e10vk
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 10-K
|
|
|
þ |
|
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES
EXCHANGE ACT OF 1934 |
For the fiscal year ended: December 31, 2005
Commission File Number 1-1143
Inco Limited
(Name of registrant as specified in its charter)
|
|
|
Canada
|
|
98-0000676 |
(Jurisdiction of incorporation)
|
|
(I.R.S. Employer Identification No.) |
|
|
|
145 King Street West, Suite 1500
|
|
M5H 4B7 |
Toronto, Ontario, Canada
|
|
(Postal code) |
(Address of principal executive offices) |
|
|
(416) 361-7511
(Telephone number)
Securities registered pursuant to Section 12(b) of the Securities Exchange Act of 1934:
|
|
|
Title of Each Class |
|
Name of Each Exchange on Which Registered |
Common Shares
|
|
New York Stock Exchange (1) |
Stock Purchase Rights
|
|
New York Stock Exchange (2) |
Common Share Purchase Warrants
|
|
New York Stock Exchange (2) |
Indicate by check mark if the registrant is a well-known seasoned issuer (as defined in Rule
405 of the Securities Act).
Indicate by check mark if the registrant is not required to file reports pursuant to
Section 13 or Section 15(d) of the Securities Exchange Act of 1934.
Indicate by check mark whether the registrant (1) has filed all reports required to be
filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months,
and (2) has been subject to such filing requirements for the past 90 days.
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of
Regulation S-K is not contained herein, and will not be contained, to the best of registrants
knowledge, in definitive proxy or information statements incorporated by reference in Part III of
this Form 10-K or any amendment to this Form 10-K. þ
Indicate by check mark whether the registrant is a large accelerated filer, an
accelerated filer or a non-accelerated filer (as defined in Rule 12b-2 of the Securities Exchange
Act of 1934).
Large accelerated filer þ Accelerated filer o Non-accelerated filer o
Indicate by check mark whether the registrant is a shell company (as defined in Rule
12b-2 of the Securities Exchange Act of 1934).
As of June 30, 2005, the approximate aggregate market value, based upon the closing sale
price of the Common Shares on the New York Stock Exchange, of the registrants voting shares held
by non-affiliates was $7,125 million.(3)
As of February 17, 2006, 192,769,128 Common Shares of the registrant were issued and
outstanding.
DOCUMENTS INCORPORATED BY REFERENCE
Portions of the Registrants proxy circular and statement dated February 17, 2006 for the 2006
Annual Meeting of Shareholders of the Registrant are incorporated by reference in Part III of this
Report to the extent set forth in Items 10, 11, 12 and 14 hereof.
|
|
|
(1) |
|
In addition, the Common Shares are listed on the Toronto Stock Exchange and are traded on
certain other exchanges principally through independent arrangements made by securities
dealers. |
|
(2) |
|
In addition, the Stock Purchase Rights and the Common Share Purchase Warrants are listed on
the Toronto Stock Exchange. |
|
(3) |
|
Unless otherwise stated, all dollar amounts in this Report are expressed in United States
currency. |
INDEX TO INCO LIMITED
2005 ANNUAL REPORT ON FORM 10-K
UNLESS OTHERWISE STATED, ALL DOLLAR AMOUNTS IN THIS REPORT
ARE EXPRESSED IN UNITED STATES CURRENCY
|
|
|
|
|
Items 1. and 2. Business and Properties of Inco Limited |
|
|
1 |
|
Introduction |
|
|
1 |
|
Availability of Documents |
|
|
2 |
|
Cautionary
Statement Regarding Forward-Looking Statements and Forward-Looking Information |
|
|
2 |
|
Material Assumptions |
|
|
4 |
|
Description of Business |
|
|
4 |
|
Sales |
|
|
4 |
|
Deliveries |
|
|
5 |
|
Prices |
|
|
5 |
|
Nickel |
|
|
5 |
|
Copper |
|
|
6 |
|
Other Metals |
|
|
6 |
|
Results of Operations |
|
|
7 |
|
Customers |
|
|
7 |
|
Competitors |
|
|
7 |
|
Inventories |
|
|
7 |
|
Nickel Unit Cash Cost of Sales |
|
|
7 |
|
Business Segment Information |
|
|
9 |
|
Nickel |
|
|
9 |
|
Applications for Nickel |
|
|
9 |
|
Historical Review of the Nickel Industry; Recent Industry Conditions |
|
|
10 |
|
Participants in the Nickel Industry |
|
|
15 |
|
Incos Position in the Nickel Industry |
|
|
16 |
|
Inco Special Products |
|
|
16 |
|
Copper |
|
|
17 |
|
Other Primary Metals and Related Products |
|
|
18 |
|
Mining and Production |
|
|
19 |
|
General |
|
|
19 |
|
Capital Expenditures |
|
|
21 |
|
Mining and Mine Production |
|
|
21 |
|
Concentrating, Smelting and Refining |
|
|
26 |
|
Ore Reserves and Mining Rights |
|
|
27 |
|
Ore Reserves |
|
|
27 |
|
Mineral
Resources |
|
|
33 |
|
Mining and Other Rights |
|
|
37 |
|
PT International Nickel Indonesia Tbk |
|
|
40 |
|
General |
|
|
40 |
|
Contract of Work Extension and 1999 Expansion of Facilities |
|
|
43 |
|
Operations |
|
|
44 |
|
Sales |
|
|
45 |
|
Voiseys Bay Nickel Company Limited |
|
|
45 |
|
Voiseys Bay Deposits |
|
|
45 |
|
Environmental Review Process |
|
|
46 |
|
Arrangements with Aboriginal Groups |
|
|
46 |
|
Arrangements with the Provincial Government |
|
|
47 |
|
Project Phases |
|
|
48 |
|
Goro Nickel S.A.S. |
|
|
48 |
|
Goro Deposits |
|
|
48 |
|
Ownership of Goro Nickel |
|
|
50 |
|
Goro Project |
|
|
51 |
|
Project Review Process |
|
|
51 |
|
i
|
|
|
|
|
Fiscal Regime |
|
|
52 |
|
Girardin Act Financing |
|
|
52 |
|
New Caledonia |
|
|
54 |
|
Prony West Deposit |
|
|
54 |
|
Exploration and Mine Development |
|
|
54 |
|
Research and Development |
|
|
59 |
|
Metals Recycling |
|
|
60 |
|
Environment, Health and Safety |
|
|
61 |
|
Environmental and Health and Safety Management Systems |
|
|
61 |
|
Environment, Health and Safety Audits |
|
|
61 |
|
SO2 Emissions |
|
|
62 |
|
Port Colborne and Sudbury Soils |
|
|
63 |
|
Decommissioning and Reclamation |
|
|
67 |
|
Re-vegetation Programs |
|
|
67 |
|
PT Inco |
|
|
68 |
|
Future
Removal and Site Restoration; Closure and Post-Closure Plans |
|
|
68 |
|
Health and Safety |
|
|
70 |
|
Regulation of Nickel and Other Nonferrous Metals |
|
|
73 |
|
Other Environmental Control Regulations |
|
|
80 |
|
Employees |
|
|
80 |
|
Exmibal |
|
|
81 |
|
Miscellaneous Investments |
|
|
82 |
|
Other Information |
|
|
82 |
|
Shareholder Rights Plan |
|
|
82 |
|
Proposed Acquisition of Falconbridge Limited |
|
|
83 |
|
Items 1A. Risk Factors |
|
|
85 |
|
Items 1B. Unresolved Staff Comments |
|
|
85 |
|
Item 3. Legal Proceedings |
|
|
85 |
|
Item 4. Submission of Matters to a Vote of Security Holders |
|
|
85 |
|
Item 5. Markets for Inco Limiteds Common Shares, Related Shareholder Matters
and Inco Limiteds Issuances or Purchases of Equity Securities |
|
|
86 |
|
Common Shares |
|
|
86 |
|
Market Information |
|
|
86 |
|
Issuance of Unregistered Securities |
|
|
86 |
|
Holders of Common Shares |
|
|
86 |
|
Dividends |
|
|
86 |
|
Common Share Purchase Warrants |
|
|
87 |
|
Other Information |
|
|
87 |
|
Class VBN Shares |
|
|
88 |
|
Preferred Shares |
|
|
88 |
|
Certain Provisions of the Preferred Shares as a Class |
|
|
88 |
|
Securities Authorized for Issuance Under Equity Compensation Plans |
|
|
89 |
|
Other Information |
|
|
89 |
|
Item 6. Selected Financial Data |
|
|
91 |
|
Item 7. Managements Discussion and Analysis of Financial Condition and Results of Operations |
|
|
93 |
|
Overview |
|
|
93 |
|
Nature of our Business |
|
|
93 |
|
Key Factors Affecting our Business |
|
|
94 |
|
2005 Nickel Market Highlights |
|
|
96 |
|
2004 Nickel Market Highlights |
|
|
98 |
|
Results of Operations |
|
|
99 |
|
2005 Compared with 2004 |
|
|
99 |
|
Earnings Summary |
|
|
99 |
|
Nickel Production |
|
|
99 |
|
Copper Production |
|
|
100 |
|
Commencement of Voiseys Bay Operations |
|
|
100 |
|
ii
|
|
|
|
|
Net Sales |
|
|
100 |
|
Realized Prices |
|
|
101 |
|
Costs and Expenses/Other Income |
|
|
101 |
|
Cost of Sales and Other Expenses |
|
|
102 |
|
Selling, General and Administrative |
|
|
102 |
|
Currency Translation Adjustments |
|
|
102 |
|
Interest Expense |
|
|
102 |
|
Asset Impairment Charges |
|
|
102 |
|
Other Income, Net |
|
|
102 |
|
Income and Mining Taxes |
|
|
102 |
|
Minority Interest |
|
|
103 |
|
Nickel Unit Cash Cost of Sales |
|
|
103 |
|
Energy Costs and Relative Advantages |
|
|
104 |
|
Intermediates Segment |
|
|
104 |
|
Development Projects Segment |
|
|
105 |
|
2004 Compared with 2003 |
|
|
106 |
|
Earnings Summary |
|
|
106 |
|
Nickel Production |
|
|
106 |
|
Copper Production |
|
|
106 |
|
Net Sales |
|
|
106 |
|
Cost of Sale and Other Expenses |
|
|
107 |
|
Selling, General and Administrative |
|
|
107 |
|
Currency Translation Adjustments |
|
|
107 |
|
Interest Expense |
|
|
107 |
|
Asset Impairment Charges |
|
|
107 |
|
Other Income, Net |
|
|
107 |
|
Income and Mining Taxes |
|
|
108 |
|
Minority Interest |
|
|
108 |
|
Nickel Unit Cash Cost of Sales |
|
|
108 |
|
Energy Costs and Relative Advantages |
|
|
108 |
|
Intermediates Segment |
|
|
108 |
|
Cash Flows, Liquidity and Capital Resources |
|
|
110 |
|
2005 Compared with 2004 |
|
|
110 |
|
Operating Activities |
|
|
110 |
|
Investing Activities |
|
|
111 |
|
Financing Activities |
|
|
111 |
|
Reinstatement of Common Shares Dividend |
|
|
113 |
|
2004 Compared with 2003 |
|
|
113 |
|
Operating Activities |
|
|
113 |
|
Investing Activities |
|
|
114 |
|
Financing Activities |
|
|
114 |
|
Off-Balance Sheet Arrangements and Aggregate Contractual Obligations |
|
|
114 |
|
Contractual Obligations |
|
|
114 |
|
Contingencies and Guarantees |
|
|
115 |
|
Derivative Instrument Positions |
|
|
116 |
|
Other Off-Balance Sheet Arrangements |
|
|
119 |
|
Risks and Uncertainties |
|
|
119 |
|
Market Risk |
|
|
119 |
|
Metals and Commodities Risk |
|
|
121 |
|
Foreign Exchange Risk |
|
|
122 |
|
Interest Rate Risk |
|
|
123 |
|
Counterparty Risk |
|
|
123 |
|
Environment Risk |
|
|
123 |
|
Other Risks and Uncertainties |
|
|
127 |
|
PT Inco |
|
|
127 |
|
Risks
Associated with, and Importance of, Future Low-Cost Nickel Projects |
|
|
127 |
|
iii
|
|
|
|
|
Uncertainty of Production and Capital and Other Cost Estimates |
|
|
128 |
|
Goro |
|
|
128 |
|
Operations |
|
|
129 |
|
Construction Risks and Technological Risks |
|
|
129 |
|
Governmental Regulations |
|
|
130 |
|
Capital Requirements and Operating Risks |
|
|
130 |
|
Labour Relations |
|
|
131 |
|
Uncertainty of Ore/Mineral Reserve Estimates |
|
|
131 |
|
The Falconbridge Transaction |
|
|
132 |
|
Sensitivities |
|
|
132 |
|
Critical Accounting Policies and Estimates |
|
|
134 |
|
Depreciation and Depletion |
|
|
134 |
|
Impairment |
|
|
135 |
|
Asset Retirement Obligations |
|
|
135 |
|
Future Employee Benefits and Costs |
|
|
136 |
|
Income and Mining Taxes |
|
|
137 |
|
Accounting Changes |
|
|
137 |
|
Outlook |
|
|
138 |
|
Nickel Market Conditions |
|
|
138 |
|
Operations |
|
|
138 |
|
2006 Planned Capital Expenditures |
|
|
139 |
|
Pending Acquisition of Falconbridge |
|
|
139 |
|
Non-GAAP Financial Measure |
|
|
139 |
|
Other Information |
|
|
140 |
|
Item 7A. Quantitative and Qualitative Disclosures About Market Risk |
|
|
141 |
|
Item 8. Financial Statements and Supplementary Data |
|
|
142 |
|
Item 9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure |
|
|
187 |
|
Item 9A. Controls and Procedures |
|
|
187 |
|
Item 9B. Other Information |
|
|
187 |
|
Item 10. Directors and Executive Officers of Inco Limited |
|
|
188 |
|
Directors |
|
|
188 |
|
Executive Officers |
|
|
188 |
|
Code of Ethics |
|
|
189 |
|
Item 11. Executive Compensation |
|
|
189 |
|
Item 12. Security Ownership of Certain Beneficial Owners and Management |
|
|
189 |
|
Security Ownership of Certain Beneficial Owners and Management |
|
|
189 |
|
Changes in Control |
|
|
189 |
|
Item 13. Certain Relationships and Related Transactions |
|
|
190 |
|
Item 14. Principal Accountant Fees and Services |
|
|
190 |
|
Item 15. Exhibits, Financial Statement Schedules, and Reports on Form 8-K |
|
|
191 |
|
Signatures |
|
|
194 |
|
Consent of Independent Auditors |
|
|
196 |
|
iv
PART I
|
|
|
Items 1. and 2. |
|
Business and Properties of Inco Limited |
Introduction
Inco Limited (Inco, the Company, we or us) was incorporated in 1916 under the
laws of Canada, succeeding a business established in 1902. In 1979, Inco was continued by articles
of continuance under the Canada Business Corporations Act and is governed by that Act. Our
executive offices are located at 145 King Street West, Suite 1500, Toronto, Ontario, Canada M5H
4B7. Unless the context otherwise requires, all references in this Report to Inco, the
Company, we, our or us include all of its consolidated subsidiaries, unincorporated units
and divisions.
Inco is one of the worlds premier mining and metals companies. We are a leading producer of
nickel, a hard, malleable metal which, given its properties and wide range of applications, can be
found in thousands of products. We are also an important producer of copper, precious metals and
cobalt and a major producer of value-added specialty nickel products. We also produce sulphuric
acid and liquid sulphur dioxide as by-products from our processing operations in Sudbury, Ontario.
Our principal mines and processing operations are located in the Sudbury area of Ontario, the
Thompson area of Manitoba, Voiseys Bay in Newfoundland and Labrador, and, through a subsidiary in
which we have an equity interest of approximately 61 per cent, PT International Nickel Indonesia
Tbk (PT Inco), on the Island of Sulawesi, Indonesia (see PT International Nickel Indonesia Tbk
below). We also operate additional wholly-owned metals refineries at Port Colborne, Ontario and in
the United Kingdom at Clydach, Wales and Acton, England. We also have interests in nickel refining
capacity in the following Asian countries: in Japan, through Inco TNC Limited (ITL), in which we
have an equity interest of 67 per cent; in Taiwan, through Taiwan Nickel Refining Corporation
(Taiwan Nickel), in which we have an equity interest of 49.9 per cent; and in South Korea,
through Korea Nickel Corporation (Korea Nickel), in which we have an equity interest of 25 per
cent. In addition, we have a 65 per cent equity interest in Jinco Nonferrous Metals Co., Ltd., a
company that produces nickel salts in Kunshan City, Peoples Republic of China (China). We also
have joint venture operations in China, through Inco Advanced Technology Materials (Dalian) Co.,
Ltd. (Dalian), in which we have a total direct and indirect equity interest of 81.6 per cent, and
Inco Advanced Technology Materials (Shenyang) Co., Ltd. (Shenyang), in which we have a total
direct and indirect equity interest of 82 per cent. In March 2005, Shenyang acquired substantially
all of the assets which represented the nickel foam business of Shenyang Golden Champower New
Materials Corp., a leading Chinese producer of nickel foam. These two ventures in China produce
nickel foam products for the Asian battery market. We also have a shearing and packaging operation
in China for certain nickel products to meet the specific needs of this geographic market.
The first nickel concentrates were produced in September 2005 at our wholly-owned Voiseys Bay
nickel-copper-cobalt project in the Province of Newfoundland and Labrador, Canada. The first
shipments of nickel concentrates from the Voiseys Bay project were made to Incos operations in
Sudbury, Ontario and Thompson, Manitoba in November 2005 and the first production of finished
nickel from these concentrates occurred in January 2006. In October 2005, Incos demonstration
plant, part of the initial phase of this project, was completed and began operations at Argentia in
the Province of Newfoundland and Labrador. This facility is being used to test proprietary
hydrometallurgical processing technologies to treat Voiseys Bay nickel concentrates as part of our
research and development program covering those processes, a program which is scheduled to run
until late 2007. For further information on the Voiseys Bay project and related matters, see
Voiseys Bay Nickel Company Limited below.
Inco is also currently developing another major new greenfield project, the Goro
nickel-cobalt project in the French overseas territorial community (collectivité territoriale) of
New Caledonia (New Caledonia). We currently hold a 71 per cent interest in the project company,
Goro Nickel S.A.S. (Goro Nickel), following the capitalization of certain shareholder advances in
late February 2005, the sale of shares representing a 21 per cent interest in Goro Nickel to a
joint venture between Sumitomo Metal Mining Co., Ltd. and Mitsui & Co., Ltd. of Japan on April 8,
2005 and, taking into account the additional capital contribution we have made to Goro Nickel as a
result of the election by Société de Participation Minière du Sud Calédonien SAS (SPMSC), a
company formed by the three provinces of New Caledonia which acquired an initial 10 per cent
interest in Goro Nickel in February 2005, not to make certain pro-rata capital contributions to the
project since it became a shareholder in Goro Nickel in February 2005. Having announced our
decision to proceed with the project in October 2004 after the completion of our comprehensive
review of the project, we have moved the project forward on a phased approach, with the first phase
focusing on engineering, contract development and permitting. Engineering was about 70 per cent
complete as of year-end 2005 and approximately 900 construction personnel were on site, initially
focusing on earthworks for the process plant, the residue storage facility and road realignment.
We are also building some 400 process plant modules and pre-finished units for the process plant in
the Philippines which are expected to be delivered to the Goro site beginning in April 2006. We
expect to have a definitive capital cost estimate by the second quarter of 2006 when engineering is
1
expected to be at least 80 per cent complete and all major contracts are expected to have been
awarded. The expected initial start-up of the project remains in late 2007. For further
information on the Goro project and related matters, see Goro Nickel S.A.S. below.
On October 11, 2005, Inco and Falconbridge Limited (Falconbridge) announced that their
respective Boards of Directors had approved the acquisition by Inco of all of the outstanding
common shares of Falconbridge by way of a friendly take-over bid. The combined organization which
would be created by the pending transaction would be one of the worlds premier mining and metals
companies in both nickel and copper, with one of the mining industrys most attractive portfolios
of low-cost, profitable growth projects. Our offer, which was mailed to Falconbridge common
shareholders on October 24, 2005 (the Offer), is conditional upon at least 66 2/3 per cent of the
common shares of Falconbridge being tendered, the receipt of all necessary regulatory clearances
and certain other conditions. The Offer was initially open for acceptance until December 23, 2005
but has been extended on three occasions in order to provide additional time to obtain the required
regulatory clearances. It is currently open for acceptance by Falconbridge common shareholders
until June 30, 2006. We currently expect to take up and pay for the Falconbridge common shares
tendered to the Offer prior to this date or shortly thereafter. For further information on this
transaction, see Proposed Acquisition of Falconbridge Limited below.
Incos properties are described under Description of Business and Ore Reserves and Mining
Rights below.
The information in this Report is as of December 31, 2005 except where an earlier or later
date is expressly indicated. Nothing included herein should be considered as implying that any
information is correct as of any date other than December 31, 2005, except as otherwise expressly
stated.
In this Report, certain data and estimates which had been previously limited to the Western
World or the Western World plus China because of limited available data from certain countries or
regions have been reported on a global or worldwide basis.
Availability of Documents
Inco files Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q and Current
Reports on Form 8-K with the Securities and Exchange Commission (the SEC). You may read and copy
any materials we file with the SEC at the SECs Public Reference Room at 100 F Street, N.E.,
Washington, DC 20549. You may obtain information on the hours of operation of the SECs Public
Reference Room by calling the SEC at 1-800-SEC-0330. The SEC maintains an Internet site
(http://www.sec.gov) that contains reports, proxy and information statements, and other information
regarding issuers that file electronically with the SEC. Such reports and all amendments to such
reports regarding Inco are available free of charge on our website, www.inco.com, as soon as
reasonably practicable after such reports are electronically filed with the SEC. Information
contained in or otherwise accessed through our website or any other website does not form part of
this Report. All such references to websites are inactive textual references only.
Cautionary Statement Regarding Forward-Looking Statements and Forward-Looking Information
Certain statements contained in this Report are forward-looking statements (as defined in
the U.S. Securities Exchange Act of 1934) or contain forward-looking information (as defined in the
Ontario Securities Act). Examples of such statements include, but are not limited to, statements
concerning: (1) the price volatility for nickel and other primary metal products produced by the
Company; (2) the demand for and supply of nickel, copper and other metals, both globally and for
certain markets and uses, as well as the availability of, and prices for, and the Companys
requirements for, intermediate products containing nickel purchased by the Company and/or to be
produced by the Company and nickel-containing stainless steel scrap and other substitutes for
primary nickel and nickel inventories; (3) the premiums realized by the Company over London Metal
Exchange (LME) cash prices and the sensitivity of the Companys results of operations to changes
in metals prices, prices of commodities and other supplies used in its operations, interest and
exchange rates, and our common share price; (4) the Companys strategies and plans and level of
capital expenditures and contributions thereto from third parties; (5) the Companys nickel unit
cash cost of sales before and after by-product credits, interest and other expenses; (6) the
Companys energy and other costs, and pension contributions and expenses and assumptions relating
thereto; (7) the Companys position as a low-cost producer of nickel; (8) the Companys debt-equity
ratio and tangible net worth; (9) the political unrest or instability in countries (such as
Indonesia) in which the Company and its subsidiaries (such as PT Inco) operate and the impact
thereof on the Company; (10) construction, commissioning, initial start-ups, shipments and other
schedules, capital costs and other aspects of the Goro and Voiseys Bay projects and PT Incos
latest program start-ups to increase its production, changes in the ownership of the Goro project,
capital expenditures, and hydroelectric power generation at PT Inco and the effect thereon of lower
water levels; (11) receipt of funds under the necessary financing plans and arrangements for, and
partner or similar investment and other agreements or arrangements associated with, the Goro
project, and the timing of the start of production and the costs of construction with respect to,
the issuance of the necessary permits and other authorizations required for,
2
and engineering and construction timetables for, the Goro project and the additional phases of
the Voiseys Bay project; (12) the Companys estimates of the quantity and quality of its
ore/mineral reserves and mineral resources, exploration and drilling schedules and the timing of
completion of feasibility assessments of the Companys reserves; (13) planned capital expenditures
and tax payments; (14) the Companys costs of production, deliveries of products, and production
levels for 2006 and beyond, including the costs of and potential impact on operations and
production of complying with existing and proposed environmental laws and regulations and net
reductions in environmental emissions; (15) the impact of changes in Canadian dollar-U.S. dollar
and other exchange rates on the Companys costs and the results of its operations; (16) the
Companys sales of specialty nickel products; (17) the Companys cost reduction and other financial
and operating objectives and planned maintenance and other shutdowns; (18) the commercial viability
of new production processes and process changes and processing recoveries for its development
projects; (19) the Companys productivity, exploration and research and development initiatives as
well as environmental, health and safety initiatives; (20) the negotiation of collective agreements
with its unionized employees; (21) the Companys sales organization and personnel requirements;
(22) business and economic conditions; (23) the extension of current mining and other leases,
export licences and concessionary rights; (24) third party tolling, smelting and refining
arrangements; and (25) factors relating to the Offer made by the Company to the common shareholders
of Falconbridge to purchase all of the outstanding common shares of Falconbridge and the results
expected to be achieved from the successful completion of the Offer and the combination of the
Company and Falconbridge, including the timing and conditions to receipt of required regulatory
clearances, the synergies and cost savings expected to be achieved and the timing thereof; the
increased market capitalization, share price multiple and improved liquidity of the Companys
shares; the improved cash flow and earnings of the Company; statements regarding strategies,
objectives, goals and targets; and the financial position and international presence that would
permit the combined company to better compete against global mining companies. Inherent in
forward-looking statements and forward-looking information are risks and uncertainties that are
well beyond the Companys ability to predict or control. Actual results and developments are likely
to differ, and may differ materially, from those expressed or implied by the forward-looking
statements and forward-looking information contained in this Report.
Such forward-looking statements and forward-looking information are based on a number of
assumptions which may prove to be incorrect, including, but not limited to, assumptions about:
business and economic conditions generally; exchange rates, availability and cost of energy and
other anticipated and unanticipated costs and pension contributions and expenses; the supply and
demand for, deliveries of, and the level and volatility of prices of, nickel, copper, cobalt,
aluminum, zinc and other primary metals products, purchased intermediates and nickel-containing
stainless steel scrap and other substitutes and competing products for the primary nickel and other
metal products the Company produces; the timing and quantities of available Voiseys Bay
intermediate nickel and copper concentrates and the feasibility and timing of the development of
the hydrometallurgical process at Voiseys Bay; the timing of the receipt of remaining regulatory
and governmental approvals for the Goro project and other operations; the continued availability of
financing on appropriate terms, including through partner or other participation arrangements in
the case of the Goro project, for the Companys development projects; the Companys costs of
production and production and productivity levels, as well as those of the Companys competitors;
our ability to continue to pay quarterly cash dividends in amounts as our Board of Directors may
determine in light of other uses for such funds; metal recovery rates and ore recovery and dilution
factors; engineering and construction timetables and capital and operating costs for the Goro and
Voiseys Bay projects and PT Incos latest expansion program; market competition; mining,
processing, exploration and research and development activities and methods; the accuracy of
ore/mineral reserve and mineral resource estimates; premiums realized over LME cash and other
benchmark prices; tax benefits/charges; the resolution of environmental reviews and environmental
and other proceedings and the impact on the Company of various environmental regulations and
initiatives; the ability to obtain or renew permits, licences, leases and concessions; assumptions
concerning political and economic stability and expectations of inflation in Indonesia and other
countries or locations in which the Company operates or otherwise; and the Companys ongoing
relations with its employees at its operations throughout the world. In addition to the foregoing,
forward-looking statements and forward-looking information relating to the Offer, its completion
and the consequences thereof are based on a number of assumptions which may prove to be incorrect,
including, but not limited to, assumptions respecting Falconbridge and its operations and plans,
the ability of the Company to successfully compete against global metals and mining and exploration
companies by creating through the combination of the Company and Falconbridge an enterprise of
increased scale; continued strong demand for nickel, copper and other metals in emerging markets
such as China; the level of pre-tax operating and other synergies and cost savings, and other
benefits to be realized based on the achievement of operational efficiencies from restructuring,
integration and other initiatives relating to the combination; the approvals or clearances required
to be obtained by the Company and Falconbridge from regulatory and other agencies and bodies being
obtained in a timely manner; divestitures required by regulatory agencies being acceptable and
completed in a timely manner; there being limited costs, difficulties or delays relating to the
integration of Falconbridges operations with those of the Company; and the timely completion of
the steps required to be taken for the eventual combination and integration of the two companies.
The forward-looking statements and forward-looking information included in this Report
represent the Companys views as of the date of this Report. While the Company anticipates that
subsequent events and developments may cause the Companys views to
3
change, the Company specifically disclaims any obligation to update these forward-looking
statements and forward-looking information. These forward-looking statements and forward-looking
information should not be relied upon as representing the Companys views as of any date subsequent
to the date of this Report. Although the Company has attempted to identify important factors or
assumptions that could cause actual actions, events or results to differ materially from those
described in forward-looking statements and forward-looking information, there may be other factors
that cause actions, events or results not to be as anticipated, estimated or intended. There can
be no assurance that forward-looking statements and forward-looking information will prove to be
accurate, as actual results and future events could differ materially from those anticipated in
such statements. Accordingly, readers of this Report should not place undue reliance on
forward-looking statements and forward-looking information. These factors are not intended to
represent a complete list of the factors that could affect the Company. Additional factors are
noted elsewhere in this Report.
Material Assumptions
A number of assumptions were made by Inco in connection with certain forward-looking
statements and forward-looking information for 2006 and beyond included in this Report and in
connection with our pending acquisition of Falconbridge. These assumptions include estimates on
the U.S. dollar-Canadian dollar exchange rate for 2006, global industrial production and in key
geographic markets, interest rates, global nickel and other metals demand and supply and in key
geographical markets, growth in the key end-use markets for the metals produced by the Company,
that we would not have any labour, equipment or other disruptions at any of our operations of any
significance in 2006 other than any planned maintenance or similar shutdowns and that any third
parties which we are relying on to supply purchased intermediates or provide toll smelting or other
processing do not experience any unplanned disruptions. Some of the material assumptions made by
us involve confidential or particularly sensitive information and, accordingly, we do not believe
it is appropriate to disclose such assumptions for competitive or other business reasons.
Forward-looking statements and forward-looking information for time periods subsequent to 2006
involve longer term assumptions and estimates than forward-looking statements and forward-looking
information for 2006 and are consequently subject to greater uncertainty. Therefore, the reader is
especially cautioned not to place undue reliance on such long-term forward-looking statements and
forward-looking information.
Description of Business
Sales
The following table shows Incos net sales to customers for the three years ended
December 31, 2005:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
(in millions) |
|
Primary nickel |
|
$ |
3,655 |
|
|
$ |
3,503 |
|
|
$ |
2,109 |
|
Copper |
|
|
463 |
|
|
|
364 |
|
|
|
171 |
|
Precious metals (1) |
|
|
267 |
|
|
|
246 |
|
|
|
114 |
|
Cobalt |
|
|
57 |
|
|
|
72 |
|
|
|
17 |
|
Other (2) |
|
|
76 |
|
|
|
93 |
|
|
|
63 |
|
|
|
|
|
|
|
|
|
|
|
Net sales to customers |
|
$ |
4,518 |
|
|
$ |
4,278 |
|
|
$ |
2,474 |
|
|
|
|
|
|
|
|
|
|
|
(1) Excludes toll-refined materials.
(2) Representing principally sales of sulphuric acid, liquid sulphur dioxide, miscellaneous
primary metals products, reprocessed waste materials and certain price adjustments.
4
Deliveries
The following table shows deliveries of Incos principal primary metals and related
products for the three years ended December 31, 2005:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005 |
|
2004 |
|
2003 |
Nickel, including intermediates(1) (tonnes)(2) |
|
|
246,282 |
|
|
|
251,882 |
|
|
|
213,890 |
|
Copper(3) (tonnes) |
|
|
120,543 |
|
|
|
124,884 |
|
|
|
93,335 |
|
Cobalt (tonnes) |
|
|
1,694 |
|
|
|
1,542 |
|
|
|
903 |
|
Platinum(4) (troy ounces, in thousands) |
|
|
172 |
|
|
|
183 |
|
|
|
83 |
|
Palladium(4) (troy ounces, in thousands) |
|
|
220 |
|
|
|
221 |
|
|
|
101 |
|
Rhodium(4) (troy ounces, in thousands) |
|
|
16 |
|
|
|
9 |
|
|
|
17 |
|
Ruthenium(4) (troy ounces, in thousands) |
|
|
2 |
|
|
|
3 |
|
|
|
2 |
|
Iridium(4) (troy ounces, in thousands) |
|
|
5 |
|
|
|
4 |
|
|
|
6 |
|
Gold(4) (troy ounces, in thousands) |
|
|
76 |
|
|
|
80 |
|
|
|
50 |
|
Silver(4) (troy ounces, in thousands) |
|
|
1,429 |
|
|
|
1,990 |
|
|
|
1,435 |
|
Sulphuric acid and liquid sulphur dioxide (tonnes) |
|
|
695,000 |
|
|
|
747,000 |
|
|
|
548,000 |
|
|
|
|
(1) |
|
Includes 22,471 tonnes in 2005, 16,697 tonnes in 2004 and 29,780 tonnes in
2003 purchased by Inco. |
|
(2) |
|
A tonne is a metric unit equal to approximately 2,204.6 pounds. |
|
(3) |
|
Includes 1,133 tonnes in 2003 purchased by Inco. |
|
(4) |
|
Excludes toll-refined materials. |
Prices
Nickel
Incos nickel price realizations tend to lag LME cash nickel price movements due
primarily to the terms of its contractual sales arrangements with certain of its customers. The
LME, a physical market where various metals, including nickel, can be bought or sold for prompt or
future delivery, represents the principal terminal market for primary nickel in the world. We
realize a premium over prevailing LME cash prices for many of our finished nickel products,
including certain of our nickel powders and other value-added products discussed under Inco
Special Products below.
Our average realized price for our primary nickel products, including intermediates and
purchased products, was $14,842 per tonne ($6.73 per pound) in 2005, representing an increase of
seven per cent from the average price of $13,906 per tonne ($6.31 per pound) in 2004 and an
all-time record average realized nickel price for Inco. The 2004 average realized price was 41 per
cent higher than the average price of $9,860 per tonne ($4.47 per pound) in 2003.
The price realizations for our nickel and other primary metals products generally reflect LME
or other metal market prices and, over the longer term, depend principally upon the balance between
demand for our products in the marketplace relative to the supply available from us and our
competitors, including for this purpose similar primary metals materials in various producer,
merchant and consumer inventories, inventories of secondary or scrap materials containing nickel
and other metals in usable or recyclable form, and supplies of other materials which may compete as
substitutes. Of particular importance is the availability of nickel-containing stainless steel
scrap, which competes directly with primary nickel as a source of nickel for use in the production
of stainless steel and certain other industrial applications. The stainless steel scrap ratio, or
the proportion or ratio of nickel-containing stainless steel scrap relative to the total nickel
(including primary nickel) consumed by stainless steel producers, was 49 per cent in 2005, compared
with 47 per cent in 2004 and 44 per cent in 2003. The applications for nickel and variations in
demand for and supply of nickel are discussed under Nickel below.
For information on Incos hedging transactions relating to nickel, see Off-Balance Sheet
Arrangements and Aggregate Contractual Obligations Derivative Instrument Positions in
Managements Discussion and Analysis of Financial Condition and Results of Operations under Item
7 of this Report and Notes 1, 19 and 24(h) to the financial statements under Item 8 of this Report.
5
The average prices, per tonne and per pound, realized by Inco for its primary nickel products,
including intermediates and purchased products, for the five years ended December 31, 2005,
including by quarter for 2005, are shown in the following table:
|
|
|
|
|
|
|
|
|
Year |
|
Nickel |
|
|
($ per tonne) |
|
($ per pound) |
2001 |
|
|
6,468 |
|
|
|
2.93 |
|
2002 |
|
|
7,143 |
|
|
|
3.24 |
|
2003 |
|
|
9,860 |
|
|
|
4.47 |
|
2004 |
|
|
13,906 |
|
|
|
6.31 |
|
|
|
|
|
|
|
|
|
|
2005 |
|
|
|
|
|
|
|
|
First Quarter |
|
|
15,312 |
|
|
|
6.95 |
|
Second Quarter |
|
|
16,578 |
|
|
|
7.52 |
|
Third Quarter |
|
|
14,857 |
|
|
|
6.74 |
|
Fourth Quarter |
|
|
12,780 |
|
|
|
5.80 |
|
Year |
|
|
14,842 |
|
|
|
6.73 |
|
Copper
Incos average realized price for copper was $3,839 per tonne ($1.74 per pound) in 2005,
representing an increase of 32 per cent from the average realized price of $2,916 per tonne ($1.32
per pound) in 2004. The 2004 average realized price was 59 per cent higher than the average
realized price of $1,832 per tonne ($0.83 per pound) in 2003.
The average prices, per tonne and per pound, realized by us for copper, including purchased
products, for the five years ended December 31, 2005, including by quarter for 2005, are shown in
the following table:
|
|
|
|
|
|
|
|
|
Year |
|
Copper |
|
|
($ per tonne) |
|
($ per pound) |
2001 |
|
|
1,668 |
|
|
|
0.76 |
|
2002 |
|
|
1,629 |
|
|
|
0.74 |
|
2003 |
|
|
1,832 |
|
|
|
0.83 |
|
2004 |
|
|
2,916 |
|
|
|
1.32 |
|
|
|
|
|
|
|
|
|
|
2005 |
|
|
|
|
|
|
|
|
First Quarter |
|
|
3,365 |
|
|
|
1.53 |
|
Second Quarter |
|
|
3,427 |
|
|
|
1.56 |
|
Third Quarter |
|
|
3,921 |
|
|
|
1.78 |
|
Fourth Quarter |
|
|
4,528 |
|
|
|
2.05 |
|
Year |
|
|
3,839 |
|
|
|
1.74 |
|
Other Metals
The average prices, per tonne or per troy ounce, realized by Inco for cobalt, the
principal platinum-group metals (platinum, palladium and rhodium), gold and silver, all of which
are produced primarily from our Ontario ores, for the five years ended December 31, 2005 are shown
in the following table:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year |
|
Cobalt |
|
Platinum |
|
Palladium |
|
Rhodium |
|
Gold |
|
Silver |
|
|
($ per tonne) |
|
|
|
|
|
($ per troy ounce) |
|
|
|
|
|
|
|
|
2001 |
|
|
23,216 |
|
|
|
541.27 |
|
|
|
711.32 |
|
|
|
1,475.85 |
|
|
|
270.50 |
|
|
|
4.40 |
|
2002 |
|
|
15,124 |
|
|
|
545.92 |
|
|
|
419.70 |
|
|
|
804.59 |
|
|
|
309.17 |
|
|
|
4.58 |
|
2003 |
|
|
18,846 |
|
|
|
588.96 |
|
|
|
297.36 |
|
|
|
530.66 |
|
|
|
367.72 |
|
|
|
4.86 |
|
2004 |
|
|
46,442 |
|
|
|
762.73 |
|
|
|
225.56 |
|
|
|
1,166.85 |
|
|
|
398.68 |
|
|
|
6.73 |
|
2005 |
|
|
32,828 |
|
|
|
841.27 |
|
|
|
209.46 |
|
|
|
2,055.55 |
|
|
|
423.21 |
|
|
|
7.06 |
|
For information on our hedging transactions relating to these metals, see Off-Balance Sheet
Arrangements and Aggregate Contractual Obligations Derivative Instrument Positions under Item 7
of this Report and Notes 1, 19 and 24(h) to the financial statements under Item 8 of this Report.
6
Results of Operations
All financial statement information in this Report is based on our financial statements
prepared in accordance with generally accepted accounting principles (GAAP) in Canada. A
reconciliation of our Canadian GAAP financial statements to United States GAAP is presented in Note
24 to the financial statements under Item 8 of this Report.
Customers
As in recent years, sales of Incos primary metals products in 2005 were concentrated in
the United States, Europe, Japan, other countries in Asia, and Canada, with sales of nickel to
customers in Asia representing about 60 per cent of its total nickel sales revenues for 2005. For
further information, see Incos Position in the Nickel Industry below.
No single non-affiliated customer of Inco accounted for more than 10 per cent of total sales
in 2005, 2004 or 2003.
See Nickel, Copper and Other Primary Metals and Related Products below for additional
information on the Companys customers.
Competitors
A discussion of the competitive conditions in the nickel industry appears under Nickel
below. Competitive conditions with respect to our other primary metals and related products are
discussed under Copper and Other Primary Metals and Related Products below.
Inventories
Incos general practice is to sell its principal primary metals products at the time of
production and not to hold inventories except as necessary to meet its current sales requirements.
Our finished nickel inventories at the end of each of the five years ended December 31, 2005 are
shown in the following table:
|
|
|
|
|
|
|
Incos Finished |
Year-end |
|
Nickel |
|
|
(in tonnes) |
2001 |
|
|
26,517 |
|
2002 |
|
|
23,126 |
|
2003 |
|
|
25,604 |
|
2004 |
|
|
27,334 |
|
2005 |
|
|
23,444 |
|
Historically, we have believed that the minimum finished nickel inventories we generally need
to run our business and meet our customers requirements should be about 26,000 tonnes, depending
upon the required product mix and other factors. We expect to continue to evaluate the factors to
be considered in determining what our minimum inventory level should be.
Nickel Unit Cash Cost of Sales
Since this cost measure captures our key costs of production and the effect of prices for
our by-products, nickel unit cash cost of sales after by-product credits represents a key
performance measurement that management uses to manage our costs and operations.
Nickel unit cash cost of sales before by-product credits, representing a calculation equal to
the total of all cash costs incurred to produce a unit of nickel before the deduction of
contributions from by-products sold divided by Inco-source nickel deliveries, increased to $6,702
per tonne ($3.04 per pound) in 2005 from $5,732 per tonne ($2.60 per pound) in 2004. For 2005, the
increase in nickel unit cash cost of sales before by-product credits was principally due to (i) the
higher average Canadian U.S. dollar exchange rate which adversely affected our costs incurred in
Canadian dollars, (ii) higher costs for heavy fuel oil and diesel fuel at PT Inco, (iii) higher
electricity and natural gas prices at our Ontario operations, (iv) higher spending on supplies and
services, and (v) lower nickel production, partially offset by approximately $40 million of net
cost reductions and related savings achieved in 2005. In addition, we experienced lower costs for
purchased intermediates due to lower volumes processed at our Canadian operations in 2005 partially
offset by higher benchmark prices upon which such purchases are made. In 2004, nickel unit cash
cost of sales before by-
7
product credits of $5,732 per tonne ($2.60 per pound) increased from $4,453 per tonne ($2.02
per pound) in 2003. For 2004, the increase in nickel unit cash cost of sales before by-product
credits was principally due to (i) the higher cost for, and volumes of, purchased nickel
intermediates, (ii) the higher average Canadian dollar-U.S. dollar exchange rate compared with
2003, (iii) higher costs for heavy oil at PT Inco, (iv) higher spending on supplies and services
primarily as a result of increased production rates, and (v) higher earnings-based compensation
payments, partially offset by the absence of ramp-up costs which we incurred in the third quarter
of 2003 after the end of a strike at our Ontario operations, and the cost reductions and related
savings as discussed below.
Nickel unit cash cost of sales after by-product credits increased to $5,842 per tonne ($2.65
per pound) in 2005 from $5,115 per tonne ($2.32 per pound) in 2004. For 2005, the increase in
nickel unit cash cost of sales after by-product credits was due to higher unit cash cost of sales
before by-product credits, partially offset by an increase in by-product credits. The increase in
by-product credits was primarily due to higher realized prices for copper and certain PGMs
partially offset by higher production costs for copper and lower deliveries of certain PGMs. In
2004, nickel unit cash cost of sales after by-product credits of $5,115 per tonne ($2.32 per pound)
increased from $4,740 per tonne ($2.15 per pound) in 2003. For 2004, the increase in nickel unit
cash cost of sales after by-product credits was due to higher nickel unit cash cost of sales before
by-product credits, partially offset by higher by-product credits as a result of higher realized
selling prices for and higher deliveries of our principal by-products.
We have used, and expect to continue to use, at least in 2006, purchased nickel intermediates
to increase processing capacity utilization at our Ontario and Manitoba operations. While the cost
of purchased nickel intermediates is higher than that for processing our own mine production and
such costs increase as the prevailing prices, LME cash nickel or other benchmark prices, on which
this material is purchased by us increases, the price realizations are also higher, resulting in
margins on these purchases remaining relatively unchanged.
A reconciliation of our nickel unit cash cost of sales before and after by-product credits to
cost of sales under Canadian GAAP for the periods indicated is shown in the table entitled
Reconciliation of Nickel Unit Cash Cost of Sales Before and After By-Product Credits to Canadian
GAAP Cost of Sales under Non-GAAP Financial Measure in Managements Discussion and Analysis of
Financial Condition and Results of Operations under Item 7 of this Report.
In 2005, Inco realized net cost reductions and related savings of $40 million, which was below
our target of $60 million for the year. In 2004, we realized cost reductions and related savings
of $59 million.
Incos nickel unit cash cost of sales, both before and after by-product credits, for the five
years ended December 31, 2005 are shown in the following table:
|
|
|
|
|
|
|
|
|
|
|
Nickel Unit Cash |
|
Nickel Unit Cash |
|
|
Cost of Sales |
|
Cost of Sales |
|
|
Before By- |
|
After By- |
Year |
|
Product Credits |
|
Product Credits |
|
|
($ per pound) |
2001 |
|
|
1.56 |
|
|
|
1.35 |
|
2002 |
|
|
1.58 |
|
|
|
1.45 |
|
2003 |
|
|
2.02 |
|
|
|
2.15 |
|
2004 |
|
|
2.60 |
|
|
|
2.32 |
|
2005 |
|
|
3.04 |
|
|
|
2.65 |
|
Based upon the average exchange rate for the year, the Canadian dollar, the currency in which
a substantial portion of our operating costs are incurred, increased by 7.2 per cent relative to
the U.S. dollar in 2005. In 2004, the Canadian dollar increased by 7.5 per cent relative to the
U.S. dollar. At December 31, 2005, the value of the Canadian dollar relative to the U.S. dollar
was $0.858, compared with $0.831 at December 31, 2004 and $0.774
at December 31, 2003, and was $0.861
at March 13, 2006. At December 31, 2005, we had outstanding forward currency contracts to purchase
Cdn.$21 million at an average exchange rate of $0.845 during 2006. The purpose of these contracts
is to eliminate the risk of exchange rate movements on a portion of the future construction costs
of certain capital projects at our Ontario operations. For further information on these contracts
and a discussion of the sensitivity of foreign currency exchange rates on the Companys earnings,
see Managements Discussion and Analysis of Financial Condition and Results of Operations under
Item 7 of this Report.
8
For information regarding Incos profit sharing and incentive arrangements and the collective
agreements with our unionized employees, see Employees below.
Business Segment Information
Our business operations consist of two segments, our (i) finished products segment,
representing our mining and processing operations in Ontario, Manitoba and Newfoundland and
Labrador, our refining operations in the United Kingdom and interests in refining operations in
Japan and other Asian countries referred to above, and (ii) intermediates segment, which represents
PT Incos mining and processing operations in Indonesia, where nickel-in-matte, an intermediate
product, is produced and sold primarily into the Japanese market. In the fourth quarter of 2005,
production of nickel and copper concentrates at the initial phase, representing an open-pit mine
and concentrator and related facilities, of our Voiseys Bay project, operated by our wholly-owned
subsidiary, Voiseys Bay Nickel Company Limited (VBNC), started and, accordingly, the assets
relating to the initial phase of this project were reclassified from the development projects
segment to the finished products segment. Voiseys Bay produces nickel concentrates for processing
by our Ontario and Manitoba operations, as well as copper concentrate for sale to third parties.
For further information on our business segments by operating segment, including each
segments net sales to customers, earnings and total assets, and geographic location, see Note 18
to the financial statements under Item 8 of this Report.
Nickel
Applications for Nickel1
Nickel is a hard, malleable metal with a wide range of uses. Its principal
characteristics include imparting strength and corrosion resistance in alloys. The following five
general categories constitute the principal applications of nickel: (i) nickel-bearing or
austenitic stainless steels, (ii) low-alloy steels, (iii) non-ferrous alloys, (iv) foundry industry
castings and (v) non-alloying uses. Incos nickel products represent what is known in the industry
as primary nickel, a designation given to nickel produced principally from nickel ores. It is
estimated that approximately 79 per cent of global primary nickel consumption relates to its end
use in austenitic stainless steel production and as an alloy with other metals. The other type of
nickel used in industrial applications is known as secondary nickel, which is also referred to as
recycled or scrap nickel. Secondary nickel units are recovered largely from austenitic stainless
steel manufacturing and fabricating operations and nickel-containing scrap from obsolete plant and
equipment. In the recent past, secondary nickel has represented between 44 and 49 per cent of the
total nickel used for austenitic stainless steels, with primary nickel accounting for between 51
and 56 per cent of such nickel use. These percentages can vary based upon relative prices, the
availability of scrap and other factors.
The nickel industry generally divides its primary nickel products into three categories: (i)
charge nickel products (products of various nickel purities produced in special forms for the
stainless and low-alloy steel industries), (ii) melting nickel products (relatively pure metallic
products for the non-ferrous metals and foundry industries) and (iii) plating nickel products
(relatively pure nickel products in certain shapes or cut to certain sizes for the plating
industry).
The largest use of primary nickel in the world has continued to be in the production of
nickel-bearing or austenitic stainless steels. Stainless steels, defined as iron-based alloys
containing 10.5 per cent or more chromium, are typically identified by their metallurgical
structure austenitic, ferritic, martensitic, precipitation-hardening and duplex. Approximately
75 to 77 per cent of global stainless steel production in recent years has consisted of austenitic,
or nickel-bearing, grades. On average, austenitic stainless steels contain approximately eight to
10 per cent nickel. Nickel-bearing stainless steels are used in a wide variety of applications
ranging from consumer products to industrial process equipment, as well as for power generation and
transportation equipment, kitchen appliances and hundreds of other applications where strength and
corrosion resistance are required. Nickel use in nickel-bearing or austenitic stainless steels
currently accounts for about 60 per cent of annual global primary nickel consumption.
A second, closely related, use of primary nickel is in low-alloy steels for construction and
in structural, tool, high-strength and electrical steels. These steels are produced in greater
volume than stainless steels but with a much lower nickel content, averaging less than one per cent
nickel by weight. They account for about five per cent of annual global primary nickel demand.
|
|
|
1 |
|
Unless otherwise indicated, data in this
Report on applications for nickel are on a global basis. Reports prior to 2003
from the Company included data on a Western-World-plus-China basis.
Western World is defined as the world excluding the former East
Bloc countries (Russia and other members of the former Commonwealth of
Independent States, China, Cuba, Bulgaria, the Czech Republic, Slovakia,
Hungary, Poland and Romania). |
9
The third category of nickel use is in non-ferrous alloys which, unlike the two categories of
steel alloys noted above, contain little or no iron. These alloys, which are used primarily in
industrial process plants, marine engineering applications, coinage, electronics, and gas turbine
engine components, as well as in other diverse products, account for approximately 10 per cent of
annual global primary nickel demand.
A fourth category is comprised of foundry industry castings, which consist of either iron
alloys, steel alloys or non-ferrous alloys. These uses account for about four per cent of annual
global primary nickel demand and represent the balance of the approximately 79 per cent of primary
nickel used to make stainless steels and nickel-containing alloys.
The fifth category consists of various non-alloying uses of primary nickel. These uses
account for the remaining 21 per cent of annual global primary nickel demand, and includes
electroplating (representing about 11 per cent of primary nickel demand) and numerous applications
of nickel powders, including Incos specialty nickel powder products described under Inco Special
Products below. Many consumer durable goods, such as metal furniture, are nickel-chrome
electroplated. Nickel powder applications are a relatively small but important nickel-consuming
sector. Given the properties of nickel powders, applications include dissolving nickel into salts
for plating and catalysts for the petrochemical industry, and use in nickel-cadmium and
nickel-hydride rechargeable batteries, lithium ion batteries, welding electrodes, metal sprays and
specialized parts made by powder metallurgy.
As indicated above, primary nickel used in stainless and low-alloy steel sectors accounts for
approximately 65 per cent of annual global primary nickel demand. In choosing to use primary
nickel, these two sectors can generally use either charge nickel products or melting nickel
products to satisfy their nickel requirements; however, they may also use secondary nickel units
such as nickel-containing stainless steel scrap or other recycled nickel-containing material, with
the decision of using primary or secondary nickel being based largely on relative prices and
availability of these materials. See Prices Nickel above for a discussion of the percentages
of nickel consumed as stainless steel scrap by stainless steel producers.
In early 2004, the Nickel Development Institute (NiDI), a non-profit association formed in
1984 to promote applications for nickel, and the Nickel Producers Environmental Research
Association (NiPERA), an organization that Inco and other nickel producers formed in 1980 to
focus on and fund scientific studies relating to environmental, health and other issues related to
various forms of nickel, merged to form the Nickel Institute (NI). Inco had been a member of
NiDI since it was founded. The NI, the membership of which represents more than 70 per cent of
current world nickel production, generates and communicates information required to support the
safe and sustainable production, use and re-use of nickel. It also provides a single membership
and management structure for the activities previously undertaken separately by NiDI and NiPERA,
such as research and development projects, including projects aimed at promoting the use of
nickel-containing stainless steels, broadening markets for nickel-containing alloys resistant to
extreme temperatures, high pressure and corrosion, and seeking to ensure that sound science is used
as the basis for regulatory developments relating to the production and use of nickel and
nickel-containing products and the recycling or disposal of nickel-containing waste materials. The
NI has continued the nickel use-related technical work of NiDI, but has focused more on nickel
issues related to stewardship and sustainable development, including the generation and use of
knowledge about the full life cycle effects of nickel.
Historical Review of the Nickel Industry; Recent Industry Conditions2
The nickel market has been cyclical in nature over the past half-century given the
positive correlation of nickel demand to industrial production.
Primary nickel demand in the Western World grew significantly during the 1946-1974 period in
response to postwar reconstruction, increased per capita incomes and the rapid growth of the
stainless steel industry. Annual demand increased from approximately 136,100 tonnes in 1950 to a
then record level of approximately 620,000 tonnes in 1974. The compound rate of annual growth in
nickel demand over the 1946-1974 period was about six per cent.
With the oil crisis in 1973, the substantial rise in energy costs resulted in a reduction in
industrial production and a consequent reduction in primary nickel demand. These negative trends
were repeated in the early 1980s following a second round of significant oil price increases in
1979-1980 but were reversed in the second half of the 1980s, when a period of strong industrial
growth resulted in an increase in the demand for nickel.
|
|
|
2 |
|
Data and estimates included in this
historical review through 2002 are limited to the Western World because of
limited available data for certain countries. See Note 1 above with respect to
our definition of Western World. |
10
Record growth in stainless steel production, accompanied by a shortage of nickel production,
placed significant upward pressure on LME cash nickel prices in 1988 and 1989, with these prices
averaging $13,823 per tonne ($6.27 per pound) and $13,338 per tonne ($6.05 per pound),
respectively, for 1988 and 1989.
During the early 1990s, significant increases in primary and secondary nickel deliveries to the
world from the Russian Federation (Russia) and other members of the former Commonwealth of
Independent States (CIS), combined with economic downturns in North America, Western Europe and
Japan, led to a surplus in primary nickel supply, resulting in a weakening of nickel prices. This
situation was exacerbated in 1992 and 1993 by negative economic growth in Western Europe and Japan
and continued exports of nickel from the CIS. From 1990 to 1993, annual average LME cash nickel
prices fell from $8,885 per tonne ($4.03 per pound) to $5,291 per tonne ($2.40 per pound).
In 1994 and 1995, a worldwide economic recovery led to strong growth in stainless steel production
and nickel demand, resulting in primary nickel demand exceeding supply and a recovery in nickel
prices, with the LME cash nickel price rising to an average of $8,231 per tonne ($3.73 per pound)
for 1995.
In the latter half of the 1990s, strong economic growth led to significant increases in stainless
steel production and nickel demand, except that the Asian economic crisis in 1998 caused overall
nickel demand to decrease slightly that year. The decrease in the demand for nickel during 1998,
combined with the markets anticipation of large supplies of low-cost nickel from three new
Australian laterite projects, Murrin Murrin, Bulong and Cawse, resulted in the LME cash nickel
price reaching a low for the decade of $3,725 per tonne ($1.69 per pound) in December 1998. Nickel
prices recovered during 1999, supported by the resumption of strong economic and nickel demand
growth, with the LME cash nickel price reaching $8,450 per tonne ($3.83 per pound) at the end of
1999.
The LME cash nickel price continued to increase into 2000, reaching a peak of $10,660 per tonne
($4.84 per pound) in March 2000 but over the balance of 2000 declined to $7,190 per tonne ($3.26
per pound) by the end of that year. Favourable market conditions contributed to the increase in
the average LME cash nickel price to $8,641 per tonne ($3.92 per pound) in 2000. World production
of stainless steel increased by 8.8 per cent in 2000 to a then record level of 19.5 million tonnes.
However, the use of primary nickel in this segment registered no growth in 2000 due to the
increased supply of nickel-containing stainless steel scrap. Overall world demand for primary
nickel grew by 5.8 per cent in 2000 to 1,109,000 tonnes, reflecting both stock building by
consumers and an estimated 12 per cent growth in consumption for primary nickel in applications
other than stainless steel. In 2000, world primary nickel supply increased by an estimated 78,000
tonnes to 1,105,000 tonnes, due mainly to a rise in primary nickel production in the Western World
of approximately 52,000 tonnes, reflecting mainly production from new nickel capacity and the
continued commissioning of the three new laterite projects in Australia referred to above. Demand
for nickel in 2000 exceeded supply by approximately 4,000 tonnes, but we believe that additional
material was withheld from the market by one leading nickel producer, as reflected in nickel
inventories held in LME warehouses, which fell by over 37,000 tonnes during the year.
Market fundamentals weakened during 2001 as the worlds major economies experienced softness. This
weakness in demand was primarily concentrated in the Western World where nickel demand declined
significantly. While there was continued strength in nickel demand in China in 2001, Inco
estimates that there was an overall decline in world nickel demand in 2001 of 2.2 per cent to
approximately 1,085,000 tonnes with world primary nickel production increasing by 43,000 tonnes to
1,148,000 tonnes in 2001. The largest sources of this increase in supply were the continued
ramping up of the laterite projects in Australia and the commissioning of new capacity in Venezuela
and Colombia. The world nickel market in 2001 shifted to a surplus position of approximately
63,000 tonnes following the deficit positions in the previous two years. Over 2001, nickel
inventories held by consumers are estimated to have fallen by 13,000 tonnes while LME inventories
increased by only 9,510 tonnes, ending 2001 at 19,188 tonnes. The cash nickel price on the LME
opened 2001 at $6,995 per tonne ($3.17 per pound) but declined to the years low of $4,420 per
tonne ($2.00 per pound) in late October 2001. With the aggressive reduction of interest rates in
the United States and renewed prospects for an economic recovery, prices for nickel improved in the
fourth
quarter of 2001 and the LME cash nickel price increased to $5,680 per tonne ($2.58 per pound) as of
December 31, 2001.
The nickel market strengthened in 2002 as world demand grew by approximately eight per cent during
the year to 1,168,000 tonnes despite continued weakness in certain large segments of the global
economy. The growth in nickel demand in 2002 was primarily concentrated in the stainless steel
sector where the demand in this use increased by almost 10 per cent, driven by an increase in
stainless steel production and minimal growth in the use of nickel-containing stainless steel scrap
by stainless steel producers. World stainless steel production increased by 7.9 per cent to
approximately 20.8 million tonnes. This production growth was particularly strong in the United
States, where production increased by 20 per cent, driven by the opening of a new 800,000
tonne-per-
11
year stainless steel production facility in Kentucky, and in Taiwan, where production increased by
20 per cent as existing facilities operated at near-capacity levels. The growth in primary nickel
supply in 2002 came principally from (i) Colombia and Venezuela, where new or greenfield projects
were completing their ramp-up to their design capacities, (ii) Australia, where production
increased from the continued ramp-up of one project and higher production from certain existing
producers, and (iii) Japan, where production in the form of ferronickel rebounded to near-capacity
levels. The strong growth in nickel demand largely offset the growth in nickel production in 2002,
resulting in a small surplus of approximately 8,000 tonnes for the year. Inventories of nickel on
the LME increased slightly during 2002, remaining at a relatively low level of 21,972 tonnes at
December 31, 2002. The LME cash nickel price opened 2002 at $5,680 per tonne ($2.58 per pound) and
increased during the first half of 2002 as the economies of certain industrialized countries began
to recover, ending the first half of the year at $7,080 per tonne ($3.21 per pound). Prices
declined through the third quarter, reaching a low of $6,305 per tonne ($2.86 per pound) in
September 2002 as concern over the pace of economic recovery and uncertainty about a potential war
involving Iraq adversely affected the nickel markets. The LME cash nickel price recovered in the
fourth quarter, underpinned by improving fundamentals for nickel, ending 2002 at $7,100 per tonne
($3.22 per pound).
The world nickel market strengthened in 2003 as demand grew by approximately seven
per cent during the year to 1,244,000 tonnes despite continued weakness in certain large segments
of the global economy. During 2003, growth in industrial production continued in China and was
positive in the United States and Japan for the first time in three years, while economic recovery
in Europe continued to struggle to take hold. The growth in nickel demand in 2003 was concentrated
in the stainless steel sector. Nickel demand growth in this sector increased by almost eight per
cent in 2003, driven by a significant increase in stainless steel production and a decline in the
stainless steel scrap-ratio. Nickel demand growth in non-stainless steel applications was
relatively weak in 2003, as one important end-use market, high nickel alloys for the aerospace
industry, continued to struggle with new aircraft orders remaining at relatively depressed levels.
However, demand for nickel in plating applications was relatively strong, led by growth in these
applications in China, slightly offset by reduced demand for these applications in Europe and the
United States. The growth in world production of primary nickel in 2003 could not keep pace with
the demand growth experienced that year. Production of primary nickel in 2003 was adversely
affected by the labour disruption at our Ontario operations during a three-month period beginning
June 1, 2003, resulting in effectively no production from these operations for this period where
they would normally produce about 9,000 tonnes (20 million pounds) of primary nickel per month. We
believe that several other major producers failed to reach their 2003 projected production targets
due to unexpected maintenance or operational problems. The shortfall in production was partially
offset by the release of approximately 60,000 tonnes into the market during 2003, which nickel had
been used as collateral for a loan to one nickel producer. In addition, production of ferronickel
in Australia, New Caledonia, Colombia and the Dominican Republic increased in 2003. As a result,
world primary nickel production increased by 28,000 tonnes to 1,204,000 tonnes in 2003. World
primary nickel supply increased to 1,264,000 tonnes, taking into account the release into the
market of the 60,000 tonnes used as loan collateral discussed below. The significant growth in
nickel demand during 2003, coupled with the limited supply growth, created an underlying deficit
between supply and demand in 2003 of approximately 40,000 tonnes. With the release in 2003 of
60,000 tonnes of nickel that one producer had pledged as collateral for a loan, we believe there
was a small surplus in the global nickel market of approximately 20,000 tonnes in 2003.
Inventories of nickel on the LME increased slightly during 2003 by 2,100 tonnes, remaining at a
relatively low level of 24,072 tonnes at December 31, 2003. The LME cash nickel price averaged
$9,860 per tonne ($4.47 per pound) in 2003. At the end of 2003, the LME cash nickel price was
$16,650 per tonne ($7.55 per pound), an increase of 135 per cent compared with $7,100 per tonne
($3.22 per pound) at the end of 2002.
The year 2004 was one characterized by high nickel prices, which we believe were due principally to
broad-based growth in global demand for nickel. The increase in demand was attributed to a
recovery in non-stainless steel applications for nickel. Primary nickel demand in stainless steel
applications experienced virtually no growth in 2004, despite strong global stainless steel
production growth, due to a large increase in nickel-containing scrap consumption and substitution
for nickel in certain stainless steel applications. The increase in nickel demand was driven by
the strongest global industrial production growth in 10 years, led by continued economic growth in
China, as well as economic growth in South
Korea, Taiwan and Japan. The economies of the United States and Europe also exhibited growth above
the levels seen in the recent 2000-2003 period. The global nickel market was in deficit for 2004
as the level of demand exceeded the level of supply. We believe that relatively low physical
inventories, high prices and the active trading in nickel by investment, hedge or similar funds
which purchase and sell or otherwise trade in metals for profit (Metals Trading Funds)
contributed to volatile price conditions in 2004.
