Directors: M A Ramphele (Chair), N J Holland
† ** (Chief Executive Officer), P A Schmidt** (Chief Financial Officer), K Ansah
# , C A Carolus, R Dañino*, A R Hill
≠ ,
D L Lazaro^, R P Menell, M S Moloko, D N Murray, D M J Ncube, R L Pennant-Rea †
, G M Wilson
† British, ≠ Canadian, # Ghanaian, *Peruvian, ^Filipino, ** Executive Director
Corporate Secretary: C Farrel
Gold Fields Limited
Reg. 1968/004880/06
150 Helen Road,
Sandown, Sandton,
2196
Postnet Suite 252
Private Bag X30500
Houghton, 2041
South Africa
Tel +27 11 562-9700
Fax +27 11 562-9838
www.goldfields.co.za
Enquiries
Investor Enquiries
Zakira Amra
Tel
+27 11 562-9775
Mobile +27 79 694-0267
email
Zakira.Amra@
goldfields.co.za
Willie Jacobsz
Tel
+1 508 839-1188
Mobile
+1 857 241-7127
email
Willie.Jacobsz@
gfexpl.com
Media Enquiries
Sven Lunsche
Tel
+27 11 562-9763
Mobile
+27 83 260-9279
email
Sven.Lunsche@
goldfields.co.za
MEDIA RELEASE
Gold Fields Limited and Gold One International
Limited to Investigate a Joint Venture for
Retreatment of West Rand Surface Tailings
Deposits
JOHANNESBURG – 24 January, 2012. Gold Fields Limited (JSE,
NYSE, NASDAQ Dubai: GFI) (“Gold Fields”) and Gold One
International Limited (ASX and JSE: GDO) are pleased to
announce that they have entered into a Memorandum of
Understanding (“MOU”) to investigate the viability of concurrently
reprocessing their combined surface tailings deposits, located on the
West Rand region of South Africa’s Witwatersrand Basin. Gold One
and Gold Fields currently operate mines on the West Rand, a region
with a long history of gold and uranium mining.
In terms of the MOU, Gold Fields and Gold One (collectively, the
“parties”) will jointly investigate the feasibility of establishing a Joint
Venture into which both parties will contribute surface assets for
retreatment. These assets are expected to comprise in excess of
700 million tonnes and represent over 60% of the total tailings
material in the region. The parties aim to complete a detailed
scoping study by the middle of this year, following which a decision
will be taken on whether to progress the study to a feasibility level.
Should the Joint Venture proceed, the intention is to reclaim and
retreat the historical tailings material and current tailings to recover
residual gold, uranium and sulphur. A key objective of the project
will be to address the re-deposition of the residues in accordance
with modern sustainable deposition practices, ultimately supporting
mine closure in an environmentally sustainable manner.
In 2010, Gold Fields completed extensive economic studies on its
Tailings Treatment Project (“TTP”), which is a low-grade gold and
uranium recovery project focusing on the existing tailings storage
facilities and the current underground mining horizons of Gold Fields'
West Rand operations, Kloof Driefontein Complex (“KDC”) and
South Deep. As at December 2010, Gold Fields declared a mineral
resource of 475.6 million tonnes at its tailings storage facilities, which
includes gold mineral resources of 4.5 million ounces and uranium
mineral resources of 53.6 million pounds.
Gold One advised Gold Fields that on 9 January, 2012, it completed
the acquisition of Rand Uranium (Pty) Limited (“Rand Uranium”).