs’ assets and liabilities included in Exelon’s, Generation’s, and BGE’s consolidated financial statements at June 30, 2014 and December 31, 2013 are as follows:

 

     June 30, 2014      December 31, 2013  
     Exelon(a)(b)      Generation(b)      BGE      Exelon(a)      Generation      BGE  

Current assets

   $ 991      $ 956      $ 28      $ 484      $ 446      $ 28  

Noncurrent assets

     7,426        7,407        3        1,905        1,884        3  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total assets

   $ 8,417      $ 8,363      $ 31      $ 2,389      $ 2,330      $ 31  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Current liabilities

   $ 815      $ 732      $ 76      $ 566      $ 481      $ 74  

Noncurrent liabilities

     2,911        2,738        158        774        562        195  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total liabilities

   $ 3,726      $ 3,470      $ 234      $ 1,340      $ 1,043      $ 269  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

(a)

Includes certain purchase accounting adjustments not pushed down to the BGE standalone entity.

(b)

Includes total assets of $5.8 billion and total liabilities of $2.4 billion due to the consolidation of CENG begining April 1, 2014. See Note 6 — Investment in CENG for additional information.

 

38


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Included within the balances above are assets and liabilities of certain consolidated VIEs for which the assets can only be used to settle obligations of those VIEs, and liabilities that creditors, or beneficiaries, do not have recourse to the general credit of the Registrants. As of June 30, 2014 and December 31, 2013, these assets and liabilities primarily consisted of the following:

 

     June 30, 2014      December 31, 2013  
     Exelon      Generation      BGE      Exelon      Generation      BGE  

Cash and cash equivalents

   $ 126      $ 126      $      $ 62      $ 62      $   

Restricted cash

     75        47        28        80        52        28  

Accounts receivable, net

                 

Customer

     296        296                260        260          

Other

     133        133                                  

Inventory

                 

Fossil fuel

     103        103                2        2          

Materials and supplies

     165        165                                  

Other current assets

     61        54                53        42          
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total current assets

     959        924        28        457        418        28  

Property, plant and equipment, net

     4,603        4,603                1,171        1,171          

Nuclear decommissioning trust funds

     2,030        2,030                                  

Goodwill

     48        48                                  

Other noncurrent assets

     125        106        3        127        106        3  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total noncurrent assets

     6,806        6,787        3        1,298        1,277        3  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total assets

   $ 7,765      $ 7,711      $ 31      $ 1,755      $ 1,695      $ 31  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Short-term borrowings

   $ 40      $ 40      $       $       $       $   

Long-term debt due within one year

     84        5        72        85        5        70  

Accounts payable

     243        243                170        170          

Accrued expenses

     89        86        4        26        22        4  

Mark-to-market derivative liabilities

     24        24                29        29          

Unamortized energy contracts

     12        12                5        5          

Other current liabilities

     165        165                5        5          
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total current liabilities

     657        575        76        320        236        74  

Long-term debt

     258        84        158        298        86        195  

Asset retirement obligations

     1,731        1,731                                  

Pension obligation(a)

     133        133                                  

Non-pension postretirement benefit

     136        136                                  

Unamortized energy contracts

     18        18                12        12          

Other noncurrent liabilities

     178        178                28        28          
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Noncurrent liabilities

     2,454        2,280        158        338        126        195  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total liabilities

   $ 3,111      $ 2,855      $ 234      $ 658      $ 362      $ 269  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

(a)

Includes the CNEG retail gas’ pension obligation, which is presented as a net asset balance within the Prepaid Pension asset line item on Generation’s balance sheet. See Note 13 — Retirement Benefits for additional details.

Unconsolidated Variable Interest Entities

Exelon’s and Generation’s variable interests in unconsolidated VIEs generally include equity investments and energy purchase and sale contracts. For the equity investments, the carrying amount of the investments is reflected on Exelon’s and Generation’s Consolidated Balance Sheets in Investments in affiliates, Investments,

 

39


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

and Other Assets. For the energy purchase and sale contracts and the fuel purchase commitments (commercial agreements), the carrying amount of assets and liabilities in Exelon’s and Generation’s Consolidated Balance Sheets that relate to their involvement with the VIEs are predominately related to working capital accounts and generally represent the amounts owed by, or owed to, Exelon and Generation for the deliveries associated with the current billing cycles under the commercial agreements. Further, Exelon and Generation have not provided material debt or equity support, liquidity arrangements or performance guarantees associated with these commercial agreements.

The Registrants’ unconsolidated VIEs consist of:

 

   

Energy purchase and sale agreements with VIEs for which Generation has concluded that consolidation is not required.

 

   

ZionSolutions, LLC asset sale agreement with EnergySolutions, Inc. and certain subsidiaries in which Generation has a variable interest but has concluded that consolidation is not required.

 

   

Equity investments in energy development projects and energy generating facilities for which Generation has concluded that consolidation is not required.

As of June 30, 2014 and December 31, 2013, Exelon and Generation had significant unconsolidated variable interests in nine and eight VIEs, respectively, for which Exelon or Generation, as applicable, was not the primary beneficiary; including certain equity method investments and certain commercial agreements. The increase in the number of unconsolidated VIEs is due to an investment in another unconsolidated VIE and the execution of an energy purchase and sale agreement with an unconsolidated VIE, offset by the sale of Generation’s ownership interest in one unconsolidated VIE. The following tables present summary information about Exelon and Generation’s significant unconsolidated VIE entities:

 

June 30, 2014

   Commercial
Agreement

VIEs
     Equity
Investment
VIEs
     Total  

Total assets(a)

   $ 119      $ 325      $ 444  

Total liabilities(a)

     2        120        122  

Exelon’s ownership interest in VIE(a)

            63        63  

Other ownership interests in VIE(a)

     117        142        259  

Registrants’ maximum exposure to loss:

        

Carrying amount of equity method investments

            73        73  

Contract intangible asset

     9               9  

Debt and payment guarantees

            3        3  

Net assets pledged for Zion Station decommissioning(b)

     45               45  

December 31, 2013

   Commercial
Agreement
VIEs
     Equity
Investment
VIEs
     Total  

Total assets(a)

   $ 128      $ 332      $ 460  

Total liabilities(a)

     17        123        140  

Exelon’s ownership interest in VIE(a)

            86        86  

Other ownership interests in VIE(a)

     111        123        234  

Registrants’ maximum exposure to loss:

        

Carrying amount of equity method investments

     7        67        74  

Contract intangible asset

     9               9  

Debt and payment guarantees

            5        5  

Net assets pledged for Zion Station decommissioning(b)

     44               44  

 

(a)

These items represent amounts on the unconsolidated VIE balance sheets, not on Exelon’s or Generation’s Consolidated Balance Sheets. These items are included to provide information regarding the relative size of the unconsolidated VIEs.

 

40


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

(b)

These items represent amounts on Exelon’s and Generation’s Consolidated Balance Sheets related to the asset sale agreement with ZionSolutions, LLC. The net assets pledged for Zion Station decommissioning includes gross pledged assets of $402 million and $458 million as of June 30, 2014 and December 31, 2013, respectively; offset by payables to ZionSolutions LLC of $357 million and $414 million as of June 30, 2014 and December 31, 2013, respectively. These items are included to provide information regarding the relative size of the ZionSolutions LLC unconsolidated VIE.

For each of the unconsolidated VIEs, Exelon and Generation assess the risk of a loss equal to their maximum exposure to be remote and, accordingly, Exelon and Generation have not recognized a liability associated with any portion of the maximum exposure to loss. In addition, there are no material agreements with, or commitments by, third parties that would affect the fair value or risk of their variable interests in these VIEs.

4.    Mergers, Acquisitions and Dispositions

Proposed Merger with Pepco Holdings, Inc. (Exelon)

Description of Transaction

On April 29, 2014, Exelon and Pepco Holdings, Inc. (PHI) signed an agreement and plan of merger (as subsequently amended and restated as of July 18, 2014, the Merger Agreement) to combine the two companies in an all cash transaction. The resulting company will retain the Exelon name and be headquartered in Chicago. Under the Merger Agreement, PHI’s shareholders will receive $27.25 of cash in exchange for each share of PHI common stock. In connection with the Merger Agreement, Exelon entered into a subscription agreement under which it purchased $90 million of a new class of nonvoting, nonconvertible and nontransferable preferred securities of PHI, in the second quarter of 2014, with additional investments of $18 million to be made quarterly up to a maximum aggregate investment of $180 million. PHI has the right to redeem the preferred securities at its option for the purchase price paid plus accrued dividends, if any. The $90 million of PHI preferred securities are included in Other non-current assets on Exelon’s Consolidated Balance Sheet as of June 30, 2014. Exelon expects total cash required to fund the acquisition of common stock and preferred securities plus other related acquisition costs to total approximately $7.2 billion.

The transaction must be approved by the shareholders of PHI. Completion of the transaction is also conditioned upon approval by the FERC, the District of Columbia Public Service Commission and several state commissions including Delaware Public Service Commission, MDPSC, the New Jersey Board of Public Utilities and the Virginia Department of Public Utilities. In addition, under the Hart-Scott-Rodino Antitrust Improvements Act of 1976 (HSR Act), the transaction cannot be completed until Exelon has made required notifications and given certain information and materials to the Federal Trade Commission (FTC) and/or the Antitrust Division of the United States Department of Justice (DOJ) and until specified waiting period requirements have expired.

Exelon has been named in suits filed in the Delaware Chancery Court alleging that individual directors of PHI breached their fiduciary duties by entering into the proposed merger transaction and Exelon aided and abetted the individual directors’ breaches. The suits seek to enjoin PHI from completing the merger or seek rescission of the merger if completed. In addition, they also seek unspecified damages and costs. Exelon intends to vigorously defend these suits. Exelon does not believe these suits will impact the completion of the transaction, and they are not expected to have a material impact on Exelon’s results of operations.

Through June 30, 2014, Exelon has incurred approximately $25 million of expense associated with the transaction, primarily related to fees incurred as part of the acquisition. As part of the applications for approval of the merger, Exelon and PHI have proposed a package of benefits to PHI utilities’ customers which results in a direct investment of more than $100 million. The Merger Agreement also provides for termination rights on behalf of both parties. Under certain circumstances, if the Merger Agreement is terminated, PHI may be required to pay Exelon a termination fee ranging from $259 million to $293 million plus certain expenses. If the Merger

 

41


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Agreement does not close due to a regulatory failure, Exelon may be required to pay PHI a termination fee equal to the amount of purchased nonvoting preferred securities (described above), by means of PHI redeeming the outstanding nonvoting preferred securities for no consideration other than the nominal par value of the stock. The companies anticipate closing the transaction in the second or third quarter of 2015, subject to receipt of required regulatory approvals.

Merger Financing

Exelon intends to fund the all-cash transaction using a combination of approximately $3.5 billion of debt, up to $1.0 billion cash from asset sales primarily at Generation, and the remainder through issuance of equity (including mandatory convertible securities). On June 11, 2014, Exelon marketed an equity offering of 57.5 million shares of its common stock at a public offering price of $35 per share in connection with forward sales agreements and $1.2 billion of junior subordinated notes in the form of 23 million equity units. In addition, Exelon signed a 364-day $7.2 billion senior unsecured bridge credit facility to support the contemplated transaction and provide flexibility for timing of permanent financing, which has subsequently been reduced to $4.2 billion as a result of the equity issuances. See Note 10 — Debt and Credit Agreements and Note 16 — Common Stock for more information.

Safe Harbor Water Power Corporation (Exelon and Generation)

On May 15, 2014, Generation entered into a Purchase and Sale Agreement with Brookfield Renewable Energy Partners L.P. to sell Generation’s 67% economic equity interest in the 417 MW Safe Harbor Water Power Corporation hydroelectric facility on the Susquehanna River in Pennsylvania (Safe Harbor). The total purchase price for the transaction is approximately $613 million. The transaction, which is subject to customary closing conditions and regulatory approvals, is expected to be completed in the third quarter of 2014, at which time Generation anticipates recording a pre-tax gain of approximately $332 million. The after-tax net cash proceeds of $375 million are expected to be used to finance a portion of the acquisition of PHI and for general corporate purposes.

5.    Regulatory Matters (Exelon, Generation, ComEd, PECO and BGE)

Regulatory and Legislative Proceedings (Exelon, Generation, ComEd, PECO and BGE)

Except for the matters noted below, the disclosures set forth in Note 3 — Regulatory Matters of the Exelon 2013 Form 10-K appropriately represent, in all material respects, the current status of regulatory and legislative proceedings of the Registrants. The following is an update to that discussion.

Illinois Regulatory Matters

Energy Infrastructure Modernization Act (Exelon and ComEd).    Since 2011, ComEd’s distribution rates are established through a performance-based rate formula, pursuant to EIMA. Participating utilities are required to file an annual update to the performance-based formula rate tariff on or before May 1, with resulting rates effective in January of the following year. This annual formula rate update is based on prior year actual costs and current year projected capital additions. The update also reconciles any differences between the revenue requirement(s) in effect for the prior year and actual costs incurred for that year. ComEd’s earned rate of return on common equity is required to be within plus or minus 50 basis points (“the collar”) of the target rate of return determined as the annual average rate on 30-year treasury notes plus 580 basis points. Therefore, the collar limits favorable and unfavorable impacts of weather and load on distribution revenue. In addition, ComEd’s target rate of return on common equity is subject to reduction if ComEd does not deliver the reliability and customer service benefits, as defined, it has committed to over the ten-year life of the investment program. ComEd records regulatory assets or regulatory liabilities and corresponding increases or decreases to operating revenues for any differences between the revenue requirement(s) in effect and ComEd’s best estimate of the revenue requirement

 

42


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

expected to be approved by the ICC for that year’s reconciliation. As of June 30, 2014, and December 31, 2013, ComEd had recorded a net regulatory asset associated with the distribution formula rate of $439 million and $463 million, respectively. The regulatory asset associated with the distribution true-up will be amortized as the associated amounts are recovered through rates.

On April 16, 2014, ComEd filed its annual distribution formula rate update with the ICC. The filing establishes the revenue requirement used to set the rates that will take effect in January 2015 after the ICC’s review and approval, which is due by December 2014. The revenue requirement requested is based on 2013 actual costs plus projected 2014 capital additions as well as an annual reconciliation of the revenue requirement in effect in 2013 to the actual costs incurred that year. ComEd’s 2014 filing request includes a total increase to the net revenue requirement of $269 million, reflecting an increase of $174 million for the initial revenue requirement for 2014 and an increase of $95 million related to the annual reconciliation for 2013. The revenue requirement for 2014 provides for a weighted average debt and equity return on distribution rate base of 7.06% inclusive of an allowed return on common equity of 9.25%, reflecting the average rate on 30-year treasury notes plus 580 basis points. The annual reconciliation for 2013 provided for a weighted average debt and equity return on distribution rate base of 7.04% inclusive of an allowed return on common equity of 9.20%, reflecting the average rate on 30-year treasury notes plus 580 basis points less a performance metrics penalty of 5 basis points.

EIMA also provides a structure for substantial capital investment by utilities over a ten-year period to modernize Illinois’ electric utility infrastructure. Participating utilities are required to file an annual update on their AMI implementation progress. On April 1, 2014, ComEd filed an annual progress report on its AMI Implementation Plan with the ICC. The ICC ruled that no investigation would be opened in regards to that April filing. In March, 2014, ComEd filed a petition with the ICC for approval to accelerate the deployment of AMI meters. On June 11, 2014, the ICC approved ComEd’s accelerated deployment plan which allows for the installation of more than four million smart meters throughout ComEd’s service territory by 2018, three years in advance of the originally scheduled 2021 completion date. To date, nearly 350,000 smart meters have been installed in the Chicago area.

Appeal of the 2012 Formula Rate Tariff (Exelon and ComEd).    On April 30, 2012, ComEd filed its annual distribution formula rate update. On December 20, 2012, the ICC issued its final order, which increased the revenue requirement by $73 million, in conformity with the formula rate structure provided in the ICC’s May 2012 and Rehearing Orders. The $73 million reflected an increase of $80 million for the initial revenue requirement for 2012 and a decrease of $7 million for the annual reconciliation for 2011. The rate increase was set using an allowed return on capital of 7.54% (inclusive of an allowed return on common equity of 9.81%). The rates took effect in January 2013. ComEd and intervenors requested a rehearing on specific issues, which was denied by the ICC. ComEd and intervenors also filed appeals with the Illinois Appellate Court.

On June 30, 2014, the Illinois Appellate Court issued its opinion in the Appeal of the 2012 Formula Rate Tariff. Two of the three issues appealed (billing determinants and the use of certain allocators) were the same issues previously rejected by the Court in the Appeal of Initial Formula Rate Tariff (see Appeal of Initial Formula Rate Tariff discussed below). The Court re-affirmed the ICC’s order and rejected ComEd’s arguments. However, on the third issue (rate case expenses), the Court allowed for the possibility of future recovery. The Court’s opinion has no accounting impact as ComEd recorded the distribution formula regulatory asset consistent with the ICC’s final Order.

Appeal of Initial Formula Rate Tariff (Exelon and ComEd).    On March 26, 2014, the Illinois Appellate Court issued an opinion with respect to ComEd’s appeal of the ICC’s order relating to ComEd’s initial formula rate tariff. The most significant financial issues under appeal related to ICC findings that were counter to the formula rate legislation and were clarified by subsequent legislation (Senate Bill 9). Therefore, only a subset of

 

43


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

the issues originally appealed remained. The Court found against ComEd on each of the remaining issues: compensation related adjustments, billing determinants and the use of certain allocators. The Court’s opinion has no accounting impact as ComEd recorded the distribution formula regulatory asset consistent with the ICC’s final Order.

ComEd has asked the Illinois Supreme Court to hear the issue of allocation between State and Federal regulatory jurisdictions. On June 4, 2014, ComEd filed a Petition for Leave to Appeal with the Illinois Supreme Court solely on the issue of allocation between FERC and ICC jurisdictional costs. On July 2, the ICC filed its Answer to the Petition, arguing that Supreme Court review is not necessary or appropriate. Under the rules, ComEd is not allowed to reply to the ICC filing. There is no set time by which the Court must decide rule on the Petition. ComEd cannot predict whether the Court will grant the appeal, or if it does, the ultimate outcome.

Advanced Metering Program Proceeding (Exelon and ComEd).    As part of ComEd’s 2007 electric distribution rate case, the ICC approved recovery of costs associated with ComEd’s System Modernization Program (Rider SMP) for the limited purpose of implementing a pilot program for AMI. In October 2009, the ICC approved ComEd’s AMI pilot program and associated rider (Rider AMP). ComEd collected approximately $24 million under Rider AMP and had no collections under Rider SMP through June 30, 2014. In ComEd’s 2010 electric distribution rate case, the ICC approved ComEd’s transfer of certain other costs from recovery under Rider AMP to recovery through electric distribution rates.

Several parties, including the Illinois Attorney General, appealed the ICC’s orders on Rider SMP and Rider AMP. The Illinois Appellate Court reversed the ICC’s approval of the cost recovery provisions of Rider SMP and Rider AMP on September 30, 2010 and March 19, 2012, respectively. In both cases, the Court ruled that the ICC’s approval of the rider constituted single-issue ratemaking. ComEd filed Petitions for Leave to Appeal to the Illinois Supreme Court, which were denied.

In October 2013, the ICC opened an investigation on Rider AMP to determine if a refund is required and if so, to determine the appropriate refund amount. The ALJ presiding over the investigation requested each party provide a pre-trial memorandum describing their positions, which were submitted on April 10, 2014. The ICC Staff and the Illinois Attorney General proposed a refund of $14.6 million, representing the amount they claim was collected under Rider AMP since September 30, 2010, the date the Illinois Appellate Court reversed the ICC’s approval of the cost recovery provisions of Rider SMP. ComEd believes no refund is appropriate and that any refund obligation associated with Rider AMP should be prospective from no earlier than the date of the Illinois Appellate Court’s order on Rider AMP, or March 19, 2012, which would represent a refund of approximately $0.4 million. During the second quarter of 2014, ComEd reached a tentative proposed agreement to jointly resolve the disputed refund claim. Any joint agreement must ultimately be approved by the ICC through its investigation. At June 30, 2014, ComEd recorded a regulatory liability of approximately $9 million based on its assessment of the likely outcome of the matter. ComEd cannot predict the ultimate outcome of the ICC’s investigation and therefore, actual refunds, if any, may differ from the estimated liability recorded at June 30, 2014.

Grand Prairie Gateway Transmission Line (ComEd).    On December 2, 2013, ComEd filed a request to obtain the ICC’s approval to construct a 57-mile, overhead 345kV transmission line that traverses Ogle, DeKalb, Kane and DuPage Counties in Northern Illinois. Numerous stakeholders are participating in the proceeding and ComEd expects the ICC to rule on its request by October 27, 2014. On May 28, 2014, in a separate proceeding, FERC issued an order granting ComEd’s request to include 100% of the capital costs recorded to construction work in progress during construction of the line in ComEd’s transmission rate base. If the project is cancelled or abandoned for reasons beyond ComEd’s control, FERC approved the ability for ComEd to recover 100% of its prudent costs incurred after May 21, 2014 and 50% of its costs incurred prior to May 21, 2014 in ComEd’s transmission rate base.

 

44


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Illinois Procurement Proceedings (Exelon, Generation and ComEd).    ComEd is permitted to recover its electricity procurement costs from retail customers without mark-up. Since June 2009, as a result of the Illinois Settlement Legislation, the IPA designs, and the ICC approves, an electricity supply portfolio for ComEd and the IPA administers a competitive process under which ComEd procures its electricity supply from various suppliers, including Generation. On December 18, 2013, the ICC approved the IPA’s procurement plan covering the period June 2014 through May 2019.

The Illinois Settlement Legislation requires ComEd to purchase an increasing percentage of the electricity for customer deliveries from renewable energy resources. Purchases by customers of electricity from competitive generation suppliers, whether as a result of the customers’ own actions or as a result of municipal aggregation, are not included in this calculation and have the effect of reducing ComEd’s purchase obligation. ComEd entered into several 20-year contracts with unaffiliated suppliers in December 2010 regarding the procurement of long-term renewable energy and associated RECs in order to meet its obligations under the state’s RPS. Under the Illinois Settlement Legislation, all associated costs are recoverable from customers. The ICC did not require the acquisition of additional renewable resources for the period June 2014 through May 2015 due to ComEd expecting to exceed the renewable cost cap.

The IPA’s 2014-2019 plan provides for two separate energy procurements during 2014 to address potential fluctuations in energy demand due to customer switching between ComEd and competitive electric generation suppliers. The ICC also approved the IPA’s expansion of energy efficiency programs for both ComEd and Ameren. As of June 30, 2014, ComEd has completed the first ICC-approved procurement process for a portion of its energy requirements through the periods ending May 31, 2015, 2016 and 2017. See Note 18 — Commitments and Contingencies for additional information on ComEd’s energy commitments.

During 2013, the ICC approved, and directed ComEd and Ameren (the Utilities) to enter into 20-year sourcing agreements with FutureGen Industrial Alliance, Inc (FutureGen), under which FutureGen will retrofit and repower an existing plant in Morgan County, Illinois to a 166 MW near zero emissions coal-fueled generation plant, with an assumed commercial operation date in 2017. The sourcing agreement provides that the Utilities will pay FutureGen’s contract prices, which are set annually pursuant to a formula rate. The contract prices are based on the difference between the costs of the facility and the revenues FutureGen receives from selling capacity and energy from the unit into the MISO or other markets, as well as any other revenue FutureGen receives from the operation of the facility. The order also directs the Utilities to recover (or pass along) these costs from the Utilities’ distribution system customers, regardless of whether they purchase electricity from the utility or from competitive electric generation suppliers. In February 2013, ComEd filed an appeal with the Illinois Appellate Court questioning the legality of requiring ComEd to procure power for retail customers purchasing electricity from competitive electric generation suppliers. On July 22, 2014, the Illinois Appellate Court issued its ruling re-affirming the ICC’s order requiring ComEd to enter into the contract with FutureGen and allowing ComEd to recover the associated costs from retail customers purchasing electricity from both ComEd and competitive electric generation suppliers. ComEd is assessing the Court’s order and is in process of determining the appropriate course of action.

On August 22, 2013, the Utilities executed the sourcing agreement with FutureGen in accordance with the ICC order. However, in the event the order is reversed as a result of the appeal, ComEd’s obligations under the sourcing agreement would be suspended. In June 2014, ComEd filed a petition with the ICC seeking approval of a tariff allowing ComEd to recover its costs associated with the FutureGen contract from all of its delivery service customers. An order approving that tariff is expected before the end of 2014. Depending on the ultimate outcome of the outstanding appeals, and petitions, the eventual market conditions and the cost of the facility, the sourcing agreement could have a material adverse impact on Exelon’s and ComEd’s cash flows and financial positions.

 

45


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Pennsylvania Regulatory Matters

Pennsylvania Procurement Proceedings (Exelon and PECO).    On October 12, 2012, the PAPUC issued its Opinion and Order approving PECO’s second DSP Program, which was filed with the PAPUC in January 2012. The program, which has a 24-month term from June 1, 2013 through May 31, 2015, complies with electric generation procurement guidelines set forth in Act 129.

In the second DSP Program, PECO is procuring electric supply for its default electric customers through five competitive procurements. The load for the residential and small and medium commercial classes is served through competitively procured fixed price, full requirements contracts of two years or less. For the large commercial and industrial class load, PECO has competitively procured contracts for full requirements default electric generation with the price for energy in each contract set to be the hourly price of the spot market during the term of delivery. In December 2012 and February 2013, PECO entered into contracts with PAPUC-approved bidders, including Generation, for its residential and small and medium commercial classes that began in June 2013. In September 2013, PECO entered into contracts with PAPUC-approved bidders, including Generation, for its residential and small and medium commercial classes that began in December 2013. In January 2014, PECO entered into contracts with PAPUC-approved bidders, including Generation, for its residential and small, medium, and large commercial classes that began in June 2014. Charges incurred for electric supply procured through contracts with Generation are included in purchased power from affiliates on PECO’s Statement of Operations and Comprehensive Income.

In addition, the second DSP Program includes a number of retail market enhancements recommended by the PAPUC in its previously issued Retail Markets Intermediate Work Plan Order. PECO was also directed to submit a plan to allow its low-income Customer Assistance Program (CAP) customers to purchase their generation supply from EGSs beginning April 2014. On May 1, 2013, PECO filed its CAP Shopping Plan with the PAPUC. By Order entered on January 24, 2014, the PAPUC approved PECO’s plan, with modifications, to make CAP shopping available beginning April 15, 2014. On March 20, 2014, low-income advocacy groups filed an appeal and emergency request for a stay with the Pennsylvania Commonwealth Court, claiming that the PAPUC-ordered CAP Shopping plan does not contain sufficient protections for low-income customers. On March 28, 2014, the Commonwealth Court issued the requested stay, pending a full review of the appeal. Pending the Commonwealth Court’s review, PECO will not implement CAP Shopping. The Commonwealth Court’s decision is expected in late 2014.

On March 10, 2014, PECO filed its third DSP Program with the PAPUC. The program has a 24-month term from June 1, 2015 through May 31, 2017, and complies with electric generation procurement guidelines set forth in Act 129. A PAPUC ruling is expected in late 2014.

Smart Meter and Smart Grid Investments (Exelon and PECO).    Pursuant to Act 129 and the follow-on Implementation Order of 2009, in April 2010, the PAPUC approved PECO’s Smart Meter Procurement and Installation Plan (SMPIP), under which PECO will install more than 1.6 million smart meters and an AMI communication network by 2020. The first phase of PECO’s SMPIP, which was completed on June 19, 2013, included the installation of an AMI communications network and the deployment of 600,000 smart meters to communicate with that network. On May 31, 2013, PECO and interested parties filed a Joint Petition for Settlement of the universal deployment plan with the PAPUC which was approved without modification on August 15, 2013. The Joint Petition for Settlement supports all material aspects of PECO’s universal deployment plan, including cost recovery, excluding certain amounts discussed below. Universal deployment is the second phase of PECO’s SMPIP, under which PECO will deploy substantially all of the 1.6 million smart meters on an accelerated basis by the end of 2014. In total, PECO currently expects to spend up to $595 million, excluding the cost of the original meters (as further described below), on its smart meter infrastructure and approximately $120 million on smart grid investments through 2014 of which $200 million will be funded by SGIG as discussed

 

46


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

below. As of June 30, 2014, PECO has spent $480 million and $119 million on smart meter and smart grid infrastructure, respectively, not including the DOE reimbursements received to date.

Pursuant to the ARRA of 2009, PECO and the DOE entered into a Financial Assistance Agreement to extend PECO $200 million in non-taxable SGIG funds of which $140 million relates to smart meter deployment and $60 million relates to smart grid infrastructure. As part of the agreement, the DOE has a conditional ownership interest in qualifying Federally-funded project property and equipment, which is subordinate to PECO’s existing mortgage. The SGIG funds are being used to offset the total impact to ratepayers of the smart meter deployment required by Act 129. As of June 30, 2014, PECO has received $198 million, including $4 million for sub-recipients, of the $200 million in reimbursements. PECO’s outstanding receivable from the DOE for reimbursable costs was $2 million as of June 30, 2014, which has been recorded in Other accounts receivable, net on Exelon’s and PECO’s Consolidated Balance Sheets.

On August 15, 2012, PECO suspended installation of smart meters for new customers based on a limited number of incidents involving overheating meters. Following its own internal investigation and additional scientific analysis and testing by independent experts completed after September 30, 2012, PECO announced its decision to resume meter deployment work on October 9, 2012. PECO has replaced the previously installed meters with an alternative vendor’s meters. PECO is moving forward with the alternative meters during universal deployment and continues to evaluate meters from several vendors and may use more than one meter vendor during universal deployment.

Following PECO’s decision, as of October 9, 2012, PECO will no longer use the original smart meters. For the meters that will no longer be used, the accounting guidance requires that any difference between the carrying value and net realizable value be recognized in the current period’s earnings, before considering potential regulatory recovery. The cost of the original meters, including installation and removal costs, owned by PECO was approximately $17 million, net of approximately $16 million of reimbursements from the DOE and approximately $2 million of depreciation. PECO requested and received approval from the DOE that the original meters continue to be allowable costs and that any settlement with the vendor will not be considered project income. In addition, PECO remains eligible for the full $200 million in SGIG funds. On August 15, 2013, PECO entered into an agreement with the original vendor, which was part of the final agreement discussed below, under which PECO transferred the original uninstalled meters to the vendor and received $12 million in return. On January 23, 2014, PECO entered a final agreement with the vendor pursuant to which PECO will be reimbursed for amounts incurred for the original meters and related installation and removal costs, via cash payments and rebates on future purchases of licenses, goods and services primarily through 2017. PECO previously had intended to seek regulatory rate recovery in a future filing with the PAPUC of amounts not recovered from the vendor. As PECO believed such costs were probable of rate recovery based on applicable case law and past precedent on reasonably and prudently incurred costs, a regulatory asset was established at the time of the removals. As of December 31, 2013, $5 million was recorded on Exelon’s and PECO’s Consolidated Balance Sheets. Pursuant to the January 23, 2014, vendor agreement, PECO reclassified the regulatory asset balance as a receivable, which was fully collected as of June 30, 2014, with no gain or loss impacts on future results of operations.

Energy Efficiency Programs (Exelon and PECO).    PECO’s PAPUC-approved Phase I EE&C Plan had a four-year term that began on June 1, 2009 and concluded on May 31, 2013. The Phase I Plan set forth how PECO would meet the required reduction targets established by Act 129’s EE&C provisions, which included a 3% reduction in electric consumption in PECO’s service territory and a 4.5% reduction in PECO’s annual system peak demand in the 100 hours of highest demand by May 31, 2013.

The peak demand period ended on September 30, 2012 and PECO filed its final compliance report on Phase 1 targets with the PAPUC on November 15, 2013. On March 20, 2014, the PAPUC issued its final report stating that PECO was in full compliance with all Phase I targets.

 

47


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

On November 14, 2013, the PAPUC issued a Tentative Order on Act 129 demand reduction programs which seeks comments on a proposed demand response program methodology for future Act 129 demand reduction programs as well as demand response potential and wholesale prices suppression studies. In its February 20, 2014 Final Order, the PAPUC stated that it does not expect to make a decision as to whether it will prescribe additional demand response obligations until 2015. Any decision reached would affect PECO’s EE&C Plan subsequent to its Phase II Plan.

On February 28, 2014, PECO filed a Petition for Approval to amend its EE&C Phase II Plan to continue its DLC demand reduction program for mass market customers from June 1, 2014 to May 31, 2016. PECO proposed to fund the estimated $10 million annual costs of the program by modifying incentive levels for other Phase II programs. The costs of the DLC program will be recovered through PECO’s Energy Efficiency Program Charge along with other Phase II Plan costs. In an April 23, 2014 Tentative Order, the PAPUC granted PECO’s Petition. The Order became final on May 5, 2014.

Pennsylvania Retail Electricity Market (Exelon and PECO).    The extreme weather experienced in early 2014 resulted in increased commodity costs causing certain shopping customers to receive unexpectedly high utility bills. In response to a significant number of customer complaints throughout Pennsylvania, on April 3, 2014, the PAPUC unanimously voted to adopt two rulemaking orders to address the issue. The first rulemaking order requires electric generation suppliers to provide more consumer education regarding their contract. The second rulemaking order requires electric distribution companies to enable customers to switch suppliers within three business days (known as accelerated switching). The improved customer education and accelerated switching are to be in place within 30 days and six months of approval of the orders, respectively. The Independent Regulatory Review Commission granted approval of the orders on May 22, 2014. The orders became final on June 14, 2014.

Maryland Regulatory Matters

2014 Maryland Electric and Gas Distribution Rate Case (Exelon and BGE).    On July 2, 2014, BGE filed an application for increases of $118 million and $68 million to its electric and gas base rates, respectively, with the MDPSC. The requested rates of return on equity in the application were 10.65% and 10.55% for electric and gas distribution, respectively. The new electric and gas distribution base rates are expected to take effect in late January 2015. BGE cannot predict the outcome of this proceeding or how much of the requested increases the MDPSC will approve.

2013 Maryland Electric and Gas Distribution Rate Case (Exelon and BGE).    On May 17, 2013, BGE filed an application for increases of $101 million and $30 million to its electric and gas base rates, respectively, with the MDPSC. The requested rates of return on equity in the application were 10.50% and 10.35% for electric and gas distribution, respectively. In addition to these requested rate increases, BGE’s application also included a request for recovery of incremental capital expenditures and operating costs associated with BGE’s proposed short-term reliability improvement plan (the “ERI initiative”) in response to a MDPSC order through a surcharge separate from base rates. On August 23, 2013, BGE filed an update to its rate request which altered the requested increase to electric base rates from $101 million to $83 million and the requested increase to gas base rates from $30 million to $24 million. On December 13, 2013, the MDPSC issued an order in BGE’s 2013 electric and natural gas distribution rate case for increases in annual distribution service revenue of $34 million and $12 million, respectively. The electric distribution rate increase was set using an allowed return on equity of 9.75% and the gas distribution rate increase was set using an allowed return on equity of 9.60%. The approved electric and natural gas distribution rates became effective for services rendered on or after December 13, 2013. As part of its December 13, 2013 decision granting BGE increases for its gas and electric distribution rates, the MDPSC also authorized BGE to recover through a surcharge mechanism costs associated with five ERI initiative

 

48


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

programs designed to accelerate electric reliability improvements. Such a decision, however, was premised upon the condition that the MDPSC approve specific projects scheduled for each year of the five-year program in advance of cost recovery through the surcharge mechanism. On March 31, 2014, after reviewing comments filed by the parties and conducting a hearing on the matter, the MDPSC approved all but one project proposed for completion in 2014 as part of the ERI initiative. As a result of the MDPSC’s decision, BGE estimates 2014 capital and operating and maintenance costs associated with the ERI initiative of $14.8 million and a revenue requirement of $1.4 million. The ERI initiative surcharge became effective June 1, 2014. BGE is required to file an update on the 2014 work plan and reliability performance information for the specific projects, along with its work plan and cost estimates for 2015, on or before November 1, 2014.

In January 2014, the residential consumer advocate in Maryland filed an appeal to the order issued by the MDPSC on December 13, 2013 in BGE’s 2013 electric and gas distribution rate cases. The nature of the appeal will not be known until further pleadings are filed by the residential consumer advocate. BGE cannot predict the outcome of this appeal.

Smart Meter and Smart Grid Investments (Exelon and BGE).    In August 2010, the MDPSC approved a comprehensive smart grid initiative for BGE that includes the planned installation of 2 million residential and commercial electric and gas smart meters at an expected total cost of $480 million of which $200 million has been recovered through a grant from the DOE. The MDPSC’s approval ordered BGE to defer the associated incremental costs, depreciation and amortization, and an appropriate return, in a regulatory asset until such time as a cost-effective advanced metering system is implemented. As of June 30, 2014 and December 31, 2013, BGE recorded a regulatory asset of $94 million and $66 million, respectively, representing incremental costs, depreciation and amortization, and a debt return on fixed assets related to its AMI program. Additionally, the MDPSC has determined that the cost recovery for the non-AMI meters that BGE retires will be considered in a future depreciation proceeding.

On February 26, 2014, the MDPSC issued an Order authorizing BGE to impose a $75 upfront fee and an $11 recurring fee to customers electing to opt-out, effective the later of the first full billing cycle following July 1, 2014, or the AMI installation date in a customer’s community. The fees authorized by the order will be reviewed after an initial 12 to 18 month period. The ultimate impact of opt-out could affect BGE’s ability to demonstrate cost-effectiveness of the advanced metering system.

Overall, BGE continues to believe the recovery of smart grid initiative costs in future rates is probable as BGE expects to be able to demonstrate that the program benefits exceed costs.

The Maryland Strategic Infrastructure Development and Enhancement Program (Exelon and BGE).    In February 2013, the Maryland General Assembly passed legislation intended to accelerate gas infrastructure replacements in Maryland by establishing a mechanism for gas companies to promptly recover reasonable and prudent costs of eligible infrastructure replacement projects separate from base rate proceedings. On May 2, 2013, the Governor of Maryland signed the legislation into law, which took effect June 1, 2013. Under the new law, following a proceeding before the MDPSC and with the MDPSC’s approval of the eligible infrastructure replacement projects along with a corresponding surcharge, BGE could begin charging gas customers a monthly surcharge for infrastructure costs incurred after June 1, 2013. The legislation includes caps on the monthly surcharges to residential and non-residential customers, and would require an annual true-up of the surcharge revenues against actual expenditures. Investment levels in excess of the cap would be recoverable in a subsequent gas base rate proceeding at which time all costs for the infrastructure replacement projects would be included in gas distribution rates. Irrespective of the cap, BGE is required to file a gas rate case every five years under this legislation. On August 2, 2013, BGE filed its infrastructure replacement plan and associated surcharge. On January 29, 2014, the MDPSC issued a decision conditionally approving the first five years of BGE’s plan and

 

49


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

surcharge. On March 26, 2014, the Maryland PSC approved as filed BGE’s proposed 2014 project list, tariff and associated surcharge amounts, with a surcharge that became effective April 1, 2014. BGE will defer the difference between the surcharge revenues and program costs as a regulated asset or liability, which was immaterial to Exelon and BGE as of June 30, 2014.

In February 2014, the residential consumer advocate in Maryland filed an appeal with the Baltimore City Circuit Court to the decision issued by the MDPSC on BGE’s infrastructure replacement plan. The residential consumer advocate filed its related legal memorandum on July 7, 2014, claiming that the MDPSC did not apply the appropriate consideration in approving BGE’s infrastructure replacement plan and associated surcharge. BGE has until August 7, 2014 to submit a response, and a hearing has been scheduled for September 5, 2014. BGE cannot predict the outcome of this appeal.

Federal Regulatory Matters

Transmission Formula Rate (Exelon, ComEd and BGE).    ComEd’s and BGE’s transmission rates are each established based on a FERC-approved formula. ComEd and BGE record regulatory assets or regulatory liabilities and corresponding increases or decreases to operating revenues for any differences between the revenue requirement in effect and ComEd’s and BGE’s best estimate of the revenue requirement expected to be approved by the FERC for that year’s reconciliation. As of June 30, 2014, and December 31, 2013, ComEd had recorded a net regulatory asset associated with the transmission formula rate of $10 million and $17 million, respectively, and BGE had recorded a net regulatory asset associated with the transmission formula rate of $4 million and a net regulatory liability of $0 million, respectively. The regulatory asset associated with the transmission true-up will be amortized as the associated amounts are recovered through rates.

On April 16, 2014, ComEd filed its annual formula rate update with the FERC. The filing establishes the revenue requirement used to set rates that will take effect in June 2014, subject to review by the FERC and other parties, which is due by November 2014. The revenue requirement is based on 2013 actual costs plus forecasted 2014 capital additions as well as an annual reconciliation of the revenue requirement in effect starting in June 2013 to the actual cost incurred in 2013. The update resulted in a revenue requirement of $524 million plus an $11 million adjustment related to the reconciliation of 2013 actual costs for a total revenue requirement of $535 million. This compares to the 2013 revenue requirement of $488 million plus a $25 million adjustment related to the reconciliation of 2012 actual costs for a total revenue requirement of $513 million. The increase in the revenue requirement was primarily driven by increased capital investment and higher operating and maintenance costs.

ComEd’s updated formula transmission rate currently provides for a weighted average debt and equity return on transmission rate base of 8.62%, inclusive of an allowed return on common equity of 11.50%, a decrease from the 8.70% average debt and equity return previously authorized. As part of the FERC-approved settlement of ComEd’s 2007 transmission rate case, the rate of return on common equity is 11.50% and the common equity component of the ratio used to calculate the weighted average debt and equity return for the transmission formula rate is currently capped at 55%.

On April 28, 2014, BGE filed its annual formula rate update with the FERC. The filings established the revenue requirement used to set rates that took effect in June 2014, subject to review by the FERC and other parties, which is due by October 2014. The revenue requirement is based on 2013 actual costs plus forecasted 2014 capital additions as well as an annual reconciliation of the revenue requirement in effect starting in June 2013 to the actual cost incurred in 2013. The update resulted in a revenue requirement of $167 million plus a $4 million adjustment related to the reconciliation of 2013 actual costs for a net revenue requirement of $171 million. This compares to the 2013 revenue requirement of $158 million offset by a $1 million reduction related

 

50


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

to the reconciliation of 2012 actual costs for a net revenue requirement of $157 million. The increase in the revenue requirement is primarily driven by higher depreciation expense and an increased level of return on investment associated with a higher equity ratio and increased rate base.

BGE’s updated formula transmission rate currently provides for a weighted average debt and equity return on transmission rate base of 8.53%, an increase from the 8.35% average debt and equity return previously authorized. As part of the FERC-approved settlement of BGE’s 2005 transmission rate case in 2006, the rate of return on common equity for BGE’s electric transmission business for new transmission projects placed in service on and after January 1, 2006 is 11.3%, inclusive of a 50 basis point incentive for participating in PJM.

FERC Transmission Complaint (Exelon and BGE).    On February 27, 2013, consumer advocates and regulators from the District of Columbia, New Jersey, Delaware and Maryland, and the Delaware Electric Municipal Cooperatives (the parties), filed a complaint at FERC against BGE and the PHI companies relating to their respective transmission formula rates. BGE’s formula rate includes a 10.8% base rate of return on common equity (ROE) for most investments included in its rate base and 11.3% for the remaining transmission investment (the latter of which is conditioned upon crediting the first 50 basis points of any incentive ROE adders). The parties seek a reduction in the base return on equity to 8.7% and changes to the formula rate process. FERC docketed the matter and set April 3, 2013 as the deadline for interventions, protests and answers. Under FERC rules, the revenues subject to refund are limited to a fifteen month period, and the earliest date from which the base return on equity could be adjusted and refunds required is the date of the complaint. On March 19, 2013, BGE filed a motion to dismiss or sever the complaint. On June 19, 2014, FERC issued an order in another case involving New England Transmission Owners (NETOs), changing its methodology to determine ROE rates for public utilities. The result was a reduction in the NETO’s ROE from 11.14% to 10.57%, with a possible further adjustment in either direction based on additional paper hearing submissions. On July 21, 2014, the NETOs filed a Request for Rehearing and Clarification with FERC of the June 19, 2014 order. Among other things, the NETOs assert that the 11.14% is reasonable based on the new methodology. As of June 30, 2014, BGE believes it is probable that BGE’s base ROE rate will be subject to the revised methodology and may result in a potential refund to customers of transmission revenue for a maximum fifteen month period. In evaluating FERC’s revised methodology, management believes it is reasonably possible no refunds will be required for BGE, and as such, no refund liability has been recorded as of June 30, 2014. If FERC were to order a reduction of BGE’s base return on equity to 8.7% as sought in the complaint (while retaining the 50 basis points of any incentives that were credited to the base return on equity for certain new transmission investment), the result would be a refund to customers of approximately $13 million, as well as an estimated ongoing annual reduction in revenues of approximately $10 million.

PJM Transmission Rate Design and Operating Agreements (Exelon, ComEd, PECO and BGE).    PJM Transmission Rate Design specifies the rates for transmission service charged to customers within PJM. Currently, ComEd, PECO and BGE incur costs based on the existing rate design, which charges customers based on the cost of the existing transmission facilities within their load zone and the cost of new transmission facilities based on those who benefit from those facilities. In April 2007, FERC issued an order concluding that PJM’s current rate design for existing facilities is just and reasonable and should not be changed. In the same order, FERC held that the costs of new facilities 500 kV and above should be socialized across the entire PJM footprint and that the costs of new facilities less than 500 kV should be allocated to the customers of the new facilities who caused the need for those facilities. After FERC ultimately denied all requests for rehearing on all issues, several parties filed petitions in the U.S. Court of Appeals for the Seventh Circuit for review of the decision. On August 6, 2009, that court issued its decision affirming FERC’s order with regard to the costs of existing facilities but reversing and remanding to FERC for further consideration its decision with regard to the costs of new facilities 500 kV and above. On March 30, 2012, FERC issued an order on remand affirming the cost allocation in its April 2007 order. On March 22, 2013, FERC issued an order denying rehearing and made it clear

 

51


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

that the cost allocation at issue concerns only projects approved prior to February 1, 2013. A number of entities have filed appeals of the FERC orders. On June 25, 2014, the U.S. Court of Appeals for the Seventh Circuit issued a decision once again remanding to FERC the cost allocation of new facilities 500 kV and above. ComEd anticipates that all impacts of any rate design changes effective after December 31, 2006, should be recoverable through retail rates and, thus, the rate design changes are not expected to have a material impact on ComEd’s results of operations, cash flows or financial position. PECO anticipates that all impacts of any rate design changes should be recoverable through the transmission service charge rider approved in PECO’s 2010 electric distribution rate case settlement and, thus, the rate design changes are not expected to have a material impact on PECO’s results of operations, cash flows or financial position. To the extent any rate design changes are retroactive to periods prior to January 1, 2011, there may be an impact on PECO’s results of operations. BGE anticipates that all impacts of any rate design changes effective after the implementation of its standard offer service programs in Maryland should be recoverable through retail rates and, thus, the rate design changes are not expected to have a material impact on BGE’s results of operations, cash flows or financial position.

PJM Minimum Offer Price Rule (Exelon and Generation).    PJM’s capacity market rules include a Minimum Offer Price Rule (MOPR) that is intended to preclude sellers from artificially suppressing the competitive price signals for generation capacity. The FERC orders approving the MOPR were upheld by the United States Court of Appeals for the Third Circuit in February 2014.

Exelon continues to work with PJM stakeholders and through the FERC process to implement several proposed changes to the PJM tariff aimed at ensuring that capacity resources (including those with state-sanctioned subsidy contracts and capacity market speculators) cannot inappropriately affect capacity auction prices in PJM.

Demand Response Resource Order (Exelon, Generation, ComEd, PECO, BGE).    On May 23, 2014, the D.C. Circuit Court issued an opinion vacating the FERC Order No. 745 (“D.C. Circuit Decision”). Order No. 745 established uniform compensation levels for demand response resources that participate in the day ahead and real-time wholesale energy markets. Under Order No. 745, buyers in ISO and RTO markets were required to pay demand response resources the full Locational Marginal Price when the demand response replaced a generation resource and was cost-effective.

In addition to invalidating the compensation structure established by Order No. 745, the D.C. Circuit Court, in broad language, explained that demand response is part of the retail market and FERC is restricted from regulating retail markets. The full implication of the D.C. Circuit Decision for both energy and capacity markets regulated by FERC is not yet known and will depend on how FERC and the RTOs and ISOs implement the decision. In addition, on July 7, 2014, FERC and several other parties sought rehearing of the D.C. Circuit Decision. Therefore, FERC will not be required to implement the D.C. Circuit Decision until at the earliest a determination is made on the rehearing request. If rehearing is denied, FERC or other parties will have an opportunity to appeal the decision to the United States Supreme Court. The final outcome of this litigation is therefore not expected for several months. Nonetheless, the final decision and its implementation by FERC and the RTOs and ISOs, could be material to Exelon, Generation, ComEd, PECO and BGE’s results of operations and cash flows.

Reliability Pricing Model (Exelon, Generation and BGE).    PJM’s RPM Base Residual Auctions take place approximately 36 months ahead of the scheduled delivery year. The most recent auction for the delivery year ending May 31, 2018 occurred in May 2014.

FERC Deficiency Letter Related to New England Capacity Market Results (Exelon and Generation).    Each year, ISO New England, Inc. (ISO-NE) files the results of its annual capacity auction at the

 

52


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

FERC which is required to include documentation regarding the competitiveness of the auction. Consistent with this requirement, on February 28, 2014, ISO-NE filed the results of its eighth capacity auction (covering the June 1, 2017 through May 30, 2018 delivery period). On June 27, 2014, the FERC issued a letter to ISO-NE noting that ISO-NE’s February 28, 2014 filing is deficient and that ISO-NE must file additional information before the FERC can process the filing. ISO-NE has 30 days to file the information and then FERC will determine how to proceed. Exelon cannot predict when the FERC will accept the capacity auction results for filing or what further action FERC may take concerning the results of that auction, but any FERC action could be material to Exelon’s expected revenues from the capacity auction.

License Renewals (Exelon and Generation).    On June 22, 2011, Generation submitted applications to the NRC to extend the operating licenses of Limerick Units 1 and 2 by 20 years. The current operating licenses for Limerick Units 1 and 2 expire in 2024 and 2029, respectively. In June 2012, the United States Court of Appeals for the DC Circuit vacated the NRC’s temporary storage rule on the grounds that the NRC should have conducted a more comprehensive environmental review to support the rule. The temporary storage rule (also referred to as the “waste confidence decision”) recognizes that licensees can safely store spent nuclear fuel at nuclear plants for up to 60 years beyond the original and renewed licensed operating life of the plants and that licensing renewal decisions do not require discussion of the environmental impact of spent fuel stored on site. In August 2012, the NRC placed a hold on issuing new or renewed operating licenses that depend on the temporary storage rule until the court’s decision is addressed. In September 2012, the NRC directed NRC Staff to revise the temporary storage rule which is now not expected until October 3, 2014. Generation does not expect the NRC to issue license renewals until the end of 2014, at the earliest.

On May 29, 2013, Generation submitted applications to the NRC to extend the operating licenses of Byron Units 1 and 2 and Braidwood Units 1 and 2 by 20 years. The current operating licenses for Byron Units 1 and 2 expire in 2024 and 2026, respectively. The current operating licenses for Braidwood Units 1 and 2 expire in 2026 and 2027, respectively. Generation does not expect the NRC to issue license renewals for Byron and Braidwood until 2015 at the earliest.

On August 29, 2012 and August 30, 2012, Generation submitted hydroelectric license applications to the FERC for 46-year licenses for the Conowingo Hydroelectric Project (Conowingo) and the Muddy Run Pumped Storage Facility Project (Muddy Run), respectively.

Generation is working with stakeholders to resolve water quality licensing issues with the MDE for Conowingo, including: (1) water quality, (2) fish passage and habitat, and (3) sediment. On January 30, 2014, Exelon filed a water quality certification application pursuant to Section 401 of the CWA with MDE for Conowingo, addressing these and other issues, although Generation cannot currently predict the conditions that ultimately may be imposed. Resolution of these issues relating to Conowingo may have a material effect on Generation’s results of operations and financial position through an increase in capital expenditures and operating costs.

On June 3, 2014, PA DEP issued its water quality certificate for Muddy Run, which is a necessary step in the FERC licensing process and included certain commitments made by Generation. On July 3, 2014, PPL Holtwood, LLC, the owner of the next upstream dam from Muddy Run, filed an appeal of PA DEP’s issuance of its water quality certificate. The financial impact associated with these commitments is estimated to be in the range of $25 million to $35 million, and will include both capital expenditures and operating expenses, primarily relating to fish passage and habitat improvement projects.

Based on the latest FERC procedural schedule, the FERC licensing process is not expected to be completed prior to the expiration of Muddy Run’s current license on August 31, 2014, and the expiration of Conowingo’s

 

53


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

license on September 1, 2014. However, the stations would continue to operate under annual licenses until FERC takes action on the 46-year license applications. The stations are currently being depreciated over their estimated useful lives, which includes the license renewal period. As of June 30, 2014, $36 million of direct costs associated with licensing efforts have been capitalized.

Regulatory Assets and Liabilities (Exelon, ComEd, PECO and BGE)

Exelon, ComEd, PECO and BGE each prepare their consolidated financial statements in accordance with the authoritative guidance for accounting for certain types of regulation. Under this guidance, regulatory assets represent incurred costs that have been deferred because of their probable future recovery from customers through regulated rates. Regulatory liabilities represent the excess recovery of costs or accrued credits that have been deferred because it is probable such amounts will be returned to customers through future regulated rates or represent billings in advance of expenditures for approved regulatory programs.

The following tables provide information about the regulatory assets and liabilities of Exelon, ComEd, PECO and BGE as of June 30, 2014 and December 31, 2013. For additional information on the specific regulatory assets and liabilities, refer to Note 3 — Regulatory Matters of the Exelon 2013 Form 10-K.

 

June 30, 2014

  Exelon     ComEd     PECO     BGE  
    Current     Noncurrent     Current     Noncurrent     Current     Noncurrent     Current     Noncurrent  

Regulatory assets

               

Pension and other postretirement benefits

  $ 208     $ 2,510     $     $     $      $     $     $  

Deferred income taxes

    13       1,495       1       68             1,358       12       69  

AMI programs

    7       222       7       56             72             94  

Under-recovered distribution service costs

    219       220       219       220                          

Debt costs

    10       51       8       49       2       2       1       8  

Fair value of BGE long-term debt(a)

    7       198                                      

Fair value of BGE supply contract(b)

    6                                            

Severance

    4       11                               4       11  

Asset retirement obligations

    1       110       1       73             26             11  

MGP remediation costs

    40       196       33       165       6       30       1       1  

RTO start-up costs

    1             1                                

Under-recovered uncollectible accounts

          70             70                          

Renewable energy

    13       121       13       121                          

Energy and transmission programs

    17       4       12                         5 (f)      4  

Deferred storm costs

    3       1                               3       1  

Electric generation-related regulatory asset

    13       24                               13       24  

Rate stabilization deferral

    73       119                               73       119  

Energy efficiency and demand response programs

    63       148                               63       148  

Merger integration costs

    2       7                               2       7  

Conservation voltage reduction

          1                                     1  

Other

    32       37       9       28       21       7       1       1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total regulatory assets

  $ 732     $ 5,545     $ 304     $ 850     $ 29     $ 1,495     $ 178     $ 499  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

54


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

June 30, 2014

  Exelon     ComEd     PECO     BGE  
    Current     Noncurrent     Current     Noncurrent     Current     Noncurrent     Current     Noncurrent  

Regulatory liabilities

               

Other postretirement benefits

  $ 53     $ 111     $     $     $      $     $      $  

Nuclear decommissioning

          2,917             2,427             490              

Removal costs

    107       1,449       83       1,248                   24       201  

Energy efficiency and demand response programs

    14       2       14                   2              

DLC Program Costs

    1       9                   1       9              

Energy efficiency Phase 2

          32                         32              

Electric distribution tax repairs

    20       104                   20       104              

Gas distribution tax repairs

    8       34                   8       34              

Energy and transmission programs

    89       11       19       11       52 (c)            18 (f)       

Over-recovered gas and electric universal service fund costs

    5                         5                    

Revenue subject to refund(d)

    47             47                                

Over-recovered gas and electric revenue decoupling(e)

    21                                     21        

Other

    3       1       1             2                   1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total regulatory liabilities

  $ 368     $ 4,670     $ 164     $ 3,686     $ 88     $ 671     $ 63     $ 202  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

December 31, 2013

  Exelon     ComEd     PECO     BGE  
    Current     Noncurrent     Current     Noncurrent     Current     Noncurrent     Current     Noncurrent  

Regulatory assets

               

Pension and other postretirement benefits

  $ 221     $ 2,794     $     $     $      $     $     $  

Deferred income taxes

    10       1,459       2       65             1,317       8       77  

AMI programs

    5       159       5       35             58             66  

AMI meter events

          5                         5              

Under-recovered distribution service costs

    178       285       178       285                          

Debt costs

    12       56       9       53       3       3       1       8  

Fair value of BGE long-term debt(a)

          219                                      

Fair value of BGE supply contract(b)

    12                                            

Severance

    16       12       12                         4       12  

Asset retirement obligations

    1       102       1       67             25             10  

MGP remediation costs

    40       212       33       178       6       33       1       1  

RTO start-up costs

    2             2                                

Under-recovered uncollectible accounts

          48             48                          

Renewable energy

    17       176       17       176                          

Energy and transmission programs

    53             52                         1 (f)       

Deferred storm costs

    3       3                               3       3  

Electric generation-related regulatory asset

    13       30                               13       30  

Rate stabilization deferral

    71       154                               71       154  

Energy efficiency and demand response programs

    73       148                               73       148  

Merger integration costs

    2       9                               2       9  

Other

    31       39       18       26       8       7       4       6  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total regulatory assets

  $ 760     $ 5,910     $ 329     $ 933     $ 17     $ 1,448     $ 181     $ 524  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

55


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

December 31, 2013

  Exelon     ComEd     PECO     BGE  
    Current     Noncurrent     Current     Noncurrent     Current     Noncurrent     Current     Noncurrent  

Regulatory liabilities

               

Other postretirement benefits

  $ 2     $ 43     $     $     $     $     $      $  

Nuclear decommissioning

          2,740             2,293             447              

Removal costs

    99       1,423       78       1,219                   21       204  

Energy efficiency and demand response programs

    53             45             8                    

DLC Program Costs

    1       10                   1       10              

Energy efficiency phase II

          21                         21              

Electric distribution tax repairs

    20       114                   20       114              

Gas distribution tax repairs

    8       37                   8       37      

Energy and transmission programs

    78             9             58 (c)            11 (f)       

Over-recovered gas and electric universal service fund costs

    8                         8                    

Revenue subject to refund(d)

    38             38                                

Over-recovered electric and gas revenue decoupling(e)

    16                                     16        

Other

    4                         3                    
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total regulatory liabilities

  $ 327     $ 4,388     $ 170     $ 3,512     $ 106     $ 629     $ 48     $ 204  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Represents the regulatory asset recorded at Exelon Corporate for the difference in the fair value of the long-term debt of BGE as of the merger date. The asset is amortized over the life of the underlying debt. See Note 10 — Debt and Credit Agreements for additional information.

(b)

Represents the regulatory asset recorded at Exelon Corporate representing the fair value of BGE’s supply contracts as of the close of the merger date. BGE is allowed full recovery of the costs of its electric and gas supply contracts through approved, regulated rates. The asset is amortized over a period of approximately 3 years.

(c)

Includes $26 million related to the DSP program, $19 million related to the over-recovered natural gas costs under the PGC and $7 million related to over-recovered electric transmission costs as of June 30, 2014. As of December 31, 2013, includes $34 million related to the DSP program, $8 million related to the over-recovered electric transmission costs and $16 million related to the over-recovered natural gas costs under the PGC.

(d)

Primarily represents the regulatory liability for revenue subject to refund recorded pursuant to the ICC’s order in the 2007 Rate Case. See Note 3 — Regulatory Matters of the Exelon 2013 Form 10-K for further information.

(e)

Represents the electric and gas distribution costs recoverable from customers under BGE’s decoupling mechanism. As of June 30, 2014, BGE had a regulatory liability of $3 million related to over-recovered electric revenue decoupling and $18 million related to over-recovered natural gas revenue decoupling. As of December 31, 2013, BGE had a regulatory liability of $7 million related to over-recovered electric revenue decoupling and $9 million related to over-recovered natural gas revenue decoupling.

(f)

Relates to $1 million of under-recovered electric supply costs, $4 million associated with the transmission formula rate and $18 million of over-recovered natural gas supply costs as of June 30, 2014. As of December 31, 2013, includes $1 million of under-recovered electric supply costs, $0 million associated with the transmission formula rate and $11 million of over-recovered natural gas supply costs.

 

56


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Purchase of Receivables Programs (Exelon, ComEd, PECO, and BGE)

ComEd, PECO and BGE are required, under separate legislation and regulations in Illinois, Pennsylvania and Maryland, respectively, to purchase certain receivables from retail electric and natural gas suppliers. For retail suppliers participating in the utilities’ consolidated billing, ComEd, PECO and BGE must purchase their customer accounts receivables. ComEd and BGE purchase receivables at a discount to primarily recover uncollectible accounts expense from the suppliers. PECO is required to purchase receivables at face value and permitted to recover uncollectible accounts expense from customers through distribution rates. Exelon, ComEd, PECO and BGE do not record unbilled commodity receivables under the POR programs. Purchased billed receivables are classified in Other accounts receivable, net on Exelon’s, ComEd’s, PECO’s and BGE’s Consolidated Balance Sheets. The following tables provide information about the purchased receivables of the Registrants as of June 30, 2014 and December 31, 2013.

 

As of June 30, 2014

   Exelon     ComEd     PECO     BGE  

Purchased receivables(a)

   $ 270     $ 116     $ 75     $ 79  

Allowance for uncollectible accounts(b)

     (32     (17     (8     (7
  

 

 

   

 

 

   

 

 

   

 

 

 

Purchased receivables, net

   $ 238     $ 99     $ 67     $ 72  
  

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2013

   Exelon     ComEd     PECO     BGE  

Purchased receivables(a)

   $ 263     $ 105     $ 72     $ 86  

Allowance for uncollectible accounts(b)

     (30     (16     (7     (7
  

 

 

   

 

 

   

 

 

   

 

 

 

Purchased receivables, net

   $ 233     $ 89     $ 65     $ 79  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

PECO’s gas POR program became effective on January 1, 2012 and includes a 1% discount on purchased receivables in order to recover the implementation costs of the program. If the costs are not fully recovered when PECO files its next gas distribution rate case, PECO will propose a mechanism to recover the remaining implementation costs as a distribution charge to low volume transportation customers or apply future discounts on purchased receivables from natural gas suppliers serving those customers.

(b)

For ComEd and BGE, reflects the incremental allowance for uncollectible accounts recorded, which is in addition to the purchase discount. For ComEd, the incremental uncollectible accounts expense is recovered through its Purchase of Receivables with Consolidated Billing (PORCB) tariff.

6.    Investment in Constellation Energy Nuclear Group, LLC (Exelon and Generation)

As a result of the Constellation merger, Generation owns a 50.01% interest in CENG, a nuclear generation business. Generation has historically had various agreements with CENG to purchase power and to provide certain services. For further information regarding these agreements, see Note 25 — Related Party Transactions of the Exelon 2013 Form 10-K.

On April 1, 2014, Generation and subsidiaries of Generation, EDF, EDF, Inc. (EDFI) (a subsidiary of EDF) and CENG entered into a Nuclear Operating Services Agreement (NOSA) pursuant to which Generation will operate the CENG nuclear generation fleet owned by CENG subsidiaries and provide corporate and administrative services for the remaining life of the CENG nuclear plants as if they were a part of the Generation nuclear fleet, subject to EDFI’s rights as a member of CENG (the Integration Transaction). CENG will reimburse Generation for its direct and allocated costs for such services. As part of the arrangement, Nine Mile Point Nuclear Station, LLC, a subsidiary of CENG, also assigned to Generation its obligations as Operator of Nine Mile Point Unit 2 under an operating agreement with the co-owner. In addition, on April 1, 2014, the Power Services Agency Agreement (PSAA) was amended and extended until the permanent cessation of power generation by the CENG generation plants.

 

57


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

In addition, on April 1, 2014, Generation made a $400 million loan to CENG, bearing interest at 5.25% per annum and payable out of specified available cash flows of CENG and, in any event, payable upon the settlement of the Put Option Agreement discussed below (if the put option is exercised) or payable upon the maturity date of April 1, 2034, whichever occurs first. Immediately following receipt of the proceeds of such loan, CENG made a $400 million special distribution to EDFI.

The parties also executed a Fourth Amended and Restated Operating Agreement for CENG on April 1, 2014, pursuant to which, among other things, CENG committed to make preferred distributions to Generation (after repayment of the $400 million loan and associated interest) quarterly out of specified available cash flows until Generation has received aggregate distributions of $400 million plus a return of 8.5% per annum from April 1, 2014 (Preferred Distribution Rights).

Generation and EDFI also entered into a Put Option Agreement on April 1, 2014, pursuant to which EDFI has the option, exercisable beginning on January 1, 2016 and thereafter until June 30, 2022, to sell its 49.99% interest in CENG to Generation for a fair market value price determined by agreement of the parties, or absent agreement, a third-party arbitration process. The appraisers determining fair market value of EDF’s 49.99% interest in CENG under the Put Option Agreement are instructed to take into account all rights and obligations under the CENG Operating Agreement, including Generation’s rights with respect to any unpaid aggregate preferred distributions and the related return, and the value of Generation’s rights to other distributions. The beginning of the exercise period will be accelerated if Exelon’s affiliates cease to own a majority of CENG and exercise a related right to terminate the NOSA. In addition, under limited circumstances, the period for exercise of the put option may be extended for 18 months.

On April 1, 2014, Generation also executed an Indemnity Agreement pursuant to which Generation indemnified EDF and its affiliates against third-party claims that may arise from any future nuclear incident (as defined in the Price Anderson Act) in connection with the CENG nuclear plants or their operations. Exelon guarantees Generation’s obligations under this indemnity.

In addition, on April 1, 2014, Generation, EDFI, CENG and Nine Mile Point Nuclear Station, LLC entered into an Employee Matters Agreement (EMA) that provides for the transfer of CENG employees to Generation or one of its affiliates (the Generation Parties) and the assumption of the employee benefit plans and their related trusts by Exelon as the plan sponsor as of July 14, 2014. The EMA also generally requires CENG to fund the underfunded balance of the pension and other postretirement welfare benefit plans measured as of July 14, 2014 by making periodic payments to Generation. These payments will be made on an agreed payment schedule or upon the occurrence of certain specified events, such as EDF’s disposition of a majority of its interest in CENG.

As a condition to obtaining regulatory approval for the NOSA and related transactions from the NRC, Exelon executed a support agreement pursuant to which Exelon may be required under specified circumstances to provide up to $245 million of financial support to CENG (Exelon Support Agreement). The Exelon Support Agreement supersedes a previous support agreement under which Generation had agreed to provide up to $205 million of financial support for CENG. In addition, Exelon executed a Guarantee pursuant to which Exelon may be required under specified circumstances to provide up to $165 million in additional financial support for CENG. A previous support agreement executed by an affiliate of EDF remains in effect under which the EDF affiliate may be required to provide up to approximately $145 million of financial support for CENG under specified circumstances. The agreements were executed on April 1, 2014 when the NRC licenses were transferred to Generation. No liability has been recognized by Exelon for the guarantees.

Prior to April 1, 2014, Exelon and Generation accounted for their investment in CENG under the equity method of accounting. From January 1, 2014, through March 31, 2014, Generation recorded $19 million of equity in losses of unconsolidated affiliates related to its investment in CENG and recorded $17 million of

 

58


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

revenues from CENG. For the three and six months ended June 30, 2013, Generation recorded $19 million and $31 million, respectively, of equity in losses of unconsolidated affiliates related to its investment in CENG and $23 million and $34 million, respectively, of revenues from CENG. The book value of Generation’s investment in CENG prior to the consolidation was $1.9 billion, and the book value of the AOCI related to CENG prior to consolidation was $116 million, net of taxes of $77 million.

As a result of the consolidation of CENG, there are several transactions included in Exelon’s and Generation’s Consolidated Financial Statements between CENG and EDF that are considered related party transactions to Generation. As further described in Note 25 — Related Party Transactions of the Exelon 2013 Form 10-K, EDF and Generation have a PPA with CENG under which they purchase 15% and 85%, respectively, of the nuclear output owned by CENG that is not sold to third parties under pre-existing PPAs. Beginning January 1, 2015 and continuing through the life of the respective plants, EDF and Generation will purchase 49.99% and 50.01%, respectively, of the nuclear output owned by CENG. Beginning April 1, 2014, sales to Generation are eliminated in consolidation. Sales to EDF of $38 million are included within Exelon’s and Generation’s Consolidated Statements of Operations for the three and six months ended June 30, 2014. See discussion above and Note 3 — Variable Interest Entities for additional information regarding other related party transactions, between CENG and EDF included within Exelon and Generation’s financial statements.

See Note 3 — Variable Interest Entities for additional information about the Registrants VIEs.

Accounting for the Consolidation of CENG

The transfer of the nuclear operating licenses and the execution of the NOSA on April 1, 2014, resulted in the derecognition of the equity method investment in CENG and the recording of all assets, liabilities and EDF’s non-controlling interest in CENG at fair value on Exelon’s and Generation’s Consolidated Balance Sheets. As a result of the consolidation, Exelon and Generation recorded a net gain of $261 million within their respective Consolidated Statements of Operations and Comprehensive Income. This gain consists of approximately $136 million related to the step up to fair value basis of our ownership interest in CENG, and approximately $132 million related to the settlement of pre-existing transactions between CENG and Generation. The net gain on the consolidation of CENG of $261 million is net of a $7 million payment to EDF.

The fair value of CENG’s assets and liabilities recorded in consolidation was determined based on significant estimates and assumptions that are judgmental in nature, including projected future cash flows (including timing); discount rates reflecting risk inherent in the future cash flows; and future market prices. There were also judgments made to determine the expected useful lives assigned to each class of assets acquired and duration of liabilities assumed.

The valuations necessary to assess the fair values of certain assets and liabilities are considered preliminary as a result of the short time period between the execution of the NOSA and the end of the second quarter of 2014. The estimates of the fair value of assets and liabilities may be modified up to one year from April 1, 2014, as more information is obtained about the fair value of assets and liabilities. The principal items that are expected to be revised include the asset retirement obligation liabilities and related asset retirement costs. These items are expected to be updated with inputs from a third party engineering firm with corresponding adjustments recorded by the end of 2014. In the period of such revisions, these and any other material changes to the fair value assessments could result in adjustments to the amounts recorded upon consolidation, including the overall gain recorded by Generation. In addition, any asset or liability adjustments impacting depreciation and/or accretion expense recorded after the consolidation date would impact Generation’s post-consolidation results of operations.

 

59


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Generation recorded the assets and liabilities of CENG at fair value as of April 1, 2014. The following assets and liabilities of CENG were recorded within Generation’s Consolidated Balance Sheets as of the date of integration:

 

Preliminary Fair Values

   Exelon and
Generation
 

Current assets

   $ 499  

Nuclear decommissioning trust fund

     1,955  

Property, plant and equipment

     2,958  

Nuclear fuel

     482  

Other assets

     10  
  

 

 

 

Total assets

     5,904  
  

 

 

 

Current liabilities

     237  

Asset retirement obligation

     1,701  

Pension and other employee benefit obligations

     281  

Unamortized energy contract liabilities

     171  

Other liabilities

     114  
  

 

 

 

Total liabilities

     2,504  
  

 

 

 

Total net assets

   $ 3,400  
  

 

 

 

Generation also recorded the fair value of the non-controlling interest on its Consolidated Balance Sheets of approximately $1.5 billion, net of the fair value of $152 million for certain specified additional distribution rights under the Operating Agreement. In addition, the non-controlling interest was further reduced by the $400 million special cash distribution to EDF.

