Form 10-K
Table of Contents

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

FORM 10-K

 

 

(Mark One)

x Annual Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934

For the fiscal year ended December 31, 2010

Or

 

¨ Transition Report pursuant to section 13 or 15(d) of the Securities Exchange Act of 1934

For the transition period from              to             

Commission File Number: 1-7525

 

 

The Goldfield Corporation

(Exact name of registrant as specified in its charter)

 

 

 

Delaware   88-0031580

(State or other jurisdiction of

incorporation or organization)

 

(I.R.S. Employer

Identification No.)

1684 W. Hibiscus Boulevard

Melbourne, Florida 32901

(Address of principal executive offices, including zip code)

(321) 724-1700

(Registrant’s telephone number, including area code)

Securities registered pursuant to Section 12 (b) of the Act:

 

Title of each class:

 

Name of each exchange on which registered:

Common Stock   NYSE Amex
par value $0.10 per share  

Securities registered pursuant to Section 12 (g) of the Act: None

 

 

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.    Yes  ¨    No  x

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.    Yes  ¨    No  x

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days:    Yes   x    No  ¨

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such a shorter period that the registrant was required to submit and post such files).    Yes  ¨    No  ¨

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K (§229.405 of this chapter) is not contained herein, and will not be contained, to the best of the registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.  x

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

 

Large accelerated filer   ¨    Accelerated filer   ¨
Non-Accelerated Filer   ¨    Smaller reporting company   x

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).    Yes  ¨     No  x

The aggregate market value of the voting and non-voting common equity held by non-affiliates of the registrant was approximately $7.5 million as of June 30, 2010 (the last business day of the registrant’s most recently completed second quarter), computed by reference to the price at which such common equity was last sold on such date.

The number of shares of the registrant’s common stock, $0.10 par value per share, outstanding as of March 23, 2011 was 25,451,354.

 

 

DOCUMENTS INCORPORATED BY REFERENCE

Portions of The Goldfield Corporation’s definitive proxy statement for its 2011 Annual Meeting of Stockholders to be filed with the Securities and Exchange Commission within 120 days after the end of the year covered by this Form 10-K Report are incorporated by reference into Part III of this Report.

 

 

 


Table of Contents

THE GOLDFIELD CORPORATION AND SUBSIDIARIES

ANNUAL REPORT ON FORM 10-K

FOR THE YEAR ENDED DECEMBER 31, 2010

TABLE OF CONTENTS

 

         Page  
  PART I   

Item 1.

 

Business.

     1   

Item 1A.

 

Risk Factors.

     5   

Item 1B.

 

Unresolved Staff Comments.

     14   

Item 2.

 

Properties.

     14   

Item 3.

 

Legal Proceedings.

     14   

Item 4.

 

(Removed and Reserved).

     15   

Item 5.

 

Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities.

     15   

Item 6.

 

Selected Financial Data

     16   

Item 7.

 

Management’s Discussion and Analysis of Financial Condition and Results of Operation.

     17   

Item 8.

 

Financial Statements and Supplementary Data.

     28   

Item 9.

 

Changes in and Disagreements with Accountants on Accounting and Financial Disclosure.

     50   

Item 9A.

 

Controls and Procedures.

     50   

Item 9B.

 

Other Information.

     51   

Item 10.

 

Directors, Executive Officers and Corporate Governance.

     51   

Item 11.

 

Executive Compensation.

     52   

Item 12.

 

Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters.

     52   

Item 13.

 

Certain Relationships and Related Transactions, and Director Independence.

     52   

Item 14.

 

Principal Accountant Fees and Services.

     52   

Item 15.

 

Exhibits, Financial Statement Schedules.

     52   

SIGNATURES

     59   


Table of Contents

PART I

 

Item 1. Business.

General

The Goldfield Corporation, incorporated in Wyoming in 1906 and subsequently reincorporated in Delaware in 1968, is currently engaged in electrical construction, including the placement of fiber optic cable, and real estate development. Unless the context otherwise requires, the terms “Goldfield” and “the Company” as used herein mean The Goldfield Corporation and its consolidated subsidiaries. The principal market for the electrical construction operation is electric utilities throughout most of the United States. The primary focus of the real estate operations is on the development of luxury condominium projects on the east coast of Florida. The Company also makes limited opportunistic investments in distressed residential properties, which it improves or repositions for resale. Prior to 2003, we were also engaged in mining activities. For financial information by business segment, see note 17 to the consolidated financial statements and “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operation.”

Our internet website address is www.goldfieldcorp.com. Within the “Investor Relations” section of our website, we make available, free of charge, through links to the U.S. Securities and Exchange Commission (“SEC”) website, our Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934, as amended, as soon as reasonably practicable after we electronically file such material with, or furnish it to, the SEC. The information on our website is not incorporated by reference into this Annual Report on Form 10-K. Alternatively, you may also access our reports at the SEC’s website at www.sec.gov. You may also read and copy any document we file with the SEC at the SEC’s public reference facilities located at 100 F Street, NE, Washington, DC 20549. Please call the SEC at 1-800-SEC-0330 for further information on the public reference facilities.

Financial Information About Geographic Areas

During the years ended December 31, 2010 and 2009, we operated primarily in the United States. We had no material foreign operations in 2010 and 2009.

Employees

As of February 28, 2011, we had 122 employees, including 102 hourly-rate employees. The number of hourly-rate employees fluctuates depending upon the number and size of projects under construction at any particular time. We have no unionized employees and believe that our relationship with our employees is good.

Electrical Construction

Through our subsidiary, Southeast Power Corporation (“Southeast Power”), we are engaged in the construction and maintenance of electrical facilities for utilities and industrial customers. We also install fiber optic cable for fiber optic cable manufacturers, telecommunication companies and electric utilities. Southeast Power, based in Titusville, Florida, performs electrical contracting services throughout most of the United States.

Our electrical construction business includes the construction of transmission lines, including concrete foundations, distribution systems and substations and other electrical installation services for utility systems and industrial and specialty projects, including fiber optic cable installation which is primarily overhead (Optical Ground Wire and All-Dielectric Self Supporting Cable).

Our customers include many of the leading companies in the industries we serve. Representative customers include:

 

Florida Power & Light Company   M & A Electric Power Cooperative
AT&T   Duke Energy Corporation
CPS Energy   Georgia Transmission Corporation
Lee County Electric Cooperative   Orlando Utilities Commission
Santee Cooper (South Carolina Public Service Authority)   Central Electric Power Cooperative

Historically, a significant portion of our revenue has come from several different customers each year. Our largest customers may change from year to year. In the year ended December 31, 2010, our top three customers accounted

 

1


Table of Contents

for approximately 45% of our consolidated revenue. Since the contribution of a customer may vary from year to year, we cannot predict the future effect of the loss of any given customer.

It is our policy to commit ourselves only to the amount of work we believe we can properly supervise, equip and complete to the customer’s satisfaction and timetable. As a result of this policy and the magnitude of some of the construction projects undertaken by us, a substantial portion of our annual revenue is derived from a relatively small number of customers, the specific identity of which vary from year to year. See note 17 to the consolidated financial statements for detail on sales to major customers which exceed 10% of total sales.

Construction is customarily performed pursuant to the plans and specifications of customers. We generally supply the management, labor, equipment and tools, while materials may or may not be supplied by our customers. Most projects have a duration of six months or less, although some contracts may extend beyond one year.

Revenue and results of operations in our electrical construction business can be subject to seasonal variations. These variations are influenced by weather, customer spending patterns and system loads. The Company performs electrical construction services throughout most of the United States, with an emphasis in the southeastern region. Electric utility customers normally perform their system upgrades and maintenance work during off-peak seasons when the demand for electrical power is reduced, which is in the first two quarters of the year in the southeast region of the United States. This pattern is typically reflected by a reduction in the number of our active projects in the third quarter. However, since hurricane season normally peaks during the third quarter, this reduction can be offset with storm restoration work resulting from hurricane damage.

The electrical construction business is highly competitive. We compete with other independent contractors, including larger regional and national firms that may have financial, operational, technical and marketing resources that exceed our own. We also face competition from existing and prospective customers establishing or augmenting in-house service organizations that employ personnel who perform some of the same types of service as those provided by us. Competitive factors include: level of technical expertise and experience, industry reputation, quality of work, price, geographic presence, dependability, availability of skilled personnel, worker safety and financial stability. Our management believes that we compete favorably with our competitors on the basis of these factors. There can be no assurance, however, that our competitors will not develop the expertise, experience and resources to provide services that are superior in both price and quality to our services, or that we will be able to maintain or enhance our competitive position.

We enter into contracts on the basis of either competitive bidding or direct negotiations with our customers. Competitively bid contracts account for a majority of our electrical construction revenue. Although there is considerable variation in the terms of the contracts undertaken, such contracts are typically lump sum (fixed price), or unit price (time and material) contracts. Many of our contracts do not require our clients to purchase a minimum amount of services, and many of our contracts are cancelable on short notice. The magnitude and duration of projects undertaken by us vary, which may result in substantial fluctuations in our backlog from time to time.

Backlog represents the amount of revenue that we expect to realize from work to be performed on uncompleted contracts, including new contractual agreements on which work has not begun. Our backlog also includes certain service agreements that contain multiple year terms which fall into the category of unit price contracts. The projected backlog amounts for these service agreement contracts are based on our historical work from these customers. There can be no assurance, however, as to the customer’s requirements during a particular period or that such estimates at any point in time are accurate. Our backlog at December 31, 2010 was $5.1 million, of which $3.1 million is believed to be firm due to the nature of our fixed priced contracts and $1.9 million of which is attributable to service agreements. Of our total backlog, 100% is reasonably expected to be completed by December 31, 2011. This compares to a backlog of $11.2 million as of December 31, 2009 of which $5.9 million was believed to be firm from fixed priced contracts and $5.3 million of which was attributable to service agreements.

In certain circumstances, we are required to provide performance and payment bonds issued by a financial institution known as a surety to secure our contractual commitments. These bonds provide a guarantee to the customer that we will perform under the terms of a contract and that we will pay subcontractors and vendors. If we fail to perform under a contract or to pay subcontractors and vendors, the customer may demand the surety make payments or provide services under the bond. Management is not aware of any performance bonds issued for us that have ever been called by a customer. We currently believe that we will not have to fund any claims under our surety arrangements in the foreseeable future. We believe that we have adequate bonding availability for our operations as

 

2


Table of Contents

presently conducted. As of December 31, 2010, outstanding performance bonds issued on behalf of our electrical construction subsidiary amounted to $3.5 million.

Generally, our customers supply most or all of the materials required for a particular contract, except for the construction of concrete foundations, and we provide the personnel, tools and equipment to perform the installation services. However, with respect to a portion of our contracts, we may supply part or all of the materials required. In these instances, we are not dependent upon any one source for the materials that we customarily utilize to complete the job. We are not presently experiencing, nor do we anticipate experiencing, any difficulties in procuring an adequate supply of materials.

We are subject to various federal, state and local statutes and rules regarding, among other things, contractor licensing, electrical codes, worker safety and environmental protection. We believe that we are in substantial compliance with all applicable regulatory requirements.

The main administrative and maintenance facilities of Southeast Power are located on a 13-acre tract of land near Titusville, Florida, which we own. The office building is approximately 6,100 square feet. The shop and maintenance facilities are approximately 17,000 square feet.

The South Carolina division of Southeast Power owns its administrative and maintenance facilities, which are located on a 2.2-acre tract of land in Spartanburg, South Carolina. The office building is approximately 1,500 square feet and the maintenance facilities are approximately 2,500 square feet.

On February 4, 2011, the Company purchased 13.2 acres of land in Bastrop County, Texas. This property, on which the Company has recently completed renovations, is the location of the Western division of Southeast Power.

We believe that the aforementioned properties are currently in good condition and properly maintained.

Real Estate

Through our subsidiary Bayswater Development Corporation and its various subsidiaries (“Bayswater”) we are engaged in the acquisition, development, management and disposition of land and improved properties. The primary focus of our real estate operations has been the development of residential condominium projects along the east coast of Central Florida and recently we have expanded our real estate development operations to include the opportunistic acquisition of residential properties in distress sale situations for subsequent refurbishment and resale. We intend to continue to use our knowledge of the local real estate market obtained through our condominium development operations to selectively pursue opportunities as they arise. During 2010 we purchased, refurbished and sold four such residential properties.

Over the past several years we have developed five condominium projects. Our current project, Pineapple House, is an eight-story building containing thirty-three luxury river-view condominium units located in Melbourne, Florida, of which twenty-nine units have been sold as of December 31, 2010. This is the first phase of a planned multi-phase development. This first phase was completed on budget and in a timely manner, and we believe the project is attractive and of high quality. Our customers generally are pre-retirement, retirement or second homebuyers seeking higher quality, maintenance free residences with generous amenities.

We acquire land for development only after feasibility and environmental testing has been performed. Generally, architectural and engineering plans for the projects are outsourced and the project plans are submitted to third party general building contractors for competitive fixed price bids to construct the improvements. In an effort to limit risk, our policy is to obtain a substantial number of contracts for sale, backed by customers’ non-refundable earnest money deposits, prior to commencing construction on the condominium projects. Generally the minimum non-refundable earnest money deposit is 10% of the purchase price and is held in escrow by a third party until such time as the unit is closed and title to the unit has been transferred to the buyer. We do not offer financing arrangements to purchasers of our condominiums.

We generally purchase land and pay for architectural, engineering and various other costs with cash reserves. Construction costs are generally financed with bank financing, as specified in note 11 to the consolidated financial statements.

As of both December 31, 2010 and 2009, we had no projects under construction and no backlog (outstanding real estate contracts for sale excluding partial revenue already recognized on said contracts under the percentage of

 

3


Table of Contents

completion method) in the real estate segment. However, we own vacant property on which we plan to build two condominium buildings, which will comprise Phase II and Phase III of the Pineapple House project. Although we have delayed the sales and construction of new projects, we believe the real estate market in our area will ultimately improve and we will resume our plans for this vacant property. However, we can provide no assurance about the real estate market or our future plans.

Our historical financial performance in real estate construction is not necessarily a meaningful indicator of future results and, in particular, we expect financial results to vary from project to project and from quarter-to-quarter. Our revenue may therefore fluctuate significantly on a quarterly basis, and we believe that quarter-to-quarter comparisons of our results should not be relied upon as an indication of future performance.

The housing market has experienced the most significant downturn in recent history. The credit markets and mortgage industry have experienced a period of unparalleled instability, and this disruption has affected buyers’ ability to secure financing for home purchases. Foreclosures and distress sales continue to adversely affect market conditions. A high local unemployment level is another factor negatively affecting the real estate market. As a result of these and other factors, we continue to postpone commencement of the next phase of the Pineapple House project until market conditions improve. We are unable to predict when market conditions will improve. Market conditions may continue to have an adverse impact on the sales and pricing of our real estate properties, the commencement and development of new projects and on the results of our real estate development operations. We have completed the first phase of the Pineapple House project on budget and in a timely manner, and believe the project is attractive and of high quality. Furthermore, we are no longer incurring construction costs with respect to this phase and our share of the holding costs on the unsold units is expected to be no more than $25,000 annually.

The real estate industry is highly competitive and fragmented. The Company competes with numerous national and local real estate developers on the basis of a number of interrelated factors, including: quality, location, design, perceived value, price and reputation in the marketplace. We believe that we have certain competitive advantages including desirable locations, attractive designs and higher quality features not generally offered by other developers in the market in which we compete.

We are subject to federal, state and local statutes, ordinances, rules and regulations regarding, among other things, zoning, building permits, environmental standards, building moratoriums and building codes. Permits and approvals mandated by regulation for development of any magnitude are often numerous, significantly time-consuming and onerous to obtain, and not guaranteed. We believe that our real estate operations are in substantial compliance with all applicable regulations.

The real estate division administrative offices are located within the Company’s corporate offices located in Melbourne, Florida.

Discontinued Operations

Through certain of our subsidiaries and predecessor companies, we were previously engaged in mining activities. All such activities were discontinued or disposed of prior to 2003. In September 2003, we were notified by the United States Environmental Protection Agency (the “EPA”) that we are a potentially responsible party (“PRP”) with respect to possible investigation and removal activities at the Anderson-Calhoun mine/mill site (the “Site”) in Stevens County, Washington which was previously owned by us. In September 2009 we entered into a settlement agreement with the EPA with respect thereto, pursuant to which we made a cash payment to the EPA of $73,000.

Furthermore and regarding a separate matter, on July 12, 2010, the Company received a request from the EPA for information pursuant to Section 104(e) of CERCLA for Newton County Mine Tailings Superfund Site, Newton County, Missouri (the “Wentworth Site”) relating to mining activities involving the site. On July 30, 2010, the Company submitted a response to the EPA’s request. On December 22, 2010, the Company received a Demand for Reimbursement of Costs from the EPA relating to the Wentworth Site, together with ancillary documents including a draft form of settlement agreement. On January 27, 2011, the Company accepted a Settlement Agreement proposed by the EPA wherein the Company agrees to pay the EPA the sum of $76,630 in exchange for a covenant not to sue from the EPA relating to the Wentworth Site, along with other protections and subject to various terms and conditions as set forth more fully in the Settlement Agreement. Public Notice of the proposed settlement was published on March 17, 2011. Comments are due by May 14, 2011. It is not known whether any comments will be

 

4


Table of Contents

filed in response to the Public Notice or whether EPA or the U.S. Department of Justice will seek to withdraw or otherwise modify the Settlement Agreement based on such comments (see “Item 3. Legal Proceedings”).

 

Item 1A. Risk Factors.

Our business involves various risks associated with the operations of our Company. To provide a framework to understand our operating environment, we are providing a brief explanation of the significant risks associated with our business. Although we have tried to identify and discuss key risk factors, others could emerge in the future. Each of the following risks could affect our performance.

Risks related to our electrical construction operations

We derive a significant portion of our revenue from a small group of customers. The loss of one or more of these customers could negatively impact our revenue and results of operations.

Our electrical construction customer base is highly concentrated. For example, in the year ended December 31, 2010, our top three customers accounted for approximately 45% of our consolidated revenue, as discussed in note 17 to our consolidated financial statements herein. Our revenue could materially decline if we lose one or more of our significant customers. In addition, revenue under our contracts with significant customers may vary from period-to-period depending on the timing and volume of work which such customers order in a given period and a result of competition from the in-house service organizations of our customers. Reduced demand for our services or the loss of one or more of these customers would, if not replaced by other business, result in a decrease in revenue, margins, profits and cash receipts, which could be material.

The electrical construction industry is highly competitive.

The electrical construction business is highly competitive and fragmented. We compete with other independent contractors, including larger regional and national firms that may have financial, operational, technical and marketing resources that exceed our own. We also face competition from existing and prospective customers establishing or augmenting in-house service organizations that employ personnel who perform some of the same types of service as those provided by us. Certain of our competitors may have lower cost structures and may, therefore, be able to provide their services at lower rates than we can provide. Many of our current and potential competitors, especially our competitors with national scope, also may have significantly greater financial, technical and marketing resources than we do. If we fail to compete favorably with new or existing competitors, our results of operations and financial condition could be adversely affected.

Our business is affected by the spending patterns of our customers and adverse weather conditions, exposing us to variable quarterly results.

Our revenues are primarily driven by the spending patterns of our customers, which can vary significantly from period to period, as well as seasonal variations. These variations are influenced by weather, hours of daylight, available system outages from utilities, bidding seasons and holidays and can have a significant impact on our gross margins. Most of our work is performed outdoors and as a result, our results of operations can be adversely impacted by extended periods of inclement weather. Any weather related delays in the completion of, or which increase the cost of, our projects could adversely affect our revenue and results of operations in any one or more of our reporting periods.

An adverse change in economic conditions in the electric utility industry could reduce the demand for our services.

Because a substantial portion of our electrical construction work is performed for customers in the electric utility industry, an adverse change in economic conditions in the electric utility industry could impair the financial condition of many of our customers, which could cause them to reduce their capital expenditures and demand for our services. For example, in January 2010, Florida Power & Light Company announced that it had suspended activities on projects representing approximately $10 billion of investments over the next five years in Florida’s infrastructure, including discretionary transmission and distribution projects, citing an adverse rate decision by the Florida Public Service Commission and a deteriorating regulatory and business environment. This suspension of discretionary projects, or similar actions taken by our other electric utility customers, could result in fewer projects

 

5


Table of Contents

being available for us to work on, which could have an adverse effect on our results of operations and financial condition.

Skilled labor shortages and increased labor costs could negatively affect our ability to compete for new projects.

In our electrical construction business, we have from time to time experienced shortages of certain types of qualified personnel. The commencement of new, large-scale infrastructure projects, increased demand for infrastructure improvements and the aging utility workforce also deplete the pool of skilled labor available to us, even if we are not awarded such projects. As a result of these factors, the supply of experienced linemen and supervisors may not be sufficient to meet our expected demand and we may not be able to allocate or hire sufficient project managers for new electrical construction projects. We may also spend considerable resources training employees who may then be hired by our competitors, forcing us to spend additional funds to attract personnel to fill those positions. If we were unable to retain sufficient qualified personnel at a reasonable cost, or at all, we would be unable to staff new and existing projects, which would reduce our revenue.

Our use of percentage-of-completion accounting could result in a reduction or elimination of previously reported profits.

As discussed in Critical Accounting Estimates and in the notes to our consolidated financial statements included herein, a significant portion of our revenue in our electrical construction operations is recognized on a percentage-of-completion method of accounting, using the cost-to-cost method, which is standard for fixed price contracts. For the percentage-of-completion accounting practice we use results in our recognizing contract revenue and earnings ratably over the contract term in proportion to our incurrence of contract costs. The earnings or losses recognized on individual contracts are based on estimates of contract revenue, costs and profitability. The cost of labor and materials, however, may vary from the costs we originally estimated. These variations, along with other risks inherent in performing fixed price contracts, may cause actual revenue and gross profit for a project to differ from those we originally estimated and could result in reduced profitability or losses on projects. Depending upon the size of a particular project, variations from the estimated contract costs could have a significant impact on our operating results for any fiscal quarter or year.