The growth in primary nickel demand in 2004 was concentrated in the non-stainless steel sector,
which increased by seven per cent, as demand for nickel for the production of high nickel alloys
improved as the recovery of the aerospace industry continued. World production of stainless steel
increased by eight per cent to approximately 24.6 million tonnes. Stainless steel production
expanded in all major industrialized geographic regions and was particularly strong in South Korea
where new production facilities operated at capacity during the year. However, primary nickel
demand growth in the stainless steel sector was adversely affected by a
12
large increase in stainless steel scrap consumption, as well as an increase in the production
of stainless steels containing relatively low amounts or grades of nickel (one to four per cent nickel) and grades containing no nickel compared with higher nickel containing stainless steel
grades (eight to 10 per cent nickel).
World supply of primary nickel in 2004 was lower than world nickel supply in 2003, although
production of primary nickel increased by four per cent in 2004, due to the relatively large
stockpile releases in 2003. World primary nickel production in 2004 totalled 1,255,000 tonnes, an
increase of 51,000 tonnes, of which approximately 50 per cent was the result of our recovery from
our strike-impacted levels experienced in 2003. However, world primary nickel supply of 1,255,000
tonnes decreased from 1,264,000 tonnes in 2003, taking into account the release into the market in
2003 of 60,000 tonnes initially pledged by one producer as collateral for a loan.
The growth in nickel demand during 2004, coupled with the overall decline in supply for 2004,
created a deficit between supply and demand of approximately 7,000 tonnes. Inventories of nickel
on the LME decreased during 2004 by 3,174 tonnes to a relatively low level of 20,898 tonnes at
December 31, 2004.
For a discussion of the LME cash nickel price during 2004, see Overview Key Factors Affecting
our Business 2004 Nickel Market Highlights in Managements Discussion and Analysis of Financial
Condition and Results of Operations under Item 7 of this Report.
The year 2005 represented a year of two very distinct periods for the nickel industry. We
believe that the first half of the year reflected relatively strong demand for nickel, relatively
tight supplies of nickel, nickel buying activity from Metals Trading Funds, falling LME nickel
inventories and relatively strong nickel prices. However, by the start of the third quarter a
significant negative shift began in the supply-demand fundamentals of the nickel market, as we
believe demand weakened, Metals Trading Funds sold the nickel positions they had acquired, LME
inventories increased and prices fell. The significant deterioration in market conditions was, we
believe, the result of a large reduction in global stainless steel production in the second half of
the year, as discussed below. For 2005 as a whole, nickel demand grew by less than one per cent
from 2004 levels. The non-stainless steel uses for nickel, in particular for high nickel alloys,
plating and battery materials, were the only end uses for primary nickel to experience demand
growth in 2005. Primary nickel demand in stainless steel applications experienced a sharp
contraction in 2005, with global stainless steel production falling by one per cent in 2005 from
2004 levels, and primary nickel demand for this application declining by about six per cent
compared with 2004. Demand was also negatively affected in this key application by substitution of
other metals or other materials for nickel in certain stainless steel applications and a higher
relative usage of secondary, or scrap, nickel.
We believe that relatively low inventories of nickel, high prices and the active trading of
Metals Trading Funds, factors which were also prevalent and, accordingly, affected the nickel
markets in 2004, contributed to the continued volatile price conditions experienced in 2005. The
difference between the high and low daily LME cash nickel prices for 2005 was $6,250 per tonne
($2.83 per pound). We estimate that the global nickel market was in a slight surplus for 2005 as
the level of demand was more than covered by the level of supply. However, we believe that the
level of demand was restrained by the relatively high nickel prices in at least the first half of
2005, and that demand would have been significantly stronger had prices been closer to historic
averages.
The modest growth in primary nickel demand in 2005 was, as noted above, due to the strength in
non-stainless steel uses for nickel, as demand from the stainless steel sector, the largest end use
of primary nickel, was adversely affected by several factors as discussed below. Nickel demand
growth for non-stainless steel uses increased by eight per cent in 2005, as demand for nickel for
the production of high nickel alloys improved as a result of the continued strength in demand for
high nickel alloys used in the aerospace industry and for land-based gas turbines, as well as
growth in the oil and gas, liquid natural gas and battery applications for nickel. Nickel demand
from battery applications improved in 2005, in part due to the increased production of hybrid
electric vehicles.
World production of stainless steel increased by approximately seven per cent during the first
half of 2005, consistent with the relatively strong production growth rates seen in this area for
2003 and 2004. This growth was due, in part, to increased capacity utilization at several large-scale
stainless steel manufacturing facilities, as well as new production capacity coming on stream,
particularly in China. The strong stainless steel production growth in the first half of 2005,
combined with strength in the non-stainless steel market, led to nickel demand growth of
approximately six per cent in the first half of the year. However, end-use consumption of
stainless steel did not keep pace with stainless steel production and global inventories increased
during the first half of the year. We believe that the increase in global stainless steel
inventories was a sign of an oversupplied market that, in turn, triggered sharply falling stainless
steel prices beginning in July 2005. At the beginning of the third quarter of 2005, almost all
major stainless steel producers had begun to reduce production levels in an effort to reduce the
relatively high global inventory levels of stainless steel and, through such supply reductions,
correct this oversupply situation. Most of these production cuts were maintained through the end
13
of 2005. We estimate that stainless steel production curtailments in the second half of the
year led to an overall production decline in stainless steel production in the second half of 2005
of nine per cent compared with the second half of 2004. This sharp reduction in stainless steel
production, in turn, led to a significant reduction in demand for primary nickel used in stainless
steel. The global stainless steel market also used relatively high amounts of secondary or scrap
nickel in 2005 compared with prior years, as well as increasing the production of stainless steels
containing relatively low amounts or grades of nickel (one to four per cent) and grades containing
no nickel compared with stainless steels with higher nickel grades (eight to ten per cent nickel).
The growth in the world supply of primary nickel in 2005 was adversely affected by several
unexpected disruptions. While domestic production by certain producers did increase in certain
countries or territories, including China, New Caledonia and Norway, these increases were largely
offset by reductions in output or lower than planned increases by producers in other countries.
Overall production of primary nickel increased by approximately 2.4 per cent in 2005, about half of
the long-term average production growth rate of four per cent. Several producers experienced
production problems as labour disruptions or shortages, feed material shortages, inclement weather,
technological challenges and extended maintenance shutdowns curtailed output below originally
announced planned levels for 2005. Approximately two thirds of global nickel production growth was
the result of a ramp-up in Chinese nickel production, in an effort to reduce that countrys nickel
import requirements. World primary nickel supply increased by 30,000 tonnes to 1,285,000 tonnes in
2005. We believe that no stockpiles of nickel were released into the market in 2005 or 2004, in
contrast to what occurred in 2003.
The slower than average growth in nickel demand for 2005, coupled with a relatively modest
amount of growth in nickel supply for the year, created a surplus for the year that we estimate to
have been approximately 15,000 tonnes. However, as discussed above, the supply-demand relationship
was in a deficit in the first half of the year and moved to a surplus in the second half of the
year. Inventories of nickel on the LME decreased during the first half of 2005 to a low of 4,926
tonnes. However, the decline in demand in the second half of the year led to a steady increase in
LME inventories during this period to a level of 36,042 tonnes at December 31, 2005. LME nickel
inventories have decreased in the first 10 weeks of 2006, with such inventories totalling
34,266 tonnes as of March 13, 2006.
For a discussion of the LME cash nickel price during 2005, see Overview Key Factors Affecting
our Business 2005 Nickel Market Highlights in Managements Discussion and Analysis of Financial
Condition and Results of Operations under Item 7 of this Report.
An uncertain global economic environment would be expected to have a significant adverse effect on
Incos business and financial results given the historical positive correlation between industrial
production and demand for primary nickel and our other products. There can be no assurance that
the over-supply situations which have existed historically in the nickel markets could not reoccur
in the future. Any such conditions would have an adverse effect on the prices realized by us for
our nickel products. Other international economic trends, expectations of inflation and political
events in major nickel producing and consuming countries can also adversely affect nickel prices
and the prices of other metals produced by us. These factors are beyond our control and have
resulted, and are expected to continue to result, in a high degree of price volatility for nickel
and other primary metals produced by us. There can be no assurance that the price for nickel or
other metals produced by us will not decline. A return to the nickel price realizations for us
reasonably near to the LME cash nickel price which prevailed through most of 1998 and into the
first half of 1999 and during a portion of the second half of 2001 would have a material adverse
effect on our results of operations, financial condition, cash flows and liquidity.
14
World primary nickel demand has increased at an average compound annual rate of approximately four
per cent over the last ten years. As noted under Applications for Nickel above, about two-thirds
of world primary nickel demand is associated with the production of austenitic stainless steels.
The following table shows the relationship between our most recent estimates of world primary
nickel demand and stainless steel production for the five years ended December 31, 2005:
|
|
|
|
|
|
|
|
|
|
|
World |
|
World |
|
|
Primary Nickel |
|
Stainless Steel |
Year |
|
Demand(1) |
|
Production |
|
|
(in tonnes) |
|
(in millions of tonnes) |
2001 |
|
|
1,085,000 |
|
|
|
19.0 |
|
2002 |
|
|
1,168,000 |
|
|
|
20.8 |
|
2003 |
|
|
1,244,000 |
|
|
|
22.7 |
|
2004 |
|
|
1,262,000 |
|
|
|
24.6 |
|
2005(2) |
|
|
1,270,000 |
|
|
|
24.3 |
|
|
|
|
(1) |
|
Previously disclosed figures were provided on a Western World-plus-China basis. |
|
(2) |
|
Preliminary estimates. |
The following table shows Incos most recent estimates of world primary nickel demand, world
primary nickel supply, year-end combined Western World producers and LME inventories of primary
nickel, year-end LME nickel inventories and the average annual LME cash nickel prices for the five
years ended December 31, 2005:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year-End |
|
|
|
|
|
|
|
|
World |
|
World |
|
Combined Western |
|
|
|
|
|
Average |
|
|
Primary |
|
Primary |
|
World Producers |
|
Year-End |
|
Annual LME |
|
|
Nickel |
|
Nickel |
|
and |
|
LME |
|
Cash Nickel |
Year |
|
Demand |
|
Supply |
|
LME Inventories(2) |
|
Inventories |
|
Prices |
|
|
|
|
|
|
(in tonnes) |
|
|
|
|
|
($ per tonne) |
2001 |
|
|
1,085,000 |
|
|
|
1,148,000 |
|
|
|
106,000 |
|
|
|
19,188 |
|
|
$ |
5,948 |
|
2002 |
|
|
1,168,000 |
|
|
|
1,176,000 |
|
|
|
100,000 |
|
|
|
21,972 |
|
|
|
6,772 |
|
2003 |
|
|
1,244,000 |
|
|
|
1,264,000 |
|
|
|
104,000 |
|
|
|
24,072 |
|
|
|
9,640 |
|
2004 |
|
|
1,262,000 |
|
|
|
1,255,000 |
|
|
|
111,000 |
|
|
|
20,898 |
|
|
|
13,852 |
|
2005 |
|
|
1,270,000 |
(1) |
|
|
1,285,000 |
(1) |
|
|
127,000 |
(1) |
|
|
36,042 |
|
|
|
14,733 |
|
|
|
|
(1) |
|
Preliminary estimates. |
|
(2) |
|
Excludes Russia, other members of the former CIS, China, Cuba and Eastern Europe. |
Future nickel consumption and nickel prices could be adversely affected by a number of factors,
including the development of new nickel capacity, such as the new capacity described below under
Participants in the Nickel Industry; new processing technologies which have made, and are
expected to continue to make, the development of relatively low-grade lateritic nickel deposits
economically viable; decreases in the general level of economic and business activity in industrial
economies which, in turn, could lead to reduced production of stainless steel; levels of
nickel-containing stainless steel scrap and other sources of secondary nickel; increased
environmental restrictions affecting the production and use of nickel and nickel-containing
products; recommissioning of any currently remaining shutdown nickel capacity; and, in the longer
term, increased use of substitutes, including plastics and ceramics, for nickel-containing
materials. In addition, the future levels of production and consumption of nickel in Russia are
expected to continue to have significant, but unpredictable, effects on world nickel prices.
Participants in the Nickel Industry
The five largest suppliers in the nickel industry, each having its own integrated facilities,
including nickel mining, processing, refining and marketing operations, are MMC Norilsk Nickel
(Norilsk), Inco, BHP Billiton plc (BHP Billiton), Falconbridge and Jinchuan Nonferrous Metals Corporation
(Jinchuan). Inco estimates that these five producers accounted for about 62 per cent of the
total world primary nickel production in 2005. In addition to these five principal industry
participants, there are approximately 25 other producers in numerous other countries around the
world that participate in the nickel industry. Operations of the five largest producers are
located in several countries. Norilsk has operations in Russia. Inco, as noted on page 1 of this
Report, has operations in Canada, the United Kingdom, Indonesia, Japan and China and in other parts
of Asia through two companies, Taiwan Nickel and Korea Nickel, in whose refining capacity Inco has
interests, but less than majority ownership. BHP Billiton has operations in
15
Australia and
Colombia; Falconbridge has operations in Canada, Norway and the Dominican Republic; and Jinchuan
has operations in China.
Norilsk has integrated facilities at Norilsk in Siberia and at Pechenga and Severonickel on
the Kola Peninsula of Russia. For 2005, Norilsk reported production of approximately 243,000
tonnes of nickel from all of its facilities, compared with 243,000 tonnes in 2004 and 239,000
tonnes in 2003. Nickel exports from Russia were 262,000 tonnes in 2005, compared with 251,000
tonnes in 2004 and 238,000 tonnes in 2003.
Incos Position in the Nickel Industry
Inco is a leading producer of nickel. Our nickel deliveries in 2005 represented an estimated 19
per cent of the total world demand for primary nickel, compared with 20 per cent in 2004 and 17 per
cent in 2003.
Our total deliveries of nickel in 2005 were 246,282 tonnes, representing a decrease of two per cent
from total deliveries of 251,882 tonnes in 2004. Deliveries of Inco-source nickel were 223,811
tonnes in 2005, representing a decrease of five per cent from deliveries of 235,185 tonnes in 2004,
primarily due to decreased production at our Ontario and Manitoba operations in 2005 as a result of
scheduled major maintenance shutdowns and slower than planned ramp-ups after such shutdowns, as
discussed below. In 2004, our deliveries of Inco-source nickel represented an increase of 28 per
cent from deliveries of 184,110 tonnes in 2003. This increase was primarily due to increased
production at our Canadian and U.K. operations as well as at PT Inco.
We believe that one of the key strengths of our position in the highly-competitive global
nickel industry is the broad geographic distribution of our customers. In 2005, we continued to
supply our customers worldwide from our operations in Canada, the United Kingdom and Asia. In
2005, reflecting our global market presence, 27 per cent of our total primary nickel deliveries
were to customers in the United States and Canada, 23 per cent to customers in Japan, 11 per cent
to customers in Europe, and 39 per cent to customers in other countries, primarily in Asia,
compared with 25 per cent to customers in the United States and Canada, 23 per cent to customers in
Japan, 11 per cent to customers in Europe, and 41 per cent to customers in other countries,
primarily in Asia, in 2004. In 2005, sales to customers in Asia, including Japan, represented 60
per cent of our total nickel deliveries for the year, compared with 62 per cent in 2004.
We have fixed-volume contracts with customers for a substantial portion of our expected annual
nickel sales. These contracts, combined with the requirements of our affiliated refineries in Asia
and our sales of proprietary nickel products, have continued to provide stable demand for a
significant portion of our annual production.
The following table shows, for the five years ended December 31, 2005, our most recent
estimates of total world primary nickel demand, our total nickel deliveries, our deliveries of
purchased nickel, our estimated share of world demand based on our total nickel deliveries, the LME
average cash and three-month nickel prices and our average realized price for our primary nickel
products:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LME |
|
LME |
|
Inco |
|
|
|
|
|
|
|
|
|
|
Inco |
|
Inco |
|
Average |
|
Average |
|
Average |
|
|
|
|
|
|
|
|
|
|
Deliveries of |
|
Share of |
|
Cash |
|
3-Month |
|
Realized |
|
|
World Primary |
|
Total Inco |
|
Purchased |
|
World |
|
Nickel |
|
Nickel |
|
Nickel |
Year |
|
Nickel Demand |
|
Deliveries(1) |
|
Nickel |
|
Demand |
|
Price |
|
Price |
|
Price(1) |
|
|
|
|
|
|
(in tonnes) |
|
|
|
|
|
(%) |
|
|
|
|
|
($ per tonne) |
|
|
|
|
2001 |
|
|
1,085,000 |
|
|
|
230,049 |
|
|
|
22,978 |
|
|
|
21 |
|
|
|
5,948 |
|
|
|
5,877 |
|
|
|
6,468 |
|
2002 |
|
|
1,168,000 |
|
|
|
231,590 |
|
|
|
19,343 |
|
|
|
20 |
|
|
|
6,772 |
|
|
|
6,755 |
|
|
|
7,143 |
|
2003 |
|
|
1,244,000 |
|
|
|
213,890 |
|
|
|
29,780 |
|
|
|
17 |
|
|
|
9,640 |
|
|
|
9,610 |
|
|
|
9,860 |
|
2004 |
|
|
1,262,000 |
|
|
|
251,882 |
|
|
|
16,697 |
|
|
|
20 |
|
|
|
13,852 |
|
|
|
13,765 |
|
|
|
13,906 |
|
2005 |
|
|
1,270,000 |
(2) |
|
|
246,282 |
|
|
|
22,471 |
|
|
|
19 |
(2) |
|
|
14,733 |
|
|
|
14,551 |
|
|
|
14,842 |
|
|
|
|
(1) |
|
Includes intermediates and purchased nickel. |
|
(2) |
|
Preliminary estimates. |
Inco Special Products
Inco is a world leader in the development, production and sale of value-added or specialty nickel
products, including powders, foams, flakes, oxides and nickel-coated graphite. These products are
used for such applications as consumer electronics, rechargeable batteries for consumer and hybrid
vehicle use, fuel cells, powder metallurgy, automotive parts, electromagnetic interference
shielding for computers and cellular telephones, special catalysts and salts, metal injection
moulding, and hard metal binders.
16
Inco Special Products, an unincorporated business unit, has responsibility for all business
activities related to our value-added or specialty nickel products. These products, most of which
are developed at our research laboratory at Mississauga, Ontario, are manufactured at our
refineries in Sudbury, Ontario and Clydach, Wales, using our proprietary gas decomposition
technology, and at
Novamet3 Specialty Products Corporation, a wholly-owned subsidiary of
Inco Limited located in Wyckoff, New Jersey, and our Dalian and Shenyang joint ventures in China.
Inco Special Products expects to continue to work closely with customers to develop advanced nickel
products to meet their needs. Accounting for approximately nine per cent of Incos nickel sales
revenue in 2005, compared with eight per cent in 2004 and nine per cent in 2003, value-added or
specialty nickel products are sold at premium prices. These premiums are affected by fluctuations
in the LME cash nickel price and how we price certain of our value-added or specialty nickel
products.
Copper
We produce copper at our Ontario operations which we recover, in conjunction with nickel,
principally from the sulphide ores mined in the Sudbury area of Ontario. In 2005, our finished
copper production, including anodes production, was 125,595 tonnes, representing an increase of one
per cent from 124,456 tonnes in 2004. In addition, production of copper in concentrates from our
Voiseys Bay operations was 4,406 tonnes in 2005. In 2004, copper production increased by 37 per
cent from 91,134 tonnes in 2003, reflecting a return to normal production levels following a
three-month strike and ramp-up problems associated with the restart of operations after the strike
at our Ontario operations in 2003.
In May 2005, our Ontario operations announced that it would be closing its copper refinery in
Sudbury as a result of a number of factors, including the size of the refinery and its cost
structure relative to the leading copper refineries in the world. The closure of this facility
resulted in an after-tax asset impairment charge of $14 million in the second quarter. In late
June 2005, we announced that we had entered into a long-term agreement with Noranda Inc. (now
Falconbridge, following the combination of Noranda Inc. and the company then known as Falconbridge
at the end of June 2005) under which Inco agreed to sell all of its copper production from its
Ontario operations in anode form to Falconbridge. This agreement, which covers a period of 10
years beginning January 1, 2006 and is subject to extension, also provides for the recovery by
Falconbridge at its Montreal, Quebec copper refinery of all other metals in the copper anodes, with
Inco receiving back the nickel and PGMs recovered from the anodes subject to certain treatment
charges and Falconbridge purchasing and paying Inco for all of the gold and silver recovered. It
is
currently estimated that between approximately 104,000 and 126,000 tonnes annually of contained
copper in anode form will be purchased and processed by Falconbridge under this agreement. The
actual volume of copper in anode form to be purchased and processed by Falconbridge under the
agreement will depend upon a number of factors, including the timing of certain capital
expenditures and related changes to Falconbridges Montreal-based copper refinery to enhance the
recovery of nickel and certain of the other metals contained in the anodes.
Copper accounted for $463 million, or 10 per cent, of our net sales to customers in 2005, compared
with $364 million, or nine per cent, in 2004.
Our sales and deliveries (including purchased copper) for the past three years and our average
realized prices for copper for the past five years are shown in the tables under Sales,
Deliveries and Prices Copper above, respectively.
World refined copper production is currently estimated to have been approximately 16.3 million
tonnes in 2005, compared with 15.8 million tonnes in 2004 and 15.2 million tonnes in 2003.
Like nickel prices, copper prices have been in recent years, and are expected to continue to be,
subject to significant price volatility. In 2004, strong economic growth in Asia, in particular
China, combined with the relatively strong economic recovery in the United States, led to an
increase in global copper demand. Global copper production was, however, negatively impacted in
2004 by an open-pit mine collapse at one leading copper producer as well as labour disruptions at
various other copper production facilities. By the end of 2004, combined reported copper stocks on
the COMEX Division of the New York Mercantile Exchange and the LME had declined from year-end 2003
levels by over 86 per cent to 97,100 tonnes in total. The LME cash copper price averaged $2,868
per tonne ($1.30 per pound) in 2004, a 61 per cent increase over the average price of $1,780 per
tonne ($0.81 per pound) in 2003. In 2005, continued economic growth in Asia, combined with a
number of supply disruptions at various copper mining and refining operations, resulted in a
tightly balanced market for copper. Inventory of reported copper stocks on the COMEX and the LME
at year-end were 98,407 tonnes, basically unchanged from year-end 2004. The LME cash copper price
averaged $3,684 per tonne ($1.67 per pound) in 2005, representing a 28 per cent increase from the
average price in 2004. For the fourth quarter of 2005, the LME cash
17
copper price averaged $4,297
per tonne ($1.95 per pound), compared with a third quarter 2005 average of $3,759 per tonne ($1.70
per pound). For the month of December 2005, the LME cash copper price averaged $4,577 per tonne
($2.08 per pound). The LME cash copper price reached a new record of $5,145 per tonne ($2.33 per
pound) on February 7, 2006 and has remained above $4,405 per tonne ($2.00 per pound) through to
mid-March 2006. The LME cash copper price was $4,946 ($2.24 per pound) on March 13, 2006.
Other Primary Metals and Related Products
Other primary metals and related products accounted for nine per cent of our total net sales to
customers in 2005, compared with 10 per cent in 2004 and eight per cent in 2003. These products
include cobalt, platinum-group metals or PGMs (platinum, palladium, rhodium, ruthenium and iridium)
(PGMs), gold, silver, sulphuric acid, liquid sulphur dioxide and some modest quantities of
selenium and tellurium. For 2005, based upon production principally from our Ontario ores, we
accounted for approximately three per cent of the worlds supply of PGMs. PGMs are utilized
primarily for catalysts, electronic components and jewellery. In addition to refining our own ores
to obtain PGMs, we process substantial volumes of spent automotive catalytic converters and other
material containing these metals at our Sudbury, Ontario and Acton, England refineries. In 2005,
such other material, which was principally toll-refined, accounted for about 64 per cent of all
PGMs refined by us, compared with 64 per cent in 2004 and 76 per cent in 2003. Deliveries of
toll-refined material, however, are not included in our deliveries of precious metals shown in the
table under Deliveries above since we do not take ownership of these materials. Sales of PGMs
accounted for approximately five per cent of our net sales to customers in 2005, compared with five
per cent in 2004 and four per cent in 2003.
Approximately 85 per cent of Incos cobalt production, which is derived from its Canadian ores and
purchased feedstock material, is sold as metal, with the balance being sold as a cobalt
intermediate product. The intermediate product is used by chemical producers to make cobalt-based
chemicals. Cobalt metal is used in the production of various alloys, particularly for aerospace
applications, as well as the manufacture of cobalt-based chemicals.
Copper and nickel producers supply a majority of the worlds cobalt production as a by-product of
their copper and nickel operations, which has resulted in the supply of cobalt being largely driven
by the demand for copper and nickel rather than the demand for cobalt. As a result, there has been
a significant increase in the supply of cobalt in the last decade. Demand for cobalt from the
aerospace and land-based gas turbine sectors, which together currently represent about 22 per cent
of world cobalt consumption, was strong in 2005, returning to the levels of demand that existed
prior to September 11, 2001. The total demand for cobalt also increased in 2005 as a result of the
growth of applications for cobalt in the battery and catalyst market sectors. The supply and
demand fundamentals for the cobalt market were, we believe, in balance during 2005. No significant
new supply came onto the market from the traditional copper- and nickel-based sources; however,
additional supplies came from the Democratic Republic of Congo. The Metal Bulletin 99.8 average
cobalt reference price, the most commonly used benchmark price for the pricing of high grade
cobalt, averaged $34,863 per tonne ($15.81 per pound) for 2005, compared with $53,177 per tonne
($24.12 per pound) in 2004 and $23,951 per tonne ($10.86 per pound) in 2003, while the Metal
Bulletin 99.3 average cobalt reference price, the most commonly used benchmark price for the
pricing of lower grade cobalt, averaged $32,084 per tonne ($14.55 per pound) for the year, compared
with $50,215 per tonne ($22.78 per pound) in 2004 and $21,564 per tonne ($9.78 per pound) in 2003.
On March 10, 2006, the Metal Bulletin 99.8 and 99.3 average
cobalt reference prices were $30,049 per
tonne ($13.63 per pound) and $27,514 per tonne ($12.48 per pound), respectively.
As indicated in the table of Incos price realizations under Prices Other Metals above, Incos
average realized price for its cobalt deliveries was $32,828 per tonne ($14.89 per pound) in 2005,
compared with $46,442 per tonne ($21.07 per pound) in 2004 and $18,846 per tonne ($8.55 per pound)
in 2003. Our Goro and Voiseys Bay projects, in addition to the quantities of nickel projected to
be produced by them, are also expected to produce significant quantities of cobalt given the
currently estimated quantities of cobalt that are present in the mineral deposits to be mined as
part of these projects. We currently estimate that we will produce about 1,100 tonnes of cobalt
from Voiseys Bay nickel concentrates in 2006. The price of cobalt has fluctuated significantly
over the past several years. The financial analyses undertaken by Inco in 2004 in support of the
substantial planned investment to be made with respect to the Goro project were based upon a
long-term price of cobalt of $19.85 per kilogram ($9.00 per pound). If realized cobalt prices, as
well as realized prices for the other metals to be produced by these two projects, were to be below
the long-term prices assumed by us, the expected financial returns from, and expected cash and
other unit costs of production after by-product credits for, these projects would be adversely
affected.
Inco also produces sulphuric acid and liquid sulphur dioxide from the sulphur dioxide gases
captured as part of its sulphur dioxide (SO2) abatement program at the Ontario
operations. We produced a total of 626,000 tonnes of sulphuric acid and liquid sulphur dioxide in
2005, compared with in 676,000 tonnes in 2004 and 473,805 tonnes in 2003. Most of our sulphuric
acid production and all of our liquid sulphur dioxide production are sold to Chemtrade Logistics
Income Fund, an unaffiliated customer, under long-term
18
contractual arrangements at prices based on
prevailing market prices for these products. These products are included in the table of product
deliveries under Deliveries above.
Tables showing the Companys sales, deliveries and average net realized prices of these other
primary metals and related products are shown under Sales, Deliveries and Prices Other
Metals above.
Mining and Production
General
Based on publicly available information and our own studies and analysis, we believe that, relative
to other nickel producers, we are a low-cost producer of nickel. Since low-cost operations are
essential in the highly competitive global nickel business, one of our key strategic objectives is
to become the worlds
lowest-cost and most profitable producer of nickel. A number of favourable factors, as described
below, generally contribute to our current cost structure, with the contribution of each factor
varying from year to year. We and a number of other nickel producers continued in 2005 to
experience some of the same cost pressures we did in 2004, including higher energy costs and the
impact of the strengthening of the Canadian dollar and certain other currencies in which some or
all of their costs of production are incurred relative to the U.S. dollar, the currency in which at
least some of their revenue is received.
Our estimated ore reserves include both sulphide and laterite nickel deposits which are the two
main types of nickel deposits found in the world. Sulphide deposits currently account for about 30
per cent of the worlds estimated nickel resources and are found in bedrock, often deep below the
surface, which generally makes them more costly to mine than laterite deposits. Sulphide deposits
commonly contain copper, precious metals and cobalt in addition to nickel. Laterite deposits,
which currently account for the remaining approximately 70 per cent of the worlds estimated nickel
resources, occur as either wet laterites or dry laterites. Wet laterites are found in tropical
areas where heavy rainfall combined with suitable landforms have resulted in the concentration of
nickel through a process of surface weathering and leaching action. Currently, wet laterites may
be processed by using either smelting or acid leaching technology, depending on the characteristics
of the particular deposit. Dry laterites, such as those found in Australia, may be processed only
by using acid leaching technology due to their mineralogy and their generally lower nickel content
compared with wet laterites. Laterite deposits are found at or near the surface and are therefore
usually amenable to low-cost surface mining. Cobalt is also usually present in these deposits.
We have large sulphide orebodies with satisfactory ore grades and metallurgical properties
principally at our Ontario operations and at the Voiseys Bay project and certain sulphide
orebodies with generally declining ore grades at our Manitoba operations, and large lateritic
orebodies with satisfactory ore grades and metallurgical properties at our operations in Indonesia.
In addition to nickel, we recover significant quantities of precious metals from our Ontario ores
and significant quantities of copper and cobalt from our Ontario ores and, beginning in 2006, from
our Voiseys Bay ores. The relative economic advantages of our Canadian sulphide ores are offset,
to some degree, by the higher mining costs for sulphide ores relative to lateritic ores and by
higher costs of doing business in Canada relative to some other nickel-producing countries. Our
unit costs of production also generally benefit from economies of scale attributable to our large,
integrated mining and processing facilities and from the use of bulk mining methods and automated
mining equipment and other productivity improvements implemented in recent years in all areas of
our business.
Energy costs are a significant component of production costs in the nickel industry since nickel
production is very energy- intensive, especially with respect to costs of processing lateritic ores
such as those processed at our PT Inco operations. Energy requirements for production from our
Canadian sulphide ores are generally only about one-fifth of the energy required to process
lateritic ores. In addition, low-cost energy is available from our hydroelectric facilities in
Ontario and at PT Incos lateritic mining operations in Indonesia, and from purchased hydroelectric
power at our Manitoba operations.
In 2005, our hydroelectric facilities in Ontario generated approximately 14 per cent of our Ontario
operations electricity requirements, and PT Incos 165-megawatt hydroelectric generating facility
at Larona together with its 93-megawatt hydroelectric generating facility at Balambano generated
virtually all of PT Incos 2005 electricity requirements. The Balambano facility continued to
generate power consistently above its design capacity due to improved water management practices
and higher reservoir levels and other related factors than were assumed in developing its original
design capacity. In 2005, energy costs at our Ontario and Manitoba operations were approximately
14 per cent of their total cash production costs, compared with 43 per cent for PT Inco. The
availability of captive hydroelectric power decreased cash energy costs at PT Inco by about 47 per
cent in 2005, 53 per cent in 2004 and 51 per cent in 2003 relative to the energy costs that would
have been incurred by PT Inco if its operations were dependent on fuel oil as the sole source to
meet its energy requirements.
19
Our Ontario operations benefit significantly, and our Manitoba operations benefit to a minor
extent, from the copper, precious metals and cobalt produced in association with nickel. In 2005,
our Ontario ores
accounted for approximately 92 per cent of our copper production, 90 per cent of our by-product
PGMs production and 57 per cent of our by-product cobalt production, with one per cent of our
copper production, five per cent of our by-product platinum-group metals production and 19 per cent
of our cobalt by-product production derived from our Manitoba ores. We also produce nickel,
copper, cobalt and precious metals from purchased materials. Precious metals have relatively high
selling values compared with our processing costs for these metals. Incos accounting and financial
reporting practice is to include revenues from deliveries of copper, precious metals and cobalt in
net sales and to include costs of recovering such metals in cost of sales. Copper is considered to
be a joint product with nickel and, as such, its production costs include an allocation of mining
costs plus its identifiable concentrating, smelting and refining costs; precious metals and cobalt
are considered to be by-products and, as such, their production costs include no allocation of
mining, concentrating and smelting costs, but do include their identifiable upgrading and refining
costs.
Incos nickel production decreased by seven per cent to 220,727 tonnes in 2005, compared with
236,817 tonnes in 2004, the year in which we experienced the highest annual production in our
history. The decrease in nickel production was primarily due to a longer than planned major
maintenance shutdown at our Ontario operations and a slower ramp-up after that shutdown caused, in
turn, by a number of factors. These factors included labour productivity problems involving one
contractor on the work undertaken during the shutdown, an increase in the scope of certain work
undertaken as a result of the shutdown, the need to repair unanticipated leaks relating to the
expansion of the acid plant at these operations and a fire in one of the dust capture bag houses.
In addition, we had a longer than usual major maintenance shutdown at our Manitoba operations
during the third quarter which was necessary to prepare those operations for the arrival of
Voiseys Bay nickel concentrates late in the fourth quarter of 2005 and the processing of the
additional cobalt contained in such concentrates and to have the ability to operate with a single
furnace. In 2004, nickel production increased by 27 per cent, compared with 187,173 tonnes in
2003, primarily reflecting higher production at our Canadian and U.K. operations compared with 2003
when the three-month strike at our Ontario operations that began on June 1, 2003 and a difficult
ramp-up of operations in September 2003 following the strike negatively affected production.
Production of finished nickel from Canadian ores and purchased material processed in Canada
totalled 145,036 tonnes in 2005, compared with 161,730 tonnes in 2004 and 120,479 tonnes in 2003.
Additional nickel and copper production statistics for our primary metals operations are shown in
the tables under Concentrating, Smelting and Refining below. For a discussion of PT Incos
operating rates and estimated ore reserves, see PT International Nickel Indonesia Tbk
Operations below.
Our 2006 nickel production, including material toll smelted and refined by third parties, is
currently expected to be approximately 256,000 tonnes, up from the 220,727 tonnes level in 2005.
The increase in production is primarily due to finished nickel products produced from our Voiseys
Bay nickel concentrates at our Canadian operations and to the toll smelting and refining
arrangements covering purchased intermediates with certain third parties as noted below. We expect
our purchases of nickel intermediates processed through our Canadian operations to decrease by 45
per cent from 2005 levels to approximately 15,400 tonnes in 2006. Finished copper production for
2006, including anodes production, is currently expected to be approximately 124,700 tonnes
compared to 125,595 tonnes in 2005. Production of copper in concentrate at Voiseys Bay is
currently expected to be approximately 29,500 tonnes compared with 4,406 tonnes of copper in
concentrate in 2005. Total production of PGMs is expected to be 400,000 troy ounces for 2006.
Since 2002, as mine production at our Manitoba operations transitioned from Thompson Mine to
the lower-grade Birchtree Mine, we have experienced lower mine production. We have relied upon the
availability of purchased nickel intermediates to maintain Manitobas nickel production at around
the 45,000 tonne annual level. With the availability of Voiseys Bay nickel concentrates for
processing at our Manitoba operations, these operations are expected to produce finished nickel
products at or above the 45,000 tonne annual level over at least the 2006 2011 period. In August
2005, we announced plans to develop the 1D Lower orebody at Thompson Mine. Work has commenced on
the development of the 1D Lower orebody, which would increase the availability of local
concentrates and, assuming the current diamond drilling program covering this orebody for lateral
and deeper extensions is successful, would provide a platform for ongoing production once Voiseys
Bay concentrates are no longer supplied to
Manitoba. The cost to develop the 1D Lower orebody is approximately $34 million and
production is expected to begin in 2008.
Starting in early 2006, we will be relying on our Voiseys Bay nickel concentrates to maintain
production at or near capacity at our Manitoba and Ontario operations. If our Voiseys Bay
operations experience problems in producing or shipping to Sudbury or Thompson its nickel
concentrates, these events would have an adverse effect on our ability to produce and sell the
nickel products we plan to produce in 2006 and would adversely affect our results of operations,
financial condition, profitability and cash flows.
We have contracts with two Australian suppliers of purchased nickel intermediates which we
have been using to maintain production principally at our Manitoba operations and, to a lesser
extent, at our Ontario operations. Under these arrangements, these
20
producers are currently
expected to provide an aggregate of about 53,000 tonnes of nickel in concentrate over the 2006
2009 period. In late 2005 and early 2006 we entered into contracts with subsidiaries of Boliden AB
and OM Group, Inc. to toll smelt and refine some of these quantities of concentrates at their
respective smelting and refining operations in Finland for three-year terms expiring in mid-2009.
The purpose of these arrangements is to enable us to increase production from our own Canadian
ores.
Capital Expenditures
The primary focus of Incos capital expenditure programs is to provide its operations with
appropriate production capacity for its nickel and other primary metals products and to develop new
projects, including the Voiseys Bay and Goro projects. Capital expenditures totalled $1,168
million in 2005, compared with $876 million in 2004 and $591 million in 2003.
Cash spent for the Goro project, including capitalized interest, totalled $344 million in 2005,
compared with $138 million in 2004 and $249 million in 2003, and for the Voiseys Bay project,
including capitalized interest, totalled $353 million in 2005, compared with $447 million in 2004
and $138 million in 2003. The balance of capital expenditures in each of the three years was
directed primarily to the development, maintenance and improvement of new and existing mining
operations in Canada and productivity improvements and to meet environmental regulations and
similar requirements. We currently estimate that our existing operations require, on an annual
basis, on average approximately $230 million of capital expenditures to sustain their operations
and to meet current environmental regulations and similar requirements at our currently planned
production and/or utilization levels for these operations.
Our total 2006 capital expenditures for our existing operations and development projects are
currently expected to total $1,820 million and, taking into account contributions to be made by the
other shareholders in Goro Nickel and receipt of certain government assistance under programs
relating to our development projects, we expect our share of this total to be $1,340 million. This
estimate includes approximately $1,140 million, including capitalized interest, for the Goro
project, $55 million for the Voiseys Bay project, $60 million for the program to increase
production at PT Inco and approximately $80 million for mines development, approximately $120
million for environmental measures, $50 million for discretionary expenditures and approximately
$315 million for sustaining capital. Total depreciation, depletion and amortization expenses for
our existing operations are currently projected to be $455 million in 2006, including an estimated
$175 million in respect of the Voiseys Bay project. The total capital expenditures for the Goro
project will depend on a number of factors, including receipt of all necessary construction and
other permits and the continued availability of certain tax-advantaged financing from the French
government. For a discussion of the Goro project, see Goro Nickel S.A.S. below.
Mining and Mine Production
At December 31, 2005, Inco had the following mines in operation in Canada:
|
|
|
|
|
Ontario |
|
Manitoba |
|
Voiseys Bay |
Copper Cliff North
|
|
Birchtree
|
|
Ovoid |
Copper Cliff South
|
|
Thompson |
|
|
Creighton (1) |
|
|
|
|
Garson |
|
|
|
|
Gertrude |
|
|
|
|
McCreedy East/Coleman |
|
|
|
|
Stobie |
|
|
|
|
|
|
|
(1) |
|
Excludes Creighton 3 Mine which is located near the main Creighton Mine and accessible
by a separate shaft and ramp. |
All of the mines listed above are underground mines except for Gertrude Mine and the Ovoid which
are open pit mines. In addition to these operating mines, our Ontario operations include several
non-operating mines or mines on standby which contain estimated ore reserves as indicated in the
tables Total Estimated Ore Reserves as of December 31, 2005 and Total Estimated Ore Reserves as
of December 31, 2004 under Ore Reserves and Mining Rights below.
The following maps show the location of the operating mines, non-operating mines, undeveloped
properties and processing and other facilities at our Ontario and Manitoba operations and the
Voiseys Bay project.
21
Ontario Operations
Location of Operating Mines, Non-Operating Mines, Undeveloped Properties
and Processing and Other Facilities
22
Manitoba Operations
Location of Operating Mines, Non-Operating Mines and and Processing and Other Facilities
For further information on the development projects or undeveloped properties at our Ontario and
Manitoba operations, see Exploration and Mine Development below.
23
Voiseys Bay Project (Initial Phase)
Location of Operating Mines, Concentrator and Other Facilities
24
At PT Inco, mining operations were being conducted at the Sorowako and Pomalaa-Antam
mining areas at December 31, 2005. For further information, see PT International Nickel Tbk
General below.
The tables below set forth our annual mine production in thousands of tonnes by operating mine
(or on an aggregate basis for PT Inco area since it has mining areas rather than mines) and the
average percentage grades of certain metals (nickel and copper) for our Ontario operations, our
Manitoba operations, our Voiseys Bay project and PT Inco for 2005, 2004 and 2003. For our
Manitoba and Ontario operations and our Voiseys Bay project, the production and average grades
represent the mine product delivered to those operations respective processing plants and do not
include adjustments due to beneficiation, smelting or refining. The mine production at PT Inco
represents the product from PT Incos dryer kilns (Dry Kiln Product) delivered to PT Incos
smelting operations and does not include nickel losses due to smelting.
Annual Mine Production
(in thousands of tonnes, except percentages)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005 |
|
2004 |
|
2003 |
Ontario Operations Operating Mines |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copper Cliff North Mine |
|
Mine production |
|
|
1,261 |
|
|
|
1,085 |
|
|
|
701 |
|
|
|
Copper (per cent) |
|
|
1.32 |
|
|
|
1.07 |
|
|
|
1.16 |
|
|
|
Nickel (per cent) |
|
|
1.09 |
|
|
|
1.04 |
|
|
|
1.21 |
|
Copper Cliff South Mine |
|
Mine production |
|
|
890 |
|
|
|
838 |
|
|
|
769 |
|
|
|
Copper (per cent) |
|
|
1.84 |
|
|
|
2.45 |
|
|
|
2.50 |
|
|
|
Nickel (per cent) |
|
|
1.36 |
|
|
|
1.92 |
|
|
|
1.80 |
|
Creighton Mine |
|
Mine production |
|
|
988 |
|
|
|
968 |
|
|
|
713 |
|
|
|
Copper (per cent) |
|
|
1.62 |
|
|
|
1.48 |
|
|
|
1.53 |
|
|
|
Nickel (per cent) |
|
|
2.09 |
|
|
|
2.06 |
|
|
|
2.10 |
|
Stobie Mine |
|
Mine production |
|
|
3,018 |
|
|
|
3,005 |
|
|
|
2,222 |
|
|
|
Copper (per cent) |
|
|
0.79 |
|
|
|
0.83 |
|
|
|
0.83 |
|
|
|
Nickel (per cent) |
|
|
0.86 |
|
|
|
0.88 |
|
|
|
0.90 |
|
Garson Mine |
|
Mine production |
|
|
721 |
|
|
|
610 |
|
|
|
434 |
|
|
|
Copper (per cent) |
|
|
1.09 |
|
|
|
1.04 |
|
|
|
1.10 |
|
|
|
Nickel (per cent) |
|
|
1.67 |
|
|
|
1.74 |
|
|
|
1.87 |
|
McCreedy East/Coleman Mine |
|
Mine production |
|
|
1,401 |
|
|
|
1,210 |
|
|
|
870 |
|
|
|
Copper (per cent) |
|
|
2.78 |
|
|
|
3.05 |
|
|
|
3.57 |
|
|
|
Nickel (per cent) |
|
|
1.68 |
|
|
|
1.69 |
|
|
|
1.78 |
|
Gertrude Mine |
|
Mine production |
|
|
474 |
|
|
|
504 |
|
|
|
453 |
|
|
|
Copper (per cent) |
|
|
0.31 |
|
|
|
0.33 |
|
|
|
0.36 |
|
|
|
Nickel (per cent) |
|
|
0.80 |
|
|
|
0.95 |
|
|
|
1.01 |
|
Total Ontario Operations |
|
Mine production |
|
|
8,753 |
|
|
|
8,220 |
|
|
|
6,162 |
|
|
|
Copper (per cent) |
|
|
1.38 |
|
|
|
1.41 |
|
|
|
1.53 |
|
|
|
Nickel (per cent) |
|
|
1.28 |
|
|
|
1.33 |
|
|
|
1.39 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Manitoba Operations Operating Mines |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Thompson Mine |
|
Mine production |
|
|
1,323 |
|
|
|
1,377 |
|
|
|
1,393 |
|
|
|
Nickel (per cent) |
|
|
2.01 |
|
|
|
2.10 |
|
|
|
2.21 |
|
Birchtree Mine |
|
Mine production |
|
|
1,121 |
|
|
|
962 |
|
|
|
640 |
|
|
|
Nickel (per cent) |
|
|
1.54 |
|
|
|
1.64 |
|
|
|
1.83 |
|
Total Manitoba Operations |
|
Mine production |
|
|
2,444 |
|
|
|
2,339 |
|
|
|
2,033 |
|
|
|
Nickel (per cent) |
|
|
1.80 |
|
|
|
1.91 |
|
|
|
2.09 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Voiseys Bay Project |
|
Mine production |
|
|
351 |
|
|
|
|
|
|
|
|
|
|
|
Copper (per cent) |
|
|
1.78 |
|
|
|
|
|
|
|
|
|
|
|
Nickel (per cent) |
|
|
3.44 |
|
|
|
|
|
|
|
|
|
25
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005 |
|
2004 |
|
2003 |
PT Inco Operating Mining Areas |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sorowako Mining Area |
|
Mine production |
|
|
4,689 |
|
|
|
4,350 |
|
|
|
3,891 |
|
|
|
Nickel (per cent) |
|
|
1.84 |
|
|
|
1.85 |
|
|
|
1.91 |
|
Pomalaa-Antam Mining Area |
|
Mine production |
|
|
370 |
|
|
|
|
|
|
|
|
|
|
|
Nickel (per cent) |
|
|
2.30 |
|
|
|
|
|
|
|
|
|
Total PT Inco |
|
Mine production |
|
|
5,059 |
|
|
|
4,350 |
|
|
|
3,891 |
|
|
|
Nickel (per cent) |
|
|
1.87 |
|
|
|
1.85 |
|
|
|
1.91 |
|
Concentrating, Smelting and Refining
The conversion of nickel ore mined from Incos sulphide deposits in Canada into
commercially marketable products requires various processing and refining steps undertaken at
concentrators, smelters and refineries. The ore is first crushed and ground, the sulphides are
separated into concentrates, and the concentrates are then smelted to produce nickel matte, an
intermediate product containing approximately 75 per cent nickel plus copper. The matte is then
refined to produce primary nickel and copper products.
Incos processing facilities in operation during 2005 in the Sudbury area included a
concentrator, a combined nickel and copper smelter, matte processing facilities, a nickel refinery,
a copper refinery, a silver refinery, a sulphuric acid plant and a sulphur dioxide liquefaction
plant. Nickel matte produced in Sudbury is refined in Sudbury and other locations into nickel
pellets, nickel powders,
UTILITY4 nickel, nickel discs and Nickel Oxide Sinter
755, a product containing approximately 75 per cent nickel. In Thompson, Manitoba, we
have a concentrator, a nickel smelter and an electrolytic nickel refinery. Certain nickel products
produced in Sudbury and Thompson are finished at Port Colborne, Ontario.
In May 2005, as discussed above, we announced the closure of our copper refinery in Sudbury
based upon a number of factors. Given this decision, all of our copper production in Ontario will
be processed into copper anodes beginning in 2006.
Finished nickel is also produced at our refinery at Clydach, Wales. The Clydach refinery
processes material supplied from our operations in Canada. At Port Colborne, we also operate an
electrocobalt refinery and a precious metals upgrading facility. The majority of our silver
production is refined at Copper Cliff, Ontario and our gold production is refined in Canada under a
tolling arrangement with the Royal Canadian Mint. This by-product production is reflected in the
tables under Sales and Deliveries above. Our refinery at Acton, England produces PGMs from
upgraded concentrates from our operations in Canada and from the recovery, through toll-refining,
of materials containing PGMs supplied by unaffiliated customers.
Incos Ontario operations, Manitoba operations and operations in the United Kingdom form a
business unit known as our Canadian and UK Operations. This organization, which was created in
2001, facilitates the sharing of knowledge and helps to optimize the use of certain of our
facilities and resources.
The conversion of nickel ore mined from PT Incos laterite deposits in Indonesia into
nickel-in-matte requires various processing steps. The ore is first screened at one of five
screening stations to reject barren or low-grade boulders. Ore-grade boulders are crushed and
added to the screening station product. Large wet ore storage inventories are maintained to feed
the processing plant. The ore in storage has a moisture content of between 25 and 35 per cent. In
PT Incos processing plant, the ore is dried in one of three dryers to reduce the moisture content
to about 20 per cent, heated (using a process called calcining) in one of five reduction kilns and
smelted in one of four electric furnaces to produce furnace matte containing about 25 to 28 per
cent nickel, 8 to 10 per cent sulphur and 60 per cent iron. The molten furnace matte is then
charged to one of three batch-refining vessels called Pierce Smith Converters to produce a saleable
nickel-in-matte product containing approximately 78 percent nickel, 1.0 to 1.5 per cent cobalt, 18
to 22 per cent sulphur and a maximum of 0.7 per cent iron.
The following table shows our total production of finished nickel and copper from our primary
metals facilities for the five years ended December 31, 2005:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Finished Nickel and Copper Production |
|
|
2005 |
|
2004 |
|
2003 |
|
2002 |
|
2001 |
|
|
|
|
|
|
|
|
|
|
(in tonnes) |
|
|
|
|
|
|
|
|
Nickel |
|
|
220,727 |
|
|
|
236,817 |
|
|
|
187,173 |
|
|
|
209,728 |
|
|
|
207,077 |
|
Copper |
|
|
125,595 |
|
|
|
124,456 |
|
|
|
91,134 |
|
|
|
111,787 |
|
|
|
116,255 |
|
|
|
|
4 |
|
Inco trademark |
|
5 |
|
Inco trademark |
26
See Mining and Production General above for information regarding Incos expected nickel
and copper production for 2006.
Of the amounts reported in the table above as finished nickel production, the following table
shows the amounts of such total finished nickel production from nickel-in-matte produced by PT Inco
for the five years ended December 31, 2005:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Finished Nickel from PT Inco Matte |
|
|
2005 |
|
2004 |
|
2003 |
|
2002 |
|
2001 |
|
|
|
|
|
|
|
|
|
|
(in tonnes) |
|
|
|
|
|
|
|
|
Nickel |
|
|
73,965 |
|
|
|
75,087 |
|
|
|
65,704 |
|
|
|
61,692 |
|
|
|
61,856 |
|
Incos worldwide nickel processing capacity, including capacity at our majority-owned
subsidiaries, is adequate to refine the production from our mines at current rates of mine
production. We also have contractual nickel refining arrangements with nickel refiners in Asia in
which we have minority equity interests. These include an arrangement with Taiwan Nickel for the
supply of intermediate products produced by Inco for Taiwan Nickels refining operations, and a
joint venture, also involving the supply of intermediate products produced by Inco, with Korea
Nickel which, in turn, produces UTILITY nickel. The other shareholders of Taiwan Nickel are a
number of Taiwanese investors and the other shareholders of Korea Nickel are Korea Zinc Company,
Ltd. (Korea Zinc), a number of individuals associated with Korea Zinc and entities associated
with Pohang Iron and Steel Co., Ltd.
All production facilities at our operations in Ontario, Manitoba, Newfoundland and Labrador,
Clydach and Acton are owned by us and are located on property which we own or with respect to which
we have contractual rights to acquire ownership or, in the case of
the Voiseys Bay project, are covered by the surface lease referred
to under Our Resources and Mining Rights Mining and Other Rights
Voiseys Bay Project below.
Permission from the Ontario government is required for the export of intermediate products
derived from Ontario ores. Our practice is to meet with government officials prior to the
expiration of each of the required export licences to discuss relevant aspects of the export
procedure. In December 2005, the Ontario government granted permission for us to continue to
export nickel oxide sinter and nickel sulphide matte, as well as nickel sulphate residue, to
Clydach until December 31, 2015. During 2005, we refined about 17 per cent of our primary nickel
production at our refinery in Clydach from intermediate products derived from our Ontario ores.
The Ontario government also granted us permission in December 2005 to continue to export
semi-refined PGMs concentrate to our Acton refinery until December 31, 2015. We are not aware of
any information or other factors at this time which would indicate that we could not reach
agreement with the Province of Ontario on extending these permits for additional periods upon their
expiry. The Province of Manitoba currently does not restrict the export of products from our
Thompson mines. As discussed under Ore Reserves and Mining Rights and Voiseys Bay Nickel
Company Limited Arrangements with the Provincial Government below, there are certain
restrictions and limitations relating to the export of intermediate products from the Province of
Newfoundland and Labrador.
Ore Reserves and Mining Rights
Ore Reserves
The following tables show, as of December 31, 2005 and 2004, our estimates of our (i)
proven ore reserves, (ii) probable ore reserves, and (iii) the aggregate of proven and probable ore
reserves at our operating mines, non-operating mines, undeveloped properties and development
projects at our Ontario operations, our Manitoba operations, our Voiseys Bay project in the
Province of Newfoundland and Labrador which began commercial production in 2005, PT Inco in
Indonesia and our Goro project in New Caledonia and the estimated respective average nickel,
copper, cobalt, platinum, palladium and gold metal grades, where significant, of each such total
amount as of the end of the periods indicated. Ore reserve estimates referred to under
Exploration and Mine Development below or elsewhere in this Report are included in these tables.
27
Total Estimated Ore Reserves as of December 31, 2005
(in millions of tonnes (Mt) except as indicated) (1)(2)(3)(7)(8)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Platinum |
|
Palladium |
|
Gold |
|
|
|
|
Quantity |
|
Nickel |
|
Copper |
|
Cobalt |
|
(grams/ |
|
(grams/ |
|
(grams/ |
|
|
Class |
|
(Mt) |
|
(per cent) |
|
(per cent) |
|
(per cent) |
|
tonne) |
|
tonne) |
|
tonne) |
ONTARIO OPERATIONS(4)(6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating Mines |
|
Proven |
|
|
69 |
|
|
|
1.22 |
|
|
|
1.32 |
|
|
|
0.04 |
|
|
|
0.6 |
|
|
|
0.7 |
|
|
|
0.2 |
|
|
|
Probable |
|
|
42 |
|
|
|
1.30 |
|
|
|
1.71 |
|
|
|
0.03 |
|
|
|
1.1 |
|
|
|
1.1 |
|
|
|
0.4 |
|
|
|
Total/Average |
|
|
111 |
|
|
|
1.25 |
|
|
|
1.47 |
|
|
|
0.04 |
|
|
|
0.8 |
|
|
|
0.8 |
|
|
|
0.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Non-Operating Mines |
|
Proven |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable |
|
|
48 |
|
|
|
1.13 |
|
|
|
0.98 |
|
|
|
0.04 |
|
|
|
0.7 |
|
|
|
0.8 |
|
|
|
0.3 |
|
|
|
Total/Average |
|
|
48 |
|
|
|
1.12 |
|
|
|
0.98 |
|
|
|
0.04 |
|
|
|
0.7 |
|
|
|
0.8 |
|
|
|
0.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Undeveloped Properties |
|
Proven |
|
|
1 |
|
|
|
1.09 |
|
|
|
0.50 |
|
|
|
0.03 |
|
|
|
0.1 |
|
|
|
0.1 |
|
|
|
|
|
|
|
Probable |
|
|
3 |
|
|
|
1.41 |
|
|
|
0.97 |
|
|
|
0.05 |
|
|
|
0.5 |
|
|
|
0.3 |
|
|
|
0.1 |
|
|
|
Total/Average |
|
|
4 |
|
|
|
1.38 |
|
|
|
0.93 |
|
|
|
0.05 |
|
|
|
0.4 |
|
|
|
0.3 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
Proven |
|
|
69 |
|
|
|
1.22 |
|
|
|
1.32 |
|
|
|
0.04 |
|
|
|
0.6 |
|
|
|
0.7 |
|
|
|
0.2 |
|
|
|
Probable |
|
|
94 |
|
|
|
1.22 |
|
|
|
1.31 |
|
|
|
0.04 |
|
|
|
0.9 |
|
|
|
0.9 |
|
|
|
0.3 |
|
|
|
Total/Average |
|
|
163 |
|
|
|
1.22 |
|
|
|
1.31 |
|
|
|
0.04 |
|
|
|
0.8 |
|
|
|
0.8 |
|
|
|
0.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MANITOBA OPERATIONS(4)(6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating Mines |
|
Proven |
|
|
14 |
|
|
|
1.94 |
|
|
|
0.13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable |
|
|
11 |
|
|
|
1.86 |
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
25 |
|
|
|
1.90 |
|
|
|
0.13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PT INCO(5)(6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mining Areas |
|
Proven |
|
|
59 |
|
|
|
1.80 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable |
|
|
88 |
|
|
|
1.81 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
147 |
|
|
|
1.80 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
VOISEYS BAY PROJECT(4)(6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating Mine |
|
Proven |
|
|
29 |
|
|
|
2.99 |
|
|
|
1.73 |
|
|
|
0.15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable |
|
|
3 |
|
|
|
0.64 |
|
|
|
0.37 |
|
|
|
0.03 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
32 |
|
|
|
2.75 |
|
|
|
1.59 |
|
|
|
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GORO PROJECT(5)(6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Development Property |
|
Proven |
|
|
96 |
|
|
|
1.34 |
|
|
|
|
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable |
|
|
24 |
|
|
|
2.01 |
|
|
|
|
|
|
|
0.09 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
120 |
|
|
|
1.48 |
|
|
|
|
|
|
|
0.11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
28
Total Estimated Ore Reserves as of December 31, 2004
(in millions of tonnes (Mt) except as indicated) (1)(2)(3)(7)(8)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Platinum |
|
Palladium |
|
Gold |
|
|
|
|
Quantity |
|
Nickel |
|
Copper |
|
Cobalt |
|
(grams/ |
|
(grams/ |
|
(grams/ |
|
|
Class |
|
(Mt) |
|
(per cent) |
|
(per cent) |
|
(per cent) |
|
tonne) |
|
tonne) |
|
tonne) |
ONTARIO OPERATIONS (4)(6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating Mines |
|
Proven |
|
|
70 |
|
|
|
1.24 |
|
|
|
1.34 |
|
|
|
0.04 |
|
|
|
0.65 |
|
|
|
0.71 |
|
|
|
0.24 |
|
|
|
Probable |
|
|
59 |
|
|
|
1.35 |
|
|
|
1.59 |
|
|
|
0.03 |
|
|
|
1.02 |
|
|
|
1.13 |
|
|
|
0.39 |
|
|
|
Total/Average |
|
|
129 |
|
|
|
1.29 |
|
|
|
1.46 |
|
|
|
0.04 |
|
|
|
0.82 |
|
|
|
0.91 |
|
|
|
0.32 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Non-Operating Mines |
|
Proven |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable |
|
|
44 |
|
|
|
1.09 |
|
|
|
0.87 |
|
|
|
0.04 |
|
|
|
0.52 |
|
|
|
0.52 |
|
|
|
0.20 |
|
|
|
Total/Average |
|
|
44 |
|
|
|
1.09 |
|
|
|
0.87 |
|
|
|
0.04 |
|
|
|
0.52 |
|
|
|
0.52 |
|
|
|
0.20 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Undeveloped Properties |
|
Proven |
|
|
1 |
|
|
|
1.09 |
|
|
|
0.50 |
|
|
|
0.03 |
|
|
|
0.10 |
|
|
|
0.10 |
|
|
|
0.03 |
|
|
|
Probable |
|
|
3 |
|
|
|
1.41 |
|
|
|
0.97 |
|
|
|
0.05 |
|
|
|
0.45 |
|
|
|
0.34 |
|
|
|
0.07 |
|
|
|
Total/Average |
|
|
4 |
|
|
|
1.38 |
|
|
|
0.93 |
|
|
|
0.05 |
|
|
|
0.41 |
|
|
|
0.32 |
|
|
|
0.07 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
Proven |
|
|
71 |
|
|
|
1.24 |
|
|
|
1.34 |
|
|
|
0.04 |
|
|
|
0.65 |
|
|
|
0.72 |
|
|
|
0.24 |
|
|
|
Probable |
|
|
106 |
|
|
|
1.24 |
|
|
|
1.28 |
|
|
|
0.04 |
|
|
|
0.79 |
|
|
|
0.86 |
|
|
|
0.31 |
|
|
|
Total/Average |
|
|
177 |
|
|
|
1.24 |
|
|
|
1.30 |
|
|
|
0.04 |
|
|
|
0.72 |
|
|
|
0.79 |
|
|
|
0.27 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MANITOBA OPERATIONS (4)(6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating Mines |
|
Proven |
|
|
14 |
|
|
|
2.08 |
|
|
|
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable |
|
|
13 |
|
|
|
2.13 |
|
|
|
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
27 |
|
|
|
2.10 |
|
|
|
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PT INCO (5)(6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mining Areas |
|
Proven |
|
|
88 |
|
|
|
1.84 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable |
|
|
20 |
|
|
|
1.81 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
108 |
|
|
|
1.83 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
VOISEYS BAY PROJECT (4)(6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Development Property |
|
Proven |
|
|
29 |
|
|
|
3.05 |
|
|
|
1.77 |
|
|
|
0.15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable |
|
|
3 |
|
|
|
0.76 |
|
|
|
0.45 |
|
|
|
0.04 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
32 |
|
|
|
2.82 |
|
|
|
1.54 |
|
|
|
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GORO PROJECT (5)(6) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Development Property |
|
Proven |
|
|
73 |
|
|
|
1.39 |
|
|
|
|
|
|
|
0.13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable |
|
|
22 |
|
|
|
2.01 |
|
|
|
|
|
|
|
0.09 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
95 |
|
|
|
1.53 |
|
|
|
|
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
Estimated ore reserves represent, in accordance with applicable rules and regulations of
the SEC, including the definitions thereunder, that part of a mineral deposit which could be
economically and legally extracted or produced at the time of the reserve determination.