Due to the Preferred Distribution Rights that Generation has on CENG’s available cash, the earnings attributable to the non-controlling interest on the Statements of Operations and Comprehensive Income as well as the corresponding adjustment to Non-controlling interest on the Consolidated Balance Sheets will not be in proportion to Generation’s and EDF’s equity ownership interests. Rather, the attribution will consider Generation’s Preferred Distribution Rights and allocate net income based on each owner’s rights to CENG’S net assets. For the three months ended June 30, 2014, Generation reduced by $4 million the amount of Net income attributable to non-controlling interests on Exelon’s and Generation’s Consolidated Statements of Operations and Comprehensive Income. As a result of the consolidation, Exelon’s and Generation’s Consolidated Statements of Operations and Comprehensive Income includes CENG’s incremental operating revenues of $98 million and CENG’s net income, prior to any intercompany eliminations and any adjustments for non-controlling interest, of $76 million during the three and six months ended June 30, 2014.

During the three and six months ended June 30, 2014, Exelon and Generation incurred integration-related costs of $11 million and $18 million, respectively. The costs incurred are classified primarily within Operating and Maintenance Expense in Exelon’s and Generation’s respective Consolidated Statements of Operations and Comprehensive Income for the three and six months ended June 30, 2014.

See Note 14 — Severance for integration-related severance costs incurred by Exelon and Generation during the three and six months ended June 30, 2014.

 

60


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

7.    Impairment of Long-Lived Assets (Exelon and Generation)

Long-Lived Assets (Exelon and Generation)

Generation evaluates long-lived assets for recoverability whenever events or changes in circumstances indicate that the carrying amount may not be recoverable. In the second quarter of 2014, updates to the long-term fundamental energy prices, which included a thorough evaluation of key assumptions including gas prices, load growth, plant retirements and renewable growth, suggested that the carrying value of certain merchant wind assets may be impaired. Generation concluded that the estimated undiscounted future cash flows and fair value of twelve wind projects, primarily located in West Texas, were less than their respective carrying values at May 31, 2014. The fair value analysis was primarily based on the income approach using significant unobservable inputs (Level 3) including revenue and generation forecasts, projected capital and maintenance expenditures and discount rates. As a result, long-lived assets held and used with a carrying amount of approximately $151 million were written down to their fair value of $65 million and a pre-tax impairment charge of $86 million was recorded during the second quarter in Operating and maintenance expense in Exelon’s and Generation’s Consolidated Statements of Operations and Comprehensive Income. Changes in the assumptions described above could potentially result in future impairments of Exelon’s long-lived assets, which could be material.

Nuclear Uprate Program (Exelon and Generation)

Generation is engaged in individual projects as part of a planned power uprate program across its nuclear fleet. When economically viable, the projects take advantage of new production and measurement technologies, new materials and application of expertise gained from a half-century of nuclear power operations. Based on ongoing reviews, the nuclear uprate implementation plan was adjusted in both the first and second quarters of 2013 to cancel certain projects. During the first quarter of 2013, the Measurement Uncertainty Recapture (MUR) uprate projects at the Dresden and Quad Cities nuclear stations were cancelled as a result of the cost of additional plant modifications identified during final design work which, when combined with then current market conditions, made the projects not economically viable. For these cancelled projects, Generation recorded approximately $21 million to Operating and maintenance expense during the first quarter of 2013 to accrue remaining costs and reverse previously capitalized costs. During the second quarter of 2013, market conditions prompted Generation to cancel the previously deferred extended power uprate projects at the LaSalle and Limerick nuclear stations. For these cancelled projects, Generation recorded a pre-tax charge during the second quarter of 2013 to Operating and maintenance expense and Interest expense of approximately $92 million and $8 million, respectively, to accrue remaining costs and reverse the previously capitalized costs.

Like-Kind Exchange Transaction (Exelon)

Prior to the PECO/Unicom Merger in October 2000, UII, LLC (formerly Unicom Investments, Inc.) (UII), a wholly owned subsidiary of Exelon, entered into a like-kind exchange transaction pursuant to which approximately $1.6 billion was invested in coal-fired generating station leases located in Georgia and Texas with two separate entities unrelated to Exelon. The generating stations were leased back to such entities as part of the transaction. See Note 11 — Income Taxes for further information. For financial accounting purposes, the investments are accounted for as direct financing lease investments. UII holds the leasehold interests in the generating stations in several separate bankruptcy remote, special purpose companies it directly or indirectly wholly owns. The lease agreements provide the lessees with fixed purchase options at the end of the lease terms. If the lessees do not exercise the fixed purchase options, Exelon has the ability to operate the stations and keep or market the power itself or require the lessees to arrange for a third-party to bid on a service contract for a period following the lease term. In any event, Exelon will be subject to residual value risk if the lessees do not exercise the fixed purchase options. This risk is partially mitigated by the fair value of the scheduled payments under the service contract. However, such payments are not guaranteed. Further, the term of the service contract is less

 

61


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

than the expected remaining useful life of the plants and, therefore, Exelon’s exposure to residual value risk will not be mitigated by payments under the service contract in this remaining period. In the fourth quarter of 2000, under the terms of the lease agreements, UII received a prepayment of $1.2 billion for all rent, which reduced the investment in the leases. There are no minimum scheduled lease payments to be received over the remaining term of the leases.

On February 26, 2014, UII and the City Public Service Board of San Antonio, Texas (CPS) finalized an agreement to terminate the leases on the generating station located in Texas, as described above, prior to its expiration dates. As a result of the lease termination, UII received a net early termination amount of $335 million from CPS and wrote off the net investment in the CPS long-term lease of $336 million in Investments in the Consolidated Balance Sheet in the first quarter of 2014; resulting in a pre-tax loss of $1 million being reflected in Operating and maintenance expense in the Consolidated Statement of Operations and Comprehensive Income in the first quarter of 2014.

Pursuant to the applicable accounting guidance, Exelon is required to review the estimated residual values of its direct financing lease investments at least annually and record an impairment charge if the review indicates an other than temporary decline in the fair value of the residual values below their carrying values. Exelon estimates the fair value of the residual values of its direct financing lease investments under the income approach, which uses a discounted cash flow analysis, which takes into consideration significant unobservable inputs (Level 3) including the expected revenues to be generated and costs to be incurred to operate the plants over their remaining useful lives subsequent to the lease end dates. Significant assumptions used in estimating the fair value include fundamental energy and capacity prices, fixed and variable costs, capital expenditure requirements, discount rates, tax rates, and the estimated remaining useful lives of the plants. The estimated fair values also reflect the cash flows associated with the service contract option discussed above given that a market participant would take into consideration all of the terms and conditions contained in the lease agreements.

Based on the annual reviews performed in the second quarter 2014 and 2013, the estimated residual value of Exelon’s direct financing leases for the Georgia generating stations experienced other than temporary declines given reduced long-term energy and capacity price expectations. As a result, Exelon recorded a $24 million and $14 million pre-tax impairment charge in the second quarter of 2014 and 2013, respectively, for these stations. These impairment charges were recorded in Investments and Operating and maintenance expense in Exelon’s Consolidated Balance Sheet and the Consolidated Statement of Operations and Comprehensive Income, respectively. Changes in the assumptions described above could potentially result in future impairments of Exelon’s direct financing lease investments, which could be material.

At June 30, 2014 and December 31, 2013, the components of the net investment in long-term leases were as follows:

 

     June  30,
2014
     December  31,
2013
 

Estimated residual value of leased assets

   $ 685      $ 1,465  

Less: unearned income

     332        767  
  

 

 

    

 

 

 

Net investment in long-term leases

   $ 353      $ 698  
  

 

 

    

 

 

 

 

62


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

8.    Fair Value of Financial Assets and Liabilities (Exelon, Generation, ComEd, PECO and BGE)

Fair Value of Financial Liabilities Recorded at the Carrying Amount

The following tables present the carrying amounts and fair values of the Registrants’ short-term liabilities, long-term debt, SNF obligation, and trust preferred securities (long-term debt to financing trusts or junior subordinated debentures) as of June 30, 2014 and December 31, 2013:

Exelon

 

     June 30, 2014  
     Carrying
Amount
     Fair Value  
        Level 1      Level 2      Level 3      Total  

Short-term liabilities

   $ 624      $ 3      $ 621      $      $ 624  

Long-term debt (including amounts due within one year)

     20,180        1,150        19,373        1,135        21,658  

Long-term debt to financing trusts

     648                      668        668  

SNF obligation

     1,021               814               814  
     December 31, 2013  
     Carrying
Amount
     Fair Value  
        Level 1      Level 2      Level 3      Total  

Short-term liabilities

   $ 344      $ 3      $ 341      $      $ 344  

Long-term debt (including amounts due within one year)

     19,132               18,672        1,079        19,751  

Long-term debt to financing trusts

     648                      631        631  

SNF obligation

     1,021               790               790  

Generation

 

     June 30, 2014  
     Carrying
Amount
     Fair Value  
        Level 1      Level 2      Level 3      Total  

Short-term liabilities

   $ 53      $       $ 53      $      $ 53  

Long-term debt (including amounts due within one year)

     7,507               6,881        1,135        8,016  

SNF obligation

     1,021               814               814  
     December 31, 2013  
     Carrying
Amount
     Fair Value  
        Level 1      Level 2      Level 3      Total  

Short-term liabilities

   $ 22      $       $ 22      $      $ 22  

Long-term debt (including amounts due within one year)

     7,729               6,586        1,062        7,648  

SNF obligation

     1,021               790               790  

ComEd

 

     June 30, 2014  
     Carrying
Amount
     Fair Value  
        Level 1      Level 2      Level 3      Total  

Short-term liabilities

   $ 498      $       $ 498      $      $ 498  

Long-term debt (including amounts due within one year)

     5,708               6,452               6,452  

Long-term debt to financing trust

     206                      211        211  

 

63


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

     December 31, 2013  
     Carrying
Amount
     Fair Value  
        Level 1      Level 2      Level 3      Total  

Short-term liabilities

   $ 184      $       $ 184      $      $ 184  

Long-term debt (including amounts due within one year)

     5,675               6,238        17        6,255  

Long-term debt to financing trust

     206                      202        202  

PECO

 

     June 30, 2014  
     Carrying
Amount
     Fair Value  
        Level 1      Level 2      Level 3      Total  

Long-term debt (including amounts due within one year)

   $ 2,197      $       $ 2,436      $      $ 2,436  

Long-term debt to financing trusts

     184                      198        198  
     December 31, 2013  
     Carrying
Amount
     Fair Value  
        Level 1      Level 2      Level 3      Total  

Long-term debt (including amounts due within one year)

   $ 2,197      $       $ 2,358      $      $ 2,358  

Long-term debt to financing trusts

     184                      180        180  

BGE

 

     June 30, 2014  
     Carrying
Amount
     Fair Value  
        Level 1      Level 2      Level 3      Total  

Short-term liabilities

   $ 73      $ 3      $ 70      $      $ 73  

Long-term debt (including amounts due within one year)

     1,976               2,206               2,206  

Long-term debt to financing trusts

     258                      259        259  
     December 31, 2013  
     Carrying
Amount
     Fair Value  
        Level 1      Level 2      Level 3      Total  

Short-term liabilities

   $ 138      $ 3      $ 135      $      $ 138  

Long-term debt (including amounts due within one year)

     2,011               2,148               2,148  

Long-term debt to financing trusts

     258                      249        249  

Short-Term Liabilities.    The short-term liabilities included in the tables above are comprised of short-term borrowings (Level 2) and dividends payable (included in other current liabilities) (Level 1). The Registrants’ carrying amounts of the short-term liabilities are representative of fair value because of the short-term nature of these instruments.

Long-Term Debt.    The fair value amounts of Exelon’s taxable debt securities (Level 2) are determined by a valuation model that is based on a conventional discounted cash flow methodology and utilizes assumptions of current market pricing curves. In order to incorporate the credit risk of the Registrants into the discount rates, Exelon obtains pricing (i.e., U.S. Treasury rate plus credit spread) based on trades of existing Exelon debt securities as well as debt securities of other issuers in the electric utility sector with similar credit ratings in both

 

64


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

the primary and secondary market, across the Registrants’ debt maturity spectrum. The credit spreads of various tenors obtained from this information are added to the appropriate benchmark U.S. Treasury rates in order to determine the current market yields for the various tenors. The yields are then converted into discount rates of various tenors that are used for discounting the respective cash flows of the same tenor for each bond or note.

The fair value of Generation’s non-government-backed fixed rate project financing debt (Level 3) is based on market and quoted prices for its own and other project financing debt with similar risk profiles. Given the low trading volume in the project financing debt market, the price quotes used to determine fair value will reflect certain qualitative factors, such as market conditions, investor demand, new developments that might significantly impact the project cash flows or off-taker credit, and other circumstances related to the project (e.g., political and regulatory environment). The fair value of Generation’s government-backed fixed rate project financing debt (Level 3) is largely based on a discounted cash flow methodology that is similar to the taxable debt securities methodology described above. Due to the lack of market trading data on similar debt, the discount rates are derived based on the original loan interest rate spread to the applicable Treasury rate as well as a current market curve derived from government-backed securities. Variable rate project financing debt resets on a quarterly basis and the carrying value approximates fair value.

SNF Obligation.    The carrying amount of Generation’s SNF obligation (Level 2) is derived from a contract with the DOE to provide for disposal of SNF from Generation’s nuclear generating stations. When determining the fair value of the obligation, the future carrying amount of the SNF obligation estimated to be settled in 2025 is calculated by compounding the current book value of the SNF obligation at the 13-week Treasury rate. The compounded obligation amount is discounted back to present value using Generation’s discount rate, which is calculated using the same methodology as described above for the taxable debt securities, and an estimated maturity date of 2025.

Long-Term Debt to Financing Trusts.    Exelon’s long-term debt to financing trusts is valued based on publicly traded securities issued by the financing trusts. Due to low trading volume of these securities, qualitative factors, such as market conditions, investor demand, and circumstances related to each issue, this debt is classified as Level 3.

Recurring Fair Value Measurements

Exelon records the fair value of assets and liabilities in accordance with the hierarchy established by the authoritative guidance for fair value measurements. The hierarchy prioritizes the inputs to valuation techniques used to measure fair value into three levels as follows:

 

   

Level 1 — quoted prices (unadjusted) in active markets for identical assets or liabilities that the Registrants have the ability to access as of the reporting date. Financial assets and liabilities utilizing Level 1 inputs include active exchange-traded corporate units, equity securities and funds, certain exchange-based derivatives, and money market funds.

 

   

Level 2 — inputs other than quoted prices included within Level 1 that are directly observable for the asset or liability or indirectly observable through corroboration with observable market data. Financial assets and liabilities utilizing Level 2 inputs include fixed income securities, derivatives, commingled and mutual investment funds priced at NAV per fund share and fair value hedges.

 

   

Level 3 — unobservable inputs, such as internally developed pricing models or third-party valuations for the asset or liability due to little or no market activity for the asset or liability. Financial assets and liabilities utilizing Level 3 inputs include infrequently traded securities and derivatives, and investments priced using an alternative pricing mechanism or third party valuation.

 

65


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Transfers in and out of levels are recognized as of the end of the reporting period the transfer occurred. Given derivatives categorized within Level 1 are valued using exchange-based quoted prices within observable periods, transfers between Level 2 and Level 1 were not material. Transfers into Level 2 from Level 3 generally occur when the contract tenure becomes more observable. Transfers into Level 3 from Level 2 generally occur due to changes in market liquidity or assumptions for certain commodity contracts. There were no transfers between Level 1 and Level 2 during the six months ended June 30, 2014 for cash equivalents, nuclear decommissioning trust fund investments, pledged assets for Zion Station decommissioning, Rabbi trust investments, and deferred compensation obligations.

Exelon

The following tables present assets and liabilities measured and recorded at fair value on Exelon’s Consolidated Balance Sheets on a recurring basis and their level within the fair value hierarchy as of June 30, 2014 and December 31, 2013:

 

As of June 30, 2014

   Level 1      Level 2      Level 3      Total  

Assets

           

Cash equivalents(a)

   $ 1,034      $      $      $ 1,034  

Nuclear decommissioning trust fund investments

           

Cash equivalents

     151        66               217  

Equity

           

Individually held

     2,572                      2,572  

Exchange traded funds

     164                      164  

Commingled funds

            2,529               2,529  
  

 

 

    

 

 

    

 

 

    

 

 

 

Equity funds subtotal

     2,736        2,529               5,265  
  

 

 

    

 

 

    

 

 

    

 

 

 

Balanced funds — commingled funds

            273               273  
  

 

 

    

 

 

    

 

 

    

 

 

 

Fixed income

           

Debt securities issued by the U.S. Treasury and other U.S. government corporations and agencies

     990                      990  

Debt securities issued by states of the United States and political subdivisions of the states

            416               416  

Debt securities issued by foreign governments

            114               114  

Corporate debt securities

            2,059        181        2,240  

Federal agency mortgage-backed securities

            84               84  

Commercial mortgage-backed securities (non-agency)

            43               43  

Residential mortgage-backed securities (non-agency)

            3               3  

Mutual funds

            18               18  

Commingled funds

            325               325  
  

 

 

    

 

 

    

 

 

    

 

 

 

Fixed income subtotal

     990        3,062        181        4,233  
  

 

 

    

 

 

    

 

 

    

 

 

 

Middle market lending

                   376        376  

Private Equity

                   35        35  

Other debt obligations

            24               24  
  

 

 

    

 

 

    

 

 

    

 

 

 

Nuclear decommissioning trust fund investments subtotal(b)

     3,877        5,954        592        10,423  
  

 

 

    

 

 

    

 

 

    

 

 

 

Pledged assets for Zion Station decommissioning

           

Cash equivalents

            45               45  

Equity

           

Individually held

     4        2               6  
  

 

 

    

 

 

    

 

 

    

 

 

 

Equity funds subtotal

     4        2               6  
  

 

 

    

 

 

    

 

 

    

 

 

 

Fixed income

           

Debt securities issued by the U.S. Treasury and other U.S. government corporations and agencies

     12        3               15  

Debt securities issued by states of the United States and political subdivisions of the states

            19               19  

Corporate debt securities

            172               172  

Commingled funds

            5               5  
  

 

 

    

 

 

    

 

 

    

 

 

 

Fixed income subtotal

     12        199               211  
  

 

 

    

 

 

    

 

 

    

 

 

 

Middle market lending

                   133        133  
  

 

 

    

 

 

    

 

 

    

 

 

 

Pledged assets for Zion Station decommissioning subtotal(c)

     16        246        133        395  
  

 

 

    

 

 

    

 

 

    

 

 

 

 

66


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

As of June 30, 2014

   Level 1     Level 2     Level 3     Total  

Rabbi trust investments(e)

        

Cash equivalents

     2                   2  

Mutual funds(d)

     43                   43  
  

 

 

   

 

 

   

 

 

   

 

 

 

Rabbi trust investments subtotal

     45                   45  
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity derivative assets

        

Economic hedges

     434       2,969       1,413       4,816  

Proprietary trading

     178       712       184       1,074  

Effect of netting and allocation of collateral(f)

     (569     (3,119     (1,127     (4,815
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity derivative assets subtotal

     43       562       470       1,075  
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative assets

     24       40             64  

Effect of netting and allocation of collateral

     (21     (7           (28
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative assets subtotal

     3       33             36  

Other investments

     13             10       23  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total assets

     5,031       6,795       1,205       13,031  
  

 

 

   

 

 

   

 

 

   

 

 

 

Liabilities

        

Commodity derivative liabilities

        

Economic hedges

     (434     (2,803     (1,465     (4,702

Proprietary trading

     (182     (707     (176     (1,065

Effect of netting and allocation of collateral(f)

     618       3,408       1,279       5,305  
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity derivative liabilities subtotal

     2       (102     (362     (462
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative liabilities

     (24     (34           (58

Effect of netting and allocation of collateral

     24       6             30  
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative liabilities subtotal

           (28           (28

Deferred compensation obligation

           (104           (104
  

 

 

   

 

 

   

 

 

   

 

 

 

Total liabilities

     2       (234     (362     (594
  

 

 

   

 

 

   

 

 

   

 

 

 

Total net assets

   $ 5,033     $ 6,561     $ 843     $ 12,437  
  

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2013

   Level 1     Level 2     Level 3     Total  

Assets

        

Cash equivalents(a)

   $ 1,230     $     $     $ 1,230  

Nuclear decommissioning trust fund investments

        

Cash equivalents

     459                   459  

Equity

        

Individually held

     1,776                   1,776  

Exchange traded funds

     115                   115  

Commingled funds

           2,271             2,271  
  

 

 

   

 

 

   

 

 

   

 

 

 

Equity funds subtotal

     1,891       2,271             4,162  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income

        

Debt securities issued by the U.S. Treasury and other U.S. government corporations and agencies

     882                   882  

Debt securities issued by states of the United States and political subdivisions of the states

           294             294  

Debt securities issued by foreign governments

           87             87  

Corporate debt securities

           1,753       31       1,784  

Federal agency mortgage-backed securities

           10             10  

Commercial mortgage-backed securities (non-agency)

           40             40  

Residential mortgage-backed securities (non-agency)

           7             7  

Mutual funds

           18             18  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income subtotal

     882       2,209       31       3,122  
  

 

 

   

 

 

   

 

 

   

 

 

 

Middle market lending

                 314       314  

Private Equity

                 5       5  

Other debt obligations

           14             14  
  

 

 

   

 

 

   

 

 

   

 

 

 

Nuclear decommissioning trust fund investments subtotal(b)

     3,232       4,494       350       8,076  
  

 

 

   

 

 

   

 

 

   

 

 

 

Pledged assets for Zion decommissioning

        

Cash equivalents

           26             26  

Equity

        

Individually held

     16                   16  
  

 

 

   

 

 

   

 

 

   

 

 

 

Equity funds subtotal

     16                   16  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

67


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

As of December 31, 2013

   Level 1     Level 2     Level 3     Total  

Fixed income

        

Debt securities issued by the U.S. Treasury and other U.S. government corporations and agencies

     45       4             49  

Debt securities issued by states of the United States and political subdivisions of the states

           20             20  

Corporate debt securities

           227             227  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income subtotal

     45       251             296  
  

 

 

   

 

 

   

 

 

   

 

 

 

Middle market lending

                 112       112  

Other debt obligations

           1             1  
  

 

 

   

 

 

   

 

 

   

 

 

 

Pledged assets for Zion Station decommissioning subtotal(c)

     61       278       112       451  
  

 

 

   

 

 

   

 

 

   

 

 

 

Rabbi trust investments(e)

        

Cash equivalents

     2                   2  

Mutual funds(d)

     54                   54  
  

 

 

   

 

 

   

 

 

   

 

 

 

Rabbi trust investments subtotal

     56                   56  
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity derivative assets

        

Economic hedges

     493       2,582       885       3,960  

Proprietary trading

     324       1,315       122       1,761  

Effect of netting and allocation of collateral(f)

     (863     (3,131     (430     (4,424
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity derivative assets subtotal

     (46     766       577       1,297  
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative assets

     30       39             69  

Effect of netting and allocation of collateral

     (30     (2           (32
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative assets subtotal

           37             37  

Other Investments

                 15       15  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total assets

     4,533       5,575       1,054       11,162  
  

 

 

   

 

 

   

 

 

   

 

 

 

Liabilities

        

Commodity derivative liabilities

        

Economic hedges

     (540     (1,890     (590     (3,020

Proprietary trading

     (328     (1,256     (119     (1,703

Effect of netting and allocation of collateral(f)

     869       3,007       404       4,280  
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity derivative liabilities subtotal

     1       (139     (305     (443
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative liabilities

     (31     (17           (48

Effect of netting and allocation of collateral

     31       1             32  
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative liabilities subtotal

           (16           (16

Deferred compensation obligation

           (114           (114
  

 

 

   

 

 

   

 

 

   

 

 

 

Total liabilities

     1       (269     (305     (573
  

 

 

   

 

 

   

 

 

   

 

 

 

Total net assets

   $ 4,534     $ 5,306     $ 749     $ 10,589  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Excludes certain cash equivalents considered to be held-to-maturity and not reported at fair value.

(b)

Excludes net assets (liabilities) of $14 million and $(5) million at June 30, 2014 and December 31, 2013, respectively. These items consist of receivables related to pending securities sales, interest and dividend receivables, and payables related to pending securities purchases.

(c)

Excludes net assets of $7 million at both June 30, 2014 and December 31, 2013, respectively. These items consist of receivables related to pending securities sales, interest and dividend receivables, and payables related to pending securities purchases.

(d)

The mutual funds held by the Rabbi trusts include $42 million related to deferred compensation and $1 million related to Supplemental Executive Retirement Plan at June 30, 2014, and $53 million related to deferred compensation and $1 million related to Supplemental Executive Retirement Plan at December 31, 2013.

(e)

Excludes $34 million and $32 million of the cash surrender value of life insurance investments at June 30, 2014 and December 31, 2013, respectively.

(f)

Includes collateral postings to counterparties. Collateral posted to counterparties, net of collateral paid to counterparties, totaled $49 million, $289 million and $152 million allocated to Level 1, Level 2 and Level 3 mark-to-market derivatives, respectively, as of June 30, 2014. Collateral posted (received) from counterparties, net of collateral paid to counterparties, totaled $6 million, $(124) million and $(26) million allocated to Level 1, Level 2 and Level 3 mark-to-market derivatives, respectively, as of December 31, 2013.

 

68


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

The following table presents the fair value reconciliation of Level 3 assets and liabilities measured at fair value on a recurring basis during the three and six months ended June 30, 2014 and 2013:

 

Three Months Ended June 30, 2014

  Nuclear
Decommissioning
Trust Fund
Investments
    Pledged Assets
for Zion Station
Decommissioning
    Mark-to-Market
Derivatives
    Other
Investments
    Total  

Balance as of March 31, 2014

  $ 486     $ 137     $ 119     $ 10     $ 752  

Total realized / unrealized gains (losses)

         

Included in net income

    2             (48 )(a)            (46

Included in other comprehensive income

                             

Included in regulatory assets

    8             34             42  

Included in payable for Zion Station decommissioning

          4                   4  

Change in collateral

                34             34  

Purchases, sales, issuances and settlements

         

Purchases

    109       13       5             127  

Sales

    (1     (21     (4           (26

Settlements

    (12                       (12

Transfers into Level 3

                (4           (4

Transfers out of Level 3

                (28           (28
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance as of June 30, 2014

  $ 592     $ 133     $ 108     $ 10     $ 843  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The amount of total gains included in income attributed to the change in unrealized gains related to assets and liabilities held for the three months ended June 30, 2014

  $ 2     $     $ 19     $      $ 21  

Six Months Ended June 30, 2014

  Nuclear
Decommissioning
Trust Fund
Investments
    Pledged Assets
for Zion Station
Decommissioning
    Mark-to-Market
Derivatives
    Other
Investments
    Total  

Balance as of December 31, 2013

  $ 350     $ 112     $ 272     $ 15     $ 749  

Total realized / unrealized gains (losses)

         

Included in net income

    3             (360 )(a)            (357

Included in other comprehensive income

                             

Included in regulatory assets

    11             59             70  

Included in payable for Zion Station decommissioning

          4                   4  

Change in collateral

                178             178  

Purchases, sales, issuances and settlements

         

Purchases

    249       42       15       2       308  

Sales

    (2     (25     (6           (33

Settlements

    (19                       (19

Transfers into Level 3

                (30           (30

Transfers out of Level 3

                (20     (7     (27
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance as of June 30, 2014

  $ 592     $ 133     $ 108     $ 10     $ 843  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The amount of total losses included in income attributed to the change in unrealized gains related to assets and liabilities held for the nine months ended June 30, 2014

  $ 2     $     $ (427   $      $ (425

 

(a)

Includes the increase for the reclassification of $67 million of realized losses due to the settlement of derivative contracts recorded in results of operations for the three months ended June 30, 2014.

 

69


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Three Months Ended June 30, 2013

  Nuclear
Decommissioning
Trust Fund
Investments
    Pledged Assets
for Zion Station
Decommissioning
    Mark-to-Market
Derivatives
    Other
Investments
    Total  

Balance as of March 31, 2013

  $ 210     $ 104     $ 260     $ 9     $ 583  

Total realized / unrealized gains (losses)

         

Included in net income

    1             158 (a)            159  

Included in other comprehensive income

                             

Included in regulatory assets

    8             (10 )(b)            (2

Included in payable for Zion Station decommissioning

          1                   1  

Change in collateral

                10             10  

Purchases, sales, issuances and settlements

         

Purchases

    35       11       13       2       61  

Sales

    (11     (5     (4           (20

Settlements

    (3                       (3

Transfers into Level 3

                3             3  

Transfers out of Level 3

                1             1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance as of June 30, 2013

  $ 240     $ 111     $ 431     $ 11     $ 793  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The amount of total losses included in income attributed to the change in unrealized losses related to assets and liabilities held for the three months ended June 30, 2013

  $ 1     $     $ 187     $      $ 188  

Six Months Ended June 30, 2013

  Nuclear
Decommissioning
Trust Fund
Investments
    Pledged Assets
for Zion
Decommissioning
    Mark-to-Market
Derivatives
    Other
Investments
    Total  

Balance as of December 31, 2012

  $ 183     $ 89     $ 367     $ 17     $ 656  

Total realized / unrealized gains (losses)

         

Included in net income

    2             31 (a)            33  

Included in other comprehensive income

                             

Included in regulatory assets

    9             (18 )(b)            (9

Included in payable for Zion Station decommissioning

          1                   1  

Change in collateral

                43             43  

Purchases, sales, issuances and settlements

         

Purchases

    67       33       8 (c)      2       110  

Sales

    (13     (12     (8     (8     (41

Settlements

    (8                       (8

Transfers into Level 3

                7             7  

Transfers out of Level 3

                1             1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance as of June 30, 2013

  $ 240     $ 111     $ 431     $ 11     $ 793  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The amount of total gains included in income attributed to the change in unrealized gains related to assets and liabilities held for the six months ended June 30, 2013

  $ 1     $     $ 108     $      $ 109  

 

(a)

Includes the reclassification of $29 million and $77 million of realized losses due to the settlement of derivative contracts recorded in results of operations for the three and six months ended June 30, 2013, respectively.

(b)

Excludes decreases in fair value of $3 million and $11 million and realized losses reclassified due to settlements of $82 million and $215 million associated with Generation’s financial swap contract with ComEd for the three and six months ended June 30, 2013. All items eliminate upon consolidation in Exelon’s Consolidated Financial Statements.

(c)

Includes $10 million which Generation was paid to enter into out of the money purchase contracts.

 

70


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

The following tables present the income statement classification of the total realized and unrealized gains (losses) included in income for Level 3 assets and liabilities measured at fair value on a recurring basis during the six months ended June 30, 2014 and 2013:

 

     Operating
Revenue
    Purchased
Power and  Fuel
    Other,  net(a)  

Total gains (losses) included in income for the three months ended June 30, 2014

   $ (62   $ 14     $ 2  

Total gains (losses) included in income for the six months ended June 30, 2014

   $ (330   $ (30   $ 3  

Change in the unrealized gains (losses) relating to assets and liabilities held for the three months ended June 30, 2014

   $ (10   $ 29     $ 2  

Change in the unrealized gains (losses) relating to assets and liabilities held for the six months ended June 30, 2014

   $ (435   $ 8     $ 2  

 

      Operating
Revenue
    Purchased
Power and Fuel
     Other,  net(a)  

Total gains included in income for the three months ended June 30, 2013

   $ 137     $ 21      $ 1  

Total gains (losses) included in income for the six months ended June 30, 2013

   $ (22   $ 53      $ 2  

Change in the unrealized gains relating to assets and liabilities held for the three months ended June 30, 2013

   $ 156     $ 31      $ 1  

Change in the unrealized gains relating to assets and liabilities held for the six months ended June 30, 2013

   $ 39     $ 69      $ 1  

 

(a)

Other, net activity consists of realized and unrealized gains (losses) included in income for the NDT funds held by Generation.

 

71


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Generation

The following tables present assets and liabilities measured and recorded at fair value on Generation’s Consolidated Balance Sheets on a recurring basis and their level within the fair value hierarchy as of June 30, 2014 and December 31, 2013:

 

As of June 30, 2014

   Level 1     Level 2     Level 3     Total  

Assets

        

Cash equivalents(a)

   $ 65     $     $     $ 65  

Nuclear decommissioning trust fund investments

        

Cash equivalents

     151       66             217  

Equity

        

Individually held

     2,572                   2,572  

Exchange traded funds

     164                   164  

Commingled funds

           2,529             2,529  
  

 

 

   

 

 

   

 

 

   

 

 

 

Equity funds subtotal

     2,736       2,529             5,265  
  

 

 

   

 

 

   

 

 

   

 

 

 

Balanced funds — commingled funds

           273             273  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income

        

Debt securities issued by the U.S. Treasury and other U.S. government corporations and agencies

     990                   990  

Debt securities issued by states of the United States and political subdivisions of the states

           416             416  

Debt securities issued by foreign governments

           114             114  

Corporate debt securities

           2,059       181       2,240  

Federal agency mortgage-backed securities

           84             84  

Commercial mortgage-backed securities (non-agency)

           43             43  

Residential mortgage-backed securities (non-agency)

           3             3  

Mutual funds

           18             18  

Commingled funds

           325             325  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income subtotal

     990       3,062       181       4,233  
  

 

 

   

 

 

   

 

 

   

 

 

 

Middle market lending

                 376       376  

Private Equity

                 35       35  

Other debt obligations

           24             24  
  

 

 

   

 

 

   

 

 

   

 

 

 

Nuclear decommissioning trust fund investments subtotal(b)

     3,877       5,954       592       10,423  
  

 

 

   

 

 

   

 

 

   

 

 

 

Pledged assets for Zion Station decommissioning

        

Cash equivalents

           45             45  

Equity

        

Individually held

     4       2             6  
  

 

 

   

 

 

   

 

 

   

 

 

 

Equity funds subtotal

     4       2             6  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income

        

Debt securities issued by the U.S. Treasury and other U.S. government corporations and agencies

     12       3             15  

Debt securities issued by states of the United States and political subdivisions of the states

           19             19  

Corporate debt securities

           172             172  

Commingled funds

           5             5  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income subtotal

     12       199             211  
  

 

 

   

 

 

   

 

 

   

 

 

 

Middle market lending

                 133       133  
  

 

 

   

 

 

   

 

 

   

 

 

 

Pledged assets for Zion Station decommissioning subtotal(c)

     16       246       133       395  
  

 

 

   

 

 

   

 

 

   

 

 

 

Rabbi trust investments(d)

        

Cash equivalents

     1                   1  

Mutual funds

     14                   14  
  

 

 

   

 

 

   

 

 

   

 

 

 

Rabbi trust investments subtotal

     15                   15  
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity derivative assets

        

Economic hedges

     434       2,969       1,413       4,816  

Proprietary trading

     178       712       184       1,074  

Effect of netting and allocation of collateral(e)

     (569     (3,119     (1,127     (4,815
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity derivative assets subtotal

     43       562       470       1,075  
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative assets

     24       22             46  

Effect of netting and allocation of collateral

     (21     (7            (28
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative assets subtotal

     3       15             18  
  

 

 

   

 

 

   

 

 

   

 

 

 

Other investments

     13             10       23  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total assets

     4,032       6,777       1,205       12,014  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

72


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

As of June 30, 2014

   Level 1     Level 2     Level 3     Total  

Liabilities

        

Commodity derivative liabilities

        

Economic hedges

     (434     (2,803     (1,331     (4,568

Proprietary trading

     (182     (707     (176     (1,065

Effect of netting and allocation of collateral(e)

     618       3,408       1,279       5,305  
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity derivative liabilities subtotal

     2       (102     (228     (328
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative liabilities

     (24     (28           (52

Effect of netting and allocation of collateral

     24       6             30  
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative liabilities subtotal

           (22           (22
  

 

 

   

 

 

   

 

 

   

 

 

 

Deferred compensation obligation

           (29           (29
  

 

 

   

 

 

   

 

 

   

 

 

 

Total liabilities

     2       (153     (228     (379
  

 

 

   

 

 

   

 

 

   

 

 

 

Total net assets

   $ 4,034     $ 6,624     $ 977     $ 11,635  
  

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2013

   Level 1     Level 2     Level 3     Total  

Assets

        

Cash equivalents(a)

   $ 1,006     $     $     $ 1,006  

Nuclear decommissioning trust fund investments

        

Cash equivalents

     459                   459  

Equity

        

Individually held

     1,776                   1,776  

Exchange traded funds

     115                   115  

Commingled funds

           2,271             2,271  
  

 

 

   

 

 

   

 

 

   

 

 

 

Equity funds subtotal

     1,891       2,271             4,162  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income

        

Debt securities issued by the U.S. Treasury and other U.S. government corporations and agencies

     882                   882  

Debt securities issued by states of the United States and political subdivisions of the states

           294             294  

Debt securities issued by foreign governments

           87             87  

Corporate debt securities

           1,753       31       1,784  

Federal agency mortgage-backed securities

           10             10  

Commercial mortgage-backed securities (non-agency)

           40             40  

Residential mortgage-backed securities (non-agency)

           7             7  

Mutual funds

           18             18  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income subtotal

     882       2,209       31       3,122  
  

 

 

   

 

 

   

 

 

   

 

 

 

Middle market lending

                 314       314  

Private Equity

                 5       5  

Other debt obligations

           14             14  
  

 

 

   

 

 

   

 

 

   

 

 

 

Nuclear decommissioning trust fund investments subtotal(b)

     3,232       4,494       350       8,076  
  

 

 

   

 

 

   

 

 

   

 

 

 

Pledged assets for Zion Station decommissioning

        

Cash equivalents

           26             26  

Equity

        

Individually held

     16                   16  
  

 

 

   

 

 

   

 

 

   

 

 

 

Equity funds subtotal

     16                   16  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income

        

Debt securities issued by the U.S. Treasury and other U.S. government corporations and agencies

     45       4             49  

Debt securities issued by states of the United States and political subdivisions of the states

           20             20  

Corporate debt securities

           227             227  
  

 

 

   

 

 

   

 

 

   

 

 

 

Fixed income subtotal

     45       251             296  
  

 

 

   

 

 

   

 

 

   

 

 

 

Middle market lending

                 112       112  

Other debt obligations

           1             1  
  

 

 

   

 

 

   

 

 

   

 

 

 

Pledged assets for Zion Station decommissioning subtotal(c)

     61       278       112       451  
  

 

 

   

 

 

   

 

 

   

 

 

 

Rabbi trust investments(d)

        

Mutual funds

     13                   13  
  

 

 

   

 

 

   

 

 

   

 

 

 

Rabbi trust investments subtotal

     13                   13  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

73


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

As of December 31, 2013

   Level 1     Level 2     Level 3     Total  

Commodity derivative assets

        

Economic hedges

     493       2,582       885       3,960  

Proprietary trading

     324       1,315       122       1,761  

Effect of netting and allocation of collateral(e)

     (863     (3,131     (430     (4,424
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity and foreign currency assets subtotal

     (46     766       577       1,297  
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative assets

     30       32             62  

Effect of netting and allocation of collateral

     (30     (2           (32
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative assets subtotal

           30             30  
  

 

 

   

 

 

   

 

 

   

 

 

 

Other investments

                 15       15  
  

 

 

   

 

 

   

 

 

   

 

 

 

Total assets

     4,266       5,568       1,054       10,888  
  

 

 

   

 

 

   

 

 

   

 

 

 

Liabilities

        

Commodity derivative liabilities

        

Economic hedges

     (540     (1,890     (397     (2,827

Proprietary trading

     (328     (1,256     (119     (1,703

Effect of netting and allocation of collateral(e)

     869       3,007       404       4,280  
  

 

 

   

 

 

   

 

 

   

 

 

 

Commodity derivative liabilities subtotal

     1       (139     (112     (250
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate derivative liabilities

     (31     (13           (44

Effect of netting and allocation of collateral

     31       1             32  
  

 

 

   

 

 

   

 

 

   

 

 

 

Interest rate and foreign currency derivative liabilities

           (12           (12
  

 

 

   

 

 

   

 

 

   

 

 

 

Deferred compensation obligation

           (29           (29
  

 

 

   

 

 

   

 

 

   

 

 

 

Total liabilities

     1       (180     (112     (291
  

 

 

   

 

 

   

 

 

   

 

 

 

Total net assets

   $ 4,267     $ 5,388     $ 942     $ 10,597  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Excludes certain cash equivalents considered to be held-to-maturity and not reported at fair value.

(b)

Excludes net assets (liabilities) of $14 million and $(5) million at June 30, 2014 and December 31, 2013, respectively. These items consist of receivables related to pending securities sales, interest and dividend receivables, and payables related to pending securities purchases.

(c)

Excludes net assets of $7 million at both June 30, 2014 and December 31, 2013, respectively. These items consist of receivables related to pending securities sales, interest and dividend receivables, and payables related to pending securities purchases.

(d)

Excludes $10 million of the cash surrender value of life insurance investments at both June 30, 2014 and December 31, 2013.

(e)

Includes collateral postings to counterparties. Collateral posted to counterparties, net of collateral paid to counterparties, totaled $49 million, $289 million and $152 million allocated to Level 1, Level 2 and Level 3 mark-to-market derivatives, respectively, as of June 30, 2014. Collateral posted (received) from counterparties, net of collateral paid to counterparties, totaled $6 million, $(124) million and $(26) million allocated to Level 1, Level 2 and Level 3 mark-to-market derivatives, respectively, as of December 31, 2013.

 

74


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

The following tables present the fair value reconciliation of Level 3 assets and liabilities measured at fair value on a recurring basis during the three and six months ended June 30, 2014 and 2013:

 

Three Months Ended June 30, 2014

  Nuclear
Decommissioning
Trust Fund
Investments
    Pledged Assets
for Zion Station
Decommissioning
    Mark-to-Market
Derivatives
    Other
Investments
    Total  

Balance as of March 31, 2014

  $ 486     $ 137     $ 287     $ 10     $ 920  

Total realized / unrealized gains (losses)

         

Included in net income

    2             (48 )(a)            (46

Included in noncurrent payables to affiliates

    8                         8  

Included in payable for Zion Station decommissioning

          4                   4  

Change in collateral

                34             34  

Purchases, sales, issuances and settlements

         

Purchases

    109       13       5             127  

Sales

    (1     (21     (4           (26

Settlements

    (12                       (12

Transfers into Level 3

                (4           (4

Transfers out of Level 3

                (28           (28
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance as of June 30, 2014

  $ 592     $ 133     $ 242     $ 10     $ 977  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The amount of total gains included in income attributed to the change in unrealized gains related to assets and liabilities held for the three months ended June 30, 2014

  $ 2     $     $ 19     $      $ 21  

Six Months Ended June 30, 2014

  Nuclear
Decommissioning
Trust Fund
Investments
    Pledged Assets
for Zion Station
Decommissioning
    Mark-to-Market
Derivatives
    Other
Investments
    Total  

Balance as of December 31, 2013

  $ 350     $ 112     $ 465     $ 15     $ 942  

Total realized / unrealized gains (losses)

         

Included in net income

    3             (360 )(a)            (357

Included in noncurrent payables to affiliates

    11                         11  

Included in payable for Zion Station decommissioning

          4                   4  

Change in collateral

            178             178  

Purchases, sales, issuances and settlements

         

Purchases

    249       42       15       2       308  

Sales

    (2     (25     (6           (33

Settlements

    (19                       (19

Transfers into Level 3

                (30           (30

Transfers out of Level 3

                (20     (7     (27
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance as of June 30, 2014

  $ 592     $ 133     $ 242     $ 10     $ 977  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The amount of total gains included in income attributed to the change in unrealized gains related to assets and liabilities held for the six months ended June 30, 2014

  $ 2     $     $ (427   $      $ (425

 

(a)

Includes an increase for the reclassification of $67 million of realized losses due to the settlement of derivative contracts recorded in results of operations for the three and six months ended June 30, 2014, respectively.

 

75


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Three Months Ended June 30, 2013

  Nuclear
Decommissioning
Trust Fund
Investments
    Pledged Assets
for Zion Station
Decommissioning
    Mark-to-Market
Derivatives
    Other
Investments
    Total  

Balance as of March 31, 2013

  $ 210     $ 104     $ 420     $ 9     $ 743  

Total realized / unrealized gains (losses)

         

Included in net income

    1             168 (a)(b)            169  

Included in other comprehensive income

                (95 )(b)            (95

Included in noncurrent payables to affiliates

    8                         8  

Included in payable for Zion Station decommissioning

          1                   1  

Changes in collateral

                10             10  

Purchases, sales, issuances and settlements

         

Purchases

    35       11       13       2       61  

Sales

    (11     (5     (4           (20

Settlements

    (3                       (3

Transfers into Level 3

                3             3  

Transfers out of Level 3

                1             1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance as of June 30, 2013

  $ 240     $ 111     $ 516     $ 11     $ 878  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The amount of total losses included in income attributed to the change in unrealized losses related to assets and liabilities held for the three months ended June 30, 2013

  $ 1     $     $ 183     $      $ 184  

Six Months Ended June 30, 2013

  Nuclear
Decommissioning
Trust Fund
Investments
    Pledged Assets
for Zion Station
Decommissioning
    Mark-to-Market
Derivatives
    Other
Investments
    Total  

Balance as of December 31, 2012

  $ 183     $ 89     $ 660     $ 17     $ 949  

Total realized / unrealized gains (losses)

         

Included in net income

    2             24 (a)(b)            26  

Included in other comprehensive income

                (219 )(b)            (219

Included in noncurrent payables to affiliates

    9                     9  

Included in payable for Zion Station decommissioning

          1                   1  

Changes in collateral

                43             43  

Purchases, sales, issuances and settlements

             

Purchases

    67       33       8 (c)      2       110  

Sales

    (13     (12     (8     (8     (41

Settlements

    (8                       (8

Transfers into Level 3

                7             7  

Transfers out of Level 3

                1             1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance as of June 30, 2013

  $ 240     $ 111     $ 516     $ 11     $ 878  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The amount of total gains included in income attributed to the change in unrealized gains related to assets and liabilities held for the six months ended June 30, 2013

  $ 1     $     $ 97     $      $ 98  

 

(a)

Includes the reclassification of $15 million and $73 million of realized losses due to the settlement of derivative contracts recorded in results of operations for the three and six months ended June 30, 2013, respectively.

(b)

Includes $3 million of decreases in fair value and $11 million of increases in fair value and realized losses due to settlements of $82 million and $215 million associated with Generation’s financial swap contract with ComEd for the three and six months ended June 30, 2013, respectively. This position eliminates upon consolidation in Exelon’s Consolidated Financial Statements.

(c)

Includes $10 million which Generation was paid to enter into out of the money purchase contracts.

 

76


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

The following tables present the income statement classification of the total realized and unrealized gains (losses) included in income for Level 3 assets and liabilities measured at fair value on a recurring basis during the six months ended June 30, 2014 and 2013:

 

     Operating
Revenue
    Purchased
Power  and
Fuel
    Other,  net(a)  

Total gains (losses) included in net income for the three months ended June 30, 2014

   $ (62   $ 14     $ 2  

Total losses included in net income for the six months ended June 30, 2014

   $ (330   $ (30   $ 3  

Change in the unrealized gains (losses) relating to assets and liabilities held for the three months ended June 30, 2014

   $ (10   $ 29     $ 2  

Change in the unrealized gains (losses) relating to assets and liabilities held for the six months ended June 30, 2014

   $ (435   $ 8     $ 2  
     Operating
Revenue
    Purchased
Power  and

Fuel
    Other,  net(a)  

Total gains included in net income for the three months ended June 30, 2013

   $ 148     $ 20     $ 1  

Total gains (losses) included in net income for the six months ended June 30, 2013

   $ (28   $ 52     $ 2  

Change in the unrealized gains relating to assets and liabilities held for the three months ended June 30, 2013

   $ 153     $ 30     $ 1  

Change in the unrealized gains relating to assets and liabilities held for the nine months ended June 30, 2013

   $ 29     $ 68     $ 1  

 

(a)

Other, net activity consists of realized and unrealized gains (losses) included in income for the NDT funds held by Generation.

ComEd

The following tables present assets and liabilities measured and recorded at fair value on ComEd’s Consolidated Balance Sheets on a recurring basis and their level within the fair value hierarchy as of June 30, 2014 and December 31, 2013:

 

As of June 30, 2014

   Level 1      Level 2     Level 3     Total  

Assets

         

Rabbi trust investments

         

Mutual funds

   $ 1      $      $     $ 1  
     

 

 

    

 

 

   

 

 

   

 

 

 

Rabbi trust investments subtotal

     1                    1  

Total assets

   $ 1      $      $     $ 1  
     

 

 

    

 

 

   

 

 

   

 

 

 

Liabilities

         

Deferred compensation obligation

            (8           (8

Mark-to-market derivative liabilities(a)

                  (134     (134
     

 

 

    

 

 

   

 

 

   

 

 

 

Total liabilities

            (8     (134     (142
     

 

 

    

 

 

   

 

 

   

 

 

 

Total net assets (liabilities)

   $ 1      $ (8   $ (134   $ (141
     

 

 

    

 

 

   

 

 

   

 

 

 

 

77


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

As of December 31, 2013

   Level 1      Level 2     Level 3     Total  

Assets

  

      

Rabbi trust investments

  

      

Mutual funds

   $ 5      $      $     $ 5  
  

 

 

    

 

 

   

 

 

   

 

 

 

Rabbi trust investments subtotal

     5                    5  
  

 

 

    

 

 

   

 

 

   

 

 

 

Total assets

     5                    5  
  

 

 

    

 

 

   

 

 

   

 

 

 

Liabilities

         

Deferred compensation obligation

            (8           (8

Mark-to-market derivative liabilities(a)

                  (193     (193
  

 

 

    

 

 

   

 

 

   

 

 

 

Total liabilities

            (8     (193     (201
  

 

 

    

 

 

   

 

 

   

 

 

 

Total net assets (liabilities)

   $ 5      $ (8   $ (193   $ (196
  

 

 

    

 

 

   

 

 

   

 

 

 

 

(a)

The Level 3 balance includes the current and noncurrent liability of $13 million and $121 million at June 30, 2014, respectively, and $17 million and $176 million at December 31, 2013, respectively, related to floating-to-fixed energy swap contracts with unaffiliated suppliers.

The following tables present the fair value reconciliation of Level 3 assets and liabilities measured at fair value on a recurring basis during the three and six months ended June 30, 2014 and 2013:

 

Three Months Ended June 30, 2014

   Mark-to-Market
Derivatives
 

Balance as of March 31, 2014

   $ (168

Total realized / unrealized gains included in regulatory assets(a)

     34  
  

 

 

 

Balance as of June 30, 2014

   $ (134
  

 

 

 

Six Months Ended June 30, 2014

   Mark-to-Market
Derivatives
 

Balance as of December 31, 2013

   $ (193

Total realized / unrealized gains included in regulatory assets(b)

     59  
  

 

 

 

Balance as of June 30, 2014

   $ (134
  

 

 

 

 

(a)

Includes $34 million decreases in the fair value partially offset by immaterial realized losses due to settlements recorded in purchased power expense associated with floating-to-fixed energy swap contracts with unaffiliated suppliers for the three months ended June 30, 2014.

(b)

Includes $64 million of decreases in the fair value partially offset by realized gains due to settlements of $5 million recorded in purchased power expense associated with floating-to-fixed energy swap contracts with unaffiliated suppliers for the six months ended June 30, 2014.

 

Three Months Ended June 30, 2013

   Mark-to-Market
Derivatives
 

Balance as of March 31, 2013

   $ (160

Total realized / unrealized gains included in regulatory assets(a)(b)

     75  
  

 

 

 

Balance as of June 30, 2013

   $ (85
  

 

 

 

 

78


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Six Months Ended June 30, 2013

   Mark-to-Market
Derivatives
 

Balance as of December 31, 2012

   $ (293

Total realized / unrealized gains included in regulatory assets(a)(b)

     208  
  

 

 

 

Balance as of June 30, 2013

   $ (85
  

 

 

 

 

(a)

Includes $3 million of increases in fair value and $11 million of decreases in fair value and realized gains due to settlements of $82 million and $215 million of associated with ComEd’s financial swap contract with Generation for the three and six months ended June 30, 2013, respectively. All items eliminate upon consolidation in Exelon’s Consolidated Financial Statements.

(b)

Includes $9 million and $20 million of increases in the fair value and realized losses due to settlements of $1 million and $4 million recorded in purchased power expense associated with floating-to-fixed energy swap contracts with unaffiliated suppliers for the three and six months ended June 30, 2013, respectively.

PECO

The following tables present assets and liabilities measured and recorded at fair value on PECO’s Consolidated Balance Sheets on a recurring basis and their level within the fair value hierarchy as of June 30, 2014 and December 31, 2013:

 

As of June 30, 2014

   Level 1      Level 2     Level 3      Total  

Assets

          

Cash equivalents

   $ 50      $     $       $ 50  

Rabbi trust investments(a)

          

Mutual funds

     9                     9  
  

 

 

    

 

 

   

 

 

    

 

 

 

Rabbi trust investments subtotal

     9                     9  
  

 

 

    

 

 

   

 

 

    

 

 

 

Total assets

     59                     59  
  

 

 

    

 

 

   

 

 

    

 

 

 

Liabilities

          

Deferred compensation obligation

            (15            (15
  

 

 

    

 

 

   

 

 

    

 

 

 

Total liabilities

            (15            (15
  

 

 

    

 

 

   

 

 

    

 

 

 

Total net assets (liabilities)

   $ 59      $ (15   $       $ 44  
  

 

 

    

 

 

   

 

 

    

 

 

 

As of December 31, 2013

   Level 1      Level 2     Level 3      Total  

Assets

          

Cash equivalents

   $ 175      $     $       $ 175  

Rabbi trust investments(a)

          

Mutual funds

     9                     9  
  

 

 

    

 

 

   

 

 

    

 

 

 

Rabbi trust investments subtotal

     9                     9  
  

 

 

    

 

 

   

 

 

    

 

 

 

Total assets

     184                     184  
  

 

 

    

 

 

   

 

 

    

 

 

 

Liabilities

          

Deferred compensation obligation

            (17            (17
  

 

 

    

 

 

   

 

 

    

 

 

 

Total liabilities

            (17            (17
  

 

 

    

 

 

   

 

 

    

 

 

 

Total net assets (liabilities)

   $ 184      $ (17   $       $ 167  
  

 

 

    

 

 

   

 

 

    

 

 

 

 

(a)

Excludes $14 million of the cash surrender value of life insurance investments at both June 30, 2014 and December 31, 2013.

 

79


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

PECO had no Level 3 assets or liabilities measured at fair value on a recurring basis during the six months ended June 30, 2014 and 2013.

BGE

The following tables present assets and liabilities measured and recorded at fair value on BGE’s Consolidated Balance Sheets on a recurring basis and their level within the fair value hierarchy as of June 30, 2014 and December 31, 2013:

 

As of June 30, 2014

   Level 1      Level 2     Level 3      Total  

Assets

          

Cash equivalents

   $ 53      $      $       $ 53  

Rabbi trust investments

          

Mutual funds

     5                     5  
  

 

 

    

 

 

   

 

 

    

 

 

 

Rabbi trust investments subtotal

     5                     5  

Total assets

     58                     58  
  

 

 

    

 

 

   

 

 

    

 

 

 

Liabilities

          

Deferred compensation obligation

            (5            (5
  

 

 

    

 

 

   

 

 

    

 

 

 

Total liabilities

            (5            (5
  

 

 

    

 

 

   

 

 

    

 

 

 

Total net assets (liabilities)

   $ 58      $ (5   $       $ 53  
  

 

 

    

 

 

   

 

 

    

 

 

 

As of December 31, 2013

   Level 1      Level 2     Level 3      Total  

Assets

          

Cash equivalents

   $ 31      $      $       $ 31  

Rabbi trust investments

          

Mutual funds

     6                     6  
  

 

 

    

 

 

   

 

 

    

 

 

 

Rabbi trust investments subtotal

     6                     6  
  

 

 

    

 

 

   

 

 

    

 

 

 

Total assets

     37                     37  
  

 

 

    

 

 

   

 

 

    

 

 

 

Liabilities

          

Deferred compensation obligation

            (6            (6
  

 

 

    

 

 

   

 

 

    

 

 

 

Total liabilities

            (6            (6
  

 

 

    

 

 

   

 

 

    

 

 

 

Total net assets (liabilities)

   $ 37      $ (6   $       $ 31  
  

 

 

    

 

 

   

 

 

    

 

 

 

BGE had no Level 3 assets or liabilities measured at fair value on a recurring basis during the three and six months ended June 30, 2014 and 2013.

Valuation Techniques Used to Determine Fair Value

The following describes the valuation techniques used to measure the fair value of the assets and liabilities shown in the tables above.

Cash Equivalents (Exelon, Generation, ComEd, PECO and BGE).    The Registrants’ cash equivalents include investments with maturities of three months or less when purchased. The cash equivalents shown in the fair value tables are comprised of investments in mutual and money market funds. The fair values of the shares of these funds are based on observable market prices and, therefore, have been categorized in Level 1 in the fair value hierarchy.

 

80


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Nuclear Decommissioning Trust Fund Investments and Pledged Assets for Zion Station Decommissioning (Exelon and Generation).    The trust fund investments have been established to satisfy Generation’s and CENG’s nuclear decommissioning obligations as required by the NRC. The NDT funds hold debt and equity securities directly and indirectly through commingled funds. Generation’s and CENG’s investment policies place limitations on the types and investment grade ratings of the securities that may be held by the trusts. These policies limit the trust funds’ exposures to investments in highly illiquid markets and other alternative investments. Investments with maturities of three months or less when purchased, including certain short-term fixed income securities are considered cash equivalents and included in the recurring fair value measurements hierarchy as Level 1 or Level 2.

With respect to individually held equity securities, the trustees obtain prices from pricing services, whose prices are obtained from direct feeds from market exchanges, which Generation is able to independently corroborate. The fair values of equity securities held directly by the trust funds are based on quoted prices in active markets and are categorized in Level 1. Equity securities held individually are primarily traded on the New York Stock Exchange and NASDAQ-Global Select Market, which contain only actively traded securities due to the volume trading requirements imposed by these exchanges.

For fixed income securities, multiple prices from pricing services are obtained whenever possible, which enables cross-provider validations in addition to checks for unusual daily movements. A primary price source is identified based on asset type, class or issue for each security. The trustees monitor prices supplied by pricing services and may use a supplemental price source or change the primary price source of a given security if the portfolio managers challenge an assigned price and the trustees determine that another price source is considered to be preferable. Generation has obtained an understanding of how these prices are derived, including the nature and observability of the inputs used in deriving such prices. Additionally, Generation selectively corroborates the fair values of securities by comparison to other market-based price sources. U.S. Treasury securities are categorized as Level 1 because they trade in a highly liquid and transparent market. The fair values of fixed income securities, excluding U.S. Treasury securities, are based on evaluated prices that reflect observable market information, such as actual trade information or similar securities, adjusted for observable differences and are categorized in Level 2. The fair values of private placement fixed income securities are determined using a third party valuation that contains significant unobservable inputs and are categorized in Level 3.

Equity, balanced and fixed income commingled funds and fixed income mutual funds are maintained by investment companies and hold certain investments in accordance with a stated set of fund objectives. The fair values of fixed income commingled and mutual funds held within the trust funds, which generally hold short-term fixed income securities and are not subject to restrictions regarding the purchase or sale of shares, are derived from observable prices. The objectives of the remaining equity commingled funds in which Exelon, Generation and CENG invest primarily seek to track the performance of certain equity indices by purchasing equity securities to replicate the capitalization and characteristics of the indices. Comingled and mutual funds are categorized in Level 2 because the fair value of the funds are based on NAVs per fund share (the unit of account), primarily derived from the quoted prices in active markets on the underlying equity securities. See Note 12 — Nuclear Decommissioning for further discussion on the NDT fund investments.

Middle market lending are investments in loans or managed funds which invest in private companies. Generation elected the fair value option for its investments in certain limited partnerships that invest in middle market lending managed funds. The fair value of these loans is determined using a combination of valuation models including cost models, market models, and income models. Investments in middle market lending are categorized as Level 3 because the fair value of these securities is based largely on inputs that are unobservable and utilize complex valuation models. Investments in middle market lending typically cannot be redeemed until maturity of the term loan.

 

81


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

As of June 30, 2014, Generation has outstanding commitments to invest in middle market lending, corporate debt securities, private equity investments, and real estate investments of approximately $430 million. These commitments will be funded by Generation’s existing nuclear decommissioning trust funds.

Rabbi Trust Investments (Exelon, Generation, ComEd, PECO and BGE).    The Rabbi trusts were established to hold assets related to deferred compensation plans existing for certain active and retired members of Exelon’s executive management and directors. The investments in the Rabbi trusts are included in investments in the Registrants’ Consolidated Balance Sheets and consist primarily of mutual funds. These funds are maintained by investment companies and hold certain investments in accordance with a stated set of fund objectives, which are consistent with Exelon’s overall investment strategy. Mutual funds are publicly quoted and have been categorized as Level 1 given the clear observability of the prices.

Mark-to-Market Derivatives (Exelon, Generation, and ComEd).    Derivative contracts are traded in both exchange-based and non-exchange-based markets. Exchange-based derivatives that are valued using unadjusted quoted prices in active markets are categorized in Level 1 in the fair value hierarchy. Certain derivatives’ pricing is verified using indicative price quotations available through brokers or over-the-counter, on-line exchanges and are categorized in Level 2. These price quotations reflect the average of the bid-ask, mid-point prices and are obtained from sources that the Registrants believe provide the most liquid market for the commodity. The price quotations are reviewed and corroborated to ensure the prices are observable and representative of an orderly transaction between market participants. This includes consideration of actual transaction volumes, market delivery points, bid-ask spreads and contract duration. The remainder of derivative contracts are valued using the Black model, an industry standard option valuation model. The Black model takes into account inputs such as contract terms, including maturity, and market parameters, including assumptions of the future prices of energy, interest rates, volatility, credit worthiness and credit spread. For derivatives that trade in liquid markets, such as generic forwards, swaps and options, model inputs are generally observable. Such instruments are categorized in Level 2. The Registrants’ derivatives are predominately at liquid trading points. For derivatives that trade in less liquid markets with limited pricing information model inputs generally would include both observable and unobservable inputs. These valuations may include an estimated basis adjustment from an illiquid trading point to a liquid trading point for which active price quotations are available. Such instruments are categorized in Level 3.

Exelon may utilize fixed-to-floating interest rate swaps, which are typically designated as fair value hedges, as a means to achieve its targeted level of variable-rate debt as a percent of total debt. In addition, the Registrants may utilize interest rate derivatives to lock in interest rate levels in anticipation of future financings. These interest rate derivatives are typically designated as cash flow hedges. Exelon determines the current fair value by calculating the net present value of expected payments and receipts under the swap agreement, based on and discounted by the market’s expectation of future interest rates. Additional inputs to the net present value calculation may include the contract terms, counterparty credit risk and other market parameters. As these inputs are based on observable data and valuations of similar instruments, the interest rate swaps are categorized in Level 2 in the fair value hierarchy. See Note 9 — Derivative Financial Instruments for further discussion on mark-to-market derivatives.

Deferred Compensation Obligations (Exelon, Generation, ComEd, PECO and BGE).    The Registrants’ deferred compensation plans allow participants to defer certain cash compensation into a notional investment account. The Registrants include such plans in other current and noncurrent liabilities in their Consolidated Balance Sheets. The value of the Registrants’ deferred compensation obligations is based on the market value of the participants’ notional investment accounts. The notional investments are comprised primarily of mutual funds, which are based on observable market prices. However, since the deferred compensation obligations themselves are not exchanged in an active market, they are categorized as Level 2 in the fair value hierarchy.

 

82


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Additional Information Regarding Level 3 Fair Value Measurements (Exelon, Generation, ComEd)

Mark-to-Market Derivatives (Exelon, Generation, ComEd).    For valuations that include both observable and unobservable inputs, if the unobservable input is determined to be significant to the overall inputs, the entire valuation is categorized in Level 3. This includes derivatives valued using indicative price quotations whose contract tenure extends into unobservable periods. In instances where observable data is unavailable, consideration is given to the assumptions that market participants would use in valuing the asset or liability. This includes assumptions about market risks such as liquidity, volatility and contract duration. Such instruments are categorized in Level 3 as the model inputs generally are not observable. Exelon’s RMC approves risk management policies and objectives for risk assessment, control and valuation, counterparty credit approval, and the monitoring and reporting of risk exposures. The RMC is chaired by the chief risk officer and includes the chief financial officer, corporate controller, general counsel, treasurer, vice president of strategy, vice president of audit services and officers representing Exelon’s business units. The RMC reports to the Exelon Board of Directors on the scope of the risk management activities and is responsible for approving all valuation procedures at Exelon. Forward price curves for the power market utilized by the front office to manage the portfolio, are reviewed and verified by the middle office, and used for financial reporting by the back office. The Registrants consider credit and nonperformance risk in the valuation of derivative contracts categorized in Level 2 and 3, including both historical and current market data in its assessment of credit and nonperformance risk by counterparty. Due to master netting agreements and collateral posting requirements, the impacts of credit and nonperformance risk were not material to the financial statements.

Disclosed below is detail surrounding the Registrants’ significant Level 3 valuations. The calculated fair value includes marketability discounts for margining provisions and other attributes. Generation’s Level 3 balance generally consists of forward sales and purchases of power and natural gas, coal purchases, certain transmission congestion contracts, and project financing debt. Generation utilizes various inputs and factors including market data and assumptions that market participants would use in pricing assets or liabilities as well as assumptions about the risks inherent in the inputs to the valuation technique. The inputs and factors include forward commodity prices, commodity price volatility, contractual volumes, delivery location, interest rates, credit quality of counterparties and credit enhancements.

For commodity derivatives, the primary input to the valuation models is the forward commodity price curve for each instrument. Forward commodity price curves are derived by risk management for liquid locations and by the traders and portfolio managers for illiquid locations. All locations are reviewed and verified by risk management considering published exchange transaction prices, executed bilateral transactions, broker quotes, and other observable or public data sources. The relevant forward commodity curve used to value each of the derivatives depends on a number of factors, including commodity type, delivery location, and delivery period. Price volatility varies by commodity and location. When appropriate, Generation discounts future cash flows using risk free interest rates with adjustments to reflect the credit quality of each counterparty for assets and Generation’s own credit quality for liabilities. The level of observability of a forward commodity price is generally due to the delivery location and delivery period. Certain delivery locations including PJM West Hub (for power) and Henry Hub (for natural gas) are more liquid and prices are observable for up to three years in the future. The observability period of volatility is generally shorter than the underlying power curve used in option valuations. The forward curve for a less liquid location is estimated by using the forward curve from the liquid location and applying a spread to represent the cost to transport the commodity to the delivery location. This spread does not typically represent a majority of the instrument’s market price. As a result, the change in fair value is closely tied to liquid market movements and not a change in the applied spread. The change in fair value associated with a change in the spread is generally immaterial. An average spread calculated across all Level 3 power and gas delivery locations is approximately $2.57 and $0.41 for power and natural gas, respectively. Many of the commodity derivatives are short term in nature and thus a majority of the fair value may be based on observable inputs even though the contract as a whole must be classified as Level 3. See ITEM 3. — QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK for information regarding the maturity by year of the Registrant’s mark-to-market derivative assets and liabilities.

 

83


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

On December 17, 2010, ComEd entered into several 20-year floating to fixed energy swap contracts with unaffiliated suppliers for the procurement of long-term renewable energy and associated RECs. See Note 9 — Derivative Financial Instruments for more information. The fair value of these swaps has been designated as a Level 3 valuation due to the long tenure of the positions and internal modeling assumptions. The modeling assumptions include using natural gas heat rates to project long term forward power curves adjusted by a renewable factor that incorporates time of day and seasonality factors to reflect accurate renewable energy pricing. In addition, marketability reserves are applied to the positions based on the tenor and supplier risk. The table below discloses the significant inputs to the forward curve used to value these positions.

 

Type of trade

   Fair Value at
June  30,
2014(c)
    Valuation
Technique
   Unobservable
Input
  Range

Mark-to-market derivatives — Economic Hedges (Generation)(a)

   $ 82     Discounted
Cash Flow
   Forward power
price
  $16 - $170(d)
        Forward gas
price
  $2.19 - $19.84(d)
     Option Model    Volatility
percentage
  8% - 260%

Mark-to-market derivatives — Proprietary trading (Generation)(a)

   $ 8     Discounted
Cash Flow
   Forward power
price
  $13 - $168(d)
     Option Model    Volatility
percentage
  8% - 260%

Mark-to-market derivatives (ComEd)

   $ (134   Discounted
Cash Flow
   Forward heat
rate
(b)
  8x - 9x
        Marketability
reserve
  3.5% - 8%
        Renewable
factor
  86% - 123%

 

a)

The valuation techniques, unobservable inputs and ranges are the same for the asset and liability positions.

b)

Quoted forward natural gas rates are utilized to project the forward power curve for the delivery of energy at specified future dates. The natural gas curve is extrapolated beyond its observable period to the end of the contract’s delivery.

c)

The fair values do not include cash collateral held on level three positions of $152 million as of June 30, 2014.

d)

The upper ends of the ranges are driven by the winter power and gas prices in the New England region. Without the New England region, the upper ends of the ranges for power and gas economic hedges would be approximately $106 and $10.29, respectively, and would be approximately $93 for power proprietary trading.

 

84


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Type of trade

   Fair Value at
December 31,
2013(c)
    Valuation
Technique
   Unobservable
Input
  Range

Mark-to-market derivatives — Economic Hedges (Generation)(a)

   $ 488     Discounted
Cash Flow
   Forward power
price
  $8 - $176(d)
        Forward gas
price
  $2.98 - $16.63(d)
     Option Model    Volatility
percentage
  15% - 142%

Mark-to-market derivatives — Proprietary trading (Generation)(a)

   $ 3     Discounted
Cash Flow
   Forward power
price
  $10 - $176(d)
     Option Model    Volatility
percentage
  14% - 19%

Mark-to-market derivatives (ComEd)

   $ (193   Discounted
Cash Flow
   Forward heat
rate
(b)
  8x - 9x
        Marketability
reserve
  3.5% - 8%
        Renewable
factor
  84% - 128%

 

a)

The valuation techniques, unobservable inputs and ranges are the same for the asset and liability positions.

b)

Quoted forward natural gas rates are utilized to project the forward power curve for the delivery of energy at specified future dates. The natural gas curve is extrapolated beyond its observable period to the end of the contract’s delivery.

c)

The fair values do not include cash collateral held on level three positions of $26 million as of December 31, 2013

d)

The upper ends of the ranges are driven by the winter power and gas prices in the New England region. Without the New England region, the upper ends of the ranges for power and gas would be approximately $100 and $5.70, respectively.