Amounts included in our backlog may not result in revenue or translate into profits.

Backlog for our electrical construction operations at December 31, 2010 was $5.1 million, which represents the amount of revenue that we expect to realize from work to be performed on uncompleted contracts, including new contractual agreements on which work has not begun. This revenue is not guaranteed, however, as many of our customers may cancel their contracts with us on short notice (typically 30-90 days), even if we are not in default under the contract. In addition, $1.9 million of these uncompleted contracts are service agreements that contain multiple year terms which fall into the category of unit price contracts. Typically, these service agreements do not require our customers to purchase a minimum amount of services and are cancelable on short notice. For these service agreements, we project the backlog amount based on our historical work from each customer. To the extent that our customers cancel their contracts with us or reduce their requirements during a particular period for any reason, we will not realize revenue or profit from the associated backlog. Furthermore, contracts included in our backlog may not be profitable. We may experience variances in the realization of our backlog because of project delays or cancellations resulting from weather conditions, external market factors and economic factors beyond our control. As a result, even if we realize all of the revenue from the projects in our backlog, if our expenses associated with these projects are higher than expected, our results of operations and financial condition would be adversely affected.

Our projects are subject to numerous hazards. If we do not maintain an adequate safety record, we may be ineligible to bid on certain projects, could be terminated from existing projects and could have difficulty procuring adequate insurance.

Hazards experienced as a result of our electric construction operations include electrocutions, fires, mechanical failure and transportation accidents. These hazards can cause and have caused personal injury and loss of life, severe damage to or destruction of property and equipment and other consequential damages, including blackouts, and may result in suspension of our operations on a project, large damage claims, and, in extreme cases, criminal liability. At any given time, we are subject to workers’ compensation claims and claims by employees, customers and third parties for property damage, loss of life and personal injuries resulting from such hazards or other

 

6


Table of Contents

workplace accidents. Further, regulatory changes implemented by the Occupational Safety and Health Administration could impose additional costs on us. Notwithstanding our investment of substantial resources in occupational health and safety programs, our industry involves a high degree of operational risk and we may be unable to avoid accidents resulting from the hazards described above and the associated liability exposure, which may be significant. Furthermore, if serious accidents or fatalities were to occur or if our safety record were to deteriorate, we could become ineligible to bid on certain projects and could be terminated from existing projects, our reputation and our prospects for future projects could be negatively affected, and we could be required to expend additional resources on health and safety programs. In addition, if our safety record were to significantly deteriorate, it would become more difficult and expensive for us to procure adequate insurance.

An inability to obtain bonding would have a negative impact on our operations and results.

In certain circumstances, we are required to provide performance bonds to secure our contractual commitments. Although to date we have not experienced difficulty in obtaining bonding, if we were unable to obtain surety bonds in the future, or were required to post collateral in order to obtain surety bonds, our ability to obtain new contracts would be adversely affected, which could have a material adverse effect on our results of operations and financial condition.

Certain provisions of President Obama’s economic stimulus plan relating to construction of new electric transmission lines may fail to result in increased demand for our services.

The credit crisis and economic downturn has resulted in a tremendous amount of uncertainty with respect to our customers’ spending plans, and has resulted in certain projects being delayed or cancelled. While we believe that President Obama’s economic stimulus plan, which was enacted in February 2009, currently provides for Federal government funding for new transmission lines in the United States and should aid the wind, electrical transmission and rural broadband businesses, the extent to which it will is uncertain. We cannot be certain how any such government funds would be used, if at all, in the regions in which we do business or what the impact that the use of any such funds would be on our financial results.

Increases in the cost of fuel could have a negative impact on our operating margins

The price of fuel needed to operate our vehicles and equipment is difficult to predict and changes based on events and factors outside of our control, including, among others, the supply and demand for oil and gas, war and civil unrest in oil producing countries, political developments and environmental concerns. As a general matter, our fixed price contracts do not permit us to pass through additional costs associated with increases in fuel prices to our customers. As a result, increases in the cost of fuel could have a material adverse effect on our profitability.

Risks related to our real estate development operations

We engage in real estate activities which are speculative and involve a high degree of risk.

The real estate industry is highly cyclical by nature and future market conditions are uncertain. Factors which adversely affect the real estate and homebuilding industries, many of which are beyond our control, include:

 

   

the availability and cost of financing;

 

   

unfavorable interest rates and increases in inflation;

 

   

overbuilding or decreases in demand;

 

   

changes in national, regional and local economic conditions;

 

   

cost overruns, inclement weather, and labor and material shortages;

 

   

the impact of present or future environmental legislation, zoning laws and other regulations;

 

   

availability, delays and costs associated with obtaining permits, approvals or licenses necessary to develop property; and

 

   

increases in real estate taxes and other local government fees.

 

7


Table of Contents

The homebuilding and condominium industry is in the midst of a severe downturn that may continue for an indefinite period and continue to adversely affect our business. A continuing decline in the demand for condominiums coupled with an increase in the inventory of available condominiums and other homes could adversely affect our sales volume and pricing even more than has occurred to date and, as a result, could reduce our earnings.

The homebuilding industry is in the midst of a severe downturn and the housing market in our area continues to be characterized by an oversupply of both new and resale home inventory, including foreclosed homes, reduced levels of consumer demand for new homes, aggressive price competition among homebuilders and increased incentives for home sales. As a result, we, like many other builders, have experienced a decline in demand for new condominiums. These challenging market conditions are expected to continue for the foreseeable future and, in the near term, these conditions may further deteriorate. We expect the continued weakness in the housing market will adversely affect this business segment as compared to prior periods and could result in additional inventory impairments in the future.

An oversupply of alternatives to new homes, such as rental properties and resale homes, has depressed prices and reduced margins. This combination of lower demand and higher inventories affects both the number of condominiums that we can sell and the prices at which we can sell them. We have no basis for predicting how long supply and demand will remain out of balance in the market where we operate or whether, even if demand and supply come back in balance, sales volumes or pricing will return to prior levels.

Changes in national and regional economic conditions, as well as local economic conditions where we conduct our real estate development operations and where prospective purchasers of our condominiums live, can have a negative impact on our business. Adverse changes in employment levels, job growth, consumer confidence, interest rates and population growth may reduce demand and depress prices for our condominiums. This, in turn, can reduce our earnings.

The homebuilding industry is cyclical and is significantly affected by changes in general and local economic conditions, such as employment levels; availability of financing for homebuyers; interest rates; consumer confidence; levels of new and existing homes for sale; demographic trends and housing demand. If any adverse conditions affect our markets, they could have a proportionately greater or lesser impact on us versus other homebuilding companies. An excess supply of housing, including homes held for sale by investors, banks and other lending institutions, can also lower new home prices and reduce our gross margins on new home sales.

As a result of the foregoing, potential customers may be less willing or able to buy our condominiums, or we may take longer or incur more costs to build them. We may not be able to recapture increased costs by raising prices in many cases because of market conditions or because we fix our prices in advance of delivery by signing home sales contracts. We may be unable to change the affordability of our homes to maintain our margins or satisfactorily address changing market conditions in other ways. In addition, cancellations of home sales contracts in backlog from time to time may increase if homebuyers’ sentiment changes and they may fail to honor their contracts.

The multifamily housing industry is highly competitive and, if others are more successful, our business could decline.

We operate in a very competitive environment, which is characterized by competition from a number of other real estate developers. We compete with large national and regional development companies and with smaller local firms for land, financing, raw materials and skilled management and labor resources. We also compete with the resale, or “previously owned,” condominium market. Increased competition could cause us to increase our selling incentives and/or reduce our prices. Increased competition could also result in an oversupply of condominiums or other housing alternatives available for sale, which could depress the prices at which we can sell our condominiums, and increase the length of time it takes us to sell them. If a failure to compete effectively resulted in our selling fewer condominiums at lower prices, our results of operations and financial condition would be adversely affected.

If we do not receive cash corresponding to previously recognized revenue, our future cash flows could be lower than expected.

Over the last few years, in accordance with generally accepted accounting principles, we have recognized revenue and profits from sales of condominium units during the course of construction. Revenue recognition commences and continues to be recorded when construction is beyond a preliminary stage, the buyer is committed to the extent

 

8


Table of Contents

of being unable to require a full refund of its deposit except for non-delivery of the residence, a substantial percentage of units are under non-cancelable contracts, collection of the sales price is reasonably assured and costs can be reasonably estimated. Due to various contingencies, like delayed construction and buyer defaults, we may receive less cash than the amount of revenue already recognized or the cash may be received at a later date than we expected, which could affect our financial condition and results of operations.

If land is not available at reasonable prices, our sales and earnings could decrease.

Our real estate development operations depend on our ability to obtain land at reasonable prices for the development of our residential condominiums. Changes in the general availability of land, competition for available land, availability of financing to acquire land, zoning regulations that limit housing density and other market conditions may hurt our ability to obtain land for new residential developments. If the supply of land appropriate for development of our residential condominiums becomes more limited because of these factors, or for any other reason, the cost of land could increase, which could reduce the profitability of our real estate development operations if we are unable to recover these costs in the sales prices of our condominiums, and the number of condominiums that we build and sell could be reduced, which would reduce our revenue.

If the market value of our land and developments drops significantly, our profits could decrease.

The market value of our land and condominium inventories of our real estate development operations depends on market conditions. We acquire land for replacement of land inventory and expansion within our current market. If housing demand decreases below what we anticipated when we acquired our inventory, we may not be able to make profits similar to what we have made in the past, may experience less than anticipated profits and may not be able to recover our costs when we sell our property or finished product. In the face of adverse market conditions, we may have substantial inventory carrying costs or may have to sell land or completed units at a loss, which would have an adverse effect on our results of operations and financial condition. Also, if there is a decrease in demand for condominiums such that the market value of a condominium is less than purchase price reduced by the deposit made by a buyer, the buyer may elect to forfeit their deposit to us and have no further obligation to purchase the condominium, resulting in a loss of revenue, operating income and a possible write-down of condominiums in inventory.

Government regulations and legal challenges may delay the start or completion of our developments, increase our expenses or limit our building activities, which could have a negative impact on our operations.

We must obtain the approval of numerous governmental authorities in connection with our real estate development operations, and these governmental authorities often have broad discretion in exercising their approval authority. We incur substantial costs related to compliance with legal and regulatory requirements. Any increase in legal and regulatory requirements may cause us to incur substantial additional costs, as discussed below. Various local, state and federal statutes, ordinances, rules and regulations concerning building, zoning, sales and similar matters apply to and/or affect the residential multifamily industry. Municipalities may restrict or place moratoriums on the availability of utilities, such as water and sewer taps. In some areas, municipalities may enact growth control initiatives, which will restrict the number of building permits available in a given year. This governmental regulation affects construction activities as well as sales activities, mortgage lending activities and other dealings with consumers. The industry also has experienced an increase in state and local legislation and regulations which limit the availability or use of land. We may be required to apply for additional approvals or modify our existing approvals because of changes in local circumstances or applicable law. Further, we may experience delays and increased expenses as a result of legal challenges to our proposed developments, whether brought by governmental authorities or private parties.

Increases in taxes or government fees could increase our costs, and adverse changes in tax laws could reduce customer demand for our condominiums.

Increases in real estate taxes and other local government fees, such as fees imposed on developers to fund schools, open space, road improvements, or to provide low and moderate income housing, could increase our costs and have an adverse effect on our real estate development operations if we are unable to recover these costs in the sales prices of our condominiums. In addition, increases in local real estate taxes could adversely affect our potential customers who may consider those costs in determining whether to make a new home purchase and decide, as a result, not to purchase one of our condominiums. In addition, any changes in the income tax laws that would reduce or eliminate

 

9


Table of Contents

tax deductions or incentives to homeowners could make housing less affordable or otherwise reduce the demand for housing, which in turn could reduce our sales and adversely affect our revenues.

Our business is concentrated in Florida, which increases our exposure to local adverse events.

In our real estate development operations, we currently develop and sell condominiums only on the east coast of Florida. As a consequence, our exposure to local adverse events, such as natural disasters or changes in economic conditions, is increased. In particular, Florida is affected by tropical storms and hurricanes, which can damage or destroy buildings, including condominiums. The occurrence of such a storm or other natural disaster could result in delays in construction and shortages and increased costs of labor and building materials. Any such delays or additional costs could adversely affect the profitability of our real estate development operations.

Additionally, the inability of property owners to obtain cost-effective insurance could have an adverse effect on demand for property in our markets, which could reduce our revenue. Furthermore, there are periods of time during which insurance companies will not write policies because of the presence of a named storm that may pass over the areas in which we sell condominiums. During these periods, home closings in areas that could be affected by such a storm will be delayed until the risk of the storm has passed and the required insurance can be obtained.

Adverse weather conditions and conditions in nature beyond our control could significantly impact our quarterly revenue and profitability.

In our real estate development operations, adverse weather conditions and natural disasters, such as, but not limited to, hurricanes, tornadoes, floods and fires, can have serious effects on our ability to perform work. We also may be affected by unforeseen engineering, environmental or geological problems. Any of these adverse events or circumstances could cause delays in the completion of, or increase the cost of, our projects and, as a result, could adversely affect our sales, earnings and profitability.

In addition, approaching storms require that sales, development and construction operations be suspended in favor of storm preparation activities such as securing construction materials and equipment. After a storm has passed, construction-related resources such as sub-contracted labor and building materials are likely to be redeployed to hurricane recovery efforts around the State of Florida.

Governmental permitting and inspection activities may similarly be focused primarily on returning displaced residents to homes damaged by the storms, rather than on new construction activity. Depending on the severity of the damage caused by the storms, disruptions such as these could last for several months.

If we experience shortages of labor and supplies or other circumstances beyond our control, there could be delays or increased costs in developing our condominiums, which could adversely affect our operating results.

Our ability to develop residential condominiums may be affected by circumstances beyond our control, including: work stoppages, labor disputes and shortages of qualified trades people, such as carpenters, roofers, electricians and plumbers; lack of availability of adequate utility infrastructure and services; our need to rely on local subcontractors who may not be adequately capitalized or insured; and shortages, or delays in availability, or fluctuations in prices of, building materials. Any of these circumstances could give rise to delays in the start or completion of, or increase the cost of, developing one or more of our condominium projects. If we are not able to recover these increased costs by raising the prices of our condominiums we might decide to postpone or cancel the development of condominium projects on which we have not yet begun construction. If that happens, our operating results could be harmed. Additionally, we may be limited in the amount we can raise sales prices by our customers’ unwillingness to pay higher prices.

Product liability litigation and warranty claims that arise in the ordinary course of business may be costly, which could adversely affect our business.

As a real estate developer, we are subject to construction defect and home warranty claims arising in the ordinary course of business. These claims, which can include bodily injury claims and mold-related property damage claims among others, are common in the homebuilding industry and can be costly. In addition, the costs of insuring against construction defect and product liability claims are high, and the amount of coverage offered by insurance companies is currently limited. There can be no assurance that this coverage will not be further restricted and become more costly. If we are not able to obtain adequate insurance against these claims, we may experience losses that could have an adverse affect on our results of operations and financial condition, which could be material.

 

10


Table of Contents

If we are not able to obtain suitable financing, our business may decline.

Our real estate development operations depend substantially on our ability to obtain financing for the development of our projects. If we are not able to obtain suitable financing, our costs would increase and our revenue would decrease, or we could be precluded from continuing our operations at current levels. Increases in interest rates can make it more difficult and expensive for us to obtain the funds we need to operate our business, which would have an adverse affect on our profitability.

If our potential customers are not able to obtain suitable financing, our business may decline.

Our real estate development operations also depend on the ability of our potential customers to obtain mortgages for the purchase of our condominiums. During 2007, the mortgage lending industry began experiencing significant instability. As a result of increased default rates, particularly (but not entirely) with regard to sub-prime and other non-conforming loans, many lenders have reduced their willingness to make and tightened their credit requirements with regard to, residential mortgage loans. Fewer loan products and stricter loan qualification standards may make it more difficult for some borrowers to finance the purchase of our condominiums. Increases in the cost of home mortgage financing could prevent our potential customers from purchasing our condominiums. In addition, where our potential customers must sell their existing homes in order to buy a condominium from us, increases in mortgage costs could prevent the buyers of our customers’ existing homes from obtaining the mortgages they need to complete the purchase, which could result in our potential customers’ inability to buy a condominium from us. Furthermore, changes in government sponsored entities involved in the residential mortgage market such as Fannie Mae and FHA could affect mortgage rates, down payment requirements and our customers’ ability to obtain affordable financing, which could subsequently affect our customers’ ability to purchase our products. If our potential customers or the buyers of our customers’ current homes are not able to obtain suitable financing, our sales and revenue could decline.

We depend upon the availability and skill of general contractors and subcontractors.

Substantially all our construction work is done by subcontractors working for a general contractor we select for a particular project. Accordingly, the timing and quality of our construction depends on the availability and skill of those subcontractors. We do not have long-term contractual commitments with any particular general contractor, subcontractors or suppliers. Although we believe that our relationships with our general contractors, subcontractors and suppliers are good, we cannot assure you that skilled subcontractors will continue to be available to us at reasonable rates. The inability to contract with skilled subcontractors or general contractors at reasonable costs on a timely basis could limit our ability to build and deliver condominiums and could have a material adverse effect on the operating results of our real estate development operations. Additionally, if there is an impairment, bankruptcy or default by the general contractor or subcontractors our production, revenue and operating income may be adversely affected.

We rely on outside professionals whose errors could increase our costs.

We often collaborate with numerous professionals such as architects, engineers and general contractors in the development of our real estate projects. In the course of our business, we rely on the work of these professionals to help design and build the condominiums that we develop, and errors in their work can create significant increases in cost and delays in construction.

Our revenue and operating results have fluctuated in the past and may continue to do so in the future.

Our revenue and operating results from real estate development operations are subject to fluctuations. Because we typically do not have more than one or two projects under development at any time, factors such as the timing of the start of construction of new projects, the timing of receipt of regulatory approvals for development and construction and others can cause our revenue and operating results to vary from period to period and from year to year. Accordingly, the historical financial performance of our real estate development operations is not necessarily a meaningful indicator of future results for any particular period, and quarter-to-quarter comparisons should not be relied upon as an indicator of future performance.

We may be subject to environmental liabilities that could adversely affect our results of operations or the value of our properties.

 

11


Table of Contents

The development and sale of real property creates a potential for environmental liability on our part as owner and developer, for our own acts as well as the acts of prior owners, current owners or past owners of adjacent parcels. If hazardous substances are discovered on or emanating from any of our properties, we may be held liable for costs and liabilities relating to those hazardous substances. Should a substantial environmental hazard be found on any of our properties, our results of operations and the value of the contaminated property could be adversely affected.

Increased insurance risk could negatively affect our business.

Insurance and surety companies may take actions that could negatively affect our business, including increasing insurance premiums, requiring higher self-insured retentions and deductibles, requiring additional collateral or covenants on surety bonds, reducing limits, restricting coverages, imposing exclusions, and refusing to underwrite certain risks and classes of business. Any of these actions may adversely affect our ability to obtain appropriate insurance coverage at reasonable costs, which could have a material adverse effect on our business.

Risks related to our business

Environmental matters and climate change impacts.

We cannot predict with certainty whether climate change is occurring and, if so, at what rate. However, the physical effects of climate change could have a material adverse effect on our properties, operations and business. The potential physical impacts of climate change on our operations are highly uncertain. Climate change may result in, among other things, changing rainfall patterns, changing storm patterns and intensities and changing temperature levels. Because our operating results are significantly influenced by weather, significant changes in historical weather patterns could significantly impact our future operating results. For example, if climate change results in drier weather and milder temperatures over a greater period of time in a given period, we may be able to increase our productivity, which could have a positive impact on our revenues and gross margins. In addition, if climate change results in an increase in severe weather, such as hurricanes, intense rainfall and ice storms, we could experience a greater amount of higher margin emergency restoration service work, which generally has a positive impact on our gross margins. Conversely, if climate change results in a greater amount of rainfall, snow, ice or other less accommodating weather over a greater period of time in a given period, we could experience reduced productivity, which could negatively impact our revenues and gross margins.

We are subject to numerous federal, state, local and environmental laws and regulations governing our operations, including the handling, transportation and disposal of non-hazardous and hazardous substances and wastes, as well as emissions and discharges into the environment, including discharges to air, surface water and groundwater and soil. We also are subject to laws and regulations that impose liability and cleanup responsibility for releases of hazardous substances into the environment. Under certain of these laws and regulations, such liabilities can be imposed for cleanup of previously operated properties regardless of whether we directly caused the contamination or violated any law at the time. The presence of any contamination from substances or wastes could interfere with ongoing operations. In addition, we could be held liable for significant penalties and damages under certain environmental laws and regulations and also could be subject to a revocation of our permits, which could materially and adversely affect our business and results of operations.

From time to time, we may incur costs and obligations for correcting environmental noncompliance matters and for remediation at or relating to certain of our operations. We believe that we are in compliance with our environmental obligations to date and that any such obligations should not have a material adverse effect on our business or financial performance.

Climate change issues may result in the adoption of new environmental regulations that may unfavorably impact us, our suppliers, our customers, and subsequently effect how we conduct our businesses. This could also cause us to incur additional direct costs in complying with any new environmental regulations, as well as increased indirect costs resulting from our customers, suppliers or both incurring additional compliance costs that are passed on to us. These costs may adversely impact our operations and financial condition. In addition, developments in federal and state legislation and regulation on climate change could result in increased capital expenditures to improve the energy efficiency of our existing properties, equipment and our processes without a corresponding increase in revenue.

 

12


Table of Contents

Our operating results may vary significantly from quarter-to-quarter.