Proven ore reserves are reserves for which (i) the quantity is computed from dimensions
revealed in outcrops, trenches, workings or drill holes; grade and/or quality are computed
from the results of detailed sampling and (ii) the sites for inspection, sampling and
measurement are spaced so closely and the geologic character is so well defined that size,
shape, depth and mineral content of reserves are well-established. Probable ore reserves
are reserves for which the quantity and grade and/or quality are computed from information
similar to that used for proven reserves, but the sites for inspection, sampling and
measurement are farther apart or are otherwise less adequately spaced. The degree of
assurance, although lower than that for proven ore reserves, is high enough to assume
continuity between points of observation. For the purposes of the SECs rules and
regulations, the ore reserves at our Ontario and Manitoba operations operating mines are
estimated based upon, among other factors, operating costs, and the ore reserves at such
operations non-operating mines are estimated based on, among other factors, mining costs
derived from certain mining feasibility studies. |
|
(2) |
|
The Company, in accordance with applicable Canadian securities regulatory requirements,
also estimates its mineral reserves (as well as mineral resources as discussed on the
following pages) in compliance with the definitions under the CIM Standards on Mineral
Resources and Reserves Definitions and Guidelines adopted by the CIM Council of the Canadian
Institute of Mining, Metallurgy and Petroleum in November 2004 (the CIM Guidelines). If
the reserve numbers in the tables above estimated as of year-end 2005 and 2004 were prepared in accordance
with such definitions for mineral reserve, probable mineral reserve and proven mineral
reserve in the CIM Guidelines, there would be no substantive difference in such estimates
from the total estimates for proven and probable ore reserves in the tables above or with
respect to the other reserve estimates set forth elsewhere in this Report. For the purposes
of the CIM Guidelines, the Ontario and Manitoba operations ore reserves at their operating
mines are estimated based on, among other factors, operating costs, and the ore reserves
estimates at such operations non-operating mines are based on, among other factors, mining
costs derived from certain mining feasibility studies. Our total ore reserve estimates are
based on a number of assumptions such as mining methods, production and other costs, metal
recovery rates and ore recovery dilution factors. |
|
|
|
We develop our business plans using a time horizon that reflects our view of long-term metals
prices over the relevant historical cycle for each metal we produce and other key long-term
assumptions. We also use these long-term metals prices and other key assumptions in preparing
our ore reserve estimates. These long-term metals prices and other key assumptions are
different (in some cases materially different) than the latest three-year averages for the
metals we |
29
|
|
|
|
|
produce and relevant exchange rates. We used the following long-term metals prices and other
assumptions as of year-end 2005 and 2004 for our business plans and ore reserve estimates;
nickel at $3.50 per pound (LME cash nickel price), with adjustments made for the premiums on
special products realized in our Ontario and Manitoba operations and discounts for the matte
product at PT Inco and the planned nickel oxide product to be produced at the Goro project;
copper at $0.90 per pound; cobalt at $9.00 per pound for cobalt metal with adjustments made
for other cobalt products; platinum at $550 per troy ounce; palladium at $200 per troy ounce;
and gold at $275 per troy ounce; with respect to currencies, a long-term average of the U.S.
dollar-Canadian dollar exchange rate of $1.00 = $1.39, and a long-term average of the U.S.
dollar-Indonesian rupiah (Rp) exchange rate of $1.00 to 10,000 Rp. The following represent
the approximately three-year averages for the period from January 1, 2003 to September 30,
2005 for these same metals prices and exchange rates; nickel at $5.78 per pound LME cash nickel
price, with adjustments made for the premiums on speciality products realized in our Ontario
and Manitoba operations, and discounts for the matte product produced at PT Inco and the
planned nickel oxide product to be produced at the Goro project; copper at $1.20 per pound;
cobalt at $14.95 per pound for cobalt metal with adjustments made for other cobalt products;
platinum at $784 per troy ounce; palladium at $207 per troy ounce; and gold at $400 per troy
ounce; and with respect to currencies, the latest three-year average U.S. dollar-Canadian
dollar exchange rate of $1.00 = Cdn. $1.32 and the latest three-year average U.S.
dollar-Indonesian rupiah (Rp) exchange rate of $1.00 = Rp. 8,969. For the period from January
1, 2002 to November 30, 2004 the averages for these same metals prices and exchange rates were as follows:
nickel at $4.56 per pound (LME cash nickel price), with adjustments made for the premiums on
speciality products realized in our Ontario and Manitoba operations, and discounts for the
matte product produced at PT Inco and the planned nickel oxide product to be produced at the
Goro project; copper at $0.95 per pound; cobalt at $12.07 per pound for cobalt metal with
adjustments made for other cobalt products; platinum at $679 per troy ounce; palladium at $256
per troy ounce; and gold at $358 per troy ounce; and with respect to currencies, the latest
three-year average U.S. dollar-Canadian dollar exchange rate of $1.00 = Cdn. $1.43 and the
latest three-year average U.S. Dollar-Indonesian rupiah (Rp) exchange rate of $1.00 = Rp.
8,934. If these approximately three-year averages were used, as applicable, for our ore
reserve estimates as of year-end 2005 and 2004, respectively, these estimates as of year-end
2005 and 2004 would not change to any significant degree given the nature of the
mineralization in our deposits and the relative importance of a number of other factors that
are used in developing our reserve estimates for these applicable periods. |
|
(3) |
|
For the purpose of estimating and reporting Incos ore reserves, all persons preparing
and/or reviewing the estimates are designated as responsible persons for internal
requirements. As part of our internal processes and procedures in developing these
estimates, the role of each such responsible person is to review those key parts of the
estimated ore reserves for which such person has the appropriate professional expertise
and/or experience, and/or supervisory or management responsibility to ensure that the
estimates are reasonable, economically viable and consistent with our production plans and
that they are not aware of any environmental, permitting, legal, ownership, taxation,
political or social issues that would materially affect the estimates. |
|
|
|
In accordance with applicable Canadian securities regulatory requirements, including the
recently revised National Instrument 43-101, Standards of Disclosure for Mineral Projects,
Mr. S. Nicholas Sheard, Vice-President of Exploration, Dr. Olivier Tavchandjian, Principal
Geologist, Mineral Reserves and Mineral Resources, and Dr. Lawrence B. Cochrane, Director of
Mines Exploration, each as a qualified person within the meaning of such National Instrument
(which means generally an individual with relevant experience as an engineer or geoscientist
who is also a member in good standing of a recognized engineering or similar professional
association) indirectly supervised the preparation of the ore reserves estimates as of
December 31, 2005 and 2004 and other information set forth in the above tables relating to
2005 and 2004 and each has, in accordance with the requirements of such National Instrument,
conducted either directly by himself or indirectly through employees of the Company reporting
directly or indirectly to him, a comprehensive review and confirmation of the application of
the detailed procedures, systems and processes the Company has developed and implemented for
the purpose of verifying such data. Each of Mr. Sheard, Dr. Tavchandjian and Dr. Cochrane, as
well as the responsible persons described above and other staff of the Company involved in the
process of developing these estimates, also periodically check the adequacy of such
procedures, systems and processes which are intended to provide sufficient verification of
such data based upon recognized sampling, analytical testing, modeling and other procedures in
the mining industry. |
|
(4) |
|
The ore reserve estimates for the Ontario and Manitoba operations and the Voiseys Bay
project are of in-place material after adjustments for mining dilution and mining recovery.
No adjustments have been made to these estimates for metal losses due to processing
(beneficiation, smelting and refining at the Ontario and Manitoba operations and
beneficiation at the Voiseys Bay project). For the Ontario operations, the average metal
recoveries after processing in 2005 were as follows: nickel 76.4 per cent, copper 89.3
per cent, platinum 74.0 per cent, palladium 76.2 per cent and gold 66.1 per cent. For
the Manitoba operations, the average metal recoveries after processing in 2005 were as
follows: nickel 85.1 per cent, copper 82.6 per cent and cobalt 42.8 per cent. For
2004, the average metal recoveries after processing at our Ontario operations were as
follows: nickel 76.6 per cent, copper 90.0 per cent, platinum 75.1 per cent, palladium
77.1 per cent and gold 68.2 per cent and at the Manitoba operations were as follows:
nickel 86.3 per cent, copper 84.3 per cent and cobalt 41.8 per cent. The metal
recoveries for each operating mine, non-operating mine and undeveloped property vary
depending on the metal grades and mineralogy for each mine or undeveloped property. In
addition, the metal recoveries at both the Ontario and Manitoba operations vary depending on
the nature and quantity of concentrates acquired from external sources. Overall metals
recoveries for the Voiseys Bay project are expected to be 82 per cent for nickel, 94 per
cent for copper, and 39 per cent for cobalt. The Voiseys Bay metal recoveries include
beneficiation which was determined from extensive pilot plant tests. Smelting and refinery
recoveries are estimated from actual recoveries at the Ontario and Manitoba operations,
given that the Voiseys Bay nickel-containing concentrates planned to be produced over the
2006-2011 period are to be processed at these operations. The realized metal recoveries in
each zone may vary depending on the metal grades and the mineralogy of the ore in each zone. |
|
(5) |
|
The ore reserve estimates for PT Incos Sorowako mining area represent Dry Kiln Product.
The estimated ore reserves for the Sorowako mining area include factors for dilution and ore
losses due to mining and screening recovery during ore preparation. The estimated ore
reserves do not include nickel losses due to smelting. The average nickel recovery after
processing used for PT Incos 2005 and 2004 ore reserve estimate was 90.0 per cent. The
estimated Pomalaa mining area ore reserves of 1.8 million tonnes grading 2.30 per cent
nickel are included in PT Incos estimated total proven ore reserves. For the Goro project,
the ore reserve estimates include factors for dilution due to mining and for ore losses due
to mining recovery and screening recovery during feed preparation. The ore reserve is
estimated using a screened fraction recovered of minus 50 millimetres. The ore reserve
estimates do not include the nickel or cobalt losses due to processing. The planned
processing recoveries for the Goro project are anticipated to be 93.0 per cent for nickel
and 90.0 per cent for cobalt. |
|
(6) |
|
At the Ontario operations, the drill-spacing for the estimated ore reserves classified as
proven ranges from 30 metres by 46 metres to 15 metres by 23 metres, averaging 23 metres by
34 metres. The drill-spacing for the estimated ore reserves classified as probable ranges
from 61 metres by 91 metres to 30 metres by 61 metres, averaging 46 metres by 76 metres.
The classifications are also dependent on the mining method and mining selectivity. At the
Manitoba operations, the drill-spacing for the estimated ore reserves classified as proven
ranges from 15 metres by 18 metres to 12 metres by 12 metres, averaging 14 metres by 15
metres. The drill-spacing for the estimated ore reserves classified as probable ranges from
30 metres by 30 metres to 61 metres by 61 metres, averaging 45 metres by 45 metres. The
classifications are also dependent on the mining method and mining selectivity. For the
Voiseys Bay project, the drill-spacing for the estimated ore reserves classified as proven
averages 50 metres by 25 metres and the drill-spacing for the estimated ore reserves
classified as probable averages 50 metres by 50 metres. For the 2005 ore reserve estimates
of PT Inco, the drill-spacing requirements were revised based on recent drill-spacing
reconciliation studies conducted by PT Inco and our Inco Technical Services Limited unit and
confirmed by external consultants. The drill-spacing for the estimated ore reserves
classified as proven are 50 metres by 50 metres and the drill-spacing for the estimated ore
reserves classified as probable are 100 metres by 100 metres. The drill-spacing for the
estimated ore reserves classified as proven for the PT Inco 2004 ore reserve estimates
ranged from 50 metres |
30
|
|
|
|
|
by 100 metres to 50 metres by 50 metres, whereas the drill-spacing for the estimated ore
reserves classified as probable ranged from 150 metres by 150 metres to 100 metres by 100
metres. The total ore reserve tonnage and grade remain essentially the same, with about 44
million tonnes of proven ore reserves having been reclassified to probable ore reserves. This
reclassification does not affect the mining plan. At the PT Inco Pomalaa mining area, where
more selective mining is conducted with smaller equipment than at the Sorowako mining area,
the drill-spacing for the ore reserves classified as proven is 25 metres by 25 metres. For
the Goro project, the average drill-spacing for the estimated ore reserves classified as
proven is 100 metres by 100 metres and 100 metres by 200 metres for the estimated ore reserves
classified as probable. |
|
(7) |
|
All estimated proven and probable ore reserves referred to in this Report, including the
estimates referred to under Exploration and Mine Development below, are included in the
tables above. |
|
(8) |
|
The estimates shown in the above tables may reflect rounding differences and,
accordingly, may not be consistent with certain of the subtotal or total numbers shown.
Certain corrections have been made to grades for 2004. |
At our Ontario operations, the estimated combined proven and probable ore reserves
declined from 2004 to 2005 by 14 million tonnes, from 177 million tonnes to 163 million tonnes.
The decrease was primarily due to mining (8.7 million tonnes) and the reclassification of certain
estimated ore reserves to mineral resources at the Victor project and Stobie Mine.
At our Manitoba operations, the estimated combined proven and probable ore reserves declined
from 2004 to 2005 by two million tonnes, from 27 million tonnes to 25 million tonnes, and the
nickel grade declined. These reductions were primarily due to mining (2.4 million tonnes) and
certain re-evaluations undertaken at each mine. These changes included a decrease in the cut-off
grade at Birchtree Mine and the re-evaluation of remnants areas together with revisions to the
mineral deposit models at Thompson Mine.
At Voiseys Bay, the estimated combined proven and probable ore reserves remained unchanged
from 2004 to 2005 with a slight decrease in nickel grade. The reduction in grade was due to mining
in 2005 and an increase in the mining dilution as a result of a change to a larger block size for
mining assessments resulting in reduced selectivity.
At PT Inco, the estimated combined proven and probable ore reserves increased from 2004 to
2005 by 39 million tonnes, from 108 million tonnes to 147 million tonnes after adjustments for
mining estimated at approximately five million tonnes. The additions were from the West Block
deposits, based on recent additional core drilling required to meet processing feed plant chemistry
constraints, allowing for additional estimated ore reserves to be added from the Petea deposit and
additional limonite material from the East Block required for blending. Ore reserves were also
added at the Pomalaa mining area as a result of drilling in 2005.
At Goro, the estimated combined proven and probable ore reserves increased by 25 million
tonnes from 2004 to 2005 due to the inclusion of the East Kwe Basin in the mining plan and the
addition of medium-grade limonite to meet processing feed plant chemistry constraints. As a result
of the addition of more limonite, the ore reserve grade decreased slightly.
The economic test that we use in establishing ore reserves is performed using a financial
model encompassing all operating processes necessary to produce a saleable product or products at
each operation or project. For all the operations and projects, this economic model represents a
cash flow evaluation based on the production plan, which demonstrates our intent to mine. The
production schedule is determined based on a variable cut-off grade and a number of other factors
including the nature of deposit mineralization, plant capacities and optimizing the benefit of the
capital investment. The economic viability of the ore reserve estimates is based on mining plans
or feasibility studies for the operating business units and full feasibility studies for
development projects.
At our Ontario and Manitoba operations, all costs are based upon Incos applicable annual
operating plan. Processing costs include operating, depreciation and sustaining capital costs and
are updated annually to reflect the assumptions for such costs included in Incos current annual or
longer term (usually five-year) operating plans. Plant overhead costs are also updated annually
with plant throughput assumed to remain constant. Corporate costs include selling, general and
administration costs, charges for stand-by mines and demolition expenses. Mining costs include
operating and mine overhead, capital and transportation expenditures. For our Ontario and Manitoba
operations, metal recoveries are calculated from models based on process plant recoveries developed
as part of our annual operating plans and the models are updated annually.
Block modeling and geostatistical interpolation methods are used to derive the ore reserve
estimates for over 90 per cent of the ore reserves at our Ontario operations. Conventional
(polygonal) methods are used primarily to estimate the ore reserves remaining in pillars for
secondary mining assessments. At our Manitoba operations, block models are used and geostatistical
interpolation methods are used at Birchtree Mine and portions of Thompson Mine. Conventional
estimation methods are used for about 15 per cent of the ore reserve estimates at our Manitoba
operations. The mining methods used are generally non-selective and the internal dilution is
included in the mining blocks evaluated in developing the estimates.
31
For the block models, an estimation method, which we believe represents an appropriate
geostatistical approach for the data, is selected and technical checks are incorporated into the
modeling process. Reconciliation studies of mined out areas are completed to verify the
appropriateness of the estimation methods and the block models are verified and peer reviewed.
External auditors have been periodically used to critique the geostatistical techniques we utilize.
Standard procedures are used for the polygonal estimation techniques. Sections and plans
employing standardized grading and interpretation procedures are used to select the mining method
and assign mining lines. Mineral tonnages and metal grades are then estimated and appropriate
mineability and dilution rates are applied.
For the Voiseys Bay project, the geological interpretation of the Ovoid zone is based on the
block modeling of the troctolite unit hosting the mineral. Within this modelling process, two
domains of massive sulphide and disseminated mineralization were further defined. The block
dimensions used in the block model in 2005 are 10 metres by 10 metres by 7.5 metres vertical. The
vertical dimension was increased from five metres in 2005. Geotechnical data derived from core
holes drilled in the pit walls were used to design the open pit to mine this zone. Economic
evaluations are based on metal recoveries determined from extensive metallurgical testing and
operating costs estimated in the Voiseys Bay projects March 2003 feasibility study.
Due to the different economic contributions from each metal, block net smelter royalty
(BNSR) values have been used instead of a single metal cut-off grade for the open pit definition,
production planning and ore reserve estimates. The BNSR calculations assume constant concentrate
grades with which to calculate smelting, refining and freight charges. Charges in the BNSR
calculation, in addition to smelting, refining, and concentrate shipping charges, include, for the
Voiseys Bay project, a three per cent royalty originally held by Archean Resources Ltd., which
royalty interest was transferred in 2003 to a limited partnership created to hold such royalty
interest and is currently held by two entities, as discussed under Mining and Other Rights below,
and an assumed technical/management fee payable to Inco. The life-of-mine schedule uses a cut-off
value corresponding to the expected milling costs. All blocks with BNSR values less than the
cut-off value were considered as waste. There are no plans for a low-grade stockpile for the
Voiseys Bay project, and, accordingly, no part of the Voiseys Bay estimated ore reserve is
considered stockpile ore.
At PT Inco, the assumed nickel price used is discounted for the nickel-in-matte product
produced by PT Inco (representing the selling price received by PT Inco for its nickel-in-matte
product equivalent to a percentage of the LME cash nickel price). Costs are based on annual plant
operating costs (including selling, general and administration costs), and current depreciation and
amortization expenses (adjusted for any future changes). For 2005, operating and fixed costs were
based on PT Incos 2006 annual budget plan, after normalizing certain costs for long-term usage and
removing certain unusual costs for one-time events (additional pre-stripping, delineation drilling
and equipment rentals) and an adjustment for oil prices to a ten-year average. PT Incos process
plant nickel recovery factor is also based on its annual operating plan and is adjusted each year.
Given the nature of PT Incos laterite deposits and how they are mined, PT Inco does not have
specific operating mines but rather has mining areas. PT Inco from time to time has, however,
collectively referred to its Sorowako West Block and East Block areas and the Petea area (shown on
the maps under PT International Nickel Indonesia Tbk below) as its Sorowako mining area.
The ore reserves for PT Inco are estimated using block modeling techniques and geostatistical
interpolation methods. Standard block sizes are used with different parameters applied to each
deposit and in each of the limonite and saprolite layers. Mining volumes were estimated using a
minimum ore thickness of two metres and material below cut-off grade was classified as internal
waste if it was equal to or less than two metres thick. A minimum of 25 metres by 25 metres
lateral extent criteria was used to classify the ore. The mineral volumes were converted to
tonnages using appropriate wet tonnage factors. Screening recovery factors based on actual
production are applied to convert the run of mine product to equivalent Dry Kiln Product. Mining
recovery and dilution were included in the estimation of the ore reserves.
For the Goro project, the ore reserves were estimated using block modeling based on a 30-metre
by 30-metre by one-metre block size. The nickel and cobalt grades, the chemical components and
screen recoveries were interpolated for each block for each of the laterite layers using recognized
mining industry methods. The specific gravity, moisture content and screen size recoveries of the
laterite layers were determined based on data collected during geological and geotechnical drilling
campaigns. Grade simulation models, developed from close-spaced drilling, were used to simulate
variability in the layers thickness and chemistry, that are expected to be encountered during
mining, to estimate the ore loss due to mining and mining dilution. A variable nickel cut-off
grade was used to estimate the ore reserves. These variable cut-off grades replaced the cut-off
grade of 1.20 per cent nickel used prior to 2005 to accommodate variations in the chemical
composition of the feed material for the processing plant. The cut-off grade provides a plant feed
that meets the required chemistry of the blended material delivered to the process plant to provide
the planned nickel and cobalt production. The cut-off grade was applied in the limonitic layer
only and all material located below that cut-off horizon are planned to be mined in bulk, without
mining selectivity applied, until bedrock is reached. Both low-grade limonite stockpiles and
high-grade saprolite stockpiles are planned.
32
The key processes for developing Incos ore reserve estimates have since 2003 been enhanced to
include more formalized senior management review and approval of such processes and the preparation
of such estimates. These processes have involved, as discussed in Note 3 to the tables entitled
Total Estimated Ore Reserves as of December 31, 2005 and Total Estimated Ore Reserves as of
December 31, 2004 above, key technical personnel at each of the principal operating units or
locations, our corporate technical group, including our corporate exploration personnel, as well as
senior management, and have been enhanced as part of the objective of recognizing ore reserve
estimating as a core business process. In addition to internal audits of the processes utilized
and the estimates themselves, we have also retained external auditing firms to review such
processes and estimates. In 2005, an external audit was conducted on the ore reserve estimates at
PT Incos Sorowako mining area. This audit resulted in the reclassification of certain proven ore
reserves as probable ore reserves. In 2004, external audits were conducted on the ore reserve
estimates at Creighton Mine in Ontario and Birchtree Mine in Manitoba. None of these audits found
any material issues with respect to the audited ore reserve estimates.
Mineral Resources
As indicated below, we are including estimated mineral resources as of December 31, 2005
and 2004 in this Report. Historically, we have not included mineral resources information in our
Annual Report on Form 10-K, but we have elected to do so in this Report based on the principles of
the multi-jurisdictional disclosure system between Canada and the United States. As indicated, we
have used certain terms, such as mineral resources and measured, indicated, and inferred
mineral resources, that SEC guidelines normally strictly prohibit U.S. registered companies from
including in their filings with the SEC. These terms are defined in Note (1) to the tables below.
Mineral resource estimates as reported are determined in accordance with applicable Canadian
requirements and are in addition to the estimated ore reserves and do not include diluting material
and allowances for losses that may occur when the material is mined. Cut-off values or grades and
other shape and physical criteria, as applicable, for such estimated mineral resources are based
upon cost estimates appropriate to the proposed mining and processing methods. Costs are derived
on the same basis as those used to determine the cut-off values or grades and other criteria as
applicable for the ore reserve estimates at each operation or development project except for mine
capital costs. The cut-off values or grades and other criteria, as applicable, may change with
additional data and economic evaluations.
Cautionary note to U.S. investors We use the terms mineral resources and measured and
indicated mineral resources. U.S. investors should be aware that, while these terms are
recognized under applicable Canadian regulations, the SEC does not recognize them. U.S. investors
are cautioned not to assume that any part or all of the mineral deposits in these categories will
ever be converted into reserves. We also use the term inferred mineral resources. U.S.
investors should be aware that, while this term is also recognized under applicable Canadian
regulations, the SEC does not recognize it. Inferred mineral resources have a greater amount of
uncertainty as to their existence, and great uncertainty with respect to their economic
feasibility. It should not be assumed that all or any part of an inferred mineral resource will
ever be upgraded to a higher category. While the SEC generally permits registered U.S. mining
companies, in their filings with the SEC, to disclose only those mineral deposits that a company
can economically and legally extract or produce, it does permit companies subject to the
multi-jurisdictional disclosure system between Canada and the United States, such as Inco to
disclose, on a voluntary basis, in their Form 10-K or other Annual Reports filed with the SEC,
their estimated mineral resources.
The following tables show, as of December 31, 2005 and 2004, our estimates of our (i) measured
mineral resources, (ii) indicated mineral resources, (iii) the aggregate of measured and indicated
mineral resources and (iv) inferred mineral resources at our operating mines, non-operating mines,
undeveloped properties and development projects at our Ontario operations, our Manitoba operations,
the Voiseys Bay project in the Province of Newfoundland and Labrador, PT Inco in Indonesia and the
Goro project in New Caledonia and the estimated respective average nickel, copper, cobalt,
platinum, palladium and gold metal grades, where significant, of each such total amount as of the
end of the periods indicated.
33
Total
Estimated Mineral
Resources(1)(3)
as of December 31, 2005
(in millions of tonnes (Mt) except as indicated)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Platinum |
|
Palladium |
|
Gold |
|
|
|
|
Quantity |
|
Nickel |
|
Copper |
|
Cobalt |
|
(grams/ |
|
(grams/ |
|
(grams/ |
|
|
Class |
|
(Mt) |
|
(per cent) |
|
(per cent) |
|
(per cent) |
|
tonne) |
|
tonne) |
|
tonne) |
ONTARIO OPERATIONS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating Mines |
|
Measured |
|
|
11 |
|
|
|
1.20 |
|
|
|
1.09 |
|
|
|
0.05 |
|
|
|
0.6 |
|
|
|
0.7 |
|
|
|
0.3 |
|
|
|
Indicated |
|
|
18 |
|
|
|
1.42 |
|
|
|
1.63 |
|
|
|
0.05 |
|
|
|
0.9 |
|
|
|
1.1 |
|
|
|
0.4 |
|
|
|
Total/Average |
|
|
29 |
|
|
|
1.34 |
|
|
|
1.43 |
|
|
|
0.05 |
|
|
|
0.8 |
|
|
|
1.0 |
|
|
|
0.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
23 |
|
|
|
1.9 |
|
|
|
1.8 |
|
|
|
0.04 |
|
|
|
1.2 |
|
|
|
1.4 |
|
|
|
0.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Non-Operating Mines |
|
Measured |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
13 |
|
|
|
1.45 |
|
|
|
0.54 |
|
|
|
0.05 |
|
|
|
0.2 |
|
|
|
0.2 |
|
|
|
|
|
|
|
Total/Average |
|
|
13 |
|
|
|
1.45 |
|
|
|
0.54 |
|
|
|
0.05 |
|
|
|
0.2 |
|
|
|
0.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
13 |
|
|
|
1.6 |
|
|
|
3.2 |
|
|
|
0.03 |
|
|
|
1.5 |
|
|
|
1.5 |
|
|
|
0.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Undeveloped Properties |
|
Measured |
|
|
0.4 |
|
|
|
1.03 |
|
|
|
0.35 |
|
|
|
0.05 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
4.3 |
|
|
|
1.16 |
|
|
|
0.89 |
|
|
|
0.05 |
|
|
|
0.6 |
|
|
|
1.2 |
|
|
|
0.2 |
|
|
|
Total/Average |
|
|
5 |
|
|
|
1.15 |
|
|
|
0.85 |
|
|
|
0.05 |
|
|
|
0.5 |
|
|
|
1.1 |
|
|
|
0.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
12 |
|
|
|
1.6 |
|
|
|
0.9 |
|
|
|
0.02 |
|
|
|
0.5 |
|
|
|
0.7 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
Measured |
|
|
11 |
|
|
|
1.19 |
|
|
|
1.07 |
|
|
|
0.05 |
|
|
|
0.7 |
|
|
|
0.7 |
|
|
|
0.2 |
|
|
|
Indicated |
|
|
36 |
|
|
|
1.40 |
|
|
|
1.14 |
|
|
|
0.05 |
|
|
|
0.6 |
|
|
|
0.8 |
|
|
|
0.2 |
|
|
|
Total/Average |
|
|
47 |
|
|
|
1.36 |
|
|
|
1.12 |
|
|
|
0.05 |
|
|
|
0.6 |
|
|
|
0.8 |
|
|
|
0.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MANITOBA OPERATIONS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating Mines |
|
Measured |
|
|
1 |
|
|
|
1.94 |
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
3 |
|
|
|
2.56 |
|
|
|
0.15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
4 |
|
|
|
2.41 |
|
|
|
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
6 |
|
|
|
1.8 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Non-Operating Mines |
|
Measured |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
24 |
|
|
|
0.8 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
Measured |
|
|
1 |
|
|
|
1.94 |
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
3 |
|
|
|
2.56 |
|
|
|
0.15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
4 |
|
|
|
2.41 |
|
|
|
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PT INCO |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mining Areas |
|
Measured |
|
|
0.4 |
|
|
|
1.85 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
0.5 |
|
|
|
1.7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
1 |
|
|
|
1.8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
2 |
|
|
|
1.9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Undeveloped Properties |
|
Measured |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
27 |
|
|
|
1.67 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
27 |
|
|
|
1.67 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
319 |
|
|
|
1.7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
Measured |
|
|
0.4 |
|
|
|
1.85 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
28 |
|
|
|
1.67 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
28 |
|
|
|
1.65 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
34
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Platinum |
|
Palladium |
|
Gold |
|
|
|
|
Quantity |
|
Nickel |
|
Copper |
|
Cobalt |
|
(grams/ |
|
(grams/ |
|
(grams/ |
|
|
Class |
|
(Mt) |
|
(per cent) |
|
(per cent) |
|
(per cent) |
|
tonne) |
|
tonne) |
|
tonne) |
VOISEYS BAY PROJECT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Undeveloped Properties |
|
Measured |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
40 |
|
|
|
1.89 |
|
|
|
0.9 |
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
40 |
|
|
|
1.89 |
|
|
|
0.9 |
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
6 |
|
|
|
2.3 |
|
|
|
1.0 |
|
|
|
0.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GORO PROJECT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Development Property |
|
Measured |
|
|
39 |
|
|
|
1.31 |
|
|
|
|
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
36 |
|
|
|
1.68 |
|
|
|
|
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
75 |
|
|
|
1.49 |
|
|
|
|
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
128 |
|
|
|
1.7 |
|
|
|
|
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total
Estimated Mineral
Resources(1)(3)
as of December 31, 2004
(in millions of tonnes (Mt) except as indicated)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Platinum |
|
Palladium |
|
Gold |
|
|
|
|
Quantity |
|
Nickel |
|
Copper |
|
Cobalt |
|
(grams/ |
|
(grams/ |
|
(grams/ |
|
|
Class |
|
(Mt) |
|
(per cent) |
|
(per cent) |
|
(per cent) |
|
tonne) |
|
tonne) |
|
tonne) |
ONTARIO OPERATIONS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating Mines |
|
Measured |
|
|
18 |
|
|
|
1.36 |
|
|
|
1.24 |
|
|
|
0.05 |
|
|
|
0.7 |
|
|
|
0.7 |
|
|
|
0.3 |
|
|
|
Indicated |
|
|
6 |
|
|
|
1.13 |
|
|
|
2.49 |
|
|
|
0.04 |
|
|
|
1.4 |
|
|
|
2.3 |
|
|
|
0.7 |
|
|
|
Total/Average |
|
|
24 |
|
|
|
1.30 |
|
|
|
1.57 |
|
|
|
0.05 |
|
|
|
0.9 |
|
|
|
1.1 |
|
|
|
0.4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
19 |
|
|
|
2.1 |
|
|
|
1.9 |
|
|
|
0.05 |
|
|
|
1.3 |
|
|
|
1.5 |
|
|
|
0.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Non-Operating Mines |
|
Measured |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
17 |
|
|
|
1.38 |
|
|
|
0.55 |
|
|
|
0.05 |
|
|
|
0.2 |
|
|
|
0.2 |
|
|
|
0.1 |
|
|
|
Total/Average |
|
|
17 |
|
|
|
1.38 |
|
|
|
0.55 |
|
|
|
0.05 |
|
|
|
0.2 |
|
|
|
0.2 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
7 |
|
|
|
1.8 |
|
|
|
5.8 |
|
|
|
0.01 |
|
|
|
2.7 |
|
|
|
2.7 |
|
|
|
0.9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Undeveloped Properties |
|
Measured |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
4 |
|
|
|
1.21 |
|
|
|
0.64 |
|
|
|
0.04 |
|
|
|
0.4 |
|
|
|
0.5 |
|
|
|
0.1 |
|
|
|
Total/Average |
|
|
4 |
|
|
|
1.21 |
|
|
|
0.64 |
|
|
|
0.04 |
|
|
|
0.4 |
|
|
|
0.5 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
12 |
|
|
|
1.6 |
|
|
|
0.9 |
|
|
|
0.02 |
|
|
|
0.5 |
|
|
|
0.6 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
Measured |
|
|
18 |
|
|
|
1.36 |
|
|
|
1.24 |
|
|
|
0.05 |
|
|
|
0.7 |
|
|
|
0.7 |
|
|
|
0.3 |
|
|
|
Indicated |
|
|
27 |
|
|
|
1.30 |
|
|
|
1.02 |
|
|
|
0.04 |
|
|
|
0.5 |
|
|
|
0.7 |
|
|
|
0.2 |
|
|
|
Total/Average |
|
|
45 |
|
|
|
1.33 |
|
|
|
1.11 |
|
|
|
0.05 |
|
|
|
0.6 |
|
|
|
0.7 |
|
|
|
0.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MANITOBA OPERATIONS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating Mines |
|
Measured |
|
|
2 |
|
|
|
2.57 |
|
|
|
0.16 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
2 |
|
|
|
2.3 |
|
|
|
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
4 |
|
|
|
2.42 |
|
|
|
0.15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
3 |
|
|
|
1.8 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Non-Operating Mines |
|
Measured |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
Measured |
|
|
2 |
|
|
|
2.57 |
|
|
|
0.16 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
2 |
|
|
|
2.30 |
|
|
|
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
4 |
|
|
|
2.42 |
|
|
|
0.15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
35
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Platinum |
|
Palladium |
|
Gold |
|
|
|
|
Quantity |
|
Nickel |
|
Copper |
|
Cobalt |
|
(grams/ |
|
(grams/ |
|
(grams/ |
|
|
Class |
|
(Mt) |
|
(per cent) |
|
(per cent) |
|
(per cent) |
|
tonne) |
|
tonne) |
|
tonne) |
PT INCO |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mining Areas |
|
Measured |
|
|
1 |
|
|
|
1.71 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
32 |
|
|
|
1.80 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
33 |
|
|
|
1.80 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
2 |
|
|
|
1.7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Undeveloped Properties |
|
Measured |
|
|
2.5 |
|
|
|
2.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
74 |
|
|
|
1.66 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
76 |
|
|
|
1.68 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
319 |
|
|
|
1.7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
Measured |
|
|
4 |
|
|
|
2.10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
106 |
|
|
|
1.70 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
110 |
|
|
|
1.72 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
VOISEYS BAY PROJECT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Undeveloped Properties |
|
Measured |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
50 |
|
|
|
1.66 |
|
|
|
0.78 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
50 |
|
|
|
1.66 |
|
|
|
0.78 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
12 |
|
|
|
1.7 |
|
|
|
0.7 |
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GORO PROJECT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Development Property |
|
Measured |
|
|
29 |
|
|
|
1.39 |
|
|
|
|
|
|
|
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Indicated |
|
|
26 |
|
|
|
1.84 |
|
|
|
|
|
|
|
0.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total/Average |
|
|
55 |
|
|
|
1.60 |
|
|
|
|
|
|
|
0.13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inferred(2) |
|
|
144 |
|
|
|
1.7 |
|
|
|
|
|
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
The following sets forth the definitions that we use for our estimated mineral resources,
inferred mineral resources, indicated mineral resources and measured mineral resources. |
|
|
|
A mineral resource is a concentration or occurrence of natural, solid, inorganic or
fossilized organic material in or on the Earths crust in such form and quantity and of such a
grade or quality that it has reasonable prospects for economic extraction. The location,
quantity, grade, geological characteristics and continuity of a mineral resource are known,
estimated or interpreted from specific geological evidence and knowledge. Mineral resources
are sub-divided, in order of increasing geological confidence, into inferred, indicated and
measured categories. Mineral resources which are not ore reserves do not have demonstrated
economic viability. |
|
|
|
An inferred mineral resource is that part of a mineral resource for which quantity and grade
or quality can be estimated on the basis of geological evidence and limited sampling and
reasonably assumed, but not verified, geological and grade continuity. The estimate is based
on limited information and sampling through appropriate techniques from locations such as
outcrops, trenches, pits, workings and drill holes. |
|
|
|
An indicated mineral resource is that part of a mineral resource for which quantity and
grade or quality, densities, shape and physical characteristics can be estimated with a level
of confidence sufficient to allow the appropriate application of technical and economic
parameters to support mine planning and evaluation of the economic viability of the deposit.
The estimate is based on detailed and reliable exploration and testing information gathered
through appropriate techniques from locations such as outcrops, trenches, pits, workings and
drill holes that are spaced closely enough for geological and grade continuity to be
reasonably assumed. |
|
|
|
A measured mineral resource is that part of a mineral resource for which quantity and grade
or quality, densities, shape and physical characteristics are so well established that they
can be estimated with confidence sufficient to allow the appropriate application of technical
and economic parameters to support production planning and evaluation of the economic
viability of the deposit. The estimate is based on detailed and reliable exploration,
sampling and testing information gathered through appropriate techniques from locations such
as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to
confirm both geological and grade continuity. |
|
|
|
For the purposes of data collection, data verification, geological modeling, block modeling,
mineral resource estimation and ore reserve estimation, we apply the CIM Guidelines and
Estimation of Mineral Resources and Reserves Best Practice Guidelines (2003) for all our
current operations and development projects. Mineral resource estimates as reported are in
addition to the estimated ore reserves and do not include diluting material and allowances for
losses that may occur when the material is mined. Cut-off values or grade and other shape and
physical criteria, as applicable, for such estimated mineral resources are based upon cost
estimates appropriate to the proposed mining and processing methods. Costs are derived on the
same basis as those used to determine the cut-off values or grades and other criteria as
applicable for the estimated ore reserves at each operation or development project except for
mine capital costs. The cut-off values or grades and other criteria, as applicable, may
change with additional data and economic evaluations. |
|
(2) |
|
Inferred mineral resources have a great amount of uncertainty as to their existence and
with respect to their economic feasibility. Investors are cautioned not to assume that any
part or all of an inferred mineral resource exists or is economically or legally mineable. |
|
(3) |
|
For the purpose of estimating and reporting Incos mineral resources, all persons
preparing and/or reviewing the estimates are designated as responsible persons for internal
requirements. As part of our internal processes and procedures in developing these
estimates, the role of each such responsible person is to review those key parts of the
estimated mineral resources for which such person has the appropriate professional expertise and/or experience, and/or
supervisory or management responsibility to ensure that the estimates are reasonable,
economically viable and consistent with our production plans and that |
36
|
|
they are not aware of any environmental, permitting, legal, ownership, taxation, political or
social issues that would materially affect the estimates. In accordance with applicable
Canadian securities regulatory requirements, including the recently revised National
Instrument 43-101, Standards of Disclosure for Mineral Projects, Mr. S. Nicholas Sheard,
Vice-President of Exploration, Dr. Olivier Tavchandjian, Principal Geologist, Mineral Reserves
and Mineral Resources, and Dr. Lawrence B. Cochrane, Director of Mines Exploration, each as a
qualified person within the meaning of such National Instrument (which means generally an
individual with relevant experience as an engineer or geoscientist who is also a member in
good standing of a recognized engineering or similar professional association) indirectly
supervised the preparation of the mineral resource estimates as of December 31, 2005 and 2004
and other information set forth in the above tables relating to 2005 and 2004 and each has, in
accordance with the requirements of such National Instrument, conducted either directly by
himself or indirectly through employees of the Company reporting directly or indirectly to
him, a comprehensive review and confirmation of the application of the detailed procedures,
systems and processes the Company has developed and implemented for the purpose of verifying
such data. Each of Mr. Sheard, Dr. Tavchandjian and Dr. Cochrane, as well as the responsible
persons described above and other staff of the Company involved in the process of developing
these estimates, also periodically check the adequacy of such procedures, systems and
processes which are intended to provide sufficient verification of such data based upon
recognized sampling, analytical testing, modeling and other procedures in the mining industry. |
|
|
|
Mining and Other Rights |
The following discussion reflects a summary of the property rights, mining rights,
licences, leases or other concessionary rights to mine for or extract metals and other associated
minerals from the areas that we currently mine or expect to mine as part of our long-term mine
plans in Canada, Indonesia and New Caledonia. With respect to those properties which are not
currently owned but are subject to leases or licenses with finite terms that are not perpetual or
cannot be automatically renewed or extended and on which estimated ore reserves are located and/or
are covered by our current long-term mine plans, we currently believe that we will be able to
obtain renewals or extensions of such leases or licenses, if required as part of our long-term mine
plans on a timely basis.
Ontario Operations
All operating mines, non-operating mines and undeveloped properties which contain estimated
proven and probable ore reserves for our Ontario operations are on lands owned by us, with the
exception of a portion of Copper Cliff South Mine (known as Kelly Lake) and a portion of the Victor
non-operating mine. These portions of the Copper Cliff South and Victor mines are located on lands
with respect to which we currently hold a licence of occupation. In 2004, we applied for a 21-year
lease for each of these two areas. We have received the lease for the Victor mine and are awaiting
receipt of the lease for Kelly Lake which we believe will be granted on a timely basis.
In Ontario, we also hold mining rights, surface rights, licences of occupation and mining
claims granted to us by the Province of Ontario. Mining rights are rights to exploit and extract
minerals on, in or under the land, and surface rights are rights to use the surface of the land.
These rights remain in effect so long as we own the land to which these rights apply. We also own
a combination of mining and surface rights covering land leased from the Province of Ontario.
These leased lands, which include a combination of mining and surface rights, are leased for either
10 or 21 years. Annual rentals are paid to the Province of Ontario to keep the leases in good
standing. These leases are renewed for further 10- or 21-year terms as they come up for renewal.
The next lease that comes up for renewal will be in 2008. Inco currently holds 165 licences of
occupation for mining, hydro electric installations and various other industrial purposes in
Ontario. These licences of occupation allow Inco to use the land in the manner specified in each
license, including the right to dig, excavate and remove ores and minerals from and under the land.
Inco currently also has a number of mining claims in Ontario. Mining claims represent rights to
explore the land covered by the claim. In early March 2001, a party purported to stake mining
claims and then initiated an administrative appeal effectively contesting the validity of a licence
of occupation originally granted to Inco more than 50 years ago covering a portion of our Kelly
Lake deposit which was identified in 1997. The actions taken by this party were ultimately
dismissed. As a result of the dismissal of these actions and the enactment of new legislation in
Ontario in 2002, we do not anticipate any future challenges to the validity of such licences on the
grounds alleged by this party.
Manitoba Operations
Incos landholdings or mining rights in Manitoba consist of order-in-council leases (OIC
Leases), mineral leases and mining claims. OIC Leases were negotiated as part of an agreement
between Inco and the Province of Manitoba entered into in 1956 covering the development of the
Thompson, Manitoba nickel deposits by Inco. OIC Leases entitle the lessee to explore for, and
mine, all minerals in the subsurface (except hydrocarbons, industrial minerals and surficial
deposits that are not incidental to the mining, milling, smelting and refining processes). OIC
Leases also provide the lessee with the right to erect buildings and structures necessary for its
operations and provide for a right of access over and upon the lands. OIC Leases provide for an
initial 21-year term and two subsequent guaranteed renewals of 21 years each, for a total
guaranteed lease period of 63 years. Subsequent lease renewals beyond the three guaranteed 21-year
terms can be granted at the discretion of the Province of Manitoba. Incos OIC Leases were
initially surveyed and made effective over a six-year period from 1957 to 1962. All of our current
OIC Leases have now been renewed twice
37
(each is in its third guaranteed 21-year term) and remain in effect through the 2020-2025
period. These include the OIC Leases that cover the current area of Thompson Mine which were
renewed in 2001 and the OIC Leases that cover the eastern and depth extensions of Thompson Mine,
including the 1D Lower orebody, which were renewed in September 2004. Mineral leases are 21-year
leases that are renewable at the discretion of the Province of Manitoba. Inco holds seven mineral
leases in the Thompson, Manitoba nickel belt. These mineral leases, which convey to Inco the
exclusive right to the minerals (other than quarry minerals) that occur on or under the land
covered by these leases and access rights to erect buildings and structures (including shafts) to
mine within the limits of the leases, remain in effect until April 1, 2013. Inco also holds mining
claims, a right issued by the Province of Manitoba under provincial legislation which conveys to
the holder the exclusive right to the minerals (other than quarry minerals) that occur on or under
the land covered by the claim and access rights to explore for and develop minerals owned by the
Province. A mining claim does not, however, entitle the holder to extract minerals from the land
covered by the claim. In order to extract minerals from the land covered by a mining claim, the
holder must obtain a mineral lease from the Province of Manitoba.
All of our Manitoba operations operating mines and all of the mineral rights for all of their
mines which contain estimated proven and probable ore reserves are on properties covered by OIC
Leases and mineral leases. Thompson Mine is located on land covered by OIC Leases that are due for
renewal in 2022 and the eastern and depth extensions of Thompson Mine are covered by OIC Leases
that are due for renewal in 2025. Birchtree Mine is located on land covered by both OIC Leases
which are due for renewal in 2022 and three mineral leases which are in good standing until April
1, 2013. Since the renewal of these OIC Leases would be beyond the three guaranteed 21-year terms,
renewals can be applied for and obtained, at the discretion of the Province of Manitoba, prior to
their current expiry dates. We currently believe that the renewal of these OIC Leases and mineral
leases will be granted before they expire.
Voiseys Bay Project
The Voiseys Bay project company, VBNC, holds mineral claims (which have been grouped into
mineral licences), a mining lease and surface rights in the Province of Newfoundland and Labrador.
A mineral claim (generally covering a 500-metre by 500-metre parcel of land), issued by the
Province of Newfoundland and Labrador under provincial legislation, gives its holder the exclusive
right to explore for minerals in, on or under the area of land described in the licence, and
obligates the holder to conduct a minimum amount of assessment work (measured by the amount of
money spent) on the land covered by the licence. Up to 256 mineral claims can be grouped together
into one mineral licence. Grouping mineral claims into a single mineral licence allows the holder
to better manage the assessment work required to be done on the land that is the subject of the
claims. Mineral claims and mineral licences are issued for a period of five years and may be
extended for three additional five-year renewal periods, for a total of 20 years. A mineral
licence does not entitle its holder to extract any minerals from the land described in the licence.
All of the Voiseys Bay projects current estimated proven and probable ore reserves are located
on lands covered by the 25-year mining lease referred to below.
In order to extract minerals from the land covered by a mineral licence, the holder of a
mineral licence must obtain a mining lease issued by the Province under provincial legislation for
the land covered by such mineral licence. VBNC obtained a mining lease, effective September 30,
2002, for a period of 25 years granting VBNC the exclusive right to extract minerals and carry out
mineral exploration, mining operations or mining processing and development in, on or under the
lands, or part of the lands, covered by the lease so long as VBNC and Inco continue to meet the
terms and conditions of the development agreement, as discussed under Voiseys Bay Nickel Company
Limited below, entered into in October 2002 between VBNC, Inco and Her Majesty the Queen in right
of Newfoundland and Labrador. This mining lease can be renewed for further 10-year terms so long
as VBNC has been in compliance with the terms of the lease and has applied for such renewal at
least three months prior to the expiration of the then current lease. Under the terms of the
mining lease, production is not to exceed on average 2.2 million tonnes of ore annually for the
first 10 years of mining operations and on average 5.5 million tonnes of ore annually thereafter.
The current areas to be mined as part of the Voiseys Bay project and all of the estimated proven
and probable ore reserves for the Voiseys Bay project are held under this mining lease. We are
not aware of any information or other factors at this time which would indicate that we could not
reach agreement with the Province on a new mining lease or an extension when the current mining
lease expires in September 2027. In conjunction with the mining lease, VBNC received a surface
lease entitling it to use certain lands necessary for its mining operations. Like the mining
lease, the surface lease was effective September 30, 2002 for a period of 25 years, and may be
renewed for further 10-year terms.
VBNC also holds nine mineral licences, all of which expire over the March-November 2014
period, covering the main claim block of the Voiseys Bay project. These mineral licences have not
been legally surveyed. Geographic coordinates define their locations. To date, sufficient
assessment work has been completed to maintain these mineral licences at least until 2008 so long
as the required renewal fees (currently being approximately Cdn.$100,000 and payable every five
years, subject to increases in such fees based on subsequent renewals) are paid. Additional
assessment work will be required to hold the mineral licences in good standing through 2014.
38
Pursuant to the terms of an option agreement originally entered into in 1993 (the Option
Agreement), Diamond Fields Resources Inc. (Diamond Fields) acquired, upon the exercise of the
option thereunder, all of the mineral claims of Archean Resources Ltd. (Archean) in Labrador and
Archean was granted a royalty, payable quarterly on the proceeds received by VBNC on the sale of
its production equal to three per cent of net smelter returns from mining production from VBNCs
Labrador properties, including the Voiseys Bay deposit (the Royalty), and a three per cent gross
royalty (also payable quarterly) on the gross value of raw diamonds and/or gemstones recovered from
these properties. The Option Agreement was assigned to VBNC by Diamond Fields in 1995. The
Royalty is secured by a mortgage on VBNCs Labrador properties in the maximum aggregate principal
amount of $100 million. The mortgage is expressly subordinated to any mine development financing
that might be obtained in the future. In 2003, Archean transferred the Royalty to a limited
partnership controlled by Archeans principal shareholders and effectively sold up to a 10 per cent
interest in the Royalty to a third party. In late February 2005, the remaining 90 per cent
interest in the Royalty then held by Archeans principal shareholders was, through the sale of
Archean, acquired by another third party.
The Voiseys Bay deposit is within a geographical area that has been the subject of land
claims negotiations between certain aboriginal groups and the Governments of Canada and the
Province of Newfoundland and Labrador. Aboriginal groups asserting land claims in the area include
the Labrador Inuit Association (the LIA) and Innu Nation. For further information, see Voiseys
Bay Nickel Company Limited Arrangements with Aboriginal Groups below.
PT Inco
Under the original Contract of Work or concessionary agreement between the Republic of
Indonesia and Inco entered into in 1968, and the agreement modifying and extending that Contract of
Work entered into in January 1996 and which sets forth certain provisions which will apply once the
terms of the original Contract of Work expire on March 1, 2008 and through December 28, 2025, PT
Inco, as the sole contractor of the Government of Indonesia in the areas covered by the Contract of
Work, has been granted exclusive rights in these specified areas on the Island of Sulawesi to mine,
process, store, transport and sell all nickel and nickel-containing minerals in any form and all
minerals (except for radioactive materials) found in association with nickel in the areas. The
Contract of Work also grants PT Inco all necessary licences and permits to conduct its operations,
including certain expansions of its operations, as provided for in the Contract of Work. All of PT
Incos mining areas currently containing estimated proven and probable ore reserves are within PT
Incos Contract of Work. Reference is made to PT International Nickel Indonesia Tbk below for a
discussion of certain recent legislative and regulatory developments in Indonesia. Under the terms
of the agreement of modification and extension of PT Incos original Contract of Work entered into
in 1996, the Government of Indonesia has agreed to give sympathetic consideration to a further
renewal or extension of the Contract of Work, upon the request of PT Inco based upon one or more
developments, including a proposal to make a substantial new investment in PT Inco, or the
demonstration by PT Inco of the positive economic and other benefits to Indonesia provided by PT
Inco. We are not aware of any information or other factors at this time that would indicate that
we would not be able to reach agreement on a further extension of PT Incos Contract of Work before
it expires at the end of 2025. If we are not able to extend the
Contract of Work past 2025, this could reduce PT Incos estimated
ore reserves and mineral resources and affect its long-term mining
plans.
Goro Project
The Goro project company, Goro Nickel, currently holds 69 mining concessions in the Massif du
Sud (part of the south province of New Caledonia) covering 20,600 hectares authorizing the mining
of nickel, cobalt, chrome, iron and manganese, and approximately 26 surface rights. An additional
10 mining concessions are held by Tiebaghi Nickel S.A.S. (Tiebaghi), a subsidiary of Inco,
outside the Goro project area in a mining domain called Tiebaghi, located in the north province of
New Caledonia. Two other concessions held by Tiebaghi were not renewed in 2005. Of the 69
concessions held by Goro Nickel, the Goro project covers 6,042 hectares within seven mining
concessions, of which four are perpetual in term, two are renewable prior to their expiry dates in
2016 and one is renewable prior to its expiry date in 2051. Goro Nickel has the right to renew
these three renewable concessions for an additional 25-year period when their initial terms expire,
provided a satisfactory technical report is delivered to the authorities five years before the
expiry date. Concessions generally represent long term permits (mostly 75 year terms, with some
having a term up to perpetuity) granted for mining large deposits which entitle the holder the
exclusive right to exploit, extract and mine. A concession applies to one or several minerals
defined by the granting decision along with its geographical location. The granting of a
concession is based on the delineation of an exploitable orebody made during exploration activities
conducted pursuant to permits called permis de recherches and permis dexploitation. Surface
rights can be granted independently of mineral rights. Goro Nickel holds surface rights, known as
occupation des sols, which are rights to use surfaces on or outside mining permits for
mining-related activities, including surfaces of other owners. All of the present estimated proven
and probable ore reserves for the Goro project as at December 31, 2005 are within the mining rights
held as concessions.
Reference is made to Goro Nickel S.A.S. Prony West Deposit below for a discussion of our
rights to the Prony West area.
39
PT International Nickel Indonesia Tbk
General
Incos current ownership interest in PT Inco is approximately 61 per cent. Sumitomo
Metal Mining Co., Ltd. (Sumitomo) of Japan holds slightly more than 20 per cent and public
shareholders hold a total of slightly more than 18 per cent of the equity of PT Inco. PT Incos
shares are traded on the Jakarta Stock Exchange. Our investment in PT Inco at book value was
approximately $392 million at December 31, 2005, compared with $392 million at December 31, 2004
and $364 million at December 31, 2003. At December 31, 2005, PT Incos outstanding indebtedness to
third party lenders was $38 million, compared with $115 million at December 31, 2004 and $192
million at December 31, 2003. This indebtedness was incurred primarily to finance the expansion
project completed in 1999 referred to below under Contract of Work Extension and 1999 Expansion of
Facilities.
In view of its remote location, PT Incos production facilities are almost completely
self-contained. They consist of an open-cast laterite mine, a processing plant with four electric
furnace smelting lines (including a fourth line constructed as part of the PT Inco expansion
project referred to below), thermal and hydroelectric power generating facilities and ancillary
infrastructure, including a townsite, roads, an airport and port facilities.
Indonesia has experienced periods of economic and political turmoil since the late 1990s, some
of which have been compounded by a downturn in the global economy. Indonesias economic and
political stability will, we believe, continue to be dependent to a large extent on the
effectiveness of measures taken by the democratically-elected Government of Indonesia to maintain
business and confidence, decisions of international financial institutions, including the World
Bank and the International Monetary Fund, regarding the availability of continued financing to
Indonesia and companies operating in Indonesia, global economic conditions, and a number of other
factors, including regulatory and political developments within Indonesia, which are beyond Incos
control or ability to predict.
In the Indonesian mining sector, mining companies have, over the past several years, been
facing several challenges stemming from the economic and political problems experienced by
Indonesia. These challenges have included regulatory uncertainty under regional autonomy
legislation which has sought to transfer governmental power in a number of areas, including
taxation and mining regulation, from the central government to regional governments; overlapping
and unclear tax and environmental legislation enacted by central, provincial and local government
authorities; weakness in the banking sector; illegal mining activities; increasingly militant
actions of non-governmental organizations and labour unions; and continued disputes between mining
companies and local communities who are making increasing demands on mining companies operating in
their communities. These other challenges may, in time, affect PT Incos operations and have, to
the extent possible, been taken into account by PT Incos management in evaluating PT Incos
current and future activities in Indonesia.
The
maps below indicate the mining areas (the East and West Blocks, the
Petea mining area and the Pomalaa-Antam mining area) where
PT Incos estimated proven and probable ore reserves were located for 2005 and 2004, as well as the
location of PT Incos processing plant and hydroelectric facilities and the boundary of the other
properties containing additional mineralized nickel laterite deposits (referred to as Sulawesi
Other Concessions on the map) within the area covered by PT Incos Contract of Work:
40
PT Inco Sulawesi Concessions
Location of Operating Mining Areas and Undeveloped Properties
41
PT Inco
Location of Operating Mines, Plant and Facilities,
Undeveloped Properties and Concessions
42
Contract of Work Extension and 1999 Expansion of Facilities
As discussed under Ore Resources and Mining Rights above, PT Incos operations are
conducted pursuant to a Contract of Work with the Government of Indonesia under which PT Inco is
the sole contractor of the Indonesian government for the production and marketing of nickel and
associated minerals (other than hydrocarbons and radioactive materials) mined in specified areas on
the Island of Sulawesi. The original Contract of Work was signed in 1968 and in January 1996 PT
Inco signed an agreement with the Government of Indonesia to modify and extend the Contract of Work
to the year 2025, subject to further extensions with the consent of the Government of Indonesia,
from its original expiry date in 2008. The Contract of Work confers upon PT Inco all
authorizations necessary for the development and operation of its nickel project.
In late 1999, PT Inco completed a major expansion project that increased its production
capacity by 50 per cent to 68,000 tonnes of nickel-in-matte per year. The expansion involved
improvements to the three existing smelting lines and the construction of a fourth electric furnace
smelting line together with the construction of 93 megawatts of additional low-cost hydroelectric
generating capacity at Balambano, approximately 25 kilometres from PT Incos production facilities
at Sorowako. Since it began operation, the Balambano facility has been able to generate power
consistently above its design capacity due to improved water management practices and higher
reservoir levels and other related factors than were assumed in developing its original design
capacity.
Financing for the expansion project was provided by a group of international lenders in the
total principal amount of $340 million for this expansion project and an additional $81 million to
refinance then existing PT Inco debt. The remainder of the original estimated cost of $580 million
for this project had been expected to be provided by PT Incos available cash balances plus cash
generated by existing operations during the construction period. However, as a result of lower
production levels caused by limited rainfall and its adverse effect on hydroelectric power
generation in 1997 and 1998, low nickel prices and increased costs due to construction delays
associated with its new hydroelectric facilities, PT Incos ability to generate cash was
significantly reduced and, as a result, Inco Limited agreed in May 1999 to provide PT Inco with a
loan facility under which $88 million was advanced. These advances were effectively repaid to Inco
Limited in 2002.
PT Incos existing hydroelectric facilities were constructed and are currently operated
pursuant to a 1975 decree of the Indonesian government. This decree, which effectively also covers
the Balambano generating capacity which was part of the expansion project, vests an Indonesian
ministry with the right, upon two years prior written notice to PT Inco, to acquire the
hydroelectric facilities. No such notice has been given. If such right were exercised, the decree
also provides that the hydroelectric facilities would be acquired at their then depreciated value
subject to the ministry providing PT Inco with sufficient power to meet its operating requirements,
at a rate based on costs plus a normal profit margin, for the remaining term of the Contract of
Work. The new hydroelectric dam referred to under Operations below to be constructed by PT Inco
as part of its latest expansion program is also expected to be subject to this decree.
PT Incos estimated proven and probable ore reserves are sufficient to support its operations
for more than 25 years, and its estimated mineral resources have the potential to continue to
supply PT Incos operations for a number of additional years. Future expansions are possible, as
warranted by market conditions, by developing the extensive laterite nickel deposits within PT
Incos Contract of Work area in the Sorowako outer area and at Bahodopi and Pomalaa, located
approximately 80 kilometres and 200 kilometres, respectively, from PT Incos operations at
Sorowako. Reference is made to Operations below for a discussion of certain recent legislative
and regulatory developments in Indonesia.
When PT Incos Contract of Work was extended in 1996, PT Inco agreed to several undertakings
with regard to future expansions of its operations. Under one such undertaking, PT Inco agreed,
subject to economic and technical feasibility, to construct production plants at Pomalaa in
Southeast Sulawesi and Bahodopi in Central Sulawesi. The Contract of Work indicated that the first
plant could be in operation by 2005 and the second by 2010, but did not specify which plant was to
be constructed first. As indicated below, this initial expansion has been deemed to be satisfied
through 2008 under certain arrangements with PT Antam Tbk (PT Antam).
In February 2003, PT Inco signed a Cooperative Resources Agreement (the CRA) with PT Antam,
an Indonesian government-controlled diversified mining company and producer of ferronickel whose
nickel operations are located near PT Incos Pomalaa deposits within its Contract of Work area.
Under the CRA, PT Inco agreed to supply saprolite, a relatively high grade of lateritic ore, to PT
Antam from certain designated portions of PT Incos Contract of Work area in Pomalaa at prices
based on an agreed upon pricing formula. The initial term of the CRA is 36 months starting from
the initial delivery of ore by PT Inco to PT Antam. The first ore deliveries by PT Inco were made
to PT Antam on July 1, 2005. The CRA can be extended for one or more additional terms of 12
43
months each provided PT Antam has fulfilled its obligations under the CRA. PT Inco has
certain unilateral termination rights under the CRA.
In conjunction with the CRA, PT Inco obtained the approval of the Indonesian Minister of
Energy and Mineral Resources with respect to PT Inco meeting certain of its undertakings covering
future mining and processing activities, as noted above, under its Contract of Work by virtue of
entering into the CRA. That approval indicated that PT Inco will be deemed to have satisfied its
obligation to build a commercial plant at Pomalaa until the later of December 31, 2008 or the
termination of the CRA, following which PT Inco will be obligated to deliver a report evaluating
the technical and economic feasibility of constructing such a plant to the Government of Indonesia.
PT Incos obligation under its Contract of Work concerning the construction of a commercial plant
at Bahodopi by 2010, subject to economic and technical feasibility, remains in effect.
PT Inco believes that the CRA provides a number of benefits to PT Inco, including (i) enabling
PT Incos saprolite mineral deposits at Pomalaa to be developed on a basis that should provide PT
Inco with a reasonable return, (ii) satisfying certain of PT Incos undertakings under its Contract
of Work, (iii) evidencing, in addition to PT Incos Sorowako expansion in 1999, Incos continuing
commitment to the Indonesian mining sector, and (iv) satisfying certain concerns relating to
regional development expressed by the provincial and regional governments in Southeast Sulawesi
which have assumed a greater role in the development of regional natural resources under
Indonesias regional autonomy program.
Operations
Production of nickel-in-matte at PT Inco increased by six per cent to a record level of
76,400 tonnes in 2005, compared with 2004, reflecting increased mine production and consistent
downstream operations, in part delivered by improved water management and power reliability.
Production in 2004 was 72,200 tonnes, up three per cent over the 2003 level of 70,200 tonnes.
Nickel-in-matte, an intermediate product, is sold by PT Inco primarily into the Japanese market.
Virtually all of PT Incos electric power requirements are supplied by its 165-megawatt
hydroelectric generating facilities on the Larona River and its newer 93-megawatt facilities at
Balambano which began operation in 2000. As noted above, the Balambano facility has been able to
generate power consistently above its design capacity due to improved water management practices
and higher reservoir levels and other related factors than were assumed in developing its original
design capacity. PT Inco announced plans in 2004 to construct a third dam on the Larona River at a
cost of approximately $150 million. The new dam is the first stage of a four-year capital program
currently estimated to total about $280 million aimed at raising PT Incos annual production by 25
per cent to about 200 million pounds of nickel-in-matte by 2009. The new dam is expected to
increase PT Incos hydroelectric generating capacity by an average of 90 megawatts annually. In
January 2006, PT Inco temporarily suspended groundwork at the new dam site, pending the receipt of
certain amendments to a required permit issued by the Minister of Forestry. While we are
optimistic that we will receive the necessary approvals to continue the groundwork, any delay will
affect the overall project timing and PT Incos ability to reach
the annual 200 million pounds of
nickel-in-matte production by 2009.
PT Incos nickel unit cash cost of sales increased 25 per cent for 2005 compared with 2004 due
to higher prices for heavy fuel oil, higher volumes of heavy fuel oil used due to higher production
and more moisture in the ore from PT Incos Petea mining area and higher prices for, and higher
volumes, of diesel used due to a greater haulage distances, given the increased ore mined at PT
Incos Petea mining area. PT Inco also required approximately 364,000 tonnes of fuel oil to
operate its dryers, kilns and other oil-fired facilities in 2005 compared with 447,000 tonnes in
2004.
The following table shows PT Incos production, together with deliveries by Inco of finished
nickel refined from PT Incos matte, for the five years ended December 31, 2005:
|
|
|
|
|
|
|
|
|
|
|
Production |
|
Deliveries of |
|
|
of Nickel- |
|
Finished Nickel |
Year |
|
in-Matte |
|
to Customers(1) |
|
|
(in tonnes) |
2001 |
|
|
62,600 |
|
|
|
61,018 |
|
2002 |
|
|
59,500 |
|
|
|
61,997 |
|
2003 |
|
|
70,200 |
|
|
|
65,512 |
|
2004 |
|
|
72,200 |
|
|
|
73,853 |
|
2005 |
|
|
76,400 |
|
|
|
73,965 |
|
|
|
|
(1) |
|
Includes 12,283 tonnes in 2001, 12,557 tonnes in 2002, 14,307 tonnes in 2003, 14,716
tonnes in 2004 and 15,441 tonnes in 2005 of nickel-in-matte delivered to Sumitomo as a final
product. |
44
As indicated in the tables on estimated ore reserves on a Company-wide basis above under
Ore Reserves and Mining Rights, PT Incos estimated ore reserves at the end of 2005 were 59
million tonnes of proven reserves grading 1.8 per cent nickel and 88 million tonnes of probable
reserves grading 1.81 per cent nickel compared with an estimated 88 million tonnes of proven
reserves grading 1.84 per cent nickel and 20 million tonnes of probable reserves grading 1.81 per
cent nickel at the end of
20046.