The inputs listed above would have a direct impact on the fair values of the above instruments if they were adjusted. The significant unobservable inputs used in the fair value measurement of Generation’s commodity derivatives are forward commodity prices and for options is price volatility. Increases (decreases) in the forward commodity price in isolation would result in significantly higher (lower) fair values for long positions (contracts that give Generation the obligation or option to purchase a commodity), with offsetting impacts to short positions (contracts that give Generation the obligation or right to sell a commodity). Increases (decreases) in volatility would increase (decrease) the value for the holder of the option (writer of the option). Generally, a change in the estimate of forward commodity prices is unrelated to a change in the estimate of volatility of prices. An increase to the reserves listed above would decrease the fair value of the positions. An increase to the heat rate or renewable factors would increase the fair value accordingly. Generally, interrelationships exist between market prices of natural gas and power. As such, an increase in natural gas pricing would potentially have a similar impact on forward power markets.

Nuclear Decommissioning Trust Fund Investments and Pledged Assets for Zion Station Decommissioning (Exelon and Generation).    For middle market lending, certain corporate debt securities, and private equity investments the fair value is determined using a combination of valuation models including cost models, market models and income models. The valuation estimates are based on valuations of comparable companies, discounting the forecasted cash flows of the portfolio company, estimating the liquidation or collateral value of the portfolio company or its assets, considering offers from third parties to buy the portfolio company, its historical and projected financial results, as well as other factors that may impact value. Significant judgment is required in the application of discounts or premiums applied to the prices of comparable companies for factors such as size, marketability, credit risk and relative performance.

 

85


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Because Generation relies on third-party fund managers to develop the quantitative unobservable inputs without adjustment for the valuations of its’ Level 3 investments, quantitative information about significant unobservable inputs used in valuing these investments is not reasonably available to Generation. This includes information regarding the sensitivity of the fair values to changes in the unobservable inputs. Generation gains an understanding of the fund managers’ inputs and assumptions used in preparing the valuations. Generation performed procedures to assess the reasonableness of the valuations. For a sample of its’ Level 3 investments, Generation reviewed independent valuations and reviewed the assumptions in the detailed pricing models used by the fund managers.

9.    Derivative Financial Instruments (Exelon, Generation, ComEd, PECO and BGE)

The Registrants use derivative instruments to manage commodity price risk and interest rate risk related to ongoing business operations.

Commodity Price Risk (Exelon, Generation, ComEd, PECO and BGE)

To the extent the amount of energy Exelon generates differs from the amount of energy it has contracted to sell, the Registrants are exposed to market fluctuations in the prices of electricity, fossil fuels and other commodities. The Registrants employ established policies and procedures to manage their risks associated with market fluctuations by entering into physical and financial derivative contracts, including swaps, futures, forwards, options and short-term and long-term commitments to purchase and sell energy and energy-related products. The Registrants believe these instruments, which are classified as either economic hedges or non-derivatives, mitigate exposure to fluctuations in commodity prices.

Derivative accounting guidance requires that derivative instruments be recognized as either assets or liabilities at fair value, with changes in fair value of the derivative recognized in earnings each period. Other accounting treatments are available through special election and designation, provided they meet specific, restrictive criteria both at the time of designation and on an ongoing basis. These alternative permissible accounting treatments include normal purchase normal sale (NPNS), cash flow hedge, and fair value hedge. For commodity transactions, effective with the date of merger with Constellation, Generation no longer utilizes the special election provided for by the cash flow hedge designation and de-designated all of its existing cash flow hedges prior to the merger. Because the underlying forecasted transactions remain at least reasonably possible, the fair value of the effective portion of these cash flow hedges was frozen in accumulated OCI and reclassified to results of operations when the forecasted purchase or sale of the energy commodity occurs, or becomes probable of not occurring. None of Constellation’s designated cash flow hedges for commodity transactions prior to the merger were re-designated as cash flow hedges. The effect of this decision is that all derivative economic hedges for commodities are recorded at fair value through earnings for the combined company, referred to as economic hedges in the following tables. The Registrants have applied the NPNS scope exception to certain derivative contracts for the forward sale of generation, power procurement agreements, and natural gas supply agreements. Non-derivative contracts for access to additional generation and certain sales to load-serving entities are accounted for primarily under the accrual method of accounting, which is further discussed in Note 22 — Commitments and Contingencies of the Exelon 2013 Form 10-K. Additionally, Generation is exposed to certain market risks through its proprietary trading activities. The proprietary trading activities are a complement to Generation’s energy marketing portfolio but represent a small portion of Generation’s overall energy marketing activities.

Economic Hedging.    The Registrants are exposed to commodity price risk primarily relating to changes in the market price of electricity, fossil fuels, and other commodities associated with price movements resulting from changes in supply and demand, fuel costs, market liquidity, weather conditions, governmental regulatory and environmental policies, and other factors. Within Exelon, Generation has the most exposure to commodity price risk. As such, Generation uses a variety of derivative and non-derivative instruments to manage the

 

86


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

commodity price risk of its electric generation facilities, including power and gas sales, fuel and energy purchases, natural gas transportation and pipeline capacity agreements and other energy-related products marketed and purchased. In order to manage these risks, Generation may enter into fixed-price derivative or non-derivative contracts to hedge the variability in future cash flows from forecasted sales of energy and gas and purchases of fuel and energy. The objectives for entering into such hedges include fixing the price for a portion of anticipated future electricity sales at a level that provides an acceptable return on electric generation operations, fixing the price of a portion of anticipated fuel purchases for the operation of power plants, and fixing the price for a portion of anticipated energy purchases to supply load-serving customers. The portion of forecasted transactions hedged may vary based upon management’s policies and hedging objectives, the market, weather conditions, operational and other factors. Generation is also exposed to differences between the locational settlement prices of certain economic hedges and the hedged generating units. This price difference is actively managed through other instruments which include derivative congestion products, whose changes in fair value are recognized in earnings each period, and auction revenue rights, which are accounted for on an accrual basis.

In general, increases and decreases in forward market prices have a positive and negative impact, respectively, on Generation’s owned and contracted generation positions that have not been hedged. Generation hedges commodity price risk on a ratable basis over three-year periods. As of June 30, 2014, the percentage of expected generation hedged for the major reportable segments was 92%-95%, 75%-78%, and 46%-49% for 2014, 2015, and 2016, respectively. The percentage of expected generation hedged is the amount of equivalent sales divided by the expected generation. Expected generation represents the amount of energy estimated to be generated or purchased through owned or contracted capacity. Equivalent sales represent all hedging products, which include economic hedges and certain non-derivative contracts including, Generation’s sales to ComEd, PECO and BGE to serve their retail load.

On December 17, 2010, ComEd entered into several 20-year floating-to-fixed energy swap contracts with unaffiliated suppliers for the procurement of long-term renewable energy and associated RECs. Delivery under the contracts began in June 2012. Pursuant to the ICC’s Order on December 19, 2012, ComEd’s commitments under the existing long-term contracts for energy and associated RECs were reduced for the June 2013 through May 2014 procurement period. In addition, the ICC’s December 18, 2013 Order approved the reduction of ComEd’s commitments under those contracts for the June 2014 through May 2015 procurement period, and the amount of the reduction was approved in March 2014. These contracts are designed to lock in a portion of the long-term commodity price risk resulting from the renewable energy resource procurement requirements in the Illinois Settlement Legislation. ComEd has not elected hedge accounting for these derivative financial instruments. ComEd records the fair value of the swap contracts on its balance sheet. Because ComEd receives full cost recovery for energy procurement and related costs from retail customers, the change in fair value each period is recorded by ComEd as a regulatory asset or liability. See Note 3 — Regulatory Matters of the Exelon 2013 Form 10-K for additional information.

PECO has contracts to procure electric supply that were executed through the competitive procurement process outlined in its PAPUC-approved DSP Programs, which are further discussed in Note 5 — Regulatory Matters. Based on Pennsylvania legislation and the DSP Programs permitting PECO to recover its electric supply procurement costs from retail customers with no mark-up, PECO’s price risk related to electric supply procurement is limited. PECO locked in fixed prices for a significant portion of its commodity price risk through full requirements contracts and block contracts. PECO has certain full requirements contracts and block contracts that are considered derivatives and qualify for the NPNS scope exception under current derivative authoritative guidance.

PECO’s natural gas procurement policy is designed to achieve a reasonable balance of long-term and short-term gas purchases under different pricing approaches in order to achieve system supply reliability at the least cost. PECO’s reliability strategy is two-fold. First, PECO must assure that there is sufficient transportation

 

87


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

capacity to satisfy delivery requirements. Second, PECO must ensure that a firm source of supply exists to utilize the capacity resources. All of PECO’s natural gas supply and asset management agreements that are derivatives either qualify for the NPNS scope exception and have been designated as such, or have no mark-to-market balances because the derivatives are index priced. Additionally, in accordance with the 2013 PAPUC PGC settlement and to reduce the exposure of PECO and its customers to natural gas price volatility, PECO has continued its program to purchase natural gas for both winter and summer supplies using a layered approach of locking-in prices ahead of each season with long-term gas purchase agreements (those with primary terms of at least twelve months). Under the terms of the 2013 PGC settlement, PECO is required to lock in (i.e., economically hedge) the price of a minimum volume of its long-term gas commodity purchases. PECO’s gas-hedging program is designed to cover about 30% of planned natural gas purchases in support of projected firm sales. The hedging program for natural gas procurement has no direct impact on PECO’s financial position or results of operations as natural gas costs are fully recovered from customers under the PGC.

BGE has contracts to procure SOS electric supply that are executed through a competitive procurement process approved by the MDPSC. The SOS rates charged recover BGE’s wholesale power supply costs and include an administrative fee. The administrative fee includes an incremental cost component and a shareholder return component for commercial and industrial rate classes. BGE’s price risk related to electric supply procurement is limited. BGE locks in fixed prices for all of its SOS requirements through full requirements contracts. Certain of BGE’s full requirements contracts, which are considered derivatives, qualify for the NPNS scope exception under current derivative authoritative guidance. Other BGE full requirements contracts are not derivatives.

BGE provides natural gas to its customers under a MBR mechanism approved by the MDPSC. Under this mechanism, BGE’s actual cost of gas is compared to a market index (a measure of the market price of gas in a given period). The difference between BGE’s actual cost and the market index is shared equally between shareholders and customers. BGE must also secure fixed price contracts for at least 10%, but not more than 20%, of forecasted system supply requirements for flowing (i.e., non-storage) gas for the November through March period. These fixed-price contracts are not subject to sharing under the MBR mechanism. BGE also ensures it has sufficient pipeline transportation capacity to meet customer requirements. All of BGE’s natural gas supply and asset management agreements qualify for the NPNS scope exception and result in physical delivery.

Proprietary Trading.    Generation also enters into certain energy-related derivatives for proprietary trading purposes. Proprietary trading includes all contracts entered into with the intent of benefiting from shifts or changes in market prices as opposed to those entered into with the intent of hedging or managing risk. Proprietary trading activities are subject to limits established by Exelon’s RMC. The proprietary trading activities, which included settled physical sales volumes of 2,629 GWhs and 5,123 GWhs for the three and six months ended June 30, 2014, respectively, and 1,995 GWhs and 3,567 for the three and six months ended June 30, 2013, respectively, are a complement to Generation’s energy marketing portfolio but represent a small portion of Generation’s revenue from energy marketing activities. ComEd, PECO and BGE do not enter into derivatives for proprietary trading purposes.

Interest Rate and Foreign Exchange Risk (Exelon, Generation, ComEd, PECO and BGE)

The Registrants use a combination of fixed-rate and variable-rate debt to manage interest rate exposure. The Registrants may also utilize fixed-to-floating interest rate swaps, which are typically designated as fair value hedges, as a means to manage their interest rate exposure. In addition, the Registrants may utilize interest rate derivatives to lock in rate levels in anticipation of future financings, which are typically designated as cash flow hedges. These strategies are employed to manage interest rate risks. At June 30, 2014, Exelon and Generation had $1,550 million and $700 million of notional amounts of fixed-to-floating hedges outstanding, respectively, and $1,111 million and $411 million of notional amounts of floating-to-fixed hedges outstanding, respectively.

 

88


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Assuming the fair value and cash flow interest rate hedges are 100% effective, a hypothetical 50 bps increase in the interest rates associated with unhedged variable-rate debt (excluding Commercial Paper) and fixed-to-floating swaps would result in approximately a $4 million decrease in Exelon Consolidated pre-tax income for the six months ended June 30, 2014. To manage foreign exchange rate exposure associated with international energy purchases in currencies other than U.S. dollars, Generation utilizes foreign currency derivatives, which are typically designated as economic hedges. Below is a summary of the interest rate and foreign currency hedges as of June 30, 2014.

 

    Generation     Other     Exelon  

Description

  Derivatives
Designated
as Hedging
Instruments
    Economic
Hedges
    Proprietary
Trading(a)
    Collateral
and

Netting(b)
    Subtotal     Derivatives
Designated
as Hedging
Instruments
    Total  

Mark-to-market derivative assets (current assets)

  $     $ 2     $ 14     $ (18   $ (2   $      $ (2

Mark-to-market derivative assets (noncurrent assets)

    16       2       12       (10     20       18       38  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative assets

  $ 16     $ 4     $ 26     $ (28   $ 18     $ 18     $ 36  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Mark-to-market derivative liabilities (current liabilities)

  $ (1   $ (4   $ (15   $ 19     $ (1   $      $ (1

Mark-to-market derivative liabilities (noncurrent liabilities)

    (19     (2     (11     11       (21     (6     (27
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative liabilities

  $ (20   $ (6   $ (26   $ 30     $ (22   $ (6   $ (28
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative net assets (liabilities)

  $ (4   $ (2   $     $ 2     $ (4   $ 12     $ 8  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Generation enters into interest rate derivative contracts to economically hedge risk associated with the interest rate component of commodity positions. The characterization of the interest rate derivative contracts between the proprietary trading activity in the above table is driven by the corresponding characterization of the underlying commodity position that gives rise to the interest rate exposure. Generation does not utilize proprietary trading interest rate derivatives with the objective of benefiting from shifts or changes in market interest rates.

(b)

Represents the netting of fair value balances with the same counterparty and any associated cash collateral.

 

89


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

The following table provides a summary of the interest rate and foreign exchange hedge balances recorded by the Registrants as of December 31, 2013:

 

    Generation     Other     Exelon  

Description

  Derivatives
Designated
as Hedging
Instruments
    Economic
Hedges
    Proprietary
Trading(a)
    Collateral
and
Netting(b)
    Subtotal     Derivatives
Designated
as Hedging
Instruments
    Total  

Mark-to-market derivative assets (current assets)

  $     $ 3     $ 15     $ (19   $ (1   $      $ (1

Mark-to-market derivative assets (noncurrent assets)

    26       3       15       (13     31       7       38  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative assets

  $ 26     $ 6     $ 30     $ (32   $ 30     $ 7     $ 37  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Mark-to-market derivative liabilities (current liabilities)

  $ (1   $ (1   $ (18   $ 19     $ (1   $      $ (1

Mark-to-market derivative liabilities (noncurrent liabilities)

    (10     (1     (13     13       (11     (4     (15
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative liabilities

  $ (11   $ (2   $ (31   $ 32     $ (12   $ (4   $ (16
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative net assets (liabilities)

  $ 15     $ 4     $ (1   $     $ 18     $ 3     $ 21  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Generation enters into interest rate derivative contracts to economically hedge risk associated with the interest rate component of commodity positions. The characterization of the interest rate derivative contracts between the proprietary trading activity in the above table is driven by the corresponding characterization of the underlying commodity position that gives rise to the interest rate exposure. Generation does not utilize proprietary trading interest rate derivatives with the objective of benefiting from shifts or changes in market interest rates.

(b)

Represents the netting of fair value balances with the same counterparty and any associated cash collateral.

Fair Value Hedges.    For derivative instruments that are designated and qualify as fair value hedges, the gain or loss on the derivative as well as the offsetting loss or gain on the hedged item attributable to the hedged risk are recognized in current earnings. Exelon includes the gain or loss on the hedged items and the offsetting loss or gain on the related interest rate swaps in interest expense as follows:

 

     

Income Statement

Location

   Three Months Ended June 30,  
      2014     2013     2014     2013  
      Gain (Loss) on Swaps     Gain (Loss) on Borrowings  

Generation

   Interest expense(a)    $ (3   $ (5   $ 2     $ 2  

Exelon

   Interest expense      3       (6     (3     3  

 

          Six Months Ended June 30,  
  

Income Statement

Location

   2014     2013     2014     2013  
      Gain (Loss) on Swaps     Gain (Loss) on Borrowings  

Generation

   Interest expense(a)    $ (8   $ (9   $ 1     $ 1  

Exelon

   Interest expense      5       (12     (7     4  

 

(a)

For the three and six months ended June 30, 2014, the loss on Generation swaps included $4 million and $8 million realized in earnings, respectively, with an immaterial amount excluded from hedge effectiveness testing. For the three and six months ended June 30, 2013, the loss on Generation swaps included $4 million and $8 million realized in earnings, respectively, with an immaterial amount excluded from hedge effectiveness testing.

 

90


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

During the first six months of 2014, Exelon entered into $50 million and $75 million of notional amounts of fixed-to-floating fair value hedges related to interest rate swaps, which expire in 2019 and 2020, respectively. At June 30, 2014, Exelon and Generation had total outstanding fixed-to-floating fair value hedges related to interest rate swaps of $1,400 million and $550 million, with unrealized gains of $33 million and $16 million, respectively. At December 31, 2013, Exelon and Generation had outstanding fixed-to-floating fair value hedges related to interest rate swaps of $1,275 million and $550 million, with unrealized gains of $26 million and $23 million, respectively. During the three and six months ended June 30, 2014, the impact on the results of operations as a result of ineffectiveness from fair value hedges was a $5 million and a $8 million gain, respectively. During the three and six months ended June 30, 2013, the impact on the results of operations as a result of ineffectiveness from fair value hedges was immaterial.

Cash Flow Hedges.    In connection with the DOE guaranteed loan for the Antelope Valley project financings, as discussed in Note 13 — Debt and Credit Agreements of the Exelon 2013 Form 10-K, Generation entered into a floating-to-fixed forward starting interest rate swap with a notional amount of $485 million and a mandatory early termination date of September 30, 2014. The swap hedges approximately 75% of Generation’s future interest rate exposure associated with the financing and was designated as a cash flow hedge. As such, the effective portion of the hedge is recorded in other comprehensive income within Generation’s Consolidated Balance Sheets, with any ineffectiveness recorded in Generation’s Consolidated Statements of Operations and Comprehensive Income. Net gains (or losses) from settlement of the hedges, to the extent effective, are amortized as an adjustment to the interest expense over the term of the DOE guaranteed loan.

Every time Generation draws down on the loan, an offsetting hedge (fixed-to-floating) is executed and a portion of the cash flow hedge with a notional amount equal to the offsetting hedge, is de-designated and the related gains or losses going forward are reflected in earnings, which are largely offset by the losses or gains in the offsetting hedge.

Antelope Valley received its first loan advance on April 5, 2012, and a series of additional advances subsequently. Generation has entered into a series of fixed-to-floating interest rate swaps with an aggregated notional amount of $350 million, approximately 75% of the loan advance amount to offset portions of the original interest rate hedge, which are not designated as cash flow hedges. The remaining cash flow hedge has a notional amount of $135 million. At June 30, 2014, Generation’s mark-to-market derivative liability relating to the interest rate swaps in connection with the loan agreement to fund Antelope Valley was $15 million.

During the third quarter of 2011, a subsidiary of Constellation entered into floating-to-fixed interest rate swaps to manage a portion of the interest rate exposure for anticipated long-term borrowings to finance Sacramento PV Energy. The swaps have a total notional amount of $27 million as of June 30, 2014 and expire in 2027. After the closing of the merger with Constellation, the swaps were re-designated as cash flow hedges. At June 30, 2014, the subsidiary had a $2 million derivative liability related to these swaps.

During the third quarter of 2012, a subsidiary of Exelon Generation entered into a floating-to-fixed interest rate swap to manage a portion of the interest rate exposure of anticipated long-term borrowings to finance Constellation Solar Horizons. The swap has a notional amount of $26 million as of June 30, 2014 and expires in 2030. This swap is designated as a cash flow hedge. At June 30, 2014, the subsidiary had a $1 million derivative asset related to the swap.

During the first quarter of 2014, a subsidiary of Exelon Generation entered into floating-to-fixed interest rate swaps to manage a portion of the interest rate exposure with long-term borrowings to finance ExGen Renewables I, LLC. See Note 10 — Debt and Credit Agreements for additional information regarding the financing. The swaps have a notional amount of $223 million as of June 30, 2014 and expire in 2020. The swaps are designated as cash flow hedges. At June 30, 2014, the subsidiary had a $2 million derivative liability related to the swaps.

 

91


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

During the first six months of 2014, Exelon entered into $400 million of floating-to-fixed interest rate hedges to refinance existing debt. The swaps are designated as cash flow hedges. At June 30, 2014, Exelon had a $6 million derivative liability related to the swaps.

During the three and six months ended June 30, 2014 and 2013, the impact on the results of operations as a result of ineffectiveness from cash flow hedges was immaterial.

Economic Hedges.    During the second quarter of 2014, Exelon entered into $300 million of floating-to-fixed forward starting interest rate swaps to manage interest rate risks associated with anticipated future debt issuance related to the proposed merger with PHI. At June 30, 2014, Exelon had an immaterial derivative asset related to the swaps.

At June 30, 2014, Exelon and Generation had $150 million in notional amounts of fixed-to-floating interest rate swaps that are marked-to-market, with unrealized gains of $1 million. These swaps, which were acquired as part of the merger with Constellation, expire in 2014. During the six months ended June 30, 2014 and 2013, the impact on the results of operations was immaterial.

At June 30, 2014, Generation had $257 million in notional amounts of interest rate derivative contracts to economically hedge risk associated with the interest rate component of commodity positions and $121 million in notional amounts of foreign currency exchange rate swaps that are marked-to-market to manage the exposure associated with international purchases of commodities in currencies other than U.S. dollars.

Fair Value Measurement and Accounting for the Offsetting of Amounts Related to Certain Contracts (Exelon, Generation, ComEd, PECO and BGE)

Fair value accounting guidance and disclosures about offsetting assets and liabilities requires the fair value of derivative instruments to be shown in the Notes to the Consolidated Financial Statements on a gross basis, even when the derivative instruments are subject to legally enforceable master netting agreements and qualify for net presentation in the Consolidated Balance Sheet. A master netting agreement is an agreement between two counterparties that may have derivative and non-derivative contracts with each other providing for the net settlement of all referencing contracts via one payment stream, which takes place as the contracts deliver, when collateral is requested or in the event of default. Generation’s use of cash collateral is generally unrestricted unless Generation is downgraded below investment grade (i.e., to BB+ or Ba1). In the table below, Generation’s energy related economic hedges and proprietary trading derivatives are shown gross and the impact of the netting of fair value balances with the same counterparty that are subject to legally enforceable master netting agreements, as well as netting of cash collateral, is aggregated in the collateral and netting column. As of June 30, 2014 and December 31, 2013, $7 million of cash collateral held and $10 million of cash collateral posted, respectively, was not offset against derivative positions because such collateral was not associated with any energy-related derivatives or as of the balance sheet date there were no positions to offset. Excluded from the tables below are economic hedges that qualify for the NPNS scope exception and other non-derivative contracts that are accounted for under the accrual method of accounting.

ComEd’s use of cash collateral is generally unrestricted unless ComEd is downgraded below investment grade (i.e., to BB+ or Ba1).

Cash collateral held by PECO and BGE must be deposited in a non affiliate major U.S. commercial bank or foreign bank with a U.S. branch office that meet certain qualifications.

 

92


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

The following table provides a summary of the derivative fair value balances recorded by the Registrants as of June 30, 2014:

 

    Generation     ComEd     Exelon  

Derivatives

  Economic
Hedges
    Proprietary
Trading
    Collateral
and
Netting(a)
    Subtotal(b)     Economic
Hedges(c)
    Total
Derivatives
 

Mark-to-market derivative assets (current assets)

  $ 3,422     $ 925     $ (3,716   $ 631     $     $ 631  

Mark-to-market derivative assets (noncurrent assets)

    1,394       149       (1,099     444             444  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative assets

  $ 4,816     $ 1,074     $ (4,815   $ 1,075     $     $ 1,075  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Mark-to-market derivative liabilities (current liabilities)

  $ (3,354   $ (900   $ 4,040     $ (214   $ (13   $ (227

Mark-to-market derivative liabilities (noncurrent liabilities)

    (1,214     (165     1,265       (114     (121     (235
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative liabilities

  $ (4,568   $ (1,065   $ 5,305     $ (328   $ (134   $ (462
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative net assets (liabilities)

  $ 248     $ 9     $ 490     $ 747     $ (134   $ 613  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Exelon and Generation net all available amounts allowed under the derivative accounting guidance on the balance sheet. These amounts include unrealized derivative transactions with the same counterparty under legally enforceable master netting agreements and cash collateral. In some cases Exelon and Generation may have other offsetting exposures, subject to a master netting or similar agreement, such as trade receivables and payables, transactions that do not qualify as derivatives, letters of credit and other forms of non-cash collateral. These are not reflected in the table above.

(b)

Current and noncurrent assets are shown net of collateral of $(126) million and $(56) million, respectively, and current and noncurrent liabilities are shown net of collateral of $(198) million and $(110) million, respectively. The total cash collateral posted, net of cash collateral received and offset against mark-to-market assets and liabilities was $490 million at June 30, 2014.

(c)

Includes current and noncurrent liabilities relating to floating-to-fixed energy swap contracts with unaffiliated suppliers.

The following table provides a summary of the derivative fair value balances recorded by the Registrants as of December 31, 2013:

 

    Generation     ComEd     Exelon  

Description

  Economic
Hedges
    Proprietary
Trading
    Collateral
and
Netting(a)
    Subtotal(b)     Economic
Hedges(c)
    Total
Derivatives
 

Mark-to-market derivative assets (current assets)

  $ 2,616     $ 1,476     $ (3,364   $ 728     $     $ 728  

Mark-to-market derivative assets (noncurrent assets)

    1,344       285       (1,060     569             569  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative assets

  $ 3,960     $ 1,761     $ (4,424   $ 1,297     $     $ 1,297  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Mark-to-market derivative liabilities (current liabilities)

  $ (2,023   $ (1,410   $ 3,292     $ (141   $ (17   $ (158

Mark-to-market derivative liabilities (noncurrent liabilities)

    (804     (293     988       (109     (176     (285
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative liabilities

  $ (2,827   $ (1,703   $ 4,280     $ (250   $ (193   $ (443
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total mark-to-market derivative net assets (liabilities)

  $ 1,133     $ 58     $ (144   $ 1,047     $ (193   $ 854  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Exelon and Generation net all available amounts allowed under the derivative accounting guidance on the balance sheet. These amounts include unrealized derivative transactions with the same counterparty under legally enforceable master

 

93


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

 

netting agreements and cash collateral. In some cases Exelon and Generation may have other offsetting exposures, subject to a master netting or similar agreement, such as trade receivables and payables, transactions that do not qualify as derivatives, and letters of credit. These are not reflected in the table above.

(b)

Current and noncurrent assets are shown net of collateral of $84 million and $72 million, respectively, and current and noncurrent liabilities are shown net of collateral of $(12) million and $0 million, respectively. The total cash collateral received, net of cash collateral posted and offset against mark-to-market assets and liabilities was $144 million at December 31, 2013.

(c)

Includes current and noncurrent liabilities relating to floating-to-fixed energy swap contracts with unaffiliated suppliers.

Cash Flow Hedges (Exelon and Generation).    As discussed previously, effective prior to the merger with Constellation, Generation de-designated all of its cash flow hedges relating to commodity price risk. Because the underlying forecasted transactions remain at least reasonably possible, the fair value of the effective portion of these cash flow hedges was frozen in accumulated OCI and is reclassified to results of operations when the forecasted purchase or sale of the energy commodity occurs, or becomes probable of not occurring. Generation began recording prospective changes in the fair value of these instruments through current earnings from the date of de-designation. Approximately $94 million of these net pre-tax unrealized gains within accumulated OCI are expected to be reclassified from accumulated OCI during the next twelve months by Generation. Generation expects the settlement of the majority of its cash flow hedges will occur during 2014.

The tables below provide the activity of accumulated OCI related to cash flow hedges for the three months ended June 30, 2014 and 2013, containing information about the changes in the fair value of cash flow hedges and the reclassification from accumulated OCI into results of operations. The amounts reclassified from accumulated OCI, when combined with the impacts of the actual physical power sales, result in the ultimate recognition of net revenues at the contracted price.

 

          Total Cash Flow Hedge OCI Activity,
                  Net of Income Tax                   
 
           Generation     Exelon  

Three Months Ended June 30, 2014

  Income  Statement
Location
    Energy-Related
Hedges
    Total Cash  Flow
Hedges
 

Accumulated OCI derivative gain at March 31, 2014

    $ 95 (a)    $ 95  

Effective portion of changes in fair value

            (10

Reclassifications from accumulated OCI to net income

    Operating Revenues        (38 )(b)      (38
   

 

 

   

 

 

 

Accumulated OCI derivative gain at June 30, 2014

    $ 57 (a)    $ 47  
   

 

 

   

 

 

 

 

(a)

Excludes $6 million and $3 million of gains, net of taxes, related to interest rate swaps and treasury rate locks as of June 30, 2014 and March 31, 2014.

(b)

Amount is net of related income tax expense of $25 million for the three months ended June 30, 2014.

 

          Total Cash Flow Hedge OCI Activity,
                  Net of Income Tax                   
 
          Generation     Exelon  

Six Months Ended June 30, 2014

  Income  Statement
Location
    Energy-Related
Hedges
    Total Cash  Flow
Hedges
 

Accumulated OCI derivative gain at December 31, 2013

    $ 119 (a)    $ 120  

Effective portion of changes in fair value

            (11

Reclassifications from accumulated OCI to net income

    Operating Revenues        (62 )(b)      (62
   

 

 

   

 

 

 

Accumulated OCI derivative gain at June 30, 2014

    $ 57 (a)    $ 47  
   

 

 

   

 

 

 

 

94


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

 

(a)

Excludes $9 million of gains and $15 million of losses, net of taxes, related to interest rate swaps and treasury locks as of June 30, 2014 and December 31, 2013, respectively.

(b)

Amount is net of related income tax expense of $40 million for the six months ended June 30, 2014.

 

            Total Cash Flow Hedge OCI Activity,
                  Net of Income Tax                   
 
            Generation     Exelon  

Three Months Ended June 30, 2013

   Income  Statement
Location
     Energy-Related
Hedges
    Total Cash  Flow
Hedges
 

Accumulated OCI derivative gain at March 31, 2013

      $ 397 (a)(c)    $ 310  

Effective portion of changes in fair value

              21 (d) 

Reclassifications from accumulated OCI to net income

     Operating Revenues         (142 )(b)(e)      (86
     

 

 

   

 

 

 

Accumulated OCI derivative gain at June 30, 2013

      $ 255 (c)    $ 245  
     

 

 

   

 

 

 

 

(a)

Includes $58 million of gains, net of taxes, related to the fair value of the five-year financial swap contract with ComEd, as of March 31, 2013.

(b)

Includes $58 million of losses, net of taxes, reclassified from accumulated OCI to recognize gains in net income related to the settlements of the five-year financial swap contract with ComEd.

(c)

Excludes $11 million and $16 million of losses, net of taxes, related to interest rate swaps and treasury rate locks as of June 30, 2013 and March 31, 2013, respectively.

(d)

Includes $18 million of losses, net of taxes, related to the effective portion of changes in fair value of interest rate swaps and treasury rate locks at Generation for the three months ended June 30, 2013.

(e)

Amount is net of related income tax expense of $94 million for the three months ended June 30, 2013.

 

            Total Cash Flow Hedge OCI Activity,
              Net of Income Tax                  
 
            Generation     Exelon  

Six Months Ended June 30, 2013

   Income  Statement
Location
     Energy-Related
Hedges
    Total Cash  Flow
Hedges
 

Accumulated OCI derivative gain at December 31, 2012

      $ 532 (a)(c)    $ 368  

Effective portion of changes in fair value

              21 (d) 

Reclassifications from accumulated OCI to net income

     Operating Revenues         (277 )(b)(e)      (144
     

 

 

   

 

 

 

Accumulated OCI derivative gain at June 30, 2013

      $ 255 (c)    $ 245  
     

 

 

   

 

 

 

 

(a)

Includes $133 million of gains, net of taxes, related to the fair value of the five-year financial swap contract with ComEd, as of December 31, 2012.

(b)

Includes $133 million of losses, net of taxes, reclassified from accumulated OCI to recognize gains in net income related to the settlements of the five-year financial swap contract with ComEd.

(c)

Excludes $11 million of losses and $20 million of losses, net of taxes, related to interest rate swaps and treasury rate locks as of June 30, 2013 and December 31, 2012, respectively.

(d)

Includes $22 million of losses, net of taxes, related to the effective portion of changes in fair value of interest rate swaps and treasury rate locks.

(e)

Amount is net of related income tax expense of $182 million for the six months ended June 30, 2013.

During the three and six months ended June 30, 2014 and 2013, Generation’s former energy related cash flow hedge activity impact to pre-tax earnings based on the reclassification adjustment from accumulated OCI to

 

95


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

earnings was a $63 million and a $102 pre-tax gain and a $236 million and a $459 pre-tax gain, respectively. Given that the cash flow hedges had primarily consisted of forward power sales and power swaps and did not include power and gas options or sales, the ineffectiveness of Generation’s cash flow hedges was primarily the result of differences between the locational settlement prices of the cash flow hedges and the hedged generating units.

The effect of Exelon’s former energy-related cash flow hedge activity on pre-tax earnings based on the reclassification adjustment from accumulated OCI to earnings was a $63 million and $102 million pre-tax gain for the three months ended June 30, 2014, and a $141 million and $240 million pre-tax gain for the three and six months ended June 30, 2013. Neither Exelon nor Generation will incur changes in cash flow hedge ineffectiveness in future periods as all energy-related cash flow hedge positions were de-designated prior to the merger date.

Economic Hedges (Exelon and Generation).    These instruments represent hedges that economically mitigate exposure to fluctuations in commodity prices and include financial options, futures, swaps, physical forward sales and purchases, but for which the fair value or cash flow hedge elections were not made. Additionally, Generation enters into interest rate derivative contracts and foreign exchange currency swaps (“treasury”) to manage the exposure related to the interest rate component of commodity positions and international purchases of commodities in currencies other than U.S. Dollars. Exelon entered into floating-to-fixed forward starting interest rate swaps to manage interest rate risks associated with anticipated future debt issuance related to the proposed merger with PHI. For the three and six months ended June 30, 2014 and 2013, the following pre-tax mark-to-market gains (losses) of certain purchase and sale contracts were reported in operating revenues, purchased, power and fuel expense, or interest expense. For the three and six months ended June 30, 2014 and 2013, the following net pre-tax mark-to-market gains (losses) of certain purchase and sale contracts were reported in operating revenues or purchased power and fuel expense at Exelon and Generation in the Consolidated Statements of Operations and Comprehensive Income and are included in “Net fair value changes related to derivatives” in Exelon’s and Generation’s Consolidated Statements of Cash Flows. In the tables below, “Change in fair value” represents the change in fair value of the derivative contracts held at the reporting date. The “Reclassification to realized at settlement” represents the recognized change in fair value that was reclassified to realized due to settlement of the derivative during the period.

 

    Generation     Intercompany
Eliminations
    HoldCo     Exelon  

Three Months Ended June 30, 2014

  Operating
Revenues
    Purchased
Power
and Fuel
    Interest
Expense
    Total     Operating
Revenues(a)
    Interest
Expense
    Total  

Change in fair value of commodity positions

  $ (124   $ 111     $     $ (13   $     $     $ (13

Reclassification to realized at settlement of commodity positions

    45       (42           3                   3  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net commodity mark-to-market gains (losses)

  $ (79   $ 69     $     $ (10   $     $     $ (10
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Change in fair value of treasury positions

  $ (3   $     $ (1   $ (4   $     $     $ (4

Reclassification to realized at settlement of treasury positions

    (1                 (1                 (1
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net treasury mark-to-market gains (losses)

  $ (4   $     $ (1   $ (5   $     $     $ (5
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net mark-to-market gains (losses)

  $ (83   $ 69     $ (1   $ (15   $     $     $ (15
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

96


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

    Generation     Intercompany
Eliminations
    HoldCo     Exelon  

Six Months Ended June 30, 2014

  Operating
Revenues
    Purchased
Power
and Fuel
    Interest
Expense
    Total     Operating
Revenues(a)
    Interest
Expense
    Total  

Change in fair value of commodity positions

  $ (975   $ 282     $     $ (693   $     $     $ (693

Reclassification to realized at settlement of commodity positions

    137       (183           (46                 (46
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net commodity mark-to-market gains (losses)

  $ (838   $ 99     $      $ (739   $      $      $ (739
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Change in fair value of treasury positions

  $ (4   $     $ (1   $ (5   $     $     $ (5

Reclassification to realized at settlementof treasury positions

    (1                 (1                 (1
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net treasury mark-to-market gains (losses)

  $ (5   $     $ (1   $ (6   $     $     $ (6
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net mark-to-market gains (losses)

  $ (843   $ 99     $ (1   $ (745   $     $     $ (745
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 
    Generation     Intercompany
Eliminations
    HoldCo     Exelon  

Three Months Ended June 30, 2013

  Operating
Revenues
    Purchased
Power
and Fuel
    Interest
Expense
    Total     Operating
Revenues(a)
    Interest
Expense
    Total  

Change in fair value of commodity positions

  $ 460     $ (77   $     $ 383     $ (13   $     $ 370  

Reclassification to realized at settlement of commodity positions

    44       1             45       3             48  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net commodity mark-to-market gains (losses)

  $ 504     $ (76   $     $ 428     $ (10   $     $ 418  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Change in fair value of treasury positions

  $     $     $ (2   $ (2   $     $     $ (2

Reclassification to realized at settlement of treasury positions

                                         
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net treasury mark-to-market gains (losses)

  $     $     $ (2   $ (2   $     $     $ (2
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net mark-to-market gains (losses)

  $ 504     $ (76   $ (2   $ 426     $ (10   $     $ 416  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 
    Generation     Intercompany
Eliminations
    HoldCo     Exelon  

Six Months Ended June 30, 2013

  Operating
Revenues
    Purchased
Power
and Fuel
    Interest
Expense
    Total     Operating
Revenues(a)
    Interest
Expense
    Total  

Change in fair value of commodity positions

  $ (26   $ 69     $        $ 43     $ (6   $     $ 37  

Reclassification to realized at settlement of commodity positions

    (56     38         (18     13             (5
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net commodity mark-to-market gains (losses)

  $ (82   $ 107     $     $ 25     $ 7     $     $ 32  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Change in fair value of treasury positions

  $     $     $ (3   $ (3   $     $     $ (3

Reclassification to realized at settlement of treasury positions

                                         
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net treasury mark-to-market gains (losses)

  $     $     $ (3   $ (3   $     $     $ (3
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net mark-to-market gains (losses)

  $ (82   $ 107     $ (3   $ 22     $ 7     $     $ 29  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Prior to the merger, the five-year financial swap contract between Generation and ComEd was de-designated. As a result, all prospective changes in fair value were recorded to operating revenues and eliminated in consolidation.

 

97


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Proprietary Trading Activities (Exelon and Generation).    For the three and six months ended June 30, 2014 and 2013, Exelon and Generation recognized the following net unrealized mark-to-market gains (losses), net realized mark-to-market gains (losses) and total net mark-to-market gains (losses) (before income taxes) relating to mark-to-market activity on commodity derivative instruments entered into for proprietary trading purposes and interest rate derivative contracts to hedge risk associated with the interest rate component of underlying commodity positions. Gains and losses associated with proprietary trading are reported as operating revenue in Exelon’s and Generation’s Consolidated Statements of Operations and Comprehensive Income and are included in “Net fair value changes related to derivatives” in Exelon’s and Generation’s Consolidated Statements of Cash Flows. In the tables below, “Change in fair value” represents the change in fair value of the derivative contracts held at the reporting date. The “Reclassification to realized at settlement” represents the recognized change in fair value that was reclassified to realized due to settlement of the derivative during the period.

 

     Location on  Income
Statement
     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
        2014     2013     2014     2013  

Change in fair value of commodity positions

     Operating Revenues       $ 1     $ 5     $     $ 1  

Reclassification to realized at settlement of commodity positions

     Operating Revenues         (8     (1     (7     5  
     

 

 

   

 

 

   

 

 

   

 

 

 

Net commodity mark-to-market gains (losses)

     Operating Revenues       $ (7   $ 4     $ (7   $ 6  
     

 

 

   

 

 

   

 

 

   

 

 

 

Change in fair value of treasury positions

     Operating Revenues       $     $     $ (1   $  

Reclassification to realized at settlement of treasury positions

     Operating Revenues         1       (1     1       (1
     

 

 

   

 

 

   

 

 

   

 

 

 

Net treasury mark-to-market gains (losses)

     Operating Revenues       $ 1     $ (1   $     $ (1
     

 

 

   

 

 

   

 

 

   

 

 

 

Net mark-to-market gains (losses)

     Operating Revenues       $ (6   $ 3     $ (7   $ 5  
     

 

 

   

 

 

   

 

 

   

 

 

 

Credit Risk (Exelon, Generation, ComEd, PECO and BGE)

The Registrants would be exposed to credit-related losses in the event of non-performance by counterparties that enter into derivative instruments. The credit exposure of derivative contracts, before collateral, is represented by the fair value of contracts at the reporting date. For energy-related derivative instruments, Generation enters into enabling agreements that allow for payment netting with its counterparties, which reduces Generation’s exposure to counterparty risk by providing for the offset of amounts payable to the counterparty against amounts receivable from the counterparty. Typically, each enabling agreement is for a specific commodity and so, with respect to each individual counterparty, netting is limited to transactions involving that specific commodity product, except where master netting agreements exist with a counterparty that allow for cross product netting. In addition to payment netting language in the enabling agreement, Generation’s credit department establishes credit limits, margining thresholds and collateral requirements for each counterparty, which are defined in the derivative contracts. Counterparty credit limits are based on an internal credit review process that considers a variety of factors, including the results of a scoring model, leverage, liquidity, profitability, credit ratings by credit rating agencies, and risk management capabilities. To the extent that a counterparty’s margining thresholds are exceeded, the counterparty is required to post collateral with Generation as specified in each enabling agreement. Generation’s credit department monitors current and forward credit exposure to counterparties and their affiliates, both on an individual and an aggregate basis.

The following tables provide information on Generation’s credit exposure for all derivative instruments, NPNS, and applicable payables and receivables, net of collateral and instruments that are subject to master netting agreements, as of June 30, 2014. The tables further delineate that exposure by credit rating of the

 

98


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

counterparties and provide guidance on the concentration of credit risk to individual counterparties. The figures in the tables below excludes credit risk exposure from individual retail counterparties, uranium procurement contracts, and exposure through RTOs, ISOs, NYMEX, ICE and Nodal commodity exchanges, further discussed in ITEM 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK. Additionally, the figures in the tables below exclude exposures with affiliates, including net receivables with ComEd, PECO and BGE of $6 million, $23 million and $36 million, respectively.

 

Rating as of June 30, 2014

  Total
Exposure
Before Credit
Collateral
    Credit
Collateral(a)
    Net
Exposure
    Number of
Counterparties
Greater than 10%
of Net Exposure
    Net Exposure of
Counterparties
Greater than 10%
of Net Exposure
 

Investment grade

  $ 1,095     $ 103     $ 992       1     $ 417  

Non-investment grade

    12       9       3              

No external ratings

         

Internally rated — investment grade

    286       2       284       1       189  

Internally rated — non-investment grade

    21       4       17              
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total

  $ 1,414     $ 118     $ 1,296       2     $ 606  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

Net Credit Exposure by Type of Counterparty

   As of June 30, 2014  

Financial institutions

   $ 185  

Investor-owned utilities, marketers, power producers

     360  

Energy cooperatives and municipalities

     729  

Other

     22  
  

 

 

 

Total

   $ 1,296  
  

 

 

 

 

(a)

As of June 30, 2014, credit collateral held from counterparties where Generation had credit exposure included $112 million of cash and $6 million of letters of credit.

ComEd’s power procurement contracts provide suppliers with a certain amount of unsecured credit. The credit position is based on forward market prices compared to the benchmark prices. The benchmark prices are the forward prices of energy projected through the contract term and are set at the point of supplier bid submittals. If the forward market price of energy exceeds the benchmark price, the suppliers are required to post collateral for the secured credit portion after adjusting for any unpaid deliveries and unsecured credit allowed under the contract. The unsecured credit used by the suppliers represents ComEd’s net credit exposure. As of June 30, 2014, ComEd’s net credit exposure to suppliers was approximately $2 million.

ComEd is permitted to recover its costs of procuring energy through the Illinois Settlement Legislation. ComEd’s counterparty credit risk is mitigated by its ability to recover realized energy costs through customer rates. See Note 3 — Regulatory Matters of the Exelon 2013 Form 10-K for additional information.

PECO’s supplier master agreements that govern the terms of its electric supply procurement contracts, which define a supplier’s performance assurance requirements, allow a supplier to meet its credit requirements with a certain amount of unsecured credit. The amount of unsecured credit is determined based on the supplier’s lowest credit rating from the major credit rating agencies and the supplier’s tangible net worth. The credit position is based on the initial market price, which is the forward price of energy on the day a transaction is executed, compared to the current forward price curve for energy. To the extent that the forward price curve for energy exceeds the initial market price, the supplier is required to post collateral to the extent the credit exposure is greater than the supplier’s unsecured credit limit. The unsecured credit used by the suppliers represents PECO’s net credit exposure. As of June 30, 2014, PECO had no net credit exposure with suppliers.

 

99


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

PECO is permitted to recover its costs of procuring electric supply through its PAPUC-approved DSP Program. PECO’s counterparty credit risk is mitigated by its ability to recover realized energy costs through customer rates. See Note 5 — Regulatory Matters for additional information.

PECO’s natural gas procurement plan is reviewed and approved annually on a prospective basis by the PAPUC. PECO’s counterparty credit risk under its natural gas supply and asset management agreements is mitigated by its ability to recover its natural gas costs through the PGC, which allows PECO to adjust rates quarterly to reflect realized natural gas prices. PECO does not obtain collateral from suppliers under its natural gas supply and asset management agreements. As of June 30, 2014, PECO had credit exposure of $6 million under its natural gas supply and asset management agreements with investment grade suppliers.

BGE is permitted to recover its costs of procuring energy through the MDPSC-approved procurement tariffs. BGE’s counterparty credit risk is mitigated by its ability to recover realized energy costs through customer rates. See Note 5 — Regulatory Matters for additional information.

BGE’s full requirement wholesale electric power agreements that govern the terms of its electric supply procurement contracts, which define a supplier’s performance assurance requirements, allow a supplier, or its guarantor, to meet its credit requirements with a certain amount of unsecured credit. The amount of unsecured credit is determined based on the supplier’s lowest credit rating from the major credit rating agencies and the supplier’s tangible net worth, subject to an unsecured credit cap. The credit position is based on the initial market price, which is the forward price of energy on the day a transaction is executed, compared to the current forward price curve for energy. To the extent that the forward price curve for energy exceeds the initial market price, the supplier is required to post collateral to the extent the credit exposure is greater than the supplier’s unsecured credit limit. The unsecured credit used by the suppliers represents BGE’s net credit exposure. The seller’s credit exposure is calculated each business day. As of June 30, 2014, BGE had a net credit exposure of $38 million to suppliers.

BGE’s regulated gas business is exposed to market-price risk. This market-price risk is mitigated by BGE’s recovery of its costs to procure natural gas through a gas cost adjustment clause approved by the MDPSC. BGE does make off-system sales after BGE has satisfied its customers’ demands, which are not covered by the gas cost adjustment clause. At June 30, 2014, BGE had credit exposure of $1 million related to off-system sales which is mitigated by parental guarantees, letters of credit, or right to offset clauses within other contracts with those third party suppliers.

Collateral and Contingent-Related Features (Exelon, Generation, ComEd, PECO and BGE)

As part of the normal course of business, Generation routinely enters into physical or financially settled contracts for the purchase and sale of electric capacity, energy, fuels, emissions allowances and other energy-related products. Certain of Generation’s derivative instruments contain provisions that require Generation to post collateral. Generation also enters into commodity transactions on exchanges (i.e., NYMEX, ICE). The exchanges act as the counterparty to each trade. Transactions on the exchanges must adhere to comprehensive collateral and margining requirements. This collateral may be posted in the form of cash or credit support with thresholds contingent upon Generation’s credit rating from each of the major credit rating agencies. The collateral and credit support requirements vary by contract and by counterparty. These credit-risk-related contingent features stipulate that if Generation were to be downgraded or lose its investment grade credit rating (based on its senior unsecured debt rating), it would be required to provide additional collateral. This incremental collateral requirement allows for the offsetting of derivative instruments that are assets with the same counterparty, where the contractual right of offset exists under applicable master netting agreements. In the absence of expressly agreed-to provisions that specify the collateral that must be provided, collateral requested

 

100


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

will be a function of the facts and circumstances of the situation at the time of the demand. In this case, Generation believes an amount of several months of future payments (i.e., capacity payments) rather than a calculation of fair value is the best estimate for the contingent collateral obligation, which has been factored into the disclosure below.

The aggregate fair value of all derivative instruments with credit-risk-related contingent features in a liability position that are not fully collateralized (excluding transactions on the exchanges that are fully collateralized) is detailed in the table below:

 

Credit-Risk Related Contingent Feature

   June 30,
2014
    December 31,
2013
 

Gross Fair Value of Derivative Contracts Containing this Feature(a)

   $ (1,102   $ (1,056

Offsetting Fair Value of In-the-Money Contracts Under Master Netting Arrangements(b)

     825       846  
  

 

 

   

 

 

 

Net Fair Value of Derivative Contracts Containing This Feature(c)

   $ (277   $ (210
  

 

 

   

 

 

 

 

(a)

Amount represents the gross fair value of out-of-the-money derivative contracts containing credit-risk related contingent features ignoring the effects of master netting agreements.

(b)

Amount represents the offsetting fair value of in-the-money derivative contracts under legally enforceable master netting agreements with the same counterparty, which reduces the amount of any liability for which a Registrant could potentially be required to post collateral.

(c)

Amount represents the net fair value of out-of-the-money derivative contracts containing credit-risk related contingent features after considering the mitigating effects of offsetting positions under master netting arrangements and reflects the actual net liability upon which any potential contingent collateral obligations would be based.

Generation had cash collateral posted of $623 million and letters of credit posted of $466 million and cash collateral held of $124 million and letters of credit held of $14 million as of June 30, 2014 for counterparties with derivative positions. Generation had cash collateral posted of $72 million and letters of credit posted of $364 million and cash collateral held of $206 million and letters of credit held of $34 million at December 31, 2013 for counterparties with derivative positions. In the event of a credit downgrade below investment grade (i.e., to BB+ by S&P or Ba1 by Moody’s), Generation would have been required to post additional collateral of $2.0 billion as of June 30, 2014 and December 31, 2013. These amounts represent the potential additional collateral required after giving consideration to offsetting derivative and non-derivative positions under master netting agreements.

Generation’s and Exelon’s interest rate swaps contain provisions that, in the event of a merger, if Generation’s debt ratings were to materially weaken, it would be in violation of these provisions, resulting in the ability of the counterparty to terminate the agreement prior to maturity. Collateralization would not be required under any circumstance. Termination of the agreement could result in a settlement payment by Exelon or the counterparty on any interest rate swap in a net liability position. The settlement amount would be equal to the fair value of the swap on the termination date. As of June 30, 2014, Generation’s swaps were in a liability position and Exelon’s swaps were in an asset position, with a fair value of $(4) million and $8 million, respectively.

See Note 24 — Segment Information of the Exelon 2013 Form 10-K for further information regarding the letters of credit supporting the cash collateral.

Generation entered into supply forward contracts with certain utilities, including PECO and BGE, with one-sided collateral postings only from Generation. If market prices fall below the benchmark price levels in these contracts, the utilities are not required to post collateral. However, when market prices rise above the benchmark price levels, counterparty suppliers, including Generation, are required to post collateral once certain unsecured credit limits are exceeded. Under the terms of ComEd’s standard block energy contracts, collateral postings are

 

101


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

one-sided from suppliers, including Generation, should exposures between market prices and benchmark prices exceed established unsecured credit limits outlined in the contracts. As of June 30, 2014, ComEd held approximately $2 million from suppliers for the purpose of collateral from suppliers in association with energy procurement contracts. Under the terms of ComEd’s annual renewable energy contracts, collateral postings are required to cover a fixed value for RECs only. In addition, under the terms of ComEd’s long-term renewable energy contracts, collateral postings are required from suppliers for both RECs and energy. The REC portion is a fixed value and the energy portion is one-sided from suppliers should the forward market prices exceed contract prices. As of June 30, 2014, ComEd held approximately $19 million in the form of cash and letters of credit as margin for both the annual and long-term REC obligations. See Note 3 — Regulatory Matters of the Exelon 2013 Form 10-K for additional information.

PECO’s natural gas procurement contracts contain provisions that could require PECO to post collateral. This collateral may be posted in the form of cash or credit support with thresholds contingent upon PECO’s credit rating from the major credit rating agencies. The collateral and credit support requirements vary by contract and by counterparty. As of June 30, 2014, PECO was not required to post collateral for any of these agreements. If PECO lost its investment grade credit rating as of June 30, 2014, PECO could have been required to post approximately $26 million of collateral to its counterparties.

PECO’s supplier master agreements that govern the terms of its DSP Program contracts do not contain provisions that would require PECO to post collateral.

BGE’s full requirements wholesale power agreements that govern the terms of its electric supply procurement contracts do not contain provisions that would require BGE to post collateral.

BGE’s natural gas procurement contracts contain provisions that could require BGE to post collateral. This collateral may be posted in the form of cash or credit support with thresholds contingent upon BGE’s credit rating from the major credit rating agencies. The collateral and credit support requirements vary by contract and by counterparty. As of June 30, 2014, BGE was not required to post collateral for any of these agreements. If BGE lost its investment grade credit rating as of June 30, 2014, BGE could have been required to post approximately $73 million of collateral to its counterparties.

10.    Debt and Credit Agreements (Exelon, Generation, ComEd, PECO and BGE)

Short-Term Borrowings

Exelon, ComEd and BGE meet their short-term liquidity requirements primarily through the issuance of commercial paper. Generation and PECO meet their short-term liquidity requirements primarily through the issuance of commercial paper and borrowings from the intercompany money pool.

The Registrants had the following amounts of commercial paper borrowings outstanding as of June 30, 2014 and December 31, 2013:

 

Commercial Paper Borrowings

   June 30,
2014
     December 31,
2013
 

Exelon Corporate

   $      $  

Generation

             

ComEd

     498        184  

PECO

             

BGE

     70        135  

 

102


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Credit Facilities

Exelon had bank lines of credit under committed credit facilities at June 30, 2014 for short-term financial needs, as follows:

 

Type of Credit Facility

   Amount(a)      Expiration Dates    Capacity Type
     (In billions)            

Exelon Corporate

        

Syndicated Revolver(b)

   $ 0.5      May 2019    Letters of credit and cash

Generation

        

Syndicated Revolver

     5.1      May 2019    Letters of credit and cash

Syndicated Revolver

     0.2      August 2018    Letters of credit and cash

Bilateral

     0.3      December 2015 and March 2016    Letters of credit and cash

Bilateral

     0.1      January 2015    Letters of credit

Bilateral

     0.1      October 2014    Letters of credit and cash

ComEd

        

Syndicated Revolver

     1.0      March 2019    Letters of credit and cash

PECO

        

Syndicated Revolver(b)

     0.6      May 2019    Letters of credit and cash

BGE

        

Syndicated Revolver(b)

     0.6      May 2019    Letters of credit and cash
  

 

 

       

Total

   $ 8.5        
  

 

 

       

 

(a)

Excludes additional credit facility agreements for Generation, ComEd, PECO and BGE with aggregate commitments of $50 million, $34 million, $34 million and $5 million, respectively, arranged with minority and community banks located primarily within ComEd’s, PECO’s and BGE’s service territories. These facilities expire on October 18, 2014 and are solely utilized to issue letters of credit. As of June 30, 2014, letters of credit issued under these agreements for Generation, ComEd, PECO and BGE totaled $20 million, $18 million, $21 million and $1 million, respectively. Also, excludes the unsecured bridge credit facility of $7.2 billion to support the PHI transaction discussed below.

(b)

Includes credit facilities for Exelon Corporate, PECO and BGE with aggregate commitments of $22 million, $27 million and $27 million, respectively, that expire in August 2018.

As of June 30, 2014, there were no borrowings under the Registrants’ credit facilities, with the exception of CENG, see discussion below

On March 28, 2014, ComEd extended for an additional year the expiration date of its unsecured revolving credit facility with aggregate bank commitments of $1.0 billion. Under this facility, ComEd may issue letters of credit in the aggregate amount of up to $500 million. The credit agreement expires on March 28, 2019. The credit facility also allows ComEd to request increases in the aggregate commitments of up to an additional $500 million. Any increases are subject to the approval of the lenders party to the credit agreement in their sole discretion. Costs incurred to extend the facility for ComEd were not material.

On April 1, 2014, as a result of the CENG integration, a $100 million bilateral CENG credit facility expiring October 2014 is now consolidated in Exelon’s and Generation’s consolidated financial statements. This facility will be utilized by CENG to fund working capital and capital projects and obtain letters of credit. As of June 30, 2014, CENG borrowed $40 million against its credit facility.

On May 30, 2014, Exelon, Generation, PECO and BGE extended for an additional year the expiration date of its unsecured revolving credit facility with aggregate bank commitments of $500 million, $5.3 billion, $600 million, $600 million, respectively into May 2019, with the exception of a cumulative amount of $300 million which expires in August 2018. Costs incurred to extend the facility were not material.

 

103


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Borrowings under Exelon Corporate’s, Generation’s, ComEd’s, PECO’s and BGE’s credit agreements bear interest at a rate based upon either the prime rate or a LIBOR-based rate, plus an adder based upon the particular registrant’s credit rating. Exelon Corporate, Generation, ComEd, PECO and BGE have adders of 27.5, 27.5, 7.5, 0.0 and 0.0 basis points for prime based borrowings and 127.5, 127.5, 107.5, 90.0 and 100.0 basis points for LIBOR-based borrowings. The maximum adders for prime rate borrowings and LIBOR-based rate borrowings are 65 basis points and 165 basis points, respectively. The credit agreements also require the borrower to pay a facility fee based upon the aggregate commitments under the agreement. The fee varies depending upon the respective credit ratings of the borrower.

Credit Agreements

In May 2014, concurrently and in connection with entering into the agreement to acquire PHI, Exelon entered into a credit facility to which the lenders committed to provide Exelon a 364-day senior unsecured bridge credit facility of $7.2 billion to support the contemplated transaction and provide flexibility for timing of permanent financing. The bridge credit facility was subsequently reduced to $4.2 billion as a result of the June 2014 equity issuances discussed below. During the three and six months ended June 30, 2014, Exelon recorded $9 million to interest expense in connection with the bridge facility. It is not currently expected that Exelon will be required to draw upon this credit facility.

Long-Term Debt

Issuance of Long-Term Debt

During the six months ended June 30, 2014, the following long-term debt was issued:

 

Company

  Type   Interest Rate     Maturity   Amount    

Use of Proceeds

Exelon

  Junior Subordinated
Notes
    2.500%      June 1, 2024   $ 1,150     Used to finance a portion of the acquisition of PHI and for general corporate purposes

Generation

  Nuclear Fuel
Purchase Contract
    3.350%      June 30, 2018   $ 38     Used for procurement of uranium

Generation

  ExGen Renewables
I Project Financing
(a)
    LIBOR + 4.250%      February 6, 2021   $ 300     Used for general corporate purposes

ComEd

  Mortgage Bonds
Series 115
    2.150%      January 15, 2019   $ 300     Used to refinance existing mortgage bonds

ComEd

  Mortgage Bonds
Series 116
    4.700%      January 15, 2044   $ 350     Used to refinance existing mortgage bonds

 

(a)

See ExGen Renewables I Project Financing, non recourse debt, discussed below

Junior Subordinated Notes

Exelon issued $1.15 billion of junior subordinated notes in the form of 23 million equity units at a stated amount of $50.00 per unit. Proceeds from the issuance were $1.11 billion, net of a $35 million underwriter fee. The net proceeds are expected to be used to finance a portion of the acquisition of PHI and for general corporate purposes.

Each equity unit represents an undivided beneficial ownership interest in Exelon’s 2.5% junior subordinated notes due in 2024 and a forward equity purchase contract which settles in 2017. The junior subordinated notes are expected to be remarketed in 2017. In connection with the remarketing, Exelon may modify the maturity date of the notes to a date earlier than June 1, 2024 but not earlier than June 1, 2020, remove redemption provisions of

 

104


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

the notes, or change the interest rate on the notes, including changing the interest rate from fixed to floating. Investors that participate in the remarketing receive the remarketing proceeds and may use those funds to either settle the equity forward upon settlement date or invest in the remarketed debt and use other funds for the share purchase. Exelon intends to use the remarketing proceeds to repay debt issued or for other corporate purposes as soon as practical following such settlements. If the remarketing fails, holders of the notes will have the right to put their notes to Exelon for an amount equal to the principal amount plus accrued interest. The equity units carry a total annual distribution rate of 6.5%, which is comprised of a quarterly coupon rate of interest of 2.5% and a quarterly contract payment of 4.0% (contract payments).

Each purchase contract obligates the holder to purchase, and Exelon to sell, for $50.00 a number of shares of Exelon’s common stock in accordance with the conversion ratios set forth below:

 

   

If the market price equals or exceeds $43.7484, then 1.1429 shares.

 

   

If the market price is less than $43.7484 but greater than $35.00, a number of shares of common stock having a value, based on the market price, equal to $50.00.

 

   

If the market price is less than or equal to $35.00, then 1.4286 shares.

A holder’s ownership interest in the notes is pledged to Exelon to secure the holder’s obligation under the related forward equity purchase contract. If a holder of the forward equity purchase contract chooses at any time to no longer be a holder of the notes, such holder’s obligation under the purchase contract must be secured by a U.S. Treasury security.

At the time of issuance, the $1.15 billion of junior subordinated notes were recorded within Long-term debt on Exelon’s Consolidated Balance Sheet. Additionally, at the time of issuance, the present value of the contract payments of $131 million were recorded to Long-term debt, representing the obligation to make contract payments, with an offsetting reduction to Common stock. The obligation for the contract payments will be accreted to interest expense over the 3 year period ending in 2017 in Exelon’s Consolidated Statement of Operations and Comprehensive Income. The Long-term debt recorded for the contract payments is considered a non-cash financing transaction that was excluded from Exelon’s Consolidated Statements of Cash Flows. Until settlement of the equity purchase contract, earnings per share dilution resulting from the equity unit issuance will be determined under the treasury stock method.

ExGen Renewables Energy I LLC

On February 6, 2014, ExGen Renewables I, LLC (EGR), an indirect subsidiary of Exelon and Generation, borrowed $300 million aggregate principal amount pursuant to a non-recourse senior secured loan, due February 6, 2021. The loan bears interest at a variable rate equal to LIBOR plus 4.25%. EGR indirectly owns Continental Wind LLC (Continental Wind). In addition to the financing, EGR entered into interest rate swaps with a notional amount of $240 million to manage a portion of the interest rate exposure in connection with the financing. The assets pledged as collateral related to EGR have a net book value of approximately $796 million as of June 30, 2014, See Note 9 — Derivative Financial Instruments for additional information regarding interest rate swaps.

 

105


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

During the six months ended June 30, 2013, the following long-term debt was issued:

 

Company

  Type   Interest Rate     Maturity   Amount    

Use of Proceeds

Generation

  Upstream Gas
Lending Agreement
    2.210%      July 22, 2016   $ 3     Used to fund Upstream gas activities

Generation

  DOE Project
Financing
    2.535 - 2.922%      January 5, 2037   $ 197     Funding for Antelope Valley Solar Development

Generation

  Energy Efficiency
Project Financing
    4.400%      August 31, 2014   $ 9     Funding to install energy conservation measures in Beckley, West Virginia

BGE

  Senior Notes     3.350%      July 1, 2023   $ 300     Used to partially refinance Notes due July 1, 2013 and for general corporate purposes

Retirement and Redemptions of Current and Long-Term Debt

During the six months ended June 30, 2014, the following long-term debt was retired and/or redeemed:

 

Company

   Type    Interest Rate     Maturity    Amount  

Generation

   2003 Senior Notes      5.35   January 15, 2014    $ 500  

Generation

   Pollution Control Loan      4.10   July 1, 2014    $ 20  

Generation

   Continental Wind Project Financing      6.00   February 28, 2033    $ 11  

Generation

   Kennett Square Capital Lease      7.83   September 20, 2020    $ 2  

Generation

   ExGen Renewables I      3mL + 4.25   February 6, 2021    $ 3  

Generation

   AVSR      2.33% - 3.55   January 5, 2037    $ 1  

Generation

   Clean Horizons Solar      2.56   September 7, 2030    $ 1  

Generation

   Sacramento Solar      2.56   December 31, 2030    $ 1  

ComEd

   Mortgage Bonds Series 110      1.63   January 15, 2014    $ 600  

ComEd

   Pollution Control Series 1994C      5.85   January 15, 2014    $ 17  

BGE

   Rate Stabilization Bonds      5.72   April 1, 2017    $ 35  

During the six months ended June 30, 2013, the following long-term debt was retired and/or redeemed:

 

Company

   Type    Interest Rate     Maturity    Amount  

Generation

   Kennett Square Capital Lease      7.830   September 20, 2020    $ 1  

Generation

   Solar Revolver      1.950   July 7, 2014    $ 6  

Generation

   Clean Horizons Solar      2.563   September 7, 2030    $ 1  

Generation(a)

   Series A Junior Subordinated Debentures      8.625   June 15, 2063    $ 450  

ComEd

   First Mortgage Bonds Series 92      7.625   April 15, 2013    $ 125  

BGE

   Rate Stabilization Bonds      5.720   April 1, 2017    $ 33  

 

(a)

Represents debt obligations assumed by Exelon as part of the merger on March 12, 2012 that became callable at face value on June 15, 2013. Exelon and subsidiaries of Generation (former Constellation subsidiaries) assumed intercompany loan agreements that mirror the terms and amounts of the third-party debt obligations of Exelon, which are eliminated in consolidation on Exelon’s Consolidated Balance Sheets. The debentures were redeemed and the intercompany loan agreements repaid on June 15, 2013.

 

106


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

11.    Income Taxes (Exelon, Generation, ComEd, PECO and BGE)

The effective income tax rate from continuing operations varies from the U.S. Federal statutory rate principally due to the following:

 

For the Three Months Ended June 30, 2014

  Exelon     Generation     ComEd     PECO     BGE  

U.S. Federal statutory rate

    35.0     35.0     35.0     35.0     35.0

Increase (decrease) due to:

         

State income taxes, net of Federal income tax benefit

    2.1       1.7       4.6       (0.5     4.1  

Qualified nuclear decommissioning trust fund income

    4.1       6.0                    

Domestic production activities deduction

    (2.0     (2.9                  

Health care reform legislation

                0.2             0.2  

Amortization of investment tax credit, net deferred taxes

    (0.4     (0.5     (0.3     (0.1     (0.7

Plant basis differences

    (1.6           (0.4     (13.2     5.1  

Production tax credits and other credits

    (0.8     (1.1                  

Noncontrolling interest

    (2.0     (2.9                  

Other

    (1.2     (0.4     0.2       0.3       (1.3
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Effective income tax rate

    33.2     34.9     39.3     21.5     42.4
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

For the Six Months Ended June 30, 2014

  Exelon     Generation     ComEd     PECO     BGE  

U.S. Federal statutory rate

    35.0     35.0     35.0     35.0     35.0

Increase (decrease) due to:

         

State income taxes, net of Federal income tax benefit

    (0.6     (14.7     5.0       0.4       5.0  

Qualified nuclear decommissioning trust fund income

    5.9       27.7                    

Domestic production activities deduction

    (3.2     (14.8                  

Health care reform legislation

    0.1             0.2             0.2  

Amortization of investment tax credit, net deferred taxes

    (1.2     (4.9     (0.3     (0.1     (0.3

Plant basis differences

    (3.0           (0.5     (10.8     0.4  

Production tax credits and other credits

    (2.4     (11.1                  

Noncontrolling interest

    (1.9     (8.8                  

Other

    (3.1     (8.9     0.2       0.3       0.1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Effective income tax rate

    25.6     (0.5 )%      39.6     24.8     40.4
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

For the Three Months Ended June 30, 2013

  Exelon     Generation     ComEd     PECO     BGE  

U.S. Federal statutory rate

    35.0     35.0     35.0     35.0     35.0

Increase (decrease) due to:

         

State income taxes, net of Federal income tax benefit

    4.1       3.5       5.6       2.9       5.6  

Qualified nuclear decommissioning trust fund income

    (1.8     (2.7                  

Domestic production activities deduction

    0.1       0.2                    

Tax exempt income

    (0.1     (0.2                  

Health care reform legislation

    0.1             0.4             (0.3

Amortization of investment tax credit, net deferred taxes

    (1.8     (2.5     (0.3     (0.1     (0.6

Plant basis differences

    (1.4           (0.4     (8.6     (0.7

Production tax credits and other credits

    (1.4     (2.2                  

Other

    (0.3     0.1       0.4       (0.1      
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Effective income tax rate

    32.5     31.2     40.7     29.1     39.0
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

107


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

For the Six Months Ended June 30, 2013

  Exelon     Generation     ComEd     PECO     BGE  

U.S. Federal statutory rate

    35.0     35.0     35.0     35.0     35.0

Increase (decrease) due to:

         

State income taxes, net of Federal income tax benefit

    8.6       0.4       4.1       2.9       5.7  

Qualified nuclear decommissioning trust fund income

    2.8       4.8                    

Domestic production activities deduction

          (0.1                  

Tax exempt income

    (0.2     (0.4                  

Health care reform legislation

    0.2             5.7             0.2  

Amortization of investment tax credit, net deferred taxes

    (3.5     (5.6     (4.9     (0.1     (0.3

Plant basis differences

    (3.1           (8.7     (7.5     (0.6

Production tax credits and other credits

    (2.8     (4.9     (0.3            

Other

    0.1       3.1       5.5             (0.2
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Effective income tax rate

    37.1     32.3     36.4     30.3     39.8
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Accounting for Uncertainty in Income Taxes

Exelon, Generation, ComEd, PECO, and BGE have $1,871 million, $1,403 million, $153 million, $44 million, and $0 million, of unrecognized tax benefits as of June 30, 2014, respectively, and $2,175 million, $1,415 million, $324 million, $44 million, and $0 million, of unrecognized tax benefits as of December 31, 2013, respectively. The unrecognized tax benefits as of June 30, 2014 reflect a decrease at Exelon and ComEd primarily attributable to the like-kind exchange and the lease termination position discussed below.

Reasonably possible the total amount of unrecognized tax benefits could significantly increase or decrease within 12 months after the reporting date

Nuclear Decommissioning Liabilities (Exelon and Generation)

AmerGen filed income tax refund claims taking the position that nuclear decommissioning liabilities assumed as part of its acquisition of nuclear power plants are taken into account in determining the tax basis in the assets it acquired. The additional basis results primarily in reduced capital gains or increased capital losses on the sale of assets in nonqualified decommissioning funds and increased tax depreciation and amortization deductions. The IRS disagrees with this position and has disallowed the claims. In November 2008, Generation received a final determination from the Appeals division of the IRS (IRS Appeals) disallowing AmerGen’s refund claims. Generation filed a complaint in the United States Court of Federal Claims on February 20, 2009 to contest this determination. During the first and second quarters of 2013, AmerGen and the DOJ completed and filed cross motions for summary judgment. On September 17, 2013, the Court granted the government’s motion denying AmerGen’s claims for refund. In the first quarter of 2014, Exelon filed an appeal of the decision to the United States Court of Appeals for the Federal Circuit.