Our quarterly results may be materially and adversely affected by:

 

   

the timing and volume of work under contract;

 

   

changes in national, regional, local and general economic conditions;

 

   

the budgetary spending patterns of customers;

 

   

variations in margins of projects performed during any particular quarter;

 

   

a change in the demand for our services;

 

   

increased costs of performance of our services caused by severe weather conditions;

 

   

increases in design and construction costs that we are unable to pass through to our customers;

 

   

the termination of existing agreements;

 

   

losses experienced in our operations that are not covered by insurance;

 

   

a change in the mix of our customers, contracts and business;

 

   

availability of qualified labor hired for specific projects; and

 

   

changes in bonding requirements applicable to existing and new agreements.

We could be adversely affected by the loss of key management personnel.

Our future success depends, to a significant degree, on the efforts of our executive officers and senior management, including those of our subsidiaries. Other than with respect to our Chief Executive Officer, we do not have employment or non-competition agreements with any of our employees. We believe that key members of our senior management possess valuable industry knowledge, relationships and experience that are important to the successful operation of our business. The relationships between our executive officers and senior management and our customers are important to our being retained. We are also dependent upon our project managers and field supervisors who are responsible for managing and drawing employees to our projects. There can be no assurance that any individual will continue in his or her capacity for any particular period of time. Industry-wide competition for managerial talent in electrical construction has increased and the loss of one or more of our key employees, could negatively impact our ability to manage our business and relationships with our customers. The loss of any of our executive officers or senior management could adversely affect our financial condition and results of operations.

Acts of war or terrorism may seriously harm our business.

Acts of war, any outbreak or escalation of hostilities between the United States and any foreign power, including the armed conflict in the Middle East, or acts of terrorism, may cause disruption to the economy, our company, our employees and our customers, which could adversely impact our total revenue and earnings.

We may not be able to utilize all of our deferred tax assets.

As of December 31, 2010, we have determined that we are in a cumulative loss position based on the guidance in ASC Topic 740, Income Taxes. Due to this cumulative loss position and lack of sufficient objective evidence regarding the realization of our deferred tax assets in the foreseeable future, we have recorded a full valuation allowance against our net deferred tax assets. Although we do expect to recover from the current economic downturn to normal profit levels in the future, it may be necessary for us to record additional valuation allowances - related to operating losses. Valuation allowances could materially increase our income tax expense or reduce our income tax benefit, and therefore adversely affect our results of operations and tangible net worth in the period in which such valuation allowance is recorded.

We could be adversely affected by liabilities associated with our former mining business.

Through certain of our subsidiaries and predecessor companies, we were previously engaged in mining activities, and all such activities were discontinued or disposed of prior to 2003. However, we could still be liable for previous activities at sites we once owned. We were identified as a PRP for investigation and removal activities at one such

 

13


Table of Contents

site and in September 2009 we entered into a settlement agreement with the EPA with respect thereto, pursuant to which we made a cash payment to the EPA of $73,000. On July 12, 2010, regarding a separate matter, the Company received a request for information from the EPA relating to mining activities involving the Wentworth Site. On July 30, 2010, the Company submitted a response to the EPA’s request. On December 22, 2010, the Company received a Demand for Reimbursement of Costs from the EPA relating to the Wentworth Site, together with ancillary documents including a draft form of settlement agreement. On January 27, 2011, the Company accepted a Settlement Agreement proposed by the EPA wherein the Company agrees to pay the EPA the sum of $76,630 in exchange for a covenant not to sue from the EPA relating to the Wentworth Site, along with other protections and subject to various terms and conditions as set forth more fully in the Settlement Agreement. Public Notice of the proposed settlement was published on March 17, 2011. Comments are due by May 14, 2011. It is not known whether any comments will be filed in response to the Public Notice or whether EPA or the U.S. Department of Justice will seek to withdraw or otherwise modify the Settlement Agreement based on such comments, as discussed in “Item 3. Legal Proceedings” herein. The discovery of previously unknown contamination or leaks, or the imposition of new clean up requirements could require us to incur significant costs or become the basis for new or increased liabilities that could harm our financial condition and results of operations.

 

Item 1B. Unresolved Staff Comments.

None.

 

Item 2. Properties.

For information with respect to the principal properties utilized in the Company’s operations, see “Item 1. Business.”

The Company’s principal office is located in Melbourne, Florida, where we lease 7,586 square feet of space at a monthly rental rate of $12,900. The lease, which expires in April 2012, may be renewed for five additional three-year periods.

 

Item 3. Legal Proceedings.

Environmental

Through certain of our subsidiaries and predecessor companies, we were previously engaged in mining activities, and all such activities were discontinued or disposed of prior to 2003.

Newton County Mine Tailings Superfund Site

On July 12, 2010, the Company received a request from the EPA for information pursuant to Section 104(e) of CERCLA for Newton County Mine Tailings Superfund Site, Newton County, Missouri (the “Wentworth Site”) relating to mining activities involving the site. On July 30, 2010, the Company submitted a response to the EPA’s request. On December 22, 2010, the Company received a Demand for Reimbursement of Costs from the EPA relating to the Wentworth Site, together with ancillary documents including a draft form of settlement agreement (the “Demand”). In the Demand, the EPA stated that based upon information presently available to it, the Company may be a PRP under CERCLA with respect to the Wentworth Site. The Demand cites the direct and indirect costs attributable to the Company associated with the EPA’s response to date as $972,242, and encourages the Company to voluntarily negotiate a consent decree in which the Company agrees to pay past costs.

On January 27, 2011, the Company accepted a Settlement Agreement proposed by the EPA wherein the Company agrees to pay the EPA the sum of $76,630 in exchange for a covenant not to sue from the EPA relating to the Wentworth Site, along with other protections and subject to various terms and conditions as set forth more fully in the Settlement Agreement. Legal counsel for EPA has informed the Company that the Settlement Agreement has been formally approved by both EPA and the U.S. Department of Justice. CERCLA requires that notice of the proposed Settlement Agreement be provided in the Federal Register in order for EPA to solicit public comments on the proposed Settlement Agreement (the “Public Notice”). On March 17, 2011, the EPA published the Public Notice in the Federal Register (Vol. 76, No. 52, Thursday, March 17, 2011) of the proposed Settlement Agreement. The Public Notice provides an opportunity for any person to submit comments to the EPA concerning the proposed settlement. Comments are due by May 14, 2011. The Public Notice states: “The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicated that the settlement is inappropriate, improper, or inadequate.” It is not known whether any comments will be filed in response to the Public Notice or whether EPA or the U.S. Department of

 

14


Table of Contents

Justice will seek to withdraw or otherwise modify the Settlement Agreement based on such comments. However, the Company notes, generally, that proposed settlements are rarely withdrawn or modified in response to public comments and, further, the Company is not aware of any reason that the terms of the Settlement Agreement negotiated with the EPA representatives would not ultimately be approved by the EPA and the U.S. Department of Justice notwithstanding comments that may be received in response to the Public Notice. The Company does not expect its portion of a settlement with the EPA to have a material adverse effect on the Company’s financial position. The Settlement Agreement is based, in part, on the agency’s acceptance of the Company’s representations to the effect that it is potentially only a minimal contributor to the hazardous substances that are the subject of the environmental investigation and response actions. The Company anticipates that the settlement process will be concluded during the second quarter of 2011.

Litigation

We are involved in various claims and legal actions arising in the ordinary course of business. In the opinion of management, the ultimate disposition of these matters will not have a material adverse effect on our consolidated financial position, results of operations or liquidity.

 

Item 4. (Removed and Reserved).

PART II

 

Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities.

Our Common Stock is listed on the NYSE Amex under the symbol GV. The following table shows the reported high and low sales price at which our Common Stock was traded in 2010 and 2009:

 

     2010      2009  
     High      Low      High      Low  

First Quarter

   $ 0.49       $ 0.36       $ 0.43       $ 0.20   

Second Quarter

     0.46         0.35         0.54         0.26   

Third Quarter

     0.38         0.27         0.49         0.38   

Fourth Quarter

     0.37         0.25         0.49         0.36   

As of March 23, 2011, there were 9,058 holders of record of our Common Stock.

We have paid no cash dividends on our Common Stock since 1933, and it is not expected that we will pay any cash dividends on our Common Stock in the immediate future.

Since September 17, 2002, we have had a stock repurchase plan which, as last amended by the Board of Directors on September 21, 2010, permits the purchase of up to 3,500,000 shares until September 30, 2011. We did not purchase any of our Common Stock during 2010. As of December 31, 2010, we have a maximum of 1,154,940 shares that may be purchased under our publicly announced stock repurchase plan. Since the inception of the repurchase plan, we have repurchased 2,345,060 shares of our Common Stock at a cost of $1,289,467 (average cost of $0.55 per share). We may repurchase our shares either in the open market or through private transactions. The volume of the shares to be repurchased is contingent upon market conditions and other factors.

 

15


Table of Contents
Item 6. Selected Financial Data

The following table sets forth summary consolidated financial information for each of the years in the five-year period ended December 31, 2010:

 

    Year Ended December 31,  
    2010     2009     2008     2007     2006  
    (In thousands except per share and share amounts)  

Continuing operations:

         

Revenue

         

Electrical construction

  $ 31,385      $ 27,772      $ 29,062      $ 26,762      $ 36,410   

Real estate development

    1,983        1,474        2,383        537 (1)      11,086   
                                       

Total revenue

  $ 33,368      $ 29,246      $ 31,445      $ 27,299      $ 47,496   
                                       

Income (loss) from continuing operations

         

Electrical construction

    2,046        (130     1,219        456        4,675   

Real estate development

    154        (3     (3,954 )(2)      (1,352 )(3)      2,752   

Corporate

    (2,300     (2,332     (2,564     (2,602     (2,933
                                       

Income (loss) before taxes from continuing operations

    (100     (2,465     (5,299     (3,498     4,494   

Income tax provision

    35 (5)      (537 )(5)      (23 )(5)      (1,196     1,740   
                                       

Net (loss) income from continuing operations available to common stockholders

    (135     (1,928     (5,276     (2,302     2,753   

Discontinued operations:

         

(Loss) gain from operations, net of tax

    (118 )(4)      —   (4)      (111 )(4)      (19 )(4)      242 (4) 
                                       

Net (loss) income

  $ (253   $ (1,927   $ (5,387   $ (2,321   $ 2,995   
                                       

(Loss) earnings per share - basic and diluted:

         

Continuing operations

  $ (0.01   $ (0.08   $ (0.21   $ (0.09   $ 0.11   

Discontinued operations

    —          —          —          —          0.01   
                                       

Net (loss) income

  $ (0.01   $ (0.08   $ (0.21   $ (0.09   $ 0.12   
                                       

Weighted average shares outstanding:

         

Basic

    25,451,354        25,451,354        25,451,354        25,451,354        26,564,550   

Diluted

    25,451,354        23,451,354        25,451,354        25,451,354        25,564,550   

Balance sheet data:

         

Total assets

  $ 20,959      $ 21,662      $ 25,499      $ 32,867      $ 41,904   

Long term debt and capital lease obligations, including current portion

    3,330        2,779        5,738        4,021        2,588   

Shareholders’ equity

    14,458        14,711        16,638        22,025        24,346   

Working capital

    7,200        7,071        10,861        13,774        16,316   
         

The total of the above categories may differ from the sum of the components due to rounding.

 

(1)

Reflects the reversal of $7.2 million of revenues, due to buyer defaults on contracts to purchase condominium units, which was partially offset by revenues received in the fourth quarter upon the sale of six Pineapple House condominium units.

(2)

Reflects the adjustments to the Oak Park inventory to estimated fair value in the second quarter of 2008 and the Pineapple House inventory to estimated fair value in the fourth quarter of 2008.

(3)

Reflects the reversal of the cost of sales relating to the condominium units underlying the purchase contracts subject to defaults, partially offset by cost of sales recognized in the fourth quarter upon the sale of six Pineapple House condominium units. Also reflects the adjustment of the Pineapple House inventory to estimated fair value in the third quarter of 2007.

(4)

In each of the five years, the Company recognized a provision for remediation as described in note 6 to the consolidated financial statements.

(5)

Reflects the change in the valuation allowance of $31,000, $324,000 and $1.9 million against the deferred tax assets for the years ended December 31, 2010, 2009 and 2008, respectively.

 

16


Table of Contents
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operation.

Forward-Looking Statements

We make “forward-looking statements” within the “safe harbor” provision of the Private Securities Litigation Reform Act of 1995 throughout this document. You can identify these statements by forward-looking words such as “may,” “will,” “expect,” “anticipate,” “believe,” “estimate,” “plan,” and “continue” or similar words. We have based these statements on our current expectations about future events. Although we believe that our expectations reflected in or suggested by our forward-looking statements are reasonable, we cannot assure you that these expectations will be achieved. Our actual results may differ materially from what we currently expect. Factors that may affect the results of our electrical construction operations include, among others: the level of construction activities by public utilities; the timing and duration of construction projects for which we are engaged; our ability to estimate accurately with respect to fixed price construction contracts; and heightened competition in the electrical construction field, including intensification of price competition. Factors that may affect the results of our real estate development operations include, among others: the continued weakness in the Florida real estate market; the level of consumer confidence; our ability to acquire land; increases in interest rates and availability of mortgage financing to our buyers; and increases in construction and homeowner insurance and the availability of insurance. Factors that may affect the results of all of our operations include, among others: adverse weather; natural disasters; effects of climate changes; changes in generally accepted accounting principles; ability to obtain necessary permits from regulatory agencies; our ability to maintain or increase historical revenue and profit margins; general economic conditions, both nationally and in our region; adverse legislation or regulations; availability of skilled construction labor and materials and material increases in labor and material costs; and our ability to obtain additional and/or renew financing. Other important factors which could cause our actual results to differ materially from the forward-looking statements in this document include, but are not limited to, those discussed in the “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and “Risk Factors” sections and should be considered while evaluating our business, financial condition, results of operations and prospects.

You should read this report completely and with the understanding that our actual future results may be materially different from what we expect. We may not update these forward-looking statements, even in the event that our situation changes in the future. All forward-looking statements attributable to us are expressly qualified by these cautionary statements.

Overview

We are a provider of electrical construction services throughout most of the United States and a developer of condominiums on the east coast of Florida and we also make limited opportunistic investments in distressed residential properties, which we improve or reposition for resale. Through our subsidiary, Southeast Power Corporation, we are engaged in the construction and maintenance of electric utility facilities for electric utilities and industrial customers and the installation of fiber optic cable for fiber optic cable manufacturers, telecommunication companies and electric utilities. Southeast Power is headquartered in Titusville, Florida, and performs electrical contracting services throughout most of the United States.

We report our results under two reportable segments, electrical construction and real estate development. For the year ended December 31, 2010 our total consolidated revenue was $33.4 million, of which 94% was attributable to the electrical construction segment and 6% to the real estate development segment.

The electrical construction business is highly competitive and fragmented. We compete with other independent contractors, including larger regional and national firms that may have financial, operational, technical and marketing resources that exceed our own. We also face competition from existing and prospective customers establishing or augmenting in-house service organizations that employ personnel who perform some of the same types of service as those provided by us. In addition, a significant portion of our electrical construction revenue is derived from a small group of customers, with several different customers accounting for a substantial portion of our revenue in any given year. For example, for the years ended December 31, 2010 and 2009, three of our customers accounted for approximately 45% and 56% of our consolidated revenue, respectively. The loss of, or decrease in current demand from, one or more of these customers would, if not replaced by other business, result in a decrease in revenue, margins and profits which could be material.

 

17


Table of Contents

Through our subsidiary Bayswater Development Corporation and its various subsidiaries (“Bayswater”) we are engaged in the acquisition, development, management and disposition of land and improved properties. The primary focus of our real estate operations has been the development of residential condominium projects along the east coast of Central Florida and recently we have expanded our real estate development operations to include the opportunistic acquisition of residential properties in distress sale situations for subsequent refurbishment and resale. We intend to continue to use our knowledge of the local real estate market obtained through our condominium development operations to selectively pursue opportunities as they arise. As of December 31, 2010, we have acquired, refurbished and sold four such residential properties. Our most recently completed condominium project, Pineapple House, is an eight-story building in Melbourne, Florida containing thirty-three luxury river-view condominium units of which twenty-nine units have been sold as of December 31, 2010. It is the first phase of a planned multi-phase development.

Our customers generally are pre-retirement, retirement or second homebuyers seeking higher quality, maintenance free residences with generous amenities. The housing market has experienced the most significant downturn in recent history. The credit markets and mortgage industry have experienced a period of unparalleled instability, and this disruption has affected buyers’ ability to secure financing for home purchases. Foreclosures and distress sales continue to adversely affect market conditions. A high local unemployment level is another factor negatively affecting the real estate market. As a result of these and other factors, we continue to postpone commencement of the next phase of the Pineapple House project until market conditions improve. We are unable to predict when market conditions will improve. Market conditions may continue to have an adverse impact on the sales and pricing of our real estate properties, the commencement and development of new projects and on the results of our real estate development operations. We have completed the first phase of the Pineapple House project on budget and in a timely manner, and believe the project is attractive and of high quality. Furthermore, we are no longer incurring construction costs with respect to this phase and our share of the holding costs on the unsold units is expected to be no more than $25,000 annually.

Critical Accounting Estimates

This discussion and analysis of our financial condition and results of operations is based upon our consolidated financial statements, which have been prepared in accordance with U.S. generally accepted accounting principles. The preparation of these financial statements requires us to make estimates and judgments that affect the reported amounts of assets, liabilities, revenue and expenses, and related disclosure of contingent assets and liabilities. On an on-going basis, we evaluate our estimates, including those related to fixed price electrical construction contracts, real estate development projects, deferred income tax assets and environmental remediation. We base our estimates on historical experience and on various other assumptions that are believed to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions. Our management has discussed the selection and development of our critical accounting policies, estimates and related disclosure with the Audit Committee of the Board of Directors.

Percentage of Completion – Electrical Construction Segment

We recognize revenue from fixed price contracts on a percentage-of-completion basis, using primarily the cost-to-cost method based on the percentage of total cost incurred to date in proportion to total estimated cost to complete the contract. Total estimated cost, and thus contract income, is impacted by several factors including, but not limited to, changes in productivity and scheduling, and the cost of labor, subcontracts, materials and equipment. Additionally, external factors such as weather, site conditions and scheduling that differ from those assumed in the original bid (to the extent contract remedies are unavailable), client needs, client delays in providing approvals, the availability and skill level of workers in the geographic location of the project, a change in the availability and proximity of materials and governmental regulation, may also affect the progress and estimated cost of a project’s completion and thus the timing of income and revenue recognition.

The accuracy of our revenue and profit recognition in a given period is almost solely dependent on the accuracy of our estimates of the cost to complete each project. Due to our experience and our detailed approach in determining our cost estimates for all of our significant projects, we believe our estimates to be highly reliable. However, our projects can be complex and in almost every case the profit margin estimates for a project will either increase or decrease to some extent from the amount that was originally estimated at the time of bid. Because we have a

 

18


Table of Contents

number of projects of varying levels of complexity and size in process at any given time, these changes in estimates can offset each other without materially impacting our overall profitability. If a current estimate of total costs indicates a loss on a contract, the projected loss is recognized in full when determined. Accrued contract losses as of December 31, 2010 and 2009, were $66,000 and $512,000, respectively. The accrued contract losses for 2010 are mainly attributable to several transmission projects experiencing adverse weather conditions and unexpected construction issues. The accrued contract losses for 2009 were mainly attributable to one electrical construction project highly impacted by adverse weather conditions. Revenue from change orders, extra work, variations in the scope of work and claims is recognized when realization is probable.

Percentage of Completion – Real Estate Development Segment

We currently do not have any projects in development. For all future projects, revenue will be recognized using the guidance provided in ASC 360-20, Real Estate Sales. ASC 360-20 provides guidance in assessing the collectability of the sales price, which is required in order to recognize profit under the percentage-of-completion method pursuant to ASC 360-20-40-50 Sales of Condominium Units. ASC 360-20-40-50 states that an entity should evaluate the adequacy of the buyer’s initial and continuing investment in reaching a conclusion that the sales price is collectible. To meet the continuing involvement criterion, a buyer would be required to either (1) make additional payments during the construction term at least equal to the level of annual payments that would be required to fund principal and interest on a customary mortgage for the remaining purchase price of the property, or (2) increase the minimum initial investment by an equivalent aggregate amount. If the test for initial and continuing investment is not met, the deposit method should be applied and profit recognized only after the buyer’s aggregate deposit meets the required investment tests for the duration of the construction period. In future projects, we believe that we will be required in most cases to collect higher deposits from buyers than we have historically in order to recognize revenue under the percentage-of-completion method of accounting. If we are unable to meet the requirements of ASC Topic 360 on future projects, we will be required to defer revenue recognition until the aggregate investment tests described in ASC 360-20-40-50 have been met.

In general, we believe that material differences in the total actual cost of a project versus our total estimated project cost are unlikely due to the nature of the fixed price contracts we enter into with the general contractors on our real estate projects.

If a current estimate of total project cost indicates a loss on a project, the projected loss is recognized in full when determined. There were no contract loss accruals recorded as of December 31, 2010 and 2009 in the real estate development segment. The timing of revenue and expense recognition using the percentage-of-completion method is contingent on construction productivity. Factors possibly impeding construction productivity include, but are not limited to, supply of labor, materials and equipment, scheduling, weather, permitting and unforeseen events. When a buyer defaults on a contract for sale, revenue and expense recognized in prior periods are adjusted in the period of default.