In July 2005, the Constitutional Court in Indonesia upheld legislation adopted by the
Indonesian parliament in August 2004 which exempted PT Inco and a limited number of other
Indonesian mining companies from certain legislation passed in 1999. The 1999 legislation had the
effect of restricting open-pit mining and certain other activities in areas designated as
protected forests. A significant portion of the areas that PT Inco is authorized to mine under
its Contract of Work was considered to be protected forests under the 1999 legislation. The
legality of the 2004 legislation was challenged in early 2005 when certain parties initiated a
process to have the 2004 legislation reviewed in the Constitutional Court. The July 2005 decision
of this Court upholding the 2004 legislation is final and non-appealable.
Although this decision of the Constitutional Court has clarified that the areas that PT Inco
is authorized to mine under its Contract of Work will not be subject to the 1999 legislation, in
order to conduct mining in protected forests PT Inco must still resolve certain issues relating to
a regulation issued by the Indonesian Minister of Forestry in late 2004 which imposed new
requirements restricting mining in protected forests, including requiring that PT Inco submit an
application for and obtain licences and other approvals to conduct such activities. While PT Inco
continues to believe that the terms of its Contract of Work provide it with all authorizations
needed to conduct mining activities in the areas covered by its Contract of Work and that any
disputes relating to its Contract of Work are subject to arbitration under international
conventions, if the forestry regulation restricts PT Incos ability to mine in certain areas, it
could reduce PT Incos estimated ore reserves and adversely affect PT Incos long-term mining
plans. In addition, as discussed above, PT Inco is awaiting receipt of an amendment to a forestry
permit in connection with its latest expansion project.
Sales
All of PT Incos production of nickel-in-matte is sold in U.S. dollars under long-term
contracts to Inco and Sumitomo. These contracts, which by their terms continue until the
expiration of the Contract of Work, provide that if the Contract of Work is extended or renewed
these contracts will be extended for the period of such extension or renewal. Under these
contracts, about 20 per cent of PT Incos production is sold to Sumitomo and the balance to Inco.
Net sales by PT Inco of nickel-in-matte totalled $885 million in 2005 compared with $792
million in 2004. This increase in 2005 relative to 2004 was due to increased deliveries as a
result of higher production rates and higher realized prices.
PT Incos deliveries of nickel-in-matte were 76,100 tonnes in 2005, compared with 72,500
tonnes in 2004 and 70,500 tonnes in 2003. The Japanese nickel market continues to be particularly
important to PT Inco since PT Incos operations were conceived, in part, as a stable source of feed
material to Japanese nickel refiners in the form of a processed intermediate nickel product which
could be imported free of existing Japanese tariffs levied on refined nickel metal and other
finished forms of nickel. ITL processes nickel-in-matte from PT Inco to produce finished products
for the stainless steel industry in Japan.
PT Incos net realized price for nickel-in-matte in 2005 averaged $11,462 per tonne ($5.20 per
pound) in 2005, compared with $10,766 per tonne ($4.88 per pound) in 2004 and $7,117 per tonne
($3.23 per pound) in 2003. Under PT Incos long-term sales contracts, the selling price of PT
Incos nickel-in-matte is determined by a formula which is based upon the LME cash price for
nickel.
Voiseys Bay Nickel Company Limited
Voiseys Bay Deposits
The Voiseys Bay deposits consist of four main mineral deposits: the Ovoid, the Eastern
Deeps and related deposits, the Reid Brook deposit and the Discovery Hill deposit. As reflected in
the table Total Estimated Ore Reserves as of December 31, 2005
|
|
|
6 |
|
Reference is made to Note (3) to
the tables entitled Total Estimated Ore Reserves as of December 31,
2005 and Total Estimated Ore Reserves as of December 31,
2004 above for the qualified persons under applicable Canadian
securities regulatory requirements who conducted, either directly by themselves
or indirectly through employees of the Company reporting directly or indirectly
to them, a comprehensive review and confirmation of the application of the
detailed procedures, systems and processes the Company has developed and
implemented for the purpose of verifying these estimated ore reserves. |
45
under Ore Reserve and Mining Rights above, as of December 31, 2005, estimated proven ore
reserves of 29 million tonnes grading 2.99 per cent nickel, 1.73 per cent copper and 0.15 per cent
cobalt and probable ore reserves of three million tonnes grading 0.64 per cent nickel, 0.37 per
cent copper and 0.03 per cent cobalt were estimated for the Ovoid.
VBNCs exploration expenditures in Labrador were $5 million in 2005, compared with $3 million
in 2004 and $2 million in 2003. In 2005, in-fill exploration drilling from surface was carried out
at the Reid Brook deposit. Fifty-two holes totalling 21,000 metres were drilled in 2005, resulting
in the addition of additional high-grade massive sulphide mineralization to this deposit. This
drilling confirmed that these massive sulphides occur primarily as flat-lying bands and lenses
within the wall rocks adjacent to the troctolite dyke that hosts the low-grade disseminated
mineralization and that there is potential to add additional massive sulphide mineralization to
this deposit with further drilling. Down-hole geophysical surveys were conducted in 2005 to
identify the zones of massive sulphides and to optimize the drilling. The resource block model for
the Reid Brook deposit was updated in 2005 and scoping-stage feasibility assessments continued on
the underground resources. The exploration program will continue at the Reid Brook deposit in 2006
to seek to further increase the estimated high-grade resource there.
Environmental Review Process
The scope of the environmental review and approval process for the Voiseys Bay project
was established under a January 1997 memorandum of understanding among the Governments of Canada
and the Province of Newfoundland and Labrador (the Province), the LIA and Innu Nation on a
harmonized environmental review process for the mine, concentrator and related facilities and
infrastructure in the Voiseys Bay area (the Mine/Concentrator Project).
Having undergone a comprehensive environmental review, both the federal and provincial
governments released the Mine/Concentrator Project from the environmental assessment process
subject to certain terms and conditions, including measures intended to mitigate potential
environmental effects relating to the Mine/Concentrator Project, and accepted a number of the
panels recommendations. We do not believe that those recommendations or the terms and conditions
of the releases stipulated by the governments created or would create any unduly burdensome
financial or other restrictions on the Mine/Concentrator Project.
In 1999, the federal and provincial governments entered into negotiations with the LIA and
Innu Nation to develop a project-specific environmental management agreement for the issuance of
the necessary governmental licences and permits for the Mine/Concentrator Project. With the
agreement on the commercial development of the Voiseys Bay project having been reached in
mid-2002, as discussed below, these discussions restarted and in July 2002 the governments entered
into an environmental management agreement with the LIA and Innu Nation which created an
environmental management board in order to provide for participation by these aboriginal groups in
the process leading to the issuance of the necessary licences and permits for the Mine/Concentrator
Project. The environmental management board has been meeting since it was created in July 2002 to
provide advice on the issuance of the necessary permits and licences for the Mine/Concentrator
Project, including the mining and surface leases issued to VBNC pursuant to the definitive
agreements entered into with the Province of Newfoundland and Labrador, as discussed below. In
2004, we also began the process covering the environmental assessment of the planned commercial
processing plant to process nickel concentrates from the Voiseys Bay mine and concentrator. This
environmental assessment process is anticipated to be a multi-year one and is expected to be
completed in 2007.
Arrangements with Aboriginal Groups
In June 2001, when confidential negotiations with the Province restarted on the terms
that would enable the project to proceed, VBNC also resumed separate IBA negotiations with the LIA
and Innu Nation. VBNC reached agreement on IBAs with both the LIA and Innu Nation in May 2002.
These IBAs were subsequently ratified by the respective memberships of the two aboriginal groups
and were signed by the parties effective July 29, 2002. The IBAs set forth (i) certain payments to
be made to the LIA and Innu Nation by Inco and VBNC over the life of the Voiseys Bay project, (ii)
programs relating to training, employment and business opportunities for the LIA and Innu Nation
and (iii) the participation of the LIA and Innu Nation in environmental and certain other programs
and procedures relating to the operation of the Mine/Concentrator Project, among other areas.
We understand that, following separate confidential negotiations between each of the LIA and
Innu Nation and the Governments of Canada and the Province of Newfoundland and Labrador, interim
agreements were reached to resolve the respective land claims of the LIA and Innu Nation in July
2002. Neither VBNC nor Inco was a party to these agreements nor to the negotiations leading to
those agreements. The LIA has since reached agreement with the federal and provincial governments
on how their claims relating to Voiseys Bay would be addressed in its final land claims agreement,
as well as an interim measures agreement to allow the Mine/Concentrator Project to proceed. We
understand that the federal and provincial governments and the LIA reached agreement on
46
a final comprehensive land claims agreement in August 2003 and that in early 2004 the LIA
completed a community-based ratification process ratifying the final comprehensive land claims
agreement among those parties. The Province passed legislation ratifying the land claims agreement
in December 2004 and the federal government ratified that agreement in 2005.
With respect to their land claims, Innu Nation has also reached agreement with the federal and
provincial governments on how their claims relating to Voiseys Bay would be addressed in its final
land claims agreement, and entered into a memorandum of agreement under which Innu Nation agreed,
among other things, not to assert any aboriginal land claims in the Voiseys Bay area, thereby
allowing the Mine/Concentrator Project to proceed. We were advised that the Innu of Labrador were
registered for eligibility to receive benefits under the Indian Act (Canada) in November 2002, and
that a reserve was created for the community of Natuashish in December 2003, but the community of
Sheshatshiu does not yet have reserve status. We also understand that the federal and provincial
governments and Innu Nation continued negotiations in 2005 towards the conclusion of a final
comprehensive land claims agreement, but no such agreement has as yet been reached.
Arrangements with the Provincial Government
After a series of negotiations over the 1998 1999 and June 2001 June 2002 periods, in
June 2002 Inco and the Government of Newfoundland and Labrador announced their agreement on a
non-binding statement of principles covering the development of the Voiseys Bay project. The
statement of principles was approved by the provincial legislature in late June 2002 and on October
7, 2002 Inco and VBNC signed definitive agreements with the government to implement the terms of
the statement of principles. The definitive agreements provide for the development of a mine and
concentrator processing plant at Voiseys Bay, representing the Mine/Concentrator Project, a
research and development program focusing on hydrometallurgical processing technologies, an
industrial and employment benefits program for the Voiseys Bay project, a timetable for the start
and completion of the principal stages of the project, and other key parts and requirements
covering the overall development of the Voiseys Bay project. The definitive agreements set forth
certain obligations of Inco to construct and operate (i) a demonstration plant in the Province as
part of the overall research and development program to test hydrometallurgical processing
technologies to treat nickel-containing ores or intermediate products from the Voiseys Bay
deposits and (ii) subject to technical and economic feasibility pursuant to the terms thereof, a
commercial processing facility in the Province by the end of 2011 to treat all of the Voiseys Bay
ores or intermediate products to produce finished nickel and cobalt products based upon
hydrometallurgical processing technologies or, if such technologies do not meet certain technical
and/or economic feasibility requirements, as may be determined by one or more agreed upon experts
as provided for in such agreements, a conventional refinery. With the completion of the
demonstration plant and the initial shipment of intermediate concentrate product from the
Mine/Concentrator Project for testing at this plant in the fall of 2005, Inco began shipping
quantities of intermediate concentrate products produced by the Mine/Concentrator Project
containing nickel and/or cobalt to Incos facilities in Ontario and Manitoba for further processing
into finished nickel and cobalt products. Shipments of such Voiseys Bay intermediate concentrates
will be limited to certain maximum aggregate quantities and will end when the construction of the
hydrometallurgical or conventional matte commercial processing facility, as the case may be, is
completed.
Under the definitive agreements, Inco is also required, prior to the cessation of the Voiseys
Bay mining operations in the Province, subject to certain exceptions relating to the availability
of such external sources, to bring into the Province for further processing at the
hydrometallurgical or conventional matte processing facility to be constructed in the Province from
sources outside the Province, in one or more intermediate forms, quantities of intermediate
products, subject to certain annual minimum quantities, containing in total quantities of nickel
and cobalt equivalent to what was shipped to our Ontario and Manitoba operations. The definitive
agreements also set forth (1) Incos commitment to an underground exploration program covering the
Voiseys Bay deposits with the objective of discovering sufficient nickel-containing ore reserves
for processing beyond the initial phase of the Voiseys Bay project, (2) the terms under which the
processing of copper intermediate in the Province would be justified, and (3) the Provinces
commitment to (i) the tax regime that will apply to the project, (ii) electric power rates for the
project and (iii) the issuance of the necessary permits and authorization to enable the Voiseys
Bay project to proceed. The definitive agreements also provide for programs and arrangements
relating to employment and industrial benefits in connection with the construction and related
aspects of the project. The definitive agreements also include specific sanctions if Inco were not
to meet certain of its contractual obligations under such agreements, including the effective
forfeiture of its lease to conduct mining operations in the Province. Under the terms of the
definitive agreements, certain provisions became effective when these agreements were executed.
The next steps which were to be met by the end of the first quarter of 2003 for these agreements to
become effective overall included the securing of acceptable financing arrangements for the project
and completing a bankable feasibility study for the first phase of the project, including the
Mine/Concentrator Project. As discussed under Project Phases below, the bankable feasibility
study was completed in late March 2003. In March 2003, Inco advised the Province that it was
waiving the financing condition in these agreements. The remaining conditions to the effectiveness
of these agreements were met in the third quarter of 2003.
47
Project Phases
Inco announced in late March 2003 (i) the results of a bankable feasibility study for the
mine and concentrator for the Ovoid and adjacent surface deposits and related facilities
representing part of the initial phase of the Voiseys Bay project and (ii) that it planned to
proceed with this initial phase. The initial phase of the Voiseys Bay project consists of (i) the
Mine/Concentrator Project and related infrastructure, (ii) a research and development program
covering hydrometallurgical processing technologies (the Hydromet R&D Program) for the treatment
of the Voiseys Bay nickel and cobalt-containing concentrates to be produced into finished nickel
and cobalt product, including a demonstration plant to be constructed in Argentia on the Island of
Newfoundland, (iii) concentrate handling facilities to be constructed at our Canadian operations
for the nickel and cobalt-containing concentrates to be processed over the 2006-2011 period once
the Mine/Concentrator Project is completed and (iv) an exploration program. As at December 31,
2005 we estimate that this initial phase will cost $970 million and as of the end of 2005 we had
incurred expenditures of approximately $902 million on this initial phase.
Production began at the Voiseys Bay project in September 2005, well ahead of the original
project schedule. The first shipments of intermediate nickel concentrates from the Voiseys Bay
project were shipped to Incos operations in Sudbury, Ontario and Thompson, Manitoba in November
2005 and the first production of finished nickel from these concentrates occurred in January 2006.
In October 2005, the demonstration plant was, as discussed above, completed and began operating at
Argentia with an initial shipment of concentrate for testing. Production from the Voiseys Bay
project in 2006 is currently expected to be approximately 54,000 tonnes of nickel in concentrates.
Assuming technical and economic feasibility, a commercial hydrometallurgical processing plant
will be built as part of the second phase of the project between 2009 and 2011. As noted above, in
the unlikely event that the hydrometallurgical process proves not to be technically and/or
economically feasible, a conventional refinery will be built to produce finished nickel product.
It is expected that the Voiseys Bay hydrometallurgical plant will produce approximately 50,000
tonnes of nickel, 2,300 tonnes of cobalt and up to 7,000 tonnes of copper intermediates. In
addition, it is expected that the Mine/Concentrator Project will produce approximately 32,000
tonnes of copper in concentrate annually. A total investment, based upon the updated capital cost
estimate for the initial phase and the prefeasibility studies for the other two phases of the
project of approximately $2,000 million would be required for all phases of the project over the
30-year life of the project, including estimated sustaining capital requirements.
Goro Nickel S.A.S.
Goro Deposits
Goro Nickel holds a number of claims covering nickel-cobalt properties in New Caledonia,
located about 1,500 kilometres east of Australia. These properties have an extensive laterite
resource base, including, as reflected in the tables above covering estimated ore reserves on a
Company-wide basis under Ore Reserves and Mining Rights, an initial mining zone with, as of
December 31, 2005, an estimated 96 million tonnes of proven ore reserves grading 1.34 per cent
nickel and 0.12 per cent cobalt and 24 million tonnes of probable ore reserves grading 2.01 per
cent nickel and 0.09 per cent cobalt which has been outlined as an initial source of feed for a
commercial
plant7. Given the completion of the comprehensive review of the Goro project
referred to below, the capital cost estimate used for this estimate of ore reserves as at year-end
2005 was based on the updated capital cost estimate announced in October 2004. This estimated ore
reserve base is to be mined using low-cost open pit methods, which, when combined with Incos
proprietary pressure-acid leaching and solvent extraction (PAL-SX) technology, will give the
project the potential to have one of the lower cash costs of nickel production in the world.
The following map shows the Goro project concessions and the location of Goro Nickels ore
reserves and mineral resources, the process plant site and other facilities:
|
|
|
7 |
|
Reference is made to Note (3) to the tables
entitled Total Estimated Ore Reserves as of December 31, 2005 and
Total Estimated Ore Reserves as of December 31, 2004 above for
the qualified persons under applicable Canadian securities regulatory
requirements who conducted, either directly by themselves or indirectly through
employees of the Company reporting directly or indirectly to them, a
comprehensive review and confirmation of the application of the detailed
procedures, systems and processes the Company has developed and implemented for
the purpose of verifying these estimated ore reserves. |
48
Goro Project
Location of Concessions, Ore Reserves and Mineral Resources, Process Plant Site and Other Facilities
49
Ownership of Goro Nickel
Inco currently owns approximately a 71 per cent interest in Goro Nickel following the
capitalization of certain shareholder advances in February 2005, the sale of shares representing a
21 per cent ownership interest in Goro Nickel to Sumic Nickel Netherlands (Sumic), a joint
venture between Sumitomo and Mitsui & Co., Ltd. (Mitsui) in April 2005, and the election by SPMSC
not to make its pro-rata capital contributions to the project as described below.
Under the terms of a share purchase agreement entered into with Inco covering their
acquisition of a 21 per cent interest in Goro Nickel, Sumitomo and Mitsui paid a total of
approximately $150 million for their interest. This amount included their pro-rata share of
certain project capital and other expenditures made since we announced our initial decision in July
2001 to proceed with the Goro project and certain advances made by us to fund the project. Under
the terms of a shareholders agreement entered into as of April 8, 2005 (the Sumic Shareholders
Agreement), setting forth the rights and obligations that Sumic (as well as Sumitomo and Mitsui)
have as a shareholder in Goro Nickel, including the right to elect two directors to the board of
directors of Goro Nickel so long as Sumic holds at least a 16 per cent ownership interest in Goro
Nickel and the right to elect one director so long as it holds at least an eight per cent ownership
interest, Sumic is also obligated to make capital contributions on a pro-rata basis, subject to
certain limitations and adjustments tied to the actual capital cost of the project, as required to
meet the funding requirements of Goro Nickel until such time as the Goro project meets certain
minimum commercial production and related performance tests (the Sumic Threshold Performance
Tests). If Sumic does not make such capital contributions, it will suffer dilution of its
ownership interest based upon a penalty dilution formula. If the capital cost of the Goro project
exceeds a threshold as specified above a capital cost estimate of $1,878 million, as calculated
under the Sumic Sharheolders Agreement, prior to when the Sumic Threshold Performance Tests are
met, then Sumic will not have any obligation to provide capital contributions to meet the Goro
projects funding requirements and we would, subject to certain terms and conditions under the
Sumic Shareholders Agreement, be required to provide certain funding to meet such requirements, up
to a specified level, in the form of interest-bearing debt repayable by Goro Nickel. In addition,
under the Sumic Shareholders Agreement Sumic has the right to participate on a pro-rata basis in
any future expansion of the Goro project and also has certain rights to approve certain
expenditures and other actions relating to Goro Nickel or the Goro project that would be outside
the currently planned scope and operation of the project. As of April 8, 2005, Inco, Sumic,
Sumitomo and Mitsui also entered into an operations agreement which sets forth Goro Nickels role
and responsibilities as the operator of the Goro project and its financial and other reporting
obligations to its shareholders and a product offtake agreement was also executed under which Sumic
has the right and obligation to purchase its pro-rata share of Goro Nickels production of nickel
and cobalt products based on its ownership interest in Goro Nickel, with a subsidiary of Inco under
a separate product offtake agreement having the right and obligation to purchase all of Goro
Nickels production not purchased by Sumic (which would currently represent 79 per cent of such
eventual production).
On February 18, 2005, SPMSC acquired all of the shares of Goro Nickel held by a subsidiary of
Bureau des Recherches Géologiques et Minières (BRGM). These shares represented, after the
capitalization by Goro Nickel of certain shareholder advances as of February 18, 2005,
approximately a 9.71 per cent interest in Goro Nickel. At the same time, Inco sold shares in Goro
Nickel to SPMSC representing approximately a 0.29 per cent interest such that SPMSC would own, as
of February 18, 2005, approximately a 10 per cent interest in Goro Nickel. SPMSC also entered into
a shareholders agreement with Inco on February 18, 2005 setting forth its rights and obligations as
a shareholder in Goro Nickel. Under the terms of that agreement, SPMSC will have a right to
nominate and elect one director to the board of directors of Goro Nickel so long as it holds at
least a five per cent interest in Goro Nickel. SPMSC will also have the right, but not the
obligation, to make capital contributions on a pro-rata basis as required to meet the funding
requirements of Goro Nickel until such time as the Goro project meets certain minimum commercial
production and related performance tests (the Threshold Performance Tests). If SPMSC does not
make such capital contributions, then Inco has agreed to provide such capital contributions in
addition to its own pro rata contributions, subject to certain limitations, and SPMSC would,
accordingly, suffer dilution of its ownership interest, with the dilution formula to be subject to
a penalty if SPMSCs interest by virtue of dilution were to fall below five per cent. If the
capital cost of the Goro project exceeds a threshold above a capital cost estimate of $1,878
million, as calculated under the shareholders agreement between SPMSC and Inco, prior to when the
Threshold Performance Tests are met, then SPMSC will not have any right or obligation to provide
capital contributions to meet the Goro projects funding requirements and Inco would be required to
provide certain funding to meet such requirements, up to a specified level, in the form of
interest-bearing debt repayable by Goro Nickel, and SPMSC would also be required to provide its pro
rata share of certain administrative and related costs incurred by Goro Nickel up to a specified
limit. Once the Threshold Performance Tests are met, to the extent that SPMSC has elected not to
make its pro rata capital contributions and, accordingly, has suffered dilution of its interest in
Goro Nickel, SPMSC has agreed to purchase from Inco, based upon the price paid by Inco for such
shares plus interest
50
thereon based upon a formula tied to Incos then applicable long-term weighted average cost of
capital, a sufficient number of shares such that SPMSC will then hold a 10 per cent interest in
Goro Nickel. Our planned capital expenditures for the Goro project do not assume that SPMSC will
make its pro rata capital contributions until it is diluted down to five per cent.
SPMSC will also have the right to participate in any future expansion of the Goro project. In
the event that the Goro project were effectively abandoned on a permanent basis or did not meet the
Threshold Performance Tests within seven years after the Goro projects process plant had been
constructed and was ready to receive feed for processing, SPMSC would have the right to receive a
preferential payment ahead of Goro Nickels other shareholders out of the proceeds received from
the sale of Goro Nickels assets, after the discharge of all of Goro Nickels liabilities to third
parties, based upon SPMSCs total capital contributions in, and purchase of shares of, Goro Nickel
subject to a ceiling. Inco has agreed to provide, subject to certain terms and conditions, a
letter of credit in the future in favour of SPMSC to secure this preferential payment.
Since SPMSC became a shareholder of Goro Nickel in February 2005, it has elected not to make
its proportionate capital contributions. Accordingly, Inco has made such contributions, resulting
in SPMSC being diluted to approximately an eight per cent ownership interest as of December 31,
2005 and Inco has increased its ownership to approximately 71 per cent in Goro Nickel by virtue of
making such additional contributions. Contributions are made in the form of shareholder advances
which are then capitalized on a quarterly basis.
Goro Project
In 1999, we completed the construction of an integrated pilot plant in New Caledonia
capable of processing 12 tonnes of ore per day to continue with the development of the PAL-SX
technology required for commercialization. The pilot plant operated successfully for over two
years, both in further proving the PAL-SX technology and in training the core workforce for a
future commercial plant.
In April 2001, following completion of a bankable feasibility study, Inco announced that it
planned to proceed with the construction of a commercial nickel-cobalt project at Goro.
During 2002, Inco proceeded with the commercial development of the Goro project. In early
September 2002, the project experienced labour disruptions by personnel associated with certain
project construction subcontractors. As a result of these disruptions, a decision was made to
curtail certain activities at the project site to enable Goro Nickel, contractors, subcontractors
and other interested parties to develop procedures to avoid future disruptions. Over the September
to November 2002 period, a number of procedures were put in place as part of a phased resumption of
certain of the project activities that had been curtailed. At the same time that the labour
disruptions referred to above occurred, Inco began updating the status of certain key aspects of
the project, including the necessary permitting, capital cost estimate, project schedule and
organization. Work on certain critical parts of the project, including engineering, continued
during this update process.
Project Review Process
On December 5, 2002, Inco announced that it would be undertaking a comprehensive review
of all key aspects of the Goro project. This action was based upon information received by Inco
from the engineering, construction and procurement firms acting as the prime construction
contractors for the project which, if confirmed, indicated an increase in the capital cost estimate
for the project in the range of 30 to 45 per cent above the then current capital cost estimate of
$1,450 million. The objective of the comprehensive review was to assess all information on the
Goro project, including the various cost estimates and trends, and determine what changes in the
capital cost estimate and the project could be made to maintain the projects economic feasibility.
As a result of the temporary suspension of certain development activities and other actions which
had been taken by year-end 2002 during this review process, we recorded a pre-tax charge of $25
million in the fourth quarter of 2002. This charge was comprised of pre-tax expenses of $62
million relating to the cancellation or termination of certain outstanding contractual obligations,
to accrue for demobilization costs and to reduce the carrying value of certain assets relating to
the project, partially offset by currency gains of $37 million as a result of the ineffectiveness
of certain forward currency contracts that had been entered into for hedging purposes. As part of
the comprehensive review, we also evaluated various contractual and other arrangements covering
construction and other work relating to the Goro project and implemented certain actions to suspend
or terminate certain of those contractual arrangements.
This review, as discussed above, evolved into two phases during 2003. Phase 1 of the review
focused on an orderly suspension of work and identification of opportunities for capital cost
reduction. In August 2003, we announced the key results of Phase 1 of the
51
review process and that we were moving to a second phase, or Phase 2, of the review which
would involve a structured process intended to (i) further develop the capital cost reduction
opportunities identified in Phase 1 and (ii) establish a capital cost control estimate, an updated
project schedule and an optimized and clearly defined scope and execution plan for the project.
In late May 2004, we announced the key preliminary findings reached to that date as part of
Phase 2 of the review. These findings included (i) an updated preliminary capital costs estimate,
taking into account an expected non-cash charge, of approximately $1,850 million for the mine,
process plant and related infrastructure, within a minus five per cent to plus 20 per cent
confidence level and (ii) changes in the planned Goro project configuration, moving to direct
heating of the ore feed and other changes intended to reduce the capital cost estimate and enhance
the operating efficiency of the planned process plant and the process itself. As a result of such
changes, capitalized expenditures incurred of $201 million were written off as of the end of the
second quarter of 2004. These changes related to certain expenditures, principally engineering and
related work associated with the original project configuration and equipment purchased for the
indirect heating of ore feed, that no longer would have any value for the project or otherwise. We
announced the key final results of Phase 2 of the review in October 2004. These final results
included an updated capital cost estimate of $1,878 million for the mine, process plant and related
infrastructure, within a minus five per cent to plus 15 per cent confidence level. This estimate
included about $40 million for assumed escalation in costs during the construction phase of the
project, an amount that was not in previous capital costs estimates, and also reflected favourable
currency hedging gains realized by Inco of about $31 million which were also not included in
previous estimates. The principal reasons for the increase from the $1,850 million estimate which
had been announced in May 2004 were higher costs for a range of construction materials and labour
required for construction and the incorporation of a new tailings storage area as part of the
project. The results of Phase 2 of the review also established an expected annual capacity for the
project of 60,000 tonnes of nickel and a current range for cobalt capacity of 4,300 to 5,000 tonnes
per year to take into account the optimized mine plan for the project. Having completed and
achieved the key objectives of Phase 2 of the review, in October 2004 we also announced the
decision to proceed with the project.
Since October 2004, project execution has been based on a phased approach, with the first
phase focusing on engineering, contract development and permitting. Engineering was about 70 per
cent complete as of year-end 2005 and approximately 900 construction personnel were on site
initially focusing on earthworks for the process plant, the residue storage facility and road
realignment. We are also building some 400 process plant modules and pre-finished units for the
process plant in the Philippines which are expected to be delivered to the Goro site beginning in
April 2006. Taking into account these cost pressures for such construction materials and other
input costs, the currently anticipated trends in such costs and the latest regulatory requirements
for the configuration of the projects tailings area, we currently believe that, if we were to
formally update our latest estimate for the capital cost for Goros mine, process plant and
infrastructure of $1,878 million with a minus five per cent plus 15 per cent confidence level, such
updated forecast would be expected to be at the high end of the plus 15 per cent confidence level.
As part of our ongoing work on the project, we have implemented a number of systems to monitor all
key costs trends which could affect the capital cost forecast. We currently expect to be in a
position to have a definitive cost estimate, reflecting all relevant factors at that time, and
which is currently expected to be subject to a confidence or accuracy level developed as part of
that estimate, sometime in the second quarter of 2006 when engineering is expected to be at least
80 per cent complete and all major construction contracts will have been awarded. The expected
initial start-up of the project remains in late 2007. Reference is made to Managements
Discussion and Analysis of Financial Condition and Results of Operations Results of Operations
Development Projects Segment under Item 7 of this Report for a discussion of the status of the
Goro project as of year-end 2005.
Fiscal Regime
The New Caledonian authorities enacted a fiscal regime in 2001 which provides a nominal
15-year tax holiday plus an additional five years at tax rates that are 50 per cent of the
prevailing tax rates for qualifying metallurgical companies. If the project achieves an internal
rate of return in excess of a cumulative threshold rate during this 20-year period, the applicable
tax rates or levels for the project would then be adjusted prospectively to be equivalent to the
general rates or levels then in effect for mining and processing companies.
Girardin Act Financing
On December 30, 2004, we entered into agreements for the Goro project covering the
Girardin Act tax-advantaged lease financing program (Girardin Financing) sponsored by the French
Government. The Girardin Financing is subject to a ruling issued by the French Minister of
Economy, Finance and Industry (the Ruling). The Ruling provides that certain investors who are
French qualified investors under the Girardin Financing (Tax Investors) may utilize certain tax
deductions in connection with assets
52
representing a portion of the Goro projects processing plant which are financed by the
Girardin Financing (Girardin Assets). The Ruling requires that Goro Nickel and Inco satisfy
certain conditions, including operating the Goro project for a minimum of five years.
As part of the Girardin Financing, a special purpose entity (SPE), a variable interest
entity, was formed by the Tax Investors to finance the purchase, construction and installation of
the Girardin Assets. As we are the primary beneficiary of the SPE, our consolidated accounts
include the accounts of the SPE. The purchase, construction and installation of the Girardin
Assets by the SPE is funded by a combination of (i) non-refundable loans (Tax Advances) provided
by the Tax Investors pursuant to a tax loan agreement (the Tax Loan Agreement) between the Tax
Investors and the SPE, and (ii) loans provided to the SPE by a subsidiary of Inco pursuant to a
loan agreement (the Loan Agreement).
Under a construction agreement between the SPE and Goro (the Construction Agreement), Goro
has been appointed the construction agent on behalf of the SPE and is responsible for the purchase,
construction, installation and commissioning of the Girardin Assets. The costs for the
construction, installation and commissioning of the Girardin Assets total approximately $500
million and are payable in three instalments. In the event of a cost overrun, a fourth instalment
would be made to Goro Nickel with the additional funds provided pursuant to the Loan Agreement.
Goro Nickel is required to give notice of substantial completion of the Girardin Assets to the SPE
by December 31, 2008 or such later date as may be approved by the French tax authorities. Upon
such substantial completion, the SPE will lease the Girardin Assets to Goro Nickel under an
agreement between the SPE and Goro Nickel (the Lease Agreement). While the term of the Lease
Agreement is 12 years, the related agreements covering the Girardin Financing extend certain call
and put options to Goro Nickel and the SPE, respectively, covering both the Girardin Assets and the
ownership interests in the SPE whereby, assuming no default by Goro Nickel under the arrangements
covering the Girardin Financing, one of these options will be exercised after five years, resulting
in the termination of the Lease Agreement and the ownership of the Girardin Assets reverting to
Goro Nickel.
The Construction Agreement and the Lease Agreement contain certain events of default and
termination rights for the benefit of the SPE, including the failure of Goro Nickel to meet certain
terms and conditions of the Ruling. Following any termination of the Lease Agreement, (1) certain
termination compensation could be payable by Goro Nickel to the Tax Investors pursuant to the
Add-Back Indemnity (as defined below) and (2) Goro Nickel would be required to either (a) repay the
entire then outstanding amount drawn under the Loan Agreement or (b) assume all of the SPEs
obligations under the Loan Agreement. Upon the occurrence of such events, Goro Nickel would
continue to have the right to use the Girardin Assets, with the SPE retaining ownership thereof
until all termination payments due by Goro Nickel under the Lease Agreement were paid. In
addition, each of the Lease Agreement and the Construction Agreement provides that Goro Nickel must
indemnify the SPE and the Tax Investors with respect to (1) the Add-Back Indemnity (as defined
below), (2) increased taxes incurred by the SPE or Tax Investors in respect of certain changes in
tax laws or the imposition of certain unanticipated taxes in New Caledonia and (3) certain
operational losses incurred by the SPE or Tax Investors arising out of third party claims in their
capacity as owners of the Girardin Assets. In the event of a termination of the Construction
Agreement or the Lease Agreement or in the event that the Tax Investors exercise their put option
upon the occurrence of certain material adverse environmental events relating to Goro Nickel prior
to the fifth anniversary of substantial completion of the Goro project, it is possible that the Tax
Investors could lose their tax deductions in respect of the Girardin Assets, thereby triggering an
indemnity whereby Goro Nickel would be required to reimburse the Tax Investors for the denial or
reversal of their tax deductions under the Girardin Financing by the French tax authorities and for
any interest and penalties levied thereon by such authorities (the Add-Back Indemnity). In
connection with any termination event, the Tax Investors will receive certain priorities relating
to Goros assets over other creditors.
As at December 31, 2005, Goro Nickel had received $307 million in Girardin Financing, of which
$79 million was in the form of Tax Advances. The SPE expects to receive the balance of the Tax
Advances in December 2006 pursuant to the terms of the Tax Loan Agreement. It is currently
estimated that such Tax Advances will total $148 million, before fees to be paid to the Tax
Investors, with the balance of the Girardin Financing to be provided under the Loan Agreement. Of
the remaining Tax Advances to be made in 2006, approximately 65 per cent of these amounts has been
committed by the Tax Investors, with the balance expected to be placed with additional investors
prior to the end of 2006. If sufficient commitments from additional investors are not obtained
prior to year-end 2006, this will reduce the total Tax Advances referred to above available to Goro
Nickel.
In connection with the Girardin Financing, Inco Limited provided certain guarantees on behalf
of Goro Nickel covering payments due from Goro Nickel of up to a maximum amount of $100 million
(the Maximum Amount) in connection with the Add-Back Indemnity. Inco Limited also provided an
additional guarantee covering the payments due from Goro Nickel of (a) amounts exceeding the
Maximum Amount in connection with the Add-Back Indemnity and (b) certain other amounts payable by
Goro Nickel under the Girardin Financing relating to certain possible operational or other
developments applicable to the Goro project.
53
New Caledonia
New Caledonia is currently an overseas territorial community (collectivité territoriale)
of France having special legal status under the French constitution, including significant autonomy
except in foreign relations, defence, justice, currency and certain other related areas. As part
of the objective of increasing New Caledonias autonomy from France and to implement arrangements
to address political and other issues that New Caledonia had experienced, in 1998 the French
government, the New Caledonian government and two New Caledonian political movements representing
the native population entered into the Noumea accord. This accord sets forth a process and
timetable for increasing the autonomy of New Caledonia over the coming years, culminating in a
referendum to be held by 2018 on whether New Caledonia would become fully independent from France.
As part of the initial phase of the accord, steps have been taken, and will be taken over the next
few years, to develop the form of provincial governments to be part of the New Caledonian
government structure and to pass local legislation, including the enactment of a new mining law,
that will provide for the transfer of certain authority in a number of areas still maintained by
France to the New Caledonian government. We do not believe that these developments will have an
adverse effect on the Goro project but there can be no assurances in this regard. Provincial
elections were held in May 2004 for the election of members of the three provincial assemblies in
New Caledonia. Each assembly has elected its president who is part of the provinces executive
board. The members of the newly elected provincial assemblies also serve as members of the
Congress of New Caledonia. This Congress is responsible for the selection of the President of New
Caledonia.
In late 2005, a number of boycotts and other related actions in New Caledonia affected the
operations of Eramet and its subsidiary, Société Le Nickel, and other local businesses as a result
of labour and other disruptions and other developments. While those actions and developments did
not affect the construction of the Goro project to any significant degree, such disruptions could
have a substantial adverse effect on the projects construction schedule and capital costs if they
were to resume and continue for any extended length of time.
Prony West Deposit
In September 2001, Goro Nickel applied for an exploration permit for an area next to the
Goro deposit known as Prony West. Several other companies applied for the same exploration permit.
After an assessment of the various applications, the government of the South Province of New
Caledonia recommended to accept Goro Nickels application based upon its approach to the
development of this deposit. The South Provinces recommendation to accept Goro Nickels
application was discussed at a government mining committee (Comité Consultatif des Mines) level in
April 2002 and the recommendation to accept Goro Nickels application was subsequently approved by
the provincial mining council (Conseil des Mines). In July 2002, after a public debate on the
awarding of this exploration permit, the legislative assembly of the South Province voted to award
the Prony West exploration permit to Goro Nickel. As soon as this decision was made, several
companies challenged the South Provinces decision. The administrative tribunal which considered
this challenge released its decision on December 24, 2003. The administrative tribunal decided
that the legislative assembly of the South Province did not have the authority to make the award as
this authority had been previously delegated to the Executive Committee of the South Province and
that the delegation had not been withdrawn. As a result of this decision, the exploration permit
previously awarded to Goro Nickel was cancelled. However, after the cancellation of this permit,
on December 27, 2003 the Executive Committee of the South Province met and re-awarded the
exploration permit to Goro Nickel. This decision to re-award the permit to Goro Nickel was open to
challenges until late April 2004. A number of challenges were filed by several different parties
and on November 21, 2005 the administrative tribunal rendered a decision annulling the Prony West
exploration permit. The tribunal annulled the permit on procedural grounds, ruling that there was
a material change in circumstances between the first and second awards given that the Goro project
was suspended in December 2002. Goro Nickel has appealed the tribunals decision. The respondents
to this appeal have not yet filed their responses and the hearing of the appeal has therefore not
yet been scheduled. If the tribunals decision to annul the permit is upheld on appeal, it is
expected that the Prony West exploration rights would then be subject to the submission by Goro
Nickel and any other interested party of a new application for an exploration permit and a new
process for the review and approval of such an application would be undertaken by the Comité
Consultatif des Mines and the Conseil des Mines.
Exploration and Mine Development
One of the objectives of Incos exploration program has been to provide us with
sufficient ore reserves and mineral resources to sustain production at current levels for at least
20 years at our Ontario and Manitoba operations. See Mining and Production General above for
further information on our planned production levels and Ore Reserves and Mining Rights in Canada
above for information on our estimated proven and probable ore reserves. We also continue to
pursue exploration opportunities for precious metals (PGMs and gold) in Ontario.
54
Exploration expense totalled $43 million in 2005, compared with $32 million in 2004 and $27 million in 2003. Our exploration efforts in 2005 focused on finding additional high-grade nickel deposits in Canada near existing mine workings to increase our estimated ore reserves and provide additional feed for our existing processing facilities, as well as looking for new deposits that would be capable of supporting stand-alone production facilities. Of our total exploration expenditures in 2005, $19 million was spent on exploration in Ontario and Manitoba directed at finding additional nickel, copper and PGMs ore reserves near our existing mines, compared with $13 million in 2004 and $11 million in 2003. Additions to estimated ore reserves from the evaluation of diamond drilling in 2005 totalled 0.4 million tonnes averaging 1.8 per cent nickel and 1.2 per cent copper at our Ontario operations and 0.5 million tonnes averaging 1.9 per cent nickel at our Manitoba operations. Significant quantities of mineral resources were added to the mineral inventory at both the Ontario and Manitoba operations and the feasibility assessments required to classify a portion of these resources as ore reserves are planned to be completed in 2006. We have also continued to evaluate joint venture opportunities that have the potential to enhance our overall mining operations.
At our Ontario operations, underground exploration continued on the 170 footwall high-grade precious metals deposit at McCreedy/Coleman Mine in 2005. Additional holes were drilled from the exploration drift. The hanging wall exploration drift, which is required to conduct the close-spaced drilling needed for a final feasibility assessment, was advanced by 330 metres in 2005. A further 90 metres is required to complete the exploration drift in 2006. In-fill drilling is currently underway and is scheduled to be completed by June 2006. As of December 31, 2005, the probable ore reserves in the 170 deposit was estimated at 1.5 million tonnes grading 1.0 per cent nickel, 7.4 per cent copper and 17.4 grams per tonne of combined platinum, palladium and gold. Other exploration drilling at McCreedy East/Coleman Mine included the intersection of an new footwall copper zone, designated as the 161 zone. The compilation of the drilling results from this zone is planned to be completed by the end of 2006. Drilling to the west of the main orebody extended the strike length of the current reserve by 180 metres. Resource compilation on this extension is ongoing and results are expected by the end of the first quarter of 2006.
At Copper Cliff North Mine, the results of the 2004 drilling program on the 178 deposit were used in 2005 to model the deposit and evaluate its exploration potential and potential economic viability. As a result of the evaluation of the 178 deposit, the economic viability of the 191 orebody project, which is located approximately 500 metres north of the 178 deposit, has been enhanced. An exploration ramp has been collared on the 4,000-foot level and will be advanced north from a production shaft, past the 178 deposit location to the 191 orebody, a total of about 2,000 metres. An exploration drilling program on the 178 deposit is scheduled to begin from this ramp in early 2007.
Exploration at Copper Cliff South Mine continued in 2005 on the 865 orebody below the 2,400-foot level. Drilling on the southern end of the 865 orebody identified a major new mineralized zone which is referred to as the 860 deposit. This deposit is continuous with, and extends approximately 500 metres south of, the 865 orebody. It is contained within the quartz diorite dyke which hosts the mineral deposits at Copper Cliff North and Copper Cliff South mines. Two additional intersections of massive sulphide mineralization were encountered at year-end 2005 containing high-grade copper and nickel over widths of about 70 metres each, extending the zone about 80 metres south of previously know mineralization. Additional drilling and geological and economic assessments are planned in 2006. Drilling on the 865 deposit in 2005 outlined a new segment of the quartz diorite dyke containing ore-grade mineralization down-dip from the currently known ore reserves and mineral resources in the 865 deposit. Further drilling on this zone is also planned for 2006.
Exploration drilling was carried out at Garson Mine to assess the known mineral resources located down-dip from the No. 1 Shear Orebody below the Phase 2A development project for this mine. The Phase 2A development project is exploiting the known ore reserves at Garson Mine down to the 5,100-foot-level. Exploration drilling has been conducted to collect samples for mill testing, provide more confidence in the continuity of the mineral resource and increase the mineral resource. The drilling demonstrated a significant increase in the thickness of the mineralization in the vicinity of structures cross-cutting the deposit due to apparent dragging of the mineralization adjacent to those structures. An exploration drift and exploration drilling are planned for 2006 to further test the No. 1 Shear Orebody and another orebody, the No. 4. This program will also test the No. 4 Shear Orebody between the 4,600-foot and the 5,000-foot levels in 2007.
In 2005, surface exploration continued at our Ontario operations to evaluate mine extensions and test new exploration targets in the South Range, North Range and East Range of the Sudbury Basin and the Copper Cliff offset. At the Copper Cliff offset, a surface-drilling program was initiated for additional mineralization between the 5,200-foot level down to the 7,000-foot level below the current ore reserves at the Kelly Lake project and to test for new copper-nickel-PGM mineralization within the Copper Cliff Offset dyke south of the Kelly Lake project. In addition, an advanced surface drilling program was initiated at the Kelly Lake project within the 710 and 720 zones to further define tonnage and grade continuity, gain additional geotechnical data and obtain material for mineralogical examination and additional mill test work for full feasibility assessment. At year-end 2005, five diamond drills were in
55
operation at this project and are scheduled to continue work in 2006. An advanced
exploration program continued at Creighton Mine in 2005 to test the extensions of the 402 orebody
up-plunge along a trend to Gertrude Mine above the 3,500-foot level. The 402 orebody is currently
being mined at the 3,800-foot level. In the South Range of the Sudbury Basin, an exploration
program was initiated at the Graham West Property, located to the west of Creighton Mine, to
evaluate an interpreted off-hole geophysical anomaly located in the contact environment. Two holes
were drilled and intersected narrow zones of mineralization at the contact of the Sudbury Igneous
Complex with the footwall rocks. The interpretation of the geological information indicated the
presence of a footwall structure that may lead to mineralization in the footwall environment. This
program is scheduled to continue in 2006. In the North Range of the Sudbury Basin, the Norman
exploration program continued to test a significant previously undrilled area in diamond drilling
along the contact of the Sudbury Igneous Complex contact down dip from Whistle Mine. Three holes
were completed in 2005 and intersected narrow widths of mineralization. This project is also
scheduled to continue in 2006.
The
$21.5 million Phase 2 project to develop a high-grade nickel deposit at McCreedy
East/Coleman Mine reached an average production rate of 1,335 tonnes of ore per day in 2005. The
$31.2 million Phase 3 project to develop a section of McCreedy East/Coleman Mines main and
west orebodies was nearing completion as of year-end 2005. All development work and construction
of the major facilities were completed in 2005. Production of ore from this area began on schedule
in December 2004 and ore production in 2005 reached an average of 307 tonnes per day, well above
the design capacity of 219 tonnes per day. Ore production in 2006 is scheduled to be 591 tonnes
per day. The final design capacity of 1,070 tonnes per day is expected to be achieved in 2008.
In October 2000, Inco began a $12 million project to develop the lower-grade area of Stobie Mine at
our Ontario operations. The development and construction needed for production to begin through
the ore-handling component of this project was completed in October 2001. Lateral development and
construction of the individual mining levels were completed in early 2005 and production from this
project reached 4,460 tonnes per day in 2005. The planned production level is scheduled to be
4,355 tonnes per day in 2006, with production from this project expected to continue until 2014.
In 2005, mine development continued on the first of the expected three phases of the Creighton Deep
project at the Ontario operations Creighton Mine, a project that was first announced in 1998.
Capital expenditures on this project totalled $4.3 million in 2005. Production from the first
phase of this project began in early 2003 and totalled 233,163 tonnes of ore grading 3.25 per cent
nickel and 2.33 per cent copper in 2005. Production of ore from this first phase is expected to
continue at a rate of approximately 250,000 tonnes per year until 2016. The second phase of the
Creighton Deep project, which includes the development of a production level at the 7,810-foot
level of the mine to access estimated proven ore reserves totalling about 1.7 million tonnes
grading 3.62 per cent copper and 3.11 per cent nickel, was approved by Incos Board of Directors in
December 2005 and is expected to cost $38 million. Capital expenditures for the second phase
totalled $1.2 million in 2005. The third phase of the Creighton Deep project, which would
provide access to estimated probable ore reserves of 2.72 million tonnes grading 2.90 per cent
copper and 2.71 per cent nickel between the 7,810- and 8,200-foot levels of the mine between the
8,200- and 10,350-foot levels, is currently being evaluated.
The
$47 million 2A project to deepen Garson Mine from the 4,470-foot level to the 5,070-foot
level was completed in 2005. Production in 2005 was 2,166 tonnes of ore per day, exceeding the
project design rate of 2,087 tonnes per day. This project is expected to extend the life of Garson
Mine until approximately 2012.
In January 2002, Inco entered into an option agreement with FNX Mining Company Inc. (FNX)
relating to certain rights extended to FNX to explore and develop five non-core properties of the
Company in the Sudbury Basin. The properties covered by this agreement all had a history of past
production but were inactive and Inco had no further plans for the exploration or development of
these properties. Subject to meeting certain conditions enabling it to exercise the option to
acquire a 100 per cent interest in the mineral rights to these properties, FNX agreed, pursuant to
the terms of the option agreement, to spend Cdn.$14 million over a 16-month period beginning in
January 2002 and was granted an option to earn a 100 per cent interest in the mineral rights in
these properties by spending a further Cdn.$16 million over the next four years. In December 2003,
FNX announced that it had completed its total expenditure commitment and had exercised its option
to acquire a 100 per cent interest in the mineral rights covering the properties. As part of the
agreement, Inco had initially acquired common shares and common share purchase warrants of FNX
representing a total equity interest in FNX of 19.9 per cent on a fully-diluted basis. This
ownership position was sold over the 2002-2003 period. The related agreements with FNX covering
the option provide Inco with the right to buy back a 51 per cent interest in any new ore deposits
meeting certain criteria that FNX discovers on the properties. Under the terms of a related
offtake agreement, Inco is currently purchasing and refining all of the ore production from the
properties covered by the option agreement. During 2005, FNX continued exploration and
rehabilitation work on these properties. In addition, FNX became the sole owner of the mineral
rights to the properties by acquiring Dynatec Corporations interest in October 2005.
56
In January 2005, Inco entered into a joint venture agreement with Lonmin Plc and its subsidiary
Lonmin Canada Inc. (Lonmin) to establish a 50:50 unincorporated joint venture covering six of our
properties in the Sudbury Basin. The purpose of this venture is to explore for, and if
economically viable subsequently develop and process, low sulphide PGMs-rich deposits occurring
away from the typical high-grade base metals deposits in the Sudbury Basin. Lonmin has committed
to solely fund minimum expenditures of $10 million over the first three years of the venture and,
subsequently, at Lonmins annual election, to spend a minimum of $3 million per year. After Lonmin
has solely funded expenditures of $32 million in total, Inco and Lonmin will fund the venture on a
50:50 basis. Lonmins interest in any PGMs deposits discovered based upon work undertaken by the
venture does not vest until a development decision is made in respect of the relevant deposit.
Inco retains 100 per cent ownership of all non-PGMs mineral deposits on the properties covered by
the venture. The venture will also pay to Inco a three per cent net smelter royalty on all
products sourced from the ventures PGMs deposits. An exploration program, consisting of surface
and borehole geophysical
surveys, mapping, sampling, trenching and diamond drilling, was conducted on all six properties in
2005. A similar program is planned for 2006.
In the Thompson, Manitoba nickel belt, the compilation of exploration targets for the regional
surface exploration program on the OIC Leases continued in 2005 and is scheduled to continue in
2006. Underground exploration continued in 2005 at Thompson Mine to test for extensions to known
deposits and to identify new satellite deposits. At Birchtree Mine, a pilot hole was drilled in
preparation for development work in 2006 that will facilitate exploration drilling to test the
depth of the extension of the 84 orebody, which is the primary production area of the mine.
An advanced exploration program on the Thompson North zone, located below the 3,600-foot level of
Thompson Mine, continued in 2005. Approximately 480 metres of development work and 22,433 metres
of diamond drilling were completed, confirming the continuity of high-grade nickel mineralization
indicated by previous, widely-spaced drilling over a 600-metre strike and 150 metres down-dip.
This exploration drilling will continue in 2006. Some 5,040 metres of diamond drilling were
completed from the 1,600-foot and 2,400-foot levels of Thompson Mine in 2005 to determine the
continuity and thickness of nickel sulphide mineralization in the upper portion of the Thompson 1D
orebody, which is currently being mined. The results are, we believe, encouraging and justify the
continuation of this program in 2006. In addition, surface drilling continued north of the T-3
shaft of Thompson Mine to assess the potential for a deposit that could be accessed by open pit
mining. 1,838 metres of diamond drilling and 231 metres of overburden drilling were completed in
2005. The evaluation of a zone immediately north of the T-3 shaft over a strike length of 270
metres above the 400-foot level was encouraging and further evaluations will be conducted in 2006.
The 2006 drilling program is planned to focus on a second zone of mineralization near surface that
is located 1,200 metres further north. An economic analysis was completed on the extensions of the
Thompson deposit to depth and to the north where additional exploration potential has been
identified. To adequately test all of the Thompson extensions in a timely and most cost-effective
manner, a dormant 3,600-foot level exploration drift is planned to be reconditioned to provide
access for exploration drilling. Preparation for this work began in 2005 and exploration drilling
and down-hole geophysical surveys are scheduled to be conducted from this drift in 2006.
In August 2005, Inco announced the development of a portion of the Thompson 1-D orebody located
between the 3,600-foot and the 4,000-foot levels of Thompson Mine. The cost of this project is
estimated to be $34 million. Designated as the 602 zone, this portion of the orebody contains
estimated proven and probable ore reserves of 4.7 million tonnes grading 2.2 per cent nickel. The
planned production rate from the 602 Zone is 2,180 tonnes of ore per day, beginning in 2008 and
extending through to 2015. Development was initially planned to begin in mid-2006. However, a
decision was made in October 2005 to advance the start of the project by six months and development
work for the project began in late 2005.
At Pipe Mine, which operated between 1970 and 1985, historical drilling data from the
area beneath the open pit and extensions of the mineralization to the north were assessed in 2005
based on an open pit mining method. A program of pulp re-assaying, diamond drilling and
metallurgical testing is planned for 2006 to further evaluate this mineralization.
In 2005, exploration continued at the Mel project, located 25 kilometres north of the City of
Thompson, under the terms of an agreement with Nuinsco Resources Limited (Nuinsco) which was
entered into in August 1999. The agreement grants Nuinsco the right to acquire the mineral lease
that covers the Mel deposit and 60 contiguous mining claims by incurring total expenditures of
Cdn.$6 million by February 2006, subject to Incos right to buy back a 51 per cent interest in the
deposit by spending the next Cdn.$6 million over a further four-year period. Nuinsco had spent
approximately Cdn.$4 million on the deposit by the end of February 2006 and is currently
negotiating with Inco to amend the August 1999 agreement. Under the terms of this agreement, all production from any commercial
quantities of ore discovered would be delivered to our Thompson facilities for processing on
then-prevailing market terms. During 2005, Nuinsco funded a program of diamond drilling,
overburden drilling and a pulse electro-magnetic borehole survey on the Mel mineral lease and
mining claims. A total of 2,506 metres of diamond drilling, 94 metres of overburden drilling and
the electro-magnetic survey were completed under this program. Massive sulphide was
57
intersected on
the mining claims but no significant nickel mineralization was found. However, the
electro-magnetic survey identified two strong conductors that warrant further work. A scoping
study to consider an open-pit mining approach for the deposit was completed in 2005, but the
project economics were unfavorable due largely to the low shear strength of the deep, clay-rich
overburden which negatively impacts the design of a potential open-pit mine.
In 2005, exploration continued at the TNB South project, located approximately 100 kilometres
southwest of the City of Thompson. The property covered by this program is contiguous with the
southwest boundary of the OIC Leases held by Inco and extends 50 kilometres further to the
southwest. Canadian Royalties Inc., under the terms of an agreement entered into with Inco in
November 2003, has the right to earn a 50 per cent interest in the property covered by the
agreement by funding 100 per cent of exploration expenditures totalling Cdn.$5 million over five
years. Inco has a right of first refusal on all production from any commercial quantities of ore
discovered. During 2005, line cutting, 27 surface electromagnetic (UTEM) surveys and 2,195 metres
of diamond drilling were completed. Some of the boreholes intersected massive sulphide
mineralization, but no significant nickel mineralization was found. Additional diamond drilling is
planned for 2006.
In 2005, field exploration apart from Incos producing mines and development projects focused on
Australia, Brazil, Canada, China, Greenland and Finland.
In Brazil, exploration on the Aguapei property, located in the state of Mato Grosso,
continued under our joint venture letter of intent with Japan Oil, Gas and Metals National
Corporation that was entered into in 2004. Drilling intersected anomalous nickel values hosted by
sulphide-bearing mafic and ultramafic rocks,
leading to a decision by the joint venture to expand the property by staking additional
mineral claims. An option agreement was entered into with Rio Gameleira Prospecção E Geologia Ltda
(Gameleira) in March 2005, allowing Inco to earn an interest in the nickel rights in a series of
properties held by Gameleira in the Tocantins area of Brazil. Work in 2005 included geological,
geophysical and geochemical surveys. The results of these surveys will be reviewed in 2006 to
determine if there are any targets that warrant drilling. Inco also entered into a data evaluation
agreement with De Beers Brazil Ltda (DeBeers) in October 2005. This agreement provides Inco with
access to DeBeers geochemical database and physical samples for an area of interest in northern
Brazil. In December 2005, Inco also entered into subscription and exploration agreements with
Perth, Australia-based Mirabela Nickel Ltd. (Mirabela) covering several nickel properties held by
Mirabela in Brazil. Under the subscription agreement, in December 2005 and February 2006 Inco
purchased approximately 10 per cent of the shares of Mirabela on a fully-diluted basis. The
exploration agreement allows Inco one year to evaluate its interest in three Mirabela properties
and then enter into an option and joint venture agreement on agreed upon terms and conditions.
In Australia, Inco continued grassroots nickel sulphide exploration on a number of
properties that we either acquired by staking or obtained the right to explore under option and/or
joint venture agreements with the owners of the properties. In Western Australia, a deep
penetrating geophysical survey was carried out over the Loongana property with negative results,
and our option agreement with Helix Resources Limited was subsequently terminated. Late in 2005,
having met our funding commitment under our joint venture agreement with LionOre Australia Pty
Ltd., ongoing exploration work under that agreement ended. Following the completion in early 2005
of a drilling program that began in 2004, our Polar Bear Nickel joint venture with Plutonic
Operations Limited and four other Australian mining companies was terminated. Geochemical and
geophysical surveys were completed, followed by the drilling of eight boreholes, on the Southern
Hills property in Western Australia under a joint venture agreement entered into with FraserX Pty
Ltd. in November 2004. The analytical results from this work are not yet available. In 2005, Inco
staked a large property position at Bangemall in Western Australia covering a strong gravity and
magnetic feature. In South Australia, following extensive geophysical surveys, we terminated our
option agreements with PlatSearch NL and Adelaide Exploration Limited. Ground geophysical surveys
were carried out over the Black Hill properties in South Australia and targets are scheduled to be
drilled in 2006. In New South Wales, an extensive program of geological, geochemical and
geophysical surveying on the Koonenberry property led to the discovery of a gossan zone that
returned anomalous copper and nickel values. Further work on this property is planned for 2006.
Finally, several properties were staked in the State of Victoria in 2005 to cover conceptual
targets based on magnetic data and exploration results from previous explorers.
Subscription and farm-in joint venture agreements were entered into with Heron Resources Limited
(Heron) in April and July 2005. Under the subscription agreement, Inco acquired approximately 10
per cent of the shares of Heron and has the right to participate in future offerings of shares by
Heron in order to maintain its percentage interest. The farm-in joint venture agreement provides
Inco with the opportunity to acquire a 60 per cent interest in Herons extensive nickel laterite
properties located in the Kalgoorlie area of Western Australia by achieving certain milestones
staged over several years. In 2005, Inco began exploration drilling on certain of the properties.
58
In Canada, Inco has active joint ventures with Aurora Platinum Corp., Soquem and Superior Diamonds
Inc. to explore certain areas in Ontario and Quebec using historic Inco airborne and ground
follow-up geophysical data. Inco retains a right to purchase any nickel, copper and PGMs produced
from the properties covered by these joint ventures, as well as the right to buy back into any
properties acquired or elect to take a royalty. Inco is using the balance of its historic airborne
database to develop nickel-PGMs targets throughout Canada which are being followed up with surface
exploration under a continuing program. On Baffin Island, the first seasons exploration work was
completed in 2005 under a data-sharing agreement with De Beers Canada Exploration Inc. which was
entered into in October 2005. Certain anomalies that were identified are planned to be drilled in
2006.
In Greenland, an option and joint venture agreement was entered into with Diamond Fields
International Ltd. (DFI) in June 2005, under which Inco had the right to earn an interest in a
property held by DFI in Greenland. Geophysical surveys followed by drilling were carried out and
the agreement was terminated by year-end 2005.
In northern Finland, Inco is exploring for nickel-copper-PGMs deposits in the Lapland area under a
joint venture with Korea Resources Corporation that was entered into in December 2004. Initial
ground mapping, prospecting, geophysics and geochemistry surveys were carried out. These were
followed by preliminary drilling. Further ground has been applied for and the area of the joint
venture has been expanded for 2006. In central and southern Finland, Inco entered into an
agreement with Polar Mining Oy in August 2005 to assess data and delineate new projects.
Inco continued to evaluate exploration projects in China during 2005. Exploration continued on the
areas covered by two cooperative joint venture agreements in Jilin province, one with Jilin Nickel
Industry Group Ltd. and the other with Geological Survey Institute, Jilin Province. Preliminary
drilling and a helicopter-based airborne geophysical survey and ground surveys were completed in
2005. Exploration is planned to continue under these agreements in 2006 with drilling and
follow-up surveys when the land positions have been secured. Preliminary ground reconnaissance
surveys were carried out under memorandums of understanding covering exploration areas in Yunnan
province and in Sichuan province in early 2005. We continue to evaluate other exploration targets
in China.
In February 2003, Canico Resource Corp. (Canico) acquired a 100 per cent ownership interest in
Incos Onça Puma nickel laterite property in Brazil. Under the agreements covering this
transaction, Inco received an equity interest in Canico and Inco agreed to (i) purchase and process
all matte produced from any mine on the property under an offtake agreement, and (ii) act as
Canicos sales agent for all nickel commodities produced from any such mine (other than those
purchased by Inco) and earn a commission of 2.75 per cent on those sales. On November 30, 2005, we
tendered our holding of 5,732,473 common shares of Canico to a take-over bid made by Companhia Vale
do Rio Dolce of Brazil and received Cdn.$20.80 per share, realizing a gain of about $88 million.
See Voiseys Bay Nickel Company Limited Voiseys Bay Deposit above for information on
exploration activities at the Voiseys Bay project.
All of the estimated ore reserves referred to in this section are included in the tables under Ore
Reserves and Mineral Resources above.
Research and Development
Incos central research and development facilities, J. Roy Gordon Research Laboratory
(JRGRL), are located in two separate buildings in Sheridan Park, Mississauga, Ontario. JRGRL is
operated by Inco Technical Services Limited (ITSL), a wholly-owned subsidiary of Inco Limited.
ITSL also provides engineering, project management and information technology services to Incos
operating locations and development projects. Our research and development activities at JRGRL are
organized into two groups, process research and product research.
Inco believes that it is a nickel industry leader in research and technology development.
Our research and development focus continues to be closely aligned with our key strategic
objectives. Our major research and development projects currently include the development of
metallurgical and environmental process improvements for existing operations, process development
work for our Voiseys Bay and Goro projects, and the development of proprietary, value-added nickel
products. Research and development expenditures totalled $35 million in 2005, compared with $29
million in 2004 and $27 million in 2003, representing continued significant expenditures on the
hydrometallurgical research and development program for the Voiseys Bay project.
ITSLs process research and process engineering groups work in close cooperation with
personnel at Incos operating locations, and with the Voiseys Bay and Goro project teams. At
Incos existing operations, this work is aimed at developing opportunities for
59
increased operating
earnings through process modifications. At our Ontario operations, the process research group
continued to assist in improving metals recoveries at the Clarabelle Mill, concentrating in
particular on modifications to grinding and mineral liberation operations. Testing was also
conducted on copper-nickel separation techniques for the Clarabelle Mill and on improvements in
matte separation at the Copper Cliff Smelter. ITSL also continued to work with the Copper Cliff
Smelter to improve its operating efficiency and reduce costs by making changes to its operating
procedures and improvements to the integrity of its furnaces, converters and kilns. Work also
continued on equipment and flow-sheet modifications to enable emissions reductions from this
smelter. In the Copper Cliff Nickel Refinery, innovations developed as a result of ITSL-sponsored
research programs contributed to higher throughputs and improved equipment reliability.