Due to the possibility of final resolution through an appellate decision, Generation continues to believe that it is reasonably possible that the total amount of unrecognized tax benefits may significantly decrease in the next 12 months.

Settlement of Income Tax Audits

As of June 30, 2014, Exelon and Generation have approximately $225 million of unrecognized state tax benefits that could significantly decrease within the 12 months after the reporting date as a result of completing federal and state audits and expected statute of limitation expirations that if recognized would decrease the effective tax rate. In January 2014, certain unrecognized tax benefits as of December 31, 2013 were effectively settled and thus resulted in reduced tax expense of $33 million at Generation in the first quarter of 2014.

 

108


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Other Income Tax Matters

Like-Kind Exchange

Exelon, through its ComEd subsidiary, took a position on its 1999 income tax return to defer approximately $1.2 billion of tax gain on the sale of ComEd’s fossil generating assets. The gain was deferred by reinvesting a portion of the proceeds from the sale in qualifying replacement property under the like-kind exchange provisions of the IRC. The like-kind exchange replacement property purchased by Exelon included interests in three municipal-owned electric generation facilities which were properly leased back to the municipalities. The IRS disagreed with this position and asserted that the entire gain of approximately $1.2 billion was taxable in 1999.

Exelon has been unable to reach agreement with the IRS regarding the dispute over the like-kind exchange position. The IRS has asserted that the Exelon purchase and leaseback transaction is substantially similar to a leasing transaction, known as a SILO, which the IRS does not respect as the acquisition of an ownership interest in property. A SILO is a “listed transaction” that the IRS has identified as a potentially abusive tax shelter under guidance issued in 2005. Accordingly, the IRS has asserted that the sale of the fossil plants followed by the purchase and leaseback of the municipal owned generation facilities does not qualify as a like-kind exchange and the gain on the sale is fully subject to tax. The IRS has also asserted a penalty of approximately $87 million for a substantial understatement of tax.

Exelon disagrees with the IRS and continues to believe that its like-kind exchange transaction is not the same as or substantially similar to a SILO. Although Exelon has been and remains willing to settle the disagreement on terms commensurate with the hazards of litigation, Exelon does not believe a settlement is possible. Because Exelon believed, as of December 31, 2012, that it was more-likely-than-not that Exelon would prevail in litigation, Exelon and ComEd had no liability for unrecognized tax benefits with respect to the like-kind exchange position.

On January 9, 2013, the U.S. Court of Appeals for the Federal Circuit reversed the U.S. Court of Federal Claims and reached a decision for the government in Consolidated Edison v. United States. The Court disallowed Consolidated Edison’s deductions stemming from its participation in a LILO transaction that the IRS also has characterized as a tax shelter.

In accordance with applicable accounting standards, Exelon is required to assess whether it is more-likely-than-not that it will prevail in litigation. Exelon continues to believe that its transaction is not a SILO and that it has a strong case on the merits. However, in light of the Consolidated Edison decision and Exelon’s current determination that settlement is unlikely, Exelon has concluded that subsequent to December 31, 2012, it is no longer more-likely-than-not that its position will be sustained. As a result, in the first quarter of 2013 Exelon recorded a non-cash charge to earnings of approximately $265 million, which represents the amount of interest expense (after-tax) and incremental state income tax expense for periods through March 31, 2013 that would be payable in the event that Exelon is unsuccessful in litigation. Of this amount, approximately $170 million was recorded at ComEd. Exelon intends to hold ComEd harmless from any unfavorable impacts of the after-tax interest amounts on ComEd’s equity. As such, ComEd recorded on its consolidated balance sheet as of March 31, 2013, a $172 million receivable and non-cash equity contributions from Exelon. Exelon and ComEd will continue to accrue interest on the unpaid tax liabilities related to the uncertain tax position, and the charges arising from future interest accruals are not expected to be material to the annual operating earnings of Exelon or ComEd. In addition, ComEd will continue to record non-cash equity contributions from Exelon in the amount of the net after-tax interest charges attributable to ComEd in connection with the like-kind exchange position. Exelon continues to believe that it is unlikely that the IRS’s assertion of penalties will ultimately be sustained and therefore no liability for the penalty has been recorded.

 

109


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

On September 30, 2013, the Internal Revenue Service issued a notice of deficiency to Exelon for the like-kind exchange position. Exelon filed a petition on December 13, 2013 to initiate litigation in the United States Tax Court. Exelon was not required to remit any part of the asserted tax or penalty in order to litigate the issue. The litigation could take three to five years including appeals, if necessary. Decisions in the Tax Court are not controlled by the Federal Circuit’s decision in Consolidated Edison.

In the event of a fully successful IRS challenge to Exelon’s like-kind exchange position, the potential tax and after-tax interest, exclusive of penalties, that could become currently payable as of June 30, 2014 may be as much as $830 million, of which approximately $310 million would be attributable to ComEd after consideration of Exelon’s agreement to hold ComEd harmless, and the balance at Exelon. Litigation could take several years such that the estimated cash and interest impacts would likely change by a material amount.

In the first quarter of 2014, Exelon entered into an agreement to terminate its investment in one of the three municipal-owned electric generation properties in exchange for a net early termination amount of $335 million. The termination will result in a 2014 tax payment of approximately $285 million by Exelon, including approximately $155 million by ComEd representing the remaining gain deferred pursuant to the like-kind exchange transaction. In the event of a fully successful IRS challenge to Exelon’s like-kind exchange position, Exelon will be required to pay the full amount of tax and after-tax interest discussed in the preceding paragraph but will ultimately be entitled to a refund of the 2014 tax payment. See Note 7 — Impairment of Long Lived Assets for further details.

Accounting for Final Tangible Property Regulations (Exelon, Generation, ComEd, PECO, and BGE)

On September 19, 2013, the Treasury Department and the IRS published final regulations regarding the tax treatment of costs incurred to acquire, produce, or improve tangible property. The Registrants have assessed the financial impact of this guidance and do not expect it to have a material impact. Any changes in method of accounting required to conform to the final regulations will be made for the Registrant’s 2014 taxable year.

Accounting for Generation Repairs (Exelon and Generation)

On April 30, 2013, the IRS issued Revenue Procedure 2013-24 providing guidance for determining the appropriate tax treatment of costs incurred to repair electric generation assets. Generation will change its method of accounting for deducting repairs in accordance with this guidance beginning with its 2014 tax year. Generation has estimated that adoption of the new method will result in a cash tax detriment of approximately $100 - $120  million.

12.    Nuclear Decommissioning (Exelon and Generation)

Nuclear Decommissioning Asset Retirement Obligations

Generation has a legal obligation to decommission its nuclear power plants following the expiration of their operating licenses. To estimate its decommissioning obligation related to its nuclear generating stations for financial accounting and reporting purposes, Generation uses a probability-weighted, discounted cash flow model which, on a unit-by-unit basis, considers multiple outcome scenarios that include significant estimates and assumptions, and are based on decommissioning cost studies, cost escalation rates, probabilistic cash flow models and discount rates. Generation generally updates its ARO annually during the third quarter, unless circumstances warrant more frequent updates, based on its review of updated cost studies and its annual evaluation of cost escalation factors and probabilities assigned to various scenarios.

 

110


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

The following table provides a rollforward of the nuclear decommissioning ARO reflected on Exelon’s and Generation’s Consolidated Balance Sheets from December 31, 2013 to June 30, 2014:

 

Nuclear decommissioning ARO at December 31, 2013(a)

   $ 4,855  

Consolidation of CENG(b)

     1,701  

Accretion expense

     154  

Costs incurred to decommission retired plants

     (3
  

 

 

 

Nuclear decommissioning ARO at June 30, 2014(a)

   $ 6,707  
  

 

 

 

 

(a)

Includes $9 million as the current portion of the ARO at June 30, 2014 and December 31, 2013 which is included in Other current liabilities on Exelon’s and Generation’s Consolidated Balance Sheets.

(b)

Includes the fair value of the CENG ARO liability as of April 1, 2014, the date of consolidation. See Note 6 — Investment in Constellation Energy Nuclear Group, LLC for additional information.

During the six months ended June 30, 2014, Generation’s ARO increased by approximately $1.9 billion. The increase is largely driven by the consolidation of CENG. The fair value of CENG’s assets and liabilities recorded in consolidation, including the ARO, was determined based on significant estimates and assumptions that are judgmental in nature. The valuation to assess the fair value of the ARO is considered an initial estimate and will be updated with inputs from a third party engineering firm with corresponding adjustments recorded by the end of 2014. For additional details on the consolidation of CENG, see Note 6 — Investment in Constellation Energy Nuclear Group, LLC.

Nuclear Decommissioning Trust Fund Investments

NDT funds have been established for each generating station unit to satisfy Generation’s nuclear decommissioning obligations. Generally, NDT funds established for a particular unit may not be used to fund the decommissioning obligations of any other unit.

The NDT funds associated with the former ComEd, former PECO, former AmerGen and the CENG units have been funded with amounts collected from ComEd customers, PECO customers, and the previous owners of the former AmerGen and the CENG plants, respectively. Based on an ICC order, ComEd ceased collecting amounts from its customers to pay for decommissioning costs. PECO is authorized to collect funds, in revenues, for decommissioning the former PECO nuclear plants through regulated rates, and these collections are scheduled through the operating lives of the former PECO plants. The amounts collected from PECO customers are remitted to Generation and deposited into the NDT funds for the unit for which funds are collected. Every five years, PECO files a rate adjustment with the PAPUC that reflects PECO’s calculations of the estimated amount needed to decommission each of the former PECO units based on updated fund balances and estimated decommissioning costs. The rate adjustment is used to determine the amount collectible from PECO customers. The most recent rate adjustment occurred on January 1, 2013, and the effective rates currently yield annual collections of approximately $24 million. The next five-year adjustment is expected to be reflected in rates charged to PECO customers effective January 1, 2018. With respect to the former AmerGen and CENG units, Generation does not collect any amounts, nor is there any mechanism by which Generation can seek to collect additional amounts, from customers. Apart from the contributions made to the NDT funds from amounts previously collected from ComEd and currently collected from PECO customers, Generation has not made contributions to the NDT funds.

Any shortfall of funds necessary for decommissioning, determined for each generating station unit, is ultimately required to be funded by Generation, with the exception of a shortfall for the current decommissioning activities at Zion Station, where certain decommissioning activities have been transferred to a third party (see

 

111


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Zion Station Decommissioning below) and the CENG units, where any shortfall is required to be funded by both Generation and EDF. Generation, through PECO, has recourse to collect additional amounts from PECO customers related to a shortfall of NDT funds for the former PECO units, subject to certain limitations and thresholds, as prescribed by an order from the PAPUC. Generally, PECO, and likewise Generation, will not be allowed to collect amounts associated with the first $50 million of any shortfall of trust funds, on an aggregate basis for all former PECO units, compared to decommissioning obligations, as well as 5% of any additional shortfalls. The initial $50 million and up to 5% of any additional shortfalls would be borne by Generation. No recourse exists to collect additional amounts from ComEd customers for the former ComEd units or from the previous owners of the former AmerGen and CENG units. With respect to the former ComEd and PECO units, any funds remaining in the NDTs after all decommissioning has been completed are required to be refunded to ComEd’s or PECO’s customers, subject to certain limitations that allow sharing of excess funds with Generation related to the former PECO units. With respect to the former AmerGen units and CENG units, Generation retains any funds remaining in the trust funds after decommissioning. However, in connection with CENG’s acquisition of the Nine Mile Point and Ginna plants and settlements with certain regulatory agencies, CENG is subject to certain conditions pertaining to nuclear decommissioning trust funds that, if met, could possibly result in obligations to make payments to certain third parties (clawbacks). For Nine Mile Point and Ginna, the clawback provisions are triggered only in the event that the required decommissioning activities are discontinued or not started or completed in a timely manner. In the event that the clawback provisions are triggered for Nine Mile Point, then, depending upon the triggering event, an amount equal to 50% of the total amount withdrawn from the funds for non-decommissioning activities or 50% of any excess funds in the trust funds above the amounts required for decommissioning (including spent fuel management and decommissioning) is to be paid to the Nine Mile Point sellers. In the event that the clawback provisions are triggered for Ginna, then an amount equal to any estimated cost savings realized by not completing any of the required decommissioning activities is to be paid to the Ginna sellers. Generation expects to comply with applicable regulations and timely commence and complete all required decommissioning activities.

At June 30, 2014 and December 31, 2013, Exelon and Generation had NDT fund investments totaling $10,437 million and $8,071 million, respectively.

The following table provides unrealized gains on NDT funds for the three and six months ended June 30, 2014 and 2013:

 

     Exelon and Generation  
     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
     2014      2013     2014      2013  

Net unrealized gains (losses) on decommissioning trust funds — Regulatory Agreement Units(a)

   $ 172      $ (102   $ 234      $ 92  

Net unrealized gains (losses) on decommissioning trust funds — Non-Regulatory Agreement Units(b)(c)

     128        (40     141        24  

 

(a)

Net unrealized gains (losses) related to Generation’s NDT funds associated with Regulatory Agreement Units are included in Regulatory liabilities on Exelon’s Consolidated Balance Sheets and Noncurrent payables to affiliates on Generation’s Consolidated Balance Sheets.

(b)

Excludes $10 million and $2 million of net unrealized gains related to the Zion Station pledged assets for the three months ended June 30, 2014 and 2013, respectively, and $20 million and $3 million of net unrealized gains related to the Zion Station pledged assets for the six months ended June 30, 2014 and 2013, respectively. Net unrealized gains (losses) related to Zion Station pledged assets are included in the Payable for Zion Station decommissioning on Exelon’s and Generation’s Consolidated Balance Sheets.

(c)

Net unrealized gains (losses) related to Generation’s NDT funds with Non-Regulatory Agreement Units are included within Other, net in Exelon’s and Generation’s Consolidated Statements of Operations and Comprehensive Income.

 

112


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Interest and dividends on NDT fund investments are recognized when earned and are included in Other, net in Exelon’s and Generation’s Consolidated Statements of Operations and Comprehensive Income. Interest and dividends earned on the NDT fund investments for the Regulatory Agreement Units are eliminated within Other, net in Exelon’s and Generation’s Consolidated Statement of Operations and Comprehensive Income.

See Note 3 — Regulatory Matters and Note 25 — Related Party Transactions of the Exelon 2013 Form 10-K for information regarding regulatory liabilities at ComEd and PECO and intercompany balances between Generation, ComEd and PECO reflecting the obligation to refund to customers any decommissioning-related assets in excess of the related decommissioning obligations.

Zion Station Decommissioning.    On September 1, 2010, Generation completed an Asset Sale Agreement (ASA) with EnergySolutions Inc. and its wholly owned subsidiaries, EnergySolutions, LLC (EnergySolutions) and ZionSolutions under which ZionSolutions has assumed responsibility for decommissioning Zion Station, which is located in Zion, Illinois and ceased operation in 1998. See Note 15 — Asset Retirement Obligations of the Exelon 2013 Form 10-K for information regarding the specific treatment of assets, including NDT funds, and decommissioning liabilities transferred in the transaction.

ZionSolutions is subject to certain restrictions on its ability to request reimbursements from the Zion Station NDT funds as defined within the ASA. Therefore, the transfer of the Zion Station assets did not qualify for asset sale accounting treatment and, as a result, the related NDT funds were reclassified to pledged assets for Zion Station decommissioning within Generation’s and Exelon’s Consolidated Balance Sheets and will continue to be measured in the same manner as prior to the completion of the transaction. Additionally, the transferred ARO for decommissioning was replaced with a payable to ZionSolutions in Generation’s and Exelon’s Consolidated Balance Sheets. Changes in the value of the Zion Station NDT assets, net of applicable taxes, will be recorded as a change in the payable to ZionSolutions. At no point will the payable to ZionSolutions exceed the project budget of the costs remaining to decommission Zion Station. Generation has retained its obligation for the SNF. Following ZionSolutions’ completion of its contractual obligations, Generation will store the SNF at Zion Station until it is transferred to the DOE for ultimate disposal and will complete all remaining decommissioning activities associated with the SNF dry storage facility. Generation has a liability of approximately $85 million, which is included within the nuclear decommissioning ARO at June 30, 2014. Generation also has retained NDT assets to fund its obligation to maintain and transfer the SNF at Zion Station and to complete all remaining decommissioning activities for the SNF storage facility. Any shortage of funds necessary to maintain the SNF and decommission the SNF storage facility is ultimately required to be funded by Generation. Any Zion Station NDT funds remaining after the completion of all decommissioning activities will be returned to ComEd customers in accordance with the applicable orders. The following table provides the pledged assets and payable to ZionSolutions, and withdrawals by ZionSolutions at June 30, 2014 and December 31, 2013:

 

     Exelon and Generation  
     June 30,
2014
     December 31,
2013
 

Carrying value of Zion Station pledged assets

   $ 402      $ 458  

Payable to Zion Solutions(a)

     357        414  

Current portion of payable to Zion Solutions(b)

     93        109  

Withdrawals by Zion Solutions to pay decommissioning costs(c)

     575        498  

 

(a)

Excludes a liability recorded within Exelon’s and Generation’s Consolidated Balance Sheets related to the tax obligation on the unrealized activity associated with the Zion Station NDT Funds. The NDT Funds will be utilized to satisfy the tax obligations as gains and losses are realized.

(b)

Included in Other current liabilities within Exelon’s and Generation’s Consolidated Balance Sheets.

(c)

Cumulative withdrawals since September 1, 2010.

 

113


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

NRC Minimum Funding Requirements.    NRC regulations require that licensees of nuclear generating facilities demonstrate reasonable assurance that funds will be available in specified minimum amounts to decommission the facility at the end of its life. On April 1, 2013, Generation submitted its NRC-required biennial decommissioning funding status report as of December 31, 2012. As of December 31, 2012, Generation provided adequate funding assurance for all of its units, including Limerick Unit 1, where Generation has in place a $115 million parent guarantee to cover the NRC minimum funding assurance requirements. On October 2, 2013, the NRC issued summary findings from the NRC Staff’s review of the 2013 decommissioning funding status reports for all 104 operating reactors, including the Generation operating units. Based on that review, the NRC Staff determined that Generation provided decommissioning funding assurance under the NRC regulations for all of its operating units, including Limerick Unit 1. On March 26, 2014, in accordance with a NRC requirement with respect to units involved in a merger or acquisition, CENG submitted its NRC-required decommissioning funding status report as of December 31, 2013 and no additional financial assurance was required.

On March 31, 2014, Generation submitted its NRC required annual decommissioning funding report as of December 31, 2013 for shutdown reactors. This submittal also included the required updated financial tests for the Limerick Unit 1 parent guarantee. There was no change to the amount of the parent guarantee, or the funding status of these reactors. Adequate decommissioning funding assurance is in place for all reactors owned by Generation.

On January 31, 2013, Generation received a letter from the NRC indicating that the NRC has identified potential “apparent violations” of its regulations because of alleged inaccuracies in the Decommissioning Funding Status reports for 2005, 2006, 2007, and 2009. The NRC asserted that Generation’s status reports deliberately reflected cost estimates for decommissioning its nuclear plants that were less than what the NRC says are the minimum amounts required by NRC regulations. The January 31, 2013 letter from the NRC does not take issue with Generation’s current funding status, and as reflected in Generation’s April 1, 2013 decommissioning funding status report referenced above, Generation continues to provide adequate funding assurance for each of its units. Generation met with the NRC on April 30, 2013 for a pre-decisional enforcement conference to provide additional information to explain why Generation believes that it complied with the regulatory requirements and did not deliberately or otherwise provide incomplete or inaccurate information in its decommissioning funding status reports. On May 1, 2014, the NRC issued its final determination. Although the NRC determined that these historical status reports did not provide complete and accurate information, the violation of the regulatory requirements was not a deliberate violation. The NRC noted the low safety significance and Generation’s corrective actions to satisfy the NRC Staff’s expectations and issued a Severity Level IV violation, with no monetary penalty. A Severity Level IV violation is the lowest level of violation.

In addition, on June 24, 2013, Exelon received a subpoena from the SEC requesting that Exelon provide the SEC with certain documents generally relating to Exelon and Generation’s reporting and funding of the future decommissioning of Generation’s nuclear power plants. Exelon and Generation have cooperated with the SEC and provided the requested documents. On February 13, 2014, Exelon received a letter from the SEC confirming that it had concluded its investigation and that no further action was anticipated based on information provided by Exelon.

13.    Retirement Benefits (Exelon, Generation, ComEd, PECO and BGE)

Exelon sponsors defined benefit pension plans and other postretirement benefit plans for essentially all Generation, ComEd, PECO, BGE and BSC employees.

On April 1, 2014, as a result of the consolidation of CENG into Generation, the obligations associated with CENG’s pension and other postretirement plans are reflected in the disclosures below based on an April 1, 2014 valuation. The plans include essentially all employees at CENG. Exelon will assume sponsorship of the CENG pension and other postretirement benefit plans in the third quarter of 2014.

 

114


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Defined Benefit Pension and Other Postretirement Benefits

During the first quarter of 2014, Exelon received an updated valuation of several of its pension and other postretirement benefit obligations to reflect actual census data as of January 1, 2014. This valuation resulted in an increase to the pension obligation of $35 million and an increase to the other postretirement benefit obligation of $12 million. Additionally, accumulated other comprehensive loss increased by approximately $12 million (after tax), regulatory assets increased by approximately $34 million, and regulatory liabilities increased by approximately $5 million. During the second quarter of 2014, Exelon received an updated valuation for the remainder of its pension and other postretirement benefit obligations to reflect actual census data as of January 1, 2014. This valuation resulted in an increase to the pension obligation of $13 million and an increase to the other postretirement benefit obligation of $3 million. Additionally, accumulated other comprehensive loss increased by approximately $1 million (after tax) and regulatory assets increased by approximately $15 million.

In April 2014, Exelon announced plan design changes for certain other postretirement benefit plans, which required an interim remeasurement of the benefit obligation for those plans using assumptions as of April 30, 2014, including updated discount rates and asset values. The remeasurement is expected to result in a decrease in the net periodic benefit costs for other postretirement benefits of approximately $149 million for the period May 2014 through December 2014 as compared to the net periodic benefit costs that were anticipated based on the January 1, 2014 valuation. The remeasurement resulted in a decrease in Exelon’s non-pension postretirement benefit obligations, regulatory assets, and accumulated other compressive loss of approximately $790 million, $240 million, and $259 million (after tax), respectively, and an increase in regulatory liabilities of approximately $125 million.

The following tables present the components of Exelon’s net periodic benefit costs for the three and six months ended June 30, 2014 and 2013. The 2014 pension benefit cost for Exelon-sponsored plans is calculated using an expected long-term rate of return on plan assets of 7.00% and a discount rate of 4.80%. The 2014 other postretirement benefit cost is calculated using an expected long-term rate of return on plan assets of 6.59% for funded plans and a discount rate of 4.90% for all plans. Certain of the other postretirement benefit plans were remeasured as of April 30, 2014 using an expected long-term rate of return on plan assets of 6.59% and a discount rate of 4.30%. Costs for the three and six months ended June 30, 2014 reflect the impact of this remeasurement. A portion of the net periodic benefit cost is capitalized within the Consolidated Balance Sheets.

 

     Pension Benefits
Three Months Ended
June 30,
    Other
Postretirement  Benefits

Three Months Ended
June 30,
 
     2014(a)     2013     2014(a)     2013  

Service cost

   $ 69     $ 79     $ 29     $ 40  

Interest cost

     184       163       45       49  

Expected return on assets

     (242     (254     (38     (33

Amortization of:

        

Prior service cost (benefit)

     4       4       (30     (6

Actuarial loss

     104       141       12       21  
  

 

 

   

 

 

   

 

 

   

 

 

 

Net periodic benefit cost

   $ 119     $ 133     $ 18     $ 71  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

115


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

     Pension Benefits
Six Months Ended

June 30,
    Other
Postretirement Benefits
Six Months Ended
June 30,
 
     2014(a)     2013     2014(a)     2013  

Service cost

   $ 138     $ 159     $ 61     $ 81  

Interest cost

     367       326       101       97  

Expected return on assets

     (483     (508     (76     (66

Amortization of:

        

Prior service cost (benefit)

     7       7       (34     (10

Actuarial loss

     209       281       20       42  
  

 

 

   

 

 

   

 

 

   

 

 

 

Net periodic benefit cost

   $ 238     $ 265     $ 72     $ 144  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Excludes components of CENG’s net periodic benefit costs for the period April 1, 2014 to June 30, 2014 as presented in the below table.

The following tables present the components of net periodic benefit costs for the CENG-sponsored benefit plans for the period April 1, 2014 to June 30, 2014 and reflect the valuation performed as of April 1, 2014. The 2014 pension benefit cost for CENG sponsored plans is calculated using an expected long-term rate of return on plan assets of 7.75% and discount rates ranging from 3.60% — 4.30%. The 2014 other postretirement benefit cost is calculated using a discount rate of 4.55% for all plans.

 

     Pension Benefits     Other Postretirement Benefits  

Service cost

   $ 5     $ 1  

Interest cost

     6       2  

Expected return on assets

     (9      
  

 

 

   

 

 

 

Net periodic benefit cost

   $ 2     $ 3  
  

 

 

   

 

 

 

The amounts below represent Generation’s, ComEd’s, PECO’s, BGE’s and BSC’s allocated portion of the pension and postretirement benefit plan costs, which were included in Capital expenditures and Operating and maintenance expense during the three and six months ended June 30, 2014 and 2013.

 

     Three Months Ended
June 30,
     Six Months Ended
June 30,
 

Pension and Other Postretirement Benefit Costs

   2014      2013      2014      2013  

Generation(a)

   $ 63      $ 87      $ 139      $ 173  

ComEd

     40        77        96        154  

PECO

     9        10        21        21  

BGE

     17        14        33        27  

BSC(b)

     13        16        26        34  

 

(a)

Includes $5 million related to CENG for the period April 1, 2014 to June 30, 2014.

(b)

These amounts primarily represent amounts billed to Exelon’s subsidiaries through intercompany allocations. These amounts are not included in the Generation, ComEd, PECO or BGE amounts above.

Management considers various factors when making pension funding decisions, including actuarially determined minimum contribution requirements under ERISA, contributions required to avoid benefit restrictions and at-risk status as defined by the Pension Protection Act of 2006, management of the pension obligation and regulatory implications. Exelon expects to make qualified pension plan contributions of $317 million to its

 

116


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

qualified pension plans in 2014, of which Generation, ComEd, PECO and BGE will contribute $169 million, $119 million, $11 million and $0 million, respectively. Exelon’s and Generation’s expected qualified pension plan contributions above include $53 million and $51 million, respectively, related to CENG-sponsored plans for the period April 1, 2014 to December 31, 2014. Unlike the qualified pension plans, Exelon’s non-qualified pension plans are not funded. Exelon expects to make non-qualified pension plan benefit payments of $18 million in 2014, of which Generation, ComEd, PECO and BGE will make payments of $9 million, $1 million, $0 million and $1 million, respectively. Exelon’s and Generation’s expected non-qualified pension plan benefit payments above include $3 million related to CENG-sponsored plans for the period April 1, to December 31, 2014.

Unlike qualified pension plans, other postretirement benefit plans are not subject to statutory minimum contribution requirements and certain plans are not funded. Exelon’s management has historically considered several factors in determining the level of contributions to its funded other postretirement benefit plans, including levels of benefit claims paid and regulatory implications (amounts deemed prudent to meet regulator expectations and best assure continued rate recovery). Exelon expects to make other postretirement benefit plan contributions, including benefit payments related to unfunded plans and considering the impact of recent plan design changes, of approximately $290 million in 2014, of which Generation, ComEd, PECO and BGE expect to contribute $128 million, $121 million, $4 million and $18 million, respectively. Exelon’s and Generation’s expected other postretirement benefit plan payments above include $5 million related to CENG-sponsored plans for the period April 1, 2014 to December 31, 2014.

Plan Assets

Investment Strategy.    On a regular basis, Exelon evaluates its investment strategy to ensure that plan assets will be sufficient to pay plan benefits when due. As part of this ongoing evaluation, Exelon may make changes to its targeted asset allocation and investment strategy.

Exelon has developed and implemented a liability hedging investment strategy for its qualified pension plans that has reduced the volatility of its pension assets relative to its pension liabilities. Exelon is likely to continue to gradually increase the liability hedging portfolio as the funded status of its plans improves. The overall objective is to achieve attractive risk-adjusted returns that will balance the liquidity requirements of the plans’ liabilities while striving to minimize the risk of significant losses. Trust assets for Exelon’s other postretirement plans are managed in a diversified investment strategy that prioritizes maximizing liquidity and returns while minimizing asset volatility.

CENG’s investment strategy for its qualified pension assets is generally consistent with Exelon’s investment strategy as outlined above.

 

117


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Defined Contribution Savings Plans

The Registrants participate in various 401(k) defined contribution savings plans that are sponsored by Exelon. The plans are qualified under applicable sections of the IRC and allow employees to contribute a portion of their pre-tax income in accordance with specified guidelines. All Registrants match a percentage of the employee contributions up to certain limits. The following table presents the matching contributions to the savings plans during the three and six months ended June 30, 2014 and 2013:

 

     Three Months Ended
June 30,
     Six Months Ended
June 30,
 

Savings Plan Matching Contributions

   2014      2013      2014      2013  

Exelon(a)

   $ 19      $ 21      $ 48      $ 43  

Generation(a)

     10        10        24        21  

ComEd

     5        5        12        10  

PECO

     2        2        4        4  

BGE

     1        2        4        4  

BSC(b)

     1        2        4        4  

 

(a)

Includes $1 million of matching contributions to CENG’s 401(k) defined contribution savings plan for the period April 1, 2014 to June 30, 2014.

(b)

These amounts primarily represent amounts billed to Exelon’s subsidiaries through intercompany allocations. These costs are not included in the Generation, ComEd, PECO or BGE amounts above.

14.    Severance (Exelon, Generation, ComEd, PECO and BGE)

The Registrants have an ongoing severance plan under which, in general, the longer an employee worked prior to termination the greater the amount of severance benefits. The Registrants record a liability and expense or regulatory asset for severance once terminations are probable of occurrence and the related severance benefits can be reasonably estimated. For severance benefits that are incremental to its ongoing severance plan (“one-time termination benefits”), the Registrants measure the obligation and record the expense at fair value at the communication date if there are no future service requirements, or, if future service is required to receive the termination benefit, ratably over the required service period.

CENG Integration-Related Severance

In connection with the Master Agreement, Generation and CENG recorded a severance accrual in the fourth quarter of 2013 for the anticipated employee position reductions as a result of the integration. The majority of these positions are corporate and support positions at CENG. On April 1, 2014, the date the NOSA was executed, Generation consolidated the CENG severance liability pursuant to the Master Agreement. Generation adjusts its accrual each quarter to reflect its best estimate of remaining severance costs. The estimated amount of severance payments associated with this plan is expected to be approximately $27 million. As of June 30, 2014, management recorded its best estimate of severance benefits, which could be adjusted through the completion of the integration process if additional employee position reductions are identified or if employees resign prior to their agreed upon service termination date. Estimated costs to be incurred after June 30, 2014 are not material.

Exelon and Generation recorded severance benefit costs associated with the employee reductions of $1 million and $2 million within Operating and maintenance expense for the three and six months ended June 30, 2014, respectively, in their Consolidated Statements of Operations and Comprehensive Income.

 

118


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Amounts included in the table below represent the severance liability recorded by Exelon and Generation related to the CENG integration:

 

Six Months Ended June 30, 2014

            

Severance Liability

   Exelon     Generation  

Balance at December 31, 2013

   $ 2     $ 2  

Integration of CENG(a)

     19       19  

Severance charges

     2       2  

Payments

     (3     (3
  

 

 

   

 

 

 

Balance at June 30, 2014

   $ 20     $ 20  
  

 

 

   

 

 

 

 

(a)

Includes the fair value of the CENG integration-related obligation as of April 1, 2014, the date of consolidation. See Note 6 — Investment in CENG for additional information.

Cash payments under the severance plan began in the second quarter of 2014. Substantially all cash payments under the plan are expected to be made by the end of 2014.

Constellation Merger-Related Severance

Upon closing the merger with Constellation, Exelon recorded a severance accrual for the anticipated employee position reductions as a result of the post-merger integration. The majority of these positions are corporate and Generation support positions. Since then, Exelon has identified specific employees to be severed pursuant to the merger-related staffing and selection process as well as employees that were previously identified for severance but have since accepted another position within Exelon and are no longer receiving a severance benefit.

The amount of severance expense associated with the post-merger integration recognized for the three and six months ended June 30, 2014 and 2013 is not material. Estimated costs to be incurred after June 30, 2014 are not material.

Amounts included in the table below represent the severance liability recorded by Exelon, Generation, ComEd, PECO and BGE for employees of those Registrants and exclude amounts billed through intercompany allocations:

 

Six Months Ended June 30, 2014

                                

Severance Liability

   Exelon     Generation     ComEd      PECO      BGE  

Balance at December 31, 2013

   $ 53      $ 10      $       $       $ 6  

Payments

     (20     (2                   (3
  

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

Balance at June 30, 2014

   $ 33      $ 8      $       $       $ 3  
  

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

Substantially all cash payments under the plan are expected to be made by the end of 2016.

Ongoing Severance Plans

The Registrants provide severance and health and welfare benefits under Exelon’s ongoing severance benefit plans to terminated employees in the normal course of business, which are not directly related to the merger with Constellation or with the integration of CENG. These benefits are accrued for when the benefits are considered probable and can be reasonably estimated.

 

119


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

For the three and six months ended June 30, 2014 and 2013, the Registrants recorded the following severance costs associated with these ongoing severance benefits within Operating and maintenance expense in their Consolidated Statements of Operations and Comprehensive Income:

 

     Exelon      Generation      ComEd      PECO      BGE  

Three Months Ending

                                  

June 30, 2014

   $ 4       $ 2       $       $       $   

June 30, 2013

   $ 1       $ 1       $       $       $   

Six Months Ending

                                  

June 30, 2014

   $ 6       $ 4       $       $       $   

June 30, 2013

   $ 2       $ 1       $ 1       $       $   

The severance liability balances associated with these ongoing severance benefits as of June 30, 2014 and December 31, 2013 are not material.

15.    Changes in Accumulated Other Comprehensive Income (Exelon, Generation, and PECO)

The following tables present changes in accumulated other comprehensive income (loss) (AOCI) by component for the six months ended June 30, 2014 and 2013:

 

For The Six Months Ended June 30, 2014

  Gains and
(Losses) on

Cash Flow
Hedges
    Unrealized
Gains and
(Losses) on
Marketable
Securities
    Pension and
Non-Pension
Postretirement
Benefit Plan
Items
    Foreign
Currency
Items
    AOCI of
Equity
Investments
    Total  

Exelon(a)

           

Beginning balance

  $ 120     $ 2     $ (2,260   $ (10   $ 108     $ (2,040
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

OCI before reclassifications

    (11     1       246       (1     11       246  

Amounts reclassified from AOCI(b)

    (62           66             (116     (112
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net current-period OCI

    (73     1       312       (1     (105     134  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Ending balance

  $ 47     $ 3     $ (1,948   $ (11   $ 3     $ (1,906
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Generation(a)

           

Beginning balance

  $ 114     $ 2     $     $ (10   $ 108     $ 214  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

OCI before reclassifications

    (8     (1           (1     11       1  

Amounts reclassified from AOCI (b)

    (62                       (116     (178
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net current-period OCI

    (70     (1           (1     (105     (177
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Ending balance

  $ 44     $ 1     $     $ (11   $ 3     $ 37  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

PECO(a)

           

Beginning balance

  $     $ 1     $     $     $     $ 1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

OCI before reclassifications

                                   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net current-period OCI

                                   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Ending balance

  $     $ 1     $     $     $     $ 1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

All amounts are net of tax. Amounts in parenthesis represent a decrease in accumulated other comprehensive income.

(b)

See tables following changes in accumulated other comprehensive income tables for details about these reclassifications.

 

120


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

For The Six Months Ended June 30, 2013

  Gains and
(Losses) on

Cash Flow
Hedges
    Unrealized
Gains and
(Losses) on
Marketable
Securities
    Pension and
Non-Pension
Postretirement
Benefit Plan
Items
    Foreign
Currency
Items
    AOCI of
Equity
Investments
    Total  

Exelon(a)

           

Beginning balance

  $ 368      $      $ (3,137   $      $ 2      $ (2,767
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

OCI before reclassifications

    24       (1     87       (6     31       135  

Amounts reclassified from AOCI(b)

    (147           101             5       (41
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net current-period OCI

    (123     (1     188       (6     36       94  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Ending balance

  $ 245     $ (1   $ (2,949   $ (6   $ 38     $ (2,673
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Generation(a)

           

Beginning balance

  $ 512     $      $      $      $ 1      $ 513  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

OCI before reclassifications

    12       (1           (6     31       36  

Amounts reclassified from AOCI(b)

    (279                       5       (274
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net current-period OCI

    (267     (1           (6     36       (238
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Ending balance

  $ 245     $ (1   $     $ (6   $ 37     $ 275  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

PECO(a)

           
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Beginning balance

  $     $ 1     $     $      $      $ 1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

OCI before reclassifications

                                   

Amounts reclassified from AOCI(b)

                                   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net current-period OCI

                                   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Ending balance

  $     $ 1     $     $      $      $ 1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

All amounts are net of tax. Amounts in parenthesis represent a decrease in accumulated other comprehensive income.

(b)

See tables following changes in accumulated other comprehensive income tables for details about these reclassifications

ComEd, PECO, BGE did not have any reclassifications out of AOCI to Net Income during the three and six months ended June 30, 2014 and 2013. The following tables present amounts reclassified out of AOCI to Net Income for Exelon and Generation during the three and six months ended June 30, 2014 and 2013.

 

121


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Three Months Ended June 30, 2014

 

Details about AOCI components

   Items reclassified out of AOCI(a)     Affected line item in the statement
where Net Income is presented
     Exelon     Generation      

Gains on cash flow hedges

      

Energy related hedges

   $ 63     $ 63    

Operating revenues

  

 

 

   

 

 

   
     63       63     Total before tax
     (25     (25   Tax (expense)
  

 

 

   

 

 

   
   $ 38     $ 38     Net of tax
  

 

 

   

 

 

   

Amortization of pension and other postretirement benefit plan items

      

Prior service costs

   $ 12     $      (b)

Actuarial losses

     (61          (b)
  

 

 

   

 

 

   
     (49         Total before tax
     18           Tax benefit
  

 

 

   

 

 

   
   $  (31)      $     Net of tax
  

 

 

   

 

 

   

Equity investments

      

Reversal of CENG equity method AOCI

   $ 193     $ 193     Gain on consolidation of
CENG
  

 

 

   

 

 

   
     193       193     Total before tax
     (77     (77   Tax benefit
  

 

 

   

 

 

   
   $ 116     $ 116     Net of tax
  

 

 

   

 

 

   

Total Reclassifications for the period

   $ 123     $ 154     Net of Tax
  

 

 

   

 

 

   

Six Months Ended June 30, 2014

 

Details about AOCI components

   Items reclassified out of AOCI(a)     Affected line item in the statement
where Net Income is presented
     Exelon     Generation      

Gains on cash flow hedges

      

Energy related hedges

   $ 102     $ 102     Operating revenues

Other cash flow hedges

               Interest expense
  

 

 

   

 

 

   
     102       102     Total before tax
     (40     (40   Tax (expense)
  

 

 

   

 

 

   
   $ 62     $ 62     Net of tax
  

 

 

   

 

 

   

Amortization of pension and other postretirement benefit plan items

      

Prior service costs

     10            (b)

Actuarial losses

   $ (117   $      (b)
  

 

 

   

 

 

   
     (107         Total before tax
     41           Tax benefit
  

 

 

   

 

 

   
   $ (66   $     Net of tax
  

 

 

   

 

 

   

Equity investments

      

Reversal of CENG equity method AOCI

   $ 193     $ 193     Gain on consolidation of

CENG

  

 

 

   

 

 

   
     193       193     Total before tax
     (77     (77   Tax benefit
  

 

 

   

 

 

   
   $ 116     $ 116     Net of tax
  

 

 

   

 

 

   

Total Reclassifications for the period

   $ 112     $ 178     Net of Tax
  

 

 

   

 

 

   

 

122


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Three Months Ended June 30, 2013

 

Details about AOCI components

   Items reclassified out of AOCI(a)     Affected line item in the statement
where Net Income is presented
     Exelon     Generation      

Gains on cash flow hedges

      

Energy related hedges

   $ 141     $ 236     Operating revenues

Other cash flow hedges

           1     Interest expense
  

 

 

   

 

 

   
     141       237     Total before tax
     (52     (93   Tax (expense)
  

 

 

   

 

 

   
   $ 89     $ 144     Net of tax
  

 

 

   

 

 

   

Amortization of pension and other postretirement benefit plan items

      

Prior service costs

   $ (1   $      (b)

Actuarial (losses)

     (82          (b)
  

 

 

   

 

 

   
     (83         Total before tax
     32           Tax benefit
  

 

 

   

 

 

   
   $ (51   $     Net of tax
  

 

 

   

 

 

   

Equity investments

      

Capital activity

   $ (5   $ (5   Equity in losses of

unconsolidated affiliates

  

 

 

   

 

 

   
     (5     (5   Total before tax
     2       2     Tax benefit
  

 

 

   

 

 

   
   $ (3   $ (3   Net of tax
  

 

 

   

 

 

   

Total Reclassifications for the period

   $ 35     $ 141     Net of Tax
  

 

 

   

 

 

   

Six Months Ended June 30, 2013

 

Details about AOCI components

   Items reclassified out of AOCI(a)     Affected line item in the statement
where Net Income is presented
     Exelon     Generation      

Gains on cash flow hedges

      

Energy related hedges

   $ 240     $ 459     Operating revenues

Other cash flow hedges

     (1     1     Interest (expense) or benefit
  

 

 

   

 

 

   
     239       460     Total before tax
     (92     (181   Tax (expense)
  

 

 

   

 

 

   
   $ 147     $ 279     Net of tax
  

 

 

   

 

 

   

Amortization of pension and other postretirement benefit plan items

      

Prior service costs

   $ (1   $      (b)

Actuarial (losses)

     (165          (b)
  

 

 

   

 

 

   
     (166         Total before tax
     65           Tax (expense)
  

 

 

   

 

 

   
   $ (101   $     Net of tax
  

 

 

   

 

 

   

Equity investments

      

Capital activity

   $ (8   $ (8   Equity in losses of

unconsolidated affiliates

  

 

 

   

 

 

   
     (8     (8   Total before tax
     3       3     Tax benefit
  

 

 

   

 

 

   
   $ (5   $ (5   Net of tax
  

 

 

   

 

 

   

Total Reclassifications for the period

   $ 41     $ 274     Net of Tax
  

 

 

   

 

 

   

 

(a)

All amounts are net of tax. Amounts in parenthesis represent a decrease in net income.

(b)

This accumulated other comprehensive income component is included in the computation of net periodic pension and OPEB cost (see Note 13 — Retirement Benefits for additional details).

 

123


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

The following table presents income tax expense (benefit) allocated to each component of other comprehensive income (loss) during the three and six months ended June 30, 2014 and 2013:

 

     Three Months
Ended June 30,
    Six Months
Ended June 30,
 
     2014     2013     2014     2013  

Exelon

        

Pension and non-pension postretirement benefit plans:

        

Prior service benefit reclassified to periodic benefit cost

   $ 5     $     $ 5     $ 1  

Actuarial loss reclassified to periodic cost

     (23     (32     (46     (66

Pension and non-pension post retirement benefit plans valuation adjustment

     (166     (1     (159     (50

Change in unrealized loss on cash flow hedges

     28       45       48       77  

Change in unrealized income on equity investments

     77       (5     70       (23

Deferred compensation unit valuation adjustment

           (6           (6
  

 

 

   

 

 

   

 

 

   

 

 

 

Total

   $ (79   $ 1     $ (82   $ (67
  

 

 

   

 

 

   

 

 

   

 

 

 

Generation

        

Change in unrealized loss on cash flow hedges

   $ 25     $ 89     $ 44     $ 175  

Change in unrealized income on equity investments

     77       (5     70       (23

Change in marketable securities

                 (2      
  

 

 

   

 

 

   

 

 

   

 

 

 

Total

   $ 102     $ 84     $ 112     $ 152  
  

 

 

   

 

 

   

 

 

   

 

 

 

16.    Common Stock (Exelon, Generation, ComEd, PECO and BGE)

Equity Securities Offering

In June 2014, Exelon marketed an equity offering of 57.5 million shares of its common stock at a public offering price of $35 per share. Concurrently, Exelon entered into forward sale agreements requiring Exelon to, at its election, prior to October 29, 2015; i) physically settle the transaction through the issuance of 57.5 million shares of its common stock in exchange for net proceeds at the forward price specified in the agreements of between approximately $1.85 billion and $1.95 billion, after consideration of underwriters discount of approximately $60 million and subject to certain adjustments as provided in the forward sales agreement, or ii) net settle the transaction either through the payment of cash or shares of its common stock based on the then current market value of the shares minus the value of the shares at the forward price, net of the underwriters discount and the daily accretion rate. No amounts have or will be recorded in Exelon’s consolidated financial statements until settlement of the forward sale agreements occurs. At June 30, 2014, if Exelon had elected to net share settle the contract, the maximum number of common shares that would have been required to be issued is approximately 4 million shares at a forward price of $33.94. If Exelon elects to cash settle the contract, the transaction costs will be recorded as a charge to earnings in the period in which it becomes probable that Exelon will cash settle. Otherwise, all transaction costs will be reflected as a reduction to the value of the common stock issued in Exelon’s Consolidated Balance Sheet. The net proceeds received upon settlement are expected to be used to finance a portion of the acquisition of PHI and for general corporate purposes. Until settlement, earnings per share dilution resulting from the forward sales agreement, if any, will be determined under the treasury stock method.

Concurrent with the forward equity transaction, Exelon also issued $1.15 billion of junior subordinated notes in the form of 23 million equity units. See Note 10 – Debt and Credit Agreements for further information on the equity units.

 

124


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

17.    Earnings Per Share and Equity (Exelon)

Earnings per Share (Exelon)

Diluted earnings per share is calculated by dividing Net income attributable to common shareholders by the weighted average number of shares of common stock outstanding adjusted to include the potentially dilutive effect of stock options, performance share awards, restricted stock outstanding under Exelon’s LTIPs, and Exelon’s equity forward sales agreement, which is further described in Note 10 — Debt and Credit Agreements. The following table sets forth the components of basic and diluted earnings per share and shows the effect of these stock options, performance share awards and restricted stock on the weighted average number of shares outstanding (in millions) used in calculating diluted earnings per share:

 

     Three Months Ended
June 30,
     Six Months Ended
June 30,
 
     2014      2013      2014      2013  

Net income attributable to common shareholders

   $ 522      $ 490      $ 612      $ 486  
  

 

 

    

 

 

    

 

 

    

 

 

 

Average common shares outstanding — basic

     860        856        860        856  

Potentially dilutive effect of stock options, performance share awards, restricted stock, and Exelon’s equity forward sales agreement

     4        4        3        3  
  

 

 

    

 

 

    

 

 

    

 

 

 

Average common shares outstanding — diluted

     864        860        863        859  
  

 

 

    

 

 

    

 

 

    

 

 

 

The number of stock options not included in the calculation of diluted common shares outstanding due to their antidilutive effect was approximately 16 million for the three and six months ended June 30, 2014 and 17 million and 18 million for the three and six months ended June 30, 2013, respectively.

Under share repurchase programs, 35 million shares of common stock are held as treasury stock with a cost of $2.3 billion as of June 30, 2014. In 2008, Exelon management decided to defer indefinitely any share repurchases.

Preferred Securities Redemption (Exelon and PECO)

On March 25, 2013, PECO announced that it issued a notice of redemption for all of its outstanding preferred securities with a redemption date of May 1, 2013. PECO had $87 million of cumulative preferred securities that were redeemable at its option at any time for the redemption price established when each series of securities were issued. The redemption premium of $6 million is treated as a reduction to Net income to arrive at Net income attributable to common shareholders utilized in the calculation of the earnings per share for Exelon. As a result of the redemption, PECO is now indirectly, wholly-owned by Exelon.

 

125


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

18.    Commitments and Contingencies (Exelon, Generation, ComEd, PECO and BGE)

The following is an update to the current status of commitments and contingencies set forth in Note 22 of the Exelon 2013 Form 10-K.

Commitments

Energy Commitments

As of June 30, 2014, Generation’s commitments relating to its purchases from unaffiliated utilities and others of energy, capacity, transmission rights and RECs, are as indicated in the following table:

 

     Net  Capacity
Purchases(a)
     REC
Purchases(b)
     Transmission
Rights
Purchases(c)
     Total  

2014

   $ 208      $ 43      $ 13      $ 264  

2015

     353        163        13        529  

2016

     269        122        2        393  

2017

     208        59        2        269  

2018

     98        13        2        113  

Thereafter

     388        4        32        424  
  

 

 

    

 

 

    

 

 

    

 

 

 

Total

   $ 1,524      $ 404      $ 64      $ 1,992  
  

 

 

    

 

 

    

 

 

    

 

 

 

 

(a)

Net capacity purchases include PPAs and other capacity contracts including those that are accounted for as operating leases. Amounts presented in the commitments represent Generation’s expected payments under these arrangements at June 30, 2014, net of fixed capacity payments expected to be received by Generation under contracts to resell such acquired capacity to third parties under long-term capacity sale contracts. Expected payments include certain fixed capacity charges which may be reduced based on plant availability.

(b)

The table excludes renewable energy purchases that are contingent in nature.

(c)

Transmission rights purchases include estimated commitments for additional transmission rights that will be required to fulfill firm sales contracts.

ComEd’s, PECO’s and BGE’s electric supply procurement, curtailment services, REC and AEC purchase commitments, as applicable, as of June 30, 2014 are as follows:

 

            Expiration within  
     Total      2014      2015      2016      2017      2018      2019
and beyond
 

ComEd

                    

Electric supply procurement(a)

   $ 740      $ 217      $ 232      $ 151      $ 140      $       $  

Renewable energy and RECs(b)

     1,548        32        73        76        77        78        1,212  

PECO

                    

Electric supply procurement(c)

     550        381        169                              

AECs(d)

     13        1        2        2        2        2        4  

BGE

                    

Electric supply procurement(e)

     1,320        448        632        240                       

Curtailment services(f)

     136        21        40        34        29        12         

 

(a)

ComEd entered into various contracts for the procurement of electricity that started to expire in 2012, and will continue to expire through 2017. ComEd is permitted to recover its electric supply procurement costs from retail customers with no mark-up. As of June 30, 2014, ComEd has completed the ICC-approved procurement process for a portion of its energy requirements through the periods ending May 31, 2015, 2016 and 2017.

 

126


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

(b)

Primarily related to ComEd 20-year contracts for renewable energy and RECs beginning in June 2012. ComEd is permitted to recover its renewable energy and REC costs from retail customers with no mark-up. The commitments represent the maximum settlements with suppliers for renewable energy and RECs under the existing contract terms.

(c)

PECO entered into various contracts for the procurement of electric supply to serve its default service customers that expire between 2014 and 2016. PECO is permitted to recover its electric supply procurement costs from default service customers with no mark-up in accordance with its PAPUC-approved DSP Programs. See Note 5 — Regulatory Matters for additional information.

(d)

PECO is subject to requirements related to the use of alternative energy resources established by the AEPS Act. See Note 5 - Regulatory Matters for additional information.

(e)

BGE entered into various contracts for the procurement of electricity that expire between 2014 through 2016. The cost of power under these contracts is recoverable under MDPSC approved fuel clauses. See Note 5 — Regulatory Matters for additional information.

(f)

BGE has entered into various contracts with curtailment services providers related to transactions in PJM’s capacity market. See Note 5 — Regulatory Matters for additional information.

Fuel Purchase Obligations

In addition to the energy commitments described above, Generation has commitments to purchase fuel supplies for nuclear and fossil generation. Beginning this quarter, all of CENG’s nuclear fuel commitments are disclosed within the Generation line below, since CENG is now fully consolidated by Generation. PECO and BGE have commitments to purchase natural gas related to transportation, storage capacity and services to serve customers in their gas distribution service territory. As of June 30, 2014, these net commitments were as follows:

 

            Expiration within  
     Total      2014      2015      2016      2017      2018      2019
and beyond
 

Generation

   $ 9,973      $ 694      $ 1,526      $ 1,230      $ 1,276      $ 929      $ 4,318  

PECO

     411        90        112        93        35        15        66  

BGE

     618        64        83        82        65        53        271  

Other Purchase Obligations

The Registrants’ other purchase obligations as of June 30, 2014, which primarily represent commitments for services, materials and information technology, are as follows:

 

            Expiration within  
     Total      2014      2015      2016      2017      2018      2019
and beyond
 

Exelon

   $ 568      $ 140      $ 171      $ 65      $ 55      $ 37      $ 100  

Generation

     474        110        155        52        47        31        79  

ComEd(a)

     53        16        8        5        5        5        14  

PECO(a)

     28        12        4        3        1        1        7  

BGE(a)

     12        1        4        5        2                

 

(a)

Purchase obligations include commitments related to smart meter installation. See Note 5 — Regulatory Matters for additional information.

Construction Commitments

Generation has committed to the construction of the Antelope Valley solar PV facility in Los Angeles County, California. The first portion of the project began operations in December 2012, with six additional blocks coming online in 2013. As of June 30, 2014, the facility was fully operational. Generation has no further remaining construction commitments for the project.

 

127


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

On July 3, 2013, Generation executed a Turbine Supply Agreement to expand its Beebe wind project in Michigan. The estimated remaining commitment under the contract is $53 million and achievement of commercial operations is expected in the fourth quarter of 2014.

On July 26, 2013, Generation executed an engineering procurement and construction contract to expand its Perryman, Maryland generation site with 120 MW of new natural gas-fired generation to satisfy certain Exelon/Constellation merger commitments. The estimated remaining commitment under the contract is $84 million and achievement of commercial operation is expected in 2015. This project will satisfy a portion of Exelon’s commitment to Maryland. See Note 4 — Mergers and Acquisitions of the Exelon 2013 Form 10-K for additional information on commitments to develop or assist in development of new generation in Maryland resulting from the Exelon/Constellation merger.

On December 27, 2013, Generation executed a Turbine Supply Agreement for construction of the 40 MW Fourmile Wind project in western Maryland. The estimated remaining commitment under the contract is $38 million and achievement of commercial operations is expected in the fourth quarter 2014. In the first quarter of 2014, Generation approved expansion of the Fourmile project to 40 MW. This project will satisfy a portion of Exelon’s 125 MW Tier I land-based renewables commitment in Maryland. See Note 4 — Mergers and Acquisitions of the Exelon 2013 Form 10-K for additional information on commitments to develop or assist in development of new generation in Maryland resulting from the Exelon/Constellation merger.

Refer to Note 3 — Regulatory Matters of the Exelon 2013 Form 10-K for information on investment programs associated with regulatory mandates, such as ComEd’s Infrastructure Investment Plan under EIMA, PECO’s Smart Meter Procurement and Installation Plan and BGE’s comprehensive smart grid initiative.

Constellation Merger Commitments

In February 2012, the MDPSC issued an Order approving the Exelon and Constellation merger. As part of the MDPSC Order, Exelon agreed to provide a package of benefits to BGE customers, the City of Baltimore and the State of Maryland, resulting in an estimated direct investment in the State of Maryland of approximately $1 billion.

The direct investment estimate includes $95 million to $120 million relating to the construction of a headquarters building in Baltimore for Generation’s competitive energy businesses. On March 20, 2013, Generation signed a 20 year lease agreement that was contingent upon the developer obtaining all required approvals, permits and financing for the construction of a building in Baltimore, Maryland. The operating lease became effective during the second quarter of 2014 when these outstanding contingencies were met by the developer. Generation’s total commitments under the lease agreement are $0 related to 2014 and 2015, and $9 million, $12 million, $12 million, and $270 million related to 2016, 2017, 2018, and 2019 and thereafter.

The direct investment commitment also includes $600 million to $650 million relating to Exelon and Generation’s development or assistance in the development of 285 — 300 MWs of new generation in Maryland, which is expected to be completed over a period of 10 years. The MDPSC Order contemplates various options for complying with the new generation development commitments, including building or acquiring generating assets, making subsidy or compliance payments, or in circumstances in which the generation build is delayed, making liquidated damages payments. Exelon and Generation expect that the majority of these commitments will be satisfied by building or acquiring generating assets and, therefore, will be primarily capital in nature and recognized as incurred. If in the future Exelon determines that it is probable that it will make subsidy, compliance or liquidated damages payments related to the new generation development commitments, Exelon will record a liability at that time. As of June 30, 2014, it is reasonably possible that Exelon will be required to make subsidy

 

128


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

or liquidated damages payments of approximately $40 million rather than build one of the generation projects contemplated by the commitments, given that the generation build is dependent upon the passage of legislation and other conditions that Exelon does not control.

Contingencies

Commercial Commitments

The Registrants’ commercial commitments as of June 30, 2014, representing commitments potentially triggered by future events were as follows:

 

     Exelon     Generation     ComEd     PECO     BGE  

Letters of credit (non-debt)(a)

   $ 1,514     $ 1,470     $ 19     $ 22     $ 1  

Guarantees

     4,706 (b)      1,346 (c)      206 (d)      181 (e)      259 (f) 

Nuclear insurance premiums(g)

     3,559       3,559                    

Underwriters discount(h)

     60                          
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total commercial commitments

   $ 9,839     $ 6,375     $ 225     $ 203     $ 260  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Non-debt letters of credit maintained to provide credit support for certain transactions as requested by third parties.

(b)

Primarily reflects parental guarantees issued on behalf of Generation to allow the flexibility needed to conduct business with counterparties without having to post other forms of collateral. Also reflects guarantees issued to ensure performance under specific contracts, preferred securities of financing trusts, property leases, indemnifications, NRC minimum funding assurance requirements and miscellaneous guarantees. The estimated net exposure for obligations under commercial transactions covered by these guarantees was $0.6 billion at June 30, 2014, which represents the total amount Exelon could be required to fund based on June 30, 2014 market prices.

(c)

Primarily reflects guarantees issued to ensure performance under energy marketing and other specific contracts. The estimated net exposure for obligations under commercial transactions covered by these guarantees was $0.3 billion at June 30, 2014, which represents the total amount Generation could be required to fund based on June 30, 2014 market prices.

(d)

Primarily reflects full and unconditional guarantees of $200 million Trust Preferred Securities of ComEd Financing III, which is a 100% owned finance subsidiary of ComEd.

(e)

Primarily reflects full and unconditional guarantees of $178 million Trust Preferred Securities of PECO Trust III and IV, which are 100% owned finance subsidiaries of PECO.

(f)

Primarily reflects full and unconditional guarantees of $250 million Trust Preferred Securities of BGE Capital Trust II, which is a 100% owned finance subsidiary of BGE.

(g)

Represents the maximum amount that Generation would be required to pay for retrospective premiums in the event of nuclear disaster at any domestic site, including CENG sites, under the Secondary Financial Protection pool as required under the Price-Anderson Act as well as the current aggregate annual retrospective premium obligation that could be imposed by NEIL. See the Nuclear Insurance section within this note for additional details on Generation’s nuclear insurance premiums.

(h)

Represents the underwriters discount for Exelon’s forward equity transaction. See Note 16 — Common Stock of the Combined Notes to Consolidated Financial Statements for further details of the equity securities offering.

Nuclear Insurance (Exelon and Generation)

Generation is subject to liability, property damage and other risks associated with major incidents at any of its nuclear stations, including the CENG nuclear stations. Generation has reduced its financial exposure to these risks through insurance and other industry risk-sharing provisions

The Price-Anderson Act was enacted to ensure the availability of funds for public liability claims arising from an incident at any of the U.S. licensed nuclear facilities and also to limit the liability of nuclear reactor

 

129


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

owners for such claims from any single incident. As of June 30, 2014, the current liability limit per incident was $13.6 billion and is subject to change to account for the effects of inflation and changes in the number of licensed reactors. An inflation adjustment must be made at least once every 5 years and the last inflation adjustment was made effective September 10, 2013. In accordance with the Price-Anderson Act, Generation maintains financial protection at levels equal to the amount of liability insurance available from private sources through the purchase of private nuclear energy liability insurance for public liability claims that could arise in the event of an incident. As of June 30, 2014, the amount of nuclear energy liability insurance purchased is $375 million for each operating site. Additionally, the Price-Anderson Act requires a second layer of protection through the mandatory participation in a retrospective rating plan for power reactors (currently 104 reactors) resulting in an additional $13.2 billion in funds available for public liability claims. Participation in this secondary financial protection pool requires the operator of each reactor to fund its proportionate share of costs for any single incident that exceeds the primary layer of financial protection. Under the Price-Anderson Act, the maximum assessment in the event of an incident for each nuclear operator, per reactor, per incident (including a 5% surcharge), is $127.3 million, payable at no more than $19 million per reactor per incident per year. Exelon’s maximum liability per incident is approximately $2.7 billion, including CENG’s related liability.

In addition, the U.S. Congress could impose revenue-raising measures on the nuclear industry to pay public liability claims exceeding the $13.6 billion limit for a single incident.

Generation is also required each year to report to the NRC the current levels and sources of property insurance that demonstrates Generation possesses sufficient financial resources to stabilize and decontaminate a reactor and reactor station site in the event of an accident. The property insurance maintained for each facility is currently provided through insurance policies purchased from NEIL, an industry mutual insurance company of which Generation is a member. Premiums paid to NEIL by its members are subject to assessment for adverse loss experience (the retrospective premium obligation). The maximum combined retrospective premium amount that Generation could be required to pay due to participation in the Price-Anderson Act retrospective rating plan for power reactors and the NEIL retrospective premium obligation is $3.6 billion, including CENG’s obligation, which is included above in the Commercial Commitments table. See the Nuclear Insurance section within Note 22 — Commitments and Contingencies of the Exelon 2013 Form 10-K for additional details on Generation’s nuclear insurance premiums.

As part of the execution of NOSA on April 1, 2014, Generation executed an Indemnity Agreement pursuant to which Generation agreed to indemnify EDF and its affiliates against third-party claims that may arise from any future nuclear incident (as defined in the Price Anderson Act) in connection with the CENG nuclear plants or their operations. Exelon guarantees Generation’s obligations under this indemnity. See Note 6 — Investment in CENG for additional information on Generation’s operations relating to CENG.

Spent Nuclear Fuel Obligation (Exelon and Generation)

Under the NWPA, the DOE is responsible for the development of a geologic repository for and the disposal of SNF and high-level radioactive waste. As required by the NWPA, Generation is a party to contracts with the DOE (Standard Contracts) to provide for disposal of SNF from Generation’s nuclear generating stations. In accordance with the NWPA and the Standard Contracts, Generation pays the DOE one mill ($0.001) per kWh of net nuclear generation for the cost of SNF disposal. This fee may be adjusted prospectively in order to ensure full cost recovery. The NWPA and the Standard Contracts required the DOE to begin taking possession of SNF generated by nuclear generating units by no later than January 31, 1998. The DOE, however, failed to meet that deadline and its performance will be delayed significantly. On November 19, 2013, the D.C. Circuit Court ordered the DOE to submit to Congress a proposal to reduce the current SNF disposal fee to zero, unless and until there is a viable disposal program. On January 3, 2014, the DOE filed a petition for rehearing which was

 

130


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

denied by the D.C. Circuit Court on March 18, 2014. Also, on January 3, 2014, the DOE submitted a proposal to Congress to reduce the current SNF disposal fee to zero. On May 9, 2014, the DOE notified Generation that the SNF disposal fee will remain in effect through May 15, 2014, after which time the fee will be set to zero. For the six months ended June 30, 2014, and for the year ended December 31, 2013, Generation incurred expense of $49 million and $136 million, respectively, in SNF disposal fees, recorded in Purchased power and fuel expense within Exelon’s and Generation’s Consolidated Statements of Operations and Comprehensive Income, including Exelon’s share of Salem and net of co-owner reimbursements (not including such fees incurred by CENG). Until such time as a new fee structure is in effect, Exelon and Generation will not accrue any further costs related to SNF disposal fees.

Indemnifications Related to Sale of Sithe (Exelon and Generation)

On January 31, 2005, subsidiaries of Generation completed a series of transactions that resulted in Generation’s sale of its investment in Sithe. Specifically, subsidiaries of Generation consummated the acquisition of Reservoir Capital Group’s 50% interest in Sithe and subsequently sold 100% of Sithe to Dynegy, Inc. (Dynegy).

The estimated maximum possible exposure to Exelon related to the guarantees provided as part of the sales transaction to Dynegy was approximately $200 million at December 31, 2013. The guarantee expired January 31, 2014. Generation was not required to make payments under the guarantee, and, therefore, has no further obligation related to this guarantee as of June 30, 2014.

Repurchase of Land Related to Master Agreement Closing (Exelon and Generation)

As a result of the closing of the transactions contemplated by the Master Agreement, EDF has the option to sell back to CENG the land adjacent to the Calvert Cliffs site, together with the rights associated with the land, at its fair market value. The option is exercisable for a period of five years, from April 1, 2014.

Environmental Issues

General.    The Registrants’ operations have in the past, and may in the future, require substantial expenditures in order to comply with environmental laws. Additionally, under Federal and state environmental laws, the Registrants are generally liable for the costs of remediating environmental contamination of property now or formerly owned by them and of property contaminated by hazardous substances generated by them. The Registrants own or lease a number of real estate parcels, including parcels on which their operations or the operations of others may have resulted in contamination by substances that are considered hazardous under environmental laws. In addition, the Registrants are currently involved in a number of proceedings relating to sites where hazardous substances have been deposited and may be subject to additional proceedings in the future.

ComEd, PECO and BGE have identified sites where former MGP activities have or may have resulted in actual site contamination. For almost all of these sites, ComEd, PECO or BGE is one of several PRPs that may be responsible for ultimate remediation of each location.

 

   

ComEd has identified 42 sites, 16 of which have been approved for cleanup by the Illinois EPA or the U.S. EPA and 26 that are currently under some degree of active study and/or remediation. ComEd expects the majority of the remediation at these sites to continue through at least 2017.

 

   

PECO has identified 26 sites, 16 of which have been approved for cleanup by the PA DEP and 10 that are currently under some degree of active study and/or remediation. PECO expects the majority of the remediation at these sites to continue through at least 2020.

 

131


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

   

BGE has identified 13 former gas manufacturing or purification sites that it currently owns or owned at one time through a predecessor’s acquisition. Two gas manufacturing sites require some level of remediation and ongoing monitoring under the direction of the MDE. The required costs at these two sites are not considered material. One gas purification site is in the initial stages of investigation at the direction of the MDE.

ComEd, pursuant to an ICC order, and PECO, pursuant to settlements of natural gas distribution rate cases with the PAPUC, are currently recovering environmental remediation costs of former MGP facility sites through customer rates. BGE is authorized to and is currently recovering environmental costs for the remediation of former MGP facility sites from customers; however, while BGE does not have a rider for MGP clean-up costs, BGE has historically received recovery of actual clean-up costs in distribution rates. ComEd, PECO and BGE have recorded regulatory assets for the recovery of these costs. See Note 5 — Regulatory Matters for additional information regarding the associated regulatory assets.

As of June 30, 2014 and December 31, 2013, the Registrants had accrued the following undiscounted amounts for environmental liabilities in other current liabilities and other deferred credits and other liabilities within their respective Consolidated Balance Sheets:

 

June 30, 2014

   Total Environmental
Investigation and
Remediation Reserve
     Portion of Total Related to
MGP Investigation and
Remediation
 

Exelon

   $ 323      $ 258  

Generation

     56         

ComEd

     222        217  

PECO

     44        41  

BGE

     1         

 

December 31, 2013

   Total Environmental
Investigation and
Remediation Reserve
     Portion of Total Related to
MGP Investigation and
Remediation
 

Exelon

   $ 338      $ 273  

Generation

     56         

ComEd

     234        229  

PECO

     47        44  

BGE

     1         

The Registrants cannot reasonably estimate whether they will incur other significant liabilities for additional investigation and remediation costs at these or additional sites identified by the Registrants, environmental agencies or others, or whether such costs will be recoverable from third parties, including customers.

Water Quality

Section 316(b) of the Clean Water Act.    Section 316(b) requires that the cooling water intake structures at electric power plants reflect the best technology available to minimize adverse environmental impacts, and is implemented through state-level NPDES permit programs. All of Generation’s and CENG’s power generation facilities with cooling water systems are subject to the regulations. Facilities without closed-cycle recirculating systems (e.g., cooling towers) are potentially most affected by changes to the existing regulations. For Generation, those facilities are Clinton, Dresden, Eddystone, Fairless Hills, Gould Street, Handley, Mountain Creek, Mystic 7, Oyster Creek, Peach Bottom, Quad Cities, Riverside, Salem and Schuylkill. For CENG, those facilities are Calvert Cliffs, Nine Mile Point Unit 1 and R.E. Ginna.

 

132


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

On May, 19 2014, the U.S. EPA released the final Section 316(b) rule. The rule has not been published in the Federal Register, and will become effective 60 days after publication. The rule requires that a series of studies and analyses be performed to determine the best technology available, followed by an implementation period. The timing of the various requirements for each facility is related to the status of its current NPDES permit and the subsequent renewal period. There is no fixed compliance schedule, as this is left to the discretion of the state permitting director.

The rule does not require closed-cycle cooling (e.g., cooling towers) as the best technology available to address impingement and entrainment. The rule provides the state permitting director with significant discretion to determine the best technology available to limit entrainment (drawing aquatic life into the plants cooling system) mortality, including application of a cost-benefit test and the consideration of a number of site-specific factors. After consideration of these factors, the state permitting agency may require closed cycle cooling, an alternate technology, or determine that the current technology is the best available. The rule also provides a number of flexible compliance options to reduce impingement (trapping aquatic life on screens) mortality, which likely will be accomplished by the installation of screens or other technology at the intake. A number of concerns raised by the electric generation industry about the proposed rule were resolved favorably in the final rule.

New York Facilities.    In July 2011, the New York Department of Environmental Conservation (DEC) issued a policy regarding the best available technology for cooling water intake structures. Through its policy, the DEC established closed-cycle cooling or its equivalent as the performance goal for all existing facilities, but also provided that the DEC will select a feasible technology whose costs are not wholly disproportionate to the environmental benefits to be gained and allows for a site-specific determination where the entrainment performance goal cannot be achieved. Each of CENG’s New York facilities has filed for its SPDES permit renewal in 2014 and the renewal applications are currently pending with the NYDEC.

Salem and Other Power Generation Facilities.    In June 2001, the NJDEP issued a renewed NPDES permit for Salem, allowing for the continued operation of Salem with its existing cooling water system. NJDEP advised PSEG, in July 2004 that it strongly recommended reducing cooling water intake flow commensurate with closed-cycle cooling as a compliance option for Salem. PSEG submitted an application for a renewal of the permit on February 1, 2006. In the permit renewal application, PSEG analyzed closed-cycle cooling and other options and demonstrated that the continuation of the Estuary Enhancement Program, an extensive environmental restoration program at Salem, is the best technology to meet the Section 316(b) requirements. PSEG continues to operate Salem under the approved June 2001 NPDES permit while the NPDES permit renewal application is being reviewed. If the final permit or Section 316(b) regulations ultimately requires the retrofitting of Salem’s cooling water intake structure to reduce cooling water intake flow commensurate with closed-cycle cooling, Exelon’s and Generation’s share of the total cost of the retrofit and any resulting interim replacement power would likely be in excess of $430 million, based on a 2006 estimate, and would result in increased depreciation expense related to the retrofit investment. However, it is unknown at this time whether implementation of the final EPA rule will result in a requirement to install closed cycle cooling at Salem.