Real Estate Inventory Valuation

Real estate inventory, which consists of completed condominium units, is carried at the lower of cost or estimated fair value. In accordance with ASC 360-10 Accounting for the Impairment or Disposal of Long-lived Asset, real estate inventory is reviewed for impairment whenever events or changes in circumstances indicate that the carrying value may not be recoverable. If no changes in circumstances occur management reviews real estate inventory on a quarterly basis. If the carrying amount or basis is not expected to be recovered, impairment losses are recorded and the related assets are adjusted to their estimated fair value. We also comply with ASC Topic 820 Fair Value Measurement, which defines fair value, establishes a framework for measuring fair value and expands disclosures about fair value measurements.

As of December 31, 2010, management reviewed the real estate inventory for impairment. ASC 360-10 requires that if the undiscounted cash flows expected to be generated by an asset are less than its carrying amount, an impairment charge should be recorded to write-down the carrying amount of such asset to its fair value. The fair value of an asset is the amount at which that asset could be bought or sold in a current transaction between willing parties, that is, other than in a forced or liquidation sale.

In determining the need for recording any impairment on our real estate inventory, management reviews the carrying value of the remaining inventory. Management considers sales expectations and the historical pace of sales during

 

19


Table of Contents

the prior year. Management also evaluates the margins of the property sold, current selling prices and any property under contract. Considering these factors we establish three probability scenarios for the amount of inventory we project to sell over the next twelve months and each successive twelve month period until all properties are projected to be sold. We estimate the number of properties that will be sold using 60%, 30% and 10% levels of probability.

Due to the fact that the estimates and assumptions included in our cash flow models are based upon historical results and projected trends, they do not anticipate unexpected changes in market conditions that may lead to us incurring additional impairment charges in the future. Additional factors considered in our analysis are unemployment rates, local real estate market trends, such as supply and demand, marketing incentives, and other local factors. Therefore, changes in the local economy highly influence our market conditions. Our most critical assumptions in our cash flow models are our projected absorption, which is analyzed based on our historical sales and current sales within surrounding areas, current selling prices and a discount factor.

We estimate the fair value of our condominium units by using a discounted cash flow model, which incorporates the probability assessments described above. In estimating the cash flows for completed condominium units, we use various estimates such as (a) expected sales pace to absorb the number of units based upon economic conditions that may have either a short-term or long-term impact on the market in which the units are located, competition within our market, historical sales rates of the units within the project; and (b) expected net sales prices in the near-term based upon current pricing estimates, as well as estimated changes in future sales prices based upon historical sales prices of the units within the project, or historical sales prices of similar product offerings in our market. Our determination of fair value requires discounting the estimated cash flows at a rate commensurate with the inherent risks associated with selling the assets and related estimated cash flows. In determining the fair value of the remaining condominium units in our Pineapple House project we used a discount rate of 8%.

In addition, we have applied sensitivity factors to our impairment analysis. If our assumptions or estimates in our fair value calculations change, we could incur impairment charges in future periods, which would decrease operating income and result in lower asset values on our balance sheet. For example, we performed a sensitivity test for the three key assumptions in our real estate inventory impairment test: current selling prices, discount factor, and projected absorption pace. Based on these analyses, we determined that a ten percent decrease in the estimated selling prices of the properties in inventory, an increase of ten percent in the estimated discount factor used in our calculation or a decrease of two units in the estimated number of condominium units to be sold over the next twelve months, each calculated separately, had no impact on the carrying value of our real estate inventory as of December 31, 2010 or December 31, 2009, because even using these adverse assumptions, we still estimate the fair value of our condominium inventory to be at or above its carrying value, based on our discounted cash flow model.

Our current real estate inventory consists of one condominium project with four remaining condominium units as of December 31, 2010. During the year ended December 31, 2010, four condominium units, or 50% of the remaining units at the end of the prior year, were sold in excess of their carrying values. In addition, the units sold are similar to the units remaining to be sold. Furthermore, during 2011 to date, we have sold two of the remaining four condominium units in inventory as of December 31, 2010. We are selling at substantially our current asking price, which is in excess of our carrying costs. This trend has continued with our two 2011 unit sales. Based on the above, management determined that no additional impairment write-down to our current real estate inventory was necessary.

Other Assets Valuation

As described above, the Company carefully monitors the value of the real estate inventory, and the Company also regularly performs impairment analysis on the electrical construction segment’s property and equipment balances. In conducting our impairment testing, we have considered whether the decrease in the Company’s market capitalization below our book value should be a specific triggering event necessitating impairment testing. We note that the Company’s market capitalization is significantly lower than our book value. While market capitalization is an indicator of market sentiment on a particular day, the day-to-day share price of the Company’s stock at particular points in time may not, and frequently does not, fairly reflect the value of the Company’s significant assets, primarily the real estate inventory of our real estate segment and the investment in the equipment of our electrical construction segment. We further note that in almost all of the past sixteen years our market capitalization has been significantly below our book value.

 

20


Table of Contents

Under these circumstances, we do not consider such market capitalization to be a specific triggering event necessitating impairment testing, particularly in light of the fact that the Company does not have any goodwill or similar intangible assets recorded on its balance sheet. Regardless, the Company reviews the book value of its assets on a regular basis to determine possible impairments in accordance with ASC Topic 360, as it believes it will continue as a viable business in the future. Specifically, in its evaluation for potential impairment, the Company determines the value of its real estate inventory, as well as its investments in electrical construction property and equipment using a fair value methodology, as further described in “Note 1 – Organization and Summary of Significant Accounting Policies – Inventory”, “Note 1 – Organization and Summary of Significant Accounting Policies – Property, Buildings, Equipment and Depreciation,” and in accordance with ASC Topic 820.

Deferred Tax Assets

We account for income taxes in accordance with ASC Topic 740, Income Taxes, which establishes the recognition requirements necessary for implementation. Deferred tax assets and liabilities are recognized for the future tax effects attributable to temporary differences and carryforwards between the financial statement carrying amounts of existing assets and liabilities and the respective tax bases. Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in tax rates is recognized in income in the period that includes the enactment date.

As of December 31, 2010, our deferred tax assets were largely comprised of net operating loss (“NOL”) carryforwards, alternative minimum tax (“AMT”) credit carryforwards and inventory basis differences on unsold condominium units (refer to note 5 to the consolidated financial statement). The carrying amounts of deferred tax assets are reduced by a valuation allowance, if based on the available evidence, it is more likely than not that such assets will not be realized. The ultimate realization of deferred tax assets is dependent upon the generation of future taxable income during the periods in which the deferred tax assets are expected to be recovered or settled. In the assessment for a valuation allowance, appropriate consideration is given to all positive and negative evidence related to the realization of the deferred tax assets. This assessment considers, among other matters, the nature, frequency and severity of current and cumulative losses, forecasts of future profitability, the duration of statutory carryforward periods, our experience with loss carryforwards expiring unused and tax planning alternatives.

Based upon an evaluation of all available evidence, we established a full valuation allowance against our net deferred tax assets beginning in 2008. Our cumulative loss position over the evaluation period and the current market conditions were significant negative evidence in assessing the need for a valuation allowance. Consequently, our future provision for income taxes will include no tax benefit with respect to losses incurred and limited tax expense with respect to income generated until the respective valuation allowance is eliminated. This will cause variability in our effective tax rate. In the event we were to subsequently determine that we would be able to realize our deferred tax assets in the future in excess of our net recorded amount, an adjustment to the previously recorded valuation allowance would increase income in the period such determination is made.

Provision for Remediation

In September 2003, we were notified by the United States Environmental Protection Agency (the “EPA”) that we were a potentially responsible party (“PRP”) with respect to possible investigation and removal activities at a mine that we formerly owned and in September 2009 we entered into a Settlement Agreement with the EPA with respect thereto, pursuant to which we made a cash payment to the EPA of $73,000. Refer to note 6 to the consolidated financial statements for a discussion of this matter.

On July 12, 2010, the Company received a request from the EPA for information pursuant to Section 104(e) of CERCLA for Newton County Mine Tailings Superfund Site, Newton County, Missouri (the “Wentworth Site”) relating to mining activities involving the site. On July 30, 2010, the Company submitted a response to the EPA’s request. On December 22, 2010, the Company received a Demand for Reimbursement of Costs from the EPA relating to the Wentworth Site, together with ancillary documents including a draft form of settlement agreement.

On January 27, 2011, the Company accepted a Settlement Agreement proposed by the EPA wherein the Company agrees to pay the EPA the sum of $76,630 in exchange for a covenant not to sue from the EPA relating to the Wentworth Site, along with other protections and subject to various terms and conditions as set forth more fully in the Settlement Agreement.

 

21


Table of Contents

The Company does not expect its portion of a settlement with the EPA to have a material adverse effect on the Company’s financial position. The Settlement Agreement is based, in part, on the agency’s acceptance of the Company’s representations to the effect that it is potentially only a minimal contributor to the hazardous substances that are the subject of the environmental investigation and response actions. The Company anticipates that the settlement process will be concluded during the second quarter of 2011.

As of December 31, 2010, the cumulative net expense was $118,000. This represents the Company’s share of the estimated costs associated with the proposed Settlement Agreement with the EPA and the professional fees associated with this matter for which the Company currently does not expect any insurance recoveries.

RESULTS OF OPERATIONS

YEAR ENDED DECEMBER 31, 2010 COMPARED TO YEAR ENDED DECEMBER 31, 2009

The table below is a reconciliation of our operating income (loss) attributable to each of our segments for the two year period ended December 31 as indicated:

 

     2010     2009  

Electrical construction

    

Revenue

   $ 31,384,594      $ 27,772,466   

Operating expenses

    

Cost of goods sold

     26,310,355        24,971,857   

Selling, general and administrative

     269,890        276,506   

Depreciation

     2,685,132        2,665,810   

Gain on sale of assets

     (2,425     (48,936
                

Total operating expenses

     29,262,952        27,865,237   
                

Operating income (loss)

   $ 2,121,642      $ (92,771
                

Real estate development

    

Revenue

   $ 1,983,385      $ 1,473,800   

Operating expenses

    

Cost of goods sold

     1,360,751        1,054,233   

Selling, general and administrative

     433,516        354,129   

Depreciation

     3,352        13,765   

Loss on sale of assets

     255        —     
                

Total operating expenses

     1,797,874        1,422,127   
                

Operating income

   $ 185,511      $ 51,673   
                

Operating income (loss) is total operating revenue less operating expenses inclusive of depreciation and selling, general and administrative expenses for each segment. Operating expenses also include any gains or losses on the sale of property and equipment. Operating income (loss) excludes interest expense, interest and other income, and income taxes.

Revenue

Total revenue in the year ended December 31, 2010 increased by 14.1% to $33.4 million, compared to $29.2 million in the year ended December 31, 2009. This increase in total revenue was mainly due to increased revenue recognized in both the electrical construction segment and the real estate development segment for the year ended December 31, 2010.

Electrical construction revenue increased 13.0% to $31.4 million for the year ended December 31, 2010, compared to $27.8 million for the year ended December 31, 2009. The increase in revenue for the year ended December 31, 2010, when compared to the same period in 2009, is largely due to an increase in demand for our electrical construction services, particularly our transmission and fiber optic work, partially offset by a decrease in storm work in 2010. The varying magnitude and duration of electrical construction projects may result in substantial fluctuation in our backlog from time to time. At December 31, 2010, the approximate value of uncompleted contracts was $5.1

 

22


Table of Contents

million, compared to $11.2 million at December 31, 2009. We expect to complete 100% of this backlog during the year ending December 31, 2011. We cannot project the levels of future demand for construction services.

Revenue from our real estate development operations increased 34.6% to $2.0 million for the year ended December 31, 2010, compared to $1.5 million for the year ended December 31, 2009. This increase was mainly due to the number, type and sales price of the properties sold during 2010, when compared to 2009. During the year ended December 31, 2010 a total of four condominium units from our Pineapple House project and four residential properties were sold. During the year ended 2009 a total of six condominium units from the Pineapple House project were sold and we had no residential property sales. During the year ended December 31, 2010, we had no projects under construction.

As of December 31, 2010, there was no backlog for the real estate development operation’s segment.

Operating Results

Total operating loss was $18,000 for the year ended December 31, 2010, compared to an operating loss of $2.4 million in 2009, an improvement of $2.4 million. Electrical construction operations had operating income of $2.1 million in the year ended December 31, 2010, compared to an operating loss of $93,000 during the year ended December 31, 2009. Operating margins on electrical construction operations increased to 6.8% for the year ended December 31, 2010, from (0.3)% for the year ended December 31, 2009. The increase in operating margins for the year ended December 31, 2010, when compared to the same period in 2009, was largely the result of the increases in revenue, which cover a higher percentage of fixed overhead costs, as well as improved productivity on several transmission jobs in the current period compared to the prior year period. Operating margins during the prior year were adversely affected, particularly during the fourth quarter of 2009, by one electrical construction project highly impacted by adverse weather conditions.

Real estate development operations had operating income of $186,000 in the year ended December 31, 2010, compared to $52,000 in the year ended December 31, 2009, an increase of $134,000. This increase was mainly due to the type and sales price of the properties sold during the year ended 2010, compared to the same period in the prior year. As of December 31, 2010, we held four Pineapple House condominium units for sale.

Costs and Expenses

Total costs and expenses, and the components thereof, increased to $33.4 million in the year ended December 31, 2010, from $31.6 million in the year ended December 31, 2009, an increase of 5.5%.

Electrical construction cost of goods sold increased to $26.3 million in the year ended December 31, 2010, from $25.0 million in the year ended December 31, 2009, an increase of 5.4%. The increase in costs corresponds to the aforementioned increase in revenue. Productivity during the year ended December 31, 2009, primarily during the fourth quarter, was highly impacted by adverse weather conditions effecting one electrical construction project, which caused higher than normal electrical construction costs in 2009.

Costs of goods sold for real estate development operations increased to $1.4 million for the year ended December 31, 2010, from $1.1 million for the year ended December 31, 2009. The increase in costs of goods sold is primarily attributable to the variance in the type, amount and costs of the properties sold during the year ended 2010, when compared to the same period in 2009.

The following table sets forth selling, general and administrative (“SG&A”) expenses for each segment for the years ended December 31 as indicated:

 

     2010      2009  

Electrical construction

   $ 269,890       $ 276,506   

Real estate development

     433,516         354,129   

Corporate

     2,256,435         2,242,331   
                 

Total

   $ 2,959,841       $ 2,872,966   
                 

SG&A expenses remained relatively unchanged at $3.0 million in the year ended December 31, 2010 compared to $2.9 million in the year ended December 31, 2009. As a percentage of revenue, SG&A expenses decreased to 8.9% for 2010 from 9.8% in 2009, due primarily to the increase in revenue in the current year.

 

23


Table of Contents

The following table sets forth depreciation expense for each segment for the years ended December 31 as indicated:

 

     2010      2009  

Electrical construction

   $ 2,685,132       $ 2,665,810   

Real estate development

     3,352         13,765   

Corporate

     68,779         118,046   
                 

Total

   $ 2,757,263       $ 2,797,621   
                 

Depreciation expense remained relatively unchanged at $2.8 million during the year ended December 31, 2010 and 2009.

Income Taxes

The following table presents our provision for income tax and effective income tax rate from continuing operations for the years ended December 31 as indicated:

 

     2010     2009  

Income tax provision

   $ 34,601      $ (537,358

Effective income tax rate

     34.6     (21.8 )% 

Our effective tax rate for the year ended December 31, 2010 was 34.6%. Our income tax provision includes only state income tax expense attributable to a subsidiary and does not reflect the federal statutory rate of (34)% since tax benefits are not recognized on anticipated losses when a full valuation allowance is in effect. Our effective tax rate for the year ended December 31, 2009 of (21.8)%, differs from the statutory rate primarily due to the valuation allowance which was further reduced by a tax benefit resulting from a change in tax law.

Discontinued Operations

Through certain of our subsidiaries and predecessor companies, we were previously engaged in mining activities, and all such activities were discontinued or disposed of prior to 2003.

In September 2003, we were notified by the United States Environmental Protection Agency (the “EPA”) that we were a potentially responsible party (“PRP”) with respect to possible investigation and removal activities at a mine that we formerly owned and in September 2009 we entered into a Settlement Agreement with the EPA with respect thereto, pursuant to which we made a cash payment to the EPA of $73,000. Refer to note 4 to the consolidated financial statements for a discussion of this matter.

On July 12, 2010, we received a request from the EPA for information pursuant to Section 104(e) of CERCLA for Newton County Mine Tailings Superfund Site, Newton County, Missouri (the “Wentworth Site”) relating to mining activities involving the site. On July 30, 2010, we submitted a response to the EPA’s request. On December 22, 2010, we received a Demand for Reimbursement of Costs from the EPA relating to the Wentworth Site, together with ancillary documents including a draft form of settlement agreement.

On January 27, 2011, we accepted a Settlement Agreement proposed by the EPA wherein we agree to pay the EPA the sum of $76,630 in exchange for a covenant not to sue from the EPA relating to the Wentworth Site, along with other protections and subject to various terms and conditions as set forth more fully in the Settlement Agreement. We do not expect our portion of a settlement with the EPA to have a material adverse effect on our financial position.

As of December 31, 2010, the cumulative net expense was $118,000. This represents our share of the estimated costs associated with the proposed Settlement Agreement with the EPA and the professional fees associated with this matter for which we currently do not expect any insurance recoveries.

The following table sets forth summary operating results of discontinued operations for the years ended December 31 as indicated:

 

24


Table of Contents
     2010     2009  

(Provision) gain for remediation

   $ (117,834   $ 387   
                

(Loss) gain from discontinued operations before income taxes

     (117,834     387   

Income tax provision

     —          —     
                

(Loss) gain from discontinued operations, net of tax

   $ (117,834   $ 387   
                

Liquidity and Capital Resources

Working Capital Analysis

Our primary cash needs have been for capital expenditures and working capital. Our primary sources of cash have been cash flow from operations and borrowings under our lines of credit. As of December 31, 2010, we had cash and cash equivalents of $4.2 million and working capital of $7.2 million. In addition, we had $3.0 million in an unused revolving line of credit as of December 31, 2010, as discussed in note 11 to the consolidated financial statements. We anticipate that this cash on hand, our credit facilities and our future cash flows from operating activities will provide sufficient cash to enable us to meet our future operating needs and debt requirements.

Cash Flow Analysis

The following table presents our net cash flows for each of the years ended December 31 as indicated:

 

     2010     2009  

Net cash provided by operating activities

   $ 3,690,359      $ 3,531,049   

Net cash used in investing activities

     (2,404,000     (3,530,947

Net cash used in financing activities

     (646,834     (1,387,089
                

Net increase (decrease) in cash and cash equivalents

   $ 639,525      $ (1,386,987
                

Operating Activities

Cash flows from operating activities are comprised of the net loss, adjusted to reflect the timing of cash receipts and disbursements therefrom. Our cash flows are influenced by the level of operations, operating margins and the types of services we provide, as well as the stages of our projects in both the electrical construction and real estate segments.

Cash provided by our operating activities totaled $3.7 million in the year ended December 31, 2010, compared to cash provided of $3.5 million from operating activities for 2009. Our cash flows are influenced by the level of operations, operating margins, the types of services we provide, as well as the stages of our projects in both the electrical construction and real estate segments.

The increase in net cash provided by operating activities in the year ended December 31, 2010 is primarily due to the changes in the costs and estimated earnings in excess of billings and billings in excess of costs within the electrical construction segment in the current year, as there has been an increase in demand and productivity of our electrical construction services. Operating cash flows normally fluctuate relative to the status of projects within both the real estate and electrical construction segments.

Days of Sales Outstanding Analysis

We evaluate fluctuations in our accounts receivable and costs and estimated earnings in excess of billings on uncompleted contracts for the electrical construction segment by comparing days of sales outstanding (“DSO”). We calculate DSO as of the end of any period by utilizing the respective quarter’s electrical construction revenue to determine sales per day. We then divide accounts receivable and accrued billings, net of allowance for doubtful accounts at the end of the period by sales per day to calculate DSO for accounts receivable. To calculate DSO for costs and estimated earnings in excess of billings, we divide costs and estimated earnings in excess of billings on uncompleted contracts by sales per day.

 

25


Table of Contents

For the quarters ended December 31, 2010 and 2009, our DSO for accounts receivable were 49 and 55, respectively, and our DSO for costs and estimated earnings in excess of billings on uncompleted contracts were 14 and 24, respectively. The decrease in our DSO for costs and estimated earnings in excess of billings on uncompleted contracts was mainly due to the increase in transmission project revenue and productivity during the fourth quarter 2010, when compared to the same period in 2009. As of March 14, 2011, we have received approximately 99.1% of our December 31, 2010 outstanding trade accounts receivable and have billed 100.0% of our costs and estimated earnings in excess of billings balance.

Investing Activities

Cash used in investing activities during the year ended December 31, 2010 was $2.4 million, compared to cash used of $3.5 million during 2009. The decrease in cash used in our investing activities for the year ended December 31, 2010, when compared to 2009 is primarily due to the decrease in capital expenditures, during the current year period. These capital expenditures are mainly attributed to purchases of equipment, primarily trucks and heavy machinery used by our electrical construction segment for the upgrading and replacement of equipment. Our capital budget for 2011 is expected to total approximately $4.6 million, the majority of which is for upgrading of equipment and purchases of new equipment for the construction of concrete foundations and expansion efforts, mainly within the electrical construction segment. These purchases will be funded through our cash reserves and our equipment loan.

Financing Activities

Cash used in financing activities during the year ended December 31, 2010 was $647,000, compared to cash used in financing activities of $1.4 million during 2009. Our financing activities for the current year consisted mainly of repayments on notes payable of $1.2 million for the Pineapple House mortgage, $500,000 on the electrical construction $3.8 million equipment loan and repayments on our working capital loan of $500,000. These were partially offset by borrowings made within the electrical construction segment of $1.1 million and borrowings on our working capital loan of $500,000, used to purchase capital equipment and residential properties. Our financing activities for the year ended December 31, 2009 consisted of repayments on notes payable of $1.5 million for the Pineapple House mortgage and $1.1 million on the electrical construction $3.5 million equipment loan, as well as repayments on our working capital loan of $865,000, as well as repayments on capital leases of $579,000. These were partially offset by borrowings made within the electrical construction segment of $1.8 million and borrowings on our working capital loan of $865,000. See note 11 to the consolidated financial statements for more information regarding these borrowings.