At our Manitoba operations, we made progress on a project to begin smelting through the operation
of a single furnace. Previous testing indicated that it may be possible to economically increase
the grades of the concentrates that are smelted. To investigate anticipated challenges in the
single-furnace smelting operation, computer modeling is being employed to identify limitations in
the operations converters and to develop ways to eliminate bottlenecks.
The process research group is also responsible for developing cost-effective, environmentally
responsible processes for the recovery of nickel, cobalt and copper from the Voiseys Bay and Goro
ores. During 2005, this group continued its successful mini-pilot plant program to develop and
demonstrate proprietary hydrometallurgical leaching and refining processes for the Voiseys Bay
project. Mini-pilot plant testing of acid leaching of concentrates was completed and the
technology was transferred to the Voiseys Bay demonstration plant at Argentia, which began
operations in October 2005. The stability of leach residues in the natural environment remains a
focus of laboratory and demonstration-scale studies. The mini-pilot plant at JRGRL was also used
to scope process alternatives for matte refining. A number of different approaches were
investigated and a program for further study in 2006 was formulated and initiated.
Inco continued to maintain a highly-focused product research group that concentrates on creating
and commercializing new, proprietary, value-added nickel products, as well as new applications for
existing products. It also provides technical support to customers for these products. The
product research group works in close collaboration with Inco Special Products, which has
responsibility for all business activities related to our specialty nickel products. Projects are
led and conducted using cross-functional teams. A stage-gate process is employed to evaluate the
potential technical and business success of proposed projects.
A filamentary nickel powder with modified properties that is capable of enhancing electrode
porosities in rechargeable batteries was developed through joint efforts between ITSL and our
Clydach Refinery. This new nickel powder was introduced into the marketplace in 2005 as Type 240.
Working with our electrolytic nickel foam plants in Shenyang and Dalian, China, ITSL provided
technical support and suggestions for improvements to the electrolytic production of high-quality
INCOFOAM8 nickel foam aimed particularly at hybrid electric vehicles. In separate
development efforts, ITSL also researched the production and properties of superior cathode
materials for lithium-ion batteries and began plans for pilot-scale studies on the production of
these materials. In 2005, technical assistance and product improvement work continued for three
nickel powder products that were recently introduced into the marketplace. These new products,
T110PM for use in powder metallurgy and INP-400 and INP-600 for applications in multi-layer ceramic
capacitors, are all based on extra-fine nickel products produced using Incos carbonyl technology.
Working with internationally-based partners and contractors, Inco has developed a process for
manufacturing nickel-based alloy foams that are resistant to corrosion and high temperatures. The
material has been tested for applications in diesel exhaust gas treatment systems and has
demonstrated effectiveness at removing particulates. A pilot plant is being constructed at
Heufeld, Germany to demonstrate the process on a larger scale and produce material for
commercial-scale testing.
Metals Recycling
Incos
subsidiary, The International Metals Reclamation Company, Inc. (Inmetco)9,
located near Pittsburgh, Pennsylvania, is a world leader in metals recycling. Using proprietary
Inco technology, Inmetco recycles nickel, chromium and iron from stainless steel mill and metal
finishing wastes and nickel and cadmium from spent batteries.
Inmetcos net sales to customers, which are included in Other in the table under Sales above,
were $46 million in 2005, compared with $50 million in 2004 and $35 million in 2003.
|
|
|
8 |
|
Inco trademark |
|
9 |
|
Inco trademark |
60
Certain feedstocks and by-products of Inmetcos process are regulated as hazardous or residual
wastes by the U.S. Environmental Protection Agency (the EPA) and the Commonwealth of
Pennsylvania. While such regulation increases the demand for Inmetcos services in some respects,
it also increases Inmetcos operating costs. We expect that in the years ahead EPA and the
Commonwealth of Pennsylvania may issue a number of new regulations that could impose additional
costs on Inmetcos operations. We are not, however, able to predict at this time the effect that
such additional regulations could have on its operating costs and financial condition.
Environment, Health and Safety
Incos operations are subject to numerous environmental laws and regulations relating to,
among other areas, air emissions, water discharges, soils, recycling and waste management,
decommissioning and reclamation, and employee health and safety. While environmental requirements
vary considerably from country to country, future laws and regulations may be expected to impose
stricter environmental requirements on the mining and metals processing industries in general, and
on specific uses of certain metals. We devote considerable resources to our performance under and
compliance with the environmental, health and safety laws and regulations to which we are subject.
However, the impact of future laws and regulations in these areas on the Company cannot be
predicted with any degree of certainty.
Environmental and Health and Safety Management Systems
In 2001, Incos Canadian operations began to develop and implement formal environmental
management systems conforming to the Mining Association of Canadas Environmental Management
Framework (the EMF). The EMF also conforms to the ISO 14001 Environmental Management System
Standard (ISO 14001). Our operations in the United Kingdom, as well as ITL, Jinco and Taiwan
Nickel have been certified to ISO 14001.
In order to conform to ISO 14001, in 2001 we broadened our environmental, health and safety policy
to include policies related to social responsibility and sustainable development and to include
pollution prevention as a key element of this policy. Work
also began on the identification and ranking of environmental aspects and effects relating to our
operations and the development of action plans to deal with any significant environmental effects.
Also in 2001, Inco established an internal working group to undertake an analysis of current
occupational health practices and activities in our operations in Canada and the United Kingdom
with a view to creating a single overarching health management system which would provide a
mechanism for workplace health management to assist in meeting applicable legal and other health
requirements. In mid-2002, we elected to develop an integrated health, safety and environmental
management system consistent with the OHSAS 18001 Occupational Health and Safety Management System
(OHSAS 18001), the ISO 9001 Quality Standard, ISO 14001, and the EMF. In 2005, each Inco
operation began implementing this system and this process is expected to be completed on a
Company-wide basis by the end of 2006.
Environment, Health and Safety Audits
Inco conducts environment, health and safety (EH&S) audits at its wholly-owned operating
facilities as well as at operations in which it has at least a 50 per cent equity interest and at
certain affiliates in which it has less than a 50 per cent equity interest. Incos EH&S audit
program supports our EH&S policy and is intended to provide senior management with assurance that
appropriate systems are in place to effectively manage EH&S risks and to ensure compliance with
applicable EH&S legislation, Incos corporate guidelines and each facilitys policies and
procedures.
The current focus of our EH&S audits has been on conducting management system audits that seek not
only to identify problems but also to examine the root cause of these problems and correct
deficiencies in the system. The program currently covers 17 key areas (six environmental, two
health, eight safety and one administrative). Audit results are reported to the facility
management, which develops an action plan to correct any deficiencies. The Environment, Health and
Safety Committee of Incos Board of Directors oversees the program, reviewing audit findings and
action plans. EH&S audits were conducted at eight Inco facilities worldwide in 2005.
61
SO2 Emissions
Sudbury
Total sulphur dioxide (SO2) emissions at Incos Ontario smelting operations were
194,000 tonnes in 2005, below the current maximum SO2 regulatory emission limit of
265,000 tonnes which was established by the Government of Ontario in 1994. These emissions
totalled 209,000 tonnes in 2004 and 169,000 tonnes in 2003.
In February 2002, the Ontario Ministry of the Environment (MOE) issued a control order
(the February 2002 Control Order) that requires us to reduce SO2 emissions by 34 per
cent from the current limit of 265,000 tonnes to 175,000 tonnes at our Ontario smelting operations
by the end of 2006. The February 2002 Control Order also reduced the limit for SO2
ground level concentrations (GLCs) by 32 per cent, from the then current level of 0.50 parts per
million (ppm) to 0.34 ppm. GLCs refer to the
concentrations of SO2 at ground level after being emitted from the emissions stack
and forced to the ground by atmospheric conditions rather than being dispersed. Fugitive emissions
(emissions which are caused when SO2 gases exit our operations through roof ventilation
equipment, windows, doors and other openings) are also controlled under this order. During 2005,
there were four exceedances of the new GLC limit (three from the stack and one fugitive). This
compares with 11 exceedances in 2004 (nine from the stack and two fugitive) and seven exceedances
in 2003 (four from the stack and three fugitive). The increase in exceedances in 2004 was due in
part to the imposition by the MOE of a new method of counting exceedances. Under the new method,
an event that registers as an exceedance on more than one monitor is counted as a separate
exceedance for each monitor that registers the exceedance. We are subject to possible regulatory
action, including fines, as a result of these exceedances, but we have not received any indication
from the MOE whether or not any charges will be laid. In order to continue to meet the
SO2 emissions and GLC limits, it is likely that the Ontario operations smelter will be
operated at reduced capacity for brief periods over the next few years when adverse meteorological
conditions, such as temperature inversion events or the absence of wind, for plume dispersal exist.
We do not, however, currently expect that compliance with the annual SO2 emission
limits from our smelter operations or GLC levels as set forth in the February 2002 Control Order
will have any significant effect on our costs, operating procedures or annual production of nickel
and other primary metals from our Ontario operations, subject to the other applicable requirements
discussed below.
We are currently implementing an investment of approximately $90 million in fluid bed roaster
(FBR) off-gas scrubbing technology intended to reduce SO2 emissions to the new levels
mandated by the February 2002 Control Order by the end of 2006. The FBR project is also expected
to have the added benefit of decreasing total metal emissions of nickel, copper, arsenic and lead
by 80 to 100 tonnes per year. The FBR project involves the installation of water scrubbers that
clean the SO2 gases by removing principally particulate matter. The SO2
gases are then directed to the acid plant to be converted into sulphuric acid. The FBR project
will also provide us with the ability to treat the same types of gases coming from certain other
smelting furnaces. In 2005, the water scrubbers and modifications to the acid plant were completed
in readiness for the commissioning of the FBR project in the second quarter of 2006. As part of
the February 2002 Control Order, we will also be required to (i) continue research into the
technology and economics of further reductions in SO2 emissions and (ii) report annually
to the MOE and the public on the progress of this research program. The February 2002 Control
Order calls for a final report on achieving the additional reductions to be submitted by December
31, 2010.
In October 2005, the Ontario government enacted legislation that created new ceilings or caps
on SO2 emissions from our Sudbury smelter to be applicable over the 2006 2015 period.
This legislation also established emission allowances that could be banked or traded (bought or
sold) in an emissions trading market. In 2006 the ceiling or cap under this legislation that
applies to our Sudbury smelter is approximately 256,000 tonnes. This cap declines to no higher
than 175,000 tonnes in 2007 and could be lower depending upon actual production rates over the 2004
2006 period. Beyond 2007 and through 2014, this annual cap could be lower than 175,000 tonnes
depending upon actual production rates over a three year rolling period. In 2015, this cap will
fall to 66,000 tonnes. We believe that, given the implementation of the FBR technology referred to
above and our ability to bank and purchase emission allowances over this period, we will be able to
meet the caps over the 2006 2014 period without seriously affecting our currently planned
production rates at our Ontario operations or requiring significant capital expenditures beyond
what we currently estimate. We cannot, however, predict at this time what additional capital
expenditures would be required and the technology that could be implemented to meet the 2015 cap
and what impact that cap would have on our production in Ontario, results of operations and cash
flow from operations.
In September 2004, the Canadian federal environmental agency, Environment Canada, published a
notice indicating its intention, under the requirements of the Canadian Environmental Protection
Act (CEPA), to control emissions from base metal smelters and refineries using pollution
prevention planning and a code of best practices for this sector. The notice also indicated a set
of emission targets that each smelter in Canada, including our facilities in Ontario and Manitoba,
would be expected to meet. Environment
62
Canada provided for an 18-month period from September 2004
for companies to indicate whether they could develop a plan to meet their proposed new targets on
certain emissions. In response to this initiative, we have proposed that target levels for such
emissions to be established by Environment Canada for our Ontario operations mirror the target
levels developed by the Ontario Government. As discussed below under Thompson, we also proposed
that any target level from our Manitoba operations be deferred. We do not know at this time what
target levels Environment Canada may decide to set for our Ontario operations and over what period
of time. Depending upon the difference in those target levels from what currently applies to our
Ontario operations for the currently applicable periods and beyond, we may not be able to meet such
levels without making very significant capital expenditures, and compliance with such levels could
materially adversely affect our production levels, our financial results and cash flow from
operations.
Canada signed and ratified the Kyoto Protocol to the United Nations Framework Convention
on Climate Change (Kyoto Protocol) in December 2002. The Kyoto Protocol calls for significant
reductions in the emissions of greenhouse gases, such as carbon dioxide, and nationwide ceilings on
such emissions. In November 2002, the federal government of Canada released an initiative to
address certain causes of climate changes. The specific requirement of this initiative is also to
limit the discharge of carbon dioxide and other greenhouse gases. Neither the Kyoto Protocol nor
this other initiative has as yet established what the specific allocation of reductions among
various sources of greenhouse gases would be. In August 2003, the federal government of Canada
released certain principles covering the Kyoto Protocol intended to be used to implement the
objective of having the oil and gas, thermal energy and mining and manufacturing sectors reduce
greenhouse gases by certain specified limits. While during 2004 there was relatively little
progress made by the federal government of Canada on advancing the implementation of greenhouse gas
emission reductions as part of the Kyoto Protocol, in April 2005 Canada announced its so-called
Project Green as part of the federal budget, intended to implement at least certain aspects of the
Kyoto Protocol. This project provided for the overall reduction of greenhouse gases (GHGs) by
so-called large final emitters (LFEs) such as leading metals and mining, energy and other
companies, including ourselves, by 45 million tonnes. In July 2005 the federal government
published a notice intended to outline certain principles for this project, including exactly what
types of companies would be viewed as LFEs, and the level of GHGs reductions to be implemented by
LFEs over the 2008 2012 first phase of the Kyoto Protocol. It is currently expected that we, as
an LFE, could be required to reduce our GHGs intensity (based upon direct energy used and actual
production) by 12 to 17 per cent from the base year of 2000 to be calculated for and applicable
only for smelting and refining emissions. This reduction could result in a cost to us, based upon
how these reductions are to be assessed, of in the order of $2 million. In November 2005, the
federal government designated GHGs as toxic under CEPA, thus giving it the authority to regulate
GHGs such as carbon dioxide under CEPA. We do not know what additional steps the federal
government might take through CEPA to reduce GHGs and the impact those steps could have on our
operations and cash flow.
While the precise impact of the Kyoto Protocol and its ratification or confirmation on our
operations in Canada and the operations of others who provide energy or other products or services
to us is uncertain at this time, we anticipate that compliance with these initiatives could have a
significant adverse effect on our results of operations and costs.
Thompson
Incos smelter at Thompson, Manitoba operated during 2005 under a regulation issued by the Manitoba
government which limits emissions of SO2 from Incos Manitoba ores to 23,000 tonnes per
month and 220,000 tonnes per calendar year. We met both of these limits during 2005, with the
total of such emissions being 180,000 tonnes for the year. These emissions totalled 192,200 tonnes
in 2004 and 191,000 tonnes in 2003.
As noted above under SO2 Emissions Sudbury, the September 2004 notice published by
Environment Canada under CEPA included a proposed set of targets for emissions that each smelter in
Canada would be expected to meet. In response to this initiative, we have proposed that the
reduced target levels for our Manitoba operations be deferred until 2020. We do not know at this
time what target levels Environment Canada may decide to set for our Manitoba operations and over
what period of time. Depending upon the difference in those target levels from what currently
applies to our Manitoba operations for the currently applicable periods and beyond, we may not be
able to meet such levels without making very significant capital expenditures, and compliance with
such levels could materially adversely affect our production levels, our financial results and cash
flow from operations.
Port Colborne and Sudbury Soils
Inco has been working with regulatory authorities and other interested parties to evaluate
elevated levels of nickel and other metals in soils located in the vicinity of our processing
facilities in Sudbury and Port Colborne, Ontario that may have been affected by the historical
emission of windblown metal-containing particulates. Reference is made to Port Colborne Soils
and Sudbury Soils below. The processes and criteria by which remediation requirements are
determined in Ontario were issued by the MOE as a
63
guideline in 1996 (the Guideline). The
Guideline specifies numerical soil concentrations above which environmental and human health
concerns are considered sufficient to warrant detailed risk assessments. Inco voluntarily agreed
to conduct such risk assessments and to remediate soils as necessary to reduce risks to negligible
levels in both the Sudbury and Port Colborne areas. In October 2004, after formal community-based
risk assessments were begun, the MOE issued a new regulation under the Ontario Environmental
Protection Act (the Regulation) which incorporated the Guideline. Since October 2004, Inco and
the MOE have been discussing when and under what circumstances the community-based risk assessments
relating to Port Colborne and Sudbury would be subject to the Regulation. Based upon these
discussions, it is unclear at this time whether these community-based risk assessments which are
being funded by Inco will fall under the Regulation, but we plan to complete our detailed
scientific measurements and risk assessments for these two communities and continue our discussions
with the MOE with respect to how those findings would satisfy the site-specific requirements
specified in the Regulation.
Port Colborne Soils
The results of soil sampling by the MOE in Port Colborne which were released in January 2000
indicated a wide area having surficial soils with levels of nickel, copper and cobalt above the
generic levels established by the MOE for phytotoxicity. Based upon these results, Inco suggested
that a community-based risk assessment (CBRA) process, funded by Inco, would represent a more
objective, fair and efficient way of assessing any risks from these levels than conducting numerous
site-specific risk assessments. The CBRA process was accepted by the MOE and the City of Port
Colborne and in April 2000 the Port Colborne city council appointed a seven-member Public Liaison
Committee (the PLC), consisting of local citizens, to interface and work with us and our
consultants on the CBRA process. A stakeholder technical sub-committee was also formed consisting
of representatives of the MOE, the Regional Public Health Department, the City of Port Colborne,
Inco and consultants. In November 2000, the scope of work for the CBRA process was agreed upon and
work commenced. The CBRA process has focused on ecological and human health assessments involving
all potential pathways for exposure to specified chemicals of concern (CoCs), nickel, copper,
cobalt and arsenic, for all living species and all health endpoints.
The soil sampling carried out by the MOE in Port Colborne showed lead levels higher than the
generic levels established by the MOE, but completely within the range found in older communities
throughout North America. It is generally believed that high lead levels in these communities were
caused principally by use of lead-based paints and leaded gasoline until the mid-1970s and the
improper disposal of lead-acid automobile batteries. Even though the Port Colborne refinery
emitted some lead-containing particulates during its approximately 80 years of operation, an
inventory of such emissions, together with air dispersion modelling, has shown that expected soil
lead concentrations from such emissions represent only a small fraction of the lead observed in the
soil. A comprehensive report on lead as a CoC within the CBRA process was prepared by a consultant
to Inco in 2003 and was peer reviewed in 2004. This report confirmed that Inco should not be held
responsible for the lead found in soils in Port Colborne. In 2005, an ad-hoc taskforce was formed
by the technical subcommittee of the PLC to educate homeowners in Port Colborne about the risks
associated with lead exposure. The taskforce includes the MOE, the Regional Public Health
Department, the City of Port Colborne, the technical consultant to the PLC and two citizens of Port
Colborne. Inco is assisting this effort by making the services of the technical consultant
available to the taskforce at Incos expense.
The objective of the CBRA process has been to assess human and environmental health risks from
multi-pathway exposures to CoCs in Port Colborne. If risks were found to exist at unacceptable
levels, as defined by governmental authorities, then the CBRA process would also recommend options
for the remediation of soils to remove those risks. As a result of this effort, the CBRA is
intended to be able to derive Port Colborne-specific soil concentrations for each CoC that will not
be a risk for environmental and human receptors in the community and all soil types and uses
occurring in the community. Significant progress was made in 2003 with the completion of two draft
reports, one on the natural environment and the second on commercial crops. Both of
these reports underwent extensive review by the consulting company hired to assist the PLC and by
external independent peer reviewers. Revisions to these draft reports in response to the reviews
were completed in mid-2004. The natural environment risk assessment looked in detail at 14 valued
ecosystem components which served as sentinel species for all species in the Port Colborne
environment. The only species that showed a potential risk to soil nickel levels was the
earthworm, which showed a possible decrease in earthworm population in certain woodlots, but the
woodlots themselves were healthy. Protection of earthworm populations in woodlots may be very
difficult to accomplish without harming the woodlot itself. Options for remediation will be
investigated as part of the CBRA process in 2006.
The agricultural crops risk assessment used a number of sentinel crops, including oats which is a
very nickel-sensitive crop. Both field and more highly-controlled greenhouse experiments were
conducted to derive Predicted No Effect Levels for nickel in the four soil types found in
agricultural sites in Port Colborne. While the results of the CBRA process have not yet been
finalized, based on the information available to date, it appears that several hundred hectares of
agricultural process land could require additional
64
sampling and remediation. Tests indicate that
the addition of limestone to the soils to adjust soil acidity and the addition of manganese to
overcome a potential deficiency would represent a cost-effective remediation solution for all farm
sites. Such a solution would not be expected result in a significant expenditure on the part of
the Company.
A third report concerning human health risks was completed and peer reviewed in 2004, and an
addendum to this report was completed and peer reviewed in 2005. Both cancer and non-cancer health
effects were evaluated. This report showed no risk to humans at any individual life stage or to
humans receiving a reasonable maximum daily intake of nickel over a 70-year lifetime. The risk to
humans appeared to be at nickel levels in the soils above 84,000 ppm. This assessment has used
more accurate site-specific information than was available to the MOE when it conducted its
assessment in 2002. There are no sites within Port Colborne that require remediation for
protection of human health.
The fourth major report associated with the CBRA process has been referred to as the integration
report. This report was completed in draft form in January 2006 and is subject to review by the
technical subcommittee of the PLC. Comments from the public will be solicited in 2006 after this
review has been completed. This report summarizes the findings of the technical risk assessments
and explains the process by which properties are to be dealt with if they require remediation. It
is expected that all of the CBRA reports will be submitted to the MOE for approval by mid-2006.
In late March 2001, two developments occurred in connection with the historic operations of Incos
refinery in Port Colborne, Ontario: (i) the filing of a purported class action proceeding in an
Ontario court and (ii) the release of a report by the MOE covering elevated levels of nickel and
other metals found in the soils at depth (below five centimetres) on 16 out of nearly 180
properties sampled by the MOE in Port Colborne (the March 2001 Report) and the issuance of a
draft remediation order by the MOE.
The purported class action proceeding originally filed against Inco and several other parties under
Ontario class action proceedings legislation claimed Cdn.$600 million in compensatory damages and
Cdn.$150 million in punitive damages covering certain residents who lived in the Port Colborne area
since 1995 and allegedly suffered a decline in their property values as a result of, and health and
other injuries from exposure to, metals and related emissions from the refinery. In June 2002,
hearings were held in the Ontario Superior Court of Justice to consider whether this action, or any
portion of it, should be certified to proceed as a class action. In July 2002 the court rejected
certifying any part of the action as a class action. The nominal plaintiff appealed this decision
and the appeal, which revised the original pleadings and focused only on the plaintiffs claim for
damages for property value diminution, resulting in a significant reduction in the number of
citizens that the plaintiff is purporting to represent, was heard in June 2003. In February 2004,
the Ontario Divisional Court rejected the plaintiffs appeal. The plaintiff subsequently sought
leave (permission) to appeal to the Ontario Court of Appeal. Leave to appeal was granted and the
appeal concerning whether this action should be certified as a class action under applicable
Ontario law was heard in May 2005. In November 2005, the Ontario Court of Appeal overturned the
decision of the Ontario Divisional Court and certified the action as a class action, but the
certification was limited to claims for declines in property values. Inco filed a motion to the
Court of Appeal on January 17, 2006 to correct certain factual errors in the Courts written
decision and to settle the precise terms of the formal order to be issued. Inco also filed a
motion in February 2006 for leave to appeal the Court of Appeals decision to the Supreme Court of
Canada. If such appeal is not heard, then this proceeding would move forward as a class action.
With respect to the issue of the finding of nickel, in particular nickel oxide as the primary form,
at various depths in the Port Colborne soils adjacent to the Port Colborne refinery, the March 2001
Report established an intervention level of 10,000 ppm or more of nickel as a potential health risk
and soil samples taken by the MOE reflected nickel concentrations above this level on 16
properties. While Inco did not accept the March 2001 Reports findings and conclusions, in
response to the report it proposed a voluntary remediation program for the 16 properties whereby
Inco offered to remove and replace the soil on these properties to bring them below the 10,000 ppm
level.
In April 2001, Inco submitted a detailed comment letter to the MOE on the March 2001 Report. Based
upon such key issues as what the exposure pathways would be and the level of exposure from nickel
oxide and other forms of nickel found in the soils at depth, we did not believe that the levels of
nickel found as reported in the March 2001 Report represented a health hazard. In May 2001, the
MOE indicated that, given the comments it had received on the March 2001 Report from Inco and
others, it would effectively be withdrawing the report and draft order and would be undertaking
further studies and analyses. A revised draft report was issued for public comment by the MOE in
late October 2001 together with a new draft order which would have required that 25 properties,
based upon the soil sampling by the MOE reflected in the March 2001 Report, be remediated given a
slightly lower intervention level for nickel, 8,000 ppm, established by the MOE in its revised
report. Inco submitted a new comment letter to the revised
report and revised draft order in late November 2001. In March 2002, the MOE released its report
and order in final form (the March 2002 Report). It contained a somewhat different methodology
for calculating health risks for certain pathways, but retained
65
8,000 ppm nickel in soils at depth
as the intervention level, and the MOE issued a broad order to Inco to remediate properties having
soil nickel levels above that level and undertake certain other activities (the March 2002
Order). We did not believe the intervention level of 8,000 ppm nickel in soils at depth was
supported by the scientific information available and believed that the March 2002 Order imposed a
number of other remediation and sampling obligations that were not supported by the findings in the
March 2002 Report.
In April 2002, Inco appealed the March 2002 Order. A group of citizens also appealed the March
2002 Order, asserting that it was too lenient. The appeals were heard by the Ontario environmental
review tribunal, starting with preliminary sessions in November 2002. On the first day of the
preliminary hearing, motions were made by both appellants regarding the scope of the hearings.
Inco moved that the appeal should deal only with human health risk associated with systemic nickel
intake, which was the basis of the March 2002 Order. The citizens group, on the other hand,
argued that the hearings should consider all environmental endpoints and also respiratory cancer.
The review tribunal accepted Incos motion to limit the scope of the appeal to issues arising from
the March 2002 Order only. Counsel for the citizens group appealed this decision by way of a
judicial review, which was heard in March 2003. The judicial review concluded that the review
tribunal was correct to limit the scope of its hearings and the hearings resumed in September 2003.
As a result of Inco receiving clarification from the MOE on the scope of the March 2002 Order, and
with the agreement of the citizens group to withdraw its appeal, the appeal was withdrawn and the
March 2002 Order was re-instated with an expiry date of December 2004.
Notwithstanding the legal actions regarding the March 2002 Order, Inco kept its voluntary
remediation program open for the original 16 properties and extended it to the additional nine
properties identified by the MOE in the March 2002 Report as having in excess of 8,000 ppm nickel
in soil at depth (the 25 Relevant Properties). Three property owners chose to participate in our
voluntary remediation program to have us remove and replace the soil on their properties in 2001
and two more participated in 2002. All but one of the remaining 20 of the 25 Relevant Properties
were remediated in 2004. The final property was scheduled for remediation in June 2005 but the
owners of the property decided not to proceed with the remediation.
In April 2001, in response to the draft order accompanying the March 2001 Report, Inco voluntarily
undertook additional sampling in residential areas adjacent to the area where the 25 Relevant
Properties were located. Based upon this additional sampling by Inco, no additional properties
were found to require remediation.
As part of the CBRA process, Inco agreed to carry out a special health survey of Port Colborne
residents, to be conducted by a team of medical experts, to determine if adverse health effects
linked to CoCs in the soils are currently being experienced by people in the
community. We retained Ventana Clinical Research Corporation (Ventana) to conduct this work.
During 2001, Ventana interviewed citizens in the community and medical professionals and presented
a conceptual scope of work in October 2001. This scope of work was reviewed, revised and
prioritized by the stakeholders during 2002. A study of the incidence of hospital admissions in
Port Colborne relative to a number of comparative communities was completed in December 2003 but
significant problems with the method of statistical analysis were found during peer review. As a
result, the study was revised and reissued in October 2004. A second study on self-reported health
status was completed in November 2004 and has been peer reviewed. A determination of the need for
potential case-control studies, based on the results of the two completed studies, is being made by
a panel of scientific and medical experts. Their report is expected to be completed in 2006.
Another proposed study on the incidence of cancer among the Port Colborne population has been
hampered by scientific design problems and it is unlikely that it can be conducted.
Given the existence of various legal appeals and scientific and medical studies currently underway,
it is not possible to predict at this time the effect that these actions and studies could have on
the Companys business, results of operations and financial condition.
Sudbury Soils
In September 2001, the MOE released a report indicating that it had analyzed soil samples collected
within the Sudbury area for various substances, including arsenic and certain other metals. This
report stated that nickel, copper, cobalt and arsenic in some soil samples were in excess of the
applicable MOE guidelines and that the elevated concentrations of these metals in the soils were
attributable to the history of nickel-copper mining and smelting in the area by Inco and
Falconbridge. The two companies agreed to jointly fund risk assessments for human and
environmental health in the Sudbury region. They also joined the MOE in extending soil sampling to
areas that were undersampled.
The Sudbury area soil data in the MOE report showed nickel concentrations lower than those found in
Port Colborne soils, but the potentially affected area in Sudbury is larger than in Port Colborne.
Some of the work being conducted at Port Colborne will be applicable to Sudbury, but the risk
assessment for Sudbury is to be based on the specific soil types located there. During 2001, the
66
City of Greater Sudbury, the Regional Health Department, the MOE, Inco and Falconbridge formed a
technical committee (the Sudbury Technical Committee), with Health Canada participating on behalf
of First Nations communities, to guide the risk assessment work on nickel, copper, cobalt and
arsenic in soils and other related environmental media. This action was followed by the formation
of a public advisory committee consisting of ten citizens and the appointment of a process observer
responsible for reviewing the timeliness, effectiveness and transparency of the risk assessment
process.
In 2002, the Sudbury Technical Committee defined the scope of work for the human health and
environmental health risk assessments, issued a comprehensive request for
proposals to carry out the assessment, reviewed six proposals submitted and chose the winning bid
based on technical, economic and public communication criteria. The risk assessments are being
carried out by the Sudbury area risk assessment group (SARA), a consortium of firms having the
collective experience necessary to conduct this multi-disciplinary project. The consortium
includes a number of environmental management and analytical firms. Work was started under a
preliminary contract in December 2002 and the final contract was signed by Inco and Falconbridge in
2003.
Public consultation as part of this process was carried out in 2003 and will continue throughout
the risk assessment process. The analysis of several thousand new soil samples was completed by
SARA and two additional elements, selenium and lead, were added to the list of CoCs for the
community. Recent indoor sampling indicated elevated levels of lead in certain residences. These
data will also be evaluated as part of the studies being undertaken. Toxicology Excellence for
Risk Assessment (TERA), a U.S.-based non-profit corporation, has been engaged to undertake the
peer reviews of SARAs work. The first volume (Background) of the SARA risk assessment report was
issued in draft form in July 2005 and was commented on by the Sudbury Technical Committee. The
second volume (Human Health Risk Assessment) was issued in draft form in October 2005 and is
currently undergoing review by the Sudbury Technical Committee. The third volume (Environmental
Risk Assessment) is expected to be issued in draft form in April 2006. It is impossible to predict
what remediation may be recommended from these assessments but the Sudbury area has undergone
successful re-vegetation efforts over the last several decades and has experienced a significant
ecological recovery.
Decommissioning and Reclamation
Inco is committed to decommissioning its facilities, at both existing and inactive mine sites,
in an environmentally sound manner commonly referred to as progressive decommissioning. In
Ontario, progressive decommissioning is ongoing at the Copper Cliff tailings area where exposed
tailings are being covered. In 2005, we continued to maintain more than 1,500 hectares of
vegetated cover on inactive tailings for stabilization purposes. We also continued in 2005 our
decommissioning and reclamation projects at both operating and non-operating properties in Ontario,
including demolition and closure work at Shebandowan, Crean Hill and Frood-Stobie mines,
re-contouring and capping Whistle Mine, tree planting and groundwater assessment. In Manitoba, our
reclamation plans for Thompson Mine and the Thompson processing facilities were accepted by the
Manitoba government. Reference is also made to Future Removal and Site Restoration; Closure and
Post-Closure Plans below.
Re-vegetation Programs
A significant part of our environmental programs in both Canada and Indonesia involves the
re-vegetation of mined-out lands and areas affected by mining and processing activities to return
them to a natural state.
In 2005, approximately 200,000 pine seedlings were grown in our surface greenhouses in
Sudbury and a further 50,000 were grown in our underground greenhouse at Creighton Mine. Of these,
100,000 were planted on Inco property, predominantly in the tailings area, 75,000 were donated to
local groups and special events and 75,000 are over-wintering in preparation for planting in 2006.
In 2005, we aerially treated two sections of land in the Sudbury basin. A 17-hectare portion of
cleaned bedrock at Whistle Mine was treated to assist with full-scale closure activities being
undertaken at that site. A further 125-hectare portion of land located between Sudbury and Val
Caron was also treated.
At PT Inco in Indonesia, reclamation efforts continued to focus on returning to mined-out areas the
waste rock and soil that was removed to access the ore and planting trees in these areas. The
objective of this program is to maintain the size of the mine footprint to a maximum of 1,000
hectares and restore mined-out areas to their natural state. In 2004, the size of the maximum mine
footprint that can be maintained without re-vegetation was increased from 650 hectares to 1,000
hectares, reflecting the increased mining activity associated with increased nickel production. By
the end of 2005, the area of active mining at PT Inco totalled 938 hectares, with 2,844 hectares
having been re-vegetated.
67
PT Inco
PT Incos operations are subject to environmental regulations and permits issued by the
Government of Indonesia. PT Inco is in compliance with these permits except for intermittent
releases of soluble nickel, manganese and chromium in its liquid effluent discharges into a small
stream adjacent to its operations and the levels of emissions of particulates from its facilities.
In recent years, PT Inco has implemented a number of projects which have reduced the levels of
nickel, manganese and chromium in its effluent discharges and is continuing its efforts to bring
these levels within the regulated limits. By dredging, PT Inco has been able to increase the
retention capacity of its sediment ponds. During 2005, there were no exceedances of the Indonesian
effluent discharge standards for nickel and manganese and only two exceedances (during the first
quarter of 2005) of the hexavalent chromium standard. A temporary treatment facility to remove
hexavalent chromium from the effluent has been set up and a permanent facility is expected to be
commissioned in 2006.
Since 2000, PT Inco has also had a program in place with the government for investigating the most
effective way to further reduce its particulate emissions. This program included an action plan
and periodic reporting to the government. PT Inco also initiated a dust handling program in 1999
to address issues associated with various dust-handling processes at PT Inco. This program
included the installation of equipment, in particular additional electrostatic precipitators
(ESPs), and other solutions to reduce dust emissions. The principal sources of dust emissions
and other particulate emissions from PT Incos facilities are PT Incos dryers, reduction kilns,
converters and electric furnaces. A new ESP was constructed and commissioned on one of PT Incos
three dryers in 2001 and operated in 2002, so that all of PT Incos dryers had installed ESPs.
This investment has resulted in a substantial decrease in dust from this source and PT Inco has
been in compliance with permitted dust emissions levels from its dryers since the installation of
the ESPs. Modifications to the ducting to one of PT Incos five kilns resulted in decreased dust
emissions and these modifications were subsequently made to
the other two similar kilns. Two newer kilns were equipped with ESPs and operate at low dust
emissions, below permitted levels. By 2004, all five kilns at PT Inco were in compliance with
permitted dust emission levels. PT Inco has also installed an automated pneumatic dust handling
system which collects and transports dusts for reprocessing and standby blowpot systems have been
installed on four of PT Incos kilns to allow maintenance to be performed without interrupting the
control and collection of dust. The fifth kiln was constructed with standby blowpot capacity, thus
providing that all five kilns now have this standby capacity. PT Incos three converters are in
compliance with permitted dust emission levels. The principal remaining sources of dust emissions
are PT Incos four furnaces. PT Inco and an independent engineering firm have studied and used a
pilot test program to evaluate options for cleaning the furnace off-gases to meet permitted dust
emission levels. During the first quarter of 2005, PT Inco commissioned dust control equipment on
one of its four furnaces. Testing has indicated that this equipment has reduced dust emissions to
below the Indonesian emission standard. Work has now begun to install similar equipment on the
other three furnaces. This work is expected to be completed by the end of 2008.
Workplace dust issues are also being addressed to improve workplace air quality. During 2005,
further improvements were realized as part of PT Incos overall dust handling program, including
the connection of the feed bin system for one of PT Incos furnaces to a dust collection system to
allow for increased dust capture. The feed bin systems on the remaining three furnaces are
scheduled to be connected to a similar dust collection system in 2006 and 2007. While PT Inco has
(i) kept the relevant Indonesian governmental authorities aware of those situations where it has
not been in compliance with certain emission limits as noted above, (ii) been working with these
governmental authorities in respect of such regulatory issues and (iii) not received any indication
from such governmental authorities that it would be subject to any penalties or sanctions for such
exceedances, PT Inco may still be subject to regulatory actions by such governmental authorities
for non-compliance with certain emission limits.
Future Removal and Site Restoration; Closure and Post-Closure Plans
The following includes information that appears in Managements Discussion and Analysis of
Financial Condition and Results of Operations under Item 7 of this Report and in Notes 1 and 11 to
the financial statements under Item 8 of this Report.
Our operations have been, and may in the future be, affected from time to time in varying degrees
by changes in environmental laws and regulations, including those for asset retirement obligations.
Both the likelihood of future changes in laws and regulations and their overall effect upon us
vary greatly from country to country and are not predictable. Our policy is to meet or, if
possible, surpass environmental standards set by relevant legislation, by the application of
technically proven and economically feasible measures.
The estimation of asset retirement obligation costs depends on the development of environmentally
acceptable closure and post-closure plans, which, in some cases, may require significant research
and development to identify preferred methods for such plans which are economically sound and
which, in many cases, may not be implemented for
several decades. We have continued to utilize
68
appropriate technical resources, including outside
consultants, to develop specific site closure and post-closure plans in accordance with the
requirements of the various jurisdictions in which we operate. Typical closure and progressive
rehabilitation activities include, where applicable, demolition of buildings, removal of
underground equipment, sealing of mine openings, treatment to reduce or prevent acid generation
from stockpiled waste materials such as tailings, general clean-up activities aimed at returning
the area to an environmentally acceptable condition, and post-closure care and maintenance.
In accordance with environmental regulations adopted by the Province of Ontario in 1991, we
developed rehabilitation and site restoration plans associated with the eventual closure of our
operations in that province. Three closure plans were filed by the end of 1997, having previously
received approval from the Province of Ontario for the consolidation of our operating mines and
properties in that province into 15 sites for purposes of closure plans, and the remaining 12
closure plans were filed by the end of 1998. As a result of provincial regulatory changes which
became effective in 2000, the plans were re-filed to meet these changes in 2001. In 2005, we
submitted a closure plan for Levack Mine. We have continued to develop future tailings disposal
and water management alternatives to accommodate up to approximately 40 years of future production.
We believe that cost-effective tailings disposal alternatives exist within the ongoing operating
activities of the Sudbury operations which would limit site restoration at closure to a care and
maintenance activity, thus significantly reducing the costs of such site restoration.
In accordance with environmental regulations adopted by the Province of Manitoba in 1999, we have
developed reclamation plans associated with the eventual closure of operations in that province.
The Province of Manitoba has accepted the closure plans for all of our operations in the province.
Closure plans for the proposed mine and mill facilities were prepared and submitted in 1998 in
connection with the environmental review process of the Voiseys Bay project in the Province of
Newfoundland and Labrador. This plan, as updated, was submitted to the province in August 2004.
Closure plans were also prepared for the Goro nickel project. The closure plan for the original
tailings impoundment and overburden storage areas for the Goro project were included in our
operating permit (installation classée) application dated May 2004. This operating permit was
issued in October 2004 but will be subject to amendment or the issuance of a revised permit to
reflect the revised project configuration developed as part of Phase 2 of the review process
discussed under Goro Nickel S.A.S. above and, as a result of the revised project configuration,
the closure plan may also have to be amended to take into account any changes to the tailings
impoundment and other storage areas.
We follow a policy of progressive rehabilitation at our Indonesian operations whereby land
disturbed by mining activities is re-vegetated on an ongoing basis. A closure plan for PT Inco was
revised in 2004 to cover all relevant facilities of PT Inco.
Closure plans have been completed for the operating facilities in the United States and the United
Kingdom. Based on currently available information, there are no required significant site
restoration activities associated with these facilities.
Substantial environmental expenditures are incurred on an ongoing basis which are intended to
significantly reduce asset retirement obligation costs that may otherwise be incurred following the
closure of any sites. This progressive rehabilitation includes tailings management, land
reclamation and re-vegetation programs, decommissioning and demolition of plants and buildings, and
waste management activities. Operating costs associated with ongoing environmental and reclamation
programs, including progressive rehabilitation, aggregated $20 million in 2005, compared with $20
million in 2004 and $39 million in 2003 and are included in cost of sales and other operating
expenses. Capital expenditures on environmental projects were $89 million in 2005, compared with
$41 million in 2004 and $28 million in 2003. We currently anticipate that capital expenditures on
environmental control and related projects in 2006 will be approximately $120 million.
The estimate of the total liability for asset retirement obligations has been developed from
independent environmental studies, which include an evaluation of, among other factors, information
available at that time with respect to closure plans and closure alternatives, the anticipated
method and extent of site restoration using current costs and existing technology, and compliance
required by presently enacted laws, regulations and existing industry standards. The total
liability for asset retirement obligations represents estimated expenditures associated with
closure, progressive rehabilitation and post-closure care and maintenance. Potential recoveries of
cash or other payments from the future sale of assets upon the ultimate closure of operations have
not been reflected in the estimate of the total liability or related annual provisions or charges.
Future changes, if any, to the estimated total liability, as a result of changes in requirements,
laws, regulations and operating assumptions may be significant and would be recognized
prospectively as a change in accounting estimate, when applicable. Although the ultimate amount to
be incurred is uncertain, the total present value of the liability for asset retirement obligations
in respect of our worldwide operations to be incurred primarily after cessation of operations was
estimated to be $171 million (including a current portion of such total obligation of $3 million)
at December 31, 2005
69
based upon certain discount rates and timing with respect to when these costs
would be expected to be incurred, compared with $174 million at December 31, 2004 and $149 million
at December 31, 2003 (including the current portions of such total obligations).
Changes made in 2000 to mining regulations in the Province of Ontario require us to provide letters
of credit or other forms of financial assurance intended to secure our ability to meet future
reclamation and restoration costs, which are not expected to be incurred for many years, if we were
to no longer meet certain minimum investment grade credit ratings for our outstanding publicly
traded debt securities. Although our debt securities are currently rated investment grade, they
were rated below investment grade in recent times and there can be no assurance that this situation
will not reoccur. If we were not able to maintain the minimum investment-grade credit ratings, it
is currently
estimated that letters of credit or other forms of financial assurance associated with the
currently estimated costs of the eventual future closure of our mines and other facilities in
Ontario would have to cover approximately $790 million in such closure costs on an undiscounted
basis. Due to the closure of three mines in Ontario, in 2002 we were required under such mining
regulations to provide letters of credit in the amount of $23 million at that time to secure these
near-term closure costs as discussed below. In addition, we are subject to certain Indonesian
regulations which require us to provide security for the reclamation of land areas that have been
mined. In the case of our Manitoba operations, in 2003 we submitted closure and reclamation plans
for all of our operations in that province and in 2004 we provided financial assurance in the form
of a letter of credit in the amount of approximately $0.4 million for certain future reclamation
and restoration costs in that province. In 2005 the reclamation and closure plan for the mine and
concentrator and related facilities at Voiseys Bay was approved by the Province of Newfoundland
and Labrador, resulting in an increase in the financial assurance covering both the construction
and operating phases of the initial phase of the project to $8 million. As discussed above, we
believe that the financial assurance in the form of one or more letters of credit we will be
required to provide to the Province of Newfoundland and Labrador will increase to in the order of
$60 million. We do not currently know what, if any, changes in the security for reclamation costs
in Indonesia or Manitoba might be made in the future. However, beyond the expected increase for
our Voiseys Bay project referred to above, it is not currently expected that such financial
assurance as might be required to be provided for our Indonesian, Manitoba and Voiseys Bay
operations will be of a material amount. These potential costs might not be incurred until many
years in the future. If these requirements for letters of credit or other forms of financial
security had to be satisfied, they could have an adverse effect on the amounts available for
borrowing by us under our bank credit facilities.
In view of the uncertainties concerning environmental remediation, the ultimate cost of asset
retirement obligations could differ materially from the estimated amounts provided. The estimate
of the total liability for asset retirement obligation costs is subject to change based on
amendments to laws and regulations and as new information concerning our operations becomes
available. Future changes, if any, to the estimated total liability, as a result of amended
requirements, laws, regulations and operating assumptions may be significant and would be
recognized prospectively as a change in accounting estimate, when applicable. Environmental laws
and regulations are continually evolving in all areas in which we operate. We are not able to
determine the impact, if any, of environmental laws and regulations that may be enacted in the
future on our results of operations or financial position due to the uncertainty surrounding the
ultimate form that such future laws and regulations may take.
Health and Safety
The health and safety of our employees are of the highest priority. The prevention of
workplace accidents and illnesses is a major goal of Inco. Safety training and educational
programs for workers have continued to be enhanced at all of our operations and, through
international workshops, sponsored university research and other activities, Inco is a leader in
efforts to determine how to better test and assess the impact of metal
compounds on humans and ecosystems.
Research Networks on Metals
Inco was one of the major contributors to the Metals in the Environment (MITE) research network
which was initiated in Canada in 1998 and was sponsored, in part, by the Mining Association of
Canada. This program concluded in 2004 and yielded useful information on the sources of metals,
the movement of metals among environmental compartments and the toxicity of metals to aquatic and
terrestrial organisms. These results are already affecting the course of regulatory activity
relating to metals throughout the world. The data generated are assisting in carrying out
necessary risk assessments and in determining risk management strategies for the continued safe use
of metals such as nickel, copper and cobalt.
As a logical extension of the stakeholder involvement created during MITE, a new network funded by
the Canadian Natural Sciences and Engineering Research Council was formed in the fall of 2005 with
specific interest in filling information gaps in human health assessments involving metals. We
continue to assist in this work through our membership in the Mining Association of Canada.
70
Diesel Particulate Matter
In 1995, the American Conference of Governmental Industrial Hygienists (ACGIH) announced its
intention to establish for the first time a threshold limit value (TLV) for diesel particulate
matter (DPM) of 0.15 mg/m3. This proposed TLV, based primarily on rat and mice
studies, constituted nearly a seven-fold reduction from the current Canadian target level of 1.0
mg/m3 DPM. If adopted by regulatory authorities in Canada, this would require
substantial changes in our use of diesel equipment in our underground operations since this
equipment emits DPM. We responded to the proposed TLV by making written and oral presentations to
the ACGIH in 1996, noting that toxicological and epidemiological studies on health effects of DPM
have given inconsistent and unreliable results and that it would, accordingly, be impossible to set
scientifically sound occupational exposure limits for DPM. For a discussion of TLVs, see
Regulation of Nickel and Other Nonferrous Metals Occupational Exposure Limits (OELs) in Canada
below.
The ACGIH did not take any action to adopt the TLV in 1997 or 1998. However, in 1999 the ACGIH
announced that it intended to further reduce the proposed TLV to 0.05 mg/m3 for DPM of
less than one micrometre in diameter. In 2001, it lowered this proposed TLV even further, to 0.02
mg/m3, analyzed as elemental carbon. In 2003, however, the ACGIH removed the proposed
TLV for DPM from its Notice of Intended Change list and placed it on the list of Chemical
Substances and Other Issues Under Study, where it remained until July 20, 2005, when it was also
deleted from that list. It is not known whether the TLV as proposed in 2001 (or some modification
thereof) will be placed on the Notice of Intended Change list again in the future.
The U.S. Mine Safety and Health Administration (MSHA) initiated a rulemaking activity in 1998 to
establish a regulatory exposure limit for DPM in underground mines in the United States. Actions
of this kind by MSHA are usually considered significant as Canadian provincial governments often
consider taking similar actions. After a period of extensive public comment, MSHA adopted its new
exposure limit in late 2000 of 0.4 mg/m3 DPM, determined using the total carbon
technique. Due to the extensive input from the mining industry, MSHA altered this rule in 2005,
specifying the method of analysis of DPM to be elemental carbon instead of total carbon. The new
MSHA rule provided an 18-month phase-in period for companies to achieve compliance, at which point
the new limit would apply for a period of five years, after which it would be reduced to 0.16
mg/m3. In response to feasibility concerns, a pending proposal would phase in the 0.16
mg/m 3 limit over a multi-year period. It is not known whether, when or how the Canadian provincial
governments will respond with similar limits.
Recognizing the importance of regulatory Occupational Exposure Limits (OELs) for DPM on our
operations in Ontario and Manitoba, as discussed under Regulation of Nickel and Other Nonferrous
Metals Occupational Exposure Limits (OELs) in Canada below, in 1997 we helped form an
industry-labour-government research consortium, the Diesel Emissions Evaluation Program (DEEP),
to determine sampling and analytical techniques capable of measuring low levels of DPM and to
evaluate techniques capable of controlling DPM emissions in workplace air. DEEP has investigated a
number of research areas, in particular biodiesel, fuels, maintenance improvements, and the effect
of light duty vehicles on DPM in underground mines. In 2000, DEEP extended its original three-year
term to allow completion of field tests on particulate filters, which potentially hold the most
promise for cost-effective control of DPM. Several of these underground tests began at Incos
Stobie Mine in 2001 and were completed in December 2004. The findings at Stobie Mine indicated
that certain active particulate filter systems involving electrical heater filter regeneration
work well for light-duty vehicles and will achieve very low DPM out of the tailpipes in a reliable
way for over the long term. However, these systems do not work as well for heavy-duty diesel
equipment because of the possibility of human error influencing the regeneration. While we have
been evaluating the risks involved and the programs necessary to change human behaviour in the
underground setting, we are also planning to evaluate new filter systems that remove human
behaviour from the equation. The adoption by Inco of ultimate DPM control strategies developed by
DEEP, and the cost of such adoption, will depend on a number of factors, including the types of
engines used and their duty cycles as well as the final regulatory limit that we will be required
to meet.
WSIB Occupational Disease Policies
Inco is subject to workers compensation laws in various jurisdictions pursuant to which
occupational injuries to, and diseases of, individual workers making claims are examined and
payments are awarded by a governmental board or agency. The expense of such awards is generally
funded by the employer, typically as a percentage of payroll costs within the jurisdiction of the
relevant board or agency, and is adjusted according to the experience with such claims either with
respect to employees of the particular employer
alone or on the basis of all claims in respect of employees in the same industry within the
relevant jurisdiction.
71
In 1994, the Occupational Disease Panel (ODP) of the Ontario Ministry of Labour (MOL) concluded
that there was a probable connection between miners lung cancer and all hardrock mining. In
1996, the ODP asserted that a 1996 cancer morbidity study conducted by researchers at McMaster
University, using a large group of Ontario male nickel production workers from Inco and
Falconbridge, confirmed such a connection for nickel miners. Consequently, the ODP recommended
that primary lung cancer and the occupation of hardrock mining be categorized under a particular
schedule of the Ontario Workers Compensation Act which would create a presumption in favour of a
causal relationship for lung cancer claims unless the contrary could be proven. In 1997, the ODP
issued another report dealing specifically with laryngeal cancer and workers in nickel production.
This report relied heavily on the 1996 McMaster University study referred to above. The ODP
recommended that laryngeal cancer and certain nickel producing occupations be treated in the same
manner as lung cancer and hardrock mining. Inco retained independent medical and epidemiological
specialists to analyze these assertions and, as a result, made several submissions to the Workplace
Safety and Insurance Board (WSIB), the regulatory body of the MOL responsible for evaluating and
adjudicating workplace injuries and diseases, taking exception to the ODP recommendations,
primarily on the basis that tobacco smoking is likely a confounding factor, and to the validity of
the findings of both the original hardrock mining report and the McMaster University study. These
submissions explained why we believed that the ODP report was flawed and suggested that no policies
on this matter be established until more methodologically sound studies were conducted. Similar
submissions were made by Falconbridge and by the Ontario Mining Association. In view of these
submissions, the WSIB did not take any action on any of the ODP reports.
In late 1994 the WSIB also revised and extended its policy with respect to lung cancer
compensation claims by nickel smelter and refinery workers. We objected to the process that was
used in considering the revised policy, which, in our opinion, failed to take into account
applicable scientific data, and we also objected to flaws in the policy itself. As a result of
submissions to, and discussions with, WSIB staff, in early 1998 the WSIB proposed a revision to the
1994 policy. However, this revision failed to address our central concerns with the policy and we
made additional written submissions to the WSIB suggesting further significant revisions. We have
continued our efforts to have the WSIB change this policy, but no changes have been forthcoming.
In mid-2001, we were invited to join a special stakeholder panel being formed by the WSIB. This
panel, called the Occupational Disease Advisory Panel (ODAP), consisted of industry and labour
representatives from a broad range of industrial sectors. The ODAPs mandate was to advise the
WSIB of criteria that should be applied in developing policies, to review contentious policies that
currently exist, and to recommend how the WSIB should deal with controversial studies previously
conducted by the ODAP. During 2003, it became apparent that the ODAP could not reach consensus on
a number of important issues and that a report from the ODAP was not possible. The ODAP Chair, who
had been selected and assigned this position by the WSIB, issued a draft report in early 2004 which
attempted to relate areas of agreement and disagreement of the ODAPs members. Inco provided
comments on the draft report as a member of the ODAP. The ODAP Chair then issued a final draft
report in mid-2004 and conducted public consultations in six cities across Ontario to obtain
stakeholder input on that draft report. Inco made additional presentations to the ODAP Chair at
these consultations held in Toronto and Sudbury in September 2004. The ODAP Chairs final report,
which we believe recommends certain fundamental changes on how WSIB claims are adjudicated, was
delivered to the WSIB in 2005. At the present time, we
are unable to predict what, if any, actions WSIB will take as a result of this report and what
effect, if any, such actions would have on our operations or financial condition.
Worker Safety
The table below shows the disabling injury frequency (DIF) for Inco in 2005, 2004, and 2003:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005 |
|
2004 |
|
2003 |
DIF |
|
|
1.3 |
|
|
|
1.4 |
|
|
|
1.7 |
|
The DIF is calculated by Inco by multiplying the total number of disabling injuries in a year that
employees incurred as a result of work-related injuries by 200,000 hours (which is a constant used
by the Mines and Aggregates Safety and Health Association (Ontario) and other similar
organizations) and then dividing that product by the total number of hours worked by employees
during that year.
Inco continues to pursue a goal of zero accidents. The implementation of an integrated health,
safety and environmental management system, which is compatible with OHSAS 18001, is intended to
confirm our commitment to improved safety performance.
Our focus on safety led to our best ever result of 1.3 disabling injuries per 200,000 hours of work
in 2005, placing Inco among the safest in the Canadian mining and metals industry based on this
measure. However, in spite of these improvements, our safety performance was overshadowed in March
of 2006 by a fatality at our Ontario operations. On March 6, 2006, Robert Nesbitt, an
72
employee at
Stobie Mine in Sudbury, died while operating an underground loader known as a scooptram from a
remote operating platform on the mines 2600-foot level. The accident remains under investigation.
We are deeply saddened by this loss and remain committed to the goal of eliminating workplace
injuries. Safety remains a key priority for us as we continue to reevaluate every aspect of how we
conduct business.
Regulation of Nickel and Other Nonferrous Metals
Regulatory and non-governmental agencies in the United States, Canada and Europe have proposed
and, in certain instances, adopted regulations and other standards relating to environmental
releases of nickel, exposure to nickel in various forms, and management of nickel-containing
wastes, as summarized below.
Ontario Air Standards
In June 2004, the MOE announced the objective of replacing Ontarios existing air quality standards
by incorporating new standards into the regulations under the Ontario Environmental Protection Act
by June 2005. At the same time, through the issuance of draft information documents, the MOE
sought input from stakeholders on new ambient air regulations for nickel, arsenic, cadmium and
chromium and on new guidelines for air dispersion modeling which would come into effect with the
new air quality standards. In
October 2004, Inco provided comments on all of these draft information documents aimed at improving
the accuracy and completeness of scientific literature and also commented on the strengths and
weaknesses of lines of evidence that could be used in developing numerical air standards for these
metals. Our comments on nickel were extensive and focused on the requirement to account for
speciation of nickel in air, to properly extrapolate occupational dose-response information to the
low doses expected in ambient air, and to suggest a new method for deriving the specific
respiratory cancer unit risk for oxidic nickel compounds, the use of which is essential because
oxidic nickel is the prevalent form of nickel in ambient air. Our comments on the proposed changes
to the air dispersion modeling guideline emphasized (i) the need for assessing compliance against
annual average air concentrations where the toxicological end-point is based on chronic health
effects, as is done in many other jurisdictions, (ii) the need for ensuring that standards
appropriately reflect true risk, and (iii) that the initiatives designed to improve air quality be
sufficiently flexible so that a broad array of corrective strategies could be evaluated and
implemented.
In November 2005, the Ontario government introduced a new regulation to govern air quality. This
regulation, called the Air Pollution Regulation Local Air Quality, will apply to base metal
smelters beginning in 2010. This new regulation includes new requirements for air dispersion
modeling and compliance with new and existing air standards. While some of our comments were taken
into account by the MOE, these new requirements are substantially the same as those set out in the
draft information documents that were submitted to stakeholders for review.
The new regulation issued in November 2005 incorporates the existing air quality standards, but the
MOE plans to replace these standards by completing a process that began in 1996 and was revised in
1999 for updating its air quality standards for priority contaminants. Under this plan, certain
elements, including nickel, arsenic, cadmium and chromium, were identified as priority contaminants
requiring review. The first step in setting new air quality standards for each element is the
release of the relevant scientific information and possible approaches by which such information
could be used in setting the standard. This information is then made available for public review
and comment. The MOE then releases its proposed new air quality standards together with its
rationale for setting the standard for each element, which is followed by a further comment period
for stakeholders. Finally, the MOE considers all comments and then issues its final standards.
This initiative did not progress during 2005 but it is now anticipated that the MOE will release
its proposed new standards and its rationale for setting those standards in 2006. We are presently
assessing these new requirements as part of our assessment of the effect of the new air quality
regulation on our Ontario operations, but we will be unable to predict what, if any, effect the new
air quality regulation will have on our operations or financial condition until the new air quality
standards are known.
Occupational Exposure Limits (OELs) in the U.S. and the U.K.
Inco is generally in compliance with the permissible occupational exposure limits (OELs) for all
forms of nickel that are currently applied by the U.S. and U.K.
governments.
Prior to April 2005, the U.K. OELs were divided into two categories: maximum exposure limits
(MELs) which were time-weighted average exposure levels that could not be exceeded, and
occupational exposure standards (OESs) which were safe working levels. The U.K had not adopted
an OES for nickel, but had adopted two MELs for nickel in 1985. The MEL for water soluble nickel
was 0.1 mg/m3, while the MEL for metallic nickel and insoluble nickel compounds was 0.5
mg/m3. As of April 2005, MELs and
73
OESs were replaced with a single standard called
workplace exposure limits (WELs). Like both MELs and OESs, WELs are time-weighted average
exposure limits, but also include new requirements to strictly observe principles of good practice
for the control of exposures to ensure that the WELs are not exceeded. The change to WELs places
an increased obligation on Inco to demonstrate the use of the best available practices to minimize
workplace exposures to nickel. The new WELs for nickel are the same as the old MELs, i.e. 0.1
mg/m3 for water soluble nickel and 0.5 mg/m3 for metallic nickel and
insoluble nickel compounds. We do not anticipate that meeting the new WELs for nickel will have a
material adverse effect on our operations or result in significant additional costs to comply.
On February 28, 2006, the U.S. Occupational Safety and Health Administration (OSHA) promulgated a
very stringent eight-hour time-weighted average permissible exposure limit (PEL) of five
micrograms of hexavalent chromium per cubic metre of air. The new PEL becomes binding on employers
with 20 or more employees on November 27, 2006, and on smaller employers on May 30, 2007. With the
exception of the painting of aircraft and large aircraft parts in the aerospace industry, employers
will have to achieve compliance with the new PEL through the use of engineering and work practice
controls, although the obligation to implement engineering controls has been postponed until May
31, 2010. In workplaces where the painting of aircraft and large aircraft parts occurs,
engineering and work practice controls will have to be used to reduce hexavalent chromium exposures
to 25 micrograms per cubic metre of air, with supplemental use of respirators to achieve the PEL.
The new PEL could have an adverse impact on various U.S. industrial sectors (such as stainless
steel producers and electroplaters) that are major users of nickel, particularly when the
obligation to achieve compliance through the use of engineering controls attaches on June 1, 2010.
We cannot predict at this time how significant that impact will be or how it will affect our
results of operations or financial condition.
U.S. Environmental Regulatory Actions
In 1990, the United States Congress amended the U.S. Clean Air Act to require, among other things,
that 189 chemicals or chemical groups (including nickel compounds) be regulated as hazardous air
pollutants (HAPs). Pursuant to this legislation, EPA has been promulgating stringent
technology-based standards for controlling emissions of HAPs from designated major source
categories. This process will continue in the future and ultimately may include the promulgation
of additional risk-based standards. Some of these standards may limit emissions of nickel and its
compounds, most likely
through limits on overall emissions of particulate matter. While it does not appear that the
major source HAP control program will target emissions at nickel producing or using industries,
it is possible that some nickel-emitting sources may ultimately be covered by such standards. We
are unable to predict what capital expenditures or operating cost increases Inco or its customers
may incur if that proves to be the case.
In July 1999, EPA issued its final Integrated Urban Air Toxics Strategy under which 33 HAPs judged
to pose the greatest threat to public health in urban areas were to be targeted for future
regulation. Nickel compounds were among the 33 HAPs listed under this strategy. As a result,
nickel compounds will be included by EPA in periodic National Air Toxics Assessments (NATAs)
designed to estimate and track trends in emissions, ambient air concentrations, population
exposures, and associated characterizations of risk. In June 2002, EPA released the Final
National-Scale Air Toxics Assessment for 1996 (NATA-1996), which estimates emissions, ambient air
concentrations, and population exposures for the 33 HAPs referred to above based on a 1996
emissions inventory, and characterizes the resulting population risks on a national and regional
basis. This assessment reflected much lower total national emissions of nickel compounds than an
earlier estimate that was based on information for 1990. NATA-1996 found that concentrations of
nickel compounds in the ambient air were not of concern with respect to non-cancer health effects.
However, nickel compounds were characterized as being a more significant contributor to potential
cancer risks. That finding was based on what Inco and other nickel producers believe to be a
flawed methodology for estimating potential cancer risk. The nickel industry made a submission to
EPA, asking that the methodology be corrected, so that a more appropriate risk characterization can
be made in the next release of NATA information. It does not appear, however, that EPA has
accepted that recommendation, which could mean that nickel compounds
will be characterized as a more significant contributor to potential
cancer risks than we believe is justified in future NATA reports as
well.
In addition to issuing NATAs, EPAs Urban Air Toxics Strategy is targeting various area
sources of hazardous air pollutants for further emissions reductions. In the case of nickel
compounds, some of these sources are likely to be fossil fuel combustion units, while others may
involve nickel-producing or using industries such as stainless steel manufacturing, metal
electroplating and secondary nonferrous metals. Currently, EPA is developing an area source
emissions standard for secondary nonferrous metals facilities that presumably would apply to our
Inmetco subsidiary. This standard is unlikely to be issued before 2007, if it is issued at all,
and we do not know what its coverage will be or what emission limits it will establish. We are
unable to predict what impact, if any, the inclusion of nickel compounds on EPAs list of Urban Air
Toxics (and the related assessments and area source standards) might have on nickel users and,
both directly and indirectly, on our results of operations or financial condition.