Until the compliance requirements are determined by the applicable state permitting director on a site-specific basis for each plant, Generation cannot estimate the effect that compliance with the rule will have on the operation of its and CENG’s generating facilities and its future results of operations, cash flows and financial position. Should a state permitting director determine that a facility must install cooling towers to comply with the rule, that facility’s economic viability would be called into question. However, the likely impact of the rule has been significantly decreased since the final rule does not mandate cooling towers as a national standard, and the state permitting director is required to apply a cost-benefit test and can take into consideration site-specific factors.

 

133


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Groundwater Contamination.    In October 2007, a subsidiary of Constellation entered into a consent decree with the MDE relating to groundwater contamination at a third-party facility that was licensed to accept fly ash, a byproduct generated by coal-fired plants. The consent decree required the payment of a $1 million penalty, remediation of groundwater contamination resulting from the ash placement operations at the site, replacement of drinking water supplies in the vicinity of the site, and monitoring of groundwater conditions. As of June 30, 2014, and December 31, 2013, Generation’s remaining groundwater contamination reserve was $15 million and $14 million respectively. In addition, a private party asserted claims relating to groundwater contamination. In February 2014, Generation settled these private party claims for an amount that was not material to the financial condition of Generation.

Air Quality

Cross State Air Pollution Rule (CSAPR).    On July 11, 2008, the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit Court) vacated the CAIR, which had been promulgated by the U.S. EPA to reduce power plant emissions of SO2 and NOx. The D.C. Circuit Court later remanded the CAIR to the U.S. EPA, without invalidating the entire rulemaking, so that the U.S. EPA could correct CAIR in accordance with the D.C. Circuit Court’s July 11, 2008 opinion. On July 7, 2011, the U.S. EPA published the final rule, known as the CSAPR. The CSAPR requires 28 states in the eastern half of the United States to significantly improve air quality by reducing power plant emissions that cross state lines and contribute to ground-level ozone and fine particle pollution in other states.

Numerous entities challenged the CSAPR in the D.C. Circuit Court, and some requested a stay of the rule pending the Court’s consideration of the matter on the merits. On December 30, 2011, the Court granted a stay of the CSAPR, and directed the U.S. EPA to continue the administration of CAIR in the interim. On August 21, 2012, a three-judge panel of the D.C. Circuit Court held that the U.S. EPA has exceeded its authority in certain material aspects of the CSAPR and vacated the rule and remanded it to the U.S. EPA for further rulemaking consistent with its decision. The Court also ordered that CAIR remain in effect pending finalization of CSAPR on remand. The Court’s order was appealed to the U.S. Supreme Court, and on April 29, 2014, the U.S. Supreme Court reversed the D.C. Circuit Court decision and upheld CSAPR, and remanded the case to the D.C. Circuit Court to resolve the remaining implementation issues. On June 26, 2014, the U.S. EPA filed a motion with the D.C. Circuit Court seeking to have the stay of the CSAPR lifted, and proposed a three-year tolling of the effective dates under the rule so that the first phase of emission budgets would be implemented on January 1, 2015. The U.S. EPA believes that this would allow sufficient time to complete the remaining aspects of the rulemaking before the implementation of the more stringent second phase of emission budgets that, under the tolling proposal, would begin on January 1, 2017.

The CSAPR restricts entirely the use of pre-2012 allowances. Existing SO2 allowances under the ARP would remain available for use. As of June 30, 2014, Generation had $64 million of emission allowances carried at the lower of weighted average cost or market.

EPA Mercury and Air Toxics Standards (MATS).    The MATS rule became final on April 16, 2012. The MATS rule reduces emissions of toxic air pollutants, and finalized the new source performance standards for fossil fuel-fired electric utility steam generating units (EGUs). The MATS rule requires coal-fired EGUs to achieve high removal rates of mercury, acid gases and other metals from air emissions. To achieve these standards, coal units with no pollution control equipment installed (uncontrolled coal units) will have to make capital investments and incur higher operating expenses. It is expected that smaller, older, uncontrolled coal units will retire rather than make these investments. Coal units with existing controls that do not meet the required standards may need to upgrade existing controls or add new controls to comply. In addition, the new standards will require oil units to achieve high removal rates of metals. Owners of oil units not currently meeting the

 

134


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

proposed emission standards may choose to convert the units to light oils or natural gas, install control technologies or retire the units. The MATS rule requires generating stations to meet the new standards three years after the rule takes effect, April 16, 2015, with specific guidelines for an additional one or two years in limited cases. Numerous entities challenged MATS in the D.C. Circuit Court, and Exelon intervened in support of the rule. On April 15, 2014, the D.C Circuit Court issued an opinion upholding MATS in its entirety. On July 14, 2014, three petitions for certiorari were filed with the U.S. Supreme Court seeking review of the D.C. Circuit Court decision upholding MATS.

Exelon, along with the other co-owners of Conemaugh Generating Station have improved the existing scrubbers and installed Selective Catalytic Reduction (SCR) controls to meet the requirements of MATS.

In addition, as of June 30, 2014, Exelon had a $353 million net investment in coal-fired plants in Georgia subject to long-term leases extending through 2028-2032. While Exelon currently estimates the value of these plants at the end of the lease term will be in excess of the recorded residual lease values, after the impairments recorded in the second quarter of 2013 and 2014, final applications of the CSAPR and MATS regulations could negatively impact the end-of-lease term values of these assets, which could result in a future impairment loss that could be material. See Note 7 — Impairment of Long-Lived Assets for additional information.

National Ambient Air Quality Standards (NAAQS).    The U.S. EPA previously announced that it would complete a review of all NAAQS by 2014. Oral argument in the litigation (State of Miss. v. EPA) of the final 2008 ozone standard occurred in the D.C. Circuit Court in November 2012 and a final Court decision was issued on July 23, 2013 with the 2008 primary ozone standard upheld, but the secondary standard remanded to EPA for reconsideration. Concurrent with litigation of the 2008 ozone standard, the U.S. EPA continues its regular, periodic review of the ozone NAAQS and is expected to propose revisions in the fall of 2014, with preliminary indications that the U.S. EPA will likely propose a tightened standard. It is unclear at this point in time whether the U.S. EPA will be able to respond to the Court remand of the secondary 2008 ozone standard on a timeframe that would be any quicker than that of the U.S. EPA’s current, periodic review schedule. In December 2012, the U.S. EPA issued its final revisions to the Agency’s particulate matter (PM) NAAQS. In its final rule, the U.S. EPA lowered the annual PM2.5 standard, but declined to issue a new secondary NAAQS to improve urban visibility. The U.S. EPA indicated in its final rule that by 2020 it expects most areas of the country will be in attainment of the new PM2.5 NAAQS based on currently expected regulations, such as the MATS regulation. It is unclear if the vacatur of the CSAPR, one of the regulations that the U.S. EPA is relying on to assist with future PM reduction, would alter the U.S. EPA’s view since either CAIR or a finalized CSAPR regulation would be in effect leading up to 2020. In March 2013, a number of industry coalitions filed a joint lawsuit challenging the new PM2.5 standard. Also during early 2013, the D.C. Circuit remanded several rules for implementation of earlier PM2.5 NAAQS to the U.S. EPA for revision of certain aspects of the rules, with a requirement that the U.S. EPA re-promulgate regulations in conformance with the correct subparts of the Clean Air Act.

In addition to these NAAQS, the U.S. EPA also finalized nonattainment designations for certain areas in the United States for the 2010 one-hour SO2 standard on August 5, 2013, and indicated that additional nonattainment areas will be designated in a future rulemaking. U.S. EPA will require states to submit state implementation plans (SIPs) for nonattainment areas by April 2015. With regard to Texas and Maryland, no nonattainment areas were identified in EPA’s final designation rule. With regard to Illinois and Pennsylvania, several counties, or portions of counties, in each state were identified as nonattainment. The U.S. EPA will follow the approach outlined in a February 2013 U.S. EPA strategy document that establishes a process and timeline for the Agency to address additional designations in states’ counties under a future rulemaking. Nonattainment county compliance with the one-hour SO2 standard is required by October 2018. While significant SO2 reductions will occur as a result of MATS compliance in 2015, Exelon is unable to predict the requirements of pending states’ SIPs to further reduce SO2 emissions in support of attainment of the one hour SO2 standard.

 

135


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Notices and Finding of Violations and Midwest Generation Bankruptcy.    In December 1999, ComEd sold several generating stations to Midwest Generation, LLC (Midwest Generation), a subsidiary of Edison Mission Energy (EME). Under the terms of the sale agreement, Midwest Generation and EME assumed responsibility for environmental liabilities associated with the ownership, occupancy, use and operation of the stations, including responsibility for compliance by the stations with environmental laws before their purchase by Midwest Generation. Midwest Generation and EME additionally agreed to indemnify and hold ComEd and its affiliates harmless from claims, fines, penalties, liabilities and expenses arising from third party claims against ComEd resulting from or arising out of the environmental liabilities assumed by Midwest Generation and EME under the terms of the agreement governing the sale. In connection with Exelon’s 2001 corporate restructuring, Generation assumed ComEd’s rights and obligations with respect to its former generation business, including its rights and obligations under the sale agreement with Midwest Generation and EME.

Under a supplemental agreement reached in 2003, Midwest Generation agreed to reimburse ComEd and Generation for 50% of the specific asbestos claims pending as of February 2003 and related expenses less recovery of insurance costs and agreed to a sharing arrangement for liabilities and expenses associated with future asbestos-related claims as specified in the agreement.

On December 17, 2012 (Petition Date), EME and certain of its subsidiaries, including Midwest Generation, filed for protection under Chapter 11 of the U.S. Bankruptcy Code.

In 2012, the Bankruptcy Court approved the rejection of an agency agreement related to a coal rail car lease under which Midwest Generation had agreed to reimburse ComEd for all obligations incurred under the coal rail car lease. The rejection left Generation as the party responsible for making all remaining payments under the lease and performing all other obligations thereunder. In January 2013, Generation made the final $10 million payment due under the lease agreement which had been accrued at December 31, 2012.

On January 17, 2014, Midwest Generation filed a plan supplement to its bankruptcy filing that included a list of contracts to be rejected upon the effective date of the reorganization plan. This list included the sale agreement, including the environmental indemnity, and the asbestos cost-sharing agreement.

On March 11, 2014, the Bankruptcy Court for the Northern District of Illinois entered its Order Confirming Debtors’ Joint Chapter 11 Plan of Reorganization. On April 1, 2014 (Effective Date), NRG Energy purchased EME’s portfolio of generation, including Midwest Generation and the Joint Chapter 11 Plan of Reorganization (Plan) became effective. As part of the Plan, the sale agreement, including the environmental indemnity, and the asbestos cost-sharing agreement were rejected. Creditors were provided 30 days from the Effective Date to file rejection damages claims associated with contracts rejected under the Plan.

During the second quarter of 2013, Exelon filed proofs of claim for approximately $21 million with the Bankruptcy Court for amounts owed by EME and Midwest Generation for the coal rail car lease, ComEd utility payments and certain legal costs. Further, Exelon filed an environmental claim with an unspecified amount that listed the indemnifications that were in place pre-Petition Date and other factors associated with the remediation and a claim under the asbestos cost-sharing agreement with an unspecified amount. As of June 30, 2014, Exelon has not recorded a receivable for the filed proofs of claim because recovery of any amount cannot be assured at this point in the bankruptcy. Exelon will not record claim recoveries unless and until they are realized.

Certain environmental laws and regulations subject current and prior owners of properties or generators of hazardous substances at such properties to liability for remediation costs of environmental contamination. As a prior owner of the generating stations, ComEd (and Generation, through its agreement in Exelon’s 2001 corporate restructuring to assume ComEd’s rights and obligations associated with its former generation business)

 

136


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

could face liability (along with any other potentially responsible parties) for environmental conditions at the stations requiring remediation, with the determination of the allocation among the parties subject to many uncertain factors. ComEd and Generation have reviewed available public information as to potential environmental exposures regarding the Midwest Generation station sites. Midwest Generation publicly disclosed in its March 31, 2014 Form 10-Q that (i) it has accrued a probable amount of approximately $9 million for estimated environmental investigation and remediation costs under CERCLA, or similar laws, for the investigation and remediation of contaminated property at two Midwest Generation plant sites, (ii) it has identified stations for which a reasonable estimate for investigation and/ or remediation cannot be made and (iii) it and the Illinois EPA entered into Compliance Commitment Agreements outlining specified environmental remediation measures and groundwater monitoring activities to be undertaken at its Crawford, Powerton, Joliet, Will County and Waukegan generating stations. At this time, however, ComEd and Generation do not have sufficient information to reasonably assess the potential likelihood or magnitude of any remediation requirements that may be asserted. For these reasons, ComEd and Generation are unable to predict whether and to what extent they may ultimately be held responsible for remediation and other costs relating to the generating stations and as a result no liability has been recorded as of June 30, 2014. Any liability imposed on ComEd or Generation for environmental matters relating to the generating stations could have a material adverse impact on their future results of operations and cash flows.

Generation increased its reserve for asbestos-related bodily injury claims at December 31, 2013 by $25 million, as a result of Midwest Generation listing such agreement in the January 2014 plan supplement as an agreement to be rejected in connection with the Plan. As discussed above, the rejection became effective as part of the Plan. Subsequently, Generation increased its reserve by $15 million pursuant to the second quarter 2014 actuarial study of such claims, of which an estimated $6 million pertains to Midwest Generation’s share. Midwest Generation publicly disclosed in its March 31, 2014 Form 10-Q that it had $53 million recorded related to asbestos bodily injury claims under the contractual indemnity with ComEd. Exelon and Generation may be entitled to damages associated with the rejection of the agreement. These amounts are considered to be contingent gains and would not be recognized until realized.

Solid and Hazardous Waste

Cotter Corporation.    The U.S. EPA has advised Cotter Corporation (Cotter), a former ComEd subsidiary, that it is potentially liable in connection with radiological contamination at a site known as the West Lake Landfill in Missouri. On February 18, 2000, ComEd sold Cotter to an unaffiliated third party. As part of the sale, ComEd agreed to indemnify Cotter for any liability arising in connection with the West Lake Landfill. In connection with Exelon’s 2001 corporate restructuring, this responsibility to indemnify Cotter was transferred to Generation. On May 29, 2008, the U.S. EPA issued a Record of Decision approving the remediation option submitted by Cotter and the two other PRPs that required additional landfill cover. The current estimated cost of the anticipated landfill cover remediation for the site is approximately $42 million, which will be allocated among all PRPs. Generation has accrued what it believes to be an adequate amount to cover its anticipated share of such liability. By letter dated January 11, 2010, the U.S. EPA requested that the PRPs perform a supplemental feasibility study for a remediation alternative that would involve complete excavation of the radiological contamination. On September 30, 2011, the PRPs submitted the final supplemental feasibility study to the U.S. EPA for review. In June 2012, the U.S. EPA requested that the PRPs perform additional analysis and groundwater sampling as part of the supplemental feasibility study, and subsequently requested additional analysis sampling and modeling that will be conducted throughout 2014 and into 2015. In light of these additional requests, it is unknown when the U.S EPA will propose a remedy for public comment, but will likely be sometime in 2015 at the earliest. Thereafter the U.S. EPA will select a final remedy and enter into a Consent Decree with the PRPs to effectuate the remedy. A complete excavation remedy would be significantly more expensive than the previously selected additional cover remedy; however, Generation believes the likelihood that the U.S. EPA would require a complete excavation remedy is remote.

 

137


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

On August 8, 2011, Cotter was notified by the DOJ that Cotter is considered a PRP with respect to the government’s clean-up costs for contamination attributable to low level radioactive residues at a former storage and reprocessing facility named Latty Avenue near St. Louis, Missouri. The Latty Avenue site is included in ComEd’s indemnification responsibilities discussed above as part of the sale of Cotter. The radioactive residues had been generated initially in connection with the processing of uranium ores as part of the U.S. government’s Manhattan Project. Cotter purchased the residues in 1969 for initial processing at the Latty Avenue facility for the subsequent extraction of uranium and metals. In 1976, the NRC found that the Latty Avenue site had radiation levels exceeding NRC criteria for decontamination of land areas. Latty Avenue was investigated and remediated by the United States Army Corps of Engineers pursuant to funding under the Formerly Utilized Sites Remedial Action Program. The DOJ has not yet formally advised the PRPs of the amount that it is seeking, but it is believed to be approximately $90 million. The DOJ and the PRPs agreed to toll the statute of limitations until August 2014 so that settlement discussions could proceed. Based on Generation’s preliminary review, it appears probable that Generation has liability to Cotter under the indemnification agreement and has established an appropriate accrual for this liability.

On February 28, 2012, and April 12, 2012, two lawsuits were filed in the U.S. District Court for the Eastern District of Missouri against 15 and 14 defendants, respectively, including Exelon, Generation and ComEd (the Exelon defendants) and Cotter. The suits allege that individuals living in the North St. Louis area developed some form of cancer due to the Exelon defendants’ negligent or reckless conduct in processing, transporting, storing, handling and/or disposing of radioactive materials. Plaintiffs have asserted claims for negligence, strict liability, emotional distress, medical monitoring, and violations of the Price-Anderson Act. The complaints do not contain specific damage claims. On May 30, 2012, the plaintiffs filed voluntary motions to dismiss the Exelon defendants from both lawsuits which were subsequently granted. Since May 30, 2012, several related lawsuits have been filed in the same court on behalf of various plaintiffs against Cotter and other defendants, but not Exelon. The allegations in these related lawsuits mirror the initially filed lawsuits. In the event of a finding of liability, it is reasonably possible that Exelon would be considered liable due to its indemnification responsibilities of Cotter described above. On March 27, 2013, the U.S. District Court dismissed all state common law actions brought under the initial two lawsuits; and also found that the plaintiffs had not properly brought the actions under the Price-Anderson Act. On July 8, 2013, the plaintiffs filed amended complaints under the Price-Anderson Act. Cotter moved to dismiss the amended complaints and has motions currently pending before the court. At this stage of the litigation, Exelon, Generation, and ComEd cannot estimate a range of loss, if any.

On April 11, 2014, a class action complaint was filed in the U.S. District Court for the Eastern District of Missouri against Cotter and six additional defendants. The complaint alleges that individuals living in the North St. Louis area within a three-mile radius of the West Lake Landfill suffered damage to property or loss of use of property due to the defendants’ negligent handling of radioactive materials. Plaintiffs have asserted claims for monetary damages under the Price-Anderson Act. At this stage of the litigation, Exelon and Generation cannot estimate a range of loss, if any.

68th Street Dump.    In 1999, the U.S. EPA proposed to add the 68th Street Dump in Baltimore, Maryland to the Superfund National Priorities List, and notified BGE and 19 others that they are PRPs at the site. In March 2004, BGE and other PRPs formed the 68th Street Coalition and entered into consent order negotiations with the U.S. EPA to investigate clean-up options for the site under the Superfund Alternative Sites Program. In May 2006, a settlement among the U.S. EPA and 19 of the PRPs, including BGE, with respect to investigation of the site became effective. The settlement requires the PRPs, over the course of several years, to identify contamination at the site and recommend clean-up options. The PRP’s submitted their investigation of the range of clean-up options in the first quarter of 2011. Although the investigation and options provided to the U.S. EPA are still subject to U.S. EPA review and selection of a remedy, the range of estimated clean-up costs to be

 

138


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

allocated among all of the PRPs is in the range of $50 million to $64 million. On September 30, 2013, U.S. EPA issued the Record of Decision identifying its preferred remedial alternative for the site. The estimated cost for the alternative chosen by U.S. EPA is consistent with the PRPs estimated range of costs noted above. Based on Generation’s preliminary review, it appears probable that Generation has liability and has established an appropriate accrual for its share of the estimated clean-up costs. A wholly owned subsidiary of Generation has agreed to indemnify BGE for most of the costs related to this settlement and clean-up of the site.

Rossville Ash Site.    The Rossville Ash Site is a 32-acre property located in Rosedale, Baltimore County, Maryland, which was used for the placement of fly ash from 1983-2007. The property is owned by Constellation Power Source Generation, LLC (CPSG). In 2008, CPSG investigated and remediated the property by entering it into the Maryland Voluntary Cleanup Program (VCP) to address any historic environmental concerns and ready the site for appropriate future redevelopment. The site was accepted into the program in 2010 and is currently going through the process to remediate the site and receive closure from MDE. Exelon currently estimates the cost to close the site to be approximately $6 million, which has been fully reserved as of June 30, 2014.

Sauer Dump.    On May 30, 2012, BGE was notified by the U.S. EPA that it is considered a PRP at the Sauer Dump Superfund site in Dundalk, Maryland. The U.S. EPA offered BGE and three other PRPs the opportunity to conduct an environmental investigation and present cleanup recommendations at the site. In addition, the U.S. EPA is seeking recovery from the PRPs of $1.7 million for past cleanup and investigation costs at the site. On March 11, 2013, BGE and three other PRP’s signed an Administrative Settlement Agreement and Order on Consent with the U.S. EPA which requires the PRP’s to conduct a Remedial Investigation and Feasibility Study at the site to determine what, if any, are the appropriate and recommended cleanup activities for the site. The ultimate outcome of this proceeding is uncertain. Since the U.S. EPA has not selected a cleanup remedy and the allocation of the cleanup costs among the PRPs has not been determined, an estimate of the range of BGE’s reasonably possible loss, if any, cannot be determined.

Climate Change Regulation.    Exelon is subject to climate change regulation or legislation at the Federal, regional and state levels. In 2007, the U.S. Supreme Court ruled that GHG emissions are pollutants subject to regulation under the new motor vehicle provisions of the Clean Air Act. Consequently, on December 7, 2009, the U.S. EPA issued an endangerment finding under Section 202 of the Clean Air Act regarding GHGs from new motor vehicles and on April 1, 2010 issued final regulations limiting GHG emissions from cars and light trucks effective on January 2, 2011. While such regulations do not specifically address stationary sources, such as a generating plant, it is the U.S. EPA’s position that the regulation of GHGs under the mobile source provisions of the Clean Air Act has triggered the permitting requirements under the Prevention of Significant Deterioration (PSD) and Title V operating permit sections of the Clean Air Act for new and modified stationary sources effective January 2, 2011. Therefore, on May 13, 2010, the U.S. EPA issued final regulations (the Tailoring Rule) relating to these provisions of the Clean Air Act for major stationary sources of GHG emissions that apply to new sources that emit greater than 100,000 tons per year, on a CO2 equivalent basis, and to modifications to existing sources that result in emissions increases greater than 75,000 tons per year on a CO2 equivalent basis. These thresholds became effective January 2, 2011, apply for six years and will be reviewed by the U.S. EPA for future applicability thereafter. On July 2, 2012 the U.S. EPA declined to lower GHG permit thresholds in its final “Step 3” Tailoring Rule update. The U.S. EPA will review permit thresholds again in a 2015 rulemaking process. On June 26, 2012, the United States Court of Appeals for the District of Columbia, in a per curium decision, dismissed industry and state petitions challenging the U.S. EPA’s “Tailpipe Rule” for cars and light duty trucks, the endangerment finding for GHG’s from stationary sources, and the Tailoring Rule. On October 15, 2013, the U.S. Supreme Court granted industry petitions to review one aspect of the PSD permitting regulations. Under the PSD regulations, new and modified major stationary sources could be required to install best available control technology, to be determined on a case by case basis. Generation could be significantly affected by the regulations if it were to build new plants or modify existing plants.

 

139


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

On June 25, 2013, President Obama announced “The President’s Climate Action Plan,” a summary of executive branch actions intended to: reduce carbon emissions; prepare the United States for the impacts of climate change; and lead international efforts to combat global climate change and prepare for its impacts. Concurrent with the announcement of the Administration’s plan, the President also issued a Memorandum for the Administrator of the Environmental Protection Agency that focused on power generation sector carbon reductions under the Section 111 New Source Performance Standards (NSPS) section of the federal Clean Air Act. The memorandum directs the U.S. EPA Administrator to issue two sets of proposed rulemakings with regard to power plant carbon emissions under Section 111 of the Clean Air Act.

The first rulemaking, under Section 111(b) of the Clean Air Act, focuses on establishing carbon regulations for new fossil-fuel power plants. This rulemaking was proposed on September 20, 2013 and is to be finalized “in a timely fashion.” In the proposed rule, U.S. EPA sets separate standards for fossil-fuel fired utility boilers and natural gas fired stationary combustion turbines.

The second rulemaking, under Section 111(d) of the Clean Air Act, focuses on modified, reconstructed and existing fossil power plants. The proposed rule was published in the Federal Register on June 18, 2014 and is open for public comment until October 16, 2014. The Climate Action Plan calls for the rule to be finalized no later than June 1, 2015, and requires that states submit to U.S. EPA their implementation plans no later than June 30, 2016. The proposed rule establishes emission reduction targets for each state and provides flexibility for each state to determine how to achieve its required reductions, including heat rate improvements at coal-fired power plants, fuel switching from coal to gas, renewable generation and new nuclear facilities, demand side energy efficiency, and the use of market-based instruments.

To the extent that the final Section 111(d) rule results in emission reductions from fossil fuel fired plants, and thereby imposes some form of direct or indirect price of carbon in competitive electricity markets, Exelon’s overall low carbon generation portfolio results could benefit.

Litigation and Regulatory Matters

Except to the extent noted below, the circumstances set forth in Note 22 of the Exelon 2013 Form 10-K describe, in all material respects, the current status of litigation matters. The following is an update to that discussion.

Asbestos Personal Injury Claims (Exelon, Generation, PECO and BGE)

Exelon and Generation.    Generation maintains a reserve for claims associated with asbestos-related personal injury actions in certain facilities that are currently owned by Generation or were previously owned by ComEd and PECO. The reserve is recorded on an undiscounted basis and excludes the estimated legal costs associated with handling these matters, which could be material.

At June 30, 2014 and December 31, 2013, Generation had reserved approximately $104 million and $90 million, respectively, in total for asbestos-related bodily injury claims. As of June 30, 2014, approximately $21 million of this amount related to 247 open claims presented to Generation, while the remaining $83 million of the reserve is for estimated future asbestos-related bodily injury claims anticipated to arise through 2050, based on actuarial assumptions and analyses, which are updated on an annual basis. On a quarterly basis, Generation monitors actual experience against the number of forecasted claims to be received and expected claim payments and evaluates whether an adjustment to the reserve is necessary. During the second quarter of 2014, Generation increased its reserve by approximately $15 million, primarily due to increased actual and projected number and severity of claims.

 

140


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

On November 22, 2013, the Supreme Court of Pennsylvania held that the Pennsylvania Workers Compensation Act does not apply to an employee’s disability or death resulting from occupational disease, such as diseases related to asbestos exposure, which manifests more than 300 weeks after the employee’s last employment-based exposure, and that therefore the exclusivity provision of the Act does not preclude such employee from suing his or her employer in court. The Supreme Court’s ruling reverses previous rulings by the Pennsylvania Superior Court precluding current and former employees from suing their employers in court, despite the fact that the same employee was not eligible for workers compensation benefits for diseases that manifest more than 300 weeks after the employee’s last employment-based exposure to asbestos. Currently, Exelon, Generation and PECO are unable to predict whether and to what extent they may experience additional claims in the future as a result of this ruling; as such no increase to the asbestos-related bodily injury liability has been recorded as of June 30, 2014. Increased claims activity resulting from this ruling could have a material adverse effect on Exelon’s, Generation’s and PECO’s future results of operations and cash flows.

BGE.    Since 1993, BGE and certain Constellation (now Generation) subsidiaries have been involved in several actions concerning asbestos. The actions are based upon the theory of “premises liability,” alleging that BGE and Generation knew of and exposed individuals to an asbestos hazard. In addition to BGE and Generation, numerous other parties are defendants in these cases.

Approximately 486 individuals who were never employees of BGE or certain Constellation subsidiaries have pending claims each seeking several million dollars in compensatory and punitive damages. Cross-claims and third-party claims brought by other defendants may also be filed against BGE and certain Constellation subsidiaries in these actions. To date, most asbestos claims which have been resolved have been dismissed or resolved without any payment by BGE or certain Constellation subsidiaries and a small minority of these cases has been resolved for amounts that were not material to BGE or Generation’s financial results.

Discovery begins in these cases after they are placed on the trial docket. At present, only two of the pending cases are set for trial. Given the limited discovery in these cases, BGE and Generation do not know the specific facts that are necessary to provide an estimate of the reasonably possible loss relating to these claims; as such, no accrual has been made and a range of loss is not estimable. The specific facts not known include:

 

   

the identity of the facilities at which the plaintiffs allegedly worked as contractors;

 

   

the names of the plaintiffs’ employers;

 

   

the dates on which and the places where the exposure allegedly occurred; and

 

   

the facts and circumstances relating to the alleged exposure.

Insurance and hold harmless agreements from contractors who employed the plaintiffs may cover a portion of any awards in the actions.

Continuous Power Interruption (ComEd)

Section 16-125 of the Illinois Public Utilities Act provides that in the event an electric utility, such as ComEd, experiences a continuous power interruption of four hours or more that affects (in ComEd’s case) more than 30,000 customers, the utility may be liable for actual damages suffered by customers as a result of the interruption and may be responsible for reimbursement of local governmental emergency and contingency expenses incurred in connection with the interruption. Recovery of consequential damages is barred. The affected utility may seek from the ICC a waiver of these liabilities when the utility can show that the cause of the interruption was unpreventable damage due to weather events or conditions, customer tampering, or certain other causes enumerated in the law.

 

141


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

On August 18, 2011, ComEd sought from the ICC a determination that ComEd is not liable for damage compensation to customers in connection with the July 11, 2011 storm system that produced multiple power interruptions that in the aggregate affected more than 900,000 customers in ComEd’s service territory, as well as for five other storm systems that affected ComEd’s customers during June and July 2011 (Summer 2011 Storm Docket). In addition, on September 29, 2011, ComEd sought from the ICC a determination that it was not liable for damage compensation related to the February 1, 2011 blizzard (February 2011 Blizzard Docket).

On June 5, 2013, the ICC approved a complete waiver of liability for five of the six summer storms and the February 2011 blizzard. The ICC held that for the July 11, 2011 storm, 34,559 interruptions were preventable and therefore no waiver should apply. As required by the ICC’s Order, ComEd notified relevant customers that they may be entitled to seek reimbursement of incurred costs in accordance with a claims procedure established under ICC rules and regulations. In addition, the ICC found that ComEd did not systematically fail in its duty to provide adequate, reliable and safe service. As a result, the ICC rejected the Illinois Attorney General’s request for the ICC to open an investigation into ComEd’s infrastructure and storm hardening investments.

Following the ICC’s June 26, 2013 denial of ComEd’s request for rehearing, on June 27, 2013 ComEd filed an appeal of both the summer and winter storm dockets with the Illinois Appellate Court regarding the ICC’s interpretation of Section 16-125 of the Illinois Public Utilities Act. On July 31, 2014, the Illinois Appellate Court reaffirmed the ICC’s decision in the appeal of the Summer 2011 Storm Docket and dismissed the appeal of the February 2011 Blizzard Docket. The Illinois Appellate Court’s opinion has no accounting impact as ComEd previously established a liability in connection with the June 5, 2013 ICC ruling discussed below.

As a result of the ICC’s June 5, 2013 ruling, ComEd established a liability, which was not material, for potential reimbursements for actual damages incurred by the 34,559 customers covered by the ICC’s June 5, 2013 Order. The liability recorded represents the low end of a range of potential losses given that no amount within the range represents a better estimate. ComEd’s ultimate liability will be based on actual claims eligible for reimbursement as well as the outcome of the appeal. Although reimbursements for actual damages will differ from the estimated accrual recorded, at this time ComEd does not expect the difference to be material to ComEd’s results of operations or cash flows.

ComEd has not recorded an accrual for reimbursement of local governmental emergency and contingency expenses as a range of loss, if any, cannot be reasonably estimated at this time, but may be material to ComEd’s results of operations and cash flows.

Telephone Consumer Protection Act Lawsuit (ComEd)

On November 19, 2013, a class action complaint was filed in the Northern District of Illinois on behalf of a single individual and a presumptive class that would include all customers that ComEd enrolled in its Outage Alert text message program. The complaint alleges that ComEd violated the Telephone Consumer Protection Act (“TCPA”) by sending approximately 1.2 million text messages to customers without first obtaining their consent to receive such messages. The complaint seeks certification of a class along with statutory damages, attorneys’ fees, and an order prohibiting ComEd from sending additional text messages. Such statutory damages could range from $500 to $1,500 per text. On February 21, 2014, ComEd filed a motion to dismiss this class action complaint and intends to contest the allegations of this suit. On June 4, 2014, ComEd’s motion to dismiss was denied. As of June 30, 2014, ComEd has a reserve, which is not material, representing its best estimate of probable loss associated with this class action complaint. As ComEd is unable to predict the ultimate outcome of this proceeding, actual damages may differ from the estimated amount recorded, which may be material to ComEd’s results of operations, cash flows, and financial position.

 

142


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Baltimore City Franchise Taxes (BGE)

The City of Baltimore claims that BGE has maintained electric facilities in the City’s public right-of-ways for over one hundred years without the proper franchise rights from the City. BGE has reviewed the City’s claim and believes that it lacks merit. BGE has not recorded an accrual for payment of franchise fees for past periods as a range of loss, if any, cannot be reasonably estimated at this time. Franchise fees assessed in future periods may be material to BGE’s results of operations and cash flows.

General (Exelon, Generation, ComEd, PECO and BGE)

The Registrants are involved in various other litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. The Registrants maintain accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of reasonably possible loss, particularly where (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss.

Income Taxes (Exelon, Generation, ComEd, PECO and BGE)

See Note 11 — Income Taxes for information regarding the Registrants’ income tax refund claims and certain tax positions, including the 1999 sale of fossil generating assets.

19.    Supplemental Financial Information (Exelon, Generation, ComEd, PECO and BGE)

Supplemental Statement of Operations Information

The following tables provide additional information about the Registrants’ Consolidated Statements of Operations and Comprehensive Income for the three and six months ended June 30, 2014 and 2013:

 

Three Months Ended June 30, 2014

   Exelon     Generation     ComEd      PECO     BGE  

Other, Net

           

Decommissioning-related activities:

           

Net realized income on decommissioning trust funds(a)

           

Regulatory agreement units

   $ 68     $ 68     $       $      $  

Non-regulatory agreement units

     38       38                     

Net unrealized gains on decommissioning trust funds

           

Regulatory agreement units

     172       172                     

Non-regulatory agreement units

     128       128                     

Net unrealized gains on pledged assets

           

Zion Station decommissioning

     10       10                     

Regulatory offset to decommissioning trust fund-related activities(b)

     (204     (204                   
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Total decommissioning-related activities

     212       212                     
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Investment income (expense)

     7       7              (1     2 (c) 

Long-term lease income

     10                           

Interest income (expense) related to uncertain income tax positions

     (2     3                     

AFUDC — Equity

     5                    1       3  

Other

     11       6       5        1        
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Other, net

   $ 243     $ 228     $ 5      $ 1     $ 5  
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

 

143


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Six Months Ended June 30, 2014

   Exelon     Generation     ComEd      PECO     BGE  

Other, Net

           

Decommissioning-related activities:

           

Net realized income on decommissioning trust funds(a)

           

Regulatory agreement units

   $ 111     $ 111     $      $     $  

Non-regulatory agreement units

     63       63                     

Net unrealized gains on decommissioning trust funds

           

Regulatory agreement units

     234       234                     

Non-regulatory agreement units

     141       141                     

Net unrealized gains on pledged assets

           

Zion Station decommissioning

     20       20                     

Regulatory offset to decommissioning trust fund-related activities(b)

     (299     (299                   
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Total decommissioning-related activities

     270       270                     
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Investment income (expense)

     8       8              (1     4 (c) 

Long-term lease income

     17                           

Interest income related to uncertain income tax positions

     7       17                     

AFUDC — Equity

     11             3        3       6  

Other

     35       23       7        1       (1
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Other, net

   $ 348     $ 318     $ 10      $ 3     $ 9  
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

 

Three Months Ended June 30, 2013

   Exelon     Generation     ComEd      PECO     BGE  

Other, Net

           

Decommissioning-related activities:

           

Net realized income on decommissioning trust funds(a)

           

Regulatory agreement units

   $ 47     $ 47     $      $     $  

Non-regulatory agreement units

     16       16                     

Net unrealized losses on decommissioning trust funds

           

Regulatory agreement units

     (102     (102                   

Non-regulatory agreement units

     (40     (40                   

Net unrealized gains on pledged assets

           

Zion Station decommissioning

     2       2                     

Regulatory offset to decommissioning trust fund-related activities(b)

     40       40                     
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Total decommissioning-related activities

     (37     (37                   
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Investment income (expense)

     2                    (1     2 (c) 

Long-term lease income

     5                           

Interest expense related to uncertain income tax positions

     (1     (2                   

AFUDC — Equity

     5             3        1       2  

Other

     9       6       3               
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Other, net

   $ (17   $ (33   $ 6      $     $ 4  
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

 

144


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Six Months Ended June 30, 2013

   Exelon     Generation     ComEd      PECO     BGE  

Other, Net

           

Decommissioning-related activities:

           

Net realized income on decommissioning trust funds(a)

           

Regulatory agreement units

   $ 84     $ 84     $      $     $  

Non-regulatory agreement units

     30       30                     

Net unrealized gains on decommissioning trust funds

           

Regulatory agreement units

     92       92                     

Non-regulatory agreement units

     24       24                     

Net unrealized gains on pledged assets

           

Zion Station decommissioning

     3       3                     

Regulatory offset to decommissioning trust fund-related activities(b)

     (148     (148                   
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Total decommissioning-related activities

     85       85                     
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Investment income (expense)

     5       (1            (1     5 (c) 

Long-term lease income

     13                           

Interest income related to uncertain income tax positions

     24       3                     

AFUDC — Equity

     12             6        2       4  

Other

     16       8       5        2        
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

Other, net

   $ 155     $ 95     $ 11      $ 3     $ 9  
  

 

 

   

 

 

   

 

 

    

 

 

   

 

 

 

 

(a)

Includes investment income and realized gains and losses on sales of investments of the trust funds.

(b)

Includes the elimination of NDT fund activity for the Regulatory Agreement Units, including the elimination of net income taxes related to all NDT fund activity for those units. See Note 15 — Asset Retirement Obligations of the Exelon 2013 Form 10-K for additional information regarding the accounting for nuclear decommissioning.

(c)

Relates to the cash return on BGE’s rate stabilization deferral. See Note 5 — Regulatory Matters for additional information regarding the rate stabilization deferral.

Supplemental Cash Flow Information

The following tables provide additional information regarding the Registrants’ Consolidated Statements of Cash Flows for the six months ended June 30, 2014 and 2013:

 

Six Months Ended June 30, 2014

   Exelon      Generation      ComEd      PECO      BGE  

Depreciation, amortization, accretion and depletion

              

Property, plant and equipment

   $ 1,015      $ 444      $ 290      $ 112      $ 142  

Regulatory assets

     117               57        5        55  

Amortization of intangible assets, net

     22        22                       

Amortization of energy contract assets and liabilities(a)

     113        118                       

Nuclear fuel(b)

     499        499                       

ARO accretion(c)

     159        159                       
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total depreciation, amortization, accretion and depletion

   $ 1,925      $ 1,242      $ 347      $ 117      $ 197  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

145


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Six Months Ended June 30, 2013

   Exelon      Generation      ComEd      PECO      BGE  

Depreciation, amortization, accretion and depletion

              

Property, plant and equipment

   $ 942      $ 402      $ 275      $ 109      $ 128  

Regulatory assets

     112               62        4        47  

Amortization of intangible assets, net

     22        22                       

Amortization of energy contract assets and liabilities(a)

     306        344                       

Nuclear fuel(b)

     454        454                       

ARO accretion(c)

     136        136                       
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total depreciation, amortization, accretion and depletion

   $ 1,972      $ 1,358      $ 337      $ 113      $ 175  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

(a)

Included in Operating revenues or Purchased power and fuel expense on the Registrants’ Consolidated Statements of Operations and Comprehensive Income.

(b)

Included in Purchased power and fuel expense on the Registrants’ Consolidated Statements of Operations and Comprehensive Income.

(c)

Included in Operating and maintenance expense on the Registrants’ Consolidated Statements of Operations and Comprehensive Income.

 

Six Months Ended June 30, 2014

   Exelon     Generation     ComEd     PECO     BGE  

Other non-cash operating activities:

          

Pension and non-pension postretirement benefit costs

   $ 315     $ 139     $ 96     $ 21     $ 33  

Loss from equity method investments

     20       20                    

Provision for uncollectible accounts

     59       8       (8     28       30  

Stock-based compensation costs

     68                          

Other decommissioning-related activity(a)

     (85     (85                  

Energy-related options(b)

     63       63                    

Amortization of regulatory asset related to debt costs

     5             4       1        

Amortization of rate stabilization deferral

     33                         33  

Amortization of debt fair value adjustment

     (26     (12                  

Discrete impacts of EIMA(c)

     9             9              

Amortization of debt costs

     19       6       (3     1       1  

Increase in inventory reserve

     3       3       1              

Impairment of investments in direct financing leases(e)

     24                          

Impairment charges(f)

     86       86                    

Other

     (26     (19           (1     (8
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other non-cash operating activities

   $ 567     $ 209     $ 99     $ 50     $ 89  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Changes in other assets and liabilities:

          

Under/over-recovered energy and transmission costs

   $ 60     $     $ 61     $ (6   $ 8  

Other regulatory assets and liabilities

     (25           (30     (13     (49

Other current assets

     (157     13       (5     (89 )(h)      51  

Other noncurrent assets and liabilities

     (158     (69     22       (6     (2
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total changes in other assets and liabilities

   $ (280   $ (56   $ 48     $ (114   $ 8  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Non-cash investing and financing activities:

          

Fair value of net assets recorded upon CENG consolidation(j)

   $ 3,400     $ 3,400     $     $     $  

Issuance of equity units(k)

     131                          

Uranium procurement(l)

     38       38                    

Indemnification of like-kind exchange position(m)

                 2              
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total non-cash investing and financing activities:

   $ 3,569     $ 3,438     $ 2     $     $  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

146


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Six Months Ended June 30, 2013

   Exelon     Generation     ComEd     PECO     BGE  

Other non-cash operating activities:

          

Pension and non-pension postretirement benefit costs

   $ 409     $ 173     $ 154     $ 21     $ 27  

Loss in equity method investments

     30       30                    

Provision for uncollectible accounts

     55       10       4       27       14  

Stock-based compensation costs

     70                          

Other decommissioning-related activity(a)

     (62     (62                  

Energy-related options(b)

     65       65                    

Amortization of regulatory asset related to debt costs

     6             5       1        

Amortization of rate stabilization deferral

     29                         29  

Amortization of debt fair value adjustment

     (22     (22                  

Discrete impacts from EIMA(c)

     (126           (126            

Amortization of debt costs

     8       5       2       1        

Merger integration costs(d)

     (6                       (6

Impairment of investments in direct financing leases(e)

     14                          

Increase in inventory reserve

     13       13                    

Impairment charges(g)

     110       110                    

Other

     (17     (7                 (3
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other non-cash operating activities

   $ 576     $ 315     $ 39     $ 50     $ 61  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Changes in other assets and liabilities:

          

Under/over-recovered energy and transmission costs

   $ (24   $     $ (61   $ 19     $ 18  

Other regulatory assets and liabilities

     3             (28     (5     (82

Other current assets

     (123     (134     2       (62 )(h)      99  

Other noncurrent assets and liabilities

     277       (34     304 (i)      (1     28  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total changes in other assets and liabilities

   $ 133     $ (168   $ 217     $ (49   $ 63  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Non-cash investing and financing activities:

          

Consolidated VIE dividend to non-controlling interest

   $ 63       63                    

Indemnification of like-kind exchange position(l)

                 174              
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total non-cash investing and financing activities

   $ 63     $ 63     $ 174     $     $  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Includes the elimination of NDT fund activity for the Regulatory Agreement Units, including the elimination of operating revenues, ARO accretion, ARC amortization, investment income and income taxes related to all NDT fund activity for these units. See Note 15 of the Exelon 2013 Form 10-K for additional information regarding the accounting for nuclear decommissioning.

(b)

Includes option premiums reclassified to realized at the settlement of the underlying contracts and recorded to results of operations.

(c)

Reflects the change in distribution rates pursuant to EIMA, which allows for the recovery of costs by a utility through a pre-established performance-based formula rate tariff. See Note 5 — Regulatory Matters for more information.

(d)

Relates to integration costs to achieve distribution synergies related to the Constellation merger transaction. See Note 5 — Regulatory Matters for more information.

(e)

Relates to an other than temporary decline in the estimated residual value of Exelon’s direct financing leases. See Note 7 — Impairment of Long-Lived Assets for more information.

(f)

Relates to the impairment of long-lived assets at Generation. See Note 7 — Impairment of Long-Lived Assets for additional information.

(g)

Relates to the cancellation of uprate projects at Generation. See Note 7 — Impairment of Long-Lived Assets for additional information.

(h)

Relates primarily to prepaid utility taxes.

 

147


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

(i)

Relates primarily to interest payable related to like-kind exchange tax position. See Note 11 — Income Taxes for discussion of the like-kind exchange tax position.

(j)

See Note 6 — Investment in Constellation Energy Nuclear Group, LLC for additional information.

(k)

Relates to the present value of the contract payments for the equity units issued by Exelon. See Note 16 — Common Stock for additional information.

(l)

Relates to the nuclear fuel procurement contract for the purchase of a fixed quantity of uranium, which was delivered to Generation on June 30, 2014. Generation is required to make payments starting June 30, 2016, with the final payment being due no later than June 30, 2018.

(m)

See Note 11 — Income Taxes for discussion of the like-kind exchange tax position.

DOE Smart Grid Investment Grant (Exelon, BGE and PECO).    For the six months ended June 30, 2014, PECO has included in the capital expenditures line item under investing activities of the cash flow statement capital expenditures of $2 million and reimbursements of $3 million related to PECO’s DOE SGIG programs. For the six months ended June 30, 2013, Exelon, PECO and BGE have included in the capital expenditures line item under investing activities of the cash flow statement capital expenditures of $41 million, $12 million and $29 million, respectively, and reimbursements of $50 million, $16 million and $34 million, respectively, related to PECO’s and BGE’s DOE SGIG programs. See Note 5 — Regulatory Matters for additional information regarding the DOE SGIG.

Supplemental Balance Sheet Information

The following tables provide additional information about assets and liabilities of the Registrants as of June 30, 2014 and December 31, 2013.

 

June 30, 2014

   Exelon     Generation     ComEd      PECO      BGE  

Property, plant and equipment:

            

Accumulated depreciation and amortization

   $ 14,369 (a)    $ 7,397 (a)    $ 3,325      $ 2,969      $ 2,781  

Accounts receivable:

            

Allowance for uncollectible accounts

     293       56       71        124        42  

December 31, 2013

   Exelon     Generation     ComEd      PECO      BGE  

Property, plant and equipment:

            

Accumulated depreciation and amortization

   $ 13,713 (b)    $ 7,034 (b)    $ 3,184      $ 2,935      $ 2,702  

Accounts receivable:

            

Allowance for uncollectible accounts

     272       57       62        107        46  

 

(a)

Includes accumulated amortization of nuclear fuel in the reactor core of $2,411 million.

(b)

Includes accumulated amortization of nuclear fuel in the reactor core of $2,371 million.

PECO Installment Plan Receivables (Exelon and PECO)

PECO enters into payment agreements with certain delinquent customers, primarily residential, seeking to restore their service, as required by the PAPUC. Customers with past due balances that meet certain income criteria are provided the option to enter into an installment payment plan, some of which have terms greater than one year, to repay past due balances in addition to paying for their ongoing service on a current basis. The receivable balance for these payment agreement receivables is recorded in accounts receivable for the current portion and other deferred debits and other assets for the noncurrent portion. The net receivable balance for installment plans with terms greater than one year was $21 million as of June 30, 2014 and $19 million as of December 31, 2013. The allowance for uncollectible accounts reserve methodology and assessment of the credit quality of the installment plan receivables are consistent with the customer accounts receivable methodology

 

148


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

discussed in Note 1 — Significant Accounting Policies of the Exelon 2013 Form 10-K. The allowance for uncollectible accounts balance associated with these receivables at June 30, 2014 of $20 million consists of $1 million, $4 million and $15 million for low risk, medium risk and high risk segments, respectively. The allowance for uncollectible accounts balance at December 31, 2013 of $18 million consists of $1 million, $4 million and $13 million for low risk, medium risk and high risk segments, respectively. The balance of the payment agreement is billed to the customer in equal monthly installments over the term of the agreement. Installment receivables outstanding as of June 30, 2014 and December 31, 2013 include balances not yet presented on the customer bill, accounts currently billed and an immaterial amount of past due receivables. When a customer defaults on its payment agreement, the terms of which are defined by plan type, the entire balance of the agreement becomes due and the balance is reclassified to current customer accounts receivable and reserved for in accordance with the methodology discussed in Note 1 — Significant Accounting Policies of the Exelon 2013 Form 10-K.

20.    Segment Information (Exelon, Generation, ComEd, PECO and BGE)

Operating segments for each of the Registrants are determined based on information used by the chief operating decision maker(s) (CODM) in deciding how to evaluate performance and allocate resources at each of the Registrants.

Exelon has nine reportable segments, ComEd, PECO, BGE and Generation’s six power marketing reportable segments consisting of the Mid-Atlantic, Midwest, New England, New York, ERCOT and all other regions not considered individually significant referred to collectively as “Other Regions”; including the South, West and Canada. ComEd, PECO and BGE each represent a single reportable segment; as such, no separate segment information is provided for these Registrants. Exelon’s CODM evaluates the performance of and allocates resources to ComEd, PECO and BGE based on net income and return on equity.

The CODMs for ComEd, PECO, and BGE evaluate performance and allocate resources for their respective companies based on net income and return on equity for ComEd, PECO, and BGE each as single integrated businesses.

The foundation of Generation’s six reportable segments is based on the geographic location of its assets, and is largely representative of the footprints of an ISO / RTO and/or NERC region. Descriptions of each of Generation’s six reportable segments are as follows:

 

   

Mid-Atlantic represents operations in the eastern half of PJM, which includes Pennsylvania, New Jersey, Maryland, Virginia, West Virginia, Delaware, the District of Columbia and parts of North Carolina.

 

   

Midwest represents operations in the western half of PJM, which includes portions of Illinois, Indiana, Ohio, Michigan, Kentucky and Tennessee, and the United States footprint of MISO excluding MISO’s Southern Region, which covers all or most of North Dakota, South Dakota, Nebraska, Minnesota, Iowa, Wisconsin, the remaining parts of Illinois, Indiana, Michigan and Ohio not covered by PJM, and parts of Montana, Missouri and Kentucky.

 

   

New England represents the operations within ISO-NE covering the states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island and Vermont.

 

   

New York represents operations within ISO-NY, which covers the state of New York in its entirety.

 

   

ERCOT represents operations within Electric Reliability Council of Texas, covering most of the state of Texas.

 

149


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

   

Other Regions not considered individually significant:

 

   

South represents operations in the FRCC, MISO’s Southern Region, and the remaining portions of the SERC not included within MISO or PJM, which includes all or most of Florida, Arkansas, Louisiana, Mississippi, Alabama, Georgia, Tennessee, North Carolina, South Carolina and parts of Missouri, Kentucky and Texas. Generation’s South region also includes operations in the SPP, covering Kansas, Oklahoma, most of Nebraska and parts of New Mexico, Texas, Louisiana, Missouri, Mississippi and Arkansas.

 

   

West represents operations in the WECC, which includes California ISO, and covers the states of California, Oregon, Washington, Arizona, Nevada, Utah, Idaho, Colorado, and parts of New Mexico, Wyoming and South Dakota.

 

   

Canada represents operations across the entire country of Canada and includes the AESO, OIESO and the Canadian portion of MISO.

The CODMs for Exelon and Generation evaluate the performance of Generation’s power marketing activities and allocate resources based on revenue net of purchased power and fuel expense. Generation believes that revenue net of purchased power and fuel expense is a useful measurement of operational performance. Revenue net of purchased power and fuel expense is not a presentation defined under GAAP and may not be comparable to other companies’ presentations or deemed more useful than the GAAP information provided elsewhere in this report. Generation’s operating revenues include all sales to third parties and sales to its affiliates, ComEd, PECO and BGE. Purchased power costs include all costs associated with the procurement and supply of electricity including capacity, energy and ancillary services. Fuel expense includes the fuel costs for Generation’s own generation and fuel costs associated with tolling agreements. Generation’s other business activities, including retail and wholesale gas, upstream natural gas, proprietary trading, energy efficiency and demand response, heating, cooling, and cogeneration facilities, and home improvements, sales of electric and gas appliances, servicing of heating, air conditioning, plumbing, electrical, and indoor quality systems, and investments in energy-related proprietary technology are not allocated to regions. Further, Generation’s other miscellaneous revenues, unrealized mark-to-market impact of economic hedging activities, and amortization of certain intangible assets relating to commodity contracts recorded at fair value as a result of the merger with Constellation and the consolidation of CENG are also not allocated to a region.

An analysis and reconciliation of the Registrants’ reportable segment information to the respective information in the consolidated financial statements for the three months ended June 30, 2014 and 2013 is as follows:

Three Months Ended June 30, 2014 and 2013

 

     Generation(a)      ComEd      PECO      BGE      Other(b)     Intersegment
Eliminations
    Exelon  

Total revenues(c):

                  

2014

   $ 3,789      $ 1,128      $ 656      $ 653      $ 329     $ (531   $ 6,024  

2013

     4,070        1,080        672        653        297       (631     6,141  

Intersegment revenues(d):

                  

2014

   $ 201      $      $      $ 2      $ 328     $ (531   $  

2013

     329                      4        298       (631      

Net income (loss):

                  

2014

   $ 372      $ 111      $ 84      $ 19      $ (29   $     $ 557  

2013

     328        96        78        25        (30           497  

Total assets:

                  

June 30, 2014

   $ 44,422      $ 24,544      $ 9,761      $ 7,877      $ 8,769     $ (11,717   $ 83,656  

December 31, 2013

     41,232        24,118        9,617        7,861        8,317       (11,221     79,924  

 

(a)

Generation includes the six power marketing reportable segments shown below: Mid-Atlantic, Midwest, New England, New York, ERCOT and Other Regions. Intersegment revenues for Generation for the three months ended June 30, 2014

 

150


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

 

include revenue from sales to PECO of $49 million and sales to BGE of $87 million in the Mid-Atlantic region, and sales to ComEd of $65 million in the Midwest region. For the three months ended June 30, 2013 intersegment revenues for Generation include revenue from sales to PECO of $97 million and sales to BGE of $99 million in the Mid-Atlantic region, sales to ComEd of $121 million in the Midwest region, and $10 million related to the unrealized mark-to-market gains related to the ComEd swap, which eliminate upon consolidation.

(b)

Other primarily includes Exelon’s corporate operations, shared service entities and other financing and investment activities.

(c)

For the three months ended June 30, 2014 and 2013, utility taxes of $21 million and $18 million, respectively, are included in revenues and expenses for Generation. For the three months ended June 30, 2014 and 2013, utility taxes of $56 million and $56 million, respectively, are included in revenues and expenses for ComEd. For the three months ended June 30, 2014 and 2013, utility taxes of $30 million and $31 million, respectively, are included in revenues and expenses for PECO. For the three months ended June 30, 2014 and 2013, utility taxes of $19 million and $19 million, respectively, are included in revenues and expenses for BGE.

(d)

Intersegment revenues exclude sales to unconsolidated affiliates. The intersegment profit associated with Generation’s sale of certain products and services by and between Exelon’s segments is not eliminated in consolidation due to the recognition of intersegment profit in accordance with regulatory accounting guidance. For Exelon, these amounts are included in operating revenues in the Consolidated Statements of Operations and Comprehensive Income.

Generation total revenues (three months ended):

 

     2014      2013  
     Revenues
from external
customers(a)
     Intersegment
revenues
    Total
Revenues
     Revenues
from external
customers(a)
     Intersegment
revenues
    Total
Revenues
 

Mid-Atlantic

   $ 1,272      $ 5     $ 1,277      $ 1,220      $ 9     $ 1,229  

Midwest

     981              981        1,076        (5     1,071  

New England

     211        1       212        209        (20     189  

New York

     194              194        175        (1     174  

ERCOT

     198        (1     197        319        (4     315  

Other Regions(b)

     314        (6     308        246        (6     240  
  

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total Revenues for Reportable Segments

     3,170        (1     3,169        3,245        (27     3,218  
  

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Other(c)

     619        1       620        825        27       852  
  

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total Generation Consolidated Operating Revenues

   $ 3,789      $      $ 3,789      $ 4,070      $     $ 4,070  
  

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

 

(a)

Includes all electric sales to third parties and affiliated sales to ComEd, PECO and BGE.

(b)

Other regions include the South, West and Canada, which are not considered individually significant.

(c)

Other represents activities not allocated to a region. See text above for a description of included activities. Also includes amortization of intangible assets related to commodity contracts recorded at fair value at the date of merger with Constellation and the consolidation of CENG in purchase accounting of $88 million and $234 million, for the three months ended June 30, 2014 and 2013, respectively, and elimination of intersegment revenues.

 

151


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

Generation total revenues net of purchased power and fuel expense (three months ended):

 

    2014     2013  
    RNF from
external
customers(a)
    Intersegment
RNF
    Total RNF     RNF from
external
customers(a)
    Intersegment
RNF
    Total RNF  

Mid-Atlantic

  $ 906     $ 14     $ 920     $ 770     $ (2   $ 768  

Midwest

    604       1       605       687       (3     684  

New England

    88       (24     64       85       (35     50  

New York

    142       6       148             14       14  

ERCOT

    117       (58     59       143       (31     112  

Other Regions(b)

    157       (82     75       111       (52     59  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total Revenues net of purchased power and fuel expense for Reportable Segments

    2,014       (143     1,871       1,796       (109     1,687  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other(c)

    (60     143       83       328       109       437  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total Generation Revenues net of purchased power and fuel expense

  $ 1,954     $     $ 1,954     $ 2,124     $     $ 2,124  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Includes purchases and sales from third parties and affiliated sales to ComEd, PECO and BGE.

(b)

Other regions include the South, West and Canada, which are not considered individually significant.

(c)

Other represents activities not allocated to a region. See text above for a description of included activities. Also includes amortization of intangible assets related to commodity contracts recorded at fair value at the date of merger with Constellation and the consolidation of CENG in purchase accounting of $50 million and $167 million for the three months ended June 30, 2014 and 2013, respectively, and the elimination of intersegment revenues.

Six Months Ended June 30, 2014 and 2013

 

     Generation(a)(b)      ComEd      PECO      BGE      Other(c)     Intersegment
Eliminations
    Exelon  

Total revenues(d):

                  

2014

   $ 8,179      $ 2,262      $ 1,649      $ 1,707      $ 619     $ (1,155   $ 13,261  

2013

     7,603        2,239        1,567        1,533        615       (1,334     12,223  

Intersegment revenues(e):

                  

2014

   $ 517      $ 1      $ 1      $ 18      $ 618     $ (1,155   $  

2013

     710        1               8        615       (1,334      

Net income (loss):

                  

2014

   $ 188      $ 209      $ 173      $ 106      $ (25   $     $ 651  

2013

     310        14        200        106        (132           498  

 

(a)

Generation includes the six power marketing reportable segments shown below: Mid-Atlantic, Midwest, New England, New York, ERCOT and Other Regions. Intersegment revenues for Generation for the six months ended June 30, 2014 include revenue from sales to PECO of $137 million and sales to BGE of $207 million in the Mid-Atlantic region, and sales to ComEd of $173 million in the Midwest region. For the six months ended June 30, 2013 intersegment revenues for Generation include revenue from sales to PECO of $238 million in the Mid-Atlantic region and sales to BGE of $212 million in the Mid-Atlantic region, and sales to ComEd of $266 million in the Midwest region, net of $7 million related to the unrealized mark-to-market losses related to the ComEd swap, which eliminate upon consolidation.

(b)

Amounts include activity recorded at CENG from April 1, 2014, the date of integration, through June 30, 2014.

(c)

Other primarily includes Exelon’s corporate operations, shared service entities and other financing and investment activities.

(d)

For the six months ended June 30, 2014 and 2013, utility taxes of $45 million and $39 million, respectively, are included in revenues and expenses for Generation. For the six months ended June 30, 2014 and 2013, utility taxes of $119 million and $117 million, respectively, are included in revenues and expenses for ComEd. For the six months ended June 30, 2014 and 2013, utility taxes of $65 million and $64 million, respectively, are included in revenues and expenses for PECO. For the six months ended June 30, 2014 and 2013, utility taxes of $43 million and $41 million, respectively, are included in revenues and expenses for BGE.

 

152


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

(e)

Intersegment revenues exclude sales to unconsolidated affiliates. The intersegment profit associated with the Generation’s sale of certain products and services by and between Exelon’s segments is not eliminated in consolidation due to the recognition of intersegment profit in accordance with regulatory accounting guidance. For Exelon, these amounts are included in operating revenues in the Consolidated Statements of Operations and Comprehensive Income.

Generation total revenues (six months ended):

 

    2014     2013  
    Revenues
from external
customers(a)
    Intersegment
revenues
    Total
Revenues
    Revenues
from external
customers(a)
    Intersegment
revenues
    Total
Revenues
 

Mid-Atlantic(b)

  $ 2,713     $ (18   $ 2,695     $ 2,551     $ 1     $ 2,552  

Midwest

    2,239       12       2,251       2,257       2       2,259  

New England

    756       5       761       600       (8     592  

New York(b)

    384       (3     381       350       (7     343  

ERCOT

    441       (1     440       612       (4     608  

Other Regions(c)

    648       1       649       429       36       465  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total Revenues for Reportable Segments

    7,181       (4     7,177       6,799       20       6,819  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other(d)

    998       4       1,002       804       (20     784  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total Generation Consolidated Operating Revenues

  $ 8,179     $     $ 8,179     $ 7,603     $     $ 7,603  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Includes all wholesale and retail electric sales from third parties and affiliated sales to ComEd, PECO and BGE.

(b)

Amounts include activity recorded at CENG from April 1, 2014, the date of integration, through June 30, 2014.

(c)

Other regions include the South, West and Canada, which are not considered individually significant.

(d)

Other represents activities not allocated to a region. See text above for a description of included activities. Also includes amortization of intangible assets related to commodity contracts recorded at fair value at the date of merger with Constellation and the consolidation of CENG in purchase accounting of $180 million and $478 million, for the six months ended June 30, 2014 and 2013, respectively, and elimination of intersegment revenues.

Generation total revenues net of purchased power and fuel expense (six months ended):

 

    2014     2013  
    RNF from
external
customers(a)
    Intersegment
RNF
    Total
RNF
    RNF from
external
customers(a)
    Intersegment
RNF
    Total
RNF
 

Mid-Atlantic(b)

  $ 1,690     $ (75   $ 1,615     $ 1,622     $ (10   $ 1,612  

Midwest

    1,134       27       1,161       1,397       4       1,401  

New England

    242       (42     200       103       (23     80  

New York(b)

    113       14       127       (16     8       (8

ERCOT

    272       (130     142       255       (42     213  

Other Regions(c)

    307       (127     180       122       (17     105  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total Revenues net of purchased power and fuel expense for Reportable Segments

    3,758       (333     3,425       3,483       (80     3,403  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other(d)

    (770     333       (437     6       80       86  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total Generation Revenues net of purchased power and fuel expense

  $ 2,988     $     $ 2,988     $ 3,489     $     $ 3,489  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Includes purchases and sales from third parties and affiliated sales to ComEd, PECO and BGE.

 

153


Table of Contents

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

(Dollars in millions, except per share data, unless otherwise noted)

 

(b)

Amounts include activity recorded at CENG from April 1, 2014, the date of integration, through June 30, 2014.

(c)

Other regions include the South, West and Canada, which are not considered individually significant.

(d)

Other represents activities not allocated to a region. See text above for a description of included activities. Also includes amortization of intangible assets related to commodity contracts recorded at fair value at the date of merger with Constellation and the consolidation of CENG in purchase accounting of $92 million and $341 million, for the six months ended June 30, 2014 and 2013, respectively.

21.    Subsequent Events (Exelon, Generation and PECO)

Summer storms during July 2014 interrupted electric service delivery in PECO’s service territory. Restoration efforts included significant costs associated with employee overtime, support from other utilities and incremental equipment, contracted tree trimming crews and supplies. PECO estimates that restoration efforts will result in $10 million to $20 million of incremental operating and maintenance expense and $10 million to $20 million of incremental capital expenditures for the third quarter of 2014.

On July 29, 2014, Generation entered into a Stock Purchase Agreement (the Purchase Agreement) with Integrys Energy Group, Inc. (Integrys). Pursuant to the Purchase Agreement, Integrys agreed to sell its competitive retail electric and natural gas businesses through a sale of all of the stock of its wholly-owned subsidiary, Integrys Energy Services, Inc. (IES), to Generation for an all cash purchase price of $60 million plus adjusted net working capital at the time of the closing. IES’s adjusted net working capital balance was approximately $183 million as of May 31, 2014. Pursuant to the Purchase Agreement, Generation has agreed to use its commercially reasonable efforts to replace the guarantees and other credit support currently being provided by Integrys for IES in support of the ongoing competitive retail businesses and to reimburse Integrys for any payments arising pursuant to such arrangements continuing for any post-closing period. The generation and solar asset businesses of IES are excluded from the transaction.

The transaction is expected to close in the fourth quarter of 2014 or the first quarter of 2015. The closing of the transaction is subject to certain conditions, included, among others, approval by the FERC and expiration or termination of the applicable waiting period under the Hart-Scott-Rodino Antitrust Improvements Act of 1976. Either party may terminate the Purchase Agreement if the transaction has not been consummated by the 6 month anniversary of the date of the Purchase Agreement, subject to an extension of up to 180 days, if necessary, to obtain regulatory approval. The Purchase Agreement also includes various representations, warranties, covenants, indemnification and other provisions customary for a transaction of this nature.

 

154


Table of Contents

Item 2.    Management’s Discussion and Analysis of Financial Condition and Results of Operations

(Dollars in millions except per share data, unless otherwise noted)

Exelon Corporation

General

Exelon, a utility services holding company, operates through the following principal subsidiaries:

 

   

Generation,     whose integrated business consists of owned, contracted and investments in electric generating facilities managed through customer supply of electric and natural gas products and services, including renewable energy products, risk management services and natural gas exploration and production activities.

 

   

As a result of the Constellation merger, Generation owns a 50.01% interest in CENG. On April 1, 2014, Generation assumed the operating licenses and corresponding operational control of CENG’s nuclear fleet. As a result, Exelon and Generation consolidate CENG’s financial position and results of operations into their businesses.

 

   

ComEd,    whose business consists of the purchase and regulated retail sale of electricity and the provision of distribution and transmission services in northern Illinois, including the City of Chicago.

 

   

PECO,    whose business consists of the purchase and regulated retail sale of electricity and the provision of distribution and transmission services in southeastern Pennsylvania, including the City of Philadelphia, and the purchase and regulated retail sale of natural gas and the provision of distribution services in the Pennsylvania counties surrounding the City of Philadelphia.

 

   

BGE,    whose business consists of the purchase and regulated retail sale of electricity and the provision of distribution and transmission services in central Maryland, including the City of Baltimore, and the purchase and regulated retail sale of natural gas and the provision of distribution services in central Maryland, including the City of Baltimore.

Exelon has nine reportable segments consisting of Generation’s six power marketing reportable segments (Mid-Atlantic, Midwest, New England, New York, ERCOT and other regions in Generation), ComEd, PECO and BGE. See Note 20 — Segment Information of the Combined Notes to Consolidated Financial Statements for additional information regarding Exelon’s reportable segments.

Through its business services subsidiary BSC, Exelon provides its operating subsidiaries with a variety of support services at cost. The costs of these services are directly charged or allocated to the applicable operating segments. Additionally, the results of Exelon’s corporate operations include costs for corporate governance and interest costs and income from various investment and financing activities.

Exelon’s consolidated financial information includes the results of its four separate operating subsidiary registrants, Generation, ComEd, PECO and BGE, which, along with Exelon, are collectively referred to as the Registrants. The following combined Management’s Discussion and Analysis of Financial Condition and Results of Operations is separately filed by Exelon, Generation, ComEd, PECO and BGE. However, none of the Registrants makes any representation as to information related solely to any of the other Registrants.

 

155


Table of Contents

Executive Overview

Financial Results.    The following consolidated financial results reflect the results of Exelon for the three and six months ended June 30, 2014 compared to the corresponding periods in 2013. All amounts presented below are before the impact of income taxes, except as noted.

 

    Three Months Ended June 30,     Favorable
(Unfavorable)
Variance
 
    2014     2013    
    Generation(a)     ComEd     PECO     BGE     Other     Exelon     Exelon    

Operating revenues

  $ 3,789     $ 1,128     $ 656     $ 653     $ (202   $ 6,024     $ 6,141     $ (117

Purchased power and fuel

    1,835       269       241       268       (201     2,412       2,419       7  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Revenue net of purchased power and fuel(b)

    1,954       859       415       385       (1     3,612       3,722       (110
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other operating expenses

               

Operating and maintenance

    1,413       355       184       188       26       2,166       1,892       (274

Depreciation and amortization

    254       174       59       89       14       590       533       (57

Taxes other than income

    118       72       38       53       7       288       271       (17
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other operating expenses

    1,785       601       281       330       47       3,044       2,696       (348

Equity in losses of unconsolidated affiliates

    (1                       1             (21     21  

Gain on consolidation of CENG

    261                               261             261  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income (loss)

    429       258       134       55       (47     829       1,005       (176
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

               

Interest expense, net

    (86     (80     (28     (27     (17     (238     (252     14  

Other, net

    228       5       1       5       4       243       (17     260  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

    142       (75     (27     (22     (13     5       (269     274  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income (loss) before income taxes

    571       183       107       33       (60     834       736       98  

Income taxes (benefit)

    199       72       23       14       (31     277       239       (38
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss)

    372       111       84       19       (29     557       497       60  

Net income attributable to noncontrolling interests, preferred security dividends and redemption and preference stock dividends

    32                   3             35       7       (28
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss) attributable to common shareholders

  $ 340     $ 111     $ 84     $ 16     $ (29   $ 522     $ 490     $ 32  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

156


Table of Contents
    Six Months Ended June 30,     Favorable
(Unfavorable)
Variance
 
    2014     2013    
    Generation(a)     ComEd     PECO     BGE     Other     Exelon     Exelon    

Operating revenues

  $ 8,179     $ 2,262     $ 1,649     $ 1,707     $ (536   $ 13,261     $ 12,223     $ 1,038  

Purchased power and fuel

    5,191       589       705       797       (530     6,752       5,400       (1,352
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Revenue net of purchased power and fuel(b)

    2,988       1,673       944       910       (6     6,509       6,823       (314
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other operating expenses

               

Operating and maintenance

    2,499       681       464       376       4       4,024       3,656       (368

Depreciation and amortization

    466       347       117       197       27       1,154       1,076       (78

Taxes other than income

    223       149       80       113       15       580       548       (32
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other operating expenses

    3,188       1,177       661       686       46       5,758       5,280       (478

Equity in earnings (loss) of unconsolidated affiliates

    (20                             (20     (30     10  

Gain on consolidation of CENG

    261                               261             261  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income (loss)

    41       496       283       224       (52     992       1,513       (521
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

               

Interest expense, net

    (172     (160     (56     (55     (22     (465     (876     411  

Other, net

    318       10       3       9       8       348       155       193  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

    146       (150     (53     (46     (14     (117     (721     604  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income (loss) before income taxes

    187       346       230       178       (66     875       792       83  

Income taxes

    (1     137       57       72       (41     224       294       70  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss)

    188       209       173       106       (25     651       498       153  

Net (loss) income attributable to noncontrolling interests, preferred security dividends and redemption and preference stock dividends

    33                   6             39       12       (27
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss) attributable to common shareholders

  $ 155     $ 209     $ 173     $ 100     $ (25   $ 612     $ 486     $ 126  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Includes the operations of CENG from April 1, 2014 through June 30, 2014.