We have paid no cash dividends on our Common Stock since 1933, and it is not expected that we will pay any cash dividends on our Common Stock in the immediate future.

Debt Covenants

Our debt arrangements contain various financial and other covenants including, but not limited to, minimum tangible net worth, outside debt limitation, and maximum debt to tangible net worth ratio. Other loan covenants prohibit, among other things, incurring additional indebtedness, issuing loans to other entities in excess of a certain amount, entering into a merger or consolidation, and any change in the Company’s current Chief Executive Officer without prior written consent from the lender. The loans also have cross-default provisions whereby any default under any loans of the Company (or its subsidiaries) with the lender will constitute a default under all of the other loans of the Company (and its subsidiaries) with the lender. The most significant of these covenants are minimum tangible net worth, outside debt limitation, and maximum debt to tangible net worth ratio. The Company must maintain a tangible net worth of at least $13.5 million, no more than $500,000 in outside debt and a maximum debt to worth ratio of no greater than 1.5 to 1.0. The Company was in compliance with all of its covenants as of December 31, 2010.

 

26


Table of Contents

The following are computations of these most restrictive financial covenants:

 

     Covenant      Actual as of
December 31, 2010
 

Tangible net worth minimum

   $ 13,500,000       $ 14,458,476   

Outside debt must not exceed $500,000

     500,000         —     

Maximum debt/worth ratio must not exceed 1.5 : 1.0

     1.5 : 1.0         .45 : 1.0   

Forecast

We anticipate our cash on hand, cash flows from operations and credit facilities will provide sufficient cash to enable us to meet our working capital needs, debt service requirements and planned capital expenditures for at least the next twelve months. The amount of our planned capital expenditures will depend, to some extent, on the results of our future performance. However, our revenue, results of operations and cash flows, as well as our ability to seek additional financing may be negatively impacted by factors including, but not limited to, a decline in demand for electrical construction services and/or real estate in the markets served and general economic conditions, heightened competition, availability of construction materials, increased interest rates and adverse weather conditions.

Inflation

As a result of relatively low levels of inflation experienced during the years ended December 31, 2010 and 2009, inflation did not have a significant effect on our results.

 

27


Table of Contents
Item 8. Financial Statements and Supplementary Data.

Report of Independent Registered Public Accounting Firm

The Board of Directors and Stockholders

The Goldfield Corporation:

We have audited the accompanying consolidated balance sheets of The Goldfield Corporation and subsidiaries as of December 31, 2010 and 2009, and the related consolidated statements of operations, cash flows and stockholders’ equity for the years then ended. These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these consolidated financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of The Goldfield Corporation and subsidiaries as of December 31, 2010 and 2009, and the results of their operations and their cash flows for the years then ended, in conformity with U.S. generally accepted accounting principles.

/s/ KPMG LLP

Orlando, Florida

March 30, 2011

Certified Public Accountants

 

28


Table of Contents

THE GOLDFIELD CORPORATION AND SUBSIDIARIES

CONSOLIDATED BALANCE SHEETS

 

     December 31,  
     2010     2009  
ASSETS     

Current assets

    

Cash and cash equivalents

   $ 4,174,518      $ 3,534,993   

Accounts receivable and accrued billings, net of allowance for doubtful accounts of $0 in 2010 and 2009

     4,393,659        3,740,047   

Remediation insurance receivable

     —          8,746   

Current portion of notes receivable

     45,102        36,419   

Construction inventory

     1,279        110,428   

Real estate inventory

     774,584        1,456,682   

Costs and estimated earnings in excess of billings on uncompleted contracts

     1,254,054        1,625,835   

Income taxes recoverable

     —          819,027   

Prepaid expenses

     304,802        365,778   

Other current assets

     125,689        15,054   
                

Total current assets

     11,073,687        11,713,009   
                

Property, buildings and equipment, at cost, net of accumulated depreciation of $22,137,012 in 2010 and $19,987,725 in 2009

     8,232,306        8,292,973   
                

Notes receivable, less current portion

     237,714        275,513   
                

Deferred charges and other assets

    

Land and land development costs

     662,219        662,219   

Cash surrender value of life insurance

     655,775        675,669   

Restricted cash non-current

     79,000        —     

Other assets

     18,781        42,815   
                

Total deferred charges and other assets

     1,415,775        1,380,703   
                

Total assets

   $ 20,959,482      $ 21,662,198   
                
LIABILITIES AND STOCKHOLDERS’ EQUITY     

Current liabilities

    

Accounts payable and accrued liabilities

   $ 2,418,056      $ 1,994,458   

Contract loss accruals

     65,989        512,079   

Billings in excess of costs and estimated earnings on uncompleted contracts

     102,948        2,603   

Current portion of notes payable

     1,176,552        2,130,666   

Federal and state income taxes payable

     12,642        —     

Reserve for remediation

     97,725        2,175   
                

Total current liabilities

     3,873,912        4,641,981   

Other accrued liabilities

     17,094        25,234   

Notes payable, less current portion

     2,610,000        2,283,950   
                

Total liabilities

     6,501,006        6,951,165   
                

Commitments and contingencies

    

Stockholders’ equity

    

Preferred stock, $1 par value, 5,000,000 shares authorized, none issued

    

Common stock, $.10 par value, 40,000,000 shares authorized; 27,813,772 shares issued and 25,451,354 shares outstanding

     2,781,377        2,781,377   

Capital surplus

     18,481,683        18,481,683   

Accumulated deficit

     (5,496,397     (5,243,840

Treasury stock, 2,362,418 shares, at cost

     (1,308,187     (1,308,187
                

Total stockholders’ equity

     14,458,476        14,711,033   
                

Total liabilities and stockholders’ equity

   $ 20,959,482      $ 21,662,198   
                

See accompanying notes to consolidated financial statements

 

29


Table of Contents

THE GOLDFIELD CORPORATION AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF OPERATIONS

 

     Years Ended December 31,  
     2010     2009  

Revenue

    

Electrical construction

   $ 31,384,594      $ 27,772,466   

Real estate development

     1,983,385        1,473,800   
                

Total revenue

     33,367,979        29,246,266   
                
Costs and expenses     

Electrical construction

     26,310,355        24,971,857   

Real estate development

     1,360,751        1,054,233   

Selling, general and administrative

     2,959,841        2,872,966   

Depreciation

     2,757,263        2,797,621   

Gain on sale of assets

     (2,168     (48,863
                

Total costs and expenses

     33,386,042        31,647,814   
                

Total operating loss

     (18,063     (2,401,548
                
Other (expenses) income, net     

Interest income

     33,156        34,708   

Interest expense, net

     (134,940     (123,590

Other income, net

     19,725        25,564   
                

Total other expenses, net

     (82,059     (63,318
                

Loss from continuing operations before income taxes

     (100,122     (2,464,866

Income tax provision

     34,601        (537,358
                

Loss from continuing operations

     (134,723     (1,927,508

(Loss) gain from discontinued operations, net of tax provision of $0 in 2010 and 2009

     (117,834     387   
                

Net loss

   $ (252,557   $ (1,927,121
                

Loss per share of common stock - basic and diluted

    

Continuing operations

   $ (0.01   $ (0.08

Discontinued operations

     —          —     
                

Net loss

   $ (0.01   $ (0.08
                
Weighted average shares outstanding - basic and diluted      25,451,354        25,451,354   
                

See accompanying notes to consolidated financial statements

 

30


Table of Contents

THE GOLDFIELD CORPORATION AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF CASH FLOWS

 

     Years Ended December 31,  
     2010     2009  

Cash flows from operating activities

    

Net loss

   $ (252,557   $ (1,927,121

Adjustments to reconcile net loss to net cash provided by operating activities

    

Depreciation

     2,757,263        2,797,621   

Gain on sale of assets

     (2,168     (48,863

Cash surrender value of life insurance

     19,894        19,265   

Changes in operating assets and liabilities:

    

Accounts receivable and accrued billings

     (653,612     2,968,968   

Remediation insurance receivable

     8,746        90,629   

Construction inventory

     109,149        (110,428

Real estate inventory

     682,098        867,074   

Costs and estimated earnings in excess of billings on uncompleted contracts

     371,781        (490,545

Land and land development costs

     —          48,276   

Income taxes recoverable

     819,027        (180,956

Prepaid expenses and other assets

     (25,625     192,464   

Restricted cash non-current

     (79,000     —     

Income taxes payable

     12,642        —     

Accounts payable and accrued liabilities

     172,916        (1,023,751

Contract loss accrual

     (446,090     484,570   

Billings in excess of costs and estimated earnings on uncompleted contracts

     100,345        (4,961

Remediation accrual

     95,550        (151,193
                

Net cash provided by operating activities

     3,690,359        3,531,049   
                

Cash flows from investing activities

    

Proceeds from disposal of property and equipment

     27,950        64,753   

Proceeds from notes receivable

     29,116        46,908   

Purchases of property and equipment

     (2,461,066     (3,276,695

Cash surrender value of life insurance

     —          (365,913
                

Net cash used in investing activities

     (2,404,000     (3,530,947
                

Cash flows from financing activities

    

Proceeds from notes payable

     1,546,050        2,617,003   

Repayments on notes payable

     (2,192,884     (3,424,735

Repayments on capital leases

     —          (579,357
                

Net cash used in financing activities

     (646,834     (1,387,089
                

Net increase (decrease) in cash and cash equivalents

     639,525        (1,386,987

Cash and cash equivalents at beginning of year

     3,534,993        4,921,980   
                

Cash and cash equivalents at end of year

   $ 4,174,518      $ 3,534,993   
                

Supplemental disclosure of cash flow information:

    

Interest paid

   $ 443,669      $ 77,709   

Income taxes refunded, net

     (797,068     (356,403

Supplemental disclosure of non-cash investing and financing activities

    

Liability for equipment acquired

     261,312        173,209   

Debt issued in lieu of interest paid

     18,770        63,370   

See accompanying notes to consolidated financial statements

 

31


Table of Contents

THE GOLDFIELD CORPORATION AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF STOCKHOLDERS’ EQUITY

Years Ended December 31, 2010 and 2009

 

            Additional                  Total  
     Common Stock      Paid-in      Retained     Treasury     Stockholders’  
     Shares      Amount      Capital      Earnings     Stock     Equity  

Balance at December 31, 2008

     27,813,772       $ 2,781,377       $ 18,481,683       $ (3,316,719   $ (1,308,187   $ 16,638,154   

Net loss

     —           —           —           (1,927,121     —          (1,927,121
                                                   

Balance at December 31, 2009

     27,813,772         2,781,377         18,481,683         (5,243,840     (1,308,187     14,711,033   

Net loss

     —           —           —           (252,557     —          (252,557
                                                   

Balance at December 31, 2010

     27,813,772       $ 2,781,377       $ 18,481,683       $ (5,496,397   $ (1,308,187   $ 14,458,476   
                                                   

See acompanying notes to consolidated financial statements

 

32


Table of Contents

THE GOLDFIELD CORPORATION AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

December 31, 2010 and 2009

Note 1 – Organization and Summary of Significant Accounting Policies

Overview

The Goldfield Corporation (the “Company”) was incorporated in Wyoming in 1906 and subsequently reincorporated in Delaware in 1968. The Company’s principal lines of business are electrical construction and real estate development. The principal market for the Company’s electrical construction operation is electric utilities throughout most of the United States. The primary focus of the Company’s real estate operations is on the development of luxury condominium projects on the east coast of Florida. The Company also makes limited opportunistic investments in distressed residential properties, which it improves or repositions for resale.

Basis of Financial Statement Presentation

The accompanying consolidated financial statements include the accounts of the Company and its wholly-owned subsidiaries. All significant intercompany accounts and transactions have been eliminated in consolidation. As of December 31, 2008, the Company no longer has a controlling interest in the Pineapple House Condominium Association, Inc. (“PHCA”) due to the sales of additional condominium units during 2008 and, accordingly, currently accounts for this investment under the equity method of accounting.

Cash and Cash Equivalents

The Company considers highly liquid investments with maturities of three months or less when purchased to be cash equivalents.

Allowance for Doubtful Accounts

The allowance for doubtful accounts is the Company’s best estimate of the amount of probable credit losses in the Company’s existing accounts receivable. The Company determines the allowance based on customer specific information and historical write-off experience. The Company reviews its allowance for doubtful accounts quarterly. Account balances are charged off against the allowance after all means of collection have been exhausted and the potential for recovery is considered remote. Any increase in the allowance account has a corresponding negative effect on the results of operations. As of December 31, 2010 and 2009, upon its review, management determined it was not necessary to record an allowance for doubtful accounts due to the majority of accounts receivable being generated by electrical utility customers who the Company considers creditworthy based on timely collection history and other considerations.

Property, Buildings, Equipment and Depreciation

Property, buildings and equipment are stated at cost. Depreciation on property, buildings and equipment is calculated on the straight-line method over the estimated useful lives of the assets. Leasehold improvements and equipment under capital leases are depreciated on a straight-line basis over the estimated useful life of the assets.

In accordance with Accounting Standard Codification (“ASC”) ASC 360-10-05, Accounting for the Impairment or Disposal of Long-Lived Assets, the Company assesses the need to record impairment losses on long-lived assets when events and circumstances indicate that the carrying amount of an asset may not be recoverable. An impairment loss would be recognized when future estimated undiscounted cash flows expected to result from use of the asset are less than the asset’s carrying value, with the loss measured at fair value based on discounted expected cash flows.

Electrical Construction Revenue

The Company accepts contracts on a fixed price, unit price and service agreement basis. Revenue from fixed price construction contracts are recognized on the percentage-of-completion method measured by the ratio of costs incurred to date to the estimated total costs to be incurred for each contract. Revenue from unit price contracts and service agreements are recognized as services are performed. Unit price contracts are billed at an agreed upon price per unit of work performed. Revenue from service agreements are billed on either a man-hour or man-hour plus equipment basis. Terms of the Company’s service agreements may extend for a period of up to five years.

 

33


Table of Contents

The Company’s contracts allow it to bill additional amounts for change orders and claims. Additionally, the Company considers a claim to be for additional work performed outside the scope of the contract, contested by the customer. Historically, claims relating to electrical construction work have not been significant. It is the Company’s policy to include revenue from change orders and claims in contract value only when they can be reliably estimated and realization is considered probable, in accordance with ASC 605-35-25-30 and ASC 605-35-25-31.

The asset, “costs and estimated earnings in excess of billings on uncompleted contracts” represents revenue recognized in excess of amounts billed. The liability, “billings in excess of costs and estimated earnings on uncompleted contracts” represents billings in excess of revenue recognized. The liability, “contract loss accruals” represents a provision for the estimated costs on contracts that exceed the estimated revenue.

Contract costs include all direct material, direct labor, subcontractor costs and other indirect costs related to contract performance, such as supplies, tools and equipment maintenance. General and administrative costs are charged to expense as incurred. Provisions for estimated losses on uncompleted contracts are made in the period in which such losses are determined. Changes in job performance, job conditions, estimated profitability and final contract settlements may result in revisions to costs and income and are recognized in the period in which the revisions are determined.

Real Estate Revenue

The Company currently does not have any projects in development. For all future projects, revenue will be recognized using the guidance provided in ASC 360-20, Real Estate Sales. ASC 360-20 provides guidance in assessing the collectibility of the sales price, which is required in order to recognize profit under the percentage-of-completion method pursuant to ASC 360-20-40-50 Sales of Condominium Units. ASC 360-20-40-50 states that an entity should evaluate the adequacy of the buyer’s initial and continuing investment in reaching a conclusion that the sales price is collectible. To meet the continuing involvement criterion, a buyer would be required to either (1) make additional payments during the construction term at least equal to the level annual payments that would be required to fund principal and interest on a customary mortgage for the remaining purchase price of the property, or (2) increase the minimum initial investment by an equivalent aggregate amount. If the test for initial and continuing investment is not met, the deposit method should be applied and profit recognized only after the buyer’s aggregate deposit meets the required investment tests for the duration of the construction period.

Inventory

Construction inventory, which consists of specifically identified electrical construction materials, is stated at the lower of cost or market.

Real estate inventory, which consists of completed condominium units, is carried at the lower of cost or estimated fair value. In accordance with ASC 360-10 Accounting for the Impairment or Disposal of Long-lived Asset, real estate inventory is reviewed for impairment whenever events or changes in circumstances indicate that the carrying value may not be recoverable. If no changes in circumstances occur, management reviews real estate inventory on a quarterly basis. If the carrying amount or basis is not expected to be recovered, impairment losses are recorded and the related assets are adjusted to their estimated fair value. The Company also complies with ASC Topic 820 Fair Value Measurement, which defines fair value, establishes a framework for measuring fair value and expands disclosures about fair value measurements

For the year ended December 31, 2010, management reviewed the Pineapple House inventory for impairment. In accordance with ASC 360-10, Accounting for the Impairment or Disposal of Long-lived Assets, requires that if the undiscounted cash flows expected to be generated by an asset are less than its carrying amount, an impairment charge should be recorded to write-down the carrying amount of such asset to its fair value. The fair value of an asset is the amount at which that asset could be bought or sold in a current transaction between willing parties, that is, other than in a forced or liquidation sale.

The Company estimates the fair value of its real estate inventory by using a discounted cash flow model, which incorporates the probability assessments described above. In estimating the cash flows for completed condominium units, various estimates are used such as (a) expected sales pace to absorb the number of units based upon economic conditions that may have either a short-term or long-term impact on the market in which the units are located, competition within the market, historical sales rates of the units within the project; and (b) expected net sales prices in the near-term based upon current pricing estimates, as well as estimated changes in future sales prices based upon

 

34


Table of Contents

historical sales prices of the units within the project, or historical sales prices of similar product offerings in the market. The determination of fair value requires discounting the estimated cash flows at a rate commensurate with the inherent risks associated with selling the assets and related estimated cash flows. In determining the fair value of the remaining condominium units in the Pineapple House project the Company used a discount rate of 8%. The Company could incur impairment charges in future periods, which would decrease operating income and result in lower asset values on the balance sheet if the assumptions or estimates in the fair value calculations change.

Land and Land Development Costs and Residential Properties Under Construction

The costs of a land purchase and any development expenses up to the initial construction phase of any new condominium development project are recorded under the asset “land and land development costs.” Once construction commences, the costs of construction are recorded under the asset “residential properties under construction.” The assets “land and land development costs” and “residential properties under construction” relating to specific projects are recorded as current assets when the estimated project completion date is less than one year from the date of the consolidated financial statements, or as non-current assets when the estimated project completion date is more than one year from the date of the consolidated financial statements.

Income Taxes

The Company accounts for income taxes in accordance with ASC Topic 740, Income Taxes, which establishes the recognition requirements necessary for implementation. Deferred tax assets and liabilities are recognized for the future tax effects attributable to temporary differences and carryforwards between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases. Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in tax rates is recognized in income in the period that includes the enactment date.

Executive Long-term Incentive Plan

The Company accounts for stock-based employee compensation arrangements in accordance with ASC Topic 718, Compensation-Stock Compensation. Under ASC Topic 718, stock-based compensation cost is measured at the grant date, based on the fair value of the award, and is recognized over the grantees’ requisite service period. The Company has not issued shares pursuant to the 1998 Executive Long-term Incentive Plan (the “Plan”) in 2010 or 2009 and all previously issued common stock options were exercised prior to December 31, 2005. Therefore, the Company has no compensation expense for shares pursuant to the Plan for the years ended December 31, 2010 or 2009. See note 14 –The Goldfield Corporation 1998 Executive Long-term Incentive Plan for additional information.

Use of Estimates

Management of the Company has made a number of estimates and assumptions relating to the reporting of assets and liabilities and the disclosure of contingent assets and liabilities to prepare these financial statements in conformity with accounting principles generally accepted in the United States. Actual results could differ from those estimates. Management considers the most significant estimates in preparing these financial statements to be the estimated cost to complete electrical construction contracts in progress, estimated cost to complete real estate development projects in progress, fair value of real estate inventory, recoverability of deferred tax assets and the adequacy of the provision for remediation.

Financial Instruments - Fair Value, Concentration of Business and Credit Risks

The carrying amounts reported in the consolidated balance sheets for cash and cash equivalents, accounts receivable and accrued billings, contracts receivable, remediation insurance receivable and accounts payable and accrued liabilities approximate fair value due to the immediate or short-term maturity of these financial instruments. The fair value of notes receivable is considered by management to approximate carrying value based on their interest rates and terms, maturities, collateral and current status of the receivables. The fair value of notes payable is considered by management to approximate carrying value due in part to the short term maturity of these borrowings. The Company’s long-term notes payable are also estimated by management to approximate carrying value since the interest rates prescribed by the Bank are variable market interest rates and are adjusted periodically. Restricted cash is also considered by management to approximate fair value due to the nature of the asset held in a secured interest bearing bank account.

 

35


Table of Contents

Financial instruments, mainly within the electrical construction operations which potentially subject the Company to concentrations of credit risk, consist principally of accounts receivable and accrued billings in the amounts of $4.4 million and $3.7 million as of December 31, 2010 and 2009, respectively, which management reviews to assess the need to establish an allowance for doubtful accounts. As of December 31, 2010 and 2009, upon its review, management determined it was not necessary to record an additional allowance for doubtful accounts due to the majority of electrical construction accounts receivable and accrued billings being generated by electrical utility customers who the Company considers creditworthy based on timely collection history and other considerations.

As of December 31, 2010 and 2009, there were no financial instruments within the real estate development operations which potentially subject the Company to concentrations of credit risk.