In December 2002, the National Toxicology Program (NTP) within the U.S. Department of Health
and Human Services released its Tenth Report on Carcinogens (ROC). In these bi-annual reports,
NTP lists various substances that it concludes are either known
74
to be human carcinogens or
reasonably anticipated to be human carcinogens. Previous versions of the ROC listed metallic
nickel and certain nickel compounds as reasonably anticipated to be human carcinogens.
Metallic nickel remained in that category in the Tenth ROC. However, nickel compounds as a class
(with no differentiation) were listed as known to be human carcinogens. That broad listing,
encompassing all inorganic nickel compounds, runs counter to arguments that Inco and other nickel
producers had made to NTP over the years. Since nickel
compounds already had been characterized as carcinogenic to humans by the International Agency for
Research on Cancer, it is not clear what additional impact, if any, NTPs listing of nickel
compounds as known to be human carcinogens will have on businesses that produce, use, handle, or
otherwise manage nickel compounds and wastes in which they are contained. Similarly, since
metallic nickel has been listed as reasonably anticipated to be a human carcinogen by the NTP for
many years, it is not clear what effect, if any, the reaffirmation of that listing will have.
Following publication of the Tenth ROC, Inco, in conjunction with nickel producer associations,
formally requested that NTP correct certain information in the Tenth ROC regarding nickel metal and
nickel compounds. That request was rejected in late 2003. However, following an appeal, NTP made
certain changes to correct some of this information in the discussion of nickel and nickel
compounds in the Eleventh ROC, although the carcinogenic listings of metallic nickel and nickel
compounds made in the Tenth ROC were not changed. The existence of these NTP listings is not
expected to have a material adverse effect on our results of operations or financial condition.
In December 2002, EPA adopted sweeping amendments (IUR Amendments) to its Inventory Update Rule
implementing provisions of the U.S. Toxic Substances Control Act. The IUR program requires
manufacturers and importers of covered chemical substances to submit quadrennial reports of
specified information if they produce or import more than a designated amount of a covered chemical
at any one site. Prior to the adoption of the IUR Amendments, inorganic chemical substances (like
nickel and its compounds) had been exempt from IUR reporting. The IUR Amendments removed that
exemption so that inorganic chemicals are subject to the IUR program in the current reporting cycle
covering calendar year 2005. While the basic reporting threshold has been increased from 10,000
pounds per site to 25,000 pounds per site, the information required to be reported was dramatically
expanded, particularly for sites that produce or import more than 300,000 pounds of a covered
chemical during the reporting year. The new processing and use information required in those cases
will be burdensome to collect and report; however, this expanded requirement to report processing
and use information will not apply to inorganic chemicals like nickel until the 2010 reporting
year. While the new IUR reporting requirements will impose additional costs and burdens on Inco
and various of its U.S. customers, they are not expected to have a material adverse effect on our
results of operations or financial condition.
Canadian Environmental Protection Act
In 1994, under CEPA, two federal government departments, Environment Canada and Health Canada,
published toxicity assessments of 17 substances, including nickel and its compounds. The
assessment concluded that metallic nickel was not considered toxic under CEPA. However, oxidic,
sulphidic and soluble compounds of nickel were considered toxic, according to statutory definitions
and criteria. As a result of this assessment, together with CEPA toxic classifications for
mercury, lead, and certain compounds of arsenic and cadmium, a base metal smelter Strategic Options
Process (the SOP) was conducted in 1997 with the result that the industrial sector committed to
develop site-specific environmental management plans and reduce sector-wide releases
of arsenic, cadmium, lead, mercury and nickel by 80 per cent from 1988 (as the base year) to 2008.
In 1999, a revised CEPA was enacted and has been viewed as granting increased authority to, and
mandating increased attention by, federal departments in data collection, pollution prevention and
other regulatory actions. As a result of the revised CEPA, Environment Canada has initiated
several additional programs. One has been to review the progress being made under the original
base metal smelter commitments made as part of the SOP and possibly accelerating their
implementation. Another program has been to take action regarding substances known to be toxic
under CEPA, including emissions of dioxins and furans, sulphur dioxide and particulate matter.
This program is discussed above under SO2 Emissions Sudbury and SO2
Emissions Thompson.
Another CEPA-related program seeks to categorize and prioritize all substances on the Domestic
Substances List (the DSL), a list of more than 20,000 substances which are permitted to be
produced in or imported into Canada. New substances that are not on the list are required to
undergo a pre-manufacturing appraisal in order to be added to the list. Environment Canada has
elected to apply criteria for this process that we believe are inappropriate for inorganic
substances. These criteria were originally developed for synthetic organic chemicals and involve
assessments of persistence, bioaccumulation and toxicity. In 2001, an expert advisory group,
including a consultant representing the Mining Association of Canada, was organized by Environment
Canada for the purpose of reviewing the scientific validity of using persistent, bioaccumulative
and toxic (PBT) criteria for inorganic substances. In late 2001, this group issued its findings
and recommendation to Environment Canada. This group concluded that the persistent,
bioaccumulative criteria do not properly categorize metals and other inorganic substances.
However, recognizing that the use of PBT criteria is legislated, the group recommended that all
inorganic substances should be considered as persistent for the purposes of this categorization,
and that toxicity alone should be the criterion by which inorganic substances should be
categorized. In June 2002,
75
Health Canada made a proposal for categorizing human exposure to substances on the DSL on
the basis of use and on the basis of industry codes originally attached to substances when they
were placed on the list. In 2005, Environment Canada and Health Canada completed the DSL priority
review for all substances on the DSL, including compounds containing nickel. Based upon this
review, it is expected that consultations will begin in 2006 with stakeholders on the risk
management requirements for each substance on the priority DSL. We cannot at this time identify or
predict what additional operating or capital expenditures will be required by Inco to meet the
ultimate regulations that may result from these and other possible CEPA-based and Environment
Canada programs or what effect they would have on our operations or financial situation.
California Regulatory Actions
In 1991, the California Air Resources Board (CARB) identified nickel and its compounds as a
toxic air contaminant. A series of guidelines were then issued for assessing risks of
non-occupational exposure, and acute and chronic reference exposure levels (RELs) were proposed
along with a cancer potency factor for nickel compounds. Because Inco and other nickel producers
believed that the guidelines and RELs were not well-founded scientifically and might lead to
unjustifiable controls being placed on users of nickel in California and elsewhere, Inco and other
nickel producers made submissions criticizing the methods used by CARB in developing the RELs. In
February 2000, California adopted final RELs. Although the final RELs represent an improvement
over the initial proposals, we believe that they are still unjustifiably low. Although the RELs do
not appear to have had a significant impact on nickel users in California, we are unable to predict
at this time what long-term impact the RELs will have in California or, indirectly, in other
jurisdictions in which nickel is produced or used.
In June 2003, the California Office of Environmental Health Hazard Assessment proposed a
Child-Specific Reference Dose (CSRD) for nickel to be used in school site risk assessments.
Nickel producer associations of which Inco is a member submitted comments questioning the
scientific basis for the proposed CSRD and arguing that it should be at least five times higher.
In a final report dated December 2005, the California Office of Environmental Health Hazard
Assessment raised the proposed CSRD by a factor of three. While that is an improvement, Inco
believes that the CSRD should be even higher. We do not believe that this CSRD for nickel will
have a material adverse impact on our results of operations or financial condition.
Late in 1999, the California Office of Environmental Health Hazard Assessment proposed a
public health goal (PHG) of one microgram of nickel per litre of drinking water. In conjunction
with other nickel producers, Inco submitted comments arguing that this proposal was scientifically
unjustified. In August 2001, a final PHG of 12 micrograms of nickel per litre of drinking water
was adopted by the California authorities. Although not itself a mandatory standard, the PHG could
serve as a benchmark for setting a drinking water standard in California. In 2005, the California
Department of Health Services announced that it did not plan a further review of the states
existing 100 microgram per litre drinking water standard for nickel. Nonetheless, the PHG could
affect the perception of the health risks associated with nickel by producers and users of
nickel-containing products, and it may have an impact on the EPAs consideration of a future
drinking water standard for nickel.
Right-to-Know Legislation
Right-to-Know and other reporting laws have been adopted in many jurisdictions in which we
operate. These laws generally require employers to advise their workers and their local
communities, as well as specified governmental authorities, of the kinds and amounts of specified
chemicals, including some chemicals made or used by Inco, which may be present in the workplace,
released to the environment, or sent to a recycling or waste management unit, and to develop
emergency response programs. Compliance with these Right-to-Know requirements has had no
material effect on our results of operations or financial condition.
Harmonization of Classification and Labeling of Chemicals
In 1990, the International Labour Organization (ILO) initiated a project to harmonize
existing systems for the classification and labeling of chemicals. This goal was endorsed by the
1992 UN Conference on Environment and Development (UNCED) and was included as one of the six
areas for action identified in Chapter 19 of Agenda 21 of UNCED on the environmentally sound
management of toxic chemicals. UNCED recommended that a globally harmonized hazard classification
and compatible labeling system, including material safety data sheets (MSDSs) and easily
understandable symbols, should be available, if feasible, by the year 2000. In September 2001, a
Harmonized Integrated Hazard Classification System for Chemical Substances and Mixtures was
approved by the ILOs Taskforce on Harmonization of Classification and Labeling and endorsed by the
OECDs Joint Meeting of the Chemicals Committee and Working Party on Chemicals, Pesticides and
Biotechnology. This document and similar documents on Physical Hazard Classification and Hazard
Communication Tools were merged to form the Globally Harmonized System (GHS). The GHS was
adopted by the UN Subcommittee of Experts on the GHS on the Classification and Labeling of
Chemicals and the UN
76
Committee of Experts on the Transport of Dangerous Goods and the GHS in December 2002.
Although adoption of the GHS by individual countries continues to be considered voluntary, the goal
of the Intergovernmental Forum on Chemical Safety, endorsed at the September 2002 World Summit on
Sustainable Development, is to have as many countries as possible implement the GHS by 2008. In
addition, the Asia-Pacific Economic Cooperation (APEC) organization is recommending that the GHS be
adopted, on a voluntary basis, by 2006, and Australia has committed to adopting the GHS by 2006.
The countries that are signatories to the North American Free Trade Agreement (Canada, the United
States and Mexico) have committed to review their internal systems and consider adopting the GHS.
It is expected that Canada will adopt the GHS by 2008. Inco does not believe that the adoption of
the GHS will have a material impact on its results of operations or financial condition.
European Union Actions
There are several key areas under discussion at the European Commission concerning nickel in
respect of workplace legislation, public health and consumer product legislation, and environmental
legislation. Inco, together with other participants in the nickel industry, has been actively
working with various European Union (EU) institutions to address these issues and investigate
their effect on the nickel industry.
In October 2003, the European Commission adopted the draft legislative text of a new chemical
policy for the EU which, when it becomes law, will supersede some 30 pieces of current EU
legislation. The legislation was approved (with amendments) by the European Parliament after first
reading in November 2005, and by the EU Council of Ministers (also with amendments) in December
2005. This legislation is expected to return to the European Parliament for a second reading
during 2006. While the new policy seems very likely to be enacted, it is unlikely to come into
force before 2007. This new legislation, referred to as REACH (for Registration, Evaluation and
Authorization of Chemicals), would place more responsibility on companies to test exhaustively for
all hazards, register their chemicals, and secure regulatory authorization as a condition for
placing certain higher risk chemicals on the EU market or importing such chemicals into the EU.
The registration requirements of this legislation would be triggered by the tonnage of certain
substances to be placed on the EU market or imported into the EU. The evaluation process set forth
in this legislation may be triggered by the EU authorities if the registration requirements are not
fully met. In addition, authorizations would be required from the EU for chemicals of high
concern, including those which are classified as category 1 or 2 carcinogens, mutagens or
reproductive toxicants and those compounds with an organic component classified as persistent,
bioaccumulative and toxic in the environment. In effect, the REACH system would require producers
and importers of such chemicals to obtain an authorization to market them based on their use
patterns. This draft legislation excludes ores and metal or mineral concentrates from the
registration process, thereby limiting the impact of the legislation on the mining and metals
sector. We do not believe that this legislation as currently drafted would, if enacted, have a
significant adverse effect on our operations or financial condition.
EU Regulation 793/93(EEC), a regulation covering the evaluation of the risks of and controls
for existing substances, includes five nickel substances (nickel sulphate, nickel chloride, nickel
nitrate, nickel carbonate and nickel metal) listed for review under this regulation. Inco believes
that this is the single most comprehensive legislative review of nickel in respect of human health,
public health, consumer health and the environment that has been undertaken by a governmental
authority worldwide. This legally driven initiative started in 1996, when Denmark, allegedly
concerned about the ability of nickel to cause dermal sensitization, placed elemental nickel and
nickel sulphate on the third priority substances list developed by the European Commission. In
1996, the Danish Environmental Protection Agency (the Danish EPA) was appointed the principal
agency for conducting risk assessments on these substances. In 2000, three additional nickel
compounds, nickel carbonate, nickel chloride and nickel dinitrate, were added to the risk
assessment program as part of another priority substances list developed by the European
Commission.
This nickel risk assessment program has progressed slowly due, in part, to the rapidly
changing methodologies for assessing the environmental risks of metals in general. The nickel
industry has been successful in demonstrating that further research and testing is required for a
scientifically credible environmental risk assessment of nickel. A formal research program has
been agreed upon with the European Commission for this work, with anticipated completion dates for
the various elements of the program ranging from late 2005 to 2007. When this research program has
been completed, the technical debate on safe levels of nickel in all of the environmental
compartments (soils, water and sediment) will resume. The scientific aspects of the health risk
assessments of the original five nickel substances were completed in January 2006 and a final
health risk assessment report is expected to be published in the second quarter of 2006. Any
recommendations for increased health risk reduction measures, such as lower occupational exposure
limits, beyond those currently in place will be passed to the relevant EU policy committees for
their consideration after a formal peer review process by the European Commission. At this time it
is not possible to predict what effect these nickel risk assessments may have on our operations or
financial condition.
77
In the area of health risk assessment, the classification of soluble nickel compounds was
referred to the specialized experts group (the SEG) of the European Commissions working group on
classification, which agreed with the Danish EPA that all soluble nickel compounds should be
classified as category 1 carcinogens or known human carcinogens. This change was scheduled to be
implemented by changes to the EU classification and labeling directive in April 2005; however, this
has not yet occurred. This change, if made, could have a material adverse effect on the sale of at
least nickel sulphate and nickel chloride, two soluble nickel company, in Europe.
In October 2004, the EU classification committee determined that soluble nickel compounds
should be classified as a category 2 reproductive toxicants under the EU classification system.
Such a classification means that soluble nickel compounds would be subject to authorization under
the new REACH legislation described above. Soluble nickel compounds also received new
classifications for (i) acute toxicity orally, (ii) acute toxicity by inhalation (nickel chloride),
(iii) causing chronic toxicity by inhalation, (iv) skin and eye irritant and (v) dangerous to the
environment. In addition, nickel metal powders received a new hazard classification for chronic
lung toxicity.
On January 10, 2006, the Danish EPA completed the final draft version of the EU nickel health
risk assessment. This draft is expected to be released to the public in the second quarter of
2006. The next phase of this process is for the Danish EPA to prepare risk reduction strategies
and risk mitigation proposals. It is anticipated that OELs for both metallic nickel and nickel
compounds may be lowered as a result of new information in this assessment. The data to support
the proposal to lower nickel OELs are also being reviewed by the European Commissions scientific
committee on occupational exposure limits (SCOEL), which has been considering nickel occupational
exposure limits for several years. A criteria document on occupational exposure limits for nickel
which was prepared by independent experts was presented to SCOEL in 1997 by the European Nickel
Group, an association whose members include most of the EUs nickel producers and importers.
Further information on the carcinogenicity of nickel and related occupational health exposures was
subsequently submitted in 2005 as part of the risk assessment process. SCOEL is expected to review
the new information in 2006 and may recommend new OELs for nickel and nickel compounds. We cannot
predict at this time if the OELs for metallic nickel and nickel compounds will be lowered and, if
they are, whether this action would have a material adverse effect on our results of operations or
financial condition.
In parallel with this risk assessment process, the Danish authorities have introduced a
proposal for a group classification of 167 nickel substances using a read across principle, which
uses the known properties of some chemicals to extrapolate the properties of other chemicals.
Potentially, the proposal could result in 152 substances being classified as category 1 carcinogens
(R49). Given the limited availability of toxicity data on these 167 substances, the Danish authorities have
suggested using water solubility as the single criterion upon which this classification would be
based. The nickel industry is in discussions with member state authorities as well as the European
Commission in evaluating the validity of the methodology used to classify these 167 substances on
the basis that it is scientifically incorrect and would result in the misclassification of the 152
substances referred to above. The industry was given the opportunity to comment on the proposal
until the beginning of 2006. The next discussions are scheduled for March 2006 and a decision by
the Member States is likely to be taken at that time.
At this time it is not known what overall impact the Danish EPA and other risk assessments
associated with various forms of nickel will have on our operations or those of our customers. In
mid-2005, the European Nickel Group issued a brief socio-economic and technical feasibility study
on the risk assessments that had been completed to date. However, the study was inconclusive as
the information from all of the risk assessments was not yet available. This draft nickel risk
assessment recognizes the need to consider economic and technical feasibility information to be
provided by the nickel industry.
The European Commissions Directive Relating to Arsenic, Cadmium, Mercury, Nickel and
Polycyclic Hydrocarbons in Ambient Air which came into effect in February 2005 is aimed at
controlling these substances in ambient air. This Directive includes a target limit value for
nickel of 20 nanograms per cubic metre for atmospheric nickel. As a result of submissions by
industry groups during the development of the Directive, the limits are target values, rather than
binding limits, and control measures are not required to go beyond the best available technology or
to require that disproportionate costs be incurred to achieve the target values. Although the
target values adopted in the Directive are not binding limits, member states have the right to
enforce them as binding limits. The monitoring of atmospheric nickel is currently the
responsibility of member states. We are currently evaluating the impact of the Directive on our
Clydach refinery. Our preliminary data support the position that current operational emissions
account for only a small percentage of the nickel in ambient air and, accordingly, compliance with
this target value would not have a significant adverse effect on our operations or financial
condition.
The European Commissions Water Framework Directive, which was issued in October 2000 and
regulates water quality standards in the EU, listed nickel as one of the priority substances of
concern and indicated that nickel may be subject to discharge control
78
measures that are more stringent than those currently in effect. It is not yet known what the
EU nickel water quality standards will be or what will be the consequences to industries producing
or using nickel in the EU. However, as part of the implementation of this Directive, member states
will initially have to classify both surface and groundwater bodies. Any failure to meet a water
quality standard within a portion of a water body will result in the entire water body being
classified as not in compliance. It is expected that water body classification will be undertaken
over a two-year timeframe beginning in 2006.
Several directives relating to the end-of-life of certain consumer products have been
finalized and are being implemented in the EU. These include end-of-life for vehicles, waste
electrical and electronic equipment, and restrictions on the use of hazardous substances in
electrical and electronic equipment. A new and more comprehensive Directive on Batteries,
Accumulators and their Waste was approved by the European Parliament on December 13, 2005. The new
Directive requires the collection of 25 per cent of all spent batteries and
accumulators within six years and 45 per cent within 10 years. Limited bans on certain heavy
metals which contaminate the environment when placed in landfills were also included in this
Directive. These bans include 0.0005 per cent mercury by weight for all batteries and 0.002 per
cent cadmium by weight for portable batteries or accumulators (defined as batteries or accumulators
used in household applications, cordless power tools, emergency lighting and electrical and
electronic equipment and other applications by either consumers or professional users) with certain
exceptions for such applications as emergency alarm systems, medical equipment and cordless power
tools. Battery producers will be required to be responsible for and bear the cost of collecting
and recycling used batteries in order to comply with this Directive. The new Directive has been
approved by the European Parliament with the recommendation that it be approved in a second reading
in 2006 by the EU Council of Ministers, which is necessary for it to be adopted. If it is rejected
by the Environmental Council, it will have to undergo a conciliation process to arrive at a
compromise between the European Parliament and the EU Council of Ministers.
The
Seveso II Directive, which was issued by the European Commission in
2003, is concerned
with preventing major accidents and releases of hazardous materials at industrial installations.
Industrial installations that store or produce certain tonnages of hazardous substances listed in
the Seveso II Directive (including nickel oxide) must make a safety report to their local
authorities and obtain a permit for operation. There are two tiers of requirements under the
Seveso II Directive, a lower tier and an upper tier. The changes relate only to lower tier
operations and do not affect Incos Clydach operations as those operations fall within the upper
tier due to the nature and quantity of Clydachs nickel oxide inventories. Inco is working with
its European nickel oxide customers to assist them in complying with this Directive.
To comply with pollution control regulations in the U.K., Incos refineries at Clydach, Wales
and Acton, England have obtained the necessary authorizations to continue to operate. These
authorizations include prescribed emission release limits and are conditional upon Inco carrying
out certain environmental improvements. In order to ensure continuous improvement, the government
reviews these authorizations at least every four years, at which time new environmental improvement
conditions may be established. Both refineries were issued the necessary authorizations in 2004
and continue to meet their specified improvement conditions, none of which are expected to have an
adverse effect on operations. The improvement program is being managed using the refineries ISO
14001 certifications.
WHO Drinking Water Guidelines
The World Health Organization (WHO) periodically reviews its guideline values for
contaminants in drinking water. Its most recent review of nickel in drinking water began in 1995.
Over the past several years nickel producers organizations, including NiPERA, made submissions to
the WHO concerning the most appropriate method for extrapolating animal test data to humans. The
WHO recommended a very stringent guideline value of 20 micrograms of nickel per litre of drinking
water. This value was disputed by the nickel industry and, in 1997, the WHO designated the value
as provisional. In 2000, a new study on the reproductive effects of ingested nickel in animals
was completed. This study, which was funded by the nickel industry, provides an improved
scientific basis for setting a nickel guideline level for drinking water and was submitted to the
WHO for its consideration. Based on its interpretation of that study, in 2004 the WHO determined
that the guideline value for nickel to protect against general systemic toxicity (as reflected in
reproductive effects) would be 130 micrograms of nickel per litre of drinking water. However, the
WHO working group went on to calculate a guideline value designed to protect against a dermatitic
reaction in individuals who are highly sensitive to nickel ingested orally. The guideline value
derived on that basis was 70 micrograms of nickel per litre of drinking water. It is currently
expected that this guideline value will be published along with a revised background document in
2006. While WHO is not a regulatory body itself, the WHO guideline values influence governmental
regulatory agencies around the world in adopting standards. We cannot predict what effect WHOs
revised guideline value for nickel in drinking water will have in specific jurisdictions, including
Canada, or what impact it will have on our results of operations or financial condition.
79
Other Environmental Control Regulations
Inco and other mining companies in Canada are aware of and concerned about the increasing
desire on the part of many regulatory authorities throughout the world to limit the mining,
refining and use of metals in the future. This desire is based on the belief of governments in the
changing expectations of society towards various approaches to the concept of sustainable
development, a concept that has been defined by regulatory and other bodies differently but, at a
minimum, appears to focus on meeting the needs of the present without compromising the ability of
future generations to meet their own needs. In response to this view, Inco believes that there is
a tendency for some governments to use inadequate or incorrect information, to rely on
inappropriate methodologies, and to apply the precautionary principle in an unwarranted manner in
making regulatory decisions regarding metals. An example of this approach is the predisposition by
some regulators to identify metals, including nickel, as PBT chemicals that should be targeted for
use reduction or waste minimization.
In 1998, EPA published a draft list of 53 chemicals or groups of chemicals described as PBT
substances that were to be the focus of a voluntary waste minimization initiative. Eleven of the
53 chemicals on the list were metals, including nickel. The inclusion of nickel on this list, if
finalized, could have led to increased regulation of nickel, placing additional burdens on
customers and users of nickel and possibly resulting in the substitution of other products for
nickel. In submissions made to EPA, Inco pointed out that the scoring and ranking scheme used to
develop this list does not, on a scientific and technical basis, properly apply to metals, so that
nickel should be removed from the list. Similarly, at an expert workshop conducted under the joint
sponsorship of EPA and other organizations in January 2000, the prevailing view was that PBT
criteria, which were developed to evaluate potential environmental hazards of organic chemicals,
could not appropriately be applied to metals and inorganic metal compounds. These views apparently
had some effect. In the summer of 2002, EPA released the final version of what is now referred to
as the Waste Minimization Priority Chemicals List. Only three metals, cadmium, lead and mercury,
were included on the list, and they were selected for reasons that do not involve a PBT
determination.
For the last four years, EPA has been engaged in developing a comprehensive cross-agency
Framework for Metals Risk Assessment (the Framework) that will set forth principles for EPA
programs to use in assessing the hazards and risks of metals and inorganic metal compounds. As
part of the process, EPA commissioned a series of issue papers addressing various questions
relating to the hazard assessment of metals. These issue papers, prepared by independent experts
under contract to EPA, emphasized the complexity of evaluating the hazard potential of metals and
questioned the scientific basis for applying to metals the same PBT criteria that EPA uses to
evaluate the hazards of organic compounds. In late 2004, a revised draft of the Framework (based
in large part on the issue papers) was released for public comment and peer review by EPAs
Science Advisory Board. Although the draft Framework was criticized in various respects during the
peer review process, EPA expects to release a revised version of the Framework as a final document
in 2006. Based on the most recent draft, it is anticipated that the final Framework will establish
a much more scientifically sound basis for evaluating the potential hazards and risks of metals
than has been the case when EPAs PBT methodology was employed.
In
the future, as in the past, at least some supranational, national, provincial, state and local
governments and authorities under which Inco operates may put into
effect new regulations covering the emission
of air pollutants, the discharge of process wastewater and the generation, storage, treatment and
disposal of liquid and solid wastes that could apply to various of
our operations in the world and that could
result in additional compliance costs on our operating units or on nickel-using
industries. Certain of the proposed regulations discussed above, if enacted without change, would
result in additional costs and/or require changes in our operations
that could seriously affect our results of
operations and/or financial condition. Reference is made to the discussion of future removal and
site restoration costs and related plans under Future Removal and Site Restoration; Closure and
Post-Closure Plans above.
Employees
At December 31, 2005, Inco had 11,707 employees, compared with 10,973 employees at
year-end 2004 and 10,478 employees at year-end 2003. At year-end 2005, 6,699 of our employees were
located in Canada, 157 in the United States, 395 in the United Kingdom, 3,380 in Indonesia, 593 in
China, 253 in New Caledonia and 230 in other countries, compared with 6,419 in Canada, 162 in the
United States, 391 in the United Kingdom, 3,320 in Indonesia, 351 in China, 189 in New Caledonia
and 141 in other countries at year-end 2004. Most full-time employees participate in Incos
performance through profit-sharing or other bonus arrangements.
On September 16, 2005, a new three-year collective agreement with our unionized workers at our
Manitoba operations was successfully negotiated. This agreement expires in September 2008.
Collective agreements with unionized hourly production and maintenance workers at our Ontario
operations will expire on May 31, 2006. These agreements in Ontario had been reached following a
three-month strike that had a material adverse effect on our 2003 production of nickel, copper and
certain other metals and
80
our results of operations, financial condition, profitability and cash flow from operations
for 2003. A three-year collective agreement with our unionized office, clerical and technical
employees at our Ontario operations was negotiated in the first quarter of 2004 and remains in
effect until March 31, 2007. Our PT Inco subsidiary entered into a new two-year collective labour
agreement with its union in the fourth quarter of 2004 which expires in December 2006. While there
were no significant problems in reaching this latest agreement with PT Incos labour force, with
the increased potential for actions of non-government organizations and other activist groups, the
continuing uncertain economic and political situation in Indonesia and the general increase in
labour activism in that country, there can be no assurance that such activism will not adversely
affect PT Incos ability to successfully operate. Any disruption in PT Incos operations as a
result of labour issues or other issues may adversely affect its operations and could materially
adversely impact our business, results of operations, financial conditions and liquidity. At Goro,
we currently have two unions representing some of our employees. In early September 2002, Goro
experienced labour disruptions by personnel associated with certain project construction
subcontractors. As a result of these disruptions, the decision was made in late September 2002 to
curtail certain activities at the projects site to enable the project company, Goro Nickel S.A.S.,
contractors, subcontractors and other interested parties to develop procedures to avoid future
disruptions. A number of procedures were put in place prior to the start of the Goro project
comprehensive review in late 2002 and over the past three years we have been seeking to complete
the implementation of these and other procedures as part of the negotiation of labour, site or
other accords to help minimize any such disruptions in the future. Through an employers
association, of which we are the controlling member, we negotiated a collective agreement effective
September 2002 covering the construction of the first phase of the Voiseys Bay project.
Currently, we are in the process of negotiating the first collective agreement with operations
employees at Voiseys Bay.
There can be no assurance that we will be able to maintain positive relationships with our
employees at our operations in Canada, Indonesia, New Caledonia, and elsewhere or that new
collective agreements will be entered into without work interruptions
when the then current collective agreements end as in the case of the
three-month strike at our Ontario operations in 2003. We could also be adversely affected by
labour disruptions involving third parties who may provide us with goods or services at our
operations in Canada and elsewhere. For example, as discussed above, our Goro project experienced
labour disruptions by certain employees of the projects
construction subcontractors and other parties. Strikes and
other labour disruptions at any of our operations and lengthy work interruptions at our Goro
project could materially adversely affect the timing of completion and the cost of that project, as
well as our business, results of operations, financial condition and liquidity.
Exmibal
In December 2004, Inco completed the sale, subject to certain conditions to be met during
the option period referred to below, of its 70 per cent interest in its Guatemalan subsidiary,
Exploraciones y Explotaciones Mineras Izabal, S.A. (Exmibal) (now called Compania Guatemalteca Mineras de
Niquel, Socieda Anomina (CGN)), to Skye Resources Inc. (Skye) pursuant to a master agreement
entered into in September 2004. Under the master agreement, Inco acquired (i) 1,888,101 common
shares of Skye, (ii) 198,665 warrants to acquire common shares of Skye at Cdn.$3.00 per share, and
(iii) 5,098 warrants to acquire commons shares of Skye at Cdn.$2.00 per share. All of these
warrants expired unexercised. The master agreement gives Skye a five-year option period to
evaluate the technical and economic feasibility of developing a nickel laterite mine project owned
by CGN (now known as the Fenix project). If Skye exercises its option to proceed with the Fenix
project, a second closing will occur at which time Skye will pay to Inco additional consideration
in the form of $3.5 million in cash and the issuance of additional commons shares of Skye
(currently estimated to be 1,750,000 shares) and Inco will transfer to Skye ownership of certain
Inco subsidiaries in Guatemala which hold certain surface rights, dock facilities and other assets
related to the project. The additional consideration would be payable after Skye has fulfilled a
number of conditions during the option period, the most significant remaining condition being the
completion of a feasibility study for the Fenix project. If Skye does not fulfill all of these
conditions during the option period or if Skye elects not to exercise its option to proceed with
the Fenix project, Inco will have the right to reacquire its interest in CGN (and the Fenix
project).
Concurrently with the acquisition of Incos interest in CGN in December 2004, Skye agreed that
it or CGN will enter into the following ancillary agreements with Inco: (i) a production interest
agreement providing for a cash payment to be made by CGN on 70 per cent of the ore mined by the
Fenix project, (ii) a sales agency agreement under which Inco would act as Skyes sales agent for
nickel commodities produced from the project and earn a 2.75 per cent commission on those sales,
and (iii) a net smelter return agreement providing Inco with a sliding-scale royalty calculated on
70 per cent of net smelter returns from the sale of ferronickel products from a ferronickel plant
that would be built as part of the Fenix project. If Skye develops the Fenix project to produce
intermediate nickel products, then Inco and CGN would enter into an offtake agreement under which
Inco would purchase those products on commercially reasonable terms.
During 2005, Inco acquired an addition 1,000,000 common shares of Skye and 250,000 warrants to
purchase common shares of Skye at Cdn.$5.75 per share, pursuant to a private placement and market
transactions. On February 24, 2006, Inco acquired 731,150
81
common shares of Skye pursuant to a private placement upon the exercise of certain pre-emptive
rights it has under the master agreement referred to above, thereby maintaining its 12.4 per cent
ownership interest in Skye on a non-diluted basis.
Miscellaneous Investments
In connection with the disposition of the battery and related products businesses
conducted by Inco ElectroEnergy Corporation (IEEC), which was completed in 1983, Inco assumed
responsibilities for certain expenditures and other costs associated with certain proceedings or
administrative actions initiated by or involving EPA or state environmental agencies concerning
certain facilities operated by these businesses. We also assumed responsibility for compliance by
these facilities with applicable local environmental regulations covering the treatment or
discharge of certain wastewaters, compounds or effluents into publicly-owned treatment works,
sewage systems, groundwater resources and watercourses and the related cleanup of deposits of
certain minerals and compounds from such watercourses. Our total accounting reserve relating to
these remaining responsibilities, which reflects their estimated cost, was $48 million at year-end
2005, compared with $30 million at year-end 2004 and 2003. The increase in this reserve at
year-end 2005 was the result of a reevaluation during 2005 of the costs to remediate one of the
IEEC properties in the U.S. that Inco agreed to retain in connection with sale back in the early
1980s of certain of the IEEC businesses.
Other Information
In addition to properties discussed under Description of Business above, certain of
Incos sales offices are leased and the Company also leases office space in Toronto, Ontario;
London, England; Saddle Brook, New Jersey; and in certain other locations around the world.
Operations in certain foreign countries involve certain risks, including risks of monetary
instability, changes in exchange rates, inconvertibility of currencies and expropriation and
nationalization. For example, Indonesia experienced a significant devaluation of its currency and
other economic issues in recent years and the future economic, social and political issues in that
country could adversely affect PT Incos ability to operate and, accordingly, our results of
operations, financial condition and prospects. For further information on the political situation
in Indonesia, see PT International Nickel Indonesia Tbk General above.
For financial information by geographic location, see Note 18 to the financial statements
under Item 8 of this Report.
Shareholder Rights Plan
Incos current shareholder rights plan is set out in a Rights Plan Agreement, as amended
and restated as noted below, entered into between Inco and CIBC Mellon Trust Company, as Rights
Agent, and is designed to (i) encourage the fair and equal treatment of shareholders in connection
with any bid for control of Inco by providing them with more time than the minimum statutory period
during which such bid must remain open in order to fully consider their options, and (ii) provide
Incos Board of Directors with additional time, if appropriate, to pursue other alternatives to
maximize shareholder value.
The plan was initially approved by Incos Board of Directors in September 1998 and became
effective in October 1998. It was amended in certain respects by Incos Board of Directors in
February 1999 to ensure that it was consistent with rights plans which had been recently adopted by
other Canadian companies. The amended plan was approved by the shareholders at our 1999 Annual and
Special Meeting of Shareholders in April 1999. In February 2002, Incos Board of Directors
approved certain minor amendments to the plan to ensure that its terms remained consistent with
other rights plans in Canada and unanimously recommended that the plan, as proposed to be amended,
be reconfirmed, as amended and restated, by the shareholders. Such reconfirmation was obtained at
our Annual and Special Meeting of Shareholders in April 2002. In February 2005, Incos Board of
Directors approved certain further minor amendments to the plan to reflect, among other things,
changes in Incos capital structure since April 2002, including the issuance of convertible debt
securities, and unanimously recommended that the plan, as proposed to be amended, be reconfirmed,
as amended and restated, by the shareholders. Such reconfirmation was obtained at our Annual and
Special Meeting of Shareholders in April 2005. The plan remains in effect until October 2008.
The rights issued under the plan are attached to and trade with Incos Common Shares and no
separate certificates will be issued unless an event triggering these rights occurs. Certificates
evidencing Common Shares will be legended to reflect that they evidence the rights until the
Separation Time (as defined below). Holders of Incos Convertible Debentures, Subordinated
Convertible Debentures and LYON Notes (as those terms are defined in Note 13 to the financial
statements under Item 8 of this Report) and the certificates of entitlement attached thereto (which
entitle their holders to receive rights in the event that the related security is converted into
Common Shares) will generally be entitled to receive, upon conversion of the relevant security and
presentment of the
82
certificate of entitlement, respectively, rights in an amount equal to the number of Common
Shares issued upon conversion of such securities.
The rights will separate from the Common Shares and be transferable, trade separately from the
Common Shares and become exercisable at the time (the Separation Time) when a person acquires, or
announces its intention to acquire, beneficial ownership of 20 per cent or more of (i) Incos then
outstanding Voting Securities (defined at this time to be Incos Common Shares) or (ii) its then
outstanding Common Shares alone, in either case without complying with the permitted bid
provisions of the plan (as summarized below), or without the approval of Incos Board of Directors.
Should such an acquisition occur, each right would entitle its holders, other than the acquiring
person or persons related to or acting jointly or in concert with such person, to purchase
additional Common Shares of the Company at a 50 per cent discount to the then current market price.
The acquisition by any person (an Acquiring Person) of 20 per cent or more of Incos Common
Shares or Voting Securities, other than by way of a permitted bid, is referred to as a
Flip-in-Event. Any rights held by an Acquiring Person will become void upon the occurrence of a
Flip-in-Event.
A permitted bid is a bid made to all holders of Incos outstanding Voting Securities that is
open for at least 60 days. If, at the end of such 60-day period, more than 50 per cent of Incos
then outstanding Common Shares, other than those securities owned by the party making the bid and
certain related persons, have been tendered, such party may take up and pay for the Common Shares
but must extend the bid for a further 10 business days to allow other shareholders to tender, thus
providing shareholders who had not tendered to the bid with enough time to tender to the bid once
it is clear that a majority of Common Shares have been tendered.
Under the plan, Inco can (i) waive its application to enable a particular takeover bid to
proceed, in which case the plan will be deemed to have been waived with respect to any other
takeover bid made prior to the expiry of any bid subject to such waiver or (ii) with the prior
approval of the holders of Voting Securities or rights, redeem the rights for nominal consideration
at any time prior to a Flip-in-Event.
Proposed Acquisition of Falconbridge Limited
On October 11, 2005, Inco and Falconbridge announced that their respective Boards of
Directors had approved the acquisition of all of the outstanding common shares of Falconbridge by
Inco by way of a friendly take-over bid. The combined organization would be one of the worlds
premier mining and metals companies in both nickel and copper, with one of the mining industrys
most attractive portfolios of low-cost, profitable growth projects.
Inco and Falconbridge entered into a Support Agreement dated October 10, 2005 (the Support
Agreement) relating to the transaction. The Support Agreement provides that Inco would make an
offer (the Offer) to acquire all of the outstanding common shares of Falconbridge not currently
owned by Inco and that Falconbridge would co-operate with Inco and use its reasonable best efforts
to permit the Offer to be successful, all on and subject to the terms and conditions set out in the
Support Agreement. In accordance with the Support Agreement, on October 24, 2005 Inco formally
made the Offer by mailing to Falconbridge common shareholders a take-over bid circular setting out
the terms of the Offer, together with the Falconbridge Board of Directors circular and related
documents. The Offer is subject to certain conditions of completion, including receipt of all
necessary regulatory clearances and acceptance of the Offer by Falconbridge common shareholders
owning not less than 66 2/3 per cent of the Falconbridge common shares on a fully diluted basis.
Once the 66 2/3 per cent acceptance level is met, Inco intends, but is not required, to take steps
to acquire all of the remaining Falconbridge common shares. The support agreement also provides
for the payment of a fee of up to $320 million to Inco by Falconbridge if the acquisition is not
completed for certain reasons.
The Offer is for Cdn.$34.00 in cash or 0.6713 of an Inco Common Share plus Cdn.$0.05 in cash
for each Falconbridge common share. Falconbridges common shareholders will have the right to
elect to receive all cash or all Inco Common Shares (plus Cdn.$0.05 per Falconbridge Common Share),
subject to pro ration based upon the maximum amount of cash and Inco Common Shares offered. Under
the terms of the Offer, the maximum amount of cash to be paid by Inco will be approximately
Cdn.$2.87 billion, and the maximum number of Inco common shares to be issued will be approximately
201 million shares, taking into account the conversion of Falconbridges outstanding convertible
debt securities and outstanding share options. Assuming full pro ration of these maximum amounts,
this would mean Cdn.$7.50 in cash and 0.524 of an Inco common share for each Falconbridge common
share subject to the Offer. Subject to certain other terms and conditions and other developments,
Inco may elect to redeem some or all of Falconbridges junior preferred shares in conjunction with
the completion of the acquisition.
The Offer was initially open for acceptance until December 23, 2005, unless withdrawn,
extended or accelerated. On December 8, 2005, Inco announced that it had determined that one of
the conditions of the Offer, receipt of all necessary regulatory clearances, would not be obtained
by the December 23, 2005 acceptance date and that, pursuant to the terms of the Support Agreement,
it was
83
extending the Offer until January 27, 2006 in order to allow more time to obtain these
clearances. Subsequently, on January 12 and February 21, 2006, Inco announced further extensions
of the acceptance date in order to provide additional time to obtain the required regulatory
clearances from the U.S. Department of Justice and the competition authorities in Europe. As a
result, the Offer is now open for acceptance until June 30, 2006, subject to withdrawal, extension
or acceleration. On January 27, 2006, Inco announced that the Canadian Competition Bureau, the
regulatory authority in Canada responsible for reviewing proposed mergers under Canadian
competition legislation, had issued a no action letter to Inco indicating that it did not intend
to oppose Incos acquisition of Falconbridge. Pursuant to amendments to the Support Agreement,
Inco has agreed that it will extend the Offer through one or more additional extensions if the
regulatory clearance condition is not met by the time provided in that agreement. Falconbridge has
agreed that any such extended acceptance date may be accelerated if the regulatory clearances are
obtained earlier.
As part of the efforts of Inco and Falconbridge to obtain all of the regulatory clearances
required to complete expeditiously the transactions contemplated by the Support Agreement, Inco is
prepared, if required, to divest Falconbridges Nikkelverk refinery in Norway and certain related
marketing organizations, as a post-transaction event. This divestiture, if required, may occur
through a sale to a third party of the divested assets/businesses or an initial public offering
covering the divested assets/businesses. If required, Inco would provide the refinery with
intermediate product to meet its forecast needs, consistent with what Falconbridge would have
provided over a specified period.
The new Inco to be created by this pending transaction would have a strong balance sheet,
enhanced financial resources and flexibility to achieve its growth plan and pursue additional
opportunities to enhance shareholder value. Shareholders in the combined company would also enjoy
significant liquidity given the strong position which it is expected to have on the Toronto and New
York stock exchanges, with a total of approximately 390 million shares to be outstanding on an as
issued basis, assuming all Falconbridge common shares are tendered under the Offer. Assuming all
of the Falconbridge common shares are tendered, upon the completion of the acquisition current Inco
common shareholders would hold approximately 54 per cent and former Falconbridge common
shareholders would hold approximately 46 per cent of the fully diluted Inco common shares.
In connection with this transaction, Inco entered into a Loan Agreement dated December 22,
2005, (the Loan Agreement) with a group of banks and financial institutions, including Morgan
Stanley Senior Funding (Nova Scotia) Co., RBC Capital Markets, Goldman Sachs Canada Credit Partners
Co. and The Bank of Nova Scotia, as lead arrangers, and Morgan Stanley Senior Funding (Nova Scotia)
Co. and RBC Capital Markets, as joint book running managers. The loan facilities under the Loan
Agreement are sufficient to permit Inco to meet, directly or through subsidiaries who can borrow
under the Loan Agreement, the total amount of cash, approximately $2,600 million, that it would
need to acquire all of the issued and outstanding common shares of Falconbridge pursuant to the
terms of the Offer and to pay the fees and expenses associated with such offer. The Loan Agreement
provides for a bridge loan facility which matures one year from the date of the final drawdown
under the bridge loan facility. The principal amount of the bridge loan facility is repayable in
one payment on such maturity date but may also be prepaid prior to maturity at the option of Inco.
Certain mandatory prepayments may also be required during the term of this facility out of net
proceeds, if any, received from dispositions of certain assets, certain public or private issuances
of debt and certain insurance proceeds received. The Loan Agreement also provides for a term loan
facility which matures on the date that is five years plus one day next following the date of the
final drawdown under the term loan facility. The principal amount of the term loan facility is
repayable in one payment on such maturity date but may also be prepaid prior to maturity at the
option of Inco. Certain mandatory prepayments may also be required during the term of this
facility out of certain net proceeds, if any, received from the divestiture of certain assets of
Falconbridge, certain public or private issuances of debt related to the divestiture of certain
assets of Falconbridge, and certain insurance proceeds received. The loan facilities provided for
in the Loan Agreement bear interest and are subject to fees at levels customary for credit
facilities of this type and include covenants, representations, warranties, conditions and events
of default consistent with the terms of Incos existing credit facilities or otherwise customary
for loan facilities of this type, including acceleration of obligations if any specified events of
default occur. The first advance under the loan facilities is available until August 10, 2006.
Subsequent advances are permitted within 140 days following the first advance. Inco is required to
obtain the prior consent of the majority lenders under the loan facilities prior to amending,
waiving, or making determinations relating to certain conditions of the acquisition of the
Falconbridge common shares under the terms of the Support Agreement.
Four members of the Falconbridge Board of Directors are to join the Inco Board of Directors
upon the completion of the acquisition. The Board of Directors of Inco upon completion of the
proposed transaction plans to review its dividend policy and the Board intends to continue a
sustainable dividend consistent with the Companys capital and growth requirements.
84
Items 1A. Risk Factors
The information under Risks and Uncertainties in Managements Discussion and Analysis
of Financial Condition and Results of Operations under Item 7 of this Report is incorporated
herein by reference to such information.
Items 1B. Unresolved Staff Comments
None.
Item 3. Legal Proceedings
There are no material pending legal proceedings to which Inco or any of its subsidiaries
is a party or of which their property is the subject. Inco and its subsidiaries are subject to
routine litigation incidental to the business conducted by them, to various environmental
proceedings, and to other litigation related to such business that Inco does not believe to be
material. Among the environmental proceedings are claims for personal injuries, enforcement
actions and certain claims dating back a number of years in which one of our subsidiaries was
designated, under the United States federal environmental law known as Superfund, or CERCLA, as
a potentially responsible party. The Superfund claims assert that, as a potentially responsible
party, Incos subsidiary sent waste to a contaminated landfill or similar site and is jointly and
severally liable for the cost of remediating such site. These claims have not proceeded to a point
where a reliable assessment can be made of the costs to Inco, assuming responsibility is found to
exist or liability is determined, but we believe, based upon our present information concerning
these matters and its past experience, that its potential liability, if found to exist, would not
be significant.
Inco has from time to time been named as a party or charged in connection with the alleged
violation of, including exceeding regulatory limits relating to discharges under, certain
environmental or similar laws and regulations applicable to its operations in Canada and elsewhere.
Such proceedings have involved, and with respect to currently pending charges may ultimately
involve, fines or similar sanctions in excess of $100,000. However, none of these currently
pending or threatened proceedings are material, either singly or in the aggregate, to our results
of operations, financial condition or liquidity.
Item 4. Submission of Matters to a Vote of Security Holders
No matters were submitted to a vote of security holders in the fourth quarter of 2005.
85
PART II
Item 5. Markets for Inco Limiteds Common Shares, Related Shareholder Matters and Inco
Limiteds Issuances or Purchases of Equity Securities
Common Shares
Market Information
There are two principal markets on which Incos Common Shares are traded, the New York
Stock Exchange (the NYSE) and the Toronto Stock Exchange (the TSX).
The high and low closing sale prices for Incos Common Shares as reported on the NYSE and the
TSX for each quarter during the past two years are as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New York Stock Exchange (U.S. $) |
|
|
|
2005 |
|
|
2004 |
|
|
|
1st Q |
|
|
2nd Q |
|
|
3rd Q |
|
|
4th Q |
|
|
1st Q |
|
|
2nd Q |
|
|
3rd Q |
|
|
4th Q |
|
High |
|
|
43.25 |
|
|
|
41.43 |
|
|
|
47.35 |
|
|
|
46.93 |
|
|
|
41.34 |
|
|
|
36.43 |
|
|
|
39.20 |
|
|
|
40.25 |
|
Low |
|
|
32.32 |
|
|
|
34.18 |
|
|
|
38.00 |
|
|
|
40.10 |
|
|
|
31.72 |
|
|
|
28.19 |
|
|
|
31.21 |
|
|
|
34.28 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Toronto Stock Exchange (Cdn. $) |
|
|
|
2005 |
|
|
2004 |
|
|
|
1st Q |
|
|
2nd Q |
|
|
3rd Q |
|
|
4th Q |
|
|
1st Q |
|
|
2nd Q |
|
|
3rd Q |
|
|
4th Q |
|
High |
|
|
52.55 |
|
|
|
51.04 |
|
|
|
54.99 |
|
|
|
54.95 |
|
|
|
53.10 |
|
|
|
47.99 |
|
|
|
49.87 |
|
|
|
50.58 |
|
Low |
|
|
40.00 |
|
|
|
43.30 |
|
|
|
46.02 |
|
|
|
47.20 |
|
|
|
42.49 |
|
|
|
39.10 |
|
|
|
41.03 |
|
|
|
42.35 |
|
On
March 13, 2006, the closing sale prices for the Companys
Common Shares were $46.14 on the
NYSE and Cdn.$53.54 on the TSX.
Issuance of Unregistered Securities
In the fourth quarter of 2005, a total of 2,557,361 Common Shares were issued on the
conversion of our LYON Notes. These Common Shares were not registered under the Securities Act of
1933 in reliance on the exemption from registration provided by Section 3(a)(9) of such Act. The
Company received no separate consideration upon such conversion. The Company did not issue any
other equity securities that were not registered under the Securities Act of 1933 in 2005.
Holders of Common Shares
The total number of holders of record of the Companys Common Shares as of February 17,
2006 was 13,612.
Dividends
Subject to the preferential rights of any prior ranking shares (of which none were issued
and outstanding as of the date of this report), the holders of Common Shares are entitled to such
dividends as may be declared by Incos Board of Directors out of funds legally available therefor.
No dividend or other distribution on the Common Shares shall be paid, and no Common Share shall be
acquired for value, unless dividends on all outstanding Preferred Shares have been paid for all
past quarterly periods.
On April 19, 2005, Inco announced that its Board of Directors had reinstated a quarterly cash
dividend of $0.10 per share on our Common Shares, beginning June 1, 2005, and on February 7, 2006
we announced that the Board of Directors had increased the quarterly dividend to $0.125 per share,
effective for the dividend payable March 1, 2006. The payment of dividends on the Common Shares
had been eliminated by the Board of Directors in 1999. The Board continues to review on a periodic
basis the declaration and payment of dividends on the Common Shares and its dividend policy. This
policy is expected to be evaluated by our Board of Directors upon the completion of the pending
acquisition of Falconbridge. The quarter-to-quarter decision as to the amount of the quarterly
dividend per Common Share is reviewed by our Board of Directors and determined with reference to a
number of factors, including current business results and cash needs.
86
Common Share Purchase Warrants
As part of the redemption price Inco paid in connection with the redemption of the
Companys Class VBN Shares discussed under Class VBN Shares below, Inco issued approximately 11
million Common Share Purchase Warrants (the Warrants). The Warrants were issued under, and are
governed by, a Warrant Agreement dated as of December 1, 2000 by and among Inco, CIBC Mellon Trust
Company, as the Canadian Warrant Agent, and ChaseMellon Shareholder Services, L.L.C., as the U.S.
Warrant Agent (the Warrant Agreement).
Each whole Warrant entitles the holder to purchase one Common Share at an exercise price of
Cdn.$30.00 (or the equivalent in U.S. dollars based upon then prevailing exchange rates at the time
of exercise), subject to certain adjustments (the Exercise Price), until 5:00 pm (Toronto time)
on August 21, 2006. Any Warrants not exercised prior to such date will expire. A Warrant holder
does not have any voting or pre-emptive rights or any other rights as a shareholder of the Company
until the Warrants held by such holder have been duly exercised and Common Shares of the Company
have been issued to the holder pursuant thereto.
The Warrant Agreement provides that the Exercise Price and/or the number and kind of
securities or property issuable on the exercise of the Warrants are subject to adjustment in
certain events, including (1) the subdivision or consolidation of the Common Shares, (2) the
issuance to all or substantially all the holders of Common Shares of a stock dividend or other
distributions excluding any issuance of securities to holders of outstanding Common Shares which
constitutes a Dividend Paid in the Ordinary Course (defined generally in the Warrant Agreement to
include dividends or other distributions exceeding certain threshold aggregate or annual amounts
based upon the value of the dividends or other distributions paid or consolidated net earnings for
specified periods), and (3) the distribution to all or substantially all the holders of Common
Shares of (i) shares of any other class, (ii) rights, options or warrants to acquire Common Shares,
or (iii) cash, property or other assets of the Company (excluding, in each case, Dividends Paid in
the Ordinary Course).
The Exercise Price and/or the number and kind of securities or property issuable on exercise
will also be subject to certain adjustments in connection with certain other events, including any
change, reclassification or alteration of the Common Shares, the consolidation, amalgamation,
merger or other similar arrangement of the Company with another Company, or the transfer of all or
substantially all of the Companys assets.
No adjustment in the Exercise Price or the number or kind of securities or property issuable
upon exercise will be required to be made (1) unless the cumulative effect of such adjustment or
adjustments would change the Exercise Price by at least one per cent or, in the event of a change
in the number of Common Shares purchasable upon exercise, the number of Common Shares issuable
would change by at least one one-hundredth of a Common Share or (2) in respect of the issue of
Common Shares pursuant to (i) the exercise of the Warrants or (ii) the Companys Optional Stock
Dividend Program and Share Purchase Plan and options granted current or former employees of the
Company or any other option or share purchase plan.
The Warrant Agreement provides that modifications and alterations to it and to the Warrants
may be made if authorized by extraordinary resolution and if all other necessary approvals are
received. The term extraordinary resolution is defined in the Warrant Agreement to mean, in
effect, a resolution passed by the affirmative votes of the holders of not less than 66 2/3 per
cent of the Warrants represented and voting at a meeting of Warrant holders or an instrument or
instruments in writing signed by the holders of not less than 66 2/3 per cent of the outstanding
Warrants. The Warrant Agreement and the Warrants may be modified and altered without authorization
by extraordinary resolution and if all necessary approvals are received in order to cure defects or
ambiguities, to make ministerial amendments otherwise provided that the rights of Warrant holders
are not materially adversely affected thereby.
The Warrants are listed on the TSX and on the NYSE. Subject to applicable law, Inco may
purchase Warrants in the market or by tender or private contract, and any Warrants so purchased
will be cancelled.
Other Information
Under its articles of incorporation, Inco is authorized to issue an unlimited number of
Common Shares.
For a description of Incos outstanding debentures and notes which are convertible into Common
Shares, see Notes 9 and 13 to the financial statements under Item 8 of this Report.
The Common Shares have general voting rights. At shareholders meetings, each holder of these
securities is entitled to one vote for each share held and there are no cumulative voting
provisions. See Note 16 to the financial statements under Item 8 of this Report.
87
Class VBN Shares
At a special meeting of shareholders held on November 28, 2000, Inco received the
requisite shareholder approval to amend the terms of the Class VBN Shares that had been created in
August 1996 in connection with the Companys acquisition of Diamond Fields to provide for their
redemption. The amendments allowed the Company to redeem each of its Class VBN Shares for
Cdn.$7.50 (or the equivalent in U.S. dollars) in cash and a fraction, 0.45, of a Warrant. For a
description of the Warrants, see Common Share Purchase Warrants above. All of the Class VBN
Shares were redeemed by the Company, effective December 14, 2000, for a total redemption price of
$133 million plus approximately 11.6 million Warrants which were reserved for issuance. As of
December 31, 2005, 2004 and 2003, approximately 11 million Warrants had been issued in connection
with this redemption. Approximately 550,000 Warrants still have not been issued given the limited
number of holders of Class VBN Shares who did not accept the redemption consideration and elected
under applicable legislation prior to the effective date of the redemption to have a court in the
Province of Ontario determine the fair value of their Class VBN Shares. As of the date of this
Report, this court proceeding was still in discovery and related preliminary stages and a related
action had been filed in November 2005 in the U.S. in the federal district court for the State of
New Jersey.
Preferred Shares
Certain Provisions of the Preferred Shares as a Class
Issuable in Series
Incos authorized share capital includes 45 million Preferred Shares issuable in series, each
series consisting of such number of shares and having such provisions attached thereto as may be
determined by the Board of Directors of the Company, subject to a maximum aggregate issue price of
Cdn.$1,500 million (or the equivalent in other currencies). As of the date of this Report, no
Preferred Shares were issued or outstanding.
Priority
The Preferred Shares of each series rank on a parity with the Preferred Shares of every other
series, and prior to the Common Shares with respect to the payment of cumulative dividends and the
distribution of assets on a liquidation, dissolution or winding up of the Company or for the
purpose of winding up its affairs (Liquidation).
Creation and Issue of Additional Preferred Shares
Subject to applicable law, Inco may, without the consent of the holders of the Preferred
Shares as a class, (i) create additional Preferred Shares, (ii) create preferred shares of another
class or classes ranking on a parity with the Preferred Shares with respect to the payment of
dividends and/or the distribution of assets on Liquidation and (iii) increase any maximum number of
authorized shares of any one or more of such other classes of shares. If (but only so long as) any
dividends are in arrears on any outstanding series of the Preferred Shares, the Company may not,
without the consent, by a simple majority of the votes cast, of the holders of the Preferred Shares
as a class, (i) issue any additional series of the Preferred Shares, or (ii) issue preferred shares
of another class ranking on a parity with the Preferred Shares with respect to the payment of
dividends and/or the distribution of assets on Liquidation.
Class Voting Rights
The holders of the Preferred Shares are not entitled to any voting rights as a class except
(i) as provided above, (ii) as provided by law, or (iii) with respect to the right to vote on
certain matters as described under Modification below. When the holders of Preferred Shares vote
as a class, or when two or more series of Preferred Shares vote together at a joint meeting, each
holder has one one-hundredth of a vote in respect of each Canadian dollar (or its equivalent in a
foreign currency at the date of issuance) of the issue price of the Preferred Shares he or she
holds.
The Board of Directors of Inco may, at the time of creation of any series of Preferred Shares,
confer voting rights on such series in addition to the voting rights of the holders of the
Preferred Shares as a class. It is the Board of Directors intention that, with respect to the
creation of any future series of Preferred Shares, to the extent that such Preferred Shares would
have general voting rights then such shares would not have more than one vote in respect of each
Preferred Share.
88
Modification
The class provisions attaching to the Preferred Shares may be amended at any time with such
approval of the holders of such shares as may then be required by law or by the rules of any stock
exchange on which the shares or any series of Preferred Shares are then listed. Currently, this
approval requirement is by at least two-thirds of the votes cast at a meeting of such holders duly
called for the purpose and at which a quorum is present, or as are required by the rules of any
stock exchange upon which the shares of any series of Preferred Shares are then listed. In
addition, the approval by at least two-thirds of the votes cast at a meeting of the holders of all
shares of the Company carrying general voting rights is currently required by law for the amendment
of such class provisions.
Securities Authorized for Issuance Under Equity Compensation Plans
The number of shares of Inco that may be issued upon the exercise of outstanding options,
warrants and rights under our equity compensation plans at December 31, 2005, the weighted average
exercise price of such options, warrants and rights, and the number of shares remaining available
for future issuance under such plans are shown in the following table:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
|
|
(B) |
|
|
(C) Number of |
|
|
|
Number of |
|
|
Weighted |
|
|
remaining securities |
|
|
|
securities to be |
|
|
average |
|
|
available for future |
|
|
|
issued upon |
|
|
exercise price |
|
|
issuance under |
|
|
|
exercise of |
|
|
of outstanding |
|
|
equity compensation |
|
|
|
outstanding |
|
|
options, |
|
|
plans (excluding |
|
|
|
options, warrants |
|
|
warrants and |
|
|
securities reflected |
|
Plan category |
|
and rights(1) |
|
|
rights |
|
|
in column (A))(2) |
|
Equity compensation plans approved by security holders |
|
|
3,116,261 |
|
|
$ |
30.98 |
|
|
|
7,773,950 |
|
Equity compensation plans not approved by security holders |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
3,116,261 |
|
|
$ |
30.98 |
|
|
|
7,773,950 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
Consists of Common Shares authorized for issuance upon the exercise of options
outstanding as of December 31, 2005 under (i) the 1993 and 1997 Key Employee Incentive Plans
which have been superseded and under which no further options may be granted, (ii) the 2001
Key Employees Incentive Plan (the 2001 KEIP), (iii) the 2005 Key Employees Incentive Plan
(the 2005 KEIP), and (iv) the 2002 Non-Employee Director Share Option Plan (the 2002
NEDSOP) which was suspended by Incos Board of Directors as of February 3, 2004. |
|
(2) |
|
Consists of Common Shares authorized for issuance as of December 31, 2005 pursuant to the
exercise of options which may be granted under the 2001 KEIP (1,773,950) and the 2005 KEIP
(5,500,000) or as restricted share awards under the 2005 KEIP (500,000). Does not include
200,000 Common Shares available for future issuance under the 2002 NEDSOP, given the Boards
decision to suspend option grants under that plan. The 2001 KEIP is nearing the end of its
term. No share options/SARS may be granted under the 2001 KEIP after April 24, 2006 and no
incentive compensation awards may be made under the 2001 KEIP in respect of any financial
year after December 31, 2006. |
Other Information
There is no limitation or restriction imposed by Canadian law or by our restated articles
of incorporation on the right of a non-resident of Canada to hold or vote Incos common shares,
except in the case where a non-resident of Canada were to seek to acquire control of Inco. The
Investment Canada Act requires notification to and, in certain cases, advance review and approval
by, the Government of Canada of the acquisition by a non-Canadian of control of a Canadian
business, all as defined in this legislation. Generally speaking, in order for an acquisition to
be subject to advance review and approval under this legislation the value of the acquired entitys
gross assets currently must exceed Cdn.$265 million. This threshold is lower if the acquiror is
not a resident of a country which is a member of the World Trade Organization. See also the
discussion of the Shareholder Rights Plan under Shareholder Rights Plan above and in Note 16 to
the financial statements under Item 8 of this Report.
Canadian federal tax legislation, in conjunction with applicable tax treaties, generally
requires that we withhold 15 per cent from dividends paid by the Company to its shareholders
resident in the United States, the United Kingdom and most western European countries. Similarly,
depending upon applicable tax treaties, dividends paid to other non-residents of Canada are subject
to a withholding tax at a maximum rate of 25 per cent. The amount of a stock dividend (for tax
purposes) would generally be equal to the amount by which the stated capital of the Company has
increased by reason of the payment of such dividend. Under regulations presently in effect in the
United States, the Company is generally subject to the U.S. backup withholding rules which would
require withholding at a rate of 28 per cent on dividends and interest paid to certain U.S. persons
who have not provided the Company with a taxpayer identification number. Recent legislation
enacted in the U.S. has reduced the tax rate to 15 per cent on certain dividends paid to U.S.
individual shareholders of non-U.S. corporations such as the Company that meet certain
requirements.
89
Through subsidiaries and affiliates, Incos operations are conducted in numerous countries and
some $3,600 million of our consolidated total assets are located outside Canada and the United
States. Accordingly, operations are subject to various governmental policies or regulations and
changes therein and the risks associated with doing business in many overseas locations.
At December 31, 2005, approximately 61 per cent of the holders of our Common Shares had
addresses in Canada, approximately 31 per cent had addresses in the United States and eight per
cent elsewhere. Canadian residents of record held approximately 50.4 per cent of our issued and
outstanding Common Shares, United States residents of record held approximately 49.3 per cent and
residents of record of other countries held less than one per cent as at December 31, 2005.