(b)

The Registrants’ evaluate operating performance using the measure of revenue net of purchased power and fuel expense. The Registrants’ believe that revenue net of purchased power and fuel expense is a useful measurement because it provides information that can be used to evaluate its operational performance. Revenue net of purchased power and fuel expense is not a presentation defined under GAAP and may not be comparable to other companies’ presentations or deemed more useful than the GAAP information provided elsewhere in this report.

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013. Exelon’s net income attributable to common shareholders was $522 million for the three months ended June 30, 2014 as compared to $490 million for the three months ended June 30, 2013, and diluted earnings per average common share were $0.60 for the three months ended June 30, 2014 as compared to $0.57 for the three months ended June 30, 2013.

 

157


Table of Contents

Operating revenue net of purchased power and fuel expense, which is a non-GAAP measure discussed below, decreased by $110 million for the three months ended June 30, 2014 as compared to the same period in 2013. The quarter-over-quarter decrease in operating revenue net of purchased power and fuel expense was primarily due to the following unfavorable factors:

 

   

Decrease in Generation’s revenue net of purchased power and fuel expense of $442 million due to mark-to-market losses of $14 million in 2014 from economic hedging activities compared to $428 million in mark-to-market gains in 2013; and

The quarter-over-quarter decrease in operating revenue net of purchased power and fuel expense was partially offset by the following favorable factors:

 

   

Increase in Generation’s electric revenue net of purchased power and fuel expense of $184 million, primarily due to the inclusion of CENG’s results for the full quarter ended June 30, 2014 and increased capacity prices related to the Reliability Pricing Model (RPM) for the PJM Interconnection, LLC (PJM) market, partially offset by lower realized energy prices, and lower generation volumes (excluding CENG);

 

   

Decrease in Generation’s amortization expense for the acquired energy contracts recorded at fair value at the date of the merger with Constellation and the integration with CENG of $117 million;

 

   

Increase in BGE’s revenue net of purchased power and fuel expense of $20 million, primarily due to increased distribution revenue as a result of 2013 electric and natural gas distribution rate case orders issued by the Maryland PSC; and

 

   

Increase in ComEd’s revenue net of purchased power expense of $27 million primarily due to higher electric distribution revenue resulting from increased capital investment and increased cost recovery associated with energy efficiency programs, partially offset by lower distribution formula rate revenue due to decreased pension and non-pension postretirement expense.

Operating and maintenance expense increased by $274 million for the three months ended June 30, 2014 as compared to the same period in 2013 primarily due to the following unfavorable factors:

 

   

Increase in Generation’s labor, contracting and materials costs of $126 million primarily due to the inclusion of CENG’s results for the second quarter ended June 30, 2014;

 

   

An increase of $61 million as a result of an increase in the number of planned nuclear refueling outage days at Generation during the second quarter;

 

   

Long lived asset impairments of $110 million in 2014 compared to $106 million in 2013;

 

   

An increase of $16 million in Generation’s reserve for future asbestos-related bodily injury claims;

 

   

Increased uncollectible accounts expense at BGE of $10 million; and

 

   

Increase at ComEd of $18 million primarily relating to increased spend on energy and efficiency programs.

The year-over-year increase in operating and maintenance expense was partially offset by the following favorable factor:

 

   

A decrease in pension and non-pension postretirement benefits expense of $57 million as a result of cost savings primarily at Exelon, Generation, and ComEd for plan design changes for certain OPEB plans, and the favorable impact of higher actuarially assumed pension and OPEB discount rates for 2014, partially offset by the inclusion of CENG’s results for the second quarter of 2014.

Depreciation and amortization expense increased by $57 million primarily due to the inclusion of CENG’s results for the full quarter ended June 30, 2014 and increased capital expenditures across all operating companies.

 

158


Table of Contents

A $261 million gain recorded upon consolidation of CENG resulting from the difference in the fair value of CENG’s net assets as of April 2014, and the equity method investment previously recorded on Generation’s and Exelon’s books and the settlement of pre-existing transactions between Generation and CENG.

Other, net increased by $260 million primarily as a result of the change in realized and unrealized gains and losses on NDT funds.

Exelon’s effective income tax rates for the three months ended June 30, 2014 and 2013 were 33.2% and 32.5%, respectively. See Note 11 — Income Taxes of the Combined Notes to Consolidated Financial Statements for additional information regarding the components of the effective income tax rates.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013. Exelon’s net income attributable to common shareholders was $612 million for the six months ended June 30, 2014 as compared to net income attributable to common shareholders of $486 million for the six months ended June 30, 2013, and diluted earnings per average common share were $0.71 for the six months ended June 30, 2014 as compared to $0.57 for the six months ended June 30, 2013.

Operating revenue net of purchased power and fuel expense, which is a non-GAAP measure discussed below, decreased by $314 million for the six months ended June 30, 2014 as compared to the same period in 2013. The year-over-year decrease in operating revenue net of purchased power and fuel expense was primarily due to the following unfavorable factors:

 

   

Decrease in Generation’s revenue net of purchased power and fuel expense of $769 million due to mark-to-market losses of $744 million in 2014 from economic hedging activities compared to $25 million in mark-to-market gains in 2013.

The year-over-year decrease in operating revenue net of purchased power and fuel expense was partially offset by the following unfavorable factors:

 

   

Increase in Generation’s electric revenue net of purchased power and fuel expense of $22 million primarily due to inclusion of CENG’s results for the quarter ended June 30, 2014 and increased capacity prices related to the Reliability Pricing Model (RPM) for the PJM Interconnection, LLC (PJM) market, partially offset by lower realized energy prices, higher procurement costs for replacement power, increased fossil fuel expense due to extreme cold weather during the first quarter of 2014, and lower generation volumes (excluding CENG);

 

   

Decrease in Generation’s amortization expense for the acquired energy contracts recorded at fair value at the date of the merger with Constellation and the integration with CENG of $249 million;

 

   

Increase in BGE’s revenue net of purchased power and fuel expense of $90 million, primarily due to increased distribution revenue as a result of the 2013 electric and natural gas distribution rate case orders issued by the Maryland PSC and increased cost recovery for energy efficiency and demand response programs;

 

   

Increase in ComEd’s revenue net of purchased power expense of $64 million primarily due to increased distribution revenue due to recovery of increased capital investments pursuant to ComEd’s performance-based rate formula, favorable weather conditions in the first quarter of 2014, and increased cost recovery associated with energy efficiency programs, partially offset by lower distribution formula rate revenue due to decreased pension and non-pension postretirement expense; and

 

   

Increase in PECO’s revenue net of purchased power and fuel expense of $41 million, primarily due to favorable weather conditions in the first quarter of 2014.

 

159


Table of Contents

Operating and maintenance expense increased by $368 million for the six months ended June 30, 2014 as compared to the same period in 2013 primarily due to the following unfavorable factors:

 

   

Increase in Generation’s labor, contracting and materials costs of $121 million primarily due to the inclusion of CENG’s results for the second quarter ended June 30, 2014;

 

   

An increase of $75 million as a result of an increase in the number of planned nuclear refueling outage days at Generation;

 

   

An increase of $16 million in Generation’s reserve for future asbestos-related bodily injury claims.

 

   

An increase in storm costs at PECO and BGE of $84 million and $13 million, respectively;

 

   

Increase at ComEd of $27 million primarily relating to increased spend on energy and efficiency programs; and

 

   

Increased uncollectible accounts expense at BGE of $13 million.

The year-over-year increase in operating and maintenance expense was partially offset by the following unfavorable factors:

 

   

A decrease in pension and non-pension postretirement benefits expense of $72 million as a result of cost savings primarily at Exelon, Generation, and ComEd for plan design changes for certain OPEB plans, and the favorable impact of higher actuarially assumed pension and OPEB discount rates for 2014, partially offset by the inclusion of CENG’s results for the second quarter of 2014; and

 

   

Long-lived asset impairments of $110 million in 2014 compared to $127 million in 2013.

Depreciation and amortization expense increased by $78 million primarily as a result of the inclusion of CENG’s results for a full quarter in 2014, increased depreciation expense across the operating companies for ongoing capital expenditures, and higher costs related to energy efficiency and demand response program expenditures.

A $261 million gain recorded upon consolidation of CENG resulting from the difference in the fair value of CENG’s net assets as of April 2014, and the equity method investment previously recorded on Generation’s and Exelon’s books and the settlement of pre-existing transactions between Generation and CENG.

Interest expense decreased by $411 million primarily as a result of a favorable settlement in 2014 of certain income tax positions on Constellation’s 2009-2012 tax returns and the impacts of a 2013 unfavorable franchise tax settlement.

Other, net increased by $193 million primarily as a result of the change in realized and unrealized gains and losses on NDT funds.

Exelon’s effective income tax rates for the six months ended June 30, 2014 and June 30, 2013 were 25.6% and 37.1%, respectively. See Note 11 — Income Taxes of the Combined Notes to Consolidated Financial Statements for additional information regarding the components of the effective income tax rates.

For further detail regarding the financial results for the three and six months ended June 30, 2014, including explanation of the non-GAAP measure revenue net of purchased power and fuel expense, see the discussions of Results of Operations by Segment below.

Adjusted (non-GAAP) Operating Earnings.     Exelon’s adjusted (non-GAAP) operating earnings for the three months ended June 30, 2014 were $ 440 million, or $ 0.51 per diluted share, compared with adjusted (non-GAAP) operating earnings of $ 454 million, or $ 0.53 per diluted share, for the same period in 2013. Exelon’s adjusted (non-GAAP) operating earnings for the six months ended June 30, 2014 were $970 million, or $1.12 per diluted share, compared with adjusted (non-GAAP) operating earnings of $1,056 million, or $1.23 per diluted share, for the same period in 2013. In addition to net income attributable to common shareholders, Exelon

 

160


Table of Contents

evaluates its operating performance using the measure of adjusted (non-GAAP) operating earnings because management believes it represents earnings directly related to the ongoing operations of the business. Adjusted (non-GAAP) operating earnings exclude certain costs, expenses, gains and losses and other specified items. This information is intended to enhance an investor’s overall understanding of year-to-year operating results and provide an indication of Exelon’s baseline operating performance. In addition, this information is among the primary indicators management uses as a basis for evaluating performance, allocating resources, setting incentive compensation targets and planning and forecasting of future periods. Adjusted (non-GAAP) operating earnings is not a presentation defined under GAAP and may not be comparable to other companies’ presentations or deemed more useful than the GAAP information provided elsewhere in this report.

The following table provides a reconciliation between net income attributable to common shareholders as determined in accordance with GAAP and adjusted (non-GAAP) operating earnings for the three and six months ended June 30, 2014 as compared to the same period in 2013. The footnotes below the table provide tax expense (benefit) impacts:

 

     Three Months Ended June 30,  
     2014     2013  

(All amounts after tax)

         Earnings per
Diluted Share
          Earnings per
Diluted Share
 

Net Income Attributable to Common Shareholders

   $ 522     $ 0.60     $ 490     $ 0.57  

Mark-to-Market Impact of Economic Hedging Activities (a)

     8       0.01       (253     (0.30

Unrealized (Gains) Losses Related to NDT Fund Investments (b)

     (76     (0.09     22       0.03  

Merger and Integration Costs (c)

     19       0.02       15       0.02  

Amortization of Commodity Contract Intangibles (d)

     23       0.03       115       0.13  

Long-Lived Asset Impairment (e)

     68       0.08       69       0.08  

Gain on CENG integration (f)

     (159     (0.18            

PHI Acquisition Costs (g)

     12       0.01              

Non-Controlling Interest (h)

     23       0.03              

Amortization of the Fair Value of Certain Debt (i)

                 (4      
  

 

 

   

 

 

   

 

 

   

 

 

 

Adjusted (non-GAAP) Operating Earnings

   $ 440     $ 0.51     $ 454     $ 0.53  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

     Six Months Ended June 30,  
     2014     2013  

(All amounts after tax)

         Earnings per
Diluted Share
          Earnings per
Diluted Share
 

Net Income Attributable to Common Shareholders

   $ 612     $ 0.71     $ 486     $ 0.57  

Mark-to-Market Impact of Economic Hedging Activities(a)

     451       0.52       (18     (0.02

Unrealized Gains Related to NDT Fund Investments(b)

     (84     (0.10     (14     (0.02

Merger and Integration Costs(c)

     28       0.03       43       0.05  

Amortization of Commodity Contract Intangibles(d)

     54       0.06       232       0.27  

Long-Lived Asset Impairment(e)

     68       0.08       82       0.10  

Tax Settlements(j)

     (35     (0.04            

Gain on CENG integration(f)

     (159     (0.18            

PHI Acquisition Costs(g)

     12       0.01              

Non-Controlling Interest(h)

     23       0.03              

Plant Retirement and Divestitures(k)

                 (13     (0.02

Amortization of the Fair Value of Certain Debt(i)

                 (7     (0.01

Remeasurement of Like-Kind Exchange Tax Position(l)

                 265       0.31  
  

 

 

   

 

 

   

 

 

   

 

 

 

Adjusted (non-GAAP) Operating Earnings

   $ 970     $ 1.12     $ 1,056     $ 1.23  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

161


Table of Contents

 

(a)

Reflects the impact of losses (gains) for the three months ended June 30, 2014 and June 30, 2013 (net of taxes of $(6) million and $163 million, respectively), and six months ended June 30, 2014 and June 30, 2013 (net of taxes of $(293) million and $13 million, respectively), on Generation’s economic hedging activities. See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional detail related to Generation’s hedging activities.

(b)

Reflects the impact of unrealized (gains) losses for the three months ended June 30, 2014 and June 30, 2013 (net of taxes of $41 million and $(41) million, respectively), and six months ended June 30, 2014 and June 30, 2013 (net of taxes of $47 million and $27 million, respectively), on Generation’s NDT fund investments for Non-Regulatory Agreement Units. See Note 12 — Nuclear Decommissioning of the Combined Notes to Consolidated Financial Statements for additional detail related to Generation’s NDT fund investments.

(c)

Reflects certain costs incurred for the three months ended June 30, 2014 and June 30, 2013 (net of taxes of $3 million and $(10) million, respectively) and for the six months ended June 30, 2014 and June 30, 2013 (net of taxes of $(2) million and $(4) million, respectively), associated with the Constellation merger and CENG integration, including employee-related expenses (e.g. severance, retirement, relocation and retention bonuses) integration initiatives and certain pre-acquisition contingencies.

(d)

Reflects the non-cash impact for the three months ended June 30, 2014 and 2013 (net of taxes of $(26) million and $(73) million, respectively), and six months ended June 30, 2014 and June 30, 2013 (net of taxes of $(46) million and $(148) million, respectively), of the amortization of intangible assets, net, related to commodity contracts recorded at fair value at the Constellation merger date and at the CENG integration date.

(e)

Reflects the 2014 charge to earnings for the three and six months ended June 30, 2014 primarily related to the impairment of certain wind generating assets (net of taxes of $(42) million). For the three and six months ended June 30, 2013, reflects a charge to earnings (net of taxes of $(44) million and $(53) million, respectively) related to Generation’s cancellation of previously capitalized nuclear uprate projects.

(f)

Reflects the non-cash gain recorded upon consolidation of CENG in accordance with the execution of the NOSA on April 1, 2014 (net of taxes of $103 million for the three and six months ended June 30, 2014).

(g)

Reflects certain costs incurred associated with the Pepco Holdings Inc. acquisition, including professional fees and upfront credit facility fees (net of taxes of $(8) million).

(h)

Represents adjustments to account for the CENG interest not owned by Generation, where applicable.

(i)

Reflects the non-cash amortization of certain debt for the three and six months ended June 30, 2013 (net of taxes of $3 million and $5 million, respectively) recorded at fair value at the Constellation merger date which was retired in the second quarter of 2013.

(j)

Reflects a benefit for the six months ended June 30, 2014, related to the favorable settlement in 2014 of certain income tax positions on Constellation’s 2009-2012 tax returns (net of tax of $(18) million).

(k)

Reflects the impact associated with the sale or retirement of generating stations (net of taxes of $5 million for the six months ended June 30, 2013).

(l)

Reflects a non-cash charge to earnings resulting from the first quarter 2013 remeasurement of a like-kind exchange tax position taken on ComEd’s 1999 sale of fossil generating assets (net of taxes of $(102) million for the six months ended June 30, 2013).

As discussed above, Exelon has incurred and will continue to incur costs associated with the Constellation merger, CENG transaction and PHI acquisition including employee-related expenses (e.g. severance, retirement, relocation and retention bonuses), integration initiatives, and certain pre-acquisition contingencies.

For the three and six months ended June 30, 2014 and 2013, expense has been recognized for costs incurred to achieve the Constellation merger, CENG transaction and PHI acquisition as follows:

 

     Pre-tax Expense  
     Three Months Ended June 30, 2014  

Merger, Integration and Acquisition Costs:

   Generation      ComEd      PECO      BGE      Exelon  

Employee-Related(a)

   $ 1      $      $      $      $ 1  

Other(b)

     15                             35  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   $ 16      $      $      $      $ 36  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

162


Table of Contents
     Pre-tax Expense  
     Three Months Ended June 30, 2013  

Merger and Integration Costs:

   Generation      ComEd      PECO      BGE      Exelon  

Employee-Related(a)

   $ 7      $      $      $      $ 7  

Other(b)

     13               2        1        18  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   $ 20      $      $ 2      $ 1      $ 25  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

     Pre-tax Expense  
     Six Months Ended June 30, 2014  

Merger, Integration and Acquisition Costs:

   Generation      ComEd      PECO      BGE      Exelon  

Employee-Related(a)

   $ 5      $      $      $      $ 5  

Other(b)

     25                             45  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   $ 30      $      $      $      $ 50  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

     Pre-tax Expense  
     Six Months Ended June 30, 2013  

Merger and Integration Costs:

   Generation      ComEd      PECO      BGE     Exelon  

Employee-Related(a)

     13               1              14  

Other(b)

     30               4        (5 )(c)      32  
  

 

 

    

 

 

    

 

 

    

 

 

   

 

 

 

Total

   $ 43      $      $ 5      $ (5   $ 46  
  

 

 

    

 

 

    

 

 

    

 

 

   

 

 

 

 

(a)

Costs primarily for employee severance, pension and OPEB expense, and retention bonuses. ComEd established a regulatory asset of $1 million during the six months ended June 30, 2013. The majority of these costs are expected to be recovered over a five-year period. These costs are not included in the table above.

(b)

Costs to integrate CENG and Constellation processes and systems into Exelon and to terminate certain Constellation debt agreements. For the three months ended June 30, 2014, includes professional fees at Exelon Corporate and upfront credit facility fees incurred at Exelon Corporate to acquire PHI. ComEd established a regulatory asset of $4 million and $7 million during the three and six months ended June 30, 2013, for certain other merger and integration costs, which are not included in the table above. BGE established a regulatory asset of $2 million during the six months ended June 30, 2013 for certain other merger integration costs, which are not included in the table above.

(c)

BGE established a regulatory asset of $6 million at June 30, 2013 for certain 2012 other merger transaction costs as part of the 2013 electric and gas distribution rate case order which are not included in the table above.

As of June 30, 2014, Exelon projects incurring total additional PHI acquisition and integration related expenses of $265 million and $239 million, respectively, over the next five years. Exelon expects to incur total additional CENG and integration related costs of $35 million, primarily in 2014.

Pursuant to the conditions set forth by the MDPSC in its approval of the merger transaction, Exelon committed to provide a package of benefits to BGE customers, and make certain investments in the City of Baltimore and the State of Maryland, resulting in an estimated direct investment in the State of Maryland of approximately $1 billion. The direct investment estimate includes $95 million to $120 million for the requirement to cause construction of a headquarters building in Baltimore for Generation’s competitive energy businesses. On March 20, 2013, Generation signed a twenty-year lease agreement that was contingent upon the developer obtaining all required approvals, permits and financing for the construction of a building in Baltimore, Maryland. The operating lease became effective during the second quarter of 2014 when these outstanding contingencies were met by the developer. The building is expected to be ready for occupancy in approximately 2 years. See Note 18 — Commitments and Contingencies of the Combined Notes to Consolidated Financial Statements for further information related to the lease commitments.

 

163


Table of Contents

Exelon’s Strategy and Outlook for the remainder of 2014 and Beyond

Exelon’s value proposition and competitive advantage come from its scope and scale across the energy value chain and its core strengths of operational excellence and financial discipline.

Generation’s electricity generation strategy is to pursue opportunities that provide generation to load matching and that diversify the generation fleet by expanding Generation’s regional and technological footprint. Generation leverages its energy generation portfolio to ensure delivery of energy to both wholesale and retail customers under long-term and short-term contracts, and in wholesale power markets. Generation’s customer facing activities foster development and delivery of other innovative energy-related products and services for its customers. Generation operates in well-developed energy markets and employs an integrated hedging strategy to manage commodity price volatility. Its generation fleet, including its nuclear plants which consistently operate at high capacity factors, also provide geographic and supply source diversity. These factors help Generation mitigate the current challenging conditions in competitive energy markets.

Exelon’s utility strategy is to improve reliability and operations and enhance the customer experience, while ensuring ratemaking mechanisms provide the utilities fair financial returns. Exelon seeks to leverage its scale and expertise across the utilities platform through enhanced standardization and sharing of best practices to achieve improved operational and financial results. Combined, the utilities plan to invest approximately $15 billion over the next five years in smart meter technology, transmission projects, gas infrastructure, and electric system improvement projects, providing greater reliability and improved service for our customers and a stable return for the company.

Exelon’s financial priorities are to maintain investment grade credit metrics at each of Exelon, Generation, ComEd, PECO and BGE, and to return value to Exelon’s shareholders with a sustainable dividend throughout the energy commodity market cycle and through earnings growth from attractive investment opportunities.

In pursuing its strategies, Exelon has exposure to various market and financial risks, including the risk of price fluctuations in the power markets. Power prices are a function of supply and demand, which in turn are driven by factors such as (1) the price of fuels, in particular, the prices of natural gas and coal, which drive the market prices that Generation can obtain for the output of its power plants, (2) the rate of expansion of subsidized low-carbon generation in the markets in which Generation’s output is sold, (3) the effects on energy demand due to factors such as weather, economic conditions and implementation of energy efficiency and demand response programs, and (4) the impacts of increased competition in the retail channel. Exelon continues to assess infrastructure, operational, commercial, policy, and legal solutions to these market pricing issues.

Proposed Merger with Pepco Holdings, Inc. (Exelon)

On April 29, 2014, Exelon and Pepco Holdings, Inc. (PHI) signed an agreement and plan of merger (as subsequently amended and restated as of July 18, 2014, the Merger Agreement) to combine the two companies in an all cash transaction. The resulting company will retain the Exelon name and be headquartered in Chicago. Under the Merger Agreement, PHI’s shareholders will receive $27.25 of cash in exchange for each share of PHI common stock. Exelon intends to fund the all-cash transaction using a combination of approximately $3.5 billion of debt, up to $1 billion cash from asset sales primarily at Generation, and the remainder through issuance of equity (including mandatory convertible securities). In addition, Exelon entered into a 364-day $7.2 billion senior unsecured bridge credit facility to support the contemplated transaction and provide flexibility for timing of permanent financing, which has subsequently been reduced to $4.2 billion as a result of the equity issuances. In connection with the Merger Agreement, Exelon entered into a subscription agreement under which it purchased $90 million of a new class of nonvoting, nonconvertible and nontransferable preferred securities in PHI, in the second quarter of 2014, with additional investments of $18 million to be made quarterly up to a maximum aggregate investment of $180 million.

The transaction must be approved by the shareholders of PHI. Completion of the transaction is also conditioned upon approval by the FERC, the District of Columbia Public Service Commission and several state

 

164


Table of Contents

commissions including Delaware Public Service Commission, MDPSC, the New Jersey Board of Public Utilities and the Virginia Department of Public Utilities. In addition, under the Hart-Scott-Rodino Antitrust Improvements Act of 1976 (HSR Act), the transaction cannot be completed until Exelon has made required notifications and given certain information and materials to the Federal Trade Commission (FTC) and/or the Antitrust Division of the United States Department of Justice (DOJ) and until specified waiting period requirements have expired. To date, Exelon and PHI have filed applications seeking approval of the proposed merger with the FERC, the Virginia State Corporation Commission, the Delaware Public Service Commission, the Public Service Commission of the District of Columbia, and the New Jersey Board of Public Utilities. Exelon plans to make its filing under the HSR Act and the companies plan to file for merger approval with the MDPSC in August 2014. PHI has filed a preliminary proxy statement for a special meeting of shareholders to approve the proposed merger; a meeting date has not yet been set.

Through June 30, 2014, Exelon has incurred approximately $25 million of expense associated with the transaction, primarily related to fees incurred as part of the acquisition. Exelon currently estimates the total costs directly related to the closing of the transaction to be $265 million. As part of the applications for approval of the merger, Exelon and PHI have proposed a package of benefits to PHI utilities’ customers which results in a direct investment of more than $100 million. The Merger Agreement also provides for termination rights on behalf of both parties. Under certain circumstances, if the Merger Agreement is terminated, PHI may be required to pay Exelon a termination fee ranging from $259 million to $293 million plus certain expenses. If the Merger Agreement does not close due to a regulatory failure, Exelon may be required to pay PHI a termination fee equal to the amount of purchased nonvoting preferred securities (described above), by means of PHI redeeming the outstanding nonvoting preferred securities for no consideration other than the nominal par value of the stock.

Exelon has listed various potential risks relating to the pending merger with PHI (see Item 1A. Risk Factors), including difficulties that may be encountered in satisfying the conditions to completion of the merger and the potential for developments that might have an adverse effect on Exelon and the ability to realize the expected benefits of the merger. Exelon is taking steps to manage these risks and expects that the merger can be completed on a basis favorable to the company’s shareholders and customers. Accordingly, Exelon anticipates closing the transaction in the second or third quarter of 2015. Refer to Note 4—Mergers, Acquisitions, and Dispositions for additional information on the merger transaction.

Power Markets

Price of Fuels.    The use of new technologies to recover natural gas from shale deposits is increasing natural gas supply and reserves, which places downward pressure on natural gas prices and, therefore, on wholesale and retail power prices, which results in a reduction in Exelon’s revenues. Forward natural gas prices have declined significantly over the last several years; in part reflecting an increase in supply due to strong natural gas production (due to shale gas development).

Subsidized Generation.    The rate of expansion of subsidized generation, including low-carbon generation such as wind and solar energy, in the markets in which Generation’s output is sold can negatively impact wholesale power prices, and in turn, Generation’s results of operations.

Various states have attempted to implement or propose legislation, regulations or other policies to subsidize new generation development which may result in artificially depressed wholesale energy and capacity prices. For example, the New Jersey legislature enacted in to law in January 2011, the Long Term Capacity Pilot Program Act (LCAPP). LCAPP provides eligible generators with 15-year fixed contracts for the sale of capacity in the PJM capacity market. Under LCAPP, the local utilities in New Jersey are required to pay (or receive) the difference between the price eligible generators receive in the capacity market and the price guaranteed under the 15-year contract. New Jersey ultimately selected three proposals to participate in LCAPP and build new generation in the state. In addition, on April 12, 2012, the MDPSC issued an order directing the Maryland electric utilities to enter into a 20-year contract for differences (CfD) with CPV Maryland, LLC (CPV), under

 

165


Table of Contents

which CPV will construct an approximately 700 MW combined cycle gas turbine in Waldorf, Maryland, that it projected will be in commercial operation by June 1, 2015. CPV has subsequently sought to extend that date. The CfD mandated that utilities (including BGE) pay (or receive) the difference between CPV’s contract price and the revenues it receives for capacity and energy from clearing the unit in the PJM capacity market.

Exelon and others filed a complaint in federal district court challenging the constitutionality and other aspects of the New Jersey legislation. Similarly, Exelon and others also challenged the selection of the three generation developers. On October 25, 2013, the U.S. District Court in New Jersey issued a judgment order finding that the New Jersey legislation violates the Supremacy Clause of the United States Constitution and the New Jersey (SOCA) contract is unenforceable. The non-prevailing parties have sought appeals in federal appellate court in the New Jersey proceeding. On October 23, 2013, the New Jersey state court dismissed the New Jersey state proceeding without prejudice, subject to the final outcome of the New Jersey federal litigation. Similarly, on October 24, 2013, the U.S. District Court in Maryland issued a judgment order finding that the MDPSC’s Order directing BGE and two other Maryland electric distribution companies to enter into a CfD violates the Supremacy Clause of the United States Constitution, as described in Note 5 — Regulatory Matters of the combined Notes to Consolidated Financial Statements. However, on October 1, 2013, a Maryland State Circuit Court upheld the MDPSC Orders as being within the MDPSC’s statutory authority under Maryland state law. This decision is separate from the judgment in the federal litigation that the MDPSC Order is unconstitutional and the CfD unenforceable under federal law. The federal judgment was affirmed on June 2, 2014, by the U.S Court of Appeals for the Fourth Circuit, and Exelon believes this judgment would prevent enforcement of the CfD even if the Maryland State Circuit Court decision stands. CPV filed for en banc review of the Fourth Circuit decision but its request was denied. CPV, one of the sellers under both a New Jersey and a Maryland contract, filed its two contracts at the FERC. Exelon believes such contracts to be void and is seeking to ensure that such contracts are not accepted by the FERC.

As required under their contracts, generator developers who were selected in the New Jersey and Maryland programs (including CPV) offered and cleared in PJM’s capacity market auctions held in May 2012, 2013 and 2014. In addition, CPV has announced its intention to move forward with construction of its New Jersey plant, with or without the challenged state subsidy. Nonetheless to the extent that the state-required customer subsidies are included under their respective contracts, Exelon believes that these projects may have artificially suppressed capacity prices in PJM in these auctions and may continue to do so in future auctions to the detriment of Exelon’s market driven position. While the U.S. District Court decisions in New Jersey and Maryland are positive developments, continuation of these state efforts, if successful and unabated by an effective minimum offer price rule (MOPR) for future capacity auctions, could continue to result in artificially depressed wholesale capacity and/or energy prices. Other states could seek to establish programs, which could substantially impact Exelon’s market driven position and could have a significant effect on Exelon’s financial results of operations, financial position and cash flows.

PJM’s capacity market rules include a MOPR, which is intended to preclude sellers from artificially suppressing the competitive price signals for generation capacity. However, as described above, Exelon does not believe that the existing MOPR will work effectively with respect to generator developers who have a state-sponsored subsidy and has concerns with certain other aspects of PJM’s rules related to the capacity auction. Accordingly, Exelon continues to work with other market stakeholders and through the FERC process to implement several proposed changes to the PJM tariff aimed at ensuring that capacity resources (including those with state-sponsored subsidy contracts and capacity market speculators) cannot inappropriately affect capacity auction prices in PJM.

See Note 5 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements for additional information on the Maryland Order.

Exelon remains active in advocating for competitive markets, while opposing policies that require taxpayers and/or consumers to subsidize or give preferential treatment to specific generation providers or technologies, or that would threaten the reliability and value of the integrated electricity grid.

 

166


Table of Contents

Energy Demand.    Modest economic growth partially offset by energy efficiency initiatives is resulting in positive growth for electricity for ComEd and PECO, and no projected growth for electricity for BGE. ComEd, PECO and BGE are projecting load volumes to increase by 0.8%, 0.7% and 0.0%, respectively, in 2014 compared to 2013.

Retail Competition.    Generation’s retail operations compete for customers in a competitive environment, which affect the margins that Generation can earn and the volumes that it is able to serve. Recently, sustained low forward natural gas and power prices and low market volatility have caused retail competitors to aggressively pursue market share, and wholesale generators (including Generation) to use their retail operations to hedge generation output. These factors have adversely affected overall gross margins and profitability in Generation’s retail operations.

Strategic Policy Alignment

Exelon routinely reviews its hedging policy, dividend policy, operating and capital costs, capital spending plans, strength of its balance sheet and credit metrics, and sufficiency of its liquidity position, by performing various stress tests with differing variables, such as commodity price movements, increases in margin-related transactions, changes in hedging practices, and the impacts of hypothetical credit downgrades.

Exelon’s board of directors declared the second quarter 2014 dividend of $0.31 per share on Exelon’s common stock. The second quarter dividend was paid on June 10, 2014 to shareholders of record on May 16, 2014. All future quarterly dividends require approval by Exelon’s board of directors.

Exelon’s board of directors declared the third quarter 2014 dividend of $0.31 per share on Exelon’s common stock. The third quarter dividend is payable on September 10, 2014 to shareholders of record on August 15, 2014.

Exelon and Generation evaluate the economic viability of each of their generating units on an ongoing basis. Decisions regarding the future of economically challenged generating assets will be based primarily on the economics of continued operation of the individual plants. If Exelon and Generation do not see a path to sustainable profitability in any of their plants, Exelon and Generation will take steps to retire those plants to avoid sustained losses. Retirement of plants could materially affect Exelon’s and Generation’s results of operations, financial position, and cash flows through, among other things, potential impairment charges, accelerated depreciation and decommissioning expenses over the plants remaining useful lives, and ongoing reductions to operating revenues, operating and maintenance expenses, and capital expenditures.

Hedging Strategy

Exelon’s policy to hedge commodity risk on a ratable basis over three-year periods is intended to reduce the financial impact of market price volatility. Generation is exposed to commodity price risk associated with the unhedged portion of its electricity portfolio. Generation enters into non-derivative and derivative contracts, including financially-settled swaps, futures contracts and swap options, and physical options and physical forward contracts, all with credit-approved counterparties, to hedge this anticipated exposure. Generation has hedges in place that significantly mitigate this risk for 2014 and 2015. However, Generation is exposed to relatively greater commodity price risk in the subsequent years with respect to which a larger portion of its electricity portfolio is currently unhedged. As of June 30, 2014, the percentage of expected generation hedged for the major reportable segments was 92%-95%, 75%-78% and 46%-49% for 2014, 2015, and 2016, respectively. The percentage of expected generation hedged is the amount of equivalent sales divided by the expected generation. Expected generation represents the amount of energy estimated to be generated or purchased through owned or contracted capacity. Equivalent sales represent all hedging products, which include economic hedges and certain non-derivative contracts including Generation’s sales of energy to ComEd, PECO and BGE relating to their respective retail load obligations. Generation has been and will continue to be proactive in using hedging strategies to mitigate commodity price risk in subsequent years as well.

 

167


Table of Contents

Generation procures coal, oil and natural gas through long-term and short-term contracts and spot-market purchases. Nuclear fuel is obtained predominantly through long-term uranium concentrate supply contracts, contracted conversion services, contracted enrichment services and contracted fuel fabrication services. The supply markets for uranium concentrates and certain nuclear fuel services, coal, oil and natural gas are subject to price fluctuations and availability restrictions. Supply market conditions may make Generation’s procurement contracts subject to credit risk related to the potential non-performance of counterparties to deliver the contracted commodity or service at the contracted prices. Approximately 60% of Generation’s uranium concentrate requirements from 2014 through 2018 are supplied by three producers. In the event of non-performance by these or other suppliers, Generation believes that replacement uranium concentrates can be obtained, although at prices that may be unfavorable when compared to the prices under the current supply agreements. Non-performance by these counterparties could have a material adverse impact on Exelon’s and Generation’s results of operations, cash flows and financial position.

ComEd, PECO and BGE mitigate such exposure through regulatory mechanisms that allow them to recover procurement costs from retail customers.

Growth Opportunities

Exelon is currently pursuing growth in both the utility and generation businesses focused primarily on smart meter and smart grid initiatives at the utilities and on renewables development and the nuclear uprate program at Generation. The utilities also anticipate making significant future investments in infrastructure modernization and improvement initiatives. Management continually evaluates growth opportunities aligned with Exelon’s existing businesses in electric and gas distribution, electric transmission, generation, customer supply of electric and natural gas products and services, and natural gas exploration and production activities, leveraging Exelon’s expertise in those areas.

Smart Meter and Smart Grid Initiatives.

ComEd’s Smart Meter and Smart Grid Investments.    ComEd plans to invest approximately $1.3 billion on smart meters and smart grid under EIMA, including $1.0 billion through the AMI Deployment Plan. On June 11, 2014, the ICC approved ComEd’s request to accelerate the deployment, which allows for the installation of more than four million smart meters throughout ComEd’s service territory by 2018, three years in advance of the originally scheduled 2021 completion date. To date, nearly 350,000 smart meters have been installed in the Chicago area by ComEd.

PECO’s Smart Meter and Smart Grid Investments.    In 2010, the PAPUC approved PECO’s Smart Meter Procurement and Installation Plan, under which PECO will install more than 1.6 million smart meters. PECO plans to spend up to a total of $595 million and $120 million on its smart meter infrastructure and smart grid investments, respectively, of which $200 million will be funded by SGIG.

BGE Smart Grid Initiative.    In August 2010, the MDPSC approved a comprehensive smart grid initiative for BGE which includes the planned installation of 2 million electric and gas smart meters at an expected total cost of approximately $480 million, before considering the $200 million SGIG for smart grid and other related initiatives.

See Note 5 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements for additional information on the Smart Meter and Smart Grid Initiatives.

Generation Renewable Development.    On September 30, 2011, Exelon announced the completion of its acquisition of all of the interests in Antelope Valley, a 230-MW solar PV project under development in northern Los Angeles County, California, from First Solar, Inc., which is developing, building, operating, and maintaining

 

168


Table of Contents

the project. The first portion of the project began operations in December 2012, with six additional blocks coming online in 2013 and the final two blocks coming online in 2014 making the facility fully operational. The acquisition supports the Exelon commitment to renewable energy as part of Exelon 2020. The project has a 25-year PPA with Pacific Gas & Electric Company for the full output of the plant, which has been approved by the CPUC. Total capitalized costs for the facility are expected to be approximately $1.1 billion. Total capitalized costs incurred through June 30, 2014 were approximately $1.0 billion. In addition, Generation constructed and placed into service 400 MWs of additional wind generation in 2012 at a cost of $710 million and another 90 MW will be added to Generation’s wind portfolio in 2014 with the 50 MW expansion of the Beebe project in Michigan, the output of which is fully contracted under a 20-year PPA, and the construction of the 40 MW Fourmile Wind project in Maryland to partially satisfy the Exelon-Constellation merger commitments to the State of Maryland.

Nuclear Uprate Program.    Generation is engaged in individual projects as part of a planned power uprate program across its nuclear fleet. When economically viable, the projects take advantage of new production and measurement technologies, new materials and application of expertise gained from a half-century of nuclear power operations. Under the nuclear uprate program, Generation has placed into service projects representing 393 MWs of new nuclear generation at a cost of $1,021 million, which has been capitalized to property, plant and equipment on Exelon’s and Generation’s consolidated balance sheets. At June 30, 2014, Generation has capitalized $184 million to construction work in progress within property, plant and equipment for nuclear uprate projects expected to be placed in service by the end of 2016, consisting of 139 MWs of new nuclear generation, that are in the installation phase at two nuclear stations; Peach Bottom in Pennsylvania and Dresden in Illinois. The remaining spend associated with these projects is expected to be approximately $225 million through the end of 2016. Generation believes that it is probable that these projects will be completed. If a project is expected not to be completed as planned, previously capitalized costs will be reversed through earnings as a charge to operating and maintenance expense and interest. See Note 7 — Impairment of Long-Lived Assets of the Combined Notes to Consolidated Financial Statements for further information.

Liquidity

Each of the Registrants annually evaluates its financing plan, dividend practices and credit line sizing, focusing on maintaining its investment grade ratings while meeting its cash needs to fund capital requirements, retire debt, pay dividends, fund pension and other postretirement benefit obligations and invest in new and existing ventures. The Registrants expect cash flows to be sufficient to meet operating expenses, financing costs and capital expenditure requirements.

Exelon, Generation, ComEd, PECO and BGE have unsecured syndicated revolving credit facilities with aggregate bank commitments of $0.5 billion, $5.3 billion, $1.0 billion, $0.6 billion and $0.6 billion, respectively. Generation also has bilateral credit facilities with aggregate maximum availability of $0.5 billion. See Liquidity and Capital Resources — Credit Matters — Exelon Credit Facilities below.

Exposure to Worldwide Financial Markets.    Exelon has exposure to worldwide financial markets including European banks. Disruptions in the European markets could reduce or restrict the Registrants’ ability to secure sufficient liquidity or secure liquidity at reasonable terms. As of June 30, 2014, approximately 29%, or $2.5 billion, of the Registrants’ aggregate total commitments were with European banks. The credit facilities include $8.4 billion in aggregate total commitments of which $6.3 billion was available as of June 30, 2014, due to outstanding letters of credit and commercial paper. There were no borrowings under the Registrants’ credit facilities as of June 30, 2014, with the exception of CENG. See Note 10 — Debt and Credit Agreements of the Combined Notes to the Consolidated Financial Statements for additional information on the credit facilities.

Tax Matters

See Note 11 of the Combined Notes to Consolidated Financial Statements for additional information.

 

169


Table of Contents

Environmental Legislative and Regulatory Developments.

Exelon supports the promulgation of certain environmental regulations by the U.S. EPA, including air, water and waste controls for electric generating units. See discussion below for further details. The air and waste regulations will have a disproportionate adverse impact on fossil-fuel power plants, requiring significant expenditures of capital and variable operating and maintenance expense, and will likely result in the retirement of older, marginal facilities. Due to their low emission generation portfolios, Generation and CENG will not be significantly directly affected by these regulations, representing a competitive advantage relative to electric generators that are more reliant on fossil-fuel plants. Various bills have been introduced in the U.S. Congress that would prohibit or impede the U.S. EPA’s rulemaking efforts. The timing of the consideration of such legislation is unknown.

Air Quality.    In recent years, the U.S. EPA has been implementing a series of increasingly stringent regulations under the Clean Air Act relating to NAAQS for conventional air pollutants (e.g., NOx, SO2 and particulate matter) as well as stricter technology requirements to control HAPs (e.g., acid gases, mercury and other heavy metals) from electric generation units. The U.S. EPA continues to review and update its NAAQS with a tightened particulate matter NAAQS issued in December 2012 and a review of the current 2008 ozone NAAQS that is expected to result in a proposed revision of the ozone NAAQS sometime in fall 2014. These updates will potentially result in more stringent emissions limits on fossil-fuel electric generating stations. There continues to be opposition among fossil-fuel generation owners to the potential stringency and timing of these air regulations.

In July 2011, the U.S. EPA published CSAPR and in June 2012, it issued final technical corrections. CSAPR requires 28 upwind states in the eastern half of the United States to significantly improve air quality by reducing power plant emissions that cross state lines and contribute to ground-level ozone and fine particle pollution in downwind states. On August 21, 2012, a three-judge panel of the D.C. Circuit Court held that the U.S. EPA had exceeded its authority in certain material aspects with respect to CSAPR and vacated the rule and remanded it to the U.S. EPA for further rulemaking consistent with its decision. The Court also ordered that CAIR remain in effect pending finalization of CSAPR on remand. Until the U.S. EPA re-issues CSAPR, Exelon cannot determine the impacts of the rule, including any that would impact power prices. In June 2013, the U.S. Supreme Court granted the U.S. EPA’s petition to review the D.C. Circuit Court’s CSAPR decision, and on April 29, 2014, the U.S. Supreme reversed the D.C. Circuit Court decision and upheld CSAPR, and remanded the case to the D.C. Circuit Court to resolve the remaining implementation issues. On June 26, 2014, the U.S. EPA filed a motion with the D.C. Circuit Court seeking to have the stay of the CSAPR lifted, and proposed a three-year tolling of the effective dates under the rule so that the first phase of emission budgets would be implemented on January 1, 2015. The U.S. EPA believes that this would allow sufficient time to complete the remaining aspects of the rulemaking before the implementation of the more stringent second phase of emission budgets that, under the tolling proposal, would begin on January 1, 2017.

On December 16, 2011, the U.S. EPA signed a final rule to reduce emissions of toxic air pollutants from power plants and signed revisions to the NSPS for electric generating units. The final rule, known as MATS, requires coal-fired electric generation plants to achieve high removal rates of mercury, acid gases and other metals. To achieve these standards, coal units with no pollution control equipment installed (uncontrolled coal units) will have to make capital investments and incur higher operating expenses. It is expected that owners of smaller, older, uncontrolled coal units will retire the units rather than make these investments. Coal units with existing controls that do not meet the MATS rule may need to upgrade existing controls or add new controls to comply. Owners of oil units not currently meeting the proposed emission standards may choose to convert the units to light oils or natural gas, install control technologies, or retire the units. Numerous entities challenged MATS in the D.C. Circuit Court, and Exelon intervened in support of the rule. On April 15, 2014, the D.C. Circuit Court issued an opinion upholding MATS in its entirety. On July 14, 2014, three petitions for certiorari were filed with the U.S. Supreme Court seeking review of the D.C. Circuit Court decision upholding MATS.

 

170


Table of Contents

The cumulative impact of these air regulations could be to require power plant operators to expend significant capital to install pollution control technologies, including wet flue gas desulfurization technology for SO2 and acid gases, and selective catalytic reduction technology for NOx. Generation, along with the other co-owners of Conemaugh Generating Station have improved the existing scrubbers and installed Selective Catalytic Reduction (SCR) controls to meet the requirements of MATS. In addition, Keystone already has SCR and Flue-gas desulfurization (FGD) controls in place.

On January 15, 2013, EPA issued a final rule for NSPS and National Emissions Standards for Hazardous Air Pollutants (NESHAP) for reciprocating internal combustion engines (RICE NESHAP/NSPS). The final rule allows diesel backup generators to operate for up to 100 hours annually under certain emergency circumstances without meeting emissions limitations, but requires units that operate over 15 hours to burn low sulfur fuel and report key engine information. The final rule eliminates after May 2014 the 50 hour exemption for peak shaving and other non-emergency demand response that was included in the proposed rule and, therefore, is not expected to result in additional megawatts of demand response to be bid into the PJM capacity auction.

In the absence of Federal legislation, the U.S. EPA is also moving forward with the regulation of GHG emissions under the Clean Air Act. The U.S. EPA is addressing the issue of carbon dioxide (CO2) emissions regulation for new and existing electric generating units through the New Source Performance Standards (NSPS) under Section 111 of the Clean Air Act. Pursuant to President Obama’s June 25, 2013 memorandum to U.S. EPA, the Agency re-proposed a Section 111(b) regulation for new units in September 2013 that may result in material costs of compliance for CO2 emissions for new fossil-fuel electric generating units, particularly coal-fired units. The Climate Action Plan also required the U.S. EPA to propose by June 2014 GHG emission regulations for existing stationary sources under Section 111(d) of the Clean Air Act, and to issue final regulations by June 2015. That proposed rule was published in the Federal Register on June 16, 2014 and is open for public comment until October 16, 2014. The proposed rule establishes emission reduction targets for each state and provides flexibility for each state to determine how to achieve its required reductions, including heat rate improvements at coal-fired power plants, fuel switching from coal to gas, renewable generation and new nuclear facilities, demand side energy efficiency, and the use of market-based instruments. While the nature and impact of the final regulations is not yet known, to the extent that the rule results in emission reductions from fossil fuel fired plants, imposing some form of direct or indirect price of carbon in competitive electricity markets, Exelon’s overall low-carbon generation portfolio results would benefit.

Exelon supports comprehensive climate change legislation or regulation, including a cap-and-trade program for GHG emissions, which balances the need to protect consumers, business and the economy with the urgent need to reduce national GHG emissions.

Water Quality.    Section 316(b) of the Clean Water Act requires that cooling water intake structures at electric power plants reflect the best technology available to minimize adverse environmental impacts, and is implemented through state-level NPDES permit programs. On May, 19 2014, the U.S. EPA released the final Section 316(b) rule. The rule has not been published in the Federal Register, and will become effective 60 days after publication. The rule requires that a series of studies and analyses be performed at each facility to determine the best technology available, followed by an implementation period. The timing of the various requirements for each facility is related to the status of its current NPDES permit and the subsequent renewal period. There is no fixed compliance schedule, as this is left to the discretion of the state permitting director.

Until the compliance requirements are determined by the applicable state permitting director on a site-specific basis for each plant, the impact of compliance with the final rule is unknown. Should a state permitting director determine that a facility is required to install cooling towers to comply with the rule, that facility’s economic viability would be called into question. However, the likely impact of the rule has been significantly decreased since the final rule does not mandate cooling towers as a national standard, and the state permitting director is required to apply a cost-benefit test and take into consideration site-specific factors.

 

171


Table of Contents

Hazardous and Solid Waste.    Under proposed U.S. EPA rules issued on June 21, 2010, coal combustion residuals (CCR) would be regulated for the first time under the RCRA. The U.S. EPA is considering several options, including classification of CCR either as a hazardous or non-hazardous waste, under RCRA. Under either option, the U.S. EPA’s intention is the ultimate elimination of surface impoundments as a waste treatment process. For plants affected by the proposed rules, this would result in significant capital expenditures and variable operating and maintenance expenditures to convert to dry handling and disposal systems and installation of new waste water treatment facilities. Generation’s plants that would be affected by the proposed rules are the Keystone and Conemaugh generating stations in Pennsylvania, which have on-site landfills that meet the requirements of Pennsylvania solid waste regulations for non-hazardous waste disposal. However, until the final rule is adopted, the impact on these facilities is unknown. The U.S. EPA has entered into a Consent Decree which requires that a final rule be issued by December 19, 2014.

See Note 18 — Commitments and Contingencies of the Combined Notes to Consolidated Financial Statements for further detail related to environmental matters, including the impact of environmental regulation.

Other Regulatory and Legislative Actions

Japan Earthquake and Tsunami and the Industry’s Response.    On March 11, 2011, Japan experienced a 9.0 magnitude earthquake and ensuing tsunami that seriously damaged the nuclear units at the Fukushima Daiichi Nuclear Power Station, which are operated by Tokyo Electric Power Co.

In July 2011, an NRC Task Force formed in the aftermath of the Fukushima Daiichi events issued a report of its review of the accident, including tiered recommendations for future regulatory action by the NRC to be taken in the near and longer term. The Task Force’s report concluded that nuclear reactors in the United States are operating safely and do not present an imminent risk to public health and safety. The NRC and its staff have issued orders and implementation guidance for commercial reactor licensees operating in the United States. The NRC and its staff are continuing to evaluate additional requirements. Generation has assessed the impacts of the Tier 1 orders and information requests and will continue monitoring the additional recommendations under review by the NRC staff, both from an operational and a financial impact standpoint. A comprehensive review of the NRC Tier 1 orders and information requests, as well as preliminary engineering assumptions and analysis, indicate that the financial impact of compliance for the period from 2014 through 2018 is expected to be between approximately $500 million and $525 million of capital (including approximately $150 million for the CENG plants) and $75 million of operating expense (including approximately $25 million for the CENG plants). As Generation completes the design and installation planning for its actions, Generation will update these estimates. Further, Generation estimates incremental costs of $15 to $20 million per unit at thirteen Mark 1 and II units (including two CENG units) for the installation of filtered vents, if ultimately required by the NRC. Generation’s current assessments are specific to the Tier 1 recommendations as the NRC has not taken specific action with respect to the Tier 2 and Tier 3 recommendations. Exelon and Generation are unable to conclude at this time to what extent any actions to comply with the requirements of Tier 2 and Tier 3 will impact their future financial position, results of operations, and cash flows. Generation will continue to engage in nuclear industry assessments and actions and stakeholder input. See Item 1A. Risk Factors and Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations — Executive Overview of the Exelon 2013 Form 10-K, for additional information.

Financial Reform Legislation.    The Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) was enacted in July 2010. Although the Dodd-Frank Act is focused primarily on the regulation and oversight of financial institutions, it also provides for a new regulatory regime for over-the-counter swaps (Swaps), including mandatory clearing for certain categories of Swaps, incentives to shift swap activity to exchange trading, margin and capital requirements, and other obligations designed to promote transparency. The Dodd-Frank Act, however, also preserves the ability of end users in the energy industry to hedge their risks without being subject to mandatory clearing. Exelon is conducting its commercial business in a manner that does not require registration as a swap dealer or major swap participant. There are additional rulemakings that have

 

172


Table of Contents

not yet been issued, however, including the capital and margin rules, which will potentially have an impact on the Registrants’ business. Depending on the substance of these final rules, the Registrants could be subject to additional new obligations.

In particular, the proposed regulations addressing collateral and capital requirements and exchange margin cash postings, when final, could require Generation to have increased collateral requirements or cash postings. Exelon had previously estimated that it could be required to make up to $1 billion of additional collateral postings under its bilateral credit lines.

Nonetheless, given that Generation is not a swap dealer or major swap participant and the majority of its wholesale portfolio is not comprised of Swaps, the actual amount of additional collateral postings that might be required as a direct result of Dodd-Frank could be lower than Exelon’s previous expectations. The actual level of collateral required at any time will depend also on many other factors, including but not limited to market conditions, the extent of its trading activity in Swaps, and Generation’s credit ratings. In addition, there will be minimal incremental costs associated with Generation’s positions that are currently cleared and subject to exchange margin. Finally, as an end-user, Generation will not be subject to any of the proposed capital requirements that will apply to swap dealers and major swap participants.

Nonetheless, to the extent collateral costs increase as a result of the Dodd-Frank Act, Generation has adequate credit facilities and flexibility in its hedging program to meet any increase, including an increase of $1 billion.

Exelon and Generation continue to monitor the rulemaking procedures and cannot predict the ultimate outcome that the financial reform legislation will have on their results of operations, cash flows or financial position.

ComEd, PECO and BGE could also be subject to some additional Dodd-Frank Act requirements to the extent they were to enter into Swap transactions. However, at this time, management of ComEd, PECO and BGE continue to expect that their companies will not be materially affected by this legislation.

Energy Infrastructure Modernization Act.    Since 2011, ComEd’s distribution rates are established through a performance-based rate formula, pursuant to EIMA. Participating utilities are required to file an annual update to the performance-based formula rate tariff on or before May 1, with resulting rates effective in January of the following year. This annual formula rate update is based on prior year actual costs and current year projected capital additions. The update also reconciles any differences between the revenue requirement(s) in effect for the prior year and actual costs incurred for that year. In addition, ComEd’s earned rate of return on common equity is required to be within plus or minus 50 basis points (“the collar”) of the target rate of return determined as the annual average rate on 30-year treasury notes plus 580 basis points. Therefore, the collar limits favorable and unfavorable impacts of weather and load on distribution revenue. Throughout each year, ComEd records regulatory assets or regulatory liabilities and corresponding increases or decreases to operating revenues for any differences between the revenue requirement(s) in effect and ComEd’s best estimate of the revenue requirement expected to be approved by the ICC for that year’s reconciliation.

Formula Rate Tariff and Annual Reconciliation.    On April 16, 2014, ComEd filed its annual distribution formula rate update with the ICC. The filing establishes the revenue requirement used to set the rates that will take effect in January 2015 after the ICC’s review and approval, which is due by December 2014. The revenue requirement requested is based on 2013 actual costs plus projected 2014 capital additions as well as an annual reconciliation of the revenue requirement in effect in 2013 to the actual costs incurred that year. ComEd’s 2014 filing request includes a total increase to the net revenue requirement of $269 million, reflecting an increase of $174 million for the initial revenue requirement for 2014 and an increase of $95 million related to the annual reconciliation for 2013. The revenue requirement for 2014 provides for a weighted average debt and equity return on distribution rate base of 7.06% inclusive of an allowed return on common equity of 9.25%, reflecting the average rate on 30-year treasury notes plus 580 basis points. The annual reconciliation for 2013 provided for a

 

173


Table of Contents

weighted average debt and equity return on distribution rate base of 7.04% inclusive of an allowed return on common equity of 9.20%, reflecting the average rate on 30-year treasury notes plus 580 basis points less a performance metrics penalty of 5 basis points.

FERC Ameren Order.    In July 2012, FERC issued an order to Ameren Corporation (Ameren) finding that Ameren had improperly included acquisition premiums/ goodwill in its transmission formula rate, particularly in its capital structure and in the application of AFUDC. FERC also directed Ameren to make refunds for the implied increase in rates in prior years. Ameren filed for rehearing of the July 2012 order, which was denied in June 2014. FERC and Ameren are in the process of determining the amount of any potential refund. ComEd believes that the FERC order authorizing its transmission formula rate is distinguishable from the circumstances that led to the July 2012 FERC order in the Ameren case. However, if ComEd were required to exclude acquisition premiums/ goodwill from its transmission formula rate, the impact could be material to ComEd’s results of operations and cash flows.

FERC Order No. 1000 Compliance (ComEd, PECO and BGE).    In FERC Order No. 1000, the FERC required public utility transmission providers to enhance their transmission planning procedures and their cost allocation methods applicable to certain new regional and interregional transmission projects. As part of the changes to the transmission planning procedures, the FERC required removal from all FERC-approved tariffs and agreements of a right of first refusal to build certain new transmission facilities. In compliance with the regional transmission planning requirements of Order No. 1000, PJM as the transmission provider submitted a compliance filing to FERC on October 25, 2012. On the same day, certain of the PJM transmission owners, including ComEd, PECO and BGE (collectively, the PJM Transmission Owners), submitted a filing asserting that their contractual rights embodied in the PJM governing documents continue to justify their right of first refusal to construct new reliability (and related) transmission projects and that the FERC should not be allowed to override such rights absent a showing that it is in the public interest to do so under the FERC’s “Mobile-Sierra” standard of review. This is a heightened standard of review which the PJM Transmission Owners argued could not be satisfied based on the facts applicable to them. On March 22, 2013, FERC issued an order on the PJM Compliance Filing and the filing of these PJM Transmission Owners (1) rejecting the arguments of those PJM Transmission Owners that changes to the PJM governing documents were entitled to review under the Mobile-Sierra standard, (2) accepting most of the PJM filing, removing the right-of-first refusal from the PJM tariffs, and (3) directing PJM to remove certain exceptions that it included in its compliance filing that FERC found did not comply with Order No. 1000. FERC’s order could enable third parties to seek to build certain regional transmission projects that had previously been reserved for the PJM Transmission Owners, potentially reducing ComEd’s, PECO’s and BGE’s financial return on new investments in energy transmission facilities. Numerous parties sought rehearing of the FERC’s March 22, 2013 order, including the PJM Transmission Owners who sought rehearing of the FERC’s rejection of their Mobile-Sierra and related arguments. PJM’s compliance filing was made on July 22, 2013. On May 15, 2014, FERC denied the rehearing requests except with respect to one issue on when PJM could consider state and local laws in evaluating projects. FERC generally accepted the July 22, 2013, Compliance Filing but required several minor additional changes. FirstEnergy and at least one other party filed an appeal of the May 15, 2014, Order upholding PJM’s right of first refusal language in the DC Circuit. Exelon has intervened in the FirstEnergy appeal. Several parties have filed requests for rehearing or clarification concerning the changes set forth in the May 15, 2014, Order.

FERC Transmission Complaint.    On February 27, 2013, consumer advocates and regulators from the District of Columbia, New Jersey, Delaware and Maryland, and the Delaware Electric Municipal Cooperatives (the parties), filed a complaint at FERC against BGE and the PHI companies relating to their respective transmission formula rates. BGE’s formula rate includes a 10.8% base rate of return on common equity (ROE) for most investments included in its rate base and 11.3% for the remaining transmission investment (the latter of which is conditioned upon crediting the first 50 basis points of any incentive ROE adders). The parties seek a reduction in the base return on equity to 8.7% and changes to the formula rate process. FERC docketed the matter and set April 3, 2013 as the deadline for interventions, protests and answers. Under FERC rules, the revenues subject to refund are limited to a fifteen month period, and the earliest date from which the base return on equity

 

174


Table of Contents

could be adjusted and refunds required is the date of the complaint. On March 19, 2013, BGE filed a motion to dismiss or sever the complaint. On June 19, 2014, FERC issued an order in another case involving New England Transmission Owners (NETOs), changing its methodology to determine ROE rates for public utilities. The result was a reduction in the ROE from 11.14% to 10.57% for the NETOs, with a possible further adjustment in either direction based on additional paper hearing submissions. On July 21, 2014, the NETOs filed a Request for Rehearing and Clarification with FERC of the June 19, 2014 order. Among other things, the NETOs request on rehearing that the 11.14% is reasonable based on the new methodology. As of June 30, 2014, BGE believes it is probable that BGE’s base ROE rate will be subject to the revised methodology and may result in a potential refund to customers of transmission revenue for a maximum fifteen month period. In evaluating FERC’s revised methodology, management believes it is reasonably possible no refunds will be required for BGE, and as such, no refund liability has been recorded as of June 30, 2014. If FERC were to order a reduction of BGE’s base return on equity to 8.7% (while retaining the 50 basis points of any incentives that were credited to the base return on equity for certain new transmission investment), the result would be a refund to customers of approximately $13 million, as well as estimated ongoing annual reduction in revenues of approximately $10 million. See Note 5 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements for additional information.

The Maryland Strategic Infrastructure Development and Enhancement Program.    In February 2013, the Maryland General Assembly passed legislation intended to accelerate gas infrastructure replacements in Maryland by establishing a mechanism for gas companies to promptly recover reasonable and prudent costs of eligible infrastructure replacement projects separate from base rate proceedings. Under the new law, following a proceeding before the MDPSC and with the MDPSC’s approval of the eligible infrastructure replacement projects along with a corresponding surcharge, BGE could begin charging gas customers a monthly surcharge for infrastructure costs incurred after June 1, 2013. On August 2, 2013, BGE filed its infrastructure replacement plan and associated surcharge. On March 26, 2014, the MDPSC approved as filed BGE’s proposed 2014 project list, tariff and associated surcharge amounts, with a surcharge becoming effective April 1, 2014. In February 2014, the residential consumer advocate in Maryland filed an appeal with the Baltimore City Circuit Court to the decision issued by the MDPSC on BGE’s infrastructure replacement plan. The residential consumer advocate filed its related legal memorandum on July 7, 2014, claiming that the MDPSC did not apply the appropriate consideration in approving BGE’s infrastructure replacement plan and associated surcharge. BGE has until August 7, 2014 to submit a response, and a hearing has been scheduled for September 5, 2014. BGE cannot predict the outcome of this appeal. See Note 5 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements for additional information.

Employees

IBEW Local 15’s collective bargaining agreements (CBAs) were set to expire in 2013 but were extended by agreement to February 28, 2014. A tentative agreement was reached prior to the expiration and on March 31, 2014, two CBA’s with IBEW Local 15 (which represents approximately 5,250 of Exelon’s employees) were ratified. The CBA’s, one with ComEd and BSC and the other with Generation, extend through September 30, 2019 and April  30, 2019, respectively.

Critical Accounting Policies and Estimates

Management of each of the Registrants makes a number of significant estimates, assumptions and judgments in the preparation of its financial statements. See “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Critical Accounting Policies and Estimates” in the Exelon’s, Generation’s, ComEd’s, PECO’s and BGE’s combined 2013 Form 10-K for a discussion of the estimates and judgments necessary in the Registrants’ accounting for AROs, purchase accounting, asset impairments, depreciable lives of property, plant and equipment, defined benefit pension and other postretirement benefits, regulatory accounting, derivative instruments, taxation, contingencies and revenue recognition. At June 30, 2014, the Registrants’ critical accounting policies and estimates had not changed significantly from December 31, 2013.

 

175


Table of Contents

Results of Operations

Net Income Attributable to Common Shareholders by Registrant

 

     Three Months Ended
June 30,
     Favorable
(Unfavorable)
Variance
    Six Months Ended
June 30,
     Favorable
(Unfavorable)
Variance
 
         2014              2013                2014              2013         

Exelon

   $ 522      $ 490      $ 32     $ 612      $ 486      $ 126  

Generation

     340        330        10       155        311         (156

ComEd

     111        96        15       209        14        195  

PECO

     84        72        12       173        193         (20

BGE

     16        22         (6     100        100         

Results of Operations — Generation

 

    Three Months Ended
June 30,
    Favorable
(Unfavorable)

Variance
    Six Months Ended
June 30,
    Favorable
(Unfavorable)

Variance
 
         2014(a)             2013                2014(a)             2013        

Operating revenues

  $ 3,789     $ 4,070     $ (281   $ 8,179     $ 7,603     $ 576  

Purchased power and fuel expense

    1,835       1,946       111       5,191       4,114       (1,077
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Revenue net of purchased power and fuel(b)

    1,954       2,124       (170     2,988       3,489       (501

Other operating expenses

           

Operating and maintenance

    1,413       1,189       (224     2,499       2,302       (197

Depreciation and amortization

    254       210       (44     466       424       (42

Taxes other than income

    118       101       (17     223       194       (29
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other operating expenses

    1,785       1,500       (285     3,188       2,920       (268
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Equity in losses of unconsolidated affiliates

    (1     (21     20       (20     (30     10  

Gain on consolidation of CENG

    261             261       261             261  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

    429       603       (174     41       539       (498
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

           

Interest expense

    (86     (93     7       (172     (176     4  

Other, net

    228       (33     261       318       95       223  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

    142       (126     268       146       (81     227  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income before income taxes

    571       477       94       187       458       (271

Income taxes (benefit)

    199       149       (50     (1     148       149  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income

    372       328       44       188       310       (122

Net income (loss) attributable to noncontrolling interests

    32       (2     (34     33       (1     (34
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income attributable to membership interest

  $ 340     $ 330     $ 10     $ 155     $ 311     $ (156
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Includes the operations of CENG from April 1, 2014, through June 30, 2014.

(b)

Generation evaluates its operating performance using the measure of revenue net of purchased power and fuel expense. Generation believes that revenue net of purchased power and fuel expense is a useful measurement because it provides information that can be used to evaluate its operational performance. Revenue net of purchased power and fuel expense is not a presentation defined under GAAP and may not be comparable to other companies’ presentations or deemed more useful than the GAAP information provided elsewhere in this report.

 

176


Table of Contents

Net Income Attributable to Membership Interest

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    Generation’s net income attributable to membership interest for the three months ended June 30, 2014 increased compared to the same period in 2013 primarily due to the gain recognized as a result of the consolidation of CENG, and the increase in other income; partially offset by decreased revenue net of purchased power and fuel, increased operating and maintenance expense and increased depreciation and amortization expense. The decrease in revenue net of purchased power and fuel primarily relates to mark-to-market losses from economic hedging activities, lower realized energy prices, and, excluding CENG, generation volumes were lower, partially offset by the consolidation of CENG, higher capacity revenues, and a decrease in amortization expense for the acquired energy contracts recorded at fair value at the merger date with Constellation and consolidation of CENG. The increase in operating and maintenance expense is primarily related to the inclusion of CENG’s results for a full quarter in 2014, and an increase in planned nuclear refueling outage days in 2014. The increase in other, net is primarily due to an increase in realized NDT fund gains.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    Generation’s net income attributable to membership interest for the six months ended June 30, 2014 decreased compared to the same period in 2013 primarily due to decreased revenue net of purchased power and fuel expense, and increased operating and maintenance expense; partially offset by the gain recognized as a result of the consolidation of CENG and an increase in other operating income. The decrease in revenue net of purchased power and fuel primarily relates to mark-to-market losses from economic hedging activities, lower realized energy prices, higher procurement costs for replacement power, increased fossil fuel expense due to extreme cold weather during the first quarter of 2014 and, excluding CENG, generation volumes were lower, partially offset by the consolidation of CENG, higher capacity revenues, and a decrease in amortization expense for the acquired energy contracts recorded at fair value at the merger date with Constellation and consolidation of CENG. The increase in operating and maintenance expense is primarily related to the inclusion of CENG’s results for a full quarter in 2014, and an increase in planned nuclear refueling outage days in 2014. The increase in other, net income is primarily due to an increase in realized NDT fund gains.

Revenue Net of Purchased Power and Fuel Expense

The foundation of Generation’s six reportable segments is based on the geographic location of its assets, and are largely representative of the footprints of an ISO / RTO and/or NERC region. Descriptions of each of Generation’s six reportable segments are as follows:

 

   

Mid-Atlantic represents operations in the eastern half of PJM, which includes Pennsylvania, New Jersey, Maryland, Virginia, West Virginia, Delaware, the District of Columbia and parts of North Carolina.

 

   

Midwest represents operations in the western half of PJM, which includes portions of Illinois, Indiana, Ohio, Michigan, Kentucky and Tennessee, and the United States footprint of MISO excluding MISO’s Southern Region, which covers all or most of North Dakota, South Dakota, Nebraska, Minnesota, Iowa, Wisconsin, the remaining parts of Illinois, Indiana, Michigan and Ohio not covered by PJM, and parts of Montana, Missouri and Kentucky.

 

   

New England represents the operations within ISO-NE covering the states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island and Vermont.

 

   

New York represents operations within New York ISO, which covers the state of New York in its entirety.

 

   

ERCOT represents operations within Electric Reliability Council of Texas, covering most of the state of Texas.

 

   

Other Regions not considered individually significant:

 

177


Table of Contents
   

South represents operations in the FRCC, MISO’s Southern Region, and the remaining portions of the SERC not included within MISO or PJM, which includes all or most of Florida, Arkansas, Louisiana, Mississippi, Alabama, Georgia, Tennessee, North Carolina, South Carolina and parts of Missouri, Kentucky and Texas. Generation’s South region also includes operations in the SPP, covering Kansas, Oklahoma, most of Nebraska and parts of New Mexico, Texas, Louisiana, Missouri, Mississippi and Arkansas.

 

   

West represents operations in the WECC, which includes California ISO, and covers the states of California, Oregon, Washington, Arizona, Nevada, Utah, Idaho, Colorado, and parts of New Mexico, Wyoming and South Dakota.

 

   

Canada represents operations across the entire country of Canada and includes the AESO, OIESO and the Canadian portion of MISO.

The following business activities are not allocated to a region, and are reported under Other: retail and wholesale gas, investments in natural gas exploration and production activities, proprietary trading, energy efficiency and demand response, heating, cooling, and cogeneration facilities, and home improvements, sales of electric and gas appliances, servicing of heating, air conditioning, plumbing, electrical, and indoor quality systems and investments in energy-related proprietary technology. Further, the following activities are not allocated to a region, and are reported in Other: unrealized mark-to-market impact of economic hedging activities; amortization of certain intangible assets relating to commodity contracts recorded at fair value as a result of the merger with Constellation and the consolidation of CENG; and other miscellaneous revenues.

Generation evaluates the operating performance of its power marketing activities using the measure of revenue net of purchased power and fuel expense which is a non-GAAP measurement. Generation’s operating revenues include all sales to third parties and affiliated sales to ComEd, PECO and BGE. Purchased power costs include all costs associated with the procurement and supply of electricity including capacity, energy and ancillary services. Fuel expense includes the fuel costs for internally generated energy and fuel costs associated with tolling agreements.

For the three and six months ended June 30, 2014 and 2013, Generation’s revenue net of purchased power and fuel expense by region were as follows:

 

     Three Months Ended
June 30,
              
          2014(a)             2013          Variance     % Change  

Mid-Atlantic(b)

   $ 920     $ 768      $ 152       19.8 %

Midwest(c)

     605       684        (79     (11.5 %) 

New England

     64       50        14       28.0 %

New York

     148       14        134       n.m.   

ERCOT

     59       112        (53     (47.3 %) 

Other Regions(d)

     75       59        16       27.1 %
  

 

 

   

 

 

    

 

 

   

 

 

 

Total electric revenue net of purchased power and fuel expense

     1,871       1,687        184       10.9 %

Proprietary Trading

     7       3        4       n.m.   