Restricted Cash

The Company’s restricted cash includes cash deposited in a secured interest bearing bank account, as required by a Collateral Trust Agreement in connection with the Company’s workers’ compensation insurance policies, as described in note 18.

Subsequent Events

The Company evaluated subsequent events and is not aware of any significant events that occurred subsequent to the balance sheet date, but prior to the filing of this report that would have a material impact on the Company’s consolidated financial statements. However, on February 22, 2011, the Company entered into a Renewal and Modification agreement with regards to the Working Capital Loan, and also entered into the Southeast Power Loan Agreement for a $6.94 million Promissory Note with the Bank as described in note 11.

Note 2 – Contracts Receivable

The Company’s real estate development operations do not extend financing to buyers and therefore, sales proceeds are received in full upon closing.

Earnest money deposits held by a third party, for the Pineapple House project were $5,000 as of December 31, 2010 and 2009.

Note 3 – Inventory

As of December 31, 2010, the Company has four completed condominium units held for sale within the Pineapple House project compared to eight at December 31, 2009.

Real estate inventory, which consists of completed condominium units, is carried at the lower of cost or estimated fair value. In accordance with ASC 360-10 Accounting for the Impairment or Disposal of Long-lived Assets, real estate inventory is reviewed for impairment whenever events or changes in circumstances indicate that the carrying value may not be recoverable. If no changes in circumstances occur management reviews real estate inventory on a quarterly basis. If the carrying amount or basis is not expected to be recovered, impairment losses are recorded and the related assets are adjusted to their estimated fair value.

For the year ended December 31, 2010, the Company reviewed the Pineapple House inventory for impairment. ASC 360-10 requires that if the undiscounted cash flow s expected to be generated by an asset are less than its carrying amount, an impairment charge should be recorded to write-down the carrying amount of such asset to its fair value. The fair value of an asset is the amount at which that asset could be bought or sold in a current transaction between willing parties, that is, other than in a forced or liquidation sale. The Company also complies with ASC Topic 820 Fair Value Measurement, which defines fair value, establishes a framework for measuring fair value and expands disclosures about fair value measurements.

In determining the need for recording any impairment on the real estate inventory, the Company reviewed the carrying value of the remaining inventory. The Company considered sales expectations and the historical pace of sales during the prior year. The Company also evaluated the margins of the units sold, current selling prices and any property under contract. Considering these factors the Company established three probability scenarios for the amount of inventory it projected to sell over the next twelve months and each successive twelve month period until all properties are projected to be sold. The Company estimated the number of properties that would be sold using 60%, 30% and 10% levels of probability.

The Company estimates the fair value of its condominium units by using a discounted cash flow model, which incorporates the probability assessments described above. In estimating the cash flows for completed condominium

 

36


Table of Contents

units, various estimates are used such as (a) expected sales pace to absorb the number of units based upon economic conditions that may have either a short-term or long-term impact on the market in which the units are located, competition within the market, historical sales rates of the units within the project; and (b) expected net sales prices in the near-term based upon current pricing estimates, as well as estimated changes in future sales prices based upon historical sales prices of the units within the project, or historical sales prices of similar product offerings in the market. The determination of fair value requires discounting the estimated cash flows at a rate commensurate with the inherent risks associated with selling the assets and related estimated cash flows. In determining the fair value of the remaining condominium units in the Pineapple House project the Company used a discount rate of 8%.

The current real estate inventory consists of one condominium project with only four remaining condominium units as of December 31, 2010. During the year ended December 31, 2010, all four condominium units, or 50% of the remaining units at the end of the prior year, were sold in excess of their carrying values. In addition, the units sold are similar to the units remaining to be sold. Furthermore, during 2011 to date, the Company sold two of the remaining four condominium units in inventory as of December 31, 2010. The Company sold its units at substantially its current asking price, which is in excess of its carrying costs. This trend has continued with the two 2011 unit sales. The Company did not record an impairment write-down for either of the years ended December 31, 2010 or 2009.

Note 4 – Costs and Estimated Earnings on Uncompleted Contracts

Long-term fixed price electrical construction contracts in progress accounted for using the percentage-of-completion method at December 31 for the years as indicated:

 

     2010     2009  

Costs incurred on uncompleted contracts

   $ 6,092,123      $ 3,210,256   

Estimated earnings

     645,164        144,334   
                
     6,737,287        3,354,590   

Less billings to date

     5,586,181        1,731,358   
                

Total

   $ 1,151,106      $ 1,623,232   
                

Included in the balance sheets under the following captions:

    

Costs and estimated earnings in excess of billings on uncompleted contracts

   $ 1,254,054      $ 1,625,835   

Billings in excess of costs and estimated earnings on uncompleted contracts

     (102,948     (2,603
                

Total

   $ 1,151,106      $ 1,623,232   
                

The amounts billed but not paid by customers pursuant to retention provisions of long-term electrical construction contracts were $221,000 and $111,000 at December 31, 2010 and 2009, respectively, and are included in the accompanying balance sheets in accounts receivable and accrued billings. Retainage is expected to be collected within the next twelve months.

 

37


Table of Contents

Note 5 – Income Taxes

The following table presents the income tax provision from continuing operations for the years ended December 31 as indicated:

 

     2010      2009  

Current

     

Federal

   $ —         $ (559,814

State

         34,601         22,456   
                 
     34,601         (537,358
                 

Deferred

     

Federal

     —           —     

State

     —           —     
                 
     —           —     
                 

Total

   $ 34,601       $ (537,358
                 

The following table presents the total income tax provision for the years ended December 31 as indicated:

 

     2010      2009  

Continuing operations

   $     34,601       $ (537,358

Discontinued operations

     —           —     
                 

Total

   $ 34,601       $ (537,358
                 

The tax provision for the year ended December 31, 2009 was affected by a tax benefit of $502,000 resulting from a change in tax law.

 

38


Table of Contents

The following table presents the temporary differences and carryforwards, which give rise to deferred tax assets and liabilities for the years ended December 31 as indicated:

 

     2010     2009  

Deferred tax assets:

    

Accrued vacations and bonuses

   $ 173,871      $ 101,428   

Contingent salary payments recorded as goodwill for tax purposes

     —          3,334   

Remediation provision

     36,774        818   

Net operating loss carryforwards

     2,275,333        1,246,117   

Accrued warranty costs

     659        11,983   

Alternative minimum tax credit carryforwards

     278,859        278,859   

Accrued workers’ compensation

     8,771        24,135   

Capitalized bidding costs & inventory adjustments

     515,973        968,679   

Accrued lease expense

     6,433        9,496   

Accrued percentage-of-completion loss

     24,832        192,695   

Other

     8,082        8,724   
                

Total deferred tax assets

     3,329,587        2,846,268   

Valuation allowance

     (2,231,896     (2,263,098
                

Total deferred tax assets after valuation allowance

     1,097,691        583,170   
                

Deferred tax liabilities:

    

Remediation receivable

     —          (3,103

Deferred gain on installment notes

     (41,562     (45,450

Tax depreciation in excess of financial statement depreciation

     (1,056,129     (534,617
                

Total deferred tax liabilities

     (1,097,691     (583,170
                

Total net deferred tax assets

   $ —        $ —     
                

As of December 31, 2010, the Company had net operating loss (“NOL”) carryforwards of approximately $5.9 million available to offset future federal taxable income, which if unused will begin to expire in 2028, and alternative minimum tax (“AMT”) credit carryforwards of approximately $279,000, available to reduce future federal income taxes over an indefinite period. In addition, there were inventory basis differences of $1.1 million, which will be recognized as condominium units are sold. The Company also had NOL carryforwards from Florida of approximately $6.2 million available to offset future Florida taxable income, which if unused will begin to expire in 2027.

The carrying amounts of deferred tax assets are reduced by a valuation allowance, if based on the available evidence, it is more likely than not such assets will not be realized. The ultimate realization of deferred tax assets is dependent upon the generation of future taxable income during the periods in which the deferred tax assets are expected to be recovered or settled. In the assessment for a valuation allowance, appropriate consideration is given to all positive and negative evidence related to the realization of the deferred tax assets. This assessment considers, among other matters, the nature, frequency and severity of current and cumulative losses, forecasts of future profitability, the duration of statutory carryforward periods, experience with loss carryforwards expiring unused and tax planning alternatives. If the Company determines it will not be able to realize all or part of the deferred tax assets, a valuation allowance would be recorded to reduce deferred tax assets to the amount that is more likely than not to be realized.

Based upon an evaluation of all available evidence, the Company established a full valuation allowance against net deferred tax assets beginning in 2008. The Company’s cumulative loss position over the evaluation period and the current market conditions were significant negative evidence in assessing the need for a valuation allowance Consequently, the future provision for income taxes will include no tax benefit with respect to losses incurred and limited tax expense with respect to income generated until the respective valuation allowance is eliminated. This will cause variability in the effective tax rate. In the event the Company was to subsequently determine that it would be able to realize deferred tax assets in the future in excess of the net recorded amount, an adjustment to the previously recorded valuation allowance would increase income in the period such determination was made. The

 

39


Table of Contents

net deferred tax asset valuation allowance was $2.2 million as of December 31, 2010, compared to $2.3 million as of December 31, 2009.

The following table presents the differences between the Company’s effective income tax rate and the federal statutory rate on its income from continuing operations for the years ended December 31 as indicated:

 

     2010     2009  

Federal statutory rate

     (34.0 )%      (34.0 )% 

State tax rate, net of federal tax benefit

     30.2        (2.6

Other non-deductible expenses

     58.7        2.1   

Valuation allowance

     (31.2 )%      13.2   

Other

     10.9        (0.5
                

Total

     34.6     (21.8 )% 
                

The Company had gross unrecognized tax benefits of $17,000 and $13,000 as of December 31, 2010 and December 31, 2009, respectively. The Company believes that it is reasonably possible that the liability for unrecognized tax benefits related to certain state income tax matters may be settled within the next twelve months. The federal statute of limitation has expired for tax years prior to 2005 and relevant state statutes vary. The Company is currently not under any income tax audits or examinations and does not expect the assessment of any significant additional tax in excess of amounts reserved.

The following table presents a reconciliation of the beginning and ending amounts of unrecognized tax benefits for the years as indicated:

 

     2010      2009  

Balance at January 1

   $ 13,050       $ 44,307   

Increase from current year tax positions

     —           —     

Increase from prior years’ tax positions

     730         2,798   

Increase/(decrease) from settlements with taxing authority

     3,305         (26,037

Decrease from expiration of statute of limitations

     —           (8,018
                 

Balance at December 31

   $ 17,085       $ 13,050   
                 

The Company accrues interest and penalties related to unrecognized tax benefits as interest expense and other general and administrative expenses, respectively, and not as a component of income taxes. Decreases in interest and penalties are due to settlements with taxing authorities and expiration of statutes of limitation. During the years ended December 31, 2010 and 2009, the Company recognized $4,000 and $(22,000) in interest and penalties. The Company had accrued as a current liability $16,000 and $12,000 for the future payment of interest and penalties as of December 31, 2010 and 2009, respectively.

Note 6 – Discontinued Operations

Commitments and Contingencies Related to Discontinued Operations

Through certain of our subsidiaries and predecessor companies, we were previously engaged in mining activities, and all such activities were discontinued or disposed of prior to 2003.

Anderson-Calhoun Mine/Mill Site

On September 8, 2003, the United States Environmental Protection Agency (the “EPA”) issued a special notice letter notifying the Company that it was a potentially responsible party (“PRP”), along with three other parties, with respect to investigation and removal activities at the Anderson-Calhoun Mine/Mill Site (the “Site”) in Stevens County, Washington.

The Company and one of the other PRPs, Combustion Engineering, entered into a Settlement Agreement with the EPA, which was adopted by the EPA as final with an effective date of September 1, 2009. In accordance with the Settlement Agreement and the EPA’s instructions, the Company made a cash payment to the EPA of $73,000 on September 17, 2009. Combustion Engineering also reported that on September 11, 2009, Combustion Engineering paid the remainder of the amount due the EPA. The Settlement Agreement is based, in part, on the EPA’s acceptance of the Company’s representations to the effect that it was a minimal contributor to the hazardous

 

40


Table of Contents

substances that are the subject of the environmental investigation and removal action. The EPA has also entered into a separate settlement agreement with Blue Tee Corporation, the remaining PRP, with respect to the Site. Pursuant to the Settlement Agreement and the Blue Tee settlement agreement, the Company is released from further claims by the EPA, Combustion Engineering and Blue Tee with respect to the Site, subject to certain terms and conditions as set forth in the settlement agreements. The Company has been advised that the EPA anticipates using settlement proceeds to implement the remediation work itself at the Site. Having entered into cash settlements with Blue Tee, Combustion Engineering, and the Company, the EPA will bear the risk of remediation cost overruns and future operation and maintenance costs, subject to certain terms and conditions set forth in the settlement agreements. The Company is not aware of any facts suggesting that the Company’s future liability associated with the Site is more than de minimis.

One of the Company’s former general liability insurance carriers (“Insurer No. 1”) has accepted the defense of this matter and has agreed to pay an 80% share of costs of defense incurred to date, subject to certain reservation of rights as to coverage. During the twelve months ended December 31, 2010 and 2009, the Company was reimbursed $5,400 and $65,100 respectively, from Insurer No. 1. As of December 31, 2010, the Company has received $434,000 from Insurer No. 1, which represents 80% of the Company’s insurable costs incurred from the inception of this matter through December 31, 2010. Another of the Company’s former general liability insurance carriers (“Insurer No. 2”) has also accepted the defense of this matter, subject to certain reservation of rights as to coverage, and has agreed to pay a 20% share of the costs of defense incurred to date. During the twelve months ended December 31, 2010 and December 31, 2009, the Company received $3,500 and $9,900 from Insurer No. 2. As of December 31, 2010, the Company has received $108,500 from Insurer No. 2, which represents 20% of the Company’s insurable costs incurred from the inception of this matter through December 31, 2010. For the twelve months ended December 31, 2010, the Company recorded an increase of $200 to the estimated insurance reimbursements as a change to the net expense within discontinued operations. For twelve months ended December 31, 2009, the Company recorded a reduction of $15,700 to the estimated insurance reimbursements as a change to the net expense within discontinued operations. As of December 31, 2010 and December 31, 2009, the balance of the receivable for estimated future insurance reimbursements was $0 and $8,700, respectively. The Company will record any additional change to the estimated insurance reimbursements as a change to the net expense within discontinued operations. However, the Company currently does not expect any changes to the net expense related to this matter.

In accordance with ASC 450-20 Loss Contingencies, and ASC 410-30, Environmental Obligations, the Company has recognized a net expense (within discontinued operations) for this matter. As of December 31, 2010, the cumulative net expense was $173,000. This represents the Company’s share of the costs associated with both an emergency removal action previously undertaken by the EPA and actual remediation costs, as fixed under the Settlement Agreement with the EPA, the professional fees associated with the EE/CA Report and the current estimate of the anticipated professional fees associated through the completed remediation, all reduced by both actual and estimated insurance recoveries. As of December 31, 2010 and December 31, 2009, the Company has recorded a reserve balance for professional fees and other applicable costs of $0 and $2,200, respectively (accrued as a current liability within discontinued operations).

Newton County Mine Tailings Superfund Site

On July 12, 2010, the Company received a request from the EPA for information pursuant to Section 104(e) of CERCLA for Newton County Mine Tailings Superfund Site, Newton County, Missouri (the “Wentworth Site”) relating to mining activities involving the site. On July 30, 2010, the Company submitted a response to the EPA’s request. On December 22, 2010, the Company received a Demand for Reimbursement of Costs from the EPA relating to the Wentworth Site, together with ancillary documents including a draft form of settlement agreement (the “Demand”). In the Demand, the EPA stated that based upon information presently available to it, the Company may be a PRP under CERCLA with respect to the Wentworth Site. The Demand cites the direct and indirect costs attributable to the Company associated with the EPA’s response to date as $972,242, and encourages the Company to voluntarily negotiate a consent decree in which the Company agrees to pay past costs.

On January 27, 2011, the Company accepted a Settlement Agreement proposed by the EPA wherein the Company agrees to pay the EPA the sum of $76,630 in exchange for a covenant not to sue from the EPA relating to the Wentworth Site, along with other protections and subject to various terms and conditions as set forth more fully in the Settlement Agreement. Legal counsel for EPA has informed the Company that the Settlement Agreement has been formally approved by both EPA and the U.S. Department of Justice. CERCLA requires that notice of the

 

41


Table of Contents

proposed Settlement Agreement be provided in the Federal Register in order for EPA to solicit public comments on the proposed Settlement Agreement (the “Public Notice”). On March 17, 2011, the EPA published the Public Notice in the Federal Register (Vol. 76, No. 52, Thursday, March 17, 2011) of the proposed Settlement Agreement. The Public Notice provides an opportunity for any person to submit comments to the EPA concerning the proposed settlement. Comments are due by May 14, 2011. The Public Notice states: “The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicated that the settlement is inappropriate, improper, or inadequate.” It is not known whether any comments will be filed in response to the Public Notice or whether EPA or the U.S. Department of Justice will seek to withdraw or otherwise modify the Settlement Agreement based on such comments. However, the Company notes, generally, that proposed settlements are rarely withdrawn or modified in response to public comments and, further, the Company is not aware of any reason that the terms of the Settlement Agreement negotiated with the EPA representatives would not ultimately be approved by the EPA and the U.S. Department of Justice notwithstanding comments that may be received in response to the Public Notice. The Company does not expect its portion of a settlement with the EPA to have a material adverse effect on the Company’s financial position. The Settlement Agreement is based, in part, on the agency’s acceptance of the Company’s representations to the effect that it is potentially only a minimal contributor to the hazardous substances that are the subject of the environmental investigation and response actions. The Company anticipates that the settlement process will be concluded during the second quarter of 2011.

As of December 31, 2010 in accordance with ASC 410-30 and ASC 450-20 the Company has estimated a provision for the aforementioned environmental liability of $98,000 (accrued as a current liability within discontinued operations). In accordance with ASC 450-20 Loss Contingencies, and ASC 410-30, Environmental Obligations, the Company has recognized a net expense (within discontinued operations) for this matter. As of December 31, 2010, the cumulative net expense was $118,000. This represents the Company’s share of the estimated costs associated with the proposed Settlement Agreement with the EPA and the professional fees associated with this matter for which the Company currently does not expect any insurance recoveries.

The following table sets forth certain operating results of the discontinued operations for the years ended December 31 as indicated:

 

     2010     2009  

(Provision) gain for remediation

   $ (117,834   $ 387   
                

(Loss) gain from discontinued operations before income taxes

     (117,834     387   

Income tax provision

     —          —     
                

(Loss) gain from discontinued operations, net of tax

   $ (117,834   $         387   
                

The following table presents the assets and liabilities of discontinued operations for the years ended December 31 as indicated:

 

     2010      2009  

Remediation insurance receivable

   $ —         $ 8,746   
                 

Reserve for remediation

   $ 97,725       $         2,175   
                 

 

42


Table of Contents

Note 7 – Property, Buildings and Equipment

The following table presents the balances of major classes of properties for the years ended December 31 as indicated:

 

     Estimated
useful
lives in
years
     2010      2009  

Land and improvements

     15       $ 376,853       $ 211,052   

Buildings

     5- 40         1,546,090         1,572,055   

Leasehold improvements

     7         136,345         136,345   

Machinery and equipment

     2 -10         28,244,505         25,685,816   

Construction in progress

     —           65,525         675,430   
                    

Total

        30,369,318         28,280,698   

Less accumulated depreciation

        22,137,012         19,987,725   
                    

Net properties, buildings and equipment

      $ 8,232,306       $ 8,292,973   
                    

In accordance with ASC 360-10-05, management reviews the net carrying value of all properties, buildings and equipment on a regular basis. As a result of such review, no impairment write-down was considered necessary during the years ended December 31, 2010 and 2009.

Note 8 – 401 (k) Employee Benefits Plan

Effective January 1, 1995, the Company adopted The Goldfield Corporation and Subsidiaries Employee Savings and Retirement Plan, a defined contribution plan that qualifies under Section 401(k) of the Internal Revenue Code. The plan provides retirement benefits to all employees who meet eligibility requirements and elect to participate. Under the plan, participating employees may defer up to 75% of their pre-tax compensation per calendar year subject to Internal Revenue Code limits. The Company’s contributions to the plan are discretionary and amounted to approximately $140,000 and $145,000 for the years ended December 31, 2010 and 2009, respectively.

Note 9 – Accounts Payable and Accrued Liabilities

The following table presents the accounts payable and accrued liabilities for the years ended December 31 as indicated:

 

     2010      2009  

Accounts payable

   $ 1,753,570       $ 1,490,759   

Accrued bonus

     266,894         99,548   

Accrued payroll costs

     354,488         303,182   

Other accrued expenses

     43,104         100,969   
                 

Total

   $ 2,418,056       $ 1,994,458   
                 

Note 10 – Contract Loss Accruals

As of December 31, 2010 and 2009, the provision for losses estimated on long-term fixed price electrical construction contracts in progress, accounted for using the percentage-of-completion method, were $66,000 and $512,000, respectively.

 

43


Table of Contents

Note 11 – Notes Payable

The following table presents the balances of our notes payables for the years ended December 31 as indicated:

 

     Maturity Date      2010     2009  

Working capital loan

     January 27, 2011       $ —        $ —     

Pineapple House mortgage

     July 18, 2011         456,552        1,635,666   

$3.8 million equipment loan

     December 29, 2014         3,330,000        2,778,950   
                   

Total notes payable

        3,786,552        4,414,616   

Less current portion of notes payable

        (1,176,552     (2,130,666
                   

Notes payable, less current portion

      $ 2,610,000      $ 2,283,950   
                   

As of December 31, 2010, the Company, the Company’s wholly owned subsidiaries, Southeast Power Corporation (“Southeast Power”), Bayswater Development Corporation (“Bayswater”), Pineapple House of Brevard, Inc. (“Pineapple House”) and Oak Park of Brevard, Inc. (“Oak Park”) have a loan agreement and a series of related ancillary agreements with Branch Banking and Trust Company (the “Bank”) providing for a revolving line of credit loan for a maximum principal amount of $3.0 million, to be used as a “Working Capital Loan.” Interest was payable monthly at an annual rate equal to monthly LIBOR rate plus one and eight-tenths percent, subject to a minimum rate of 3.50% (3.50% as of both December 31, 2010 and December 31, 2009, respectively) and was due and payable on January 27, 2011. As of December 31, 2010 and December 31, 2009, there were no borrowings outstanding under the Working Capital Loan.