90
Item 6. Selected Financial Data
The following table provides selected financial data as reported in Incos 2005
consolidated financial statements on the basis of GAAP in Canada:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year Ended December 31, |
|
|
2005 |
|
2004 |
|
2003 |
|
2002 |
|
2001 |
|
|
|
|
|
|
(Restated) |
|
(Restated) |
|
(Restated) |
|
(Restated) |
|
|
($ in millions, except per share amounts) |
Net sales |
|
$ |
4,518 |
|
|
|
4,278 |
|
|
|
2,474 |
|
|
|
2,161 |
|
|
|
2,066 |
|
Cost of sales and operating expenses, excluding depreciation and depletion |
|
$ |
2,633 |
|
|
|
2,348 |
|
|
|
1,735 |
|
|
|
1,378 |
|
|
|
1,416 |
|
Depreciation and depletion (2) |
|
$ |
256 |
|
|
|
248 |
|
|
|
227 |
|
|
|
242 |
|
|
|
263 |
|
Selling, general and administrative |
|
$ |
207 |
|
|
|
192 |
|
|
|
169 |
|
|
|
136 |
|
|
|
111 |
|
Asset impairment charges |
|
$ |
25 |
|
|
|
201 |
|
|
|
|
|
|
|
2,415 |
|
|
|
|
|
Interest expense(3) |
|
$ |
26 |
|
|
|
36 |
|
|
|
56 |
|
|
|
58 |
|
|
|
62 |
|
Income and mining taxes (2)(3) |
|
$ |
408 |
|
|
|
432 |
|
|
|
(27 |
) |
|
|
(641 |
) |
|
|
(88 |
) |
Net earnings (loss) (2)(3) |
|
$ |
836 |
|
|
|
619 |
|
|
|
146 |
|
|
|
(1,475 |
) |
|
|
302 |
|
Dividends per common share |
|
$ |
0.30 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Preferred dividends |
|
|
|
|
|
|
|
|
|
|
(6 |
) |
|
|
(26 |
) |
|
|
(26 |
) |
Premium on redemption of preferred shares |
|
|
|
|
|
|
|
|
|
|
(15 |
) |
|
|
|
|
|
|
|
|
Net earnings (loss) applicable to common shares (2)(3) |
|
$ |
836 |
|
|
|
619 |
|
|
|
125 |
|
|
|
(1,501 |
) |
|
|
276 |
|
Net earnings (loss) per common share basic(1)(2)(3) |
|
$ |
4.41 |
|
|
|
3.30 |
|
|
|
0.68 |
|
|
|
(8.21 |
) |
|
|
1.52 |
|
Common shares outstanding (weighted average, in millions) |
|
|
189 |
|
|
|
188 |
|
|
|
185 |
|
|
|
183 |
|
|
|
182 |
|
Total assets (2)(3) |
|
$ |
12,010 |
|
|
|
10,716 |
|
|
|
9,058 |
|
|
|
8,596 |
|
|
|
9,630 |
|
Long-term debt(3) |
|
$ |
1,852 |
|
|
|
1,761 |
|
|
|
1,603 |
|
|
|
1,636 |
|
|
|
842 |
|
Convertible debt(3) |
|
$ |
362 |
|
|
|
418 |
|
|
|
418 |
|
|
|
148 |
|
|
|
148 |
|
Preferred shares |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
472 |
|
|
|
472 |
|
|
|
|
(1) |
|
Net earnings (loss) per common share is calculated by dividing net earnings (loss)
applicable to Common Shares by the weighted-average number of Common Shares issued and
outstanding for the relevant period. |
|
(2) |
|
Amounts reported in 2001 have not been restated for the change in depreciation and
depletion as discussed in Note 2(d) to the financial statements under Item 8 of this Report. |
|
(3) |
|
Prior year amounts have been restated for a change in accounting principles and a
restatement. Reference is made to Notes 2(a), 2(b) and 2 Restatements to the financial
statements under Item 8 of this Report. |
There are a number of differences between Canadian and United States GAAP. The
differences, insofar as they affect Incos consolidated financial statements, relate to accounting
for post-retirement benefits, currency translation gains (losses), research and development,
exploration, asset impairment, our convertible debt, derivative instruments, investments, income
and mining taxes and reporting of comprehensive income. A full discussion of these differences is
presented in the Notes to the financial statements under Item 8 of this Report and, in particular,
Note 24 to such financial statements.
91
The following table reconciles results as reported under Canadian GAAP with those that would
have been reported under United States GAAP:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year Ended December 31, |
|
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
2002 |
|
|
2001 |
|
|
|
|
|
|
|
(Restated) (1) |
|
|
(Restated)(1) |
|
|
(Restated)(1) |
|
|
(Restated)(1) |
|
|
|
($ in millions, except per share amounts) |
|
Net earnings (loss) Canadian GAAP |
|
$ |
836 |
|
|
$ |
619 |
|
|
$ |
146 |
|
|
$ |
(1,475 |
) |
|
$ |
302 |
|
Increased post-retirement benefits expense |
|
|
(64 |
) |
|
|
(53 |
) |
|
|
(45 |
) |
|
|
(24 |
) |
|
|
(24 |
) |
Currency translation gains (losses) |
|
|
(62 |
) |
|
|
(89 |
) |
|
|
(219 |
) |
|
|
(49 |
) |
|
|
123 |
|
Increased intangible assets amortization expense |
|
|
|
|
|
|
|
|
|
|
(2 |
) |
|
|
(2 |
) |
|
|
|
|
Increased research and development expense |
|
|
(47 |
) |
|
|
(17 |
) |
|
|
(5 |
) |
|
|
(6 |
) |
|
|
(8 |
) |
Decreased (increased) exploration expense |
|
|
(8 |
) |
|
|
1 |
|
|
|
(4 |
) |
|
|
(3 |
) |
|
|
(7 |
) |
Decreased (increased) asset impairment charges |
|
|
|
|
|
|
11 |
|
|
|
|
|
|
|
(961 |
) |
|
|
|
|
Increased interest expense |
|
|
(23 |
) |
|
|
(14 |
) |
|
|
(13 |
) |
|
|
(1 |
) |
|
|
(5 |
) |
Cash settlement of LYON Notes tendered for conversion |
|
|
(26 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Unrealized net gain (loss) on derivative instruments |
|
|
(17 |
) |
|
|
5 |
|
|
|
(1 |
) |
|
|
5 |
|
|
|
(4 |
) |
Increased income and mining tax expense |
|
|
|
|
|
|
|
|
|
|
(15 |
) |
|
|
|
|
|
|
|
|
Decreased (increased) minority interest |
|
|
9 |
|
|
|
(8 |
) |
|
|
1 |
|
|
|
2 |
|
|
|
2 |
|
Change in accounting policy |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
|
|
1 |
|
Taxes on United States GAAP differences |
|
|
30 |
|
|
|
22 |
|
|
|
28 |
|
|
|
139 |
|
|
|
15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) before cumulative effect of a
change in accounting principle United States GAAP |
|
|
628 |
|
|
|
477 |
|
|
|
(129 |
) |
|
|
(2,374 |
) |
|
|
395 |
|
Cumulative effect of a change in accounting principle |
|
|
|
|
|
|
|
|
|
|
(17 |
) |
|
|
(2 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) United States GAAP |
|
$ |
628 |
|
|
$ |
477 |
|
|
$ |
(146 |
) |
|
$ |
(2,376 |
) |
|
$ |
395 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) per share Basic
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) per share before cumulative
effect of a change in accounting principle |
|
$ |
3.32 |
|
|
$ |
2.54 |
|
|
$ |
(0.82 |
) |
|
$ |
(13.13 |
) |
|
$ |
2.03 |
|
Cumulative effect of a change in accounting principle |
|
|
|
|
|
|
|
|
|
|
(0.09 |
) |
|
|
(0.01 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) per share Basic |
|
$ |
3.32 |
|
|
$ |
2.54 |
|
|
$ |
(0.91 |
) |
|
$ |
(13.14 |
) |
|
$ |
2.03 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) per share Diluted
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) per share before cumulative
effect of a change in accounting principle |
|
$ |
2.87 |
|
|
$ |
2.30 |
|
|
$ |
(0.82 |
) |
|
$ |
(13.13 |
) |
|
$ |
1.99 |
|
Cumulative effect of a change in accounting principle |
|
|
|
|
|
|
|
|
|
|
(0.09 |
) |
|
|
(0.01 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) per share Diluted |
|
$ |
2.87 |
|
|
$ |
2.30 |
|
|
$ |
(0.91 |
) |
|
$ |
(13.14 |
) |
|
$ |
1.99 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) |
|
Reference is made to Notes 2 and 24 to the financial statements under Item 8 of this
Report. |
The selected financial data item Preferred shares would be reported in the same amounts
under Canadian and United States GAAP. Under United States GAAP, Total assets would be reported
as $10,249 million at December 31, 2005 (2004 $9,352 million; 2003 $7,959 million; 2002
$7,727 million; 2001 $9,755 million).
92
Item 7. Managements Discussion and Analysis of Financial Condition and Results of
Operations
Overview
The following Managements Discussion and Analysis of Financial Condition and Results of
Operations (MD&A) should be read in conjunction with our 2005 consolidated financial statements
and notes, which are expressed in U.S. dollars and prepared in accordance with generally accepted
accounting principles (GAAP) in Canada, which generally conform with those principles established
in the United States except as explained in note 24 to our 2005 consolidated financial statements.
This MD&A contains certain forward-looking statements based on our current expectations or
developments, anticipated benefits and other possible occurrences. These forward-looking
statements entail various risks and uncertainties, as discussed below, which could cause actual
results to differ materially from those reflected in these forward-looking statements. Reference
is also made to Cautionary Statement Regarding Forward-Looking Statements and Forward-Looking
Information and Material Assumptions above. Since we have not completed our pending acquisition
of all of the common shares of Falconbridge, this MD&A only includes information on the Company
alone and without taking into account the benefits of such acquisition unless otherwise expressly
indicated in this MD&A with respect to certain forward-looking statements relating to what we have
referred to as the new Inco to be created by the combination of Inco and Falconbridge. The
information in this MD&A is as of December 31, 2005 unless otherwise indicated.
Nature of our Business
As discussed above, we are a leading producer of nickel, a hard, malleable metal which,
given its properties and wide range of applications, can be found in thousands of products. The
largest end use for nickel is in the production of austenitic or nickel-bearing stainless steels.
This end use currently accounts for about two-thirds of demand for primary nickel. We define
primary nickel to be nickel produced from nickel-containing ores. The other principal source of
nickel, as discussed below, for nickel-bearing stainless steels and certain other industrial
applications is secondary nickel or nickel-containing recycled or scrap material. We are also an
important producer of copper, precious metals and cobalt and a major producer of value-added
specialty nickel products. Our principal mines and processing operations are located in the
Sudbury area of Ontario, the Thompson area of Manitoba, Voiseys Bay in Newfoundland and Labrador,
and, through a subsidiary in which we have an equity interest of approximately 61 per cent, PT
Inco, on the island of Sulawesi, Indonesia. We also operate wholly-owned metals refineries at Port
Colborne, Ontario and in the United Kingdom at Clydach, Wales and Acton, England. We also have
interests in nickel refining capacity in Japan, through ITL, in which we have an equity interest of
67 per cent; in Taiwan, through Taiwan Nickel, in which we have an equity interest of 49.9 per
cent; and in South Korea, through Korea Nickel, in which we have an equity interest of 25 per cent.
Additionally, we have a 65 per cent equity interest in Jinco, a company that produces nickel salts
in Kunshan City, China. We also have joint venture operations in China, through Dalian, in which
we have a total direct and indirect equity interest of 81.6 per cent, and Shenyang, in which we
have a total direct and indirect equity interest of 82 per cent. In March 2005, Shenyang acquired
substantially all of the assets which represented the nickel foam business of Shenyang Golden
Champower New Materials Corp., a leading Chinese producer of nickel foam. These two ventures in
China produce nickel foam products for the Asian battery market. We also have a shearing and
packaging operation in China for certain nickel products to meet the specific needs of this
geographic market.
Our business operations consist of two segments, our (i) finished products segment,
representing our mining and processing operations in Ontario, Manitoba and Newfoundland and
Labrador, our refining operations in the United Kingdom and interests in the refining operations in
Japan and other Asian countries referred to above, and (ii) intermediates segment, which represents
PT Incos mining and processing operations in Indonesia, where nickel-in-matte, an intermediate
product, is produced and sold primarily into the Japanese market. In the fourth quarter of 2005,
production of nickel and copper concentrates at the initial phase, representing an open-pit mine
and concentrator and related facilities, of our Voiseys Bay project, operated by our wholly-owned
subsidiary, Voiseys Bay Nickel Company Limited, started and, accordingly, the assets relating to
the initial phase of the Voiseys Bay project were reclassified from the development projects
segment to the finished products segment. Voiseys Bay produces nickel concentrates for processing
by our Ontario and Manitoba operations, as well as copper concentrates for sale to third parties.
As part of our strategy to be the worlds lowest cost and most profitable nickel producer, we are
currently developing our Goro project in New Caledonia in which we currently hold an approximate 71
per cent equity interest.
In recent years, sales of our primary metal products were concentrated in the United States,
Europe, Japan, elsewhere in Asia, and Canada, with about 60 per cent of our 2005 revenues from the
sale of a range of nickel products in Asia.
On October 11, 2005, we announced our friendly offer to purchase all of the outstanding common
shares of Falconbridge. Our offer is Cdn. $34.00 in cash or 0.6713 of an Inco common share plus
Cdn. $0.05 in cash for each Falconbridge common share.
93
Falconbridges common shareholders will have the right to elect to receive all cash or all
Inco common shares (plus Cdn. $0.05 per Falconbridge common share), subject to pro ration based
upon the maximum amount of cash and Inco common shares offered. Under the terms of our offer, the
maximum amount of cash to be paid by us will be approximately Cdn. $2.87 billion, and the maximum
number of Inco common shares to be issued by us will be approximately 201 million, taking into
account the conversion of Falconbridges outstanding convertible debt securities and outstanding
share options. Assuming full pro ration of these maximum amounts, this would mean Cdn. $7.50 in
cash and 0.524 of an Inco common share for each Falconbridge common share subject to the offer.
Our offer is conditional on at least 66 2/3 per cent of Falconbridge common shares being tendered
to our offer, receipt of all necessary regulatory clearances and certain other conditions.
Pursuant to our notice of extension dated February 27, 2006, the offer is open for acceptance by
Falconbridge common shareholders until June 30, 2006, subject to further extension, acceleration or
withdrawal. We currently expect to take up and pay for the Falconbridge common shares tendered
pursuant to the offer late in the second quarter or sometime in the third quarter of 2006.
Assuming that the pending transaction is completed as currently contemplated, we believe that it
would create the world leader in primary nickel production and sales and a leading copper producer,
with growth prospects in both metals, given the combined companys expected strong operations and
portfolio of growth projects. The combined company that would be created by this pending
transaction, which we have referred to as the new Inco, would be expected to generate substantial
positive cash flow from operations, assuming that the prices to be realized for the metals and
related products produced by the combined company remain at or near the levels realized in 2005,
and have the ability to pursue its growth strategy on a scale that neither company could have
contemplated individually. The new Inco would be a geographically diverse company, having a
presence in North and South America, Asia, the South Pacific and Europe. Combining the two
companies operations is expected to create significant operating and other synergies that are
uniquely available given the proximity of our respective operations in Ontario and elsewhere.
These synergies would come from efficiencies in overlapping operations in Ontario, better use of
mining and processing facilities in Canada, improving procurement practices and other opportunities
for increased efficiencies and cost savings.
Key Factors Affecting our Business
The price of nickel has represented, and is currently expected to continue to represent,
the principal determinant of our profitability and cash flow from operations. Accordingly, our
financial performance has been, and is expected to continue to be, closely linked to the price of
nickel and, to a lesser extent, the price of copper and other primary metals produced by us.
Historically, the demand for nickel has been closely correlated to industrial production in the
major industrialized geographic regions as well as in those regions which are emerging as
significant and industrialized areas, in particular North America, Europe and Asia, and we expect
this positive correlation to continue. During 2005 we experienced, and currently expect to
continue to experience at least in 2006, favourable demand and realized prices for the nickel
products we produce based upon the relationship that has recently existed, and is currently
expected to continue to exist at least for 2006, between global nickel supply and demand. While
global nickel demand remained relatively strong in 2005 and is expected to remain relatively strong
at least in 2006, global nickel supply has not increased significantly, creating an overall global
nickel market that was essentially in balance for 2005 but one that we expect will reflect that
overall supply may not keep pace with overall demand at least in 2006. While we currently believe
that this favourable relationship between global nickel supply and demand will continue beyond
2006, we are not in a position to predict that those conditions will continue given the wide range
of factors that could affect such conditions. In 2005, our average realized price for the nickel
products we sold was $14,842 per tonne ($6.73 per pound), compared with $13,906 per tonne ($6.31
per pound) for 2004. The LME cash price for nickel, the price that is generally viewed as the
benchmark price for nickel, averaged $14,733 per tonne ($6.68 per pound) in 2005, compared with
$13,852 per tonne ($6.28 per pound) in 2004. Given the historically high nickel prices that
prevailed for at least the first half of 2005, the nickel industry, as also happened in 2004, saw
in 2005 some substitution of non-nickel products in place of primary nickel as well as a
significant amount of substitution of non-nickel containing stainless steels in place of stainless
steels having some or higher grades of nickel.
Since we sell our nickel products in all major geographic markets, the realized prices for our
primary nickel and other metal products are influenced by both global and regional supply-demand
factors and by the availability and prices of secondary or metal-containing scrap material,
including nickel-containing scrap generated by the stainless steel industry and other substitute or
competing commodity products for the primary nickel and other metal products we produce. We
believe that the industrial-based strength of the Chinese, United States and Japanese economies,
coupled with continued slow economic recovery in some European countries, as well as the influence
of Metals Trading Funds, were important factors in the increase in nickel price levels on average
for 2005 and the volatility experienced in nickel prices during 2005. We currently expect these
factors will continue to affect nickel demand and nickel prices at least for 2006.
While the price and global demand for nickel are the most important determinants of our
profitability and cash flow from operations, our financial results are also affected by increases
in the costs we incur to produce nickel and our other metals. In 2003,
94
2004 and 2005, we experienced increases in our costs due to a number of factors, including
rising energy and pension and other post-retirement benefits expenses, the continued strengthening
of the Canadian dollar relative to the U.S. dollar and the effect this has had on our operating
costs incurred in Canadian dollars and higher costs for purchased nickel intermediates for our
Canadian operations in advance of the availability of nickel concentrates on a significant ongoing
basis from our Voiseys Bay operations. While we have continued to implement programs designed to
manage our costs, our ability to continue to do so successfully will influence our profitability
and cash flow from operations.
The initial phase or phase one of our Voiseys Bay project, which includes an open pit mine,
concentrator and related facilities and certain research and development and other programs, began,
as noted above, commercial production in the fourth quarter of 2005. The first shipment of nickel
concentrate from Voiseys Bay took place on November 16, 2005, well ahead of the original schedule
for this project. Our Ontario operations received feed from our Voiseys Bay operations in
December 2005 and began processing this material. During 2005 we completed the rationalization of
our cobalt production facilities at our Manitoba operations as well as the installation of the
facilities required to receive Voiseys Bay nickel concentrates. Our Manitoba operations received
an initial shipment of nickel concentrates from Voiseys Bay in late December 2005. In 2005, we
spent $353 million, including capitalized interest, on our Voiseys Bay project and we currently
expect to spend approximately $55 million on this project in 2006.
In 2005, we moved forward with the construction of our Goro development project as well as
other capital investment initiatives. We spent $344 million, including capitalized interest, on
our Goro project in 2005 and we currently plan to spend $1,140 million on this project in 2006 and
estimate that we will have to fund approximately $670 million of this total after taking into
account funding received or to be received from government assistance programs and partner
contributions. In 2004, we announced plans to construct a third dam at a cost of approximately
$150 million, the first stage of a four-year capital program currently estimated to total about
$280 million, aimed at raising PT Incos annual production by 33 per cent from its current
nameplate capacity of about 150 million pounds to about 200 million pounds of nickel-in-matte by
2009. PT Inco spent $58 million on this program in 2005 and is expected to spend an additional $60
million in 2006. Our development projects continue to be very important to our future given that
(1) the Voiseys Bay project currently represents a key source of intermediate nickel products for
our Manitoba and Ontario operations, in particular our Manitoba operations given the decline in
mine production which has been experienced over the past few years at this operation, and (2) these
projects will be needed if we are to remain a leading nickel producer in an expected growing nickel
market.
We currently plan to rely in part on, and accordingly, need to generate, very substantial cash
flows from operations to meet sustaining capital expenditure requirements for our existing
operations and the planned capital expenditures for our development projects. Our planned capital
expenditures in respect of our current operations and development projects are expected to total
approximately $1,820 million in 2006. Taking into account capital contributions expected to be
made in 2006 by other shareholders in our Goro project, certain previously announced government
assistance relating to our growth projects and other financing arrangements that are already in
place for these projects, we currently project that of this $1,820 million total estimate, we have
funded or will be required to fund about $1,340 million.
The following table shows our average realized price for nickel, the average LME cash nickel
price and our cash flow from operations (which we refer to as our net cash provided by (or used
for) operating activities) for each of the past ten years to show the relative correlation between
nickel prices and our financial results:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inco Average Realized |
|
Average LME Cash |
|
Cash Flow from |
|
|
Price for Nickel1 |
|
Nickel Price |
|
Operations |
Year |
|
($ per tonne) |
|
($ per tonne) |
|
($ in millions) |
|
1996 |
|
|
7,959 |
|
|
|
7,500 |
|
|
|
378 |
|
1997 |
|
|
7,407 |
|
|
|
6,916 |
|
|
|
243 |
2 |
1998 |
|
|
5,291 |
|
|
|
4,617 |
|
|
|
174 |
|
1999 |
|
|
6,415 |
|
|
|
6,027 |
|
|
|
128 |
2 |
2000 |
|
|
9,007 |
|
|
|
8,641 |
|
|
|
842 |
|
2001 |
|
|
6,468 |
|
|
|
5,948 |
|
|
|
360 |
|
2002 |
|
|
7,143 |
|
|
|
6,772 |
|
|
|
599 |
|
2003 |
|
|
9,860 |
|
|
|
9,640 |
|
|
|
131 |
2 |
2004 |
|
|
13,906 |
|
|
|
13,852 |
|
|
|
1,393 |
|
2005 |
|
|
14,842 |
|
|
|
14,733 |
|
|
|
739 |
|
|
|
|
(1) |
|
Includes intermediates. |
|
(2) |
|
Cash flow from operations for 1997 reflects a one-month strike at the Ontario operations.
Cash flow from operations for 1999 and 2003 reflect three-months strikes at our Manitoba
and Ontario operations, respectively. |
95
The nickel industry is very competitive in all of its key parts, including the
exploration for, and the development of, new sources of supply, the acquisition of mineral
deposits, and the processing, distribution and marketing of nickel products. The level of
production and export of primary nickel from Russia as well as the supply of secondary or
nickel-containing scrap material, together with the continuing relatively limited level of domestic
consumption of nickel in Russia, has had, and could continue to have, a significant affect on the
nickel industrys supply-demand balance. While we produce primary nickel, the other principal
source or type of nickel used in stainless steel and certain other industrial applications, as
noted above, is secondary nickel, which is also referred to as recycled or scrap nickel. Secondary
nickel is recovered largely from austenitic stainless steel manufacturing and fabricating
operations and nickel-containing scrap from obsolete facilities and equipment. In the recent past,
secondary nickel has represented (1) between 44 and 49 per cent of the total nickel used in the
production of nickel-bearing or austenitic stainless steels, with primary nickel accounting for
between 51 and 56 per cent of such nickel use and (2) between 34 and 36 per cent of total nickel
used in all applications. These percentages can vary based upon relative prices, the availability
of scrap, technical ability of users to switch between primary and secondary nickel sources, and
other factors. To the extent that the supply of such secondary nickel increases, such an
occurrence could also adversely affect nickel prices and our results of operations, financial
condition and cash flows.
2005 Nickel Market Highlights
The year 2005 was a year of two very distinct periods. The first half of the year
reflected relatively strong demand for nickel, relatively tight supplies of nickel, nickel buying
activity from Metals Trading Funds, falling LME nickel inventories and relatively strong nickel
prices. However, by the start of the third quarter a significant negative shift began in the
supply-demand fundamentals of the nickel market, as demand weakened, Metals Trading Funds sold the
nickel positions they had acquired, LME inventories increased and prices fell. The significant
deterioration in market conditions was, we believe, the result of a large reduction in global
stainless steel production in the second half of the year, as discussed below. For 2005 as a
whole, nickel demand grew by less than one per cent from 2004 levels. The non-stainless steel uses
for nickel, in particular for high nickel alloys, plating and battery materials, were the only end
uses for primary nickel to experience demand growth in 2005. Primary nickel demand in stainless
steel applications experienced a sharp contraction in 2005, with global stainless steel production
falling by one per cent in 2005 from 2004 levels, and primary nickel demand for this application
declining by about six per cent. Demand was also negatively affected in this key application by
substitution for nickel in certain stainless steel applications and a higher relative usage of
secondary, or scrap, nickel.
The relatively low inventories of nickel, high prices and the active trading of Metals Trading
Funds, factors which were also prevalent and, accordingly, affected the nickel markets in 2004,
contributed to the continued volatile price conditions in 2005. The difference between the high
and low daily LME cash nickel prices for 2005 was $6,250 per tonne ($2.83 per pound). We estimate
that the global nickel market had a slight surplus for 2005 as the level of demand was more than
covered by the level of supply. However, we believe that the level of demand was restrained by the
relatively high nickel prices in at least the first half of 2005, and that demand would have been
significantly stronger had prices been closer to historic averages.
The modest growth in primary nickel demand in 2005 was, as noted above, due to the strength in
non-stainless steel uses for nickel, as demand from the stainless steel sector, the largest end use
of primary nickel, was adversely affected by several factors as discussed below. Nickel demand
growth for non-stainless steel uses increased by eight per cent in 2005, as demand for nickel for
the production of high nickel alloys improved as a result of the continued strength in demand for
high nickel alloys used in the aerospace industry and for land-based gas turbines, as well as
growth in the oil and gas, liquid natural gas and battery applications for nickel. Nickel demand
from battery applications improved in 2005, in part due to the increased production of hybrid
electric vehicles that contain nickel in their battery systems.
World production of stainless steel increased by approximately seven per cent during the first
half of 2005, consistent with the relatively strong growth rates seen in this production for 2003
and 2004. This growth was due, in part, to increased capacity utilization at several large-scale
stainless steel manufacturing facilities, as well as new production capacity coming on stream,
especially in China. The strong stainless steel production growth in the first half of 2005,
combined with strength in the non-stainless steel market, led to nickel demand growth of
approximately six per cent in the first half of the year. However, end-use consumption of
stainless steel did not keep pace with stainless steel production and global inventories increased
during the first half of the year. The increase in global stainless steel inventories was a sign
of an oversupplied market that, in turn, triggered sharply falling stainless steel prices beginning
in July 2005. At the beginning of the third quarter of 2005, almost all major stainless steel
producers had begun to reduce production levels in an effort to reduce the relatively high global
inventory levels of stainless steel and, through such supply reductions, correct this oversupply
situation. Most of these production cuts were maintained through the end of 2005. We estimate
that stainless steel production curtailments in the second half of the year led to an overall
production decline in the second half of 2005
96
of nine per cent as compared with the second half of 2004. This sharp reduction in stainless
steel production, in turn, led to a significant reduction in demand for primary nickel used in
stainless steel. The global stainless steel market used relatively high amounts of secondary or
scrap nickel in 2005 as compared with prior years, as well as increasing the production of
stainless steels containing relatively low amounts or grades of nickel (one to four per cent) and
grades containing no nickel compared with stainless steels with higher nickel grades (eight to ten
per cent nickel).
The growth in the world supply of primary nickel in 2005 was adversely affected by several
unexpected disruptions. While domestic production by certain producers did increase in certain
countries, including China, New Caledonia and Norway, these increases were largely offset by
reductions in output or lower than planned increases by producers in other countries. Overall
production of primary nickel increased by approximately 2.4 per cent in 2005, about half of the
long-term average production growth rate of four per cent. Several producers experienced
production problems as labour disruptions or shortages, feed material shortages, inclement weather,
technological challenges and extended maintenance shutdowns curtailed output below originally
announced planned levels for 2005. Approximately two thirds of global nickel production growth was
the result of a ramp-up in Chinese nickel production, in an effort to reduce that countrys nickel
import requirements. World primary nickel supply increased by 30,000 tonnes to 1,285,000 tonnes in
2005. We believe that no stockpiles of nickel were released into the market in 2005 or 2004, in
contrast to what occurred in 2003.
The slower than average growth in nickel demand for 2005, coupled with a relatively modest
amount of growth in nickel supply for the year, created a surplus that we estimate to have been
approximately 15,000 tonnes. However, as discussed above, we believe that the supply-demand
relationship was in a deficit in the first half of the year and moved to a surplus in the second
half of the year. Inventories of nickel on the LME, a physical market (i) where various metals,
including nickel, can be bought or sold for prompt or future delivery and (ii) representing the
principal terminal market for primary nickel in the world, decreased during the first half of 2005
to a low of 4,926 tonnes. However, the decline in demand in the second half of the year led to a
steady increase in LME inventories during this period to a level of 36,042 tonnes at December 31,
2005. LME nickel inventories have decreased in the first 10 weeks of 2006, with such
inventories totalling 34,266 tonnes as of March 13, 2006.
The two distinct periods of nickel demand and supply dynamics for 2005 as noted above were
reflected in the LME cash nickel price movements. The LME cash nickel price opened the year at
$14,035 per tonne ($6.37 per pound) and moved on a steady upward path during the first quarter, as
strong demand for nickel in China and a sharp reduction in LME inventories during the first quarter
to below 8,000 tonnes led to what we believed were tight market conditions. Nickel prices
experienced an overall increase during the first quarter of 2005, with the LME cash price
increasing to $16,250 per tonne ($7.37 per pound) at the end of the quarter. The LME cash price
was $16,140 per tonne ($7.32 per pound) at the beginning of the second quarter, and LME inventories
declined by 3,372 tonnes during that quarter. Continued strong demand in China and elsewhere as
well as limited new nickel supply led to continued price strength through the middle of May. The
LME cash nickel price reached the year high on May 12, 2005 of $17,750 per tonne ($8.05 per pound).
From that point, we believe that market sentiment weakened as the scale of large stainless steel
inventories became apparent and stainless steel production cuts began. LME stocks began to
increase and we believe Metals Trading Funds started to liquidate the positions in nickel they had
accumulated in the second quarter of 2005. The LME cash nickel price decreased during the balance
of the second quarter and ended the second quarter of 2005 at $14,700 per tonne ($6.67 per pound).
In the third quarter, the stainless steel production cuts began to have a negative effect on demand
for primary nickel, resulting in a surplus of nickel. Some of this nickel was delivered to the LME
as evidenced by a 11,310 tonne increase in LME stocks during this period. LME cash nickel prices
increased modestly through the middle of September, as we believe Metals Trading Funds built
speculative positions in advance of the expiration of our Manitoba operations collective agreement
in anticipation of a possible labour disruption together with the expectation that the stainless
steel industry was at or close to the end of its production curtailments. Having reached a new
collective agreement covering the unionized hourly rated workforce at our Manitoba operations
without a labour disruption in mid-September 2005, coupled with announcements of continued
stainless steel production cuts and steadily increasing LME stocks to a quarter-end level of 13,488
tonnes, the nickel price fell for the remainder of September and ended the quarter at $13,600 per
tonne ($6.17 per pound). Nickel prices continued to decline during the early part of the fourth
quarter of 2005, reaching a low for the year of $11,500 per tonne ($5.22 per pound) on November 1,
2005. However, the nickel price increased through the remainder of the quarter due to, we believe,
the expectation of improved stainless steel market conditions and increased nickel demand in the
first quarter of 2006 and averaged $13,429 per tonne ($6.09 per pound) for December 2005. LME
stocks increased steadily throughout the fourth quarter and ended the year at 36,042 tonnes. The
LME cash nickel price ended the year at $13,380 per tonne ($6.07 per pound) compared with $15,205
per tonne ($6.90 per pound) at the end of 2004. The LME cash nickel price averaged $14,733 per
tonne ($6.68 per pound) for 2005, higher than the 2004 average of $13,852 per tonne ($6.28 per
pound) and the highest average annual benchmark nickel price ever based upon available data. The
LME cash nickel price during the January 3 March 13, 2006
period averaged $14,775 per tonne ($6.70 per
pound) and was $14,780 per tonne ($6.70 per pound) on March 13, 2006. This increase in prices early in
97
2006 has been, we believe, related to the expectation of improved demand for nickel from the
stainless steel sector, as well as increased purchases of nickel by Metals Trading Funds.
The following table summarizes certain world primary nickel market and LME statistics for the
years indicated (either in tonnes or in dollars per tonne in the case of LME cash nickel prices):
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year-End Combined |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Western |
|
|
|
|
|
Average |
|
|
|
|
|
|
|
|
|
|
World2 |
|
|
|
|
|
Annual |
|
|
World Primary Nickel |
|
World Primary Nickel |
|
Producers and LME |
|
Year-End LME |
|
LME |
Year |
|
Demand |
|
Supply |
|
Inventories |
|
Inventories |
|
Cash Nickel Prices |
|
2001 |
|
|
1,085,000 |
|
|
|
1,148,000 |
|
|
|
106,000 |
|
|
|
19,188 |
|
|
$ |
5,948 |
|
2002 |
|
|
1,168,000 |
|
|
|
1,176,000 |
|
|
|
100,000 |
|
|
|
21,972 |
|
|
|
6,772 |
|
2003 |
|
|
1,244,000 |
|
|
|
1,264,000 |
|
|
|
104,000 |
|
|
|
24,072 |
|
|
|
9,640 |
|
2004 |
|
|
1,262,000 |
|
|
|
1,255,000 |
|
|
|
111,000 |
|
|
|
20,898 |
|
|
|
13,852 |
|
2005 |
|
|
1,270,000 |
1 |
|
|
1,285,000 |
1 |
|
|
127,000 |
1 |
|
|
36,042 |
|
|
|
14,733 |
|
|
|
|
(1) |
|
Preliminary estimates. |
|
(2) |
|
Excludes Russia, other members of the former Commonwealth of Independent States, China,
Cuba and Eastern Europe. |
2004 Nickel Market Highlights
The year 2004 was one characterized by high nickel prices, which we believe were due
principally to broad-based growth in global demand for nickel. The increase in demand was
attributed to a recovery in non-stainless steel applications for nickel. Primary nickel demand in
stainless steel applications experienced virtually no growth in 2004, despite strong global
stainless steel production growth, due to a large increase in nickel-containing scrap consumption
and substitution for nickel in certain stainless steel applications. The increase in nickel demand
was driven by the strongest global industrial production growth in 10 years, led by continued
economic growth in China, as well as economic growth in South Korea, Taiwan and Japan. The
economies of the United States and Europe also exhibited growth above the levels seen in the recent
2000 2003 period. The global nickel market was in deficit for 2004 as the level of demand
exceeded the level of supply. We believe that relatively low physical inventories, high prices and
the active trading in nickel by Metals Trading Funds contributed to volatile price conditions in
2004.
The growth in primary nickel demand in 2004 was concentrated in the non-stainless steel
sector, which increased by seven per cent, as demand for nickel for the production of high nickel
alloys improved as the recovery of the aerospace industry continued. World production of stainless
steel increased by eight per cent to approximately 24.6 million tonnes. Stainless steel production
expanded in all major industrialized geographic regions and was particularly strong in South Korea
where new production facilities operated at capacity during the year. However, primary nickel
demand growth in the stainless steel sector was adversely affected by a large increase in stainless
steel scrap consumption, as well as an increase in the production of stainless steels containing
relatively low amounts or grades of nickel (one to four per cent of nickel) and grades containing
no nickel compared with higher nickel containing stainless steel grades (eight to ten per cent).
World supply of primary nickel in 2004 was lower than world nickel supply in 2003, although
production of primary nickel increased by four per cent in 2004, due to the relatively large
stockpile releases in 2003. World primary nickel production in 2004 totalled 1,255,000 tonnes, an
increase of 51,000 tonnes, of which approximately 50 per cent was the result of our recovery from
our strike-impacted levels experienced in 2003. However, world primary nickel supply of 1,255,000
tonnes decreased from 1,264,000 tonnes in 2003, taking into account the release into the market in
2003 of 60,000 tonnes initially pledged by one producer as collateral for a loan.
The growth in nickel demand during 2004, coupled with the overall decline in supply for 2004,
created a deficit between supply and demand of approximately 6,000 tonnes. Inventories of nickel
on the LME decreased during 2004 by 3,174 tonnes to a relatively low level of 20,898 tonnes at
December 31, 2004.
While 2004 represented a very strong year for the global nickel market given the demand-supply
fundamentals described above, there was also, as noted above, a very significant amount of
volatility in nickel prices. The LME cash nickel price opened the year at $16,690 per tonne ($7.57
per pound). On January 6, 2004 the LME cash nickel price reached its highest level since March 9,
1989, $17,770 per tonne ($8.06 per pound). The LME cash price then drifted lower in the first
quarter and was $14,220 per tonne ($6.45 per pound) at the beginning of the second quarter.
Continued concern over a possible economic slowdown in China led to ongoing price
98
volatility and overall declining LME cash nickel prices to the middle of May. From that
point, LME stock withdrawals and positive demand growth contributed to the LME cash nickel price
increasing. In the third quarter, trading activity by Metals Trading Funds in nickel was limited
during the traditionally quiet summer months and with a 6,534 tonne increase in LME stocks during
this period, nickel prices declined to $12,050 per tonne ($5.47 per pound) by September 9, 2004.
Prices increased in late September, despite a rise in LME inventories, and ended the quarter at
$15,100 per tonne ($6.85 per pound). LME stocks increased steadily throughout the fourth quarter
and ended the year at 20,898 tonnes. The LME cash price ended the year at $15,205 per tonne ($6.90
per pound) compared with $16,650 per tonne ($7.55 per pound) at the end of 2003. The LME cash
nickel price averaged $13,852 per tonne ($6.28 per pound) for 2004.
Results of Operations
2005 Compared with 2004
Earnings Summary
Net earnings for 2005 were $836 million, or $4.41 per share ($3.75 per share on a diluted
basis), compared with net earnings of $619 million, or $3.30 per share ($2.95 per share on a
diluted basis) in 2004. Results for 2005 relative to 2004 primarily reflect higher realized
selling prices for substantially all metals, significantly lower asset impairment charges and a
gain on the sale of a non-core investment. These favourable factors were partially offset by
higher production costs for nickel and copper and lower deliveries of nickel, copper and certain
PGMs and estimated pre-tax remediation costs of $20 million involving a property we retained from a
disposed business unrelated to our current operations.
The following bar chart sets forth the dollar impact (in millions of dollars) of the principal
factors, both favourable and unfavourable (the dollar amounts of unfavourable factors are shown in
parentheses), affecting our 2005 net earnings compared with 2004, with the starting point (first
bar on the left) being the level of net earnings for 2004:
Principal Factors Affecting 2005 Net Earnings in Comparison
with 2004
(in millions of dollars)
Nickel Production
Nickel production decreased to 220,727 tonnes (487 million pounds) in 2005 compared with
236,817 tonnes (522 million pounds) in 2004. The decrease in nickel production was primarily due
to a longer than planned major maintenance shutdown at our Ontario operations and a slower ramp-up
after that shutdown caused, in turn, by a number of factors. These factors included labour
productivity problems involving one contractor on the work undertaken during the shutdown, an
increase in the scope of certain work undertaken as a result of the shutdown, the need to repair
unanticipated leaks relating to the expansion of the acid plant at these
99
operations and a fire in one of the dust capture bag houses. In addition, we had a longer
than usual major maintenance shutdown at our Manitoba operations during the third quarter which was
necessary to prepare those operations for the arrival of Voiseys Bay nickel concentrates late in
the fourth quarter of 2005 and the processing of the additional cobalt contained in such
concentrates and to have the ability to operate with a single furnace. Finished nickel production
from PT Inco nickel-in-matte was comparable to 2004. Historically, we have believed that the
minimum finished nickel inventories we generally need to run our business and meet customers
requirements should be about 26,000 tonnes, depending upon the required product mix and other
factors. We expect to continue to evaluate the factors to be considered in determining what this
minimum inventory level should be. Our finished nickel inventories were 23,444 tonnes at December
31, 2005 compared with 27,334 tonnes at the end of 2004.
Copper Production
Finished copper production, including anode production for processing as discussed below
under an agreement we entered into with Falconbridge, increased by one per cent to 125,595 tonnes
(277 million pounds) in 2005 compared with 124,456 tonnes (274 million pounds) in 2004. In
addition, production of copper in concentrates from our Voiseys Bay operations was 4,406 tonnes
(10 million pounds) in 2005. In May 2005, we announced the closure of our copper refinery in
Sudbury based upon a number of factors, including that facilitys size and cost structure relative
to the leading copper refineries in the world. In connection with our decision to close this
facility, we recorded a charge of $25 million in the second quarter of 2005. The copper refinery
was closed as planned in December 2005. We entered into a ten-year agreement in mid-2005 with
Falconbridge under which we agreed to sell all our copper production from our Ontario operations in
anode form to this company.
Commencement of Voiseys Bay Operations
On December 1, 2005, the open pit mine and 6,000 tonnes-per-day concentrator at Voiseys
Bay began commercial production. For the year 2005, 10,450 tonnes (23 million pounds) of nickel in
concentrates and 4,406 tonnes (10 million pounds) of copper in concentrate were produced at
Voiseys Bay and two shipments of concentrates were made in 2005, with the nickel concentrates
being sent to our Ontario and Manitoba operations. The first copper in concentrates was sold in
January 2006. We produced initial quantities of finished nickel from the Voiseys Bay nickel
concentrates in January 2006.
Net Sales
The following table sets forth deliveries and net sales of our principal metal products
for the years indicated:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Deliveries |
|
|
|
|
|
Deliveries |
|
|
|
|
|
Deliveries |
|
|
|
|
(tonnes |
|
Net Sales |
|
(tonnes except as |
|
Net Sales |
|
(tonnes except as |
|
Net Sales |
|
|
except as indicated) |
|
(in $ millions) |
|
indicated) |
|
(in $ millions) |
|
indicated) |
|
(in $ millions) |
|
|
2005 |
|
2005 |
|
2004 |
|
2004 |
|
2003 |
|
2003 |
|
Primary nickel,
Including intermediates
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inco-source |
|
|
223,811 |
|
|
|
|
|
|
|
235,185 |
|
|
|
|
|
|
|
184,110 |
|
|
|
|
|
Purchased |
|
|
22,471 |
|
|
|
|
|
|
|
16,697 |
|
|
|
|
|
|
|
29,780 |
|
|
|
|
|
|
|
|
|
246,282 |
|
|
$ |
3,655 |
|
|
|
251,882 |
|
|
$ |
3,503 |
|
|
|
213,890 |
|
|
$ |
2,109 |
|
|
Copper |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Finished |
|
|
120,543 |
|
|
|
|
|
|
|
124,884 |
|
|
|
|
|
|
|
92,202 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Purchased |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1,133 |
|
|
|
|
|
|
|
|
|
120,543 |
|
|
|
463 |
|
|
|
124,884 |
|
|
|
364 |
|
|
|
93,335 |
|
|
|
171 |
|
|
Cobalt |
|
|
1,694 |
|
|
|
57 |
|
|
|
1,542 |
|
|
|
72 |
|
|
|
903 |
|
|
|
17 |
|
Precious metals (in
thousands of troy
ounces) 1 |
|
|
1,920 |
|
|
|
267 |
|
|
|
2,490 |
|
|
|
246 |
|
|
|
1,694 |
|
|
|
114 |
|
Other |
|
|
|
|
|
|
76 |
|
|
|
|
|
|
|
93 |
|
|
|
|
|
|
|
63 |
|
|
Net Sales to customers |
|
|
|
|
|
$ |
4,518 |
|
|
|
|
|
|
$ |
4,278 |
|
|
|
|
|
|
$ |
2,474 |
|
|
|
|
|
(1) |
|
Excludes toll-refined materials. |
100
Realized Prices
The following table sets forth our average annual realized prices for the years indicated
for the metal products we produce and sell:
|
|
|
|
|
|
|
|
|
|
|
|
|
($ per tonne/per pound) |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Primary nickel, including
intermediates |
|
$ |
14,842/6.73 |
|
|
$ |
13,906/6.31 |
|
|
$ |
9,860/4.47 |
|
Copper |
|
|
3,839/1.74 |
|
|
|
2,916/1.32 |
|
|
|
1,832/0.83 |
|
Cobalt |
|
|
32,828/14.89 |
|
|
|
46,442/21.07 |
|
|
|
18,846/8.55 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
($ per troy ounce) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Platinum |
|
$ |
841.27 |
|
|
$ |
762.73 |
|
|
$ |
588.96 |
|
Palladium |
|
|
209.46 |
|
|
|
225.56 |
|
|
|
297.36 |
|
Rhodium |
|
|
2,055.55 |
|
|
|
1,166.85 |
|
|
|
530.66 |
|
Gold |
|
|
423.21 |
|
|
|
398.68 |
|
|
|
367.72 |
|
Silver |
|
|
7.06 |
|
|
|
6.73 |
|
|
|
4.86 |
|
Net sales increased in 2005 due to higher selling prices for nickel, copper and certain PGMs
partially offset by lower deliveries of nickel, copper and certain PGMs and lower average realized
selling prices for cobalt.
Our nickel deliveries in 2005 represented an estimated 19 per cent share of the world market
for primary nickel, compared with 20 per cent in 2004.
Our price realizations for nickel have tended to lag LME cash price changes. The premiums we
realize over the prevailing LME cash price for our specialty or value-added and other nickel
products are normally affected by (i) fluctuations in the LME cash nickel price, (ii) the effect
these fluctuations have on the price we receive for the nickel-in-matte product produced by PT
Inco, (iii) the lag effect that changes in the LME benchmark cash price have on the pricing of
certain of our nickel products, (iv) how certain of our nickel products are priced and (v) the mix
of our primary nickel products sold in the year. For 2005, the average realized price for our
primary nickel products, including intermediates, was $14,842 per tonne ($6.73 per pound), compared
with the LME cash nickel price which averaged $14,733 per tonne ($6.68 per pound). For 2004, the
average realized price for our primary nickel products, including intermediates, was $13,906 per
tonne ($6.31 per pound), compared with the LME cash nickel price which averaged $13,852 per tonne
($6.28 per pound).
The price realizations for our nickel and other metal products generally reflect LME or other
metal market prices and, over the longer term, depend principally upon the balance between demand
for our primary nickel products in the marketplace relative to supply available from us and our
competitors, including for this purpose, supply of secondary or scrap materials containing metals
in usable or recyclable form and supplies of other materials which do or may compete as substitutes
for nickel and our other metal products. As noted above, the availability of nickel-containing
stainless steel scrap, which competes directly with primary nickel as a source of nickel for use in
the production of stainless steel, is particularly important to stainless steel primary nickel
demand. The stainless steel scrap ratio was 49 per cent in 2005 compared with 47 per cent in 2004.
In 2005, our copper sales increased by 27 per cent from the previous year due to higher
average realized selling prices, partially offset by lower deliveries. Sales of precious metals
increased by nine per cent in 2005 due to higher realized selling prices for certain PGMs,
partially offset by lower deliveries of certain PGMs.
101
Costs and Expenses/Other Income
The following table sets forth certain of our costs, principal expenses, other income,
income and mining taxes and minority interest for the years indicated:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
($ millions) |
|
|
|
|
|
(Restated)1 |
|
|
(Restated)1 |
|
|
Cost of sales and other expenses |
|
$ |
2,633 |
|
|
$ |
2,348 |
|
|
$ |
1,735 |
|
Depreciation and depletion |
|
|
256 |
|
|
|
248 |
|
|
|
227 |
|
Selling, general and administrative |
|
|
207 |
|
|
|
192 |
|
|
|
169 |
|
Research and development |
|
|
35 |
|
|
|
29 |
|
|
|
27 |
|
Exploration |
|
|
43 |
|
|
|
32 |
|
|
|
27 |
|
Currency translation adjustments |
|
|
59 |
|
|
|
85 |
|
|
|
177 |
|
Interest expense |
|
|
26 |
|
|
|
36 |
|
|
|
56 |
|
Asset impairment charges |
|
|
25 |
|
|
|
201 |
|
|
|
|
|
Other income, net |
|
|
(83 |
) |
|
|
(49 |
) |
|
|
(108 |
) |
Income and mining taxes |
|
|
408 |
|
|
|
432 |
|
|
|
(27 |
) |
Minority interest |
|
|
73 |
|
|
|
105 |
|
|
|
45 |
|
|
|
|
|
(1) |
|
Reference is made to note 2 to our 2005 consolidated financial statements. |
Cost of Sales and Other Expenses
Cost of sales and other expenses increased by 12 per cent in 2005, reflecting the
adverse impact of a strengthening of the Canadian dollar relative to the U.S. dollar on our costs
incurred in Canadian dollars, higher energy costs as a result of higher prices for and quantities
of heavy fuel oil and diesel used at PT Inco, purchased electricity and natural gas used at our
Ontario operations, higher spending on services and supplies and increased costs for and volume of
purchased finished nickel. The cost of the nickel intermediates we purchase is based upon LME and
other benchmark prices and is included in cost of sales and these costs increase as the benchmark
prices increase as they did in the first half of 2005.
Selling, General and Administrative
Selling, general and administrative expenses increased by $15 million in 2005 compared
with 2004. The increase was primarily due to higher capital taxes and higher expenses associated
with share options granted in prior years, including share appreciation rights granted in
association with such options, based upon the price of our common shares.
Currency Translation Adjustments
Currency translation adjustments represented primarily the effect of exchange rate
movements on the translation of our Canadian dollar-denominated liabilities, post-retirement
benefits, accounts payable and certain deferred income and mining taxes into U.S. dollars.
Unfavourable currency translation adjustments were primarily due to the strengthening of the
Canadian dollar as at December 31, 2005 relative to the U.S. dollar. The Canadian dollar U.S.
dollar exchange rate was 0.858 at the end of 2005 compared with 0.831 at the end of 2004,
representing approximately a three per cent appreciation in the Canadian dollar relative to the
U.S. dollar on a year-to-year basis.
Interest Expense
Interest expense for 2005 was lower than 2004 by $10 million. Interest expense excluded
capitalized interest of $103 million in 2005 and $70 million in 2004. We expect that our total
interest costs (expensed and capitalized) will increase to approximately $135 million in 2006, with
approximately $55 million of that amount expected to be expensed and $80 million expected to be
capitalized as part of our Goro project. The expected increase in interest expense for 2006 is
primarily related to lower capitalized interest in respect of our Voiseys Bay project as of
December 1, 2005 when the project achieved commercial production.
Asset Impairment Charges
As noted above, we entered into a ten-year agreement in late June 2005 with Falconbridge
under which we agreed to sell all of our copper production from our Ontario operations in anode
form to this company beginning in 2006. As a result of this decision, we recorded a $25 million
impairment charge before taxes in the second quarter of 2005 related to the closure, which occurred
in December 2005, of our copper refining facility in Sudbury, Ontario.
Other Income, Net
Other income included a gain of $88 million in respect of the sale in the fourth quarter
of 2005 of a non-core investment in a junior mining company.
Income and Mining Taxes
Our effective tax rate for 2005 of 31 per cent was lower than the combined statutory
income and mining tax rate in Canada of about 39 per cent due principally to the non-taxable nature
of the gain referred to above on the sale of a non-core investment, the
102
benefit of profits earned in jurisdictions having lower tax rates and the net tax benefits relating to certain tax rulings,
interpretations or determinations relating to prior years partially offset by the net tax costs
relating to currency translation adjustments.
Minority Interest
Our minority interest represents primarily the respective minority shareholders
interests in the earnings of PT Inco, ITL, Jinco and Goro Nickel. For 2005, minority interest
included a favourable adjustment of $25 million, reflecting the recovery of losses previously taken
by Inco due to insufficient minority interest balances existing in 2004 to absorb the share by the
minority interest of the impairment charge associated with the Goro project recorded in the second
quarter of 2004. Excluding the impact of the $25 million favourable adjustment, minority interest
decreased in 2005 compared with 2004 primarily due to the lower earnings at PT Inco. Although PT
Inco experienced higher average realized prices for and higher deliveries of its nickel-in-matte
product in 2005, these benefits were partially offset by higher energy and supplies costs and the
write-downs of certain capital assets, resulting in an overall decline in net earnings compared
with 2004.
Nickel Unit Cash Cost of Sales
The following table sets forth nickel unit cash costs of sales before and after
by-product credits for the periods indicated:
|
|
|
|
|
|
|
|
|
|
|
2005 |
|
|
2004 |
|
|
Nickel unit cash cost of sales before by-product credits |
|
|
|
|
|
|
|
|
per tonne |
|
$ |
6,702 |
|
|
$ |
5,732 |
|
per pound |
|
|
3.04 |
|
|
|
2.60 |
|
Nickel unit cash cost of sales after by-product credits |
|
|
|
|
|
|
|
|
per tonne |
|
$ |
5,842 |
|
|
$ |
5,115 |
|
per pound |
|
|
2.65 |
|
|
|
2.32 |
|
|
Since this cost measure captures our key costs of production and the impact of prices for our
by-products, nickel unit cash cost of sales after by-product credits represents a key performance
measurement that management uses to manage our costs and operations. The following bar chart shows
the principal factors (on a per pound basis), both favourable and unfavourable (favourable factors
are shown in parentheses), affecting our 2005 nickel unit cash cost of sales after by-product
credits, with the starting point (first bar on the left) being our nickel unit cash cost of sales
after by-product credits for 2004:
Principal Factors Affecting Our 2005 Nickel Unit Cash Costs of Sales After By-Product Credits
in Comparison with Such Costs for 2004
Nickel unit cash cost of sales before by-product credits represents a calculation equal to the
total of all cash costs incurred to produce a unit of nickel before the deduction of contributions
from by-products sold divided by Inco-source nickel deliveries. For 2005 compared with 2004, the
increase in nickel unit cash cost of sales before by-product credits was principally due to the
higher average Canadian U.S. dollar exchange rate which adversely affected our costs incurred in
Canadian dollars, higher costs for heavy
103
fuel oil and diesel fuel at PT Inco, higher electricity and natural gas prices at our Ontario operations, higher spending on supplies and services and
lower nickel production, partially offset by approximately $40 million of net cost reductions and
related savings achieved in 2005. In addition, we experienced lower costs for purchased
intermediates due to lower volumes processed at our Canadian operations in 2005 partially offset by
higher benchmark prices upon which such purchases are made. For 2005 compared with 2004, the
increase in nickel unit cash cost of sales after by-product credits was due to higher unit cash
cost of sales before by-product credits, partially offset by an increase in by-product credits.
The increase in by-product credits was primarily due to higher realized selling prices for copper
and certain PGMs, partially offset by higher production costs for copper and lower deliveries of
certain PGMs.
As discussed above, we have used, and expect to continue to use at least in 2006, purchased
nickel intermediates to increase processing capacity utilization at our Canadian operations. While
the cost of purchased nickel intermediates is higher than that for processing our own mine
production and such costs increase as the prevailing prices, LME cash nickel or other benchmark
prices, on which basis this material is purchased by us increases, the price realizations are also
higher, resulting in margins on these purchases remaining relatively unchanged.
A reconciliation of our nickel unit cash cost of sales before and after by-product credits to
cost of sales under Canadian GAAP is shown in the table entitled Reconciliation of Nickel Unit
Cash Cost of Sales Before and After By-Product Credits to Canadian GAAP Cost of Sales under
Non-GAAP Financial Measure below.
Energy Costs and Relative Advantages
Energy costs are a significant component of production costs in the nickel industry since
nickel production is very energy-intensive, especially with respect to the costs of processing
lateritic ores such as those processed at our PT Inco operations. Energy requirements for
production from our Canadian sulphide ores are generally only about one-fifth of the energy
required to process lateritic ores. In addition, low-cost energy is available from our
hydroelectric facilities in Ontario and at PT Incos lateritic mining operations in Indonesia, and
from purchased hydroelectric power at our Manitoba operations.
In 2005, our hydroelectric facilities in Ontario generated approximately 14 per cent of our
Ontario operations electricity requirements, and PT Incos 165-megawatt hydroelectric
generating-facility at Larona together with its 93-megawatt hydroelectric generating facility at
Balambano generated virtually all of PT Incos 2005 electricity requirements. The Balambano
facility has been able to generate power consistently above its design capacity due to improved
water management practices and higher reservoir levels and other related factors than were assumed
in developing its original design capacity. In 2005, energy costs at our Ontario and Manitoba
operations were approximately 14 per cent of their total cash production costs, compared with 43
per cent for PT Inco. The availability of captive hydroelectric power decreased cash energy costs
at PT Inco by about 47 per cent in 2005 and 53 per cent in 2004 relative to the energy costs that
would have been incurred by PT Inco if its operations were dependent on fuel oil as the sole source
to meet its energy requirements.
Intermediates Segment
Our intermediates segment represents the mining and processing operations of PT Inco in
Indonesia where nickel-in-matte, an intermediate product, is produced and sold primarily into the
Japanese market. Net sales by PT Inco of nickel-in-matte were $885 million in 2005 compared with
$792 million in 2004. This increase in 2005 relative to 2004 was due to increased deliveries as a
result of higher production rates and higher realized prices. PT Incos deliveries of
nickel-in-matte totalled a record 76,100 tonnes (168 million pounds) in 2005 compared with 72,500
tonnes (160 million pounds) in 2004. PT Incos net realized price for nickel-in-matte in 2005
averaged $11,462 per tonne ($5.20 per pound) compared with $10,766 per tonne ($4.88 per pound) in
2004. The selling price of PT Incos nickel-in-matte is determined by a formula which is based
upon the LME cash price for nickel. All of PT Incos production is sold in U.S. dollars under
long-term contracts to us and Sumitomo Metal Mining Co., Ltd.
Nickel-in-matte production at PT Inco increased by six per cent to a record 76,400 tonnes (168
million pounds) in 2005 from 72,200 tonnes (159 million pounds) in 2004. PT Incos nickel unit
cash cost of sales increased 25 per cent for 2005 compared with 2004 due to higher prices for heavy
fuel oil, higher volumes of heavy fuel oil used in 2005 compared with 2004 due to higher production
and more moisture in the ore from PT Incos Petea mining area and higher prices for diesel and
higher volumes of diesel used in 2005 relative to 2004 due to a greater haulage distances, given
the increased ore mined at PT Incos Petea mining area.
104
Development Projects Segment
Our development projects segment includes the Goro nickel-cobalt project in New Caledonia
and work on the second and third phases of our Voiseys Bay project.
Goro
Following the decision in October 2004 to proceed with the Goro project on the basis of a
revised project scope resulting from a comprehensive review completed in September 2004, a phased
execution approach was adopted. The first phase of this approach, focusing on process engineering
definition, securing of all necessary permits, the appointment of leading construction firms to
work with our own team to oversee construction and long-lead time procurement, continued through
much of the first half of 2005. The second phase, which had been scheduled to commence in the
second quarter of 2005 and would involve finalization of detailed engineering and procurement and
negotiation of the remaining contracts for site mobilization and the start of construction,
encountered a delay in its start pending the receipt of certain assurances from the New Caledonian
government that we required in order to begin construction. These assurances related to a number
of key construction permits, developing an agreed-upon process for revising the projects required
operating permit and implementation of a 60 hour site work week.
An acceptable outcome with respect to these assurances was finally achieved early in the third
quarter of 2005, enabling site mobilization to begin as well as the award of major site-related
construction contracts to proceed. By year-end 2005 overall engineering progress was about 70 per
cent complete while the number of personnel on site totalled approximately 900. Major construction
activities are currently focused on the port, earthworks, civil works and the establishment of
temporary facilities. Project execution will make extensive use of modularization and the
utilization of skilled construction labour from low cost locations. By year-end 2005 facilities in
the Philippines had been selected to produce modules for the process plant and other key parts of
the project facilities and the major construction contracts had been finalized. For the year 2005
capital expenditures on the Goro project totalled $355 million, bringing total capital spending on
this project since the October 2004 decision to proceed to $378 million. During 2005 Goro
encountered significant cost challenges as a result of sharply higher oil prices, the continued
strength in other commodity prices as well as very competitive market conditions for supplies and
services and these challenges are expected to continue in 2006 and likely through the balance of
construction for those items which we have not yet purchased.
Taking into account these cost pressures for such construction materials and other input
costs, the currently anticipated trends in such costs and the latest regulatory requirements for
the configuration of the projects tailings area, we currently believe that, if we were to formally
update our latest estimate for the capital cost for Goros mine, process plant and infrastructure
of $1.878 billion with a minus 5 per cent plus 15 per cent confidence level, such updated forecast
would be expected to be at the high end of the plus 15 per cent confidence level. As part of our
ongoing work on the project, we have implemented a number of systems to monitor all key costs
trends which could affect the capital cost forecast. We currently expect to be in a position to
have a definitive cost estimate, reflecting all relevant factors at that time, and which is
currently expected to be subject to a confidence or accuracy level developed as part of that
estimate, sometime in the second quarter of 2006 when engineering is expected to be at least 80 per
cent complete and all major construction contracts will have been awarded.
In late 2005 a number of boycotts and other related actions in New Caledonia affected the
operations of Eramet and its subsidiary, Société Le Nickel, and other local businesses as a result
of labour and other disruptions and other developments. While those actions and developments did
not affect the construction of the Goro project to any significant degree, such disruptions could
have a substantial adverse effect on the projects construction schedule and capital costs if they
were to resume and continue for any extended length of time.
Voiseys Bay
In 2005, we continued our exploration program in the Province, spending $5 million on this
program. Late in 2005, we also commissioned the demonstration plant at Argentia in the Province of
Newfoundland and Labrador to test hydrometallurgical processes to treat the Voiseys Bay nickel
concentrates as part of the initial phase of the project. This demonstration plant had a capital
cost totalling about $80 million.
105
2004 Compared with 2003
Earnings Summary
Net earnings for 2004 totalled $619 million, or $3.30 per share ($2.95 per share on a
diluted basis), compared with net earnings of $146 million, or 68 cents per share (64 cents per
share on a diluted basis), in 2003. Results for 2004 included net income tax benefits totalling
$23 million and the following pre-tax items: (1) an asset impairment charge of $201 million related
to the write off of certain capitalized costs for our Goro nickel-cobalt project due to changes in
project scope and other factors, and (2) unfavourable non-cash currency translation adjustments of
$85 million. The unfavourable non-cash currency translation adjustments were due to the effect of
a significant strengthening of the Canadian dollar relative to the U.S. dollar during the year
principally on Canadian dollar-denominated post-retirement benefit liabilities.
Results for 2003 included net income tax benefits totalling $84 million and the following
pre-tax items: (1) unfavourable non-cash currency translation adjustments of $177 million, (2)
income of $24 million, representing a milestone payment received as part of the terms of the sale
of a non-core exploration property in 1998, (3) a charge of $23 million for estimated remediation
costs for certain former industrial sites in the United States we retained relating to a business
sold in 1983, (4) an expense of $107 million associated with the three-month strike at our Ontario
operations and (5) currency hedging gains net of suspension costs of $15 million relating to our
Goro project. In addition, with respect to only the calculation of net earnings per share for
2003, a premium of $15 million was paid on the May 1, 2003 redemption of our 5.5 per cent
Convertible Redeemable Preferred Shares Series E.
Nickel Production
Nickel production increased by 27 per cent to 236,817 tonnes (522 million pounds) in
2004, our highest annual production ever, exceeding our previous record of 510 million pounds in
1974, compared with 187,173 tonnes (413 million pounds) in 2003, primarily reflecting higher
production at our Canadian and U.K. operations compared with 2003 when the three-month strike at
our Ontario operations that began on June 1, 2003 and a difficult ramp-up of operations in
September 2003 following the strike negatively affected production. PT Incos production increased
by about 4 million pounds to 159 million pounds of nickel-in-matte in 2004 compared with 155
million pounds of nickel-in-matte in 2003. Finished nickel inventories were 27,334 tonnes at
December 31, 2004 compared with 25,604 tonnes at the end of 2003 due to the timing of certain
shipments in late 2004.
Copper Production
Copper production increased by 37 per cent to 124,456 tonnes (274 million pounds) in 2004
compared with 91,134 tonnes (201 million pounds) in 2003. Copper production in 2003 was negatively
impacted by the three-month strike at our Ontario operations.
Net Sales
Net sales increased substantially in 2004 due to higher selling prices for substantially
all the metals we produce, particularly for nickel and copper, as well as higher deliveries of
Inco-source nickel, copper, cobalt and PGMs. Deliveries of Inco-source nickel in 2004 increased by
28 per cent compared with 2003 due to increased production at our Canadian and U.K. operations as
well as at PT Inco. Production for all metals for 2003 was adversely affected by a three-month
strike at our Ontario operations that began on June 1, 2003.