Mark-to-market gains (losses)

     (14     428        (442     (103.3 %) 

Other(e)

     90       6        84       n.m.   
  

 

 

   

 

 

    

 

 

   

 

 

 

Total revenue net of purchased power and fuel expense

   $ 1,954     $ 2,124      $ (170     (8.0 %) 
  

 

 

   

 

 

    

 

 

   

 

 

 

 

178


Table of Contents
     Six Months Ended
June 30,
             
          2014(a)             2013         Variance     % Change  

Mid-Atlantic(b)

   $ 1,615     $ 1,612     $ 3       0.2 %

Midwest(c)

     1,161       1,401       (240     (17.1 %) 

New England

     200       80       120       n.m.   

New York

     127       (8     135       n.m.   

ERCOT

     142       213       (71     (33.3 %) 

Other Regions(d)

     180       105       75       71.4 %
  

 

 

   

 

 

   

 

 

   

 

 

 

Total electric revenue net of purchased power and fuel expense

     3,425       3,403       22       0.6 %

Proprietary Trading

     20       12       8       66.7 %

Mark-to-market gains (losses)

     (744     25       (769     n.m.   

Other(e)

     287       49       238       n.m.   
  

 

 

   

 

 

   

 

 

   

 

 

 

Total revenue net of purchased power and fuel expense

   $ 2,988     $ 3,489     $ (501     (14.4 %) 
  

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Includes the operations of CENG from April 1, 2014, through June 30, 2014

(b)

Results of transactions with PECO and BGE are included in the Mid-Atlantic region.

(c)

Results of transactions with ComEd are included in the Midwest region.

(d)

Other Regions includes South, West and Canada, which are not considered individually significant.

(e)

Other represents activities not allocated to a region. See text above for a description of included activities. Also includes amortization of intangible assets related to commodity contracts recorded at fair value at the date of the merger with Constellation and the consolidation of CENG in purchase accounting of $50 million and $92 million pre-tax for the three and six months ended June 30, 2014, and $167 million and $341 million pre-tax for the three and six months ended June 30, 2013.

 

179


Table of Contents

Generation’s supply sources by region are summarized below:

 

     Three Months Ended
June 30,
              

Supply source (GWh)

       2014              2013          Variance     % Change  

Nuclear generation

          

Mid-Atlantic(a)

     14,912        11,794        3,118       26.4 %

Midwest

     22,719        22,807        (88     (0.4 %) 

New York(a)

     3,766               3,766       n.m.   
  

 

 

    

 

 

    

 

 

   

 

 

 

Total nuclear generation

     41,397        34,601        6,796       19.6 %

Fossil and renewables(a)

          

Mid-Atlantic

     3,165        2,796        369       13.2 %

Midwest

     319        318        1       0.3 %

New England

     1,299        3,132        (1,833     (58.5 %) 

New York

     1               1       n.m.   

ERCOT

     1,553        1,617        (64     (4.0 %) 

Other Regions(c)

     2,041        1,431        610       42.6 %
  

 

 

    

 

 

    

 

 

   

 

 

 

Total fossil and renewables

     8,378        9,294        (916     (9.9 %) 

Purchased power

          

Mid-Atlantic(b)

     810        2,616        (1,806     (69.0 %) 

Midwest

     520        1,503        (983     (65.4 %) 

New England

     2,290        1,365        925       67.8 %

New York(b)

            3,073        (3,073     (100.0 %) 

ERCOT

     2,518        4,269        (1,751     (41.0 %) 

Other Regions(c)

     3,654        4,998        (1,344     (26.9 %) 
  

 

 

    

 

 

    

 

 

   

 

 

 

Total purchased power

     9,792        17,824        (8,032     (45.1 %) 

Total supply/sales by region(d)

          

Mid-Atlantic(e)

     18,887        17,206        1,681       9.8 %

Midwest(e)

     23,558        24,628        (1,070     (4.3 %) 

New England

     3,589        4,497        (908     (20.2 %) 

New York

     3,767        3,073        694       22.6 %

ERCOT

     4,071        5,886        (1,815     (30.8 %) 

Other Regions(c)

     5,695        6,429        (734     (11.4 %) 
  

 

 

    

 

 

    

 

 

   

 

 

 

Total supply/sales by region

     59,567        61,719        (2,152     (3.5 %) 
  

 

 

    

 

 

    

 

 

   

 

 

 

 

180


Table of Contents
     Six Months Ended
June 30,
              

Supply source (GWh)

       2014              2013          Variance     % Change  

Nuclear generation

          

Mid-Atlantic(a)

     27,048        24,556        2,492       10.1 %

Midwest

     45,844        46,076        (232     (0.5 %) 

New York(a)

     3,766               3,766       n.m.   
  

 

 

    

 

 

    

 

 

   

 

 

 

Total nuclear generation

     76,658        70,632        6,026       8.5 %

Fossil and renewables(a)

          

Mid-Atlantic

     6,373        5,956        417       7.0 %

Midwest

     736        899        (163     (18.1 %) 

New England

     3,033        5,524        (2,491     (45.1 %) 

New York

     2               2       n.m.   

ERCOT

     3,208        2,350        858       36.5 %

Other Regions(c)

     3,670        3,685        (15     (0.4 %) 
  

 

 

    

 

 

    

 

 

   

 

 

 

Total fossil and renewables

     17,022        18,414        (1,392     (7.6 %) 

Purchased power

          

Mid-Atlantic(b)

     4,043        5,849        (1,806     (30.9 %) 

Midwest

     1,231        3,203        (1,972     (61.6 %) 

New England

     4,360        2,872        1,488       51.8 %

New York(b)

     2,857        6,584        (3,727     (56.6 %) 

ERCOT

     5,958        8,468        (2,510     (29.6 %) 

Other Regions(c)

     7,009        8,701        (1,692     (19.4 %) 
  

 

 

    

 

 

    

 

 

   

 

 

 

Total purchased power

     25,458        35,677        (10,219     (28.6 %) 

Total supply/sales by region(d)

          

Mid-Atlantic(e)

     37,464        36,361        1,103       3.0 %

Midwest(e)

     47,811        50,178        (2,367     (4.7 %) 

New England

     7,393        8,396        (1,003     (11.9 %) 

New York

     6,625        6,584        41       0.6 %

ERCOT

     9,166        10,818        (1,652     (15.3 %) 

Other Regions(c)

     10,679        12,386        (1,707     (13.8 %) 
  

 

 

    

 

 

    

 

 

   

 

 

 

Total supply/sales by region

     119,138        124,723        (5,585     (4.5 %) 
  

 

 

    

 

 

    

 

 

   

 

 

 

 

(a)

Includes the proportionate share of output where Generation has an undivided ownership interest in jointly-owned generating plants and includes the total output of plants that are fully consolidated (e.g. CENG). Nuclear generation for the three months and six months ended June 30, 2014 includes physical volumes of 3,780 GWh in Mid-Atlantic and 3,766 GWh in New York for CENG.

(b)

Purchased power for the three months and six months ended June 30, 2014 includes physical volumes of 0 GWh and 2,489 GWh in the Mid-Atlantic and 0 GWh and 2,857 GWh in New York as a result of the PPA with CENG. Purchased power for the three months and six months ended June 30, 2013 includes physical volumes of 3,114 GWh and 5,702 GWh in the Mid-Atlantic and 2,655 GWh and 5,868 GWh in New York as a result of the PPA with CENG. As of the integration date of April 1, 2014, CENG volumes are included in nuclear generation.

(c)

Other Regions includes South, West and Canada, which are not considered individually significant.

(d)

Excludes physical proprietary trading volumes of 2,629 GWh and 1,995 GWh for the three months ended June 30, 2014 and 2013, respectively, and 5,123 GWh and 3,567 GWh for the six months ended June 30, 2014 and 2013, respectively.

(e)

Includes affiliate sales to PECO and BGE in the Mid-Atlantic region and affiliate sales to ComEd in the Midwest region.

Mid-Atlantic

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    The $152 million increase in revenue net of purchased power and fuel expense in the Mid-Atlantic was primarily due to the consolidation of CENG, higher capacity revenues, and the cancellation of the DOE spent nuclear fuel disposal fee, partially offset by lower realized energy prices and lower generation volumes, excluding CENG.

 

181


Table of Contents

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    The $3 million increase in revenue net of purchased power and fuel expense in the Mid-Atlantic was primarily due to the consolidation of CENG, higher capacity revenues, and the cancellation of the DOE spent nuclear fuel disposal fees, partially offset by lower realized energy prices, higher procurement costs for replacement power, an increase in generation fuel prices, and lower generation volumes, excluding CENG.

Midwest

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    The $79 million decrease in revenue net of purchased power and fuel expense in the Midwest was primarily due to lower realized energy prices, partially offset by increased capacity revenue and the cancellation of the DOE spent nuclear fuel disposal fee.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    The $240 million decrease in revenue net of purchased power and fuel expense in the Midwest was primarily due to lower realized energy prices, partially offset by increased capacity revenue and the cancellation of the DOE spent nuclear fuel disposal fee.

New England

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    The $14 million increase in revenue net of purchased power and fuel expense in New England was primarily due to higher realized energy prices and favorable impacts from the restructuring of a fuel supply contract, partially offset by lower generation volume.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    The $120 million increase in revenue net of purchased power and fuel expense in New England was driven by higher realized energy prices and favorable impacts from the restructuring of a fuel supply contract, partially offset by lower generation volume.

New York

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    The $134 million increase in revenue net of purchased power and fuel expense in New York was primarily due to the consolidation of CENG.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    The $135 million increase in revenue net of purchased power and fuel expense in New York was primarily due to the consolidation of CENG.

ERCOT

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    The $53 million decrease in revenue net of purchased power and fuel expense in ERCOT was primarily due to higher procurement costs for replacement power and the termination of an energy supply contract with a retail power supply company that was previously a consolidated variable interest entity. As a result of the termination, Generation no longer has a variable interest in the retail supply company and ceased consolidation of the entity during the third quarter of 2013.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    The $71 million decrease in revenue net of purchased power and fuel expense in ERCOT was primarily due to increased generation fuel costs, higher procurement costs for replacement power in the second quarter of 2014, and the termination of an energy supply contract with a retail power supply company that was previously a consolidated variable interest

 

182


Table of Contents

entity. As a result of the termination, Generation no longer has a variable interest in the retail supply company and ceased consolidation of the entity during the third quarter of 2013. The decreases were partially offset by higher realized energy prices and higher generation volume in the first quarter of 2014.

Other Regions

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    The $16 million increase in revenue net of purchased power and fuel expense in Other Regions was primarily due to higher generation volumes and higher realized energy prices, partially offset by increased generation fuel costs.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    The $75 million increase in revenue net of purchased power and fuel expense in Other Regions was primarily due to higher realized energy prices, partially offset by increased generation fuel costs.

Mark-to-market

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    Generation is exposed to market risks associated with changes in commodity prices and enters into economic hedges to mitigate exposure to these fluctuations. Mark-to-market losses on economic hedging activities were $14 million for the three months ended June 30, 2014 compared to gains of $428 million for the three months ended June 30, 2013. See Notes 8 – Fair Value of Financial Assets and Liabilities and 9 — Derivative Financial Instruments of the Combined Notes to the Consolidated Financial Statements for information on gains and losses associated with mark-to-market derivatives.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    Generation is exposed to market risks associated with changes in commodity prices and enters into economic hedges to mitigate exposure to these fluctuations. Mark-to-market losses on economic hedging activities were $744 million for the six months ended June 30, 2014 compared to gains of $25 million for the six months ended June 30, 2013. See Notes 8 — Fair Value of Financial Assets and Liabilities and 9 — Derivative Financial Instruments of the Combined Notes to the Consolidated Financial Statements for information on gains and losses associated with mark-to-market derivatives.

Other

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    The $84 million increase in other revenue net of purchased power and fuel expense was driven by the reduction of amortization of the acquired energy contracts recorded at the date of merger with Constellation and the consolidation of CENG.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    The $238 million increase in other revenue net of purchased power and fuel was driven by the reduction of amortization of the acquired energy contracts recorded at fair value at the date of merger with Constellation and the consolidation of CENG.

Nuclear Fleet Capacity Factor and Production Costs

The following table presents nuclear fleet operating data for the three and six months ended June 30, 2014 as compared to the same periods in June 30, 2013, for the Generation-operated plants. The nuclear fleet capacity factor presented in the table is defined as the ratio of the actual output of a plant over a period of time to its output if the plant had operated at full average annual mean capacity for that time period. Nuclear fleet production cost is defined as the costs to produce one MWh of energy, including fuel, materials, labor, contracting and other miscellaneous costs, but excludes depreciation and certain other non-production related overhead costs. Generation considers capacity factor and production costs useful measures comparatively to analyze the nuclear fleet performance between periods. Generation has included the analysis below as a

 

183


Table of Contents

complement to the financial information provided in accordance with GAAP. However, these measures are not a presentation defined under GAAP and may not be comparable to other companies’ presentations or be more useful than the GAAP information provided elsewhere in this report.

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
         2014           2013       2014     2013  

Nuclear fleet capacity factor(a)

     91.8     92.8     92.9     94.6

Nuclear fleet production cost per MWh(a)

   $ 20.31     $ 18.86     $ 20.50     $ 19.27  

 

(a)

Excludes Salem, which is operated by PSEG Nuclear, LLC. Reflects ownership percentage of stations operated by Exelon. As of April 1, 2014, CENG is included.

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    The nuclear fleet capacity factor decreased primarily due to the inclusion of the ownership share of CENG. In addition, there were more refueling and non-refueling outage days, excluding Salem outages, during the three months ended June 30, 2014 compared to the same period in 2013. For the three months ended June 30, 2014 and 2013, non-refueling outage days totaled 44 and 31, respectively. During the same periods, refueling outage days totaled 108 and 47, respectively. Inclusion of the ownership share of CENG resulted in higher production costs per MWh for the three months ended June 30, 2014 as compared to the same period in June 30, 2013.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    The nuclear fleet capacity factor decreased primarily due to the inclusion of the ownership share of CENG. In addition, there were more refueling and non-refueling outage days, excluding Salem outages, during the six months ended June 30, 2014 compared to the same period in 2013. For the six months ended June 30, 2014 and 2013, non-refueling outage days totaled 64 and 37, respectively. During the same periods, refueling outage days totaled 160 and 96, respectively. Inclusion of the ownership share of CENG resulted in higher production costs per MWh for the six months ended June 30, 2014 as compared to the same period in June 30, 2013.

Operating and Maintenance Expense

The changes in operating and maintenance expense for the three and six months ended June 30, 2014 compared to the same period in 2013, consisted of the following:

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
     Increase
(Decrease)(a)
    Increase
(Decrease)(a)
 

Labor, other benefits, contracting, materials

   $ 126      $ 121   

Impairment of certain wind generating assets(b)

     86       86  

Nuclear refueling outage costs, including the co-owned Salem plants(c)

     61        75   

Accretion expense

     25       28  

Regulatory fees and assessment

     20       17  

Increase in asbestos reserve

     16       16  

Nuclear uprate project cancellation(d)

     (92     (113

Pension and non-pension postretirement benefits expense

     (31     (40

Merger and integration cots

     (5     (12

Other

     18       19  
  

 

 

   

 

 

 

Increase in operating and maintenance expense

   $ 224     $ 197  
  

 

 

   

 

 

 

 

(a)

Includes the operations of CENG, from April 1, 2014 through June 30, 2014.

(b)

Reflects the impact of the charge to earnings related to the impairment of certain wind generating assets.

(c)

Reflects the impact of increased planned refueling outage days in 2014.

(d)

Reflects the impact of the 2013 cancellation of previously capitalized nuclear uprate projects.

 

184


Table of Contents

Depreciation and Amortization

The increase in depreciation and amortization expense for the three and six months ended June 30, 2014 compared to the three and six months ended June 30, 2013 was primarily due the inclusion of CENG’s results for a full quarter in 2014 and an increase in ongoing capital expenditures.

Taxes Other Than Income

The increase in taxes other than income for the three and six months ended June 30, 2014 as compared to the three and six months ended June 30, 2013 was primarily due to an increase in payroll taxes and real estate taxes.

Equity in Losses of Unconsolidated Affiliates

The favorable increase in Equity in losses of unconsolidated affiliates for the three and six months ended June 30, 2014 as compared to the three and six months ended June 30, 2013 was due to the decrease in non-cash amortization as a result of the second quarter 2013 non-cash amortization of the fair value basis difference recorded at the Constellation merger date, offset by equity in losses in CENG in 2013 which is now consolidated in 2014.

Interest Expense 

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.

Interest expense for three months ended June 30, 2014 compared to same period in 2013 remained relatively level.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.

The decrease in interest expense primarily reflects a benefit recorded in 2014 related to the favorable settlement of certain income tax positions on Constellation’s 2009-2012 tax returns.

Other, Net

The increase in Other, net for the three and six months ended June 30, 2014 compared to the three and six months ended June 30, 2013 primarily reflects the change in the realized and unrealized gains and losses related to the NDT funds of its Non-Regulatory Agreement Units as described in the table below. Other, net also reflects $46 million and $(13) million for the three months ended June 30, 2014 and 2013, respectively, and $66 million and $30 million for the six months ended June 30, 2014 and 2013, respectively, related to the contractual elimination of income tax expense (benefit) associated with the NDT funds of the Regulatory Agreement Units. Refer to Note 12 — for additional information regarding NDT funds.

The following table provides unrealized and realized gains (losses) on the NDT funds of the Non-Regulatory Agreement Units recognized in Other, net for the three and six months ended June 30, 2014 and 2013:

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
     2014(a)      2013     2014(a)      2013  

Net unrealized gains (losses) on decommissioning trust funds

   $ 128      $ (40   $ 141      $ 24  

Net realized gains on sale of decommissioning trust funds

   $ 12      $     $ 25      $ 2  

 

(a)

Includes results of CENG from April 1, 2014 through June 30, 2014.

 

185


Table of Contents

Effective Income Tax Rate

The effective income tax rate was 34.9% and (0.5)% for the three and and six months ended June 30, 2014, respectively, compared to 31.2% and 32.3% for the same periods during 2013. See Note 11 of the Combined Notes to the Consolidated Financial Statements for further discussion of the change in the effective income tax rate.

Results of Operations — ComEd

 

     Three Months Ended
June 30,
    Favorable
(Unfavorable)

Variance
    Six Months Ended
June 30,
    Favorable
(Unfavorable)

Variance
 
        2014          2013         2014     2013    

Operating revenues

   $ 1,128     $ 1,080     $ 48     $ 2,262     $ 2,239     $ 23  

Purchased power expense

     269       248       (21     589       630       41  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Revenue net of purchased power expense(a)

     859       832       27       1,673       1,609       64  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other operating expenses

            

Operating and maintenance

     355       359       4       681       687       6  

Depreciation and amortization

     174       170       (4     347       337       (10

Taxes other than income

     72       71       (1     149       145       (4
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other operating expenses

     601       600       (1     1,177       1,169       (8
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

     258       232       26       496       440       56  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

            

Interest expense, net

     (80     (76     (4     (160     (429     269  

Other, net

     5       6       (1     10       11       (1
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

     (75     (70     (5     (150     (418     268  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income before income taxes

     183       162       21       346       22       324  

Income taxes

     72       66       (6     137       8       (129
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income

   $ 111     $ 96     $ 15     $ 209     $ 14     $ 195  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

ComEd evaluates its operating performance using the measure of revenue net of purchased power expense. ComEd believes that revenue net of purchased power expense is a useful measurement because it provides information that can be used to evaluate its operational performance. In general, ComEd only earns margin based on the delivery and transmission of electricity. ComEd has included its discussion of revenue net of purchased power expense below as a complement to the financial information provided in accordance with GAAP. However, revenue net of purchased power expense is not a presentation defined under GAAP and may not be comparable to other companies’ presentations or deemed more useful than the GAAP information provided elsewhere in this report.

Net Income

Three Months Ended June 30, 2014, Compared to Three Months Ended June 30, 2013.    ComEd’s net income for the three months ended June 30, 2014, was higher than the same period in 2013, primarily due to higher electric distribution revenue resulting from increased capital investment.

Six Months Ended June 30, 2014, Compared to Six Months Ended June 30, 2013.    ComEd’s net income for the six months ended June 30, 2014, was higher than the same period in 2013, primarily due to the interest expense and related income tax effects of the remeasurement of Exelon’s like-kind exchange tax position in the first quarter of 2013, as well as increased distribution revenue resulting from increased capital investment in 2014. See Note 11 — Income Taxes of the Combined Notes to Consolidated Financial Statements for additional information on the like-kind exchange tax position.

 

186


Table of Contents

Operating Revenues Net of Purchased Power Expense

There are certain drivers of revenue that are fully offset by their impact on purchased power expense, such as commodity procurement costs and participation in customer choice programs. ComEd is permitted to recover electricity procurement costs from retail customers without mark-up. Therefore, fluctuations in electricity procurement costs have no impact on revenue net of purchased power expense. See Note 5 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements for additional information on ComEd’s electricity procurement process.

All ComEd customers have the choice to purchase electricity from a competitive electric generation supplier. Customer choice programs do not impact ComEd’s volume of deliveries, but do affect ComEd’s operating revenue related to supplied energy, which is fully offset in purchased power expense. Therefore, customer choice programs have no impact on revenue net of purchased power expense.

The number of retail customers participating in customer choice programs was 2,550,114 and 2,593,064 at June 30, 2014, and 2013, respectively, representing 66% and 68% of total retail customers, respectively. Retail energy purchased from competitive electric generation suppliers represented 81% and 80% of ComEd’s retail kWh sales for the three months and six months ended June 30, 2014, respectively, as compared to 81% and 78% for the three and six months ended June 30, 2013, respectively.

The changes in ComEd’s revenue net of purchased power expense for the three months and six months ended June 30, 2014, compared to the same periods in 2013 consisted of the following:

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
     Increase
(Decrease)
    Increase
(Decrease)
 

Weather

   $ 1     $ 16  

Volume

           6  

Electric distribution revenues

     (1     39  

Transmission revenues

     3       2  

Regulatory required programs

     18       27  

Uncollectible accounts recovery, net

     7       (12

Pricing and customer mix

     14       4  

Revenue subject to refund

     (9     (9

Other

     (6     (9
  

 

 

   

 

 

 

Increase in revenue net of purchased power expense

   $ 27     $ 64  
  

 

 

   

 

 

 

Weather.    The demand for electricity is affected by weather conditions. Very warm weather in summer months and very cold weather in other months are referred to as “favorable weather conditions” because these weather conditions result in increased customer usage. Conversely, mild weather reduces demand. For the three months ended June 30, 2014, weather conditions were relatively consistent with the same period in 2013.

During the six months ended June 30, 2014 compared to the same period in 2013, operating revenues net of purchased power expense were higher due to the impact of favorable 2014 winter weather conditions in ComEd’s service territory.

 

187


Table of Contents

Heating and cooling degree days are quantitative indices that reflect the demand for energy needed to heat or cool a home or business. Normal weather is determined based on historical average heating and cooling degree days for a 30-year period in ComEd’s service territory with cooling degree days generally having a more significant impact to ComEd, particularly during the summer months. The changes in heating and cooling degree days in ComEd’s service territory for the three and six months ended June 30, 2014, and 2013, consisted of the following:

 

                          % Change  

Heating and Cooling Degree-Days

   2014      2013      Normal      From 2013     From Normal  

Three Months Ended June 30,

             

Heating Degree-Days

     695        778        765        (10.7 )%      (9.2 )% 

Cooling Degree-Days

     259        240        218        7.9     18.8

Six Months Ended June 30,

             

Heating Degree-Days

     4,569        4,037        3,929        13.2     16.3

Cooling Degree-Days

     259        240        218        7.9     18.8

Volume.    Revenue net of purchased power expense increased as a result of higher delivery volume, exclusive of the effects of weather, reflecting increased average usage per residential customer as compared to the same six month period in 2013.

Electric Distribution Revenue.    EIMA provides for a performance-based rate formula, which requires an annual reconciliation of the revenue requirement in effect to the actual costs that the ICC determines are prudently and reasonably incurred in a given year. Distribution revenue varies from year to year based on fluctuations in the underlying costs, investments being recovered and other billing determinants. In addition, ComEd’s earned rate of return on common equity is required to be within plus or minus 50 basis points (“the collar”) of the target rate of return determined as the annual average rate on 30-year treasury notes plus 580 basis points. Therefore, the collar limits favorable and unfavorable impacts of weather and load on distribution revenue. During the three months ended June 30, 2014, ComEd recorded decreased electric distribution revenue primarily due to the one-time reduction for decreased expenses associated with OPEB plan design changes, mostly offset by increased costs and capital investment.

During the six months ended June 30, 2014, ComEd recorded increased electric distribution revenue primarily due to increased costs and capital investment, partially offset by the one-time reduction for decreased expenses associated with OPEB plan design changes. See Operating and Maintenance Expense below, and Note 5 — Regulatory Matters and Note 13 — Retirement Benefits of the Combined Notes to Consolidated Financial Statements for additional information on ComEd’s rate formula pursuant to EIMA and the OPEB plan design changes.

Transmission Revenues.    ComEd’s transmission rates are established based on a FERC-approved formula. ComEd’s most recent annual formula rate update, filed in April 2014, reflects 2013 actual costs plus forecasted 2014 capital additions. Transmission revenue net of purchased power expense vary from year to year based upon fluctuations in the underlying costs, investments being recovered and other billing determinants, such as the highest daily peak load from the previous calendar year. See Note 5 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements for additional information.

Regulatory Required Programs.    Revenues related to regulatory required programs represents the recoveries from customers for costs of various legislative and regulatory programs on a full and current basis through approved regulated rates. Programs include ComEd’s energy efficiency and demand response and purchased power administrative costs. An equal and offsetting amount has been reflected in operating and maintenance expense during the periods presented.

 

188


Table of Contents

Uncollectible Accounts Recovery, Net.    Represents recoveries under ComEd’s uncollectible accounts tariff. See the operating and maintenance expense discussion below for additional information on this tariff.

Pricing and Customer Mix.    The increase in revenue net of purchased power as a result of pricing and customer mix is primarily attributable to higher overall effective rates due to decreased usage across all major customer classes and change in customer mix for the three and six months ended June 30, 2014, as compared to the same periods in 2013.

Revenue Subject to Refund.    ComEd records revenues subject to refund based upon its best estimate of customer collections that may be required to be refunded. As of the three and six months ended June 30, 2014 ComEd recorded $9 million of revenue subject to refund.

Other.    Other revenue, which can vary period to period, includes rental revenue, revenue related to late payment charges, revenue from other utilities for mutual assistance programs and recoveries of environmental costs associated with MGP sites, for which an equal and offsetting amount is reflected in depreciation and amortization expense during the periods presented.

Operating and Maintenance Expense

 

     Three Months Ended
June 30,
     Increase
(Decrease)
    Six Months Ended
June 30,
     Increase
(Decrease)
 
         2014              2013                2014              2013         

Operating and maintenance expense — baseline

   $ 281      $ 304      $ (23   $ 559      $ 593      $ (34

Operating and maintenance expense — regulatory required programs(a)

     74        55        19       122        94        28  
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

Total operating and maintenance expense

   $ 355      $ 359      $ (4   $ 681      $ 687      $ (6
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

 

(a)

Operating and maintenance expenses for regulatory required programs are costs for various legislative and/or regulatory programs that are recoverable from customers on a full and current basis through approved regulated rates. An equal and offsetting amount has been reflected in operating revenues.

 

189


Table of Contents

The changes in operating and maintenance expense for the three and six months ended June 30, 2014 compared to the same periods in 2013, consisted of the following:

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
     Increase
(Decrease)
    Increase
(Decrease)
 

Baseline

    

Labor, other benefits, contracting and materials

   $ 4     $ 10  

Pension and non-pension postretirement benefits expense

     (27     (38

Storm-related costs

     (11     (6

Uncollectible accounts expense — provision(a)

     1       2  

Uncollectible accounts expense — recovery, net(a)

     6       (14

Other

     4       12  
  

 

 

   

 

 

 
     (23     (34

Regulatory required programs

    

Energy efficiency and demand response programs

     18       27  

Purchased power administrative costs

     1       1  
  

 

 

   

 

 

 
     19       28  
  

 

 

   

 

 

 

Decrease in operating and maintenance expense

   $ (4   $ (6
  

 

 

   

 

 

 

 

(a)

ComEd is allowed to recover from or refund to customers the difference between the utility’s annual uncollectible accounts expense and the amounts collected in rates annually through a rider mechanism. During the three and six months ended June 30, 2014, ComEd recorded a net increase and reduction, respectively, in operating and maintenance expense related to uncollectible accounts due to the timing of regulatory cost recovery and customers purchasing electricity from competitive electric generation suppliers as a result of municipal aggregation. An equal and offsetting increase and reduction, respectively, has been recognized in operating revenues for the periods presented.

Depreciation and Amortization

Depreciation and amortization expense increased during the three and six months ended June 30, 2014, compared to the same periods in 2013, primarily due to ongoing capital expenditures and increased regulatory asset amortization related to higher MGP remediation expenditures. An equal and offsetting amount for the amortization expense related to the MGP remediation expenditures is reflected in operating revenues during the periods presented.

Taxes Other Than Income

Taxes other than income taxes, which can vary period to period, include municipal and state utility taxes, real estate taxes and payroll taxes. Taxes other than income taxes remained relatively flat for the three and six months ended June 30, 2014, compared to the same periods in 2013.

 

190


Table of Contents

Interest Expense, Net

The changes in interest expense, net for the three and six months ended June 30, 2014, compared to the same period in 2013, consisted of the following:

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
     Increase
(Decrease)
    Increase
(Decrease)
 

Interest expense related to uncertain tax positions(a)

   $      $ 275  

Interest expense on debt (including financing trusts)

     (4     (6
  

 

 

   

 

 

 

Decrease in interest expense, net

   $ (4   $ 269  
  

 

 

   

 

 

 

 

(a)

Primarily reflects the remeasurement of Exelon’s like-kind exchange tax position in the first quarter of 2013. See Note 11 — Income Taxes of the Combined Notes to Financial Statements for additional information.

Effective Income Tax Rate

The effective income tax rate was 39.3% for the three months ended June 30, 2014 compared to 40.7% for the same period during 2013. The effective income tax rate was 39.6% for the six months ended June 30, 2014 compared to 36.4% for the same period during 2013. See Note 11 — Income Taxes of the Combined Notes to Consolidated Financial Statements for additional information regarding the components of the effective income tax rates.

 

191


Table of Contents

ComEd Electric Operating Statistics and Revenue Detail

 

      Three Months Ended
June 30,
    

% Change

    Weather-
Normal

%  Change
              

Retail Deliveries to Customers (in GWhs)

   2014      2013            

Retail Deliveries(a)

               

Residential

     6,177        6,090        1.4     1.1     

Small commercial & industrial

     7,759        7,832        (0.9 )%      (1.3 )%      

Large commercial & industrial

     6,769        6,711        0.9     0.5     

Public authorities & electric railroads

     304        294        3.4     5.7     
  

 

 

    

 

 

           

Total Retail Deliveries

     21,009        20,927        0.4     0.0     
  

 

 

    

 

 

           
     Six Months Ended
June 30,
    

% Change

    Weather-
Normal %

Change
              

Retail Deliveries to Customers (in GWhs)

   2014      2013            

Retail Deliveries(a)

               

Residential

     13,587        12,966        4.8     1.5     

Small commercial & industrial

     16,090        15,705        2.5     0.5     

Large commercial & industrial

     13,864        13,551        2.3     0.8     

Public authorities & electric railroads

     701        667        5.1     5.5     
  

 

 

    

 

 

           

Total Retail Deliveries

     44,242        42,889        3.2     0.9     
  

 

 

    

 

 

           
     As of June 30,                            

Number of Electric Customers

   2014      2013                            

Residential

     3,487,337        3,465,712            

Small commercial & industrial

     367,354        366,153            

Large commercial & industrial

     2,025        2,006            

Public authorities & electric railroads

     4,827        4,852            
  

 

 

    

 

 

           

Total

     3,861,543        3,838,723            
  

 

 

    

 

 

           
      Three Months Ended
June 30,
    

% Change

    Six Months Ended
June 30,
     % Change  

Electric Revenue

   2014      2013        2014     2013     

Retail Sales(a)

               

Residential

   $ 499      $ 476        4.8   $ 1,007     $ 1,060        (5.0 )% 

Small commercial & industrial

     340        315        7.9     684       623        9.8

Large commercial & industrial

     113        113        0.0     229       215        6.5

Public authorities & electric railroads

     12        12        0.0     24       24        0.0
  

 

 

    

 

 

      

 

 

   

 

 

    

Total Retail

     964        916        5.2     1,944       1,922        1.1
  

 

 

    

 

 

      

 

 

   

 

 

    

Other Revenue(b)

     164        164        0.0     318       317        0.3
  

 

 

    

 

 

      

 

 

   

 

 

    

Total Electric Revenues

   $ 1,128      $ 1,080        4.4   $ 2,262     $ 2,239        1.0
  

 

 

    

 

 

      

 

 

   

 

 

    

 

(a)

Reflects delivery revenues and volumes from customers purchasing electricity directly from ComEd and customers purchasing electricity from a competitive electric generation supplier, as all customers are assessed delivery charges. For customers purchasing electricity from ComEd, revenue also reflects the cost of energy and transmission.

(b)

Other revenue primarily includes transmission revenue from PJM. Other items include rental revenue, revenue related to late payment charges, revenue from other utilities for mutual assistance programs and recoveries of environmental costs associated with MGP sites.

 

192


Table of Contents

Results of Operations — PECO

 

    Three Months Ended
June 30,
    Favorable
(Unfavorable)

Variance
    Six Months Ended
June 30,
    Favorable
(Unfavorable)

Variance
 
      2014         2013         2014     2013    

Operating revenues

  $ 656     $ 672     $ (16   $ 1,649     $ 1,567     $ 82  

Purchased power and fuel

    241       258       17       705       664       (41
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Revenue net of purchased power and fuel(a)

    415       414       1       944       903       41  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other operating expenses

           

Operating and maintenance

    184       181       (3     464       369       (95

Depreciation and amortization

    59       56       (3     117       113       (4

Taxes other than income

    38       39       1       80       80        
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other operating expenses

    281       276       (5     661       562       (99
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

    134       138       (4     283       341       (58
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

           

Interest expense, net

    (28     (28           (56     (57     1  

Other, net

    1             1       3       3        
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

    (27     (28     1       (53     (54     1  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income before income taxes

    107       110       (3     230       287       (57

Income taxes

    23       32       9       57       87       30  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income

    84       78       6       173       200       (27

Preferred security dividends and redemption

          6       6             7       7  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income attributable to common shareholders

  $ 84     $ 72     $ 12     $ 173     $ 193     $ (20
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

PECO evaluates its operating performance using the measures of revenue net of purchased power expense for electric sales and revenue net of fuel expense for gas sales. PECO believes revenue net of purchased power expense and revenue net of fuel expense are useful measurements of its performance because they provide information that can be used to evaluate its net revenue from operations. PECO has included the analysis below as a complement to the financial information provided in accordance with GAAP. However, revenue net of purchased power expense and revenue net of fuel expense figures are not a presentation defined under GAAP and may not be comparable to other companies’ presentations or more useful than the GAAP information provided elsewhere in this report.

Net Income attributable to common shareholders 

Three Months Ended June 30, 2014 Compared to Three Months Ended June 30, 2013.    The increase in net income attributable to common shareholders was driven primarily by a decrease to income tax expense and redemption of preferred securities in May 2013, partially offset by an increase in operating expenses.

Six Months Ended June 30, 2014 Compared to Six Months Ended June 30, 2013.    The decrease in net income attributable to common shareholders was driven primarily by higher operating and maintenance expenses, partially offset by higher operating revenue net of purchased power and fuel expense and a decrease to income taxes expense and redemption of preferred securities in May 2013.

Operating Revenues, Purchased Power and Fuel Expense 

Electric and gas revenues and purchased power and fuel expense are affected by fluctuations in commodity procurement costs. PECO’s electric supply and natural gas cost rates charged to customers are subject to adjustments at least quarterly that are designed to recover or refund the difference between the actual cost of electric supply and natural gas and the amount included in rates in accordance with the PAPUC’s GSA and PGC, respectively. Therefore, fluctuations in electric supply and natural gas procurement costs have no impact on electric and gas revenue net of purchased power and fuel expense.

 

193


Table of Contents

Electric and gas revenues and purchased power and fuel expense are also affected by fluctuations in participation in the Customer Choice Program. All PECO customers have the choice to purchase electricity and gas from competitive electric generation and natural gas suppliers, respectively. The customer’s choice of suppliers does not impact the volume of deliveries, but affects revenue collected from customers related to supplied energy and natural gas service. Customer choice program activity has no impact on electric and gas revenue net of purchased power and fuel expense. The number of retail customers purchasing electricity from a competitive electric generation supplier was 538,800 and 523,900 at June 30, 2014 and 2013, respectively. Retail deliveries purchased from competitive electric generation suppliers represented 72% and 70% of PECO’s retail kWh sales for the three and six months ended June 30, 2014, respectively, compared to 70% and 68% for the three and six months ended June 30, 2013. The number of retail customers purchasing natural gas from a competitive natural gas supplier was 74,800 and 59,100 at June 30, 2014 and 2013, respectively. Retail deliveries purchased from competitive natural gas suppliers represented 24% and 21% of PECO’s mmcf sales for the three and six months ended June 30, 2014, respectively, compared to 21% and 18% for the three and six months ended June 30, 2013.

The changes in PECO’s operating revenues net of purchased power and fuel expense for the three and six months ended June 30, 2014 compared to the same period in 2013 consisted of the following:

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
     Increase
(Decrease)
    Increase
(Decrease)
 
     Electric     Gas      Total     Electric     Gas     Total  

Weather

   $ (9   $ 1      $ (8   $ 10     $ 16     $ 26  

Volume

     2       1        3       7       2       9  

Pricing

     (2            (2     (6     (3     (9

Regulatory required programs

     5              5       13             13  

Other

     2       1        3       2             2  
  

 

 

   

 

 

    

 

 

   

 

 

   

 

 

   

 

 

 

Total increase (decrease)

   $ (2   $ 3      $ 1     $ 26     $ 15     $ 41  
  

 

 

   

 

 

    

 

 

   

 

 

   

 

 

   

 

 

 

Weather.    The demand for electricity and gas is affected by weather conditions. With respect to the electric business, very warm weather in summer months and, with respect to the electric and gas businesses, very cold weather in winter months are referred to as “favorable weather conditions” because these weather conditions result in increased deliveries of electricity and gas. Conversely, mild weather reduces demand. During the three months ended June 30, 2014 compared to the same period in 2013, operating revenues net of purchased power and fuel expense were lower due to unfavorable spring and summer weather conditions in PECO’s service territory.

During the six months ended June 30, 2014 compared to the same period in 2013, operating revenues net of purchased power and fuel expense were higher due to the impact of favorable 2014 winter weather conditions, offset by unfavorable 2014 spring and summer weather conditions in PECO’s service territory.

 

194


Table of Contents

Heating and cooling degree days are quantitative indices that reflect the demand for energy needed to heat or cool a home or business. Normal weather is determined based on historical average heating and cooling degree days for a 30-year period in PECO’s service territory. The changes in heating and cooling degree days in PECO’s service territory for the three and six months ended June 30, 2014 compared to the same periods in 2013 and normal weather consisted of the following:

 

                          % Change  

Heating and Cooling Degree-Days

   2014      2013      Normal      From 2013     From Normal  

Three Months Ended June 30,

             

Heating Degree-Days

     393         421         463         (6.7 )%      (15.1 )% 

Cooling Degree-Days

     375         418         348         (10.3 )%      7.8

Six Months Ended June 30,

             

Heating Degree-Days

     3,237        2,861        2,939        13.1     10.1

Cooling Degree-Days

     375        418        348        (10.3 )%      7.8

Volume.    The increase in operating revenues net of purchased power and fuel expense related to delivery volume, exclusive of the effects of weather, for the three and six months ended June 30, 2014 compared to the same period in 2013, primarily reflects the impact of moderate economic and customer growth and a shift in the volume profile across classes from lower priced classes to higher priced classes, partially offset by energy efficiency initiatives on customer usages.

Pricing.    The decrease in operating revenues net of purchased power and fuel expense as a result of pricing is primarily attributable to lower overall effective rates due to increased usage per customer across all customer classes.

Regulatory Required Programs.    This represents the change in operating revenues collected under approved riders to recover costs incurred for regulatory programs such as smart meter, energy efficiency and the GSA. The riders are designed to provide full and current cost recovery as well as a return. The costs of these programs are included in operating and maintenance expense, depreciation and amortization expense and income taxes. Refer to the operating and maintenance expense discussion below for additional information on included programs.

Operating and Maintenance Expense

 

    Three Months Ended
June 30,
    Increase
(Decrease)
    Six Months Ended
June 30,
    Increase
(Decrease)
 
      2014         2013             2014           2013      

Operating and Maintenance Expense — Baseline

  $ 155     $ 155     $      $ 415     $ 329     $ 86  

Operating and Maintenance Expense — Regulatory Required Programs(a)

    29       26       3       49       40       9  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total Operating and Maintenance Expense

  $ 184     $ 181     $ 3     $ 464     $ 369     $ 95  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Operating and maintenance expenses for regulatory required programs are costs for various legislative and/or regulatory programs that are recoverable from customers on a full and current basis through approved regulated rates. An equal and offsetting amount has been reflected in operating revenues.

 

195


Table of Contents

The changes in operating and maintenance expense for the three and six months ended June 30, 2014 compared to the same periods in 2013, consisted of the following:

 

     Three Months Ended
June 30,
    Six Months Ended
June 30,
 
     Increase
(Decrease)
    Increase
(Decrease)
 

Baseline

    

Labor, other benefits, contracting and materials

   $ 5     $ 6  

Storm-related costs

     5       84 (a) 

Injuries and Damages

     (1     (3

Pension and non-pension postretirement benefits expense

     (2      

Constellation merger and integration costs

     (2     (5

Uncollectable Accounts Expense

     (8     1  

Other

     3       3  
  

 

 

   

 

 

 
           86  

Regulatory Required Programs

    

Smart Meter

     3       6  

Energy Efficiency

           3  
  

 

 

   

 

 

 
     3       9  
  

 

 

   

 

 

 

Increase (Decrease) in operating and maintenance expense

   $ 3     $ 95  
  

 

 

   

 

 

 

 

(a)

Total storm-related costs include approximately $70 million of incremental storm costs incurred from the February 5, 2014 ice storm and other storms during the first half of 2014.

Depreciation and Amortization Expense 

The increase in depreciation and amortization expense for the three and six months ended June 30, 2014 compared to the same periods in 2013 was primarily due to ongoing capital expenditures.

Taxes Other Than Income 

The change in taxes other than income for the three and six months ended June 30, 2014 compared to the same period in 2013 remained relatively constant.

Interest Expense, Net 

The decrease in interest expense, net for the three and six months ended June 30, 2014 compared to the same periods in 2013 remained relatively constant.

Other, Net 

The change in Other, net for the three and six months ended June 30, 2014 remained relatively level compared to the same period in 2013.

Effective Income Tax Rate 

PECO’s effective income tax rate was 21.5% and 29.1% for the three months ended June 30, 2014 and 2013, respectively.

 

196


Table of Contents

The effective income tax rate was 24.8% and 30.3% for the six months ended June 30, 2014 and 2013, respectively. See Note 11 — Income Taxes of the Combined Notes to the Consolidated Financial Statements for further discussion of the change in effective income tax rate.

PECO Electric Operating Statistics and Revenue Detail

 

    Three Months
Ended June 30,
    %
Change
    Weather-
Normal
% Change
    Six Months
Ended June 30,
    %
Change
    Weather-
Normal
% Change
 

Retail Deliveries to Customers (in GWhs)

  2014     2013         2014     2013      

Retail Deliveries(a)

               

Residential

    2,801       2,888       (3.0 )%      1.6     6,649       6,353       4.7     1.5

Small commercial & industrial

    1,947       1,960       (0.7 )%      0.7     4,002       3,969       0.8     0.1

Large commercial & industrial

    3,741       3,784       (1.1 )%      (0.6 )%      7,518       7,430       1.2     0.7

Public authorities & electric railroads

    222       238       (6.8 )%      (6.8 )%      481       493       (2.4 )%      (2.4 )% 
 

 

 

   

 

 

       

 

 

   

 

 

     

Total Retail Deliveries

    8,711       8,870       (1.8 )%      0.2     18,650       18,245       2.2     0.8
 

 

 

   

 

 

       

 

 

   

 

 

     
    As of June 30,                                      

Number of Electric Customers

  2014     2013                                      

Residential

    1,428,080       1,419,977              

Small commercial & industrial

    149,259       148,723              

Large commercial & industrial

    3,108       3,109              

Public authorities & electric railroads

    9,712       9,672              
 

 

 

   

 

 

             

Total

    1,590,159       1,581,481              
 

 

 

   

 

 

             
    Three Months
Ended June 30,
    %
Change
          Six Months
Ended June 30,
    %
Change
       

Electric Revenue

  2014     2013             2014     2013          

Retail Sales(a)

               

Residential

  $ 338      $ 354        (4.5 )%      $ 782      $ 749        4.4  

Small commercial & industrial

    101       109       (7.3 )%        212       215       (1.4 )%   

Large commercial & industrial

    54       61       (11.5 )%        117       120       (2.5 )%   

Public authorities & electric railroads

    8       8       0.0       16       16       0.0  
 

 

 

   

 

 

       

 

 

   

 

 

     

Total Retail

    501       532       (5.8 )%        1,127       1,100       2.5  
 

 

 

   

 

 

       

 

 

   

 

 

     

Other Revenue(b)

    58       53       9.4       109       108       0.9  
 

 

 

   

 

 

       

 

 

   

 

 

     

Total Electric Revenues

  $ 559     $ 585       (4.4 )%      $ 1,236      $ 1,208        2.3  
 

 

 

   

 

 

       

 

 

   

 

 

     

 

(a)

Reflects delivery volumes and revenues from customers purchasing electricity directly from PECO and customers purchasing electricity from a competitive electric generation supplier as all customers are assessed distribution charges. For customers purchasing electricity from PECO, revenue also reflects the cost of energy and transmission.

(b)

Other revenue includes transmission revenue from PJM and wholesale electric revenues.

 

197


Table of Contents

PECO Gas Operating Statistics and Revenue Detail

 

    Three Months Ended
June 30,
   

% Change

    Weather-
Normal
% Change
    Six Months Ended
June 30,
    % Change     Weather-
Normal
% Change
 

Deliveries to Customers (in mmcf)

  2014     2013         2014     2013      

Retail Delivery

               

Retail sales(a)

    7,424       6,919       7.3     3.9     40,594       35,357       14.8     1.4

Transportation and other

    6,005       5,956       0.8     (0.8 )%      14,374       14,839       (3.1 )%      (4.5 )% 
 

 

 

   

 

 

       

 

 

   

 

 

     

Total Gas Deliveries

    13,429       12,875       4.3     1.4     54,968       50,196       9.5     (1.6 )% 
 

 

 

   

 

 

       

 

 

   

 

 

     
    As of June 30,                                      

Number of Gas Customers

  2014     2013                                      

Residential

    459,407       455,518              

Commercial & industrial

    42,042       41,648              
 

 

 

   

 

 

             

Total Retail

    501,449       497,166              

Transportation

    882       903              
 

 

 

   

 

 

             

Total

    502,331       498,069              
 

 

 

   

 

 

             
    Three Months Ended
June 30,
    % Change           Six Months Ended
June 30,
    % Change        

Gas Revenue

  2014     2013             2014     2013          

Retail Sales

               

Retail sales(a)

  $ 88      $ 78        12.8     $ 390      $ 338        15.4  

Transportation and other

    9       9       0.0       23       21       9.5  
 

 

 

   

 

 

       

 

 

   

 

 

     

Total Gas Revenues

  $ 97      $ 87        11.5     $ 413      $ 359        15.0  
 

 

 

   

 

 

       

 

 

   

 

 

     

 

(a)

Reflects delivery volumes and revenues from customers purchasing natural gas directly from PECO and customers purchasing natural gas from a competitive natural gas supplier as all customers are assessed distribution charges. For customers purchasing natural gas from PECO, revenue also reflects the cost of natural gas.

 

198


Table of Contents

Results of Operations — BGE

 

     Three Months Ended
June 30,
    Favorable
(Unfavorable)

Variance
    Six Months Ended
June 30,
    Favorable
(Unfavorable)

Variance
 
         2014             2013           2014     2013    

Operating revenues

   $ 653     $ 653     $     $ 1,707     $ 1,533     $ 174  

Purchased power and fuel

     268       288       20       797       713       (84
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Revenue net of purchased power and fuel(a)

     385       365       20       910       820       90  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other operating expenses

            

Operating and maintenance

     188       160       (28     376       303       (73

Depreciation and amortization

     89       82       (7     197       175       (22

Taxes other than income

     53       54       1       113       109       (4
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other operating expenses

     330       296       (34     686       587       (99
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

     55       69       (14     224       233       (9
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Other income and (deductions)

            

Interest expense, net

     (27     (32     5       (55     (66     11  

Other, net

     5       4       1       9       9        
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other income and (deductions)

     (22     (28     6       (46     (57     11  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income before income taxes

     33       41       (8     178       176       2  

Income taxes

     14       16       2       72       70       (2
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income

     19       25       (6     106       106        

Preference stock dividends

     3       3             6       6        
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income attributable to common shareholder

   $ 16     $ 22     $ (6   $ 100     $ 100     $  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

BGE evaluates its operating performance using the measure of revenue net of purchased power expense for electric sales and revenue net of fuel expense for gas sales. BGE believes revenue net of purchased power and fuel expense are useful measurements of its performance because they provide information that can be used to evaluate its net revenue from operations. BGE has included the analysis below as a complement to the financial information provided in accordance with GAAP. However, revenue net of purchased power and fuel expense figures are not a presentation defined under GAAP and may not be comparable to other companies’ presentations or more useful than the GAAP information provided elsewhere in this report.

Net income attributable to common shareholders

Three Months Ended June 30, 2014, Compared to Three Months Ended June 30, 2013.    BGE’s net income attributable to common shareholders for the three months ended June 30, 2014, was lower than the same period in 2013, primarily due to increases in operating and maintenance expense and depreciation expense, partially offset by an increase in revenue net of purchased power and fuel expense as a result of the December 2013 electric and gas distribution rate order issued by the MDPSC.

Six Months Ended June 30, 2014, Compared to Six Months Ended June 30, 2013.    BGE’s net income attributable to common shareholders for the six months ended June 30, 2014, was consistent with the same period in 2013, primarily due to an increase in revenue net of purchased power and fuel expense as a result of the 2013 electric and gas distribution rate orders issued by the MDPSC, offset by increases in operating and maintenance expense and depreciation expense.

 

199


Table of Contents

Operating Revenues, Purchased Power and Fuel Expense

There are certain drivers to operating revenue that are offset by their impact on purchased power expense and fuel expense, such as commodity procurement costs and programs allowing customers to select a competitive electric or natural gas supplier. Electric and gas revenues and purchased power and fuel expense are affected by fluctuations in commodity procurement costs. BGE’s electric and natural gas rates charged to customers are subject to periodic adjustments that are designed to recover or refund the difference between the actual cost of purchased electric power and purchased natural gas and the amount included in rates in accordance with the MDPSC’s market-based SOS and gas commodity programs, respectively.

The number of customers electing to select a competitive electric generation supplier affects electric SOS revenues and purchased power expense. The number of customers electing to select a competitive natural gas supplier affects gas cost adjustment revenues and purchased natural gas expense. All BGE customers have the choice to purchase energy from a competitive electric generation supplier. This customer choice of electric generation suppliers does not impact the volume of deliveries, but affects revenue collected from customers related to SOS. The number of retail customers purchasing electricity from a competitive electric generation supplier was 382,600 and 389,400 at June 30, 2014 and 2013, respectively, representing 31% of total retail customers at each date. Retail deliveries purchased from competitive electric generation suppliers represented 63% and 60% of BGE’s retail kWh sales for the three and six months ended June 30, 2014, respectively, compared to 63% and 61% for the three and six months ended June 30, 2013, respectively. The number of retail customers purchasing natural gas from a competitive natural gas supplier was 165,500 and 161,900 at June 30, 2014 and 2013, respectively, representing 25% of total retail customers at each date. Retail deliveries purchased from competitive natural gas suppliers represented 64% and 51% of BGE’s retail mmcf sales for the three and six months ended June 30, 2014, respectively, compared to 63% and 51% for the three and six months ended June 30, 2013, respectively.

The changes in BGE’s operating revenues net of purchased power and fuel expense for the three and six months ended June 30, 2014, compared to the same period in 2013, consisted of the following:

 

     Three Months Ended
June 30,
     Six Months Ended
June 30,
 
     Increase
(Decrease)
     Increase
(Decrease)
 
     Electric      Gas      Total      Electric      Gas     Total  

Distribution rate increase

   $ 7      $ 3      $ 10      $ 35      $ 20     $ 55  

Regulatory required programs

                          10        (1     9  

Commodity margin

            1        1        1        8       9  

Transmission revenues

     3               3        8              8  

Other

     6               6        6        3       9  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

   

 

 

 

Total increase

   $ 16      $ 4      $ 20      $ 60      $ 30     $ 90  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

   

 

 

 

Revenue Decoupling.    The demand for electricity and gas is affected by weather and usage conditions. The MDPSC has allowed BGE to record a monthly adjustment to its electric and gas distribution revenues from all residential customers, commercial electric customers, the majority of large industrial electric customers, and all firm service gas customers to eliminate the effect of abnormal weather and usage patterns per customer on BGE’s electric and gas distribution volumes, thereby recovering a specified dollar amount of distribution revenues per customer, by customer class, regardless of changes in consumption levels. This means BGE recognizes revenues at MDPSC-approved levels per customer, regardless of what actual distribution volumes were for a billing period. Therefore, while these revenues are affected by customer growth, they will not be affected by actual weather or usage conditions. BGE bills or credits customers in subsequent months for the difference between approved revenue levels under revenue decoupling and actual customer billings.

 

200


Table of Contents

Heating degree days are quantitative indices that reflect the demand for energy needed to heat a home or business. Normal weather is determined based on historical average heating and cooling degree days for a 30-year period in BGE’s service territory. The changes in heating degree days in BGE’s service territory for the three and six months ended June 30, 2014 compared to the same period in 2013 consisted of the following:

 

                          % Change  

Heating and Cooling Degree-Days

   2014      2013      Normal      From 2013     From Normal  

Three Months Ended June 30,

             

Heating Degree-Days

     497        492        513        1.0      (3.1 )% 

Cooling Degree-Days

     233        263        252        (11.4 )%      (7.5 )% 

Six Months Ended June 30,

             

Heating Degree-Days

     3,358        2,943        2,900        14.1      15.8

Cooling Degree-Days

     233        264        255        (11.7 )%      (8.6 )% 

Distribution Rate Increase.    The increase in distribution rates for the three and six months ended June 30, 2014, compared to the same periods in 2013, was primarily due to the impact of the new electric and natural gas distribution rates charged to customers that became effective in December 2013 in accordance with the MDPSC approved electric and natural gas distribution rate case order. See Note 5 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements for additional information.

Regulatory Required Programs.    This represents the change in revenues collected under approved riders to recover costs incurred for the energy efficiency and demand response programs as well as administrative and commercial and industrial customer bad debt costs for SOS. The riders are designed to provide full recovery, as well as a return in certain instances. The costs of these programs are included in operating and maintenance expense, depreciation and amortization expense and taxes other than income taxes. The increase in revenues during the six months ended June 30, 2014 compared to the same period in 2013 was primarily due to the recovery of higher energy efficiency program costs.

Commodity Margin.    The increase in commodity margin under BGE’s market-based rate incentive mechanism for the three and six months ended June 30, 2014, compared to the same periods in 2013 was primarily due to the higher gas margins earned by BGE due to the extreme cold weather during the first quarter under BGE’s MBR mechanism. See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information.

Transmission Revenues.    The increase in transmission rates for the three and six months ended June 30, 2014, compared to the same periods in 2013, was primarily due to the impact of the new transmission rates charged to customers that became effective in June 2014. See Note 5 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements for additional information.

Other.    Other revenues, which can vary from period to period, include miscellaneous revenues such as service application and late payment fees. Other revenues increased during the three and six months ended June 30, 2014 compared to the same periods in 2013.

 

201


Table of Contents

Operating and Maintenance Expense

The changes in operating and maintenance expense for the three and six months ended June 30, 2014 compared to the same periods in 2013, consisted of the following:

 

     Three Months Ended
June  30,
    Six Months Ended
June 30,
 
     Increase
(Decrease)
    Increase
(Decrease)
 

Labor, other benefits, contracting and materials

   $ 8     $ 25  

Pension and non-pension postretirement benefits expense

     2       4  

Storm-related costs

     (1     13  

Uncollectible accounts expense

     10       13  

Corporate allocations

     5       7  

Other

     4       11  
  

 

 

   

 

 

 

Increase in operating and maintenance expense

   $ 28     $ 73  
  

 

 

   

 

 

 

Depreciation and Amortization

The increase in depreciation and amortization expense for the three and six months ended June 30, 2014 compared to the same periods in 2013 was primarily due to higher amortization expense related to energy efficiency and demand response programs, which are fully offset in revenues above, and higher property, plant and equipment balances resulting from ongoing capital expenditures.

Taxes Other Than Income

The increase in taxes other than income for the three and six months ended June 30, 2014 compared to the same periods in 2013 was primarily due to increased gross receipts tax as a result of higher revenues.

Interest Expense, Net

The decrease in interest expense, net for the three and six months ended June 30, 2014 compared to the same periods in 2013 was primarily due to favorable interest rates in 2014 on long-term debt balances.

Effective Income Tax Rate

BGE’s effective income tax rate was 42.4% and 39.0% for the three months ended June 30, 2014 and 2013, respectively, and 40.4% and 39.8% for the six months ended June 30, 2014 and 2013, respectively. See Note 11 — Income Taxes of the Combined Notes to Consolidated Financial Statements for further discussion of the change in effective income tax rate.

 

202


Table of Contents

BGE Electric Operating Statistics and Revenue Detail

 

Retail Deliveries to Customers (in GWhs)

  Three Months Ended
June 30,
    %
Change
    Weather-
Normal%

Change
    Six Months
Ended June 30,
    %
Change
    Weather-
Normal%

Change
 
  2014     2013         2014     2013      

Retail Deliveries(a)

               

Residential

    2,639       2,757       (4.3 )%      n.m        6,732       6,293       7.0     n.m   

Small commercial & industrial

    704       716       (1.7 )%      n.m        1,538       1,492       3.1     n.m   

Large commercial & industrial

    3,593       3,610       (0.5 )%      n.m        7,062       7,164       (1.4 )%      n.m   

Public authorities & electric railroads

    79       80       (1.3 )%      n.m        157       161       (2.5 )%      n.m   
 

 

 

   

 

 

       

 

 

   

 

 

     

Total Electric Retail Deliveries

    7,015       7,163       (2.1 )%      n.m        15,489       15,110       2.5     n.m   
 

 

 

   

 

 

       

 

 

   

 

 

     
    As of June 30,                                      

Number of Electric Customers

  2014     2013                                      

Residential

    1,123,804       1,117,569              

Small commercial & industrial

    112,827       113,009              

Large commercial & industrial

    11,660       11,612              

Public authorities & electric railroads

    290       294              
 

 

 

   

 

 

             

Total

    1,248,581       1,242,484              
 

 

 

   

 

 

             

Electric Revenue

  Three Months Ended
June 30,
    %
Change
          Six Months
Ended June 30,
    %
Change
       
  2014     2013             2014     2013          

Retail Sales(a)

               

Residential

  $ 293     $ 302       (3.0 )%      $ 729     $ 667       9.3  

Small commercial & industrial

    64       60       6.7       136       125       8.8  

Large commercial & industrial

    120       112       7.1       243       217       12.0  

Public authorities & electric railroads

    8       8             16       15       6.7  
 

 

 

   

 

 

       

 

 

   

 

 

     

Total Retail

    485       482       0.6       1,124       1,024       9.8  
 

 

 

   

 

 

       

 

 

   

 

 

     

Other Revenue

    67       61       9.8       138       124       11.3  
 

 

 

   

 

 

       

 

 

   

 

 

     

Total Electric Revenues

  $ 552     $ 543       1.7     $ 1,262     $ 1,148       9.9  
 

 

 

   

 

 

       

 

 

   

 

 

     

 

(a)

Reflects delivery volumes and revenues from customers purchasing electricity directly from BGE and customers purchasing electricity from a competitive electric generation supplier as all customers are assessed distribution charges. For customers purchasing electricity from BGE, revenue also reflects the cost of energy and transmission.

 

203


Table of Contents

BGE Gas Operating Statistics and Revenue Detail

 

Deliveries to Customers (in mmcf)

  Three Months Ended
June 30,
    % Change     Weather-
Normal

%  Change
    Six Months Ended
June 30,
    % Change     Weather-
Normal
% Change
 
  2014     2013         2014     2013      

Retail Deliveries(b)

               

Retail sales

    14,834       14,951       (0.8 )%      n.m.        61,222       55,212       10.9     n.m.   

Transportation and other

    875       1,545       (43.4 )%      n.m.        7,204       7,195       0.1     n.m.   
 

 

 

   

 

 

       

 

 

   

 

 

     

Total Gas Deliveries

    15,709       16,496       (4.8 )%      n.m.        68,426       62,407       9.6     n.m.   
 

 

 

   

 

 

       

 

 

   

 

 

     
    As of June 30,                                      

Number of Gas Customers

  2014     2013                                      

Residential

    612,202       611,146              

Commercial & industrial

    44,019       44,059              
 

 

 

   

 

 

             

Total

    656,221       655,205              
 

 

 

   

 

 

             

Gas Revenue

  Three Months Ended
June  30,
    % Change           Six Months Ended
June 30,
    % Change        
  2014     2013             2014     2013          

Retail Sales(b)

               

Retail sales

  $ 92     $ 100       (8.0 )%      $ 377     $ 345       9.3  

Transportation and other(c)

    9       10       (10.0 )%        68       40       70.0  
 

 

 

   

 

 

       

 

 

   

 

 

     

Total Gas Revenues

  $ 101     $ 110       (8.2 )%      $ 445     $ 385       15.6  
 

 

 

   

 

 

       

 

 

   

 

 

     

 

(b)

Reflects delivery volumes and revenues from customers purchasing natural gas directly from BGE and customers purchasing natural gas from a competitive natural gas supplier as all customers are assessed distribution charges. The cost of natural gas is charged to customers purchasing natural gas from BGE.

(c)

Transportation and other gas revenue includes off-system revenue of 875 mmcfs ($5 million) and 1,545 mmcfs ($8 million) for the three months ended June 30, 2014 and 2013, respectively, and 7,204 mmcfs ($58 million) and 7,195 mmcfs ($32 million) for the six months ended June 30, 2014 and 2013, respectively.

Liquidity and Capital Resources

Exelon’s and Generation’s current year activity presented below includes the activity of CENG from the integration date effective April 1, 2014 through June 30, 2014. All results included throughout the liquidity and capital resources section are presented on a GAAP basis.

The Registrants’ operating and capital expenditures requirements are provided by internally generated cash flows from operations as well as funds from external sources in the capital markets and through bank borrowings. The Registrants’ businesses are capital intensive and require considerable capital resources. Each Registrant’s access to external financing on reasonable terms depends on its credit ratings and current overall capital market business conditions, including that of the utility industry in general. If these conditions deteriorate to the extent that the Registrants no longer have access to the capital markets at reasonable terms, Exelon Corporate, Generation, ComEd, PECO and BGE have access to unsecured revolving credit facilities with aggregate bank commitments of $0.5 billion, $5.3 billion, $1.0 billion, $0.6 billion and $0.6 billion, respectively. Exelon Corporate, Generation, ComEd, PECO and BGE’s revolving credit facilities expire in 2019. In addition, Generation has $0.5 billion in bilateral credit facilities. Generation’s bilateral credit facilities have expirations in October 2014, January 2015, December 2015 and March 2016. The Registrants utilize their credit facilities to support their commercial paper programs, provide for other short-term borrowings and issue letters of credit. See the “Credit Matters” section below for further discussion. The Registrants expect cash flows to be sufficient to meet operating expenses, financing costs and capital expenditure requirements.

 

204


Table of Contents

The Registrants primarily use their capital resources, including cash, to fund capital requirements, including construction expenditures, retire debt, pay dividends, fund pension and other postretirement benefit obligations and invest in new and existing ventures. The Registrants spend a significant amount of cash on capital improvements and construction projects that have a long-term return on investment. Additionally, ComEd, PECO and BGE operate in rate-regulated environments in which the amount of new investment recovery may be delayed or limited and where such recovery takes place over an extended period of time. See Note 10 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for further discussion of the Registrants’ debt and credit agreements.

Cash Flows from Operating Activities

General

Generation’s cash flows from operating activities primarily result from the sale of electric energy and energy-related products and services to customers. Generation’s future cash flows from operating activities may be affected by future demand for and market prices of energy and its ability to continue to produce and supply power at competitive costs as well as to obtain collections from customers.

ComEd’s, PECO’s and BGE’s cash flows from operating activities primarily result from the transmission and distribution of electricity and, in the case of PECO and BGE, gas distribution services. ComEd’s, PECO’s and BGE’s distribution services are provided to an established and diverse base of retail customers. ComEd’s, PECO’s and BGE’s future cash flows may be affected by the economy, weather conditions, future legislative initiatives, future regulatory proceedings with respect to their rates or operations, competitive suppliers, and their ability to achieve operating cost reductions.

See Notes 5 — Regulatory Matters and 18 — Commitments and Contingencies of the Combined Notes to Consolidated Financial Statements for further discussion of regulatory and legal proceedings and proposed legislation.

Pension and Other Postretirement Benefits

Management considers various factors when making pension funding decisions, including actuarially determined minimum contribution requirements under ERISA, contributions required to avoid benefit restrictions and at-risk status as defined by the Pension Protection Act of 2006, management of the pension obligation and regulatory implications. On July 6, 2012, President Obama signed into law the Moving Ahead for Progress in the Twenty-first Century Act, which contains a pension funding provision that results in lower pension contributions in the near term while increasing the premiums pension plans pay to the Pension Benefit Guaranty Corporation. Certain provisions of the law were applied in 2012 while the others took effect in 2013. The estimated impacts of the law are reflected in the projected pension contributions below.

Exelon expects to make qualified pension plan contributions of $317 million to its qualified pension plans in 2014, of which Generation, ComEd, PECO and BGE will contribute $169 million, $119 million, $11 million and $0 million, respectively. Exelon’s and Generation’s expected qualified pension plan contributions above include $53 million and $51 million, respectively, related to CENG-sponsored plans for the period April 1, 2014 to December 31, 2014 (the period for which CENG is consolidated). Unlike the qualified pension plans, Exelon’s non-qualified pension plans are not funded. Exelon expects to make non-qualified pension plan benefit payments of $18 million in 2014, of which Generation, ComEd, PECO and BGE will make payments of $9 million, $1 million, $0 million and $1 million, respectively. Exelon and Generation’s non-qualified expected pension plan benefit payments above include $3 million related to CENG-sponsored plans for the period April 1, 2014 to December 31, 2014.

 

205


Table of Contents

To the extent interest rates decline significantly or the pension plans do not earn the expected asset return rates, annual pension contribution requirements in future years could increase, especially in years 2017 and beyond. Additionally, the contributions above could change if Exelon changes its pension funding strategy.

Unlike qualified pension plans, other postretirement benefit plans are not subject to statutory minimum contribution requirements and certain plans are not funded. Exelon’s management has historically considered several factors in determining the level of contributions to its funded other postretirement benefit plans, including levels of benefit claims paid and regulatory implications (amounts deemed prudent to meet regulator expectations and best assure continued recovery). Exelon expects to make other postretirement benefit plan contributions, including benefit payments related to unfunded plans, of approximately $290 million in 2014, of which Generation, ComEd, PECO and BGE expect to contribute $128 million, $121 million, $4 million and $18 million, respectively. Exelon and Generation’s expected other postretirement benefit plan payments above include $5 million related to CENG-sponsored plans for the period April 1, 2014 to December 31, 2014 and contemplate reductions related to recent plan design changes.

During the first quarter of 2014, the Society of Actuaries issued an exposure draft with a proposed revised mortality table for use by actuaries, insurance companies, governments, benefit plan sponsors and others in setting assumptions regarding life expectancy in the United States for purposes of estimating pension and OPEB obligations, costs and required contribution amounts. The newly proposed mortality tables indicate substantial life expectancy improvements since the last study published in 2000 (RP 2000). Adoption of the new mortality table, if issued in its current form, would result in significantly increased future pension and OPEB plan obligations, costs and required contribution amounts for many plan sponsors, including Exelon. Exelon is currently evaluating the exposure draft and potential impacts to the December 31, 2014 valuation and future expected pension and OPEB plan contributions. The IRS has indicated the RP 2000 should be used for ERISA funding calculations impacting qualified pension plans in 2014 and 2015, meaning the earliest a new table would be required for determining those funding requirements is January 1, 2016.

Tax Matters

The Registrants’ future cash flows from operating activities may be affected by the following tax matters:

 

   

Exelon, Generation, ComEd, PECO and BGE expect to receive tax refunds of approximately $360 million, $60 million, $320 million, $10 million and $20 million, respectively, between 2014 and 2015.

 

   

Given the current economic environment, state and local governments are facing increasing financial challenges, which may increase the risk of additional income tax levies, property taxes and other taxes or the imposition, extension or permanence of temporary tax levies.

 

   

In the first quarter of 2014, Exelon entered into an agreement to terminate its investment in one of the three municipal-owned electric generation properties in exchange for a net early termination amount of $335 million. The termination will result in a 2014 tax payment of approximately $285 million by Exelon and its subsidiaries in 2014, including approximately $155 million by ComEd. Exelon intends to fund its portion of the tax payment using a portion of the net early termination amount. ComEd intends to fund its portion of the tax payment using a combination of debt and equity contributions from Exelon to substantially maintain its existing capital structure. See Note 11 — Income Taxes of the Combined Notes to the Consolidated Financial Statements for additional information.

 

   

Under the Taxpayer Relief Act of 2012, 50% bonus depreciation expired on December 31, 2013. In the second quarter 2014, the Senate Finance Committee passed a two year extension of 50% bonus depreciation for 2014 and 2015. Further, on July 11, 2014, the House of Representatives passed H.R. 4718 permanently extending 50% bonus depreciation beginning with the 2014 tax year. If ultimately enacted for 2014 and 2015, 50% bonus depreciation legislation would generate incremental cash of approximately $1,175 million, $575 million, $375 million, $100 million, and $125 million, for Exelon,

 

206


Table of Contents
 

Generation, ComEd, PECO, and BGE, respectively, primarily in 2015. The cash generated is an acceleration of tax benefits that Registrants would have received over the normal tax depreciable life of the qualifying property. Additionally, the extension of 50% bonus depreciation would result in a decrease to Generation’s Domestic Production Activities Deduction, reducing cash tax benefits and increasing income tax expense by approximately $35 million and $25 million for 2014 and 2015, respectively. The potential extension of 50% bonus depreciation is not expected to result in a material impact on ComEd’s, PECO’s, or BGE’s results of operations.