Subsequently on February 22, 2011, the Company and the Bank entered into a Note Modification Agreement to effect the renewal and modification of the Working Capital Loan. Pursuant to the loan renewal and modification, the Working Capital loan is now due and payable on January 5, 2012. In addition, until the Working Capital Loan matures, the Company must make monthly payments of interest to the Bank in arrears at an annual rate equal to monthly LIBOR rate plus two and one-half percent. The loan renewal was concurrently modified for the following: (a) to increase the rate of interest added to the monthly LIBOR from 1.80% to 2.50%; (b) to remove the minimum interest rate requirement of 3.50%; and (c) to grant a security interest by Southeast Power in all now owned and hereafter acquired and wherever located personal property as follows: (i) machinery and equipment, including all accessions thereto, all manufacturers’ warranties, parts and tools therefore; (ii) all vehicles owned by Southeast Power; and (iii) all proceeds (cash and non-cash) and products of the foregoing. All of the other terms of the Working Capital Loan and related ancillary agreements remain unchanged with the exception that Oak Park was released as guarantor of the Working Capital Loan.

As of December 31, 2010, the Company, the Company’s wholly owned subsidiaries, Southeast Power, Bayswater, and Pineapple House, and the Bank are parties to a loan agreement and a series of related ancillary agreements for a revolving line of credit loan for a maximum principal amount of $499,405 (the “Pineapple House Mortgage”). Interest is payable monthly at an annual rate equal to the monthly LIBOR rate plus one and eighty-five one-hundredths percent, subject to a minimum rate of 3.20% (3.20% and 2.08% as of December 31, 2010 and December 31, 2009, respectively). The maturity date of the Pineapple House Mortgage is July 18, 2011, unless extended by the Bank at its discretion. Borrowings outstanding under this agreement were $457,000 and $1.6 million as of December 31, 2010 and December 31, 2009, respectively. The loan is secured by a Mortgage and Security Agreement.

Subsequently in 2011, the Company made payments of principal and interest to the Bank totaling $458,160, paying off the Pineapple House Mortgage in its entirety. Borrowings outstanding under the Pineapple House Mortgage agreement were $0 as of February 25, 2011.

As of December 31, 2010, the Company, the Company’s wholly owned subsidiary, Southeast Power, and the Bank, had a loan agreement for a maximum principal amount of $3.8 million to be used by Southeast Power for durable equipment purchases, evidenced by a promissory note dated December 29, 2009, (the “$3.8 million equipment loan”). Borrowings outstanding under this loan agreement were $3.3 million and $2.8 million as of December 31, 2010 and December 31, 2009, respectively. Interest is payable monthly at an annual rate equal to the Monthly LIBOR rate plus two and one-half percent (2.76% and 2.73% as of December 31, 2010 and December 31, 2009, respectively). The maturity date of the loan is December 29, 2014. Repayment terms of the loan are as follows: interest is payable in sixty monthly payments beginning January 29, 2010, plus nine monthly principal payments of

 

44


Table of Contents

$55,000 beginning on April 29, 2010, followed by twelve monthly principal payments of $60,000, followed by thirty-six monthly principal payments of $72,500. The loan is secured by the grant of a continuing security interest in all equipment purchased with the proceeds of the loan, and any replacements, accessions, or substitutions thereof and all cash and non-cash proceeds thereof.

Subsequently on February 22, 2011, the Company’s wholly owned subsidiary, Southeast Power, and the Bank, executed a $6.94 million Promissory Note and related ancillary agreements (the “Southeast Power Loan Agreement”). The Southeast Power Loan Agreement will mature, and all amounts due to the Bank under the Southeast Power Loan Agreement and the related Promissory Note, will be due and payable in full on February 22, 2016. The Company must make monthly payments of principal and interest to the Bank commencing on March 22, 2011 in equal monthly principal payments of $82,619.05 plus accrued interest, with one final payment of all remaining principal and accrued interest due on February 22, 2016. The Southeast Power Loan Agreement will bear interest at a rate per annum equal to monthly LIBOR plus two and one-half percent, which will be adjusted monthly and subject to a maximum rate of 24.00%. The initial interest rate for advances is 2.8125%. The proceeds of the loan were used by the Company to refinance the existing debt outstanding under the $3.8 million equipment loan, ($3.3 million outstanding as of December 31, 2010) and to fund the purchase of additional equipment and vehicles to be owned by Southeast Power. The Company had drawn down $5.9 million under the Southeast Power Loan Agreement as of March 17, 2011.

The Company’s debt arrangements contain various financial and other covenants including, but not limited to, minimum tangible net worth, outside debt limitation, and maximum debt to tangible net worth ratio. Other loan covenants prohibit, among other things, incurring additional indebtedness, issuing loans to other entities in excess of a certain amount, entering into a merger or consolidation, and any change in the Company’s current Chief Executive Officer without prior written consent from the Bank. The loans also have cross-default provisions whereby any default under any loans of the Company (or its subsidiaries) with the Bank will constitute a default under all of the other loans of the Company (and its subsidiaries) with the Bank. The Company was in compliance with all of its covenants as of December 31, 2010.

The schedule of payments of the notes payable as of December 31, 2010 is as follows:

 

2011

   $ 1,176,552   

2012

     870,000   

2013

     870,000   

2014

     870,000   
        

Total payments of debt

   $ 3,786,552   
        

Note 12 – Commitments and Contingencies

Operating Leases

The Company leases its principal office space under a seven-year non-cancelable operating lease. Within the provisions of the office lease, there are escalations in payments over the base lease term, as well as renewal periods. The effects of the escalations have been reflected in rent expense on a straight-line basis over the expected lease term. The Company also leases office equipment under operating leases that expire over the next four years. The Company’s leases require payments of property taxes, insurance and maintenance costs in addition to the rent payments. Additionally, the Company leases several off-site storage facilities, used to store equipment and materials, under a month to month lease arrangement. The Company recognizes rent expense on a straight-line basis over the expected lease term.

 

45


Table of Contents

Future minimum lease payments under operating leases having initial or remaining non-cancelable lease terms in excess of one year as of December 31, 2010 are as follows:

 

2011

   $  164,651   

2012

     45,228   

2013

     4,950   
        

Total minimum operating lease payments

   $ 214,829   
        

Total rent expense for the operating leases were $158,000 and $152,000 for the years ended December 31, 2010 and 2009, respectively.

Performance Bonds

In certain circumstances, the Company is required to provide performance bonds to secure its contractual commitments. Management is not aware of any performance bonds issued for the Company that have ever been called by a customer. As of December 31, 2010, outstanding performance bonds issued on behalf of the Company’s electrical construction subsidiary amounted to approximately $3.5 million.

Note 13 – Preferred Stock Purchase Rights

On September 17, 2002, the Company announced that its Board of Directors adopted and entered into a Shareholder Rights Agreement designed to protect and maximize shareholder value and to assist the Board of Directors in ensuring fair and equitable benefit to all shareholders in the event of a hostile bid to acquire the Company, (the “Rights Agreement”).

The Company adopted this Rights Agreement to protect stockholders from coercive or otherwise unfair takeover tactics. In general terms, the Rights Agreement imposes a significant penalty upon any person or group that acquires 20% or more of the Company’s outstanding common stock without the approval of the Company’s Board of Directors. The Rights Agreement was not adopted in response to any known attempt to acquire control of the Company.

Under the Rights Agreement, a dividend of one preferred Stock Purchase Right (the “Right”) was declared for each common share held of record as of the close of business on September 18, 2002. No separate certificates evidencing the Rights will be issued unless and until they become exercisable.

The Rights generally will not become exercisable unless an acquiring entity accumulates or initiates a tender offer to purchase 20% or more of the Company’s common stock. In that event, each Right will entitle the holder, other than the unapproved acquirer and its affiliates, to purchase either the Company’s common stock or shares in an acquiring entity at one-half of market value.

The Rights’ initial exercise price, which is subject to adjustment, is $2.20. The Company’s Board of Directors generally will be entitled to redeem the Rights at a redemption price of $.001 per Right until an acquiring entity acquires a 20% position. The Rights expire on September 18, 2012.

The complete terms of the Rights are set forth in, and the foregoing description is qualified in its entirety by, the Rights Agreement between the Company and American Stock Transfer & Trust Company, as Rights Agent, a copy of which was filed with the Securities and Exchange Commission on September 18, 2002.

Note 14 – The Goldfield Corporation 1998 Executive Long-term Incentive Plan

In 1998, the stockholders of the Company approved the 1998 Executive Long-term Incentive Plan, which permits the granting of Nonqualified Stock Options, Incentive Stock Options, Stock Appreciation Rights, Restricted Stock, Restricted Stock Units, Performance Units, Performance Shares and other awards to all officers and key employees of the Company and its subsidiaries. Shares granted pursuant to the Plan may be authorized but unissued shares of Common Stock, Treasury shares or shares purchased on the open market. The exercise price under such grants will be based on the fair market value of the Common Stock at the date of grant. The maximum number of shares available for grant under the Plan is 1,300,000. Pursuant to the terms of the Plan, Incentive Stock Options may no longer be granted. As of December 31, 2010 there were 315,000 shares available for grant under the Plan.

The Company accounts for stock-based employee compensation arrangements in accordance with the provisions of ASC Topic 718 and its related implementation guidance in accounting for stock-based employee compensation

 

46


Table of Contents

arrangements. ASC Topic 718 requires the recognition of the fair value of stock compensation in net income. ASC Topic 718 also requires a public entity to measure the cost of employee services received in exchange for an award of equity instruments based on the grant-date fair value of the award (with limited exceptions). Stock-based compensation expense is recognized over the period during which an employee is required to provide service in exchange for the award—the requisite service period (usually the vesting period), net of estimated forfeitures. However, the Company has not issued any shares pursuant to the Plan during the years ended December 31, 2010 or 2009.

Note 15 – Loss Per Share of Common Stock

Basic loss per common share is computed by dividing net loss by the weighted average number of common stock shares outstanding during the period. Diluted loss per share reflects the potential dilution that could occur if common stock equivalents, such as stock options outstanding, were exercised into common stock that subsequently shared in the earnings of the Company.

As of December 31, 2010 and 2009, the Company had no common stock equivalents. The computation of the weighted average number of common stock shares outstanding excludes 2,362,418 shares of Treasury Stock for each of the years ended December 31, 2010 and 2009, respectively.

Note 16 – Common Stock Repurchase Plan

Since September 17, 2002, the Company has had a stock repurchase plan which, as last amended by the Board of Directors on September 21, 2010, permits the purchase of up to 3,500,000 shares until September 30, 2011. The Company may repurchase its shares either in the open market or through private transactions. The volume of the shares to be repurchased is contingent upon market conditions and other factors. No shares were repurchased during the years ended December 31, 2010 and December 31, 2009. As of December 31, 2010, the total number of shares repurchased under the Repurchase Plan was 2,345,060 at a cost of $1,289,467 (average cost of $0.55 per share) and the remaining number of shares available to be repurchased under the Repurchase Plan is 1,154,940. The Company currently holds the repurchased stock as Treasury Stock, reported at cost. Prior to September 17, 2002, the Company had 17,358 shares of Treasury Stock which it had purchased at a cost of $18,720.

 

47


Table of Contents

Note 17 – Business Segment Information

The Company is currently involved in two segments, electrical construction and real estate development. There were no material amounts of sales or transfers between segments and no material amounts of foreign sales. Any intersegment sales have been eliminated.

The following table sets forth certain segment information as of December 31 for the years indicated:

 

     2010     2009  

Continuing operations:

    

Revenues

    

Electrical construction

   $ 31,384,594      $ 27,772,466   

Real estate development

     1,983,385        1,473,800   
                
     33,367,979        29,246,266   
                

Operating expenses

    

Electrical construction

     29,262,952        27,865,237   

Real estate development

     1,797,874        1,422,127   

Corporate

     2,325,216        2,360,450   
                
     33,386,042        31,647,814   
                

Operating (loss) income

    

Electrical construction

     2,121,642        (92,771

Real estate development

     185,511        51,673   

Corporate

     (2,325,216     (2,360,450
                
     (18,063     (2,401,548
                

Other income (expenses), net

    

Electrical construction

     (75,962     (37,488

Real estate development

     (31,285     (54,223

Corporate

     25,188        28,393   
                
     (82,059     (63,318
                

Net (loss) income before taxes

    

Electrical construction

     2,045,680        (130,259

Real estate development

     154,226        (2,550

Corporate

     (2,300,028     (2,332,057
                
   $ (100,122   $ (2,464,866
                

Identifiable assets:

    

Electrical construction

   $ 17,859,453      $ 17,293,104   

Real estate development

     1,497,369        2,171,919   

Corporate

     1,602,660        2,188,429   

Discontinued operations

     —          8,746   
                

Total

   $ 20,959,482      $ 21,662,198   
                

Capital expenditures:

    

Electrical construction

   $ 2,438,552      $ 3,266,911   

Real estate development

     1,249        —     

Corporate

     21,265        9,784   
                

Total

   $ 2,461,066      $ 3,276,695   
                

Depreciation:

    

Electrical construction

   $ 2,685,132      $ 2,665,810   

Real estate development

     3,352        13,765   

Corporate

     68,779        118,046   
                

Total

   $ 2,757,263      $ 2,797,621   
                

 

48


Table of Contents

Operating income (loss) is total operating revenue less operating expenses inclusive of depreciation and SG&A expenses for each segment. Operating income (loss) excludes interest expense, interest and other income, and income taxes. General corporate expenses are comprised of general and administrative expenses and corporate depreciation expense. Identifiable assets by segment are used in the operations of each segment.

Sales (in thousands of dollars) to major customers exceeding 10% of total sales follows for the years ended December 31 as indicated:

 

     2010      2009  
     Amount      % of Total
Sales
     Amount      % of Total
Sales
 

Electrical construction:

           

Customer A

   $ 5,155         15       $ 7,743         26   

Customer B

     5,512         17         6,485         22   

Customer C

     4,494         13         —           —     

The real estate development operations did not have sales, from any one customer, which exceeded 10% of total sales for each of the years ended December 31, 2010 and 2009.

Sales by service/product (in thousands of dollars) for the years ended December 31 as indicated are as follows:

 

     2010      2009  
     Amount      % of Total
Sales
     Amount      % of Total
Sales
 

Electrical construction:

           

Transmission & Foundation

   $ 25,927         77       $ 21,837         75   

Fiber optics

     5,299         16         3,788         13   

Miscellaneous

     159         1         2,147         7   
                                   

Total

     31,385         94         27,772         95   

Real estate development:

           

Property sales

     1,983         6         1,474         5   
                                   

Total

     1,983         6         1,474         5   

Total Sales

   $ 33,368         100       $ 29,246         100   
                                   

Note 18 – Restricted Cash

On October 25, 2010, the Company, as grantor, Valley Forge Insurance Company (the “Beneficiary”) and Branch Banking and Trust Company (the “Trustee”) entered into a Collateral Trust Agreement (the “Agreement”) in connection with the Company’s workers’ compensation insurance policies previously issued by the Beneficiary (the “Policies”). The Agreement was made to grant the Beneficiary a security interest in certain of the Company’s assets and to place those assets in a Trust Account to secure the Company’s obligations to the Beneficiary under the Policies. On October 28, 2010, the Company made a cash deposit in the amount of $79,000 to the Trust Account, pursuant to and in accordance with the terms and specifications of the Agreement regarding the establishment of the Trust Account. Also pursuant to the Agreement, the Company may be required to deposit additional assets into the Trust Account if the Beneficiary determines that the value of the assets in the Trust Account is insufficient to secure the Company’s obligations under the Policies. The Trust Account may only be terminated by the joint action of the Company and the Beneficiary.

Note 19 – Subsequent Event

On February 22, 2011 the Company entered into a Renewal and Modification agreement with regards to the Working Capital Loan, and also entered into the Southeast Power Loan Agreement for a $6.94 million Promissory Note with the Bank, both events are described in note 11.

 

49


Table of Contents
Item 9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure.

None.

 

Item 9A. Controls and Procedures.

Evaluation of disclosure controls and procedures

John H. Sottile, our Chief Executive Officer (“CEO”), and Stephen R. Wherry, our Chief Financial Officer (“CFO”), have performed an evaluation of our disclosure controls and procedures, as that term is defined in Rule 13a-15(e) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), as of December 31, 2010, and each has concluded that such disclosure controls and procedures are effective to ensure that information required to be disclosed in our periodic reports filed or submitted under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified by the Securities and Exchange Commission’s (the “SEC”) rules and regulations. Based upon this evaluation, the CEO and the CFO concluded that our disclosure controls and procedures were effective, as of the end of the period covered by this Annual Report on Form 10-K, to ensure that information relating to The Goldfield Corporation and its consolidated subsidiaries required to be included in our Exchange Act reports filed with the SEC is accumulated and communicated to management, including the CEO and the CFO, in order to allow timely decisions regarding required disclosures.

This annual report does not include an attestation report of our registered public accounting firm regarding internal control over financial reporting. Our internal control over financial reporting was not subject to attestation by our independent registered public accounting firm pursuant to the Dodd-Frank Wall Street Reform and Consumer Protection Act, which includes a provision that permanently exempts smaller public companies that qualify as either a Non-Accelerated Filer or Smaller Reporting Company from the auditor attestation requirement of Section 404(b) of the Sarbanes-Oxley Act of 2002. As of December 31, 2010, the Company is exempt from such requirement, which permits us to provide only management’s report in this Annual Report on Form 10-K.

Management’s annual report on internal control over financial reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting as such term is defined in Exchange Act Rule 13a-15(f), which consists of processes and procedures designed to provide reasonable assurance to our management and board of directors regarding the preparation and fair presentation of our published financial statements. Under the supervision and with the participation of our management, including our CEO and CFO, we conducted an evaluation of the effectiveness of our internal control over financial reporting as of December 31, 2010 based on the criteria set forth in Internal Control – Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on our assessment, we believe that as of December 31, 2010, our internal control over financial reporting was effective based on those criteria.

This Annual Report does not include an attestation report of our independent registered public accounting firm regarding internal control over financial reporting. We were not required to have, nor have we engaged our independent registered public accounting firm to perform, an audit on our internal control over financial reporting pursuant to rules of the SEC that permit us to provide only management’s report in this Annual Report.

Changes in internal controls

No changes in our internal controls over financial reporting occurred during the fourth quarter of 2010 that have materially affected, or are reasonably likely to materially affect, our internal controls over financial reporting.

Limitations of the effectiveness of controls

A control system, no matter how well conceived and operated, can provide only reasonable assurance, not absolute assurance that the objectives of the control system are met. Because of inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues, if any, within a company have been detected. These inherent limitations include the realities that judgments in decision-making can be faulty and that breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the individual acts of some persons, by collusion of two or more people or by management override of the controls. The design of any system of controls is also based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that the design will succeed in achieving its stated goals under all potential future conditions; over time, controls may become inadequate because of changes in conditions, or the degree of compliance with policies and procedures may deteriorate. Because of the inherent limitations in a cost-effective

 

50


Table of Contents

control system, misstatements due to error or fraud may occur and not be detected. Accordingly, our disclosure controls and procedures are designed to provide reasonable, not absolute, assurance that the objectives of our disclosure control system are met and, as set forth above, our CEO and CFO have concluded, based on their evaluation, that our disclosure controls and procedures were effective as of December 31, 2010 to provide reasonable assurance that the objectives of the disclosure control system were met.

 

Item 9B. Other Information.

None.

PART III

 

Item 10. Directors, Executive Officers and Corporate Governance.

Information concerning the directors of the Company will be contained under the heading “Election of Directors” and information concerning compliance with Section 16(a) of the Securities Exchange Act of 1934, as amended, will be contained under the heading “Section 16(a) Beneficial Ownership Reporting Compliance” in our 2011 Proxy Statement, which information is incorporated herein by reference.

Our executive officers are as follows:

 

Name and Title(1)

   Year in  Which
Service Began
as Officer
         Age      

John H. Sottile
Chairman of the Board, President and Chief
Executive Officer, Director

     1983         63   

Stephen R. Wherry,
Senior Vice President, Chief Financial Officer,
Treasurer, and Assistant Secretary

     1988         52   

 

(1) As of February 28, 2011

Throughout the past five years John H. Sottile and Stephen R. Wherry have been principally employed as executive officers of the Company, with responsibilities substantially consistent with those of their current positions.

John H. Sottile has served as Chairman of the Board of Directors since May 1998.

The term of office of all directors is until the next annual meeting and the term of office of all officers is for one year and until their successors are chosen and qualify.

Code of Ethics

In March 2003, our Board of Directors adopted a Code of Ethics (the “Code”) that is specifically applicable to its Chief Executive Officer and Senior Financial Officers. The Code incorporates guidelines designed to deter wrongdoing, to promote honest and ethical conduct, compliance with applicable laws and regulations, prompt internal reporting of Code violations and accountability for Code adherence. A copy of the Code was filed as an exhibit to the 2003 Form 10-K.

The Code is also available, free of charge, within the “Corporate Governance” section of our website, at www.goldfieldcorp.com. We intend to disclose on our website any amendments to, or waivers from, our Code of Ethics that are required to be publicly disclosed pursuant to the rules of the Securities and Exchange Commission.