The following table provides a summary of the major items affecting Exelon’s cash flows from operations for the six months ended June 30, 2014 and 2013:

 

     Six Months Ended
June 30,
       
         2014             2013         Variance  

Net income

   $ 651      $ 498      $ 153  

Add (subtract):

      

Non-cash operating activities(a)

     3,208        2,025        1,183  

Gain on consolidation of CENG

     (268            (268

Pension and other postretirement benefit contributions

     (499     (284     (215

Income taxes

     (16     705        (721

Changes in working capital and other noncurrent assets and liabilities(b)

     (740     (337     (403

Option premiums received (paid), net

     21        (10     31  

Counterparty collateral posted, net

     (606     (259     (347
  

 

 

   

 

 

   

 

 

 

Net cash flows provided by operations

   $ 1,751      $ 2,338      $ (587
  

 

 

   

 

 

   

 

 

 

 

(a)

Represents depreciation, amortization and accretion, impairment of long-lived assets, mark-to-market gains and losses on derivative transactions, deferred income taxes, provision for uncollectible accounts, pension and other postretirement benefit expense, equity in losses of unconsolidated affiliates and investments, decommissioning-related items, stock compensation expense and other non-cash charges.

(b)

Changes in working capital and other noncurrent assets and liabilities exclude the changes in commercial paper, income taxes and the current portion of long-term debt.

Cash flows provided by operations for the six months ended June 30, 2014 and 2013 by Registrant were as follows:

 

     Six Months Ended
June 30,
 
         2014              2013      

Exelon

   $ 1,751      $ 2,338  

Generation

     742        1,150  

ComEd

     429        503  

PECO

     340        467  

BGE

     410        366  

 

207


Table of Contents

Changes in Exelon’s, Generation’s, ComEd’s, PECO’s and BGE’s cash flows provided by operations were generally consistent with changes in each Registrant’s respective results of operations, as adjusted by changes in working capital in the normal course of business. In addition, significant operating cash flow impacts for the Registrants for the six months ended June 30, 2014 and 2013 were as follows:

Generation

 

   

During the six months ended June 30, 2014 and 2013, Generation had net payments of counterparty collateral of $633 million and $303 million, respectively. Net payments during the six months ended June 30, 2014 and 2013 were primarily due to market conditions that resulted in changes to Generation’s net mark-to-market position and initial margin requirements on the exchanges. Depending upon whether Generation is in a net mark-to-market liability or asset position, collateral may be required to be posted with or collected from its counterparties. This collateral may be in various forms, such as cash, which may be obtained through the issuance of commercial paper, or letters of credit.

 

   

During the six months ended June 30, 2014 and 2013, Generation had net collections (payments) of approximately $21 million and $(10) million, respectively, related to purchases and sales of options. The level of option activity in a given period may vary due to several factors, including changes in market conditions as well as changes in hedging strategy.

ComEd

 

   

During the six months ended June 30, 2014 and 2013, ComEd’s payables for Generation energy purchases decreased by $33 million and $14 million, respectively, and payables to other energy suppliers for energy purchases increased by $55 million and $31 million, respectively.

PECO

 

   

During the six months ended June 30, 2014 and 2013, PECO’s payables to Generation for energy purchases decreased by $15 million and $11 million, respectively, and payables to other electric and gas suppliers for energy purchases (decreased) increased by $(4) million and $26 million, respectively.

BGE

 

   

During the six months ended June 30, 2014 and 2013, BGE’s payables to Generation for energy purchases increased by $9 million and $2 million, respectively, and payables to other electric and gas suppliers for energy purchases decreased by $16 million and $30 million, respectively.

Cash Flows from Investing Activities

Cash flows used in investing activities for the six months ended June 30, 2014 and 2013 by Registrant were as follows:

 

     Six Months Ended
June 30,
 
         2014             2013      

Exelon

   $ (2,187   $ (2,549

Generation

     (1,014     (1,378

ComEd

     (731     (693

PECO

     (302     (514

BGE

     (332     (257

 

208


Table of Contents

Capital expenditures by Registrant for the six months ended June 30, 2014 and 2013 and projected amounts for the full year 2014 are as follows:

 

      Projected
Full Year

2014(d)
     Six Months Ended
June 30,
 
             2014              2013      

Exelon

   $ 5,775       $ 2,501      $ 2,518  

Generation(a)

     2,625        1,103        1,277  

ComEd(b)

     1,775        747        711  

PECO

     675        308        254  

BGE

     600        313        264  

Other(c)

     100         30        12  

 

(a)

Includes nuclear fuel.

(b)

The projected capital expenditures include approximately $442 million of expected incremental spending pursuant to EIMA, ComEd has committed to invest approximately $2.6 billion over a ten year period to modernize and storm-harden its distribution system and to implement smart grid technology.

(c)

Other primarily consists of corporate operations and BSC.

(d)

Total projected capital expenditures do not include adjustments for non-cash activity.

Projected capital expenditures and other investments are subject to periodic review and revision to reflect changes in economic conditions and other factors.

Generation

Approximately 38% and 10% of the projected 2014 capital expenditures at Generation are for the acquisition of nuclear fuel and investments in renewable energy generation, including Antelope Valley and wind construction costs, respectively, with the remaining amounts reflecting additions and upgrades to existing facilities (including material condition improvements during nuclear refueling outages).

ComEd, PECO and BGE

Approximately 85%, 78% and 88% of the projected 2014 capital expenditures at ComEd, PECO and BGE, respectively, are for continuing projects to maintain and improve operations, including enhancing reliability and adding capacity to the transmission and distribution systems such as ComEd’s reliability related investments required under EIMA, and ComEd’s, PECO’s and BGE’s construction commitments under PJM’s RTEP. In addition to the capital expenditure for continuing projects, ComEd’s total capital expenditures include smart grid/smart meter technology required under EIMA and for PECO and BGE, total capital expenditures related to their respective smart meter program and SGIG project.

In 2010, NERC provided guidance to transmission owners that recommends ComEd, PECO and BGE perform assessments of all their transmission lines. In compliance with this guidance, ComEd, PECO and BGE submitted their final bi-annual reports to NERC in January 2014. ComEd, PECO and BGE will be incurring incremental capital expenditures associated with this guidance following the completion of the assessments. Specific projects and expenditures are identified as the assessments are completed. ComEd’s, PECO’s and BGE’s forecasted 2014 capital expenditures above reflect capital spending in 2014 for remediation to be completed through 2017.

ComEd, PECO and BGE anticipate that they will fund their capital expenditures with internally generated funds and borrowings, including ComEd’s capital expenditures associated with EIMA as further discussed in Note 5 — Regulatory Matters of the Combined Notes to Consolidated Financial Statements.

 

209


Table of Contents

Cash Flows from Financing Activities

Cash flows provided by (used in) financing activities for the six months ended June 30, 2014 and 2013 by Registrant were as follows:

 

     Six Months Ended
June 30,
 
         2014             2013      

Exelon(a)

   $ 189      $ (284

Generation(a)

     (681     (221

ComEd

     304       139  

PECO

     (162     (259

BGE

     (94     259  

 

(a)

Includes $415 million of distributions to EDF.

Debt

See Note 10 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for further details of the Registrants’ debt issuances and retirements.

Dividends

Cash dividend payments and distributions during the six months ended June 30, 2014 and 2013 by Registrant were as follows:

 

     Six Months Ended
June 30,
 
         2014              2013      

Exelon(a)

   $ 948      $ 716  

Generation(a)

     650        474  

ComEd

     153        110  

PECO

     160        167  

BGE(b)

     6        6  

 

(a)

Includes $415 million of distributions to EDF.

(b)

Relates to dividends paid on BGE’s preference stock.

First Quarter 2014 Dividend

On January 28, 2014, the Exelon Board of Directors declared a first quarter 2014 regular quarterly dividend of $0.31 per share on Exelon’s common stock payable on March 10, 2014, to shareholders of record of Exelon at the end of the day on February 14, 2014.

Second Quarter 2014 Dividend

On May 6, 2014, the Exelon Board of Directors declared a second quarter 2014 regular quarterly dividend of $0.31 per share on Exelon’s common stock payable on June 10, 2014, to shareholders of record of Exelon at the end of the day on May 16, 2014.

Third Quarter 2014 Dividend

On July 29, 2014, the Exelon Board of Directors declared a third quarter 2014 regular quarterly dividend of $0.31 per share on Exelon’s common stock payable on September 10, 2014 to shareholders of record of Exelon at the end of the day on August 15, 2014.

 

210


Table of Contents

Short-Term Borrowings

During the six months ended June 30, 2014, ComEd and BGE issued(repaid) $314 million and $(65) million of commercial paper, respectively, and Generation issued $ 31 million in short-term notes payable. During the six months ended June 30, 2013, ComEd issued $374 million of commercial paper and Generation issued $276 million of commercial paper and $12 million in short-term notes payable.

Contributions from Parent/Member

During the six months ended June 30, 2014, ComEd received $112 million from Parent (Exelon). During the six months ended June 30, 2013, there were no contributions from Parent/Member (Exelon).

Distributions from Parent/Member

On April 1, 2014, Generation loaned $400 million to CENG, the proceeds of which were used to make a distribution to EDFI of $400 million. See Note 6 — Investment in Constellation Energy Nuclear Group, LLC for additional information on the integration of CENG.

Other

For the six months ended June 30, 2014, other financing activities primarily consisted of financing costs associated with the acquisition of PHI, other project financing and various debt issuance costs. See Notes 4, 10 and 16 for additional information.

Credit Matters

The Registrants fund liquidity needs for capital investment, working capital, energy hedging and other financial commitments through cash flows from continuing operations, public debt offerings, commercial paper markets and large, diversified credit facilities. The credit facilities include $8.5 billion in aggregate total commitments of which $6.5 billion was available as of June 30, 2014, and of which no financial institution has more than 8% of the aggregate commitments. Exelon, Generation, ComEd, PECO and BGE had access to the commercial paper market during the second quarter of 2014 to fund their short-term liquidity needs, when necessary. The Registrants routinely review the sufficiency of their liquidity position, including appropriate sizing of credit facility commitments, by performing various stress test scenarios, such as commodity price movements, increases in margin-related transactions, changes in hedging levels and the impacts of hypothetical credit downgrades. The Registrants have continued to closely monitor events in the financial markets and the financial institutions associated with the credit facilities, including monitoring credit ratings and outlooks, credit default swap levels, capital raising and merger activity. See Part I. Item 1A. Risk Factors of Exelon’s 2013 Annual Report on Form 10-K for further information regarding the effects of uncertainty in the capital and credit markets.

The Registrants believe their cash flow from operating activities, access to credit markets and their credit facilities provide sufficient liquidity. If Generation lost its investment grade credit rating as of June 30, 2014, it would have been required to provide incremental collateral of $2.0 billion to meet collateral obligations for derivatives, non-derivatives, normal purchase normal sales contracts and applicable payables and receivables, net of the contractual right of offset under master netting agreements, which is well within its current available credit facility capacities of $4.3 billion. If ComEd lost its investment grade credit rating as of June 30, 2014, it would have been required to provide incremental collateral of $7 million, which is well within its current available credit facility capacity of $500 million, which takes into account commercial paper borrowings as of June 30, 2014. If PECO lost its investment grade credit rating as of June 30, 2014, it would not be required to provide collateral pursuant to PJM’s credit policy and would have been required to provide collateral of $26 million

 

211


Table of Contents

related to its natural gas procurement contracts, which, in the aggregate, are well within PECO’s current available credit facility capacity of $599 million. If BGE lost its investment grade credit rating as of June 30, 2014, it would have been required to provide collateral of $4 million pursuant to PJM’s credit policy and would have been required to provide collateral of $73 million related to its natural gas procurement contracts, which, in the aggregate, are well within BGE’s current available credit facility capacity of $530 million.

Exelon Credit Facilities

Exelon, ComEd and BGE meet their short-term liquidity requirements primarily through the issuance of commercial paper. Generation and PECO meet their short-term liquidity requirements primarily through the issuance of commercial paper and borrowings from the intercompany money pool. The Registrants may use their respective credit facilities for general corporate purposes, including meeting short-term funding requirements and the issuance of letters of credit. See Note 10 — Debt and Credit Agreements of the Combined Notes to the Consolidated Financial Statements for further information regarding the Registrants’ credit facilities.

The following table reflects the Registrants’ commercial paper programs supported by the revolving credit agreements and bilateral credit agreements at June 30, 2014:

Commercial Paper Programs

 

Commercial Paper Issuer

   Maximum
Program Size
     Outstanding
Commercial Paper at
June 30, 2014
     Average Interest Rate on
Commercial Paper
Borrowings for the Six
Months Ended

June 30, 2014
 

Exelon Corporate

   $ 500      $         

Generation

     5,600               0.32

ComEd

     1,000        498        0.33

PECO

     600                

BGE

     600        70        0.27

In order to maintain their respective commercial paper programs in the amounts indicated above, each Registrant must have credit facilities in place, at least equal to the amount of its commercial paper program. While the amount of its commercial paper outstanding does not reduce available capacity under a Registrant’s credit agreement, a Registrant does not issue commercial paper in an aggregate amount exceeding the available capacity under its credit agreement.

Credit Agreements

 

Borrower

   Facility Type    Aggregate Bank
Commitment(a)
     Facility
Draws
     Outstanding
Letters of
Credit
     Available Capacity at
June 30, 2014
 
               Actual      To Support
Additional
Commercial
Paper
 

Exelon Corporate

   Syndicated Revolver    $ 500      $       $ 2      $ 498      $ 498  

Generation

   Syndicated Revolver      5,300               1,161        4,139        4,139  

Generation

   Bilaterals      375               245        1        130  

CENG

   Bilaterals      100        40               60         

ComEd

   Syndicated Revolver      1,000               2        998        500  

PECO

   Syndicated Revolver      600               1        599        599  

BGE

   Syndicated Revolver      600                      600        530  

 

(a)

Excludes $123 million of credit facility agreements arranged with minority and community banks at Generation, ComEd, PECO and BGE. These facilities expire on October 18, 2014, and are solely utilized to issue letters of credit. See Note 10 — Debt and Credit Agreements of the Combined Notes to the Consolidated Financial Statements for further information.

 

212


Table of Contents

As of June 30, 2014, there were no borrowings under the Registrants’ credit facilities, with the exception of CENG, see discussion below.

On March 28, 2014, ComEd extended its unsecured revolving credit facility with aggregate bank commitments of $1.0 billion. Under this facility, ComEd may issue letters of credit in the aggregate amount of up to $500 million. The credit agreement expires on March 28, 2019. The credit facility also allows ComEd to request increases in the aggregate commitments of up to an additional $500 million. Any increases are subject to the approval of the lenders party to the credit agreement in their sole discretion. Costs incurred to extend the facility for ComEd were not material.

On April 1, 2014, as a result of the CENG integration, a $100 million bilateral CENG credit facility expiring October 2014 is now consolidated in Exelon’s and Generation’s consolidated financial statements. This facility will be utilized by CENG to fund working capital and capital projects and obtain letters of credit. As of June 30, 2014, CENG borrowed $40 million against its credit facility.

On May 30, 2014, Exelon, Generation, PECO and BGE extended for an additional year the expiration date of its unsecured revolving credit facility with aggregate bank commitments of $500 million, $5.3 billion, $600 million, $600 million, respectively into May 2019, with the exception of a cumulative amount of $300 million which expires in August 2018. Costs incurred to extend the facility were not material.

Borrowings under Exelon Corporate’s, Generation’s, ComEd’s, PECO’s and BGE’s credit facilities bear interest at a rate based upon either the prime rate or a LIBOR-based rate, plus an adder based upon the registrants credit rating. Exelon Corporate, Generation, ComEd, PECO and BGE have adders of 27.5, 27.5, 7.5, 0.0 and 0.0 basis points for prime based borrowings and 127.5, 127.5, 107.5, 90.0 and 100.0 basis points for LIBOR-based borrowings. The maximum adders for prime rate borrowings and LIBOR-based rate borrowings are 65 basis points and 165 basis points, respectively. The credit agreements also require the borrower to pay a facility fee based upon the aggregate commitments under the agreement. The fee varies depending upon the respective credit ratings of the borrower.

Each revolving credit agreement for Exelon, Generation, ComEd, PECO and BGE requires the affected borrower to maintain a minimum cash from operations to interest expense ratio for the twelve-month period ended on the last day of any quarter. The following table summarizes the minimum thresholds reflected in the credit agreements for the six months ended June 30, 2014:

 

     Exelon      Generation      ComEd      PECO      BGE  

Credit agreement threshold

     2.50 to 1         3.00 to 1         2.00 to 1         2.00 to 1         2.00 to 1   

At June 30, 2014, the interest coverage ratios at the Registrants were as follows:

 

     Exelon      Generation      ComEd      PECO      BGE  

Interest coverage ratio

     10.63         11.73         5.99         7.95         8.53  

An event of default under any Registrant’s indebtedness will not constitute an event of default under any of the other Registrants’ credit facilities, except that a bankruptcy or other event of default in the payment of principal, premium or indebtedness in principal amount in excess of $100 million in the aggregate by Generation will constitute an event of default under the Exelon Corporate credit facility.

Security Ratings

The Registrants’ access to the capital markets, including the commercial paper market, and their respective financing costs in those markets, may depend on the securities ratings of the entity that is accessing the capital markets.

 

213


Table of Contents

The Registrants’ borrowings are not subject to default or prepayment as a result of a downgrading of securities, although such a downgrading of a Registrant’s securities could increase fees and interest charges under that Registrant’s credit agreements.

As part of the normal course of business, the Registrants enter into contracts that contain express provisions or otherwise permit the Registrants and their counterparties to demand adequate assurance of future performance when there are reasonable grounds for doing so. In accordance with the contracts and applicable contracts law, if the Registrants are downgraded by a credit rating agency, it is possible that a counterparty would attempt to rely on such a downgrade as a basis for making a demand for adequate assurance of future performance, which could include the posting of collateral. See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information on collateral provisions.

Intercompany Money Pool

To provide an additional short-term borrowing option that will generally be more favorable to the borrowing participants than the cost of external financing, Exelon operates an intercompany money pool. Maximum amounts contributed to and borrowed from the money pool by participant and the net contribution or borrowing as of June 30, 2014, are presented in the following table:

 

     During the three months ended
June 30, 2014
     As of
June 30, 2014
 

Contributed (borrowed) as of June 30, 2014

   Maximum
Contributed
     Maximum
Borrowed
     Contributed
(Borrowed)
 

Generation

   $      $ 405      $ (190

PECO

     129                

BSC

            329        (259

Exelon Corporate

     563        N/A         449  

Investments in Nuclear Decommissioning Trust Funds

Exelon, Generation and CENG maintain trust funds, as required by the NRC, to fund certain costs of decommissioning nuclear plants. The mix of securities in the trust funds is designed to provide returns to be used to fund decommissioning and to offset inflationary increases in decommissioning costs. Generation actively monitors the investment performance of the trust funds and periodically reviews asset allocations in accordance with Generation’s NDT fund investment policy. Generation’s and CENG’s investment policies establish limits on the concentration of holdings in any one company and also in any one industry. See Note 12 — Nuclear Decommissioning of the Combined Notes to Consolidated Financial Statements for further information regarding the trust funds, the NRC’s minimum funding requirements and related liquidity ramifications.

Shelf Registration Statements

The Registrants have a currently effective combined shelf registration statement unlimited in amount, filed with the SEC, that will expire in May 2017. The ability of each Registrant to sell securities off the shelf registration statement or to access the private placement markets will depend on a number of factors at the time of the proposed sale, including other required regulatory approvals, as applicable, the current financial condition of the Registrant, its securities ratings and market conditions.

Regulatory Authorizations

As of June 30, 2014, ComEd had $702 million available in long-term debt refinancing authority and $1.2 billion available in new money long-term debt financing authority from the ICC. As of June 30, 2014, PECO had $1.4 billion available in long-term debt financing authority from the PAPUC. As of June 30, 2014, BGE had $850 million available in long-term financing authority from MDPSC.

As of June 30, 2014, ComEd, PECO and BGE had short-term financing authority from FERC, which expires on December 31, 2015, of $2.5 billion, $2.5 billion, and $0.7 billion, respectively. Generation currently has blanket financing authority from FERC, which was granted in connection with its market-based rate authority.

 

214


Table of Contents

Contractual Obligations and Off-Balance Sheet Arrangements

Contractual obligations represent cash obligations that are considered to be firm commitments and commercial commitments triggered by future events. See Note 18 — Commitments and Contingencies of the Combined Notes to Consolidated Financial Statements for discussion of the Registrants’ commitments.

Generation, ComEd, PECO and BGE have obligations related to contracts for the purchase of power and fuel supplies, and ComEd, PECO and BGE have obligations related to their financing trusts. The power and fuel purchase contracts and the financing trusts have been considered for consolidation in the Registrants’ respective financial statements pursuant to the authoritative guidance for VIEs. See Note 1 — Basis of Presentation of the Combined Notes to Consolidated Financial Statements for further information.

For an in-depth discussion of the Registrant’s contractual obligations and off-balance sheet arrangements, see “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Contractual Obligations and Off-Balance Sheet Arrangements” in the Exelon 2013 Form 10-K.

 

215


Table of Contents
Item 3. Quantitative and Qualitative Disclosures about Market Risk

The Registrants are exposed to market risks associated with adverse changes in commodity prices, counterparty credit, interest rates and equity prices. Exelon’s RMC approves risk management policies and objectives for risk assessment, control and valuation, counterparty credit approval, and the monitoring and reporting of risk exposures. The RMC is chaired by the chief enterprise risk officer and includes the chief executive officer, chief financial officer, chief commercial risk officer, corporate controller, general counsel, treasurer, vice president of strategy, vice president of audit services and officers representing Exelon’s business units. The RMC reports to the Risk Oversight Committee of the Exelon Board of Directors on the scope of the risk management activities. The following discussion serves as an update to ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK of the Registrants’ 2013 Annual Report on Form 10-K incorporated herein by reference.

Commodity Price Risk (Exelon, Generation, ComEd, PECO and BGE)

Commodity price risk is associated with price movements resulting from changes in supply and demand, fuel costs, market liquidity, weather conditions, governmental regulatory and environmental policies, and other factors. To the extent the amount of energy Exelon generates differs from the amount of energy it has contracted to sell, Exelon has price risk from commodity price movements. Exelon seeks to mitigate its commodity price risk through the sale and purchase of electricity, fossil fuel, and other commodities.

Generation

Normal Operations and Hedging Activities.    Electricity available from Generation’s owned or contracted generation supply in excess of Generation’s obligations to customers, including portions of ComEd’s, PECO’s and BGE’s retail load, is sold into the wholesale markets. To reduce price risk caused by market fluctuations, Generation enters into non-derivative contracts as well as derivative contracts, including forwards, futures, swaps, and options, with approved counterparties to hedge anticipated exposures. Generation believes these instruments represent economic hedges that mitigate exposure to fluctuations in commodity prices. Generation expects the settlement of the majority of its economic hedges will occur during 2014 through 2016.

In general, increases and decreases in forward market prices have a positive and negative impact, respectively, on Generation’s owned and contracted generation positions which have not been hedged. Generation hedges commodity risk on a ratable basis over the three years leading to the spot market. As of June 30, 2014, the percentage of expected generation hedged for the major reportable segments was 92%-95%, 75%-78% and 46%-49% for 2014, 2015 and 2016, respectively. The percentage of expected generation hedged is the amount of equivalent sales divided by the expected generation. Expected generation represents the amount of energy estimated to be generated or purchased through owned or contracted capacity. Equivalent sales represent all hedging products, which include economic hedges and certain non-derivative contracts including sales to ComEd, PECO and BGE to serve their retail load.

A portion of Generation’s hedging strategy may be accomplished with fuel products based on assumed correlations between power and fuel prices, which routinely change in the market. Market price risk exposure is the risk of a change in the value of unhedged positions. The forecasted market price risk exposure for Generation’s entire non-trading portfolio associated with a $5 reduction in the annual average around-the-clock energy price based on June 30, 2014 market conditions and hedged position would be a decrease in pre-tax net income of approximately $20 million, $270 million and $570 million, respectively, for 2014, 2015 and 2016. Power price sensitivities are derived by adjusting power price assumptions while keeping all other price inputs constant. Generation expects to actively manage its portfolio to mitigate market price risk exposure for its unhedged position. Actual results could differ depending on the specific timing of, and markets affected by, price changes, as well as future changes in Generation’s portfolio.

Proprietary Trading Activities.    Generation also enters into certain energy-related derivatives for proprietary trading purposes. Proprietary trading includes all contracts entered into with the intent of benefiting

 

216


Table of Contents

from shifts or changes in market prices as opposed to those entered into with the intent of hedging or managing risk. Proprietary trading activities are subject to limits established by Exelon’s RMC. The proprietary trading portfolio is subject to a risk management policy that includes stringent risk management limits, including volume, stop loss and Value-at-Risk (VaR) limits to manage exposure to market risk. Additionally, the Exelon risk management group and Exelon’s RMC monitor the financial risks of the proprietary trading activities. The proprietary trading activities, which included physical volumes of 2,629 GWhs and 5,123 GWhs for the three and six months ended June 30, 2014, respectively, and 1,995 GWhs and 3,567 GWhs for the three and six months ended June 30, 2013, respectively, are a complement to Generation’s energy marketing portfolio, but represent a small portion of Generation’s overall revenue from energy marketing activities. Trading portfolio activity for the six months ended June 30, 2014 resulted in pre-tax gains of $20 million due to net mark-to-market losses of $7 million and realized gains of $27 million. Generation uses a 95% confidence interval, assuming standard normal distribution, one day holding period, one-tailed statistical measure in calculating its VaR. The daily VaR on proprietary trading activity averaged $ 0.4 million of exposure during the quarter. Generation has not segregated proprietary trading activity within the following discussion because of the relative size of the proprietary trading portfolio in comparison to Generation’s total gross margin from continuing operations for the six months ended June 30, 2014 of $2,988 million.

Fuel Procurement.    Generation procures coal and natural gas through long-term and short-term contracts, and spot-market purchases. Nuclear fuel assemblies are obtained primarily through long-term contracts for uranium concentrates, and long-term contracts for conversion services, enrichment services and fuel fabrication services. The supply markets for coal, natural gas, uranium concentrates and certain nuclear fuel services are subject to price fluctuations and availability restrictions. Supply market conditions may make Generation’s procurement contracts subject to credit risk related to the potential non-performance of counterparties to deliver the contracted commodity or service at the contracted prices. Approximately 60% of Generation’s uranium concentrate requirements from 2014 through 2018 are supplied by three producers. In the event of non-performance by these or other suppliers, Generation believes that replacement uranium concentrates can be obtained, although at prices that may be unfavorable when compared to the prices under the current supply agreements. Non-performance by these counterparties could have a material impact on Exelon’s and Generation’s results of operations, cash flows and financial positions. See Note 18 — Commitments and Contingencies of the Combined Notes to Consolidated Financial Statements for additional information regarding uranium and coal supply agreement matters.

ComEd

ComEd entered into 20-year contracts for renewable energy and RECs beginning in June 2012. ComEd is permitted to recover its renewable energy and REC costs from retail customers with no mark-up. The annual commitments represent the maximum settlements with suppliers for renewable energy and RECs under the existing contract terms. Pursuant to the ICC’s Order on December 19, 2012, ComEd’s commitments under the existing long-term contracts were reduced for the June 2013 through May 2014 procurement period. In addition, the ICC’s December 18, 2013 Order approved the reduction of ComEd’s commitments under those contracts for the June 2014 through May 2015 procurement period, and the amount of the reduction was approved by the ICC in March 2014. See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements in this report and Note 3 — Regulatory Matters of the Exelon 2013 Form 10-K for additional information regarding energy procurement and derivatives.

PECO

PECO has contracts to procure electric supply that were executed through the competitive procurement process outlined in its PAPUC-approved DSP Programs, which are further discussed in Note 5 — Regulatory Matters of the Combined Notes to the Consolidated Financial Statements. PECO has certain full requirements contracts and block contracts which are considered derivatives and qualify for the normal purchases and normal

 

217


Table of Contents

sales scope exception under current derivative authoritative guidance, and as a result are accounted for on an accrual basis of accounting. Under the DSP Programs, PECO is permitted to recover its electric supply procurement costs from retail customers with no mark-up.

PECO has also entered into derivative natural gas contracts, which either qualify for the normal purchases and normal sales exception or have no mark-to-market balances because the derivatives are index priced, to hedge its long-term price risk in the natural gas market. PECO’s hedging program for natural gas procurement has no direct impact on its financial position or results of operations as natural gas costs are fully recovered from customers under the PGC.

PECO does not enter into derivatives for speculative or proprietary trading purposes. For additional information on these contracts, see Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements.

BGE

BGE procures electric supply for default service customers through full requirements contracts pursuant to BGE’s MDPSC-approved SOS program. BGE’s full requirements contracts that are considered derivatives qualify for the normal purchases and normal sales scope exception under current derivative authoritative guidance, and as a result, are accounted for on an accrual basis of accounting. Under the SOS program, BGE is permitted to recover its electricity procurement costs from retail customers, plus an administrative fee which includes a shareholder return component and an incremental cost component. However, through December 2016, BGE provides all residential electric customers a credit for the residential shareholder return component of the administrative charge.

BGE has also entered into derivative natural gas contracts, which qualify for the normal purchases and normal sales scope exception, to hedge its price risk in the natural gas market. The hedging program for natural gas procurement has no direct impact on BGE’s financial position. However, under BGE’s market-based rates incentive mechanism, BGE’s actual cost of gas is compared to a market index (a measure of the market price of gas in a given period). The difference between BGE’s actual cost and the market index is shared equally between shareholders and customers.

BGE does not enter into derivatives for speculative or proprietary trading purposes. For additional information on these contracts, see Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements.

Trading and Non-Trading Marketing Activities.    The following detailed presentation of Exelon’s, Generation’s, ComEd’s and PECO’s trading and non-trading marketing activities is included to address the recommended disclosures by the energy industry’s Committee of Chief Risk Officers (CCRO).

 

218


Table of Contents

The following table provides detail on changes in Exelon’s, Generation’s and ComEd’s commodity mark-to-market net asset or liability balance sheet position from December 31, 2013 to June 30, 2014. It indicates the drivers behind changes in the balance sheet amounts. This table incorporates the mark-to-market activities that are immediately recorded in earnings as well as the settlements from OCI to earnings and changes in fair value for the cash flow hedging activities that are recorded in accumulated OCI on the Consolidated Balance Sheets. This table excludes all normal purchase and normal sales contracts and does not segregate proprietary trading activity. See Note 9 — Derivative Financial Instruments of the Combined Notes to the Consolidated Financial Statements for additional information on the balance sheet classification of the mark-to-market energy contract net assets (liabilities) recorded as of June 30, 2014 and December 31, 2013.

 

    Generation     ComEd     Exelon  

Total mark-to-market energy contract net assets (liabilities) at December 31, 2013(a)

  $ 1,047     $ (193   $ 854  

Total change in fair value during 2014 of contracts recorded in result of operations

    (693           (693

Reclassification to realized at settlement of contracts recorded in results of operations

    (53           (53

Reclassification to realized at settlement from accumulated OCI

    (102           (102

Changes in fair value — energy derivatives(c)

          59       59  

Changes in allocated collateral

    634             634  

Changes in net option premium paid/(received)

    (21           (21

Option premium amortization(b)

    (63           (63

Other balance sheet reclassifications

    (2           (2
 

 

 

   

 

 

   

 

 

 

Total mark-to-market energy contract net assets (liabilities) at June 30, 2014(a)

  $ 747     $ (134   $ 613  
 

 

 

   

 

 

   

 

 

 

 

(a)

Amounts are shown net of collateral paid to and received from counterparties.

(b)

Includes $63 million of amounts reclassified to realized at the settlement of contracts recorded to results of operations related to option premiums due to the settlement of the underlying transactions for the six months ended June 30, 2014.

(c)

For ComEd, the changes in fair value are recorded as a change in regulatory assets or liabilities. As of June 30, 2014, ComEd recorded a $134 million regulatory asset related to its mark-to-market derivative liabilities with Generation and unaffiliated suppliers. As of June 30, 2014, ComEd also recorded $64 million of decreases in fair value and $5 million of realized losses due to settlements associated with floating-to-fixed energy swap contracts with unaffiliated suppliers.

Fair Values.    The following tables present maturity and source of fair value for Exelon, Generation and ComEd mark-to-market commodity contract net assets (liabilities). The tables provide two fundamental pieces of information. First, the tables provide the source of fair value used in determining the carrying amount of the Registrants’ total mark-to-market net assets (liabilities), net of allocated collateral. Second, the tables show the maturity, by year, of the Registrants’ commodity contract net assets (liabilities), net of allocated collateral, giving an indication of when these mark-to-market amounts will settle and either generate or require cash. See Note 8 — Fair Value of Financial Assets and Liabilities of the Combined Notes to Consolidated Financial Statements for additional information regarding fair value measurements and the fair value hierarchy.

Exelon

 

    Maturities Within        
    2014     2015     2016     2017     2018     2019 and
Beyond
    Total Fair
Value
 

Normal Operations, Commodity derivative contracts(a)(b)

             

Actively quoted prices (Level 1)

  $ 22     $ (4   $ 20     $ 2     $ 5     $     $ 45  

Prices provided by external sources (Level 2)

    159       253       52       (4                 460  

Prices based on model or other valuation methods (Level 3)(c)

    32       107       14       30       (17     (58     108  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total

  $ 213     $ 356     $ 86     $ 28     $ (12   $ (58   $ 613  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

219


Table of Contents

 

(a)

Mark-to-market gains and losses on other economic hedge and trading derivative contracts that are recorded in results of operations.

(b)

Amounts are shown net of collateral paid to and received from counterparties (and offset against mark-to-market assets and liabilities) of $490 million at June 30, 2014.

(c)

Includes ComEd’s net assets (liabilities) associated with the floating-to-fixed energy swap contracts with unaffiliated suppliers.

Generation

 

    Maturities Within        
    2014     2015     2016     2017     2018     2019 and
Beyond
    Total Fair
Value
 

Normal Operations, Commodity derivative contracts(a)(b)

             

Actively quoted prices (Level 1)

  $ 22     $ (4   $ 20     $ 2     $ 5     $     $ 45  

Prices provided by external sources (Level 2)

    159       253       52       (4                 460  

Prices based on model or other valuation methods (Level 3)

    39       122       28       43       (5     15       242  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total

  $ 220     $ 371     $ 100     $ 41     $     $ 15     $ 747  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(a)

Mark-to-market gains and losses on other economic hedge and trading derivative contracts that are recorded in the results of operations.

(b)

Amounts are shown net of collateral paid to and received from counterparties (and offset against mark-to-market assets and liabilities) of $490 million at June 30, 2014.

ComEd

 

    Maturities Within        
    2014     2015     2016     2017     2018     2019 and
beyond
    Total Fair
Value
 

Prices based on model or other valuation methods(a)

  $ (7   $ (15   $ (14   $ (13   $ (12   $ (73   $ (134

 

(a)

Represents ComEd’s net liabilities associated with the floating-to-fixed energy swap contracts with unaffiliated suppliers.

Credit Risk, Collateral, and Contingent Related Features (Exelon, Generation, ComEd, PECO and BGE)

The Registrants would be exposed to credit-related losses in the event of non-performance by counterparties that enter into derivative instruments. The credit exposure of derivative contracts, before collateral, is represented by the fair value of contracts at the reporting date. See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for a detailed discussion of credit risk, collateral, and contingent related features.

Generation

The following tables provide information on Generation’s credit exposure for all derivative instruments, normal purchase normal sales agreements, and applicable payables and receivables, net of collateral and instruments that are subject to master netting agreements, as of June 30, 2014. The tables further delineate that exposure by credit rating of the counterparties and provide guidance on the concentration of credit risk to individual counterparties and an indication of the duration of a company’s credit risk by credit rating of the counterparties. The figures in the tables below exclude credit risk exposure from individual retail customers,

 

220


Table of Contents

uranium procurement contracts, and exposure through RTOs, ISOs, NYMEX, ICE and Nodal commodity exchanges, which are discussed below. Additionally, the figures in the tables below exclude exposures with affiliates, including net receivables with ComEd, PECO and BGE of $6 million, $23 million and $36 million, respectively. See Note 25 — Related Party Transactions of the Exelon 2013 Form 10-K for additional information.

 

Rating as of June 30, 2014

   Total Exposure
Before
Credit Collateral
     Credit
Collateral(a)
     Net
Exposure
     Number of
Counterparties
Greater than 10%
of Net Exposure
     Net Exposure of
Counterparties
Greater than
10% of Net
Exposure
 

Investment grade

   $ 1,095      $ 103      $ 992        1      $ 417  

Non-investment grade

     12        9        3                

No external ratings

              

Internally rated — investment grade

     286        2        284        1        189  

Internally rated — non-investment grade

     21        4        17                
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   $ 1,414      $ 118      $ 1,296        2      $ 606  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

      Maturity of Credit Risk Exposure  

Rating as of June 30, 2014

   Less than
2 Years
     2-5 Years      Exposure
Greater than
5 Years
     Total Exposure
Before Credit
Collateral
 

Investment grade

   $ 709      $ 295      $ 91      $ 1,095  

Non-investment grade

     11        1               12  

No external ratings

           

Internally rated — investment grade

     195        88        3        286  

Internally rated — non-investment grade

     21                      21  
  

 

 

    

 

 

    

 

 

    

 

 

 

Total

   $ 936      $ 384      $ 94      $ 1,414  
  

 

 

    

 

 

    

 

 

    

 

 

 

 

Net Credit Exposure by Type of Counterparty

   As of June 30,
2014
 

Investor-owned utilities, marketers and power producers

   $ 360  

Energy cooperatives and municipalities

     729  

Financial institutions

     185  

Other

     22  
  

 

 

 

Total

   $ 1,296  
  

 

 

 

 

(a)

As of June 30, 2014, credit collateral held from counterparties where Generation had credit exposure included $112 million of cash and $6 million of letters of credit.

ComEd

There have been no significant changes or additions to ComEd’s exposures to credit risk that are described in ITEM 1A. RISK FACTORS of Exelon’s 2013 Annual Report on Form 10-K.

See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for information regarding credit exposure to suppliers.

PECO

There have been no significant changes or additions to PECO’s exposures to credit risk as described in ITEM 1A. RISK FACTORS of Exelon’s 2013 Annual Report on Form 10-K.

 

221


Table of Contents

See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for information regarding credit exposure to suppliers.

BGE

There have been no significant changes or additions to BGE’s exposures to credit risk as described in ITEM 1A. RISK FACTORS of Exelon’s 2013 Annual Report on Form 10-K.

See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for information regarding credit exposure to suppliers.

Collateral (Exelon, Generation, ComEd, PECO and BGE)

Generation

As part of the normal course of business, Generation routinely enters into physical or financial contracts for the sale and purchase of electricity, fossil fuel and other commodities. These contracts either contain express provisions or otherwise permit Generation and its counterparties to demand adequate assurance of future performance when there are reasonable grounds for doing so. In accordance with the contracts and applicable law, if Generation is downgraded by a credit rating agency, especially if such downgrade is to a level below investment grade, it is possible that a counterparty would attempt to rely on such a downgrade as a basis for making a demand for adequate assurance of future performance. Depending on Generation’s net position with a counterparty, the demand could be for the posting of collateral. In the absence of expressly agreed-to provisions that specify the collateral that must be provided, collateral requested will be a function of the facts and circumstances of the situation at the time of the demand. In this case, Generation believes an amount of several months of future payments (i.e. capacity payments) rather than a calculation of fair value is the best estimate for the contingent collateral obligation, which has been factored into the disclosure below. See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for information regarding collateral requirements.

Generation sells output through bilateral contracts. The bilateral contracts are subject to credit risk, which relates to the ability of counterparties to meet their contractual payment obligations. Any failure to collect these payments from counterparties could have a material impact on Exelon’s and Generation’s results of operations, cash flows and financial position. As market prices rise above contracted price levels, Generation is required to post collateral with purchasers; as market prices fall below contracted price levels, counterparties are required to post collateral with Generation. In order to post collateral, Generation depends on access to bank credit facilities, which serve as liquidity sources to fund collateral requirements. See Note 10 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

As of June 30, 2014, Generation had cash collateral of $623 million posted and cash collateral held of $124 million for counterparties with derivative positions, of which $490 million and $2 million in net cash collateral deposits were offset against energy mark-to-market and interest rate and foreign exchange derivative assets and liabilities related to underlying energy contracts, respectively. As of June 30, 2014, $7 million of cash collateral posted was not offset against net derivative positions because it was not associated with energy-related derivatives or as of the balance sheet date there were no positions to offset. See Note 18 — Commitments and Contingencies of the Combined Notes to Consolidated Financial Statements for information regarding the letters of credit supporting the cash collateral.

ComEd

As of June 30, 2014, ComEd held approximately $2 million of collateral from suppliers in association with energy procurement contracts and held approximately $19 million in the form of cash and letters of credit for both annual and long-term renewable energy contracts. See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements in this report and Note 3 — Regulatory Matters of the 2013 Exelon Form 10-K for additional information.

 

222


Table of Contents

PECO

As of June 30, 2014, PECO was not required to post collateral under its energy and natural gas procurement contracts. See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information.

BGE

BGE is not required to post collateral under its electric supply contracts. As of June 30, 2014, BGE was not required to post collateral under its natural gas procurement contracts. However, BGE did hold approximately $20 million of collateral from suppliers for both electric supply and natural gas procurement contracts as of June 30, 2014. See Note 9 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information.

RTOs and ISOs (Exelon, Generation, ComEd, PECO and BGE)

Generation, ComEd, PECO and BGE participate in all, or some, of the established, real-time energy markets that are administered by PJM, ISO-NE, ISO-NY, CAISO, MISO, SPP, AESO, OIESO and ERCOT. In these areas, power is traded through bilateral agreements between buyers and sellers and on the spot markets that are operated by the RTOs or ISOs, as applicable. In areas where there is no spot market, electricity is purchased and sold solely through bilateral agreements. For sales into the spot markets administered by an RTO or ISO, the RTO or ISO maintains financial assurance policies that are established and enforced by those administrators. The credit policies of the RTOs and ISOs may, under certain circumstances, require that losses arising from the default of one member on spot market transactions be shared by the remaining participants. Non-performance or non-payment by a major counterparty could result in a material adverse impact on the Registrants’ results of operations, cash flows and financial positions.

Exchange Traded Transactions (Exelon and Generation)

Generation enters into commodity transactions on NYMEX, ICE and the Nodal exchange. The NYMEX, ICE and Nodal exchange clearinghouses act as the counterparty to each trade. Transactions on the NYMEX, ICE and Nodal exchange must adhere to comprehensive collateral and margining requirements. As a result, transactions on NYMEX, ICE and Nodal exchange are significantly collateralized and have limited counterparty credit risk.

Long-Term Leases (Exelon)

Exelon’s Consolidated Balance Sheet, as of June 30, 2014, included a $353 million net investment in coal-fired plants in Georgia subject to long-term leases. This investment represents the estimated residual value of leased assets at the end of the respective lease terms of $685 million, less unearned income of $332 million. The lease agreements provide the lessees with fixed purchase options at the end of the lease terms. If the lessee does not exercise the fixed purchase options, Exelon has the ability to operate the stations and keep or market the power itself or require the lessee to arrange for a third party to bid on a service contract for a period following the lease term. Exelon will be subject to residual value risk if the lessee does not exercise the fixed purchase options. This risk is partially mitigated by the fair value of the scheduled payments under the service contract. However, such payments are not guaranteed. Further, the term of the service contract is less than the expected remaining useful life of the plants and, therefore, Exelon’s exposure to residual value risk will not be mitigated by payments under the service contract in this remaining period. Lessee performance under the lease agreements is supported by collateral and credit enhancement measures. Management regularly evaluates the creditworthiness of Exelon’s counterparties to these long-term leases. Exelon monitors the continuing credit quality of the credit enhancement party.

 

223


Table of Contents

Exelon’s Consolidated Balance Sheet, as of December 31, 2013, also included a net investment in a coal-fired plant in Texas subject to a long-term lease. In February 2014, Exelon and the City Public Service Board of San Antonio, Texas (CPS) finalized an agreement to terminate the leases prior to their expiration dates. As a result of the lease termination, Exelon received a net early termination amount of $335 million from CPS and wrote off the net investment in the CPS long-term lease of $336 million; resulting in a pre-tax loss of $1 million. See Note 11 — Income Taxes for the impact of the lease termination on income taxes.

Interest Rate and Foreign Exchange Risk (Exelon, Generation, ComEd, PECO and BGE)

The Registrants use a combination of fixed-rate and variable-rate debt to manage interest rate exposure. The Registrants may also utilize fixed-to-floating interest rate swaps, which are typically designated as fair value hedges, as a means to manage their interest rate exposure. In addition, the Registrants may utilize interest rate derivatives to lock in rate levels in anticipation of future financings, which are typically designated as cash flow hedges. These strategies are employed to manage interest rate risks. At June 30, 2014, Exelon and Generation had $1,550 million and $700 million of notional amounts of fixed-to-floating hedges outstanding, respectively, and $1,111 million and $411 million of notional amounts of floating-to-fixed hedges outstanding, respectively. Assuming the fair value and cash flow interest rate hedges are 100% effective, a hypothetical 50 bps increase in the interest rates associated with unhedged variable-rate debt (excluding Commercial Paper) and fixed-to-floating swaps would result in approximately a $4 million decrease in Exelon Consolidated pre-tax income for the six months ended June 30, 2014. To manage foreign exchange rate exposure associated with international energy purchases in currencies other than U.S. dollars, Generation utilizes foreign currency derivatives, which are typically designated as economic hedges.

Equity Price Risk (Exelon and Generation)

Exelon and Generation maintain trust funds, as required by the NRC, to fund certain costs of decommissioning Generation’s nuclear plants. As of June 30, 2014, Generation’s decommissioning trust funds are reflected at fair value on its Consolidated Balance Sheets. The mix of securities in the trust funds is designed to provide returns to be used to fund decommissioning and to compensate Generation for inflationary increases in decommissioning costs; however, the equity securities in the trust funds are exposed to price fluctuations in equity markets, and the value of fixed-rate, fixed-income securities are exposed to changes in interest rates. Generation actively monitors the investment performance of the trust funds and periodically reviews asset allocation in accordance with Generation’s NDT fund investment policy. A hypothetical 10% increase in interest rates and decrease in equity prices would result in a $617 million reduction in the fair value of the trust assets. This calculation holds all other variables constant and assumes only the discussed changes in interest rates and equity prices. See ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS for further discussion of equity price risk as a result of the current capital and credit market conditions.

 

Item 4. Controls and Procedures

During the second quarter of 2014, each of Exelon’s, Generation’s, ComEd’s, PECO’s and BGE’s management, including its principal executive officer and principal financial officer, evaluated its disclosure controls and procedures related to the recording, processing, summarizing and reporting of information in its periodic reports that it files with the SEC. These disclosure controls and procedures have been designed by all Registrants to ensure that (a) material information relating to that Registrant, including its consolidated subsidiaries, is accumulated and made known to Exelon’s management, including its principal executive officer and principal financial officer, by other employees of that Registrant and its subsidiaries as appropriate to allow timely decisions regarding required disclosure, and (b) this information is recorded, processed, summarized, evaluated and reported, as applicable, within the time periods specified in the SEC’s rules and forms. Due to the inherent limitations of control systems, not all misstatements may be detected. These inherent limitations include

 

224


Table of Contents

the realities that judgments in decision-making can be faulty and that breakdowns can occur because of simple error or mistake. Additionally, controls could be circumvented by the individual acts of some persons or by collusion of two or more people.

Accordingly, as of June 30, 2014, the principal executive officer and principal financial officer of each of Exelon, Generation, ComEd, PECO and BGE concluded that such Registrant’s disclosure controls and procedures were effective to accomplish its objectives. All Registrants continually strive to improve its disclosure controls and procedures to enhance the quality of its financial reporting and to maintain dynamic systems that change as conditions warrant. There have been no changes in internal control over financial reporting that occurred during the second quarter of 2014 that have materially affected, or are reasonably likely to materially affect, any of Exelon’s, Generation’s, ComEd’s, PECO’s and BGE’s internal control over financial reporting.

 

225


Table of Contents

PART II — OTHER INFORMATION

 

Item 1. Legal Proceedings

The Registrants are parties to various lawsuits and regulatory proceedings in the ordinary course of their respective businesses. For information regarding material lawsuits and proceedings, see (a) ITEM 3. LEGAL PROCEEDINGS of Exelon’s 2013 Form 10-K and (b) Notes 5 and 18 of the Combined Notes to Consolidated Financial Statements in PART I, ITEM 1. FINANCIAL STATEMENTS of this Report. Such descriptions are incorporated herein by these references.

 

Item 1A. Risk Factors

In addition to the risk factors described in Part I, Item 1A. Risk Factors in Exelon’s 2013 Form 10-K, Exelon faces the following additional risks:

Risks Related to the Pending Merger with PHI

Exelon and PHI may encounter difficulties in satisfying the conditions for the completion of the Merger and the Merger may not be completed within the expected timeframe or at all.

Consummation of the Merger is subject to the satisfaction or waiver of specified closing conditions, including (1) the approval of the Merger by the holders of a majority of the outstanding shares of the PHI common stock, (2) the receipt of regulatory approvals required to consummate the Merger, (3) the expiration or termination of the applicable waiting period under the HSR Act and (4) other customary closing conditions, including (a) the accuracy of each party’s representations and warranties (subject to customary materiality qualifiers) and (b) each party’s compliance with its obligations and covenants contained in the Merger Agreement. In addition, the obligation of Exelon to consummate the Merger is subject to the required regulatory approvals not, individually or in the aggregate, imposing terms, conditions, obligations or commitments that constitute a burdensome condition (as defined in the Merger Agreement)

Satisfying the conditions to completion of the Merger may take longer, and could cost more, than Exelon expects. Any delay in completing the Merger or any additional conditions imposed in order to complete the Merger may materially adversely affect the synergies and other benefits that Exelon expects to achieve from the Merger and the integration of the companies’ respective businesses.

In addition, conditions to the completion of the Merger may fail to be satisfied. Exelon or PHI may terminate the Merger Agreement if the Merger is not completed by July 29, 2015 except that, under certain circumstances, the date may be extended by Exelon or PHI to October 29, 2015.

The Merger is subject to the receipt of consent or approval from governmental entities that could delay the completion of the Merger or impose conditions that could have a material adverse effect on the combined company or that could cause abandonment of the Merger.

Completion of the Merger is conditioned upon the receipt of consents, orders, approvals or clearances, to the extent required, from the FERC, the FCC, the District of Columbia Public Service Commission, and the public utility commissions or similar entities in certain states in which the companies operate, including the Delaware Public Service Commission, MDPSC, the New Jersey Board of Public Utilities and the Virginia Department of Public Utilities. The Merger is also subject to review by the DOJ Antitrust Division, under the HSR Act, and the expiration or earlier termination of the waiting period (and any extension of the waiting period) applicable to the Merger is a condition to closing the Merger. As of July 31, 2014, Exelon and PHI have made some, but not all, of the required regulatory filings, and the Merger remains subject to the approval or review of each of the regulatory agencies mentioned above.

 

226


Table of Contents

Exelon and PHI have proposed conditions for approval in some of the regulatory filings that have been made and may subsequently propose or agree to further conditions, even if such conditions could have an adverse effect on Exelon, PHI or the combined company.

Exelon cannot provide assurance that all required regulatory consents or approvals will be obtained or that these consents or approvals will not contain terms, conditions or restrictions that would be detrimental to the combined company after the completion of the Merger. The Merger Agreement generally permits Exelon to terminate the Merger Agreement if the final terms of any of the required regulatory consents or approvals include burdensome conditions (as defined in the Merger Agreement). Any substantial delay in obtaining satisfactory approvals, receipt of proceeds from asset divestitures in an amount substantially lower than anticipated or the imposition of any terms or conditions in connection with such approvals could cause a material reduction in the expected benefits of the Merger.

Failure to obtain regulatory approval may result in Exelon’s payment of a reverse termination fee.

If the Merger Agreement is terminated under certain circumstances due to the failure to obtain regulatory approvals or the breach by Exelon of its obligations in respect of obtaining regulatory approvals, Exelon will be required to pay PHI a reverse termination fee of up to $180 million, by means of PHI redeeming the outstanding nonvoting preferred securities purchased by Exelon for no consideration other than the nominal par value of the stock.

Failure to complete the Merger could negatively affect the share price and the future business and financial results of Exelon.

Completion of the Merger is not assured and is subject to risks, including the risks that approval of the transaction by governmental agencies will not be obtained or that certain other closing conditions will not be satisfied. If the Merger is not completed, the ongoing businesses of Exelon may be adversely affected and Exelon will be subject to several risks, including:

 

   

having to pay certain significant costs relating to the Merger without receiving the benefits of the Merger, including, in certain circumstances, a termination fee of up to $180 million payable by Exelon to PHI under some circumstances; and

 

   

the share price of Exelon may decline if and to the extent that the current market prices reflect an assumption by the market that the Merger will be completed.

Exelon and PHI have and will incur significant transaction and Merger-related costs in connection with the Merger.

Exelon and PHI expect to incur a number of non-recurring costs associated with combining the operations of the two companies. Most of these costs will be transaction costs, including fees paid to financial and legal advisors related to the Merger and related financing arrangements, and employment-related costs, including change-in- control related payments made to certain PHI executives. In addition, if the closing of the Merger is materially delayed, Exelon may be required to pay financing costs without having realized any benefits from the Merger during the period of delay. Exelon will also incur transaction fees and costs related to formulating integration plans. Additional unanticipated costs may be incurred in the integration of the two companies’ businesses. Although Exelon expects that the elimination of costs, as well as the realization of other efficiencies related to the integration of the businesses, will exceed incremental transaction and Merger-related costs over time, this net benefit may not be achieved in the near term, or at all.

 

227


Table of Contents

Exelon may not realize the expected benefits of the Merger because of integration difficulties and other challenges.

The success of the PHI acquisition will depend, in part, on Exelon’s ability to realize all or some of the anticipated benefits from integrating PHI’s business with Exelon’s existing businesses. The integration process may be complex, costly and time-consuming. The challenges associated with integrating the operations of PHI’s business include, among others:

 

   

delay in implementation of our business plan for the combined business;

 

   

unanticipated issues or costs in integrating financial, information technology, communications and other systems;

 

   

possible inconsistencies in standards, controls, procedures and policies, and compensation structures between PHI’ s structure and our structure;

 

   

unanticipated changes in applicable laws and regulations;

 

   

difficulties in retention of key employees;

 

   

operating risks inherent in PHI’s business and our business; and

 

   

unexpected regulatory requirements.

Exelon and PHI will be subject to various uncertainties while the Merger is pending that may adversely affect their ability to attract and retain key employees, and potentially affect the company’s financial results.

Uncertainty about the effect of the Merger on employees, suppliers and customers may have an adverse effect on Exelon and/or PHI. These uncertainties may impair Exelon’s and/or PHI’s ability to attract, retain and motivate key personnel until the Merger is completed and for a period of time thereafter, as employees and prospective employees may experience uncertainty about their future roles with the combined company. In addition, current and prospective Exelon and PHI employees may determine that they do not desire to work for the combined company for a variety of possible reasons.

The Merger may divert attention of management at Exelon and PHI, which could detract from efforts to meet business goals.

The pursuit of the Merger and the preparation for the integration may place a burden on management and internal resources. Any significant diversion of management attention away from ongoing business concerns and any difficulties encountered in the transition and integration process could affect Exelon’s and/or PHI’s financial results. The process of integrating the operations of PHI may require a disproportionate amount of resources and management attention. Exelon’s future operations and cash flows will depend to a significant degree upon Exelon’s ability to operate PHI efficiently, achieve the strategic operating objectives for the business and realize cost savings and synergies. Exelon’s management team may encounter unforeseen difficulties in managing the integration. In order to successfully integrate PHI, Exelon’s management team will need to focus on realizing anticipated synergies and cost savings on a timely basis while maintaining the efficiency of operations. Any substantial diversion of management attention could affect Exelon’s ability to achieve operational, financial and strategic objectives.

We are obligated to complete the Merger whether or not we have obtained the required financing.

Exelon intends to fund the cash consideration in the Merger using a combination of approximately $3.5 billion of debt, up to $1.0 billion cash from asset sales, and the remainder through issuance of equity (including mandatory convertible securities). Exelon has executed a $2.0 billion equity offering of 57.5 million shares of common stock in connection with forward sales agreements and $1.2 billion of junior subordinated

 

228


Table of Contents

notes in the form of 23 million equity units. In addition, Exelon signed a 364-day $7.2 billion senior unsecured bridge credit facility to provide financing for the Merger pending the arrangement of permanent financing, which has subsequently been reduced to $4.2 billion as a result of the equity issuances. The unsecured bridge credit facility is subject to various conditions contained in the agreement and the issuance of long-term debt and sales of assets to finance the Merger will be subject to future market conditions.

The combined company’s assets, liabilities or results of operations could be adversely affected by unknown or unexpected events, conditions or actions that might occur at PHI prior to the closing of the Merger.

The PHI assets, liabilities, business, financial condition, cash flows, operating results and prospects to be acquired or assumed by Exelon by reason of the merger could be adversely affected before or after the Merger closing as a result of previously unknown events or conditions occurring or existing before the Merger closing. Adverse changes in PHI’s business or operations could occur or arise as a result of actions by PHI, legal or regulatory developments including the emergence or unfavorable resolution of pre-acquisition loss contingencies, deteriorating general business, market, industry or economic conditions, and other factors both within and beyond the control of PHI. A significant decline in the value of PHI assets to be acquired by Exelon or a significant increase in PHI liabilities to be assumed by Exelon could adversely affect the combined company’s future business, financial condition, cash flows, operating results and prospects.

Exelon may record goodwill that could become impaired and adversely affect its operating results.

In accordance with GAAP, the Merger will be accounted for as an acquisition of PHI common stock by Exelon and will follow the acquisition method of accounting for business combinations. The assets and liabilities of PHI will be consolidated with those of Exelon. The excess of the purchase price over the fair values of PHI’s assets and liabilities, if any, will be recorded as goodwill.

The amount of goodwill, which could be material, will be allocated to the appropriate reporting units of the combined company. Exelon is required to assess goodwill for impairment at least annually by comparing the fair value of reporting units to the carrying value of those reporting units. To the extent the carrying value of any of those reporting units is greater than the fair value, a second step comparing the implied fair value of goodwill to the carrying amount would be required to determine if the goodwill is impaired. Such a potential impairment could result in a material charge that would have a material impact on Exelon’s future operating results and consolidated balance sheet.

Legal proceedings in connection with the Merger, the outcomes of which are uncertain, could delay or prevent the completion of the Merger.

One of the conditions to the closing of the Merger is that no judgment (whether preliminary, temporary or permanent) or other order by any court or other governmental entity shall be in effect that restrains, enjoins or otherwise prohibits or makes illegal the consummation of the Merger.

PHI and its directors have been named as defendants in a purported class action lawsuits filed on behalf of named plaintiffs and other public stockholders challenging the proposed Merger and seeking, among other things, to enjoin the defendants from consummating the Merger on the agreed-upon terms. Exelon has been named as a defendant is some of these lawsuits.

If a plaintiff in this or any other litigation that may be filed in the future is successful in obtaining an injunction prohibiting the parties from completing the Merger on the terms contemplated by the Merger Agreement, the injunction may prevent the completion of the Merger in the expected timeframe or altogether. If completion of the Merger is prevented or delayed, it could result in substantial costs to Exelon. In addition, Exelon could incur significant costs in connection with the lawsuits, including costs associated with the indemnification of PHI’s directors and officers.

 

229


Table of Contents

Private parties who may believe they are adversely affected by the Merger and individual states may bring legal actions under the antitrust laws in certain circumstances or intervene in regulatory proceedings. Although Exelon and PHI believe the completion of Merger will not conflict with any antitrust law, there can be no assurance that a challenge to the Merger on antitrust grounds will not be made or, if a challenge is made, what the result will be. Under the Merger Agreement, Exelon and PHI have agreed to use their reasonable best efforts to obtain all regulatory clearances necessary to complete the Merger as promptly as practicable. In addition, in order to complete the Merger, Exelon and PHI may be required to comply with conditions, terms, obligations or restrictions imposed by regulatory agencies and any such conditions, terms, obligations or restrictions may have the effect of delaying completion of the Merger, imposing additional material costs on or materially limiting Exelon’s revenues after the completion of the Merger, or otherwise reducing the anticipated benefits from the Merger. In addition, any such conditions, terms, obligations or restrictions could result in the delay or abandonment of the Merger.

The Merger may be completed on terms different from those contained in the Merger Agreement.

Prior to the completion of the Merger, Exelon and PHI may, by their mutual agreement, amend or alter the terms of the Merger Agreement, including with respect to, among other things, the Merger consideration to be received by PHI stockholders or any covenants or agreements with respect to the parties’ respective operations pending completion of the Merger. In addition, Exelon may choose to waive requirements of the Merger Agreement, including some conditions to closing of the Merger. Any such amendments, alterations or waivers may have negative consequences to Exelon.

 

Item 4. Mine Safety Disclosures

Exelon, Generation, ComEd, PECO and BGE

Not applicable to the Registrants.

 

Item 6. Exhibits

Certain of the following exhibits are incorporated herein by reference under Rule 12b-32 of the Securities and Exchange Act of 1934, as amended. Certain other instruments which would otherwise be required to be listed below have not been so listed because such instruments do not authorize securities in an amount which exceeds 10% of the total assets of the applicable registrant and its subsidiaries on a consolidated basis and the relevant registrant agrees to furnish a copy of any such instrument to the Commission upon request.

 

Exhibit

No.

  

Description

    1.1    Common Stock Underwriting Agreement, dated June 11, 2014, with Barclays Capital Inc. and Goldman, Sachs & Co., as representatives of the several underwriters (File No. 001-16169, Form 8-K dated June 17, 2014, Exhibit 1.1)
    1.2    Corporate Units Underwriting Agreement, dated June 11, 2014, with Barclays Capital Inc. and Goldman, Sachs & Co., as representatives of the several underwriters (File No. 001-16169, Form 8-K dated June 17, 2014, Exhibit 1.2)
    2.1    Agreement and Plan of Merger, dated as of April 29, 2014, by and among Pepco Holdings, Inc., Exelon Corporation and Purple Acquisition Corp. (File No. 001-16169, Form 8-K dated April 30, 2014, Exhibit 2.1)
    2.2    Subscription Agreement for Series A Non-Voting Non-Convertible Preferred Stock (File No. 001-16169, Form 8-K dated April 30, 2014, Exhibit 2.2)
    2.3    Amended and Restated Agreement of Plan of Merger, dated as of July 18, 2014, among Pepco Holdings, Inc., Exelon Corporation and Purple Acquisition Corp. (File No. 001-16169, Form 8-K dated July 21, 2014, Exhibit 2.1)

 

230


Table of Contents

Exhibit

No.

  

Description

    4.1    Indenture, dated as of June 17, 2014, between Exelon Corporation and The Bank of New York Mellon Trust Company, N.A., as Trustee (File No. 001-16169, Form 8-K dated June 23, 2014, Exhibit 4.1)
    4.2    First Supplemental Indenture, dated as of June 17, 2014, between Exelon Corporation and The Bank of New York Mellon Trust Company, N.A., as Trustee (File No. 001-16169, Form 8-K dated June 23, 2014, Exhibit 4.2)
    4.3    Form of 2.50% Notes due 2024 (File No. 001-16169, Form 8-K dated June 23, 2014, Exhibit 4.3)
    4.4    Purchase Contract and Pledge Agreement, between Exelon Corporation and The Bank of New York Mellon Trust Company, N.A., as Purchase Contract Agent, Collateral Agent, Custodial Agent and Securities Intermediary (File No. 001-16169, Form 8-K dated June 23, 2014, Exhibit 4.4)
    4.5    Form of Remarketing Agreement (File No. 001-16169, Form 8-K dated June 23, 2014, Exhibit 4.5)
    4.6    Form of Corporate Unit (File No. 001-16169, Form 8-K dated June 23, 2014, Exhibit 4.6)
    4.7    Form of Treasury Unit (File No. 001-16169, Form 8-K dated June 23, 2014, Exhibit 4.7)
  10.1    Commitment Letter for $7.221 Billion Senior Unsecured Bridge Facility (File No. 001-16169, Form 8-K dated April 30, 2014, Exhibit 10.1)
  10.2    364-Day Bridge Term Loan Agreement, dated as of May 30, 2014, among Exelon Corporation, as Borrow, the various financial institutions named therein, as Lenders, and Barclays Bank PLC, as Administrative Agent (File No. 001-16169, Form 8-K dated June 4, 2014, Exhibit 10.1)
  10.3    Amendment No. 4 to Credit Agreement, dated May 30, 2014, among Exelon Corporation, the Borrower, the financial institutions signatory therein, as Lenders and JPMorgan Chase Bank, N.A., as Administrative Agent (File No. 001-16169, Form 8-K dated June 4, 2014, Exhibit 10.2)
  10.4    Amendment No. 4 to Credit Agreement, dated May 30, 2014, among Exelon Generation Company, LLC, as Borrower, the financial institutions signatory therein, as Lenders and JPMorgan Chase Bank, N.A., as Administrative Agent (File No. 001-16169, Form 8-K dated June 4, 2014, Exhibit 10.3)
  10.5    Amendment No. 3 to Credit Agreement, dated May 30, 2014, among PECO Energy Company, as Borrower, the financial institutions signatory therein, as Lenders and JPMorgan Chase Bank, N.A., as Administrative Agent (File No. 001-16169, Form 8-K dated June 4, 2014, Exhibit 10.4)
  10.6    Amendment No. 2 to Credit Agreement, dated May 30, 2014, among Baltimore Gas and Electric Company, as Borrower, the financial institutions signatory therein, as Lenders and The Royal Bank of Scotland plc, as Administrative Agent (File No. 001-16169, Form 8-K dated June 4, 2014, Exhibit 10.5)
  10.7    Confirmation of Base Issuer Forward Transaction, dated June 11, 2014, between Exelon Corporation and Barclays Capital, Inc., acting as Agent for Barclays Bank PLC (File No. 001-16169, Form 8-K dated June 17, 2014, Exhibit 10.1)
  10.8    Confirmation of Base Issuer Forward Transaction, dated June 11, 2014, between Exelon Corporation and Goldman Sachs & Co. (File No. 001-16169, Form 8-K dated June 17, 2014, Exhibit 10.2)
  10.9    Confirmation of Additional Issuer Forward Transaction, dated June 13, 2014, between Exelon Corporation and Barclays Capital Inc., acting as Agent for Barclays Bank PLC (File No. 001-16169, Form 8-K dated June 17, 2014, Exhibit 10.3)
  10.10    Confirmation of Additional Issuer Forward Transaction, dated June 13, 2014, between Exelon Corporation and Goldman Sachs & Co. (File No. 001-16169, Form 8-K dated June 17, 2014 Exhibit 10.4)
101.INS    XBRL Instance
101.SCH    XBRL Taxonomy Extension Schema

 

231


Table of Contents

Exhibit

No.

  

Description

101.CAL    XBRL Taxonomy Extension Calculation
101.DEF    XBRL Taxonomy Extension Definition
101.LAB    XBRL Taxonomy Extension Labels
101.PRE    XBRL Taxonomy Extension Presentation

Certifications Pursuant to Rule 13a-14(a) and 15d-14(a) of the Securities and Exchange Act of 1934 as to the Quarterly Report on Form 10-Q for the quarterly period ended June 30, 2014 filed by the following officers for the following companies:

 

31-1    — Filed by Christopher M. Crane for Exelon Corporation
31-2    — Filed by Jonathan W. Thayer for Exelon Corporation
31-3    — Filed by Kenneth W. Cornew for Exelon Generation Company, LLC
31-4    — Filed by Bryan P. Wright for Exelon Generation Company, LLC
31-5    — Filed by Anne R. Pramaggiore for Commonwealth Edison Company
31-6    — Filed by Joseph R. Trpik, Jr. for Commonwealth Edison Company
31-7    — Filed by Craig L. Adams for PECO Energy Company
31-8    — Filed by Phillip S. Barnett for PECO Energy Company
31-9    — Filed by Calvin G. Butler, Jr. for Baltimore Gas and Electric Company
31-10    — Filed by David M. Vahos for Baltimore Gas and Electric Company

Certifications Pursuant to Section 1350 of Chapter 63 of Title 18 United States Code (Sarbanes — Oxley Act of 2002) as to the Quarterly Report on Form 10-Q for the quarterly period ended June 30, 2014 filed by the following officers for the following companies:

 

32-1    — Filed by Christopher M. Crane for Exelon Corporation
32-2    — Filed by Jonathan W. Thayer for Exelon Corporation
32-3    — Filed by Kenneth W. Cornew for Exelon Generation Company, LLC
32-4    — Filed by Bryan P. Wright for Exelon Generation Company, LLC
32-5    — Filed by Anne R. Pramaggiore for Commonwealth Edison Company
32-6    — Filed by Joseph R. Trpik, Jr. for Commonwealth Edison Company
32-7    — Filed by Craig L. Adams for PECO Energy Company
32-8    — Filed by Phillip S. Barnett for PECO Energy Company
32-9    — Filed by Calvin G. Butler, Jr. for Baltimore Gas and Electric Company
32-10    — Filed by David M. Vahos for Baltimore Gas and Electric Company

 

232


Table of Contents

SIGNATURES

Pursuant to requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

EXELON CORPORATION

 

/S/    CHRISTOPHER M. CRANE

  

/S/    JONATHAN W. THAYER

Christopher M. Crane

President and Chief Executive Officer

(Principal Executive Officer)

  

Jonathan W. Thayer

Senior Executive Vice President and Chief

Financial Officer

(Principal Financial Officer)

/S/    DUANE M. DESPARTE

    

Duane M. DesParte

Senior Vice President and Corporate Controller

(Principal Accounting Officer)

  

July 31, 2014

Pursuant to requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

EXELON GENERATION COMPANY, LLC

 

/s/    KENNETH W. CORNEW

  

/s/    BRYAN P. WRIGHT

Kenneth W. Cornew

President and Chief Executive Officer

(Principal Executive Officer)

  

Bryan P. Wright

Senior Vice President and Chief Financial Officer

(Principal Financial Officer)

/s/    ROBERT M. AIKEN

    

Robert M. Aiken

Chief Accounting Officer

(Principal Accounting Officer)

  

July 31, 2014

 

233


Table of Contents

Pursuant to requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

COMMONWEALTH EDISON COMPANY

 

/s/    ANNE R. PRAMAGGIORE

  

/s/    JOSEPH R. TRPIK, JR.

Anne R. Pramaggiore    Joseph R. Trpik, Jr.

President and Chief Executive Officer

(Principal Executive Officer)

  

Senior Vice President, Chief Financial Officer and

Treasurer

(Principal Financial Officer)

/s/    GERALD J. KOZEL

    
Gerald J. Kozel   

Vice President and Controller

(Principal Accounting Officer)

  

July 31, 2014

Pursuant to requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

PECO ENERGY COMPANY

 

/s/    CRAIG L. ADAMS

  

/s/    PHILLIP S. BARNETT

Craig L. Adams    Phillip S. Barnett

President and Chief Executive Officer

(Principal Executive Officer)

  

Senior Vice President, Chief Financial Officer and

Treasurer

(Principal Financial Officer)

/s/    SCOTT A. BAILEY

    
Scott A. Bailey   

Vice President and Controller

(Principal Accounting Officer)

  

July 31, 2014

Pursuant to requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

BALTIMORE GAS AND ELECTRIC COMPANY

 

/s/    CALVIN G. BUTLER, JR.

  

/s/    DAVID M. VAHOS

Calvin G. Butler, Jr.    David M. Vahos

Chief Executive Officer

(Principal Executive Officer)

  

Vice President, Chief Financial Officer and

Treasurer

(Principal Financial Officer)

/s/    MATTHEW N. BAUER

    
Matthew N. Bauer   

Vice President and Controller

(Principal Accounting Officer)

  

July 31, 2014

 

234