Audit Committee

Information concerning our Audit Committee including the Audit Committee Financial Expert will be contained under “Committees and Meetings of the Board of Directors” in our 2011 Proxy Statement, which information is incorporated herein by reference.

 

51


Table of Contents
Item 11. Executive Compensation.

Information concerning executive compensation will be contained under “Executive Compensation” in our 2011 Proxy Statement, which information is incorporated herein by reference.

 

Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters.

Information concerning the security ownership will be contained under “Ownership of Voting Securities by Certain Beneficial Owners and Management” and “Equity Compensation Plan Information” in our 2011 Proxy Statement, which information is incorporated herein by reference.

 

Item 13. Certain Relationships and Related Transactions, and Director Independence.

Information concerning certain relationships and related transactions of the directors and officers of our Company and director independence will be contained under “Election of Directors” in our 2011 Proxy Statement, which information is incorporated herein by reference.

 

Item 14. Principal Accountant Fees and Services.

Information concerning the accounting services performed by our Independent Registered Public Accounting Firm, KPMG LLP, and their respective fees for such services will be contained under “Audit Committee Report and Fee Information” in our 2011 Proxy Statement, which information is incorporated herein by reference.

PART IV

 

Item 15. Exhibits, Financial Statement Schedules.

(a) The following documents are filed as part of this report:

(1) Financial Statements

 

     Page

Report of Independent Registered Public Accounting Firm

   28

Consolidated Balance Sheets – December 31, 2010 and 2009

   29

Consolidated Statements of Operations – Years ended December 31, 2010 and 2009

   30

Consolidated Statements of Cash Flows – Years ended December 31, 2010 and 2009

   31

Consolidated Statements of Stockholders’ Equity – Years ended December 31, 2010 and 2009

   32

Notes to Consolidated Financial Statements

   33

(2) Financial Statement Schedules

No financial statement schedules are included as all applicable information is included in the notes to the consolidated financial statements.

(3) Exhibits

The following exhibits are required pursuant to Item 601 of Regulation S-K:

 

3-1    Restated Certificate of Incorporation of the Company, as amended, is hereby incorporated by reference to Exhibit 3-1 of the Company’s Annual Report on Form 10-K for the year ended December 31, 1987, heretofore filed with the Commission (file No. 1-7525).
3-2    Amended and Restated By-Laws of the Company are hereby incorporated by reference to Exhibit 3-1 of the Company’s Current Report on Form 8-K dated December 11, 2007, heretofore filed with the Commission (file No. 1-7525).

 

52


Table of Contents
4-1    Specimen copy of Company’s Common Stock certificate is hereby incorporated by reference to Exhibit 4-5 of the Company’s Annual Report on Form 10-K for the year ended December 31, 1987, heretofore filed with the Commission (file No. 1-7525).
4-2    The Goldfield Corporation 1998 Executive Long-term Incentive Plan is hereby incorporated by reference to Exhibit 4-3 of the Company’s Annual Report on Form 10-K for the year ended December 31, 1998, heretofore filed with the Commission (file No. 1-7525).
4-3    The Rights Agreement between The Goldfield Corporation and American Stock Transfer & Trust Company, as Rights Agent, is hereby incorporated by reference to Exhibit 4-1 of the Company’s Form 8-A dated September 19, 2002, heretofore filed with the Commission (file No. 1-7525).
10-1(a)    Amended and Restated Employment Agreement dated November 1, 2001 between The Goldfield Corporation and John H. Sottile is hereby incorporated by reference to Exhibit 10-2(g) of the Company’s Quarterly Report on Form 10-Q for the period ended September 30, 2001, heretofore filed with the Commission (file No. 1-7525).
10-1(b)    Letter dated January 23, 2009 from John H. Sottile to the Board of Directors of The Goldfield Corporation, is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated March 10, 2009, heretofore filed with the Commission (file No. 1-7525).
10-1(c)    Letter dated March 18, 2010 from John H. Sottile to the Benefits and Compensation Committee of the Board of Directors of The Goldfield Corporation, is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated March 18, 2010, heretofore filed with the Commission (file No. 1-7525).
10-1(d)    Amendment to John H. Sottile Employment Agreement, dated April 15, 2010, between John H. Sottile and The Goldfield Corporation, is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated April 15, 2010, heretofore filed with the Commission (file No. 1-7525).
10-2    Form of Indemnification Agreement is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated July 15, 2005, heretofore filed with the Commission (file No. 1-7525).
10-3    Performance-Based Bonus Plan effective January 1, 2002 is hereby incorporated by reference to Exhibit 10-4 of the Company’s Quarterly Report on Form 10-Q for the period ended September 30, 2002, heretofore filed with the Commission (file No. 1-7525).
10-4    The Lease Agreement dated June 7, 2004 between Hibiscus Office Park, LLC and The Goldfield Corporation is hereby incorporated by reference to Exhibit 10-1 of the Company’s Quarterly Report on Form 10-Q for the period ended June 30, 2004, heretofore filed with the Commission (file No. 1-7525).
10-5(a)    Loan Agreement, dated August 26, 2005, among The Goldfield Corporation, Southeast Power Corporation, Bayswater Development Corporation, Pineapple House of Brevard, Inc. and Oak Park of Brevard, Inc. and Branch Banking and Trust Company relating to Loans of up to $1.0 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated August 26, 2005, heretofore filed with the Commission (file No. 1-7525).
10-5(b)    Revolving Line of Credit Promissory Note of The Goldfield Corporation relating to Loans of up to $1.0 million is hereby incorporated by reference to Exhibit 10-4 of the Company’s Current Report on Form 8-K dated August 26, 2005, heretofore filed with the Commission (file No. 1-7525).
10-5(c)    Amendment to Loan Agreement, dated March 14, 2006, among The Goldfield Corporation, Southeast Power Corporation, Bayswater Development Corporation, Pineapple House of Brevard, Inc. and Oak Park of Brevard, Inc. and Branch Banking and Trust Company relating to Loans of up to $3.0 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated July 15, 2005, heretofore filed with the Commission on March 20, 2006 (file No. 1-7525).

 

53


Table of Contents
10-5(d)    Renewal Revolving Line of Credit Promissory Note of The Goldfield Corporation relating to Loans of up to $3.0 million is hereby incorporated by reference to Exhibit 10-2 of the Company’s Current Report on Form 8-K dated July 15, 2005, heretofore filed with the Commission on March 20, 2006 (file No.1-7525).
10-5(e)    Form of Guaranty is hereby incorporated by reference to Exhibit 10-3 of the Company’s Current Report on Form 8-K dated July 15, 2005, heretofore filed with the Commission on March 20, 2006 (file No. 1-7525).
10-5(f)    Renewal Revolving Line of Credit Promissory Note of The Goldfield Corporation relating to Loans of up to $3.0 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated September 28, 2006, heretofore filed with the Commission (file No. 1-7525).
10-5(g)    Allonge to Promissory Note of The Goldfield Corporation relating to Loans of up to $3.0 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated September 27, 2007, heretofore filed with the Commission (file No. 1-7525).
10-5(h)    Renewal Revolving Line of Credit Promissory Note of The Goldfield Corporation relating to Loans of up to $3.0 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated November 25, 2008, heretofore filed with the Commission (file No. 1-7525).
10-5(i)    Extension of Revolving Line of Credit Promissory Note of The Goldfield Corporation relating to Loans of up to $3.0 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated November 27, 2009, heretofore filed with the Commission (file No. 1-7525).
10-5(j)    Note Modification Agreement of Revolving Line of Credit Promissory Note of The Goldfield Corporation relating to Loans of up to $3.0 million and Addendum to Promissory Note is hereby incorporated by reference to Exhibit 10-6 of the Company’s Current Report on Form 8-K dated December 29, 2009, heretofore filed with the Commission (file No. 1-7525).
10-5(k)    Amendment to Loan Agreement, dated March 25, 2010, among The Goldfield Corporation, Southeast Power Corporation, Bayswater Development Corporation, Pineapple House of Brevard, Inc. and Oak Park of Brevard, Inc. and Branch Banking and Trust Company relating to Loans of up to $3.0 million is hereby incorporated by reference to Exhibit 10-5 of the Company’s Current Report on Form 10-K for the period ended December 31, 2009, heretofore filed with the Commission (file No. 1-7525).
10-5(l)    Extension of Revolving Line of Credit Promissory Note of The Goldfield Corporation relating to Loans of up to $3.0 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated December 22, 2010 heretofore filed with the Commission (file No. 1-7525).
10-5(m)    Note Modification Agreement of Revolving Line of Credit Promissory Note of The Goldfield Corporation relating to Loans of up to $3.0 million dated February 22, 2011, is hereby incorporated by reference to Exhibit 10-6 of the Company’s Current Report on Form 8-K dated February 22, 2011, heretofore filed with the Commission (file No. 1-7525).
10-5(n)    Addendum to Note Modification Agreement dated February 22, 2011 among The Goldfield Corporation, and Branch Banking and Trust Company relating to Loans of up to $3.0 million, is hereby incorporated by reference to Exhibit 10-6 of the Company’s Current Report on Form 8-K dated February 22, 2011, heretofore filed with the Commission (file No. 1-7525).
10-5(o)    Loan Agreement, dated February 22, 2011, among The Goldfield Corporation, Southeast Power Corporation, Pineapple House of Brevard, Inc. and Branch Banking and Trust Company relating to Loans of up to $3.0 million is hereby incorporated by reference to Exhibit 10-8 of the Company’s Current Report on Form 8-K dated February 22, 2011, heretofore filed with the Commission (file No. 1-7525).
10-5(p)    Security Agreement, dated February 22, 2011, between Southeast Power Corporation and Branch Banking and Trust Company is hereby incorporated by reference to Exhibit 10-9 of the Company’s Current Report on Form 8-K dated February 22, 2011, heretofore filed with the Commission (file No. 1-7525).

 

54


Table of Contents
10-5(q)    Guaranty, dated February 22, 2011, between Southeast Power, Pineapple House of Brevard, Inc., Bayswater Development Corporation and Branch Banking and Trust Company is hereby incorporated by reference to Exhibit 10-10 of the Company’s Current Report on Form 8-K dated February 22, 2011, heretofore filed with the Commission (file No. 1-7525).
10-5(r)    Release of Guarantor Oak Park of Brevard, Inc. relating to Loans of up to $ 3.0 million is hereby incorporated by reference to Exhibit 10-11 of the Company’s Current Report on Form 8-K dated February 22, 2011 heretofore filed with the Commission (file No. 1-7525).
10-6(a)    Loan Agreement for Construction and Other Matters, dated November 18, 2005, between Pineapple House of Brevard, Inc. and Branch Banking and Trust Company relating to Loans of up to $14.0 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated November 18, 2005, heretofore filed with the Commission (file No. 1-7525).
10-6(b)    Mortgage and Security Agreement, dated November 18, 2005, between Pineapple House of Brevard, Inc. and Branch Banking and Trust Company relating to Loans of up to $14.0 million is hereby incorporated by reference to Exhibit 10-2 of the Company’s Current Report on Form 8-K dated November 18, 2005, heretofore filed with the Commission (file No. 1-7525).
10-6(c)    Revolving Line of Credit Promissory Note, dated November 18, 2005, between Pineapple House of Brevard, Inc. and Branch Banking and Trust Company relating to Loans of up to $14.0 million is hereby incorporated by reference to Exhibit 10-3 of the Company’s Current Report on Form 8-K dated November 18, 2005, heretofore filed with the Commission (file No. 1-7525).
10-6(d)    Form of Guaranty is hereby incorporated by reference to Exhibit 10-4 of the Company’s Current Report on Form 8-K dated November 18, 2005, heretofore filed with the Commission (file No. 1-7525).
10-6(e)    Allonge to Promissory Note of the Goldfield Corporation relating to Loans of up to $14.0 million is hereby incorporated by reference to Exhibit 10-2 of the Company’s Current Report on Form 8-K dated September 27, 2007, heretofore filed with the Commission (file No. 1-7525).
10-6(f)    Mortgage Modification/Extension Agreement of the Goldfield Corporation relating to Loans of up to $14.0 million is hereby incorporated by reference to Exhibit 10-3 of the Company’s Current Report on Form 8-K dated September 27, 2007, heretofore filed with the Commission (file No. 1-7525).
10-6(g)    Allonge to Promissory Note of The Goldfield Corporation relating to Loans of up to $14.0 million dated November 13, 2008, is hereby incorporated by reference to Exhibit 10-1 of the Company’s Quarterly Report on Form 10-Q for the period ended September 30, 2008, heretofore filed with the Commission (file No. 1-7525).
10-6(h)    Allonge to Promissory Note of The Goldfield Corporation relating to Loans of up to $3.6 million (formerly $14.0 million) is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated March 6, 2009, heretofore filed with the Commission (file No. 1-7525).
10-6(i)    Mortgage Modification/Extension Agreement of the Goldfield Corporation relating to Loans of up to $881,000 (formerly $14.0 million and $3.6 million) is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated May 18, 2010, heretofore filed with the Commission (file No. 1-7525).
10-6(j)    Allonge to Promissory Note of The Goldfield Corporation relating to Loans of up to $881,000 (formerly $14.0 million and $3.6 million) is hereby incorporated by reference to Exhibit 10-2 of the Company’s Current Report on Form 8-K dated May 18, 2010, heretofore filed with the Commission (file No. 1-7525).
10-6(k)    First Amendment to Loan Agreement dated November 25, 2005 for Construction and Other Matters

 

55


Table of Contents
   relating to Loans of up to $881,000 (formerly $14.0 million and $3.6 million) is hereby incorporated by reference to Exhibit 10-3 of the Company’s Current Report on Form 8-K dated May 18, 2010, heretofore filed with the Commission (file No. 1-7525).
10-6(l)    Extension Agreement of the Goldfield Corporation relating to Loans of up to $881,000 (formerly $14.0 million and $3.6 million) is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated July 16, 2010, heretofore filed with the Commission (file No. 1-7525)
10-6(m)    Mortgage Modification/Extension Agreement of the Goldfield Corporation relating to Loans of up to $499,405 (formerly $14.0 million, $3.6 million and $881,000) is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated July 30, 2010, heretofore filed with the Commission (file No. 1-7525).
10-6(n)    Allonge to Promissory Note of The Goldfield Corporation relating to Loans of up to $499,405 (formerly $14.0 million, $3.6 million and $881,000) is hereby incorporated by reference to Exhibit 10-2 of the Company’s Current Report on Form 8-K dated July 30, 2010, heretofore filed with the Commission (file No. 1-7525).
10-6(o)    Second Amendment to Loan Agreement dated November 25, 2005 for Construction and Other Matters relating to Loans of up to $499,405 (formerly $14.0 million, $3.6 million and $881,000) is hereby incorporated by reference to Exhibit 10-3 of the Company’s Current Report on Form 8-K dated July 30, 2010, heretofore filed with the Commission (file No. 1-7525).
10-6(p)    Release of Guarantor Oak Park of Brevard, Inc. relating to Loans of up to $ 499,405 (formerly $14.0 million, $3.6 million and $881,000) is hereby incorporated by reference to Exhibit 10-4 of the Company’s Current Report on Form 8-K dated July 30, 2010, heretofore filed with the Commission (file No. 1-7525).
10-7(a)    Loan Agreement, dated July 13, 2006, among The Goldfield Corporation, Southeast Power Corporation, and Branch Banking and Trust Company relating to Loans of up to $3.5 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated July 13, 2006, heretofore filed with the Commission (file No. 1-7525).
10-7(b)    Addendum to Loan Agreement dated July 13, 2006, among The Goldfield Corporation, Southeast Power Corporation, and Branch Banking and Trust Company relating to Loans of up to $3.825 million is hereby incorporated by reference to Exhibit 10-2 of the Company’s Current Report on Form 8-K dated December 29, 2009, heretofore filed with the Commission (file No. 1-7525).
10-7(c)    Revolving Line of Credit Promissory Note of Southeast Power Corporation relating to Loans of up to $3.5 million is hereby incorporated by reference to Exhibit 10-2 of the Company’s Current Report on Form 8-K dated July 13, 2006, heretofore filed with the Commission (file No. 1-7525).
10-7(d)    Guaranty, dated July 13, 2006, between The Goldfield Corporation and Branch Banking and Trust Company is hereby incorporated by reference to Exhibit 10-3 of the Company’s Current Report on Form 8-K dated July 13, 2006, heretofore filed with the Commission (file No. 1-7525).
10-7(e)    Security Agreement, dated July 13, 2006, between Southeast Power Corporation and Branch Banking and Trust Company is hereby incorporated by reference to Exhibit 10-4 of the Company’s Current Report on Form 8-K dated July 13, 2006, heretofore filed with the Commission (file No. 1-7525).
10-7(f)    Promissory Note of Southeast Power Corporation relating to Loans of up to $3.825 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated December 29, 2009, heretofore filed with the Commission (file No. 1-7525).
10-7(g)    BB&T Security Agreement, dated December 29, 2009, between Southeast Power Corporation and Branch Banking and Trust Company and Attachment “A” to the BB&T Security Agreement dated December 29, 2009, is hereby incorporated by reference to Exhibit 10-3 of the Company’s Current Report on Form 8-K dated December 29, 2009, heretofore filed with the Commission (file No. 1-7525).
10-7(h)    Guaranty, dated December 29, 2009, between The Goldfield Corporation and Branch Banking and Trust Company is hereby incorporated by reference to Exhibit 10-4 of the Company’s Current Report on Form 8-K

 

56


Table of Contents
  dated December 29, 2009, heretofore filed with the Commission (file No. 1-7525).
10-7(i)   Guaranty, dated December 29, 2009, between Pineapple House of Brevard, Inc. and Branch Banking and Trust Company is hereby incorporated by reference to Exhibit 10-5 of the Company’s Current Report on Form 8-K dated December 29, 2009, heretofore filed with the Commission (file No. 1-7525).
10-7(j)   Promissory Note of Southeast Power Corporation relating to Loans of up to $6.94 million is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated February 22, 2011, heretofore filed with the Commission (file No. 1-7525).
10-7(k)   Addendum to Promissory Note dated February 22, 2011, among Southeast Power Corporation, and Branch Banking and Trust Company relating to Loans of up to $6.94 million is hereby incorporated by reference to Exhibit 10-2 of the Company’s Current Report on Form 8-K dated February 22, 2011, heretofore filed with the Commission (file No. 1-7525).
10-7(l)   Loan Agreement, dated February 22, 2011, among Southeast Power Corporation, The Goldfield Corporation, Pineapple House of Brevard, Inc. and Branch Banking and Trust Company relating to Loans of up to $6.94 million is hereby incorporated by reference to Exhibit 10-3 of the Company’s Current Report on Form 8-K dated February 22, 2011, heretofore filed with the Commission (file No. 1-7525).
10-7(m)   Security Agreement, dated February 22, 2011, between Southeast Power Corporation and Branch Banking and Trust Company is hereby incorporated by reference to Exhibit 10-4 of the Company’s Current Report on Form 8-K dated February 22, 2011, heretofore filed with the Commission (file No. 1-7525).
10-7(n)   Guaranty, dated February 22, 2011, between The Goldfield Corporation, Pineapple House of Brevard, Inc. and Branch Banking and Trust Company is hereby incorporated by reference to Exhibit 10-5 of the Company’s Current Report on Form 8-K dated February 22, 2011, heretofore filed with the Commission (file No. 1-7525).
10-8(a)   Collateral Trust Agreement between The Goldfield Corporation, Valley Forge Insurance Company Branch Banking and Trust Company is hereby incorporated by reference to Exhibit 10-1 of the Company’s Current Report on Form 8-K dated October 25, 2010, heretofore filed with the Commission (file No. 1-7525).
11   For computation of per share earnings, see note 14 to the consolidated financial statements.
14   The Goldfield Corporation Code of Ethics for the Chief Executive Officer and Senior Financial Officers is hereby incorporated by reference to Exhibit 14 of the Company’s Annual Report on Form 10-K for the year ended December 31, 2003, heretofore filed with the Commission (file No. 1-7525).
*21   Subsidiaries of Registrant
*23   Consent of Independent Registered Public Accounting Firm
*24   Powers of Attorney
*31-1   Certification Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002, 15 U.S.C. Section 7241
*31-2   Certification Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002, 15 U.S.C. Section 7241

 

57


Table of Contents
*32-1    **Certification Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, 18 U.S.C. Section 1350
*32-2    **Certification Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, 18 U.S.C. Section 1350

 

* Filed herewith.
** These exhibits are intended to be furnished in accordance with Regulation S-K Item 601(b)(32) and shall not be deemed to be filed for purposes of Section 18 of the Securities Act of 1934 or incorporated by reference into any filing under the Securities Act of 1933, except as shall be expressly set forth by specific reference.

 

58


Table of Contents

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

THE GOLDFIELD CORPORATION
     
By:  

/s/ JOHN H. SOTTILE

  (John H. Sottile)
  Chairman of the Board, President and Chief Executive Officer (Principal Executive Officer)

Dated: March 30, 2011

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on March 30, 2011.

 

Signature    Title    

/s/ JOHN H. SOTTILE

  

Chairman of the Board, President and, Chief Executive Officer (Principal Executive Officer)

 
(John H. Sottile)     

/s/ STEPHEN R.WHERRY

(Stephen R. Wherry)

  

Senior Vice President, Chief Financial Officer, Treasurer and Assistant Secretary (Principal Financial and Accounting Officer)

 
    

*

   Director  
(Thomas E. Dewey, Jr.)     

*

   Director  
(Harvey C. Eads, Jr.)     

*

   Director  
(John P. Fazzini)     

*

   Director  
(Danforth E. Leitner)     

*

   Director  
(Al Marino)     

*

   Director  
(Dwight W. Severs)     

 

*By:  

/s/ JOHN H. SOTTILE

  John H. Sottile
  Attorney-in-Fact

 

59