Primary nickel sales increased by 66 per cent in 2004 from the previous year due to a 41 per
cent increase in our average realized nickel price and an 18 per cent increase in nickel deliveries
given the effect in 2003 of the three-month strike at our Ontario operations noted above on
deliveries.
Our nickel deliveries in 2004 represented an estimated 20 per cent share of the world market
for primary nickel, compared with 17 per cent in 2003.
The average realized price for our primary nickel products, including intermediates, was
$13,906 per tonne ($6.31 per pound) in 2004, compared with the LME cash nickel price which averaged
$13,852 per tonne ($6.28 per pound). The average realized price for our primary nickel products,
including intermediates, was $9,860 per tonne ($4.47 per pound) in 2003, compared with the LME cash
nickel price which averaged $9,640 per tonne ($4.37 per pound).
106
In 2004, our copper sales increased by 113 per cent from the previous year due to a 34 per
cent increase in deliveries compared with the strike-affected levels for 2003 and a 59 per cent
increase in our average realized price. Sales of precious metals increased by 116 per cent in 2004
due to increased deliveries and increased selling prices in 2004 for substantially all of the
precious metals we produce.
Cost of Sale and Other Expenses
Cost of sales and other expenses increased by 35 per cent in 2004, reflecting higher
deliveries of the metals we produce, increased costs for and volumes of purchased nickel
intermediates processed, the adverse impact of a strengthening of the Canadian dollar relative to
the U.S. dollar on our costs incurred in Canadian dollars, higher spending on services and supplies
primarily as a result of increased production rates, higher employment costs associated with higher
earnings-based compensation payments, and increased prices for heavy fuel oil used at PT Inco,
partially offset by cost reductions and related savings achieved in 2004. As noted above, the cost
of the nickel intermediates we purchase is based upon LME and other benchmark prices and is
included in cost of sales. Results for 2003 included a pre-tax expense of $107 million associated
with the three-month strike at our Ontario operations. In addition, during the third quarter of
2003 our Ontario operations experienced a series of unanticipated problems associated with the
ramp-up of certain of its facilities after the strike which resulted in an expense of $25 million.
Selling, General and Administrative
Selling, general and administrative expenses increased by $23 million in 2004 compared
with 2003. The increase was primarily due to higher expenses associated with our earnings-based
incentive compensation programs, partially offset by lower expenses associated with share
appreciation rights which historically had been granted as part of certain share option awards.
Selling, general and administrative expenses also included $6 million in 2004 spent on our program
to evaluate and report on our internal control over financial reporting under the U.S.
Sarbanes-Oxley Act and certain expenditures totalling $11 million in 2004 and $10 million in 2003
in support of our Goro and Voiseys Bay projects.
Currency Translation Adjustments
Currency translation adjustments represented primarily the effect of exchange rate
movements on the translation of Canadian dollar-denominated liabilities, post-retirement benefits,
accounts payable and certain deferred income and mining taxes into U.S. dollars. Unfavourable
currency translation adjustments were primarily due to the strengthening of the Canadian dollar as
at December 31, 2004 relative to the U.S. dollar. The Canadian dollar U.S. dollar exchange rate
was 0.774 at the end of 2003 and 0.831 at the end of 2004, representing approximately a 7 per cent
appreciation in the Canadian dollar relative to the U.S. dollar on a year-to-year basis.
Interest Expense
Interest expense for 2004 declined compared with 2003, primarily as a result of an
increase in capitalized interest associated with our projects under development and lower interest
rates on our outstanding debt for 2004 compared with 2003, taking into account refinancing
activities in 2003 and our interest rate swaps we entered into with certain third party financial
institutions. Interest expense excluded capitalized interest of $70 million in 2004 compared with
$55 million in 2003.
Asset Impairment Charges
Changes in the planned Goro project configuration, including moving to direct heating of
the ore feed and other changes intended to reduce the projects capital cost and enhance the
operating efficiency of the planned process plant and the process to be used to recover metals,
resulted in certain capitalized costs incurred, principally for engineering and related work
associated with the original project configuration and for equipment purchased for the indirect
heating of ore feed, no longer having any value for the project or otherwise. As a result of these
changes, an impairment charge covering capitalized expenditures of $201 million before minority
interest and taxes was taken in the second quarter of 2004.
Other Income, Net
Other income decreased in 2004, compared with 2003. In 2004, other income included gains
on foreign currency contracts in the amount of $10 million covering anticipated expenditures
relating to the Goro project. We also realized a gain of $6 million on the sale of our interest in
a Guatemalan subsidiary. In 2003, other income included gains of $35 million realized from the
sale or transfer of
107
shares and other interests contributed to or received in conjunction with strategic and other
collaborations relating to our primary metals operations, the receipt of a milestone payment of $24
million under the terms of sale reached in 1998 of a non-core exploration property and net gains of
$12 million in connection with derivative positions in metals intended to meet future customer
requirements. In addition, currency hedging gains of $11 million were realized in 2003 on the
closing out of certain forward currency contracts as a consequence of the decision to suspend the
Goro project made in late 2003.
Income and Mining Taxes
Our effective tax rate for 2004 of 37 per cent was slightly lower than the statutory rate
due to (1) the benefit of losses not previously recognized, (2) the favourable outcome of tax
matters related to prior years and (3) the benefit of lower tax rates on profits earned in low tax
jurisdictions. These factors were partially offset by the negligible tax relief recorded on the
$201 million non-cash impairment charge, before minority interest and taxes, recorded in the second
quarter of 2004 and taxes provided on unrealized foreign exchange gains with respect to the
Canadian parents U.S. dollar-denominated debt.
Minority Interest
Our minority interest represents primarily the respective minority shareholders
interests in the earnings of PT Inco, ITL, Jinco and Goro Nickel. Minority interest increased in
2004 compared with 2003 primarily due to the higher earnings at PT Inco as a result of higher
average realized prices for and higher deliveries of nickel-in-matte produced by PT Inco.
Nickel Unit Cash Cost of Sales
Nickel unit cash cost of sales before by-product credits increased to $5,732 per tonne
($2.60 per pound) in 2004 from $4,453 per tonne ($2.02 per pound) in 2003. Nickel unit cash cost
of sales after by-product credits increased to $5,115 per tonne ($2.32 per pound) in 2004 from
$4,740 per tonne ($2.15 per pound) in 2003.
The 2004 increase in nickel unit cash cost of sales before by-product credits was principally
due to the higher cost for, and volumes of, purchased nickel intermediates, the higher average
Canadian dollar exchange rate relative to the U.S. dollar exchange rate compared with 2003, higher
costs for heavy fuel oil at PT Inco, higher spending on supplies and services primarily as a result
of increased production rates and higher earnings-based compensation payments, partially offset by
the absence of ramp-up costs which we incurred in the third quarter of 2003 after the end of the
strike at our Ontario operations, and the cost reductions and related savings as discussed below.
The increase in nickel unit cash cost of sales after by-product credits for 2004 compared with
2003 was due to higher nickel unit cash cost of sales before by-product credits, partially offset
by higher by-product credits as a result of higher realized selling prices for and higher
deliveries of our principal by-products.
A reconciliation of our nickel unit cash cost of sales before and after by-product credits to
cost of sales under Canadian GAAP is shown in the table entitled Reconciliation of Nickel Unit
Cash Cost of Sales Before and After By-Product Credits to Canadian GAAP Cost of Sales under
Non-GAAP Financial Measure below.
Energy Costs and Relative Advantages
In 2004, our hydroelectric facilities in Ontario generated approximately 19 per cent of
our Ontario operations electricity requirements, and PT Incos 165-megawatt hydroelectric
generating-facility at Larona together with its 93-megawatt hydroelectric generating facility at
Balambano generated virtually all of PT Incos 2004 electricity requirements. In 2004, energy
costs at our Ontario and Manitoba operations were approximately 12 per cent of total cash
production costs, compared with 34 per cent for PT Inco. The availability of captive hydroelectric
power decreased cash energy costs at PT Inco by about 53 per cent in 2004 and 51 per cent in 2003
relative to the energy costs that would have been incurred by PT Inco if its operations were
dependent on fuel oil as the sole source to meet its energy requirements.
Intermediates Segment
Net sales by PT Inco of nickel-in-matte were $792 million in 2004 compared with $509
million in 2003. This increase in 2004 relative to 2003 was due to higher realized prices and
increased deliveries as a result of then record production. PT Incos deliveries of
nickel-in-matte totalled 72,500 tonnes (160 million pounds) in 2004 compared with 70,500 tonnes
(155 million pounds) in 2003.
108
The increase in 2004 compared with 2003 was due to higher production. PT Incos net realized
price for nickel-in-matte in 2004 averaged $10,766 per tonne ($4.88 per pound) compared with $7,117
per tonne ($3.23 per pound) in 2003. The selling price of PT Incos nickel-in-matte is determined
by a formula which is based upon the LME cash price for nickel.
Nickel-in-matte production at PT Inco increased by three per cent to 72,200 tonnes (159
million pounds) in 2004 from 70,200 tonnes (155 million pounds) in 2003. Nickel unit cash cost of
sales increased by 15 per cent in 2004 compared with 2003 due to increases in the price of heavy
fuel oil as well as greater usage of mining-related services due to the higher production levels.
In order to increase production to take advantage of the favourable nickel market conditions in
2004, we augmented PT Incos hydroelectric power generation by increasing the utilization of more
expensive fuel-oil based power sources. PT Incos energy costs were up in 2004 due to increased
consumption of heavy fuel oil as a result of the higher production rates and higher prices paid for
such fuel oil to operate its dryers, kilns and other oil-fired facilities. Fuel oil costs were up
nine per cent in 2004 compared with 2003. Fuel oil represented about 27 per cent of PT Incos cash
costs of production of nickel-in-matte in 2004 compared with 31 per cent in 2003.
109
Cash Flows, Liquidity and Capital Resources
2005 Compared with 2004
The following bar chart presents the principal sources and uses of cash and cash
equivalents for 2005 (uses of cash are shown in parentheses) with the starting point (first bar on
the left) being the balance of cash and cash equivalents as at December 31, 2004:
Principal Sources and Uses of Cash in 2005
(in millions of dollars)
Operating Activities
The following table summarizes cash flow from operating activities for the periods
indicated:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
($ millions) |
|
|
|
|
|
(Restated) |
|
|
(Restated) |
|
|
Earnings before minority interest |
|
$ |
909 |
|
|
$ |
724 |
|
|
$ |
191 |
|
Charges not affecting cash |
|
|
415 |
|
|
|
626 |
|
|
|
363 |
|
Contributions greater than post-retirement benefits expense |
|
|
(137 |
) |
|
|
(140 |
) |
|
|
(23 |
) |
|
|
|
|
1,187 |
|
|
|
1,210 |
|
|
|
531 |
|
Decrease (increase) in non-cash working capital related to operations |
|
|
(448 |
) |
|
|
183 |
|
|
|
(400 |
) |
|
Net cash provided by operating activities |
|
$ |
739 |
|
|
$ |
1,393 |
|
|
$ |
131 |
|
|
The decrease in net cash provided by operating activities in 2005 relative to 2004 was
primarily due to higher working capital requirements in 2005. The increased working capital
requirements were primarily related to reduced income and mining tax payable balances in view of
the significant tax payments of $245 million made during the first quarter of 2005 in respect of
the 2004 taxation year and higher tax instalments paid in 2005. In addition, inventory levels
increased primarily as a result of increased production costs, increased finished copper
inventories as a result of the previously indicated closure of the copper refinery in Ontario in
the month of December 2005 and higher in-process inventories of Voiseys Bay concentrates as well
as the establishment of required supplies inventories at Voiseys Bay as this project moved into
production.
In 2005 and in 2004, contributions to our pension plans significantly exceeded our minimum
required pension contributions due to voluntary contributions included in the total contributions
made. These voluntary contributions were $130 million in 2005 and $144 million in 2004. Our total
contributions were $271 million for 2005 compared with $265 million in 2004. We have had in effect
for a number of years defined benefit pension plans principally in Canada, the United States and
the United Kingdom. Each of the jurisdictions in which these plans are located has legislation and
regulations which, among other statutory requirements, cover the minimum contributions to be made
to these plans to meet their potential liabilities as calculated in accordance with such
legislation and regulations. Based upon the value of the assets in these plans, as determined
pursuant to applicable provincial legislation and
110
regulations in Canada and other factors to be taken into account under such legislative
or regulatory requirements, we, in accordance with such applicable legislation or regulations, and
in light of our relatively strong financial position, made voluntary contributions to such plans.
We currently expect that our annual minimum pension contributions will be approximately $180
million in 2006. Since the liabilities associated with these pension plans are affected by changes
in certain exchange rates, primarily the Canadian dollar, changes in such exchange rates could also
significantly affect the level of contributions for future years.
Investing Activities
Net cash used for investing activities increased to $892 million in 2005 compared with
$881 million in 2004. This increase was primarily due to higher capital spending, mainly in
respect of our Goro project, and higher sustaining capital expenditures at our Canadian operations
and PT Inco, partially offset by proceeds from the April 2005 sale of an interest in the Goro
project company to a joint venture formed by Sumitomo Metal Mining Co., Ltd. and Mitsui & Co., Ltd.
and subsequent pro rata capital contributions from that shareholder in the project, the proceeds
from the sale of a non-core investment and lower capital spending for our Voiseys Bay project.
Reference is made to Risks and Uncertainties Other Risks and Uncertainties Capital
Requirements and Operating Risks below for a discussion of the risks associated with our capital
requirements. The following table sets forth our capital expenditures by principal operations and
other investing activities for the years indicated:
|
|
|
|
|
|
|
|
|
|
|
|
|
($ millions) |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Capital Expenditures |
|
|
|
|
|
|
|
|
|
|
|
|
Ontario operations |
|
$ |
(261 |
) |
|
$ |
(152 |
) |
|
$ |
(101 |
) |
Manitoba operations |
|
|
(86 |
) |
|
|
(42 |
) |
|
|
(50 |
) |
PT Inco |
|
|
(105 |
) |
|
|
(79 |
) |
|
|
(45 |
) |
Goro Project |
|
|
(344 |
) |
|
|
(138 |
) |
|
|
(249 |
) |
Voiseys Bay project |
|
|
(353 |
) |
|
|
(447 |
) |
|
|
(138 |
) |
Other |
|
|
(19 |
) |
|
|
(18 |
) |
|
|
(8 |
) |
Other Investing Activities |
|
|
|
|
|
|
|
|
|
|
|
|
Partial sale of interest in Goro Nickel S.A.S. |
|
|
150 |
|
|
|
|
|
|
|
|
|
Proceeds from the sale of a non-core investment |
|
|
103 |
|
|
|
|
|
|
|
|
|
Other |
|
|
23 |
|
|
|
(5 |
) |
|
|
26 |
|
|
Total |
|
$ |
(892 |
) |
|
$ |
(881 |
) |
|
$ |
(565 |
) |
|
Financing Activities
Net cash provided by financing activities in 2005 was $35 million compared with net cash
provided by financing activities in 2004 of $146 million.
In 2005, we received approximately $49 million (2004 $41 million) in respect of the French
government-sponsored financing for the Goro project as described in note 12 to our 2005
consolidated financial statements.
Financing activities in 2005 included the use of $76 million in respect of the tender for
conversion and settlement of such conversions in cash at our election of a portion of our LYON
Notes. During 2005, LYON Notes representing approximately $163 million aggregate principal amount
were tendered for conversion. At our option, we elected to settle a portion of such conversions in
respect of these Notes in accordance with their terms for cash in lieu of shares in the amount of
$76 million. The difference between the cash settlement price of $76 million and the book value of
$41 million represents a charge of $35 million. For accounting purposes, the LYON Notes are
bifurcated between debt and equity, the equity portion representing the value of the holders
conversion options. Consequently, the charge of $35 million has been bifurcated between a charge
to earnings of $9 million and a charge to retained earnings of $26 million. The remainder of the
LYON Notes tendered for conversion in 2005 were, at our option, settled in shares with no impact on
net earnings.
111
The table below summarizes our long-term borrowings and repayments of our long-term debt in
2005, 2004 and 2003:
|
|
|
|
|
|
|
|
|
|
|
|
|
($ millions) |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Long-term borrowings |
|
|
|
|
|
|
|
|
|
|
|
|
Term loan |
|
$ |
200 |
|
|
$ |
200 |
|
|
$ |
|
|
5.70% Debentures due 2015 |
|
|
|
|
|
|
|
|
|
|
300 |
|
Other |
|
|
14 |
|
|
|
5 |
|
|
|
14 |
|
|
Total |
|
$ |
214 |
|
|
$ |
205 |
|
|
$ |
314 |
|
|
Repayments of long-term debt |
|
|
|
|
|
|
|
|
|
|
|
|
PT Inco loan facilities and other debt |
|
|
(91 |
) |
|
|
(85 |
) |
|
|
(82 |
) |
5 3/4% Convertible Debentures due 2004 |
|
|
|
|
|
|
|
|
|
|
(173 |
) |
7 3/4% Convertible Debentures due 2016 |
|
|
|
|
|
|
|
|
|
|
(145 |
) |
9.60% Debentures due 2022 |
|
|
|
|
|
|
|
|
|
|
(159 |
) |
Other |
|
|
(14 |
) |
|
|
(15 |
) |
|
|
(15 |
) |
|
Total |
|
$ |
(105 |
) |
|
$ |
(100 |
) |
|
$ |
(574 |
) |
|
During 2005, we drew down the remaining $200 million of our $400 million term facility entered
into in late 2004 as part of the financing plan for our capital expenditure program for the Goro
project intended to optimize certain tax benefits relating to the Girardin Act financing for this
project. This term facility matures on December 23, 2011.
To continue to provide liquidity for our operations, on May 28, 2004 we concluded a $750
million syndicated revolving credit facility with a maturity date of May 28, 2009. This syndicated
facility replaced several bilateral bank credit agreements under which we had an aggregate of $680
million of available credit as of year-end 2003, where $273 million of such $680 million would have
otherwise expired on June 1, 2004 and the balance in either June 2005, June 2006 or June 2007.
Subject to the approval of the lenders representing not less than 66 2/3 per cent in total
commitments under this $750 million facility, the maturity date of the syndicated revolving credit
facility may be extended for the commitments of those lenders who have approved such extension for
an additional one-year period on each May 28 anniversary date. Effective May 28, 2005, the lenders
under the $750 million facility agreed to extend the maturity date of the facility from May 28,
2009 by an additional year to May 28, 2010.
The borrowings under this facility may be made in either Canadian dollars in the form of (a)
Prime Rate loans (as defined under the credit facility) or (b) in Bankers Acceptances (as defined
under the credit facility) or in United States dollars in the form of (i) United States Base Rate
loans (as defined under the credit facility) or (ii) London interbank offered rate loans (as
defined under the credit facility). Borrowings under these facilities bear interest, when drawn,
at a rate which varies based on the type of borrowing and our credit ratings at the time of
borrowing. As of December 31, 2005, there were no amounts drawn under the facility.
This syndicated credit facility provides that, so long as advances are outstanding or any
letters of credit or guarantees issued pursuant to the terms of the facility are outstanding, we
will be required to maintain a ratio of Consolidated Indebtedness, as defined in the credit
facility, to Tangible Net Worth, as defined in the credit facility, not to exceed 50:50. At
December 31, 2005 this ratio of Consolidated Indebtedness to Tangible Net Worth was 25:75. The
facility does not require any acceleration or prepayment of outstanding balances if our credit
ratings on outstanding debt securities were downgraded or if there were a significant decline in
our earnings, cash flow or in the price of our publicly traded common shares or other equity
securities. A downgrade in our rating would, however, increase the interest rate payable on
borrowings under the facility and, conversely, any upgrade in our rating would reduce the interest
rate payable on borrowings. As of December 31, 2005, our outstanding debt securities were rated as
investment grade by Moodys Investors Service and Standard & Poors Ratings Services. After the
announcement of our offer to purchase all of the common shares of Falconbridge on October 11, 2005,
as referred to in note 23 to our consolidated financial statements, Standard & Poors Ratings
Services placed our BBB- credit rating on credit watch with negative implications while Moodys
affirmed our Baa3 rating (with a stable outlook). These rating agencies apply their own criteria
to determine their ratings and may change those criteria at any time. Such ratings do not
represent a recommendation to buy, sell or hold our debt securities, may be subject to revision or
withdrawal at any time by the particular rating organization, and each rating should be evaluated
independently of any other rating.
In connection with our offer, on December 22, 2005 we entered into a loan agreement (the Loan
Agreement) with a group of banks and financial institutions. The loan facilities under the Loan
Agreement are in an amount sufficient for us to meet, directly or through subsidiaries who can
borrow under the Loan Agreement, the total amount of cash of approximately $2.6 billion we would
need to acquire all of the issued and outstanding common shares of Falconbridge (the Falconbridge
Shares) pursuant to the terms of our pending offer made to acquire the Falconbridge Shares and pay
the currently estimated fees and expenses associated with such offer. The Loan Agreement provides
for a bridge loan facility which matures one year from the date of the final drawdown under the
112
bridge loan facility. The principal amount of the bridge loan facility is repayable in one
payment on such maturity date but may also be prepaid prior to maturity at our option. Certain
mandatory prepayments may also be required during the term of this facility out of net proceeds, if
any, received from dispositions of certain assets, certain public or private issuances of debt and
certain insurance proceeds received. The Loan Agreement also provides for a term loan facility
which matures on the date that is five years plus one day following the date of the final drawdown
under the term loan facility. The principal amount of the term loan facility is repayable in one
payment on such maturity date but may also be prepaid prior to maturity at our option. Certain
mandatory prepayments may also be required during the term of this facility out of certain net
proceeds, if any, received from the divestiture of certain assets of Falconbridge, certain public
or private issuances of debt related to the divestiture of certain assets of Falconbridge, and
certain insurance proceeds received. The two loan facilities provided for in the Loan Agreement
bear interest and are subject to fees at levels customary for credit facilities of this type and
include covenants, representations, warranties, conditions and events of default consistent with
the terms of our existing credit facilities or otherwise customary for loan facilities of this
type, including acceleration of obligations if any specified events of default occur. The first
drawdown under these loan facilities is currently available until August 10, 2006. Subsequent
drawdowns are permitted within 140 days following the first drawdown. We are required to obtain
the prior consent of the majority lenders under the loan facilities prior to amending, waiving, or
making determinations relating to certain conditions with respect to the acquisition of the
Falconbridge Shares under the terms of the Support Agreement dated as of October 10, 2005, as
amended, between Inco and Falconbridge covering the offer.
Our total debt as a percentage of our total debt plus shareholders equity as of December 31
for the years indicated is set forth in the following table:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2005 |
|
2004 |
|
2003 |
December 31 |
|
|
|
(Restated) |
|
(Restated) |
|
Total debt as % of total debt plus shareholders equity |
|
|
28 |
% |
|
|
30 |
% |
|
|
32 |
% |
|
Recognizing the sensitivity of our cash flow to nickel and other metals prices, we currently
believe that our level of cash and cash equivalents as of December 31, 2005, together with
currently projected cash to be provided by operating activities, available cash from our unused
lines of credit and the Loan Agreement and access to international capital markets, will be more
than sufficient to meet our currently anticipated cash requirements of our current operations, our
development projects at least for the 2006 2008 period and the cash portion of our offer to
acquire all of the Falconbridge Shares and related expenses of the offer. Our requirements include
ongoing cash needs for our existing operations as well as the cash required to finance currently
planned expenditures on sustaining and other capital projects, including our Goro and Voiseys Bay
projects. As discussed above, our required capital expenditures continue to be very significant
over the 2006-2008 period given the current spending plans for our Goro project and at PT Inco.
Our liquidity is affected by a number of key factors, including decreases in the amount of,
and a change in the timing of, our production outlook at our existing operations as well as the
timing of completion of our Voiseys Bay and Goro projects. Reference is made to Risks and
Uncertainties Other Risks and Uncertainties PT Inco, Risks and Uncertainties Other Risks
and Uncertainties Risks Associated with, and Importance of, Future Low-Cost Nickel Projects and
Risks and Uncertainties Other Risks and Uncertainties Uncertainty of Production and Capital
and Other Cost Estimates below for detailed discussions of these factors and their impact on our
liquidity.
Reinstatement of Common Shares Dividend
In April 2005, our Board of Directors reinstated a quarterly cash dividend on our common
shares of $0.10 per share. The amount of this quarterly cash dividend was increased by our Board
in early February 2006 to $0.125 for the dividend payable March 1, 2006.
2004 Compared with 2003
Operating Activities
Net cash provided by operating activities in 2004 totalled $1,393 million, which
represented a significant increase from the $131 million in net cash provided by operating
activities in 2003. The increase was primarily due to higher earnings, excluding asset impairment
and other non-cash charges, and a reduction in working capital in 2004, compared with an increase
in working capital in 2003. Increased investments in accounts receivable and inventories in 2004
were more than offset by higher balances of income and mining taxes payable in 2004. Accounts
receivable at the end of 2004 increased due to significantly higher deliveries and prices for the
metals we produced in the fourth quarter of 2004 relative to the corresponding period of 2003. Our
investment in inventory increased at the end of 2004 relative to 2003 due principally to higher
production costs associated with that inventory. In 2004,
113
working capital primarily benefitted from the delay in the payment of accrued income and
mining tax liabilities as the minimum required income and mining tax instalments during the year
were less than the amount of the full tax obligation ultimately payable in respect of 2004. The
balance of tax payments in respect of 2004 was $245 million and was made in the first quarter of
2005. In 2004, pension payments totalled $265 million which was a significant increase compared
with 2003 as a result of voluntary contributions in the amount of $144 million in addition to
required contributions totalling $121 million.
Investing Activities
Net cash used for investing activities increased to $881 million in 2004 compared with
$565 million in 2003. The increase was primarily due to higher capital spending, mainly in respect
of our Voiseys Bay project, compared with 2003.
Financing Activities
Net cash provided by financing activities in 2004 was $146 million compared with cash
used for financing activities in 2003 of $235 million.
We received $41 million in respect of the French government-sponsored financing for the Goro
project.
In late December 2004 we concluded a new $400 million term loan facility. Borrowings under
this facility may be made up to December 23, 2005 and the amount of the loan available will be
reduced to the aggregate amount of the advances at that date (the Final Loan Amount). Repayments
of the Final Loan Amount outstanding at December 23, 2005 are as follows 25 per cent of the Final
Loan Amount will be due on December 31, 2009; 121/2 per cent of the Final Loan Amount on June 30,
2010; 121/2 per cent of the Final Loan Amount on December 31, 2010; 121/2 per cent of the Final Loan
Amount on June 30, 2011; and the remaining amount still outstanding on the final maturity date of
December 23, 2011. The borrowings under this facility may be made in U.S. dollars in the form of
(i) loans based on a U.S. dollar base rate or (ii) loans based on certain London interbank offered
rates. Borrowings under this facility bear interest, when drawn, at rates which vary based on the
type of borrowing and our credit ratings at the time of borrowing. As of December 31, 2004, there
was $200 million drawn under this new facility.
Off-Balance Sheet Arrangements and Aggregate Contractual Obligations
Contractual Obligations
This section summarizes as of December 31, 2005 certain of our contractual obligations
and our off-balance sheet arrangements. The first table below sets forth our contractual
obligations as of December 31, 2005. Certain of these contractual obligations, including long-term
debt obligations and asset retirement obligations, are also reflected in our December 31, 2005
balance sheet (Reference is made to notes 9 and 11 to our 2005 consolidated financial statements),
while the other obligations are off-balance sheet ones. In addition to these contractual
obligations, we also have certain contingencies and guarantees, as discussed below. The majority
of our derivative positions as at December 31, 2005 fall into the category of off-balance sheet
arrangements and, consistent with the Canadian GAAP, are designated as effective hedging
relationships. Our outstanding derivative positions as at December 31, 2005 and December 31, 2004
are summarized in the tables under Derivative Instrument Positions below.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(in $ millions) |
|
Total |
|
|
Less than 1 year |
|
|
1-3 years |
|
|
3-5 years |
|
|
After 5 years |
|
|
Long-term debt obligations |
|
$ |
1,974 |
|
|
$ |
122 |
|
|
$ |
35 |
|
|
$ |
226 |
|
|
$ |
1,591 |
|
Operating lease obligations |
|
|
83 |
|
|
|
33 |
|
|
|
36 |
|
|
|
8 |
|
|
|
6 |
|
Purchase obligations1 |
|
|
1,815 |
|
|
|
1,081 |
|
|
|
486 |
|
|
|
224 |
|
|
|
24 |
|
Post-retirement benefit obligations2 |
|
|
180 |
|
|
|
180 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Asset retirement obligations |
|
|
1,090 |
|
|
|
2 |
|
|
|
7 |
|
|
|
6 |
|
|
|
1,075 |
|
Other long-term liabilities and contractual
obligations |
|
|
99 |
|
|
|
2 |
|
|
|
6 |
|
|
|
10 |
|
|
|
81 |
|
|
Total |
|
$ |
5,241 |
|
|
$ |
1,420 |
|
|
$ |
570 |
|
|
$ |
474 |
|
|
$ |
2,777 |
|
|
|
|
|
(1) |
|
These purchase obligations are largely related to the Goro project, with the balance
comprising routine orders to purchase goods and services at our current operating locations. |
|
(2) |
|
We have only included these obligations in the table for one year since such obligations
are calculated on an annual basis. |
With respect to any mandatory redemption requirements covering our outstanding debt
securities over the 2006 2010 period, reference is made to (i) note 13 to our 2005 consolidated
financial statements for information on the special contingent conversion
114
right that holders of certain of our convertible debt have and (ii) note 9 to our 2005
consolidated financial statements for information on the redemption provisions of certain long-term
debt.
The purchase obligations set forth in the table above include our commitments for the Goro
project, as noted under Outlook below, as at December 31, 2005. Except for these commitments,
this table does not include a significant portion of our expected capital expenditures over the
next five years and thereafter since such expenditures do not represent contractual obligations.
We currently estimate that our existing operations require, on an annual basis, on average
approximately $230 million of capital expenditures to sustain their operations and to meet current
environmental regulations and similar requirements at our currently planned production and/or
utilization levels for these operations.
Amounts included in Post-retirement benefit obligations in the table above represent the
contractual funding requirements for our pension plans in 2006. The required funding amounts for
our pension plans are actuarially determined and are subject to future uncertainties, including
whether the expected or assumed rate of return on plan assets and the discount rate on pension
obligations we use will be higher or lower over time (each of which may change over time). We have
only included these obligations in the table for one year since such obligations are calculated on
an annual basis.
The amounts included in Asset retirement obligations in the table above represent our
present legal obligations for closure and related costs at all our existing operating mines and
non-operating mines and properties based upon the closure plans which we have developed in
accordance with regulatory or our own internal requirements applicable to those mines and
properties.
Our arrangements covering the Voiseys Bay project entered into with the Province of
Newfoundland and Labrador (Province) in 2002 provide that we are obligated to refine the nickel
concentrates produced by the project in the Province beginning in 2012. As such refining
facilities are not yet constructed, we are currently permitted to ship the nickel concentrates out
of the Province for refining. Once we have constructed a refining facility in the Province, we are
obligated over a specified period to return the equivalent amount of nickel in the concentrates
shipped out of the Province for refining in the Province. Through December 31, 2005, 4,486 tonnes
(10 million pounds) of nickel in concentrates have been shipped out of the Province.
Contingencies and Guarantees
In the course of our operations, we are subject to routine claims and litigation
incidental to our business, to various environmental proceedings, and to other litigation related
to such business. With respect to the environmental proceedings currently pending or threatened
against us, they include (1) a proceeding brought under the Ontario class action legislation
covering claims relating to the alleged decline in property values in a community where we had
operated a nickel refinery over the 1918 1984 period, (2) claims for personal injuries, (3)
enforcement actions, (4) alleged violations of, including exceeding regulatory limits relating to
discharges under, certain environmental or similar laws and regulations applicable to our
operations in Canada and elsewhere and (5) certain claims dating back a number of years in which
one of our subsidiaries was designated, under the United States federal environmental law known as
Superfund or CERCLA, as a potentially responsible party. We currently believe that the
ultimate resolution of such proceedings, claims and litigation will not significantly impair our
operations or have a material adverse effect on our financial position or results of operation.
In connection with our 1996 acquisition of Diamond Fields Resources Inc., we assumed an
obligation to pay to a company retained by Diamond Field Resources Inc. to provide certain
exploration and other services an annual royalty in the form of a net smelter return amounting to
three per cent of the net proceeds received from the sale of ores, metals and other minerals
produced from our Voiseys Bay project, after deducting certain costs associated with the
production and sale of the ores, metals and minerals produced. While no such royalty payments have
been made given when the initial concentrates were produced by the Voiseys Bay project and
proceeds from the sale of such concentrates are to be received, these royalties will be payable
quarterly beginning in 2006.
In addition, as discussed in notes 12 and 20 of the 2005 consolidated financial statements, in
connection with a French government-sponsored financing program for which our Goro project
qualified (the Girardin Financing), we provided certain guarantees on behalf of Goro Nickel
covering payments due from Goro Nickel of up to a maximum amount of $100 million (Maximum Amount)
in connection with an indemnity relating to certain potential liabilities that might occur
associated with the loss or forfeiture by qualified French tax investors who participated in this
program of certain tax benefits associated with the Girardin Financing (Add-Back Indemnity). We
also provided an additional guarantee covering the payments due from Goro Nickel of (a) amounts
exceeding the Maximum Amount in connection with the Add-Back Indemnity and (b) certain other
amounts payable by Goro Nickel under the Girardin Financing relating to certain possible
operational or other developments applicable to the Goro project.
115
We also provided a guarantee covering certain termination payments due from Goro Nickel to the
supplier under an electricity supply agreement (ESA) entered into in October 2004 for the Goro
project. The amount of the termination payments guaranteed depends upon a number of factors,
including whether any termination of the ESA is as a result of a default by Goro Nickel and the
date on which an early termination of the ESA were to occur. If Goro Nickel defaults under the
ESA, the termination payment could reach Euros 145 million. This maximum amount could be payable
if termination of the ESA occurred prior to the anticipated start date for supply of electricity
under the ESA to the project. Once the supply of electricity to the project begins, the guaranteed
amounts will decrease over the life of the ESA.
Derivative Instrument Positions
As discussed in Risks and Uncertainties Market Risk Metals and Commodities Risk
Foreign Exchange Risk and Interest Rate Risk below, we engage in derivative instrument
transactions to reduce the impact, to varying degrees, of certain market risks to which we are
exposed on our earnings and cash flows from operations. Reference is made to these sections under
Risks and Uncertainties below for further information on these transactions, as well as to note
19 to the 2005 consolidated financial statements.
The following table shows the notional amounts, average price, contract amount and fair value
of our principal derivative instrument positions as at December 31, 2005:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
As at December 31, 2005 |
|
2006 |
|
|
2007 |
|
|
2008 |
|
|
2009 |
|
|
Total |
|
|
Metals |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LME forward nickel purchase
contracts1 (tonnes) |
|
|
12,462 |
|
|
|
420 |
|
|
|
|
|
|
|
|
|
|
|
12,882 |
|
Average price ($ per tonne) |
|
|
12,795 |
|
|
|
10,496 |
|
|
|
|
|
|
|
|
|
|
|
12,720 |
|
Contract amount (in $ millions) |
|
|
160 |
|
|
|
4 |
|
|
|
|
|
|
|
|
|
|
|
164 |
|
Fair value (in $ millions) |
|
|
8 |
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
9 |
|
|
LME forward nickel sell contracts1
(tonnes) |
|
|
4,086 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4,086 |
|
Average price ($ per tonne) |
|
|
13,342 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13,342 |
|
Contract amount (in $ millions) |
|
|
55 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
55 |
|
Fair value (in $ millions) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COMEX forward copper sell contracts2
(tonnes) |
|
|
181 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
181 |
|
Average price ($ per tonne) |
|
|
4,003 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4,003 |
|
Contract amount (in $ millions) |
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
Fair value (in $ millions) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copper range forward options2
(tonnes) |
|
|
19,500 |
|
|
|
58,992 |
|
|
|
48,384 |
|
|
|
|
|
|
|
126,876 |
|
Average (minimum-maximum)
($ per tonne) |
|
|
2,535-3,400 |
|
|
|
2,205-2,988 |
|
|
|
2,205-2,773 |
|
|
|
|
|
|
|
2,256-2,969 |
|
Contract amount (in $ millions) |
|
|
49-66 |
|
|
|
130-177 |
|
|
|
107-134 |
|
|
|
|
|
|
|
286-377 |
|
Fair value (in $ millions) |
|
|
(20 |
) |
|
|
(46 |
) |
|
|
(35 |
) |
|
|
|
|
|
|
(101 |
) |
|
Copper put options2 (tonnes) |
|
|
15,000 |
|
|
|
|
|
|
|
9,996 |
|
|
|
|
|
|
|
24,996 |
|
Average price ($ per tonne) |
|
|
2,425 |
|
|
|
|
|
|
|
2,491 |
|
|
|
|
|
|
|
2,451 |
|
Contract amount (in $ millions) |
|
|
36 |
|
|
|
|
|
|
|
25 |
|
|
|
|
|
|
|
61 |
|
Fair value (in $ millions) |
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
|
Platinum fixed price swaps3
(troy ounces) |
|
|
12,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12,000 |
|
Average price ($ per troy ounce) |
|
|
651 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
651 |
|
Contract amount (in $ millions) |
|
|
8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
|
Fair value (in $ millions) |
|
|
(4 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(4 |
) |
|
Platinum range forward options3
(troy ounces) |
|
|
20,009 |
|
|
|
24,174 |
|
|
|
34,644 |
|
|
|
|
|
|
|
78,827 |
|
Average (minimum-maximum)
($ per troy ounce) |
|
|
688-802 |
|
|
|
720-823 |
|
|
|
700-808 |
|
|
|
|
|
|
|
703-811 |
|
Contract amount (in $ millions) |
|
|
14-16 |
|
|
|
17-20 |
|
|
|
24-28 |
|
|
|
|
|
|
|
55-64 |
|
Fair value (in $ millions) |
|
|
(4 |
) |
|
|
(5 |
) |
|
|
(8 |
) |
|
|
|
|
|
|
(17 |
) |
|
116
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
As at December 31, 2005 |
|
2006 |
|
|
2007 |
|
|
2008 |
|
|
2009 |
|
|
Total |
|
|
Fuel oil
swaps4 (tonnes) |
|
|
32,150 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
32,150 |
|
Average price ($ per tonne) |
|
|
290 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
290 |
|
Contract amount (in $ millions) |
|
|
9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
|
Fair value (in $ millions) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Currencies |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cdn.$ forward contracts5 (millions) |
|
|
21 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
21 |
|
Average price (U.S.$) |
|
|
0.845 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0.845 |
|
Contract amount (in $ millions) |
|
|
18 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
18 |
|
Fair value (in $ millions) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Aus.$ forward contracts5 (millions) |
|
|
155 |
|
|
|
45 |
|
|
|
|
|
|
|
|
|
|
|
200 |
|
Average price (U.S.$) |
|
|
0.668 |
|
|
|
0.712 |
|
|
|
|
|
|
|
|
|
|
|
0.678 |
|
Contract amount (in $ millions) |
|
|
102 |
|
|
|
32 |
|
|
|
|
|
|
|
|
|
|
|
134 |
|
Fair value (in $ millions) |
|
|
11 |
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
12 |
|
|
Euro forward contracts5 (millions) |
|
|
86 |
|
|
|
30 |
|
|
|
|
|
|
|
|
|
|
|
116 |
|
Average price (U.S.$) |
|
|
1.193 |
|
|
|
1.213 |
|
|
|
|
|
|
|
|
|
|
|
1.198 |
|
Contract amount (in $ millions) |
|
|
103 |
|
|
|
36 |
|
|
|
|
|
|
|
|
|
|
|
139 |
|
Fair value (in $ millions) |
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
|
Pounds sterling forward contracts5
(millions) |
|
|
8 |
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
9 |
|
Average price (U.S.$) |
|
|
1.743 |
|
|
|
1.766 |
|
|
|
|
|
|
|
|
|
|
|
1.746 |
|
Contract amount (in $ millions) |
|
|
14 |
|
|
|
2 |
|
|
|
|
|
|
|
|
|
|
|
16 |
|
Fair value (in $ millions) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Interest rate swap6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(notional principal amount in $ millions) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(maturity 2011) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
200 |
|
Fair value (in $ millions) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
|
|
|
|
|
(1) |
|
In general, we do not use derivative instruments to hedge our exposure to fluctuating
nickel prices. We do enter into LME forward purchase contracts which are substantially
offset by fixed price customer contracts in order to more fully expose us to nickel price
risk. We also enter into LME forward sales contracts to minimize nickel price risk
associated with purchased nickel inventories of intermediates and finished nickel products. |
|
(2) |
|
We had outstanding put option contracts, giving us the right but not the obligation to
sell copper, and sold call option contracts, giving the buyer the right but not the
obligation, to purchase copper for time periods extending to 2008. We also enter into
forward copper sell contracts based upon quotations for copper on the COMEX Division of the
New York Mercantile Exchange. |
|
(3) |
|
Depending on market conditions, we enter into precious metals hedging contracts. These
contracts, in the form of swap contracts (whereby we simultaneously sell at a fixed price
and buy the same quantities for the same maturity dates at a floating price), are intended
to provide certain minimum price realizations in respect of a portion of our future
production of such metals. Under these swap contracts, we receive fixed prices for platinum
and pay a floating price based on monthly average spot prices. We also had outstanding put
option contracts, giving us the right but not the obligation to sell platinum and sold call
option contracts, giving the buyer the right but not the obligation, to purchase platinum
during the same time period. |
|
(4) |
|
We use fuel oil swap contracts to reduce the effect of fuel oil price changes in respect
of a portion of our energy requirements at PT Inco. Under these swap contracts, we pay
fixed prices for fuel oil and receive a floating price based on monthly average spot price
quotations. |
|
(5) |
|
We use forward currency contracts to eliminate the risk of exchange rate movements on a
portion of our future construction costs of capital assets at our Ontario operations and the
planned production facilities for the Goro project. |
|
(6) |
|
As at December 31, 2005, we had an outstanding interest rate swap of a notional amount of
$200 million on our term loan due 2011, whereby we initially receive a floating rate at
0.875 per cent over the 3-month London interbank offered rate and pay a fixed rate of 5.098
per cent. |
117
The following table shows the notional amounts, average price, contract amount and fair
value of our principal derivative instrument positions as at December 31, 2004:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
As at December 31, 2004 |
|
2005 |
|
|
2006 |
|
|
2007 |
|
|
2008 |
|
|
Total |
|
|
Metals |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LME forward nickel purchase
Contracts1 (tonnes) |
|
|
5,274 |
|
|
|
804 |
|
|
|
348 |
|
|
|
|
|
|
|
6,426 |
|
Average price ($ per tonne) |
|
|
12,283 |
|
|
|
9,748 |
|
|
|
9,667 |
|
|
|
|
|
|
|
11,824 |
|
Contract amount (in $ millions) |
|
|
65 |
|
|
|
8 |
|
|
|
3 |
|
|
|
|
|
|
|
76 |
|
Fair value (in $ millions) |
|
|
13 |
|
|
|
3 |
|
|
|
1 |
|
|
|
|
|
|
|
17 |
|
|
LME forward nickel sell contracts (tonnes) |
|
|
1,464 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1,464 |
|
Average price ($ per tonne) |
|
|
14,543 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14,543 |
|
Contract amount (in $ millions) |
|
|
21 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
21 |
|
Fair value (in $ millions) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Palladium fixed price swaps
(troy ounces) |
|
|
9,390 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9,390 |
|
Average price ($ per troy ounce) |
|
|
295 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
295 |
|
Contract amount (in $ millions) |
|
|
3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
|
Fair value (in $ millions) |
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
|
Platinum fixed price swaps
(troy ounces) |
|
|
30,828 |
|
|
|
12,000 |
|
|
|
|
|
|
|
|
|
|
|
42,828 |
|
Average price ($ per troy ounce) |
|
|
647 |
|
|
|
651 |
|
|
|
|
|
|
|
|
|
|
|
648 |
|
Contract amount (in $ millions) |
|
|
20 |
|
|
|
8 |
|
|
|
|
|
|
|
|
|
|
|
28 |
|
Fair value (in $ millions) |
|
|
(7 |
) |
|
|
(2 |
) |
|
|
|
|
|
|
|
|
|
|
(9 |
) |
|
Gold fixed price swaps
(troy ounces) |
|
|
29,956 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
29,956 |
|
Average price ($ per troy ounce) |
|
|
390 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
390 |
|
Contract amount (in $ millions) |
|
|
12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
|
Fair value (in $ millions) |
|
|
(2 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(2 |
) |
|
Platinum range forward options
(troy ounces) |
|
|
35,173 |
|
|
|
20,009 |
|
|
|
24,174 |
|
|
|
34,644 |
|
|
|
114,000 |
|
Average (minimum-maximum)
($ per troy ounce) |
|
|
698-829 |
|
|
|
688-802 |
|
|
|
720-823 |
|
|
|
700-808 |
|
|
|
701-816 |
|
Contract amount (in $ millions) |
|
|
25-29 |
|
|
|
14-16 |
|
|
|
17-20 |
|
|
|
24-28 |
|
|
|
80-93 |
|
Fair value (in $ millions) |
|
|
(2 |
) |
|
|
(2 |
) |
|
|
(2 |
) |
|
|
(2 |
) |
|
|
(8 |
) |
|
Fuel oil
swaps (tonnes) |
|
|
83,650 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
83,650 |
|
Average Price ($ per tonne) |
|
|
165 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
165 |
|
Contract amount (in $ millions) |
|
|
14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14 |
|
Fair value (in $ millions) |
|
|
2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
Currencies |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cdn.$ forward contracts (millions) |
|
|
458 |
|
|
|
21 |
|
|
|
|
|
|
|
|
|
|
|
479 |
|
Average price (U.S.$) |
|
|
0.782 |
|
|
|
0.845 |
|
|
|
|
|
|
|
|
|
|
|
0.785 |
|
Contract amount (in $ millions) |
|
|
358 |
|
|
|
18 |
|
|
|
|
|
|
|
|
|
|
|
376 |
|
Fair value (in $ millions) |
|
|
23 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
23 |
|
|
Aus.$ (millions) |
|
|
100 |
|
|
|
155 |
|
|
|
45 |
|
|
|
|
|
|
|
300 |
|
Average price (U.S.$) |
|
|
0.675 |
|
|
|
0.668 |
|
|
|
0.712 |
|
|
|
|
|
|
|
0.677 |
|
Contract amount (in $ millions) |
|
|
67 |
|
|
|
104 |
|
|
|
32 |
|
|
|
|
|
|
|
203 |
|
Fair value (in $ millions) |
|
|
9 |
|
|
|
14 |
|
|
|
2 |
|
|
|
|
|
|
|
25 |
|
|
Pounds sterling (millions) |
|
|
6 |
|
|
|
8 |
|
|
|
|
|
|
|
|
|
|
|
14 |
|
Average price (U.S.$) |
|
|
1.749 |
|
|
|
1.743 |
|
|
|
|
|
|
|
|
|
|
|
1.746 |
|
Contract amount (in $ millions) |
|
|
10 |
|
|
|
14 |
|
|
|
|
|
|
|
|
|
|
|
24 |
|
Fair value (in $ millions) |
|
|
1 |
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
Interest rate swaps (notional principal
amount in $ millions) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(maturity 2011) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
200 |
|
(maturity 2012) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
400 |
|
(maturity 2015) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
300 |
|
Fair value (in $ millions) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
|
|
118
Other Off-Balance Sheet Arrangements
During the past three years, we have had discussions with representatives of the Province
of Manitoba regarding what amount of financial assurance covering future closure or similar
requirements might be required for our Manitoba operations under applicable provincial regulations.
Based upon those discussions, financial assurance in the form of a letter of credit of
approximately $0.4 million covering certain long-term costs of maintaining certain of the Manitoba
operations has been provided by us. We understand that the Province of Manitoba is currently
reviewing changes it plans to make to its financial assurance requirements that would be applicable
to our Manitoba operations. While we currently cannot predict what, if any, actual additional
amount of financial assurance will be required by this Province, we do not believe that it will
have a material effect on our results of operations, financial condition or liquidity.
As discussed under Risks and Uncertainties Environmental Risks below, as of December 31,
2005 we had outstanding letters of credit in the amount of $23 million to secure a portion of our
closure costs covering three mines in our Ontario operations. We have also provided a letter of
credit in the amount of approximately $8 million covering certain remediation costs relating to the
construction and operating phases of our Voiseys Bay project. We understand that the Province of
Newfoundland and Labrador is also reviewing changes to its financial assurance requirements that
would apply to our Voiseys Bay project. Based upon our understanding of what changes could be
implemented, we could be required in 2006 to increase the letter of credit we have provided by an
amount in the order of $60 million to cover future closure and related requirements applicable to
these operations.
The off-balance sheet arrangements we currently have in place involve accounts receivable
securitized financing arrangements in the United States and Asia with unrelated entities under
which up to approximately $115 million in eligible receivables may be sold by us to these entities
at any time. Under these accounts receivable financing arrangements, a significant deterioration
in our credit rating and/or accounts receivable being sold could give the purchaser of such
receivables the right not to renew the arrangements. We have accounted for these securitizations
as asset sales since their inception but have recorded where relevant any loss retention reserves
with respect to the sale. As at December 31, 2005, the aggregate amount of receivables sold was
$39 million. We do not currently believe that our liquidity would be substantially reduced if
these arrangements were not available to us.
There are no significant long-term contractual arrangements with any related parties that
create or result in any obligations that are not on an arms length, negotiated basis.
Risks and Uncertainties
The following risks and uncertainties, among others, should be considered in evaluating
our outlook and future prospects.
Market Risk
We define market risk as being the risk of potential economic loss arising from adverse
changes in market rates and prices. Given the nature of our business and operations, the areas of
highest market risk or exposure for us are nickel prices and, to a lesser extent, our prices of
other metals and commodities that we produce or purchase (representing what we refer to as our
metals and commodities risk), foreign currency exchange rates (representing what we refer to as our
foreign exchange risk) and interest rates (representing what we refer to as our interest rate
risk), all of which are as discussed below. In the case of our metals and commodities risk, we
sell our products at prices based on world market prices and purchase fuel oil and other supplies
at market prices since these supplies are essentially commodities which can be purchased from a
large number of available sources. In addition to the two Australian suppliers of intermediate
nickel products to our Canadian operations and certain previously announced purchase and sale, toll
smelting and refining arrangements covering (1) our total planned copper production in anode form
with Falconbridge and (2) intermediate nickel products to be smelted and refined into finished
nickel by subsidiaries of Boliden AB and OM Group, Inc. that we entered into in 2005 and early
2006, we have a limited number of sole source suppliers of critical materials or services,
including electricity in Canada and other locations. The metals and commodity risks relating to
nickel and, to a lesser extent, other metals produced by us, given the significance of price
realizations to us of such metals, are expected to continue to have a material impact on our
results of operations, cash flow and financial condition. While the prices for our primary nickel
and other metals produced are based largely on, and sold in, U.S. dollars, we are subject to
foreign exchange risk because we incur a substantial portion of our costs and expenses in
currencies other than the U.S. dollar, in particular the Canadian dollar. We are exposed to
additional foreign exchange risk and are also exposed to interest rate risk because, to the extent
that we fund our operations and capital expenditures, including non-U.S. dollar capital
expenditures, through long-term and short-term borrowings, these borrowings are primarily in U.S.
dollars. Based upon past movements of certain foreign currency exchange rates, as described below,
and our current expectations of continued volatility in such
119
exchange rates for 2006, we believe that the potential near-term impact on future earnings and
cash flows with respect to changes in foreign currency exchange rates could have a material effect
on our financial condition, results of operations and cash flow. Based upon recent past movements
in interest rates, as described below, and our current expectations of changes in interest rates in
2006, we currently believe that the potential near-term impact of such changes on future earnings
will not have a material impact on our financial condition or results of operations.
The nickel industry has seen some substitution of other less costly metals or materials for
nickel in certain applications. Any significant increases in such substitution, particularly if
such changes represented a permanent shift away from the use of the primary nickel we produce,
would be expected to adversely affect nickel demand and our results of operations, financial
condition and cash flow from operations.
An uncertain global economic environment would be expected to have a significant adverse
effect on our business, results of operations, financial condition and cash flows given, as
indicated above, the historical correlation between industrial production and demand for primary
nickel and the other products we produce. There can be no assurance that oversupply situations
that existed in the past in the nickel markets could not reoccur in the future. Any excess supply
condition would have an adverse effect on the prices realized by us for our nickel products. Other
international economic trends, expectations of inflation and political events in major nickel
producing and consuming countries could also adversely affect nickel prices and the prices of other
metals produced by us. These factors are beyond our control and have resulted, and are expected to
continue to result, in a high degree of price volatility for nickel and other primary metals
produced by us.
There can be no assurance that the price for nickel or other metals produced by us will not
decline significantly from current levels. A return to the relatively low nickel price
realizations experienced in the late 1990s for us would have a material adverse effect on our
results of operations, financial condition and cash flow.
If demand for nickel in China or other major nickel-consuming markets in Asia, or any other
major consuming region, were to decline significantly, such an event would be expected to
negatively affect nickel prices and our results of operations, financial condition and our cash
flow from operations. If and to the extent that, given the positive correlation that has existed
historically between demand for nickel and industrial production, other industrialized regions of
the world were to experience slower economic growth or an actual decline in economic growth, such a
development would also be expected to affect nickel prices and our results of operations, financial
condition, and cash flow from operations. We have experienced periods of low nickel prices due to
over-supply conditions and/or declines in nickel demand and, given the historically cyclical nature
of nickel supply and demand, we expect that similar periods could reoccur in the future which could
result in our experiencing unfavourable results of operations, including net losses and negative
cash flows from operations.
We have engaged in transactions to reduce, to varying degrees, the impact of certain of these
market risks to which we are exposed on our earnings and cash flow from operations. We have
established policies and procedures governing the use of derivative instruments to address certain
market risks. These policies and procedures are intended to reduce some of the uncertainties
associated with the market risks specific to our business and operations and reduce the effect of
market fluctuations relating to the metals we produce and supplies of products and services we need
for our operations on our earnings and cash flows. We only use derivative instruments based on an
economic analysis of the underlying exposures, factoring in the anticipated correlations of the
underlying exposures, anticipating that adverse effects on future earnings and cash flows due to
fluctuations in metals and commodities prices, foreign currency exchange rates and interest rates
will be offset by proceeds from, and changes in the fair value of, the derivative instruments. We
do not, however, hedge our exposure to all market risks and do not hedge our exposure to any market
risk in a manner that completely eliminates the effects of changing market conditions on earnings
or cash flows.
We have had in place an internal risk management committee for a number of years. This
committee is comprised of senior financial and marketing executives and chaired by our Chief
Executive Officer. This internal committee oversees our hedging activities, whereby we use
derivative instruments to reduce market risks. The risk management committees oversight includes
reviewing compliance with our risk management policies authorized by our Board of Directors. The
risk management policies set forth the responsibilities of the internal risk management committee,
its membership and conduct, reporting requirements, controls, maximum hedging limits and related
authorizations delegated by our Board of Directors.
Under our risk management policies, hedging activities are restricted by maximum limits which
are specifically approved by our Board of Directors. The maximum limits are usually tied to a
maximum percentage of forecast annual production volume (or annual requirements, in the case of
supplies or currencies, as the case may be) for current and future years, up to five years.
Maximum limits are, subject to changes in, or stand-alone authorizations which Incos Board of
Directors may approve from time to time, currently as
120
follows: for nickel (year 1: 35 per cent of forecast annual production, year 2: 25 per cent,
year 3: 10 per cent); copper, platinum, palladium and gold (years 1 and 2: 75 per cent of forecast
annual production, years 3 to 5: 50 per cent); certain supplies to our operations (such as oil,
natural gas and electricity) (year 1: 75 per cent of forecast annual requirements, year 2: 50 per
cent, years 3 to 5: 25 per cent); and foreign currency (year 1: 75 per cent of forecast annual
requirements, years 2 and 3: 50 per cent, years 4 and 5: 20 per cent). To the extent that we do
hedge for certain metals and for supplies and foreign currencies, we have historically hedged at
levels below these limits absent specific circumstances where we believe that hedging up to or
close to such limits would be appropriate.
In addition, pursuant to our annual financing plan approved each year by our Board of
Directors, as well as specific debt financings authorized by our Board of Directors from time to
time, interest rate swaps may be authorized to effectively convert the interest rate applicable to
all or part of a debt financing from a fixed to a floating rate or vice versa at rates covered by
such approvals or authorizations, including interest rate swaps entered into on a short-term basis
in anticipation of the completion of a specific financing.
In addition to a quarterly review by our internal risk management committee of all hedging
activities and hedge positions, each quarter all hedging activities and hedge positions are
reviewed with and reported to our Audit Committee. Our internal audit group is also responsible
for periodically examining internal controls, trade execution and monitoring, reporting and
compliance with the risk management policy.
Metals and Commodities Risk
We are subject to metals and commodities risk because we sell our products and purchase
fuel oil and other supplies or services at prices for the most part effectively determined through
trading on major commodity exchanges, in particular the LME and the New York Mercantile Exchange.
The prices offered on these exchanges generally reflect the global balance of supply and demand for
the particular metal or commodity but are also influenced in the short-term by such factors as
investment funds flow, speculative activity in the particular commodity and currency exchange
rates.
The price of nickel, our principal product, continues to represent the major factor
influencing our results of operations, financial condition and cash flow from operations. The
selling prices for our primary nickel products are generally based on the LME cash nickel price.
However, certain of our products are customarily sold at a premium over the LME cash price,
particularly our specialty products such as nickel powders and foams. The markets for our products
have been, and are expected to continue to be, cyclical in nature and prices have been, and are
expected to continue to be, volatile. However, because we are one of the largest producers and
marketers of primary nickel in the world, we have chosen, subject to certain limited exceptions as
discussed below, not to hedge or otherwise attempt to mitigate to any significant degree the risk
of fluctuations in the price of nickel. We review this policy from time to time and may choose to
increase the currently limited use of derivative instruments to reduce such risks in the future.
In the case of other metals produced by us, we have from time to time entered into derivative
instruments to fix minimum realized prices. We do enter into LME forward purchase contracts which
are substantially offset by fixed price customer contracts in order to more fully expose us to
nickel price risk. We also enter into LME forward sales contracts to minimize nickel price risk
associated with purchased nickel inventories of intermediates and finished nickel products.
Depending on market conditions, we enter into precious metals hedging contracts. These
contracts, in the form of swap contracts (whereby we simultaneously sell at a fixed price and buy
the same quantities for the same maturity dates at a floating price), are intended to provide
certain minimum price realizations in respect of a portion of our future production of such metals.
We use fuel oil swap contracts to reduce the effect of fuel oil price changes in respect of a
portion of our energy requirements at PT Inco. Under these contracts, we receive or make payments
based on the difference between a fixed and a floating price for fuel oil.
With Voiseys Bay having begun production and once the Goro project has started commercial
production, we will become a significant producer of cobalt. When that occurs, we could be
affected by the highly competitive market for cobalt that currently exists and is expected to
continue to exist. Cobalt sold to customers is currently sold either on a fixed price basis using
annual contracts for customers in certain industries or on the basis of prices as quoted in the
Metals Bulletin and Platts, which are recognized metals industry publications that publish cobalt
and other metal prices. Such published prices are generally accepted as representing the benchmark
or market price indicator for cobalt. Cobalt, like nickel and copper, has historically been
subject to significant price volatility and we currently expect that such volatility will continue.
The financial analyses undertaken by us during 2004 in support of the substantial investment to be
made with respect to our Goro project were based upon a long term price of cobalt of $19.85 per
kilogram ($9.00 per pound). If realized cobalt prices, as well as realized prices for the other
metals to be produced by our Voiseys
121
Bay and/or Goro projects, were to be below the long-term prices assumed by us, the expected
financial returns from, and expected cash and other costs for, these projects would be adversely
affected.
At December 31, 2005, none of our currently planned nickel production is covered by, or
subject to, derivative contracts. At December 31, 2005, we had entered into derivative contracts
to hedge a portion of our planned copper and precious metals production over varying periods up to
four years. Outstanding derivative contracts for copper cover 29 per cent, 49 per cent and 47 per
cent of planned copper production in 2006, 2007 and 2008, respectively and for platinum the
derivative contracts cover 21 per cent, 15 per cent and 21 per cent of planned platinum production
in 2006, 2007 and 2008, respectively. Reference is made to note 19 to the 2005 consolidated
financial statements. We currently expect to produce copper and precious metals from our estimated
proven and probable ore/mineral reserves at our Ontario operations for a period in excess of twenty
years, a period that extends well beyond the maturity of our current derivative contracts covering
these metals. Reference is made to Derivative Instruments under Off-Balance Sheet Arrangements
and Aggregate Contractual Obligations above.
Foreign Exchange Risk
By virtue of our international operations, we incur costs and expenses in a number of
foreign currencies other than the U.S. dollar. The exchange rates covering such currencies have
varied substantially in the last three years. A substantial portion of our revenue is received in
U.S. dollars since the price of nickel and other metals we produce are generally referenced in U.S.
dollars, while a significant portion of our costs and expenses are incurred in Canadian dollars.
Fluctuations in exchange rates between the U.S. dollar and the Canadian dollar and between the U.S.
dollar and certain other currencies give rise to foreign currency exposure, either favourable or
unfavourable, which have materially affected and are expected to continue to materially affect our
results of operations and financial condition.
Our primary foreign exchange risk is to changes in the value of the Canadian dollar relative
to the U.S. dollar. We reduce, from time to time, the impact of this risk by entering into forward
currency contracts and foreign currency options. However, these activities do not eliminate the
potentially significant adverse effect that exchange rate fluctuations could have on our results of
operations or financial condition. At the end of 2005, these contracts took the form of forward
contracts, which establish a fixed exchange rate for the future purchases of the Canadian dollar
and certain other currencies, principally the Australian dollar, Euro and Pound sterling. The
purpose of these forward currency contracts is to eliminate the risk of foreign exchange movements
on (i) a portion of future Canadian dollar expenditures relating to our sustaining and other
capital projects in Canada and (ii) a portion of the future Australian dollar, Euro and Pound
sterling denominated construction costs for the planned production facilities for the Goro project.
We are, to a substantially lesser extent, also subject to fluctuations in the value of the
Indonesian rupiah relative to the U.S. dollar as a result of our operations in Indonesia. This
impact is reduced by the fact that a significant portion of PT Incos costs and revenues are
effectively denominated in U.S. dollars. Because of the limited nature of this exposure, we do not
customarily hedge the value of the rupiah against the U.S. dollar and no such financial instruments
were in effect at December 31, 2005.
We have experienced periods where the U.S. dollar has been relatively strong in relation to
the Canadian dollar. Historically, the positive correlation between the Canadian dollar and metal
prices has resulted in higher profit margins for us during periods when the Canadian dollar has
been relatively strong against the U.S. dollar. Accordingly, while a stronger Canadian dollar has
historically led to higher cash operating costs for us in U.S. dollar terms, the historical
accompanying increase in metal prices has resulted in higher profit margins. Conversely,
historically when the Canadian dollar has weakened relative to the U.S. dollar we have experienced
lower cash operating costs in U.S. dollar terms and the historical accompanying decrease in metal
prices has resulted in lower profit margins for us. Due to this correlation and the historical
responsiveness of nickel prices to cyclical supply-demand factors, we do not currently anticipate
that the impact of fluctuations in the Canadian dollar over the relevant period for which we use
the average exchange rates in estimating our ore/mineral reserves will affect the quantities of our
estimated proven and probable ore/mineral reserves given the relative importance of factors,
including the nature of the mineralization in our deposits, other than metals prices and exchange
rates on the estimation of our ore/mineral reserves. Reference is made to Ore Reserves above for
a description of the assumptions used in developing these estimates. However, there can be no
assurance that the historical correlation between the change in the value of the Canadian dollar
relative to the U.S. dollar and metal prices will continue and if it fails to do so our estimates
of proven and probable ore/mineral reserves could be adversely affected by a significant
strengthening of the Canadian dollar compared with the U.S. dollar. To the extent that we would
use other expected metal prices and exchange rates for our estimated proven and probable
ore/mineral reserves, these estimates could change significantly.
122
While the U.S. dollar is the functional currency in our Canadian operations, we are required,
for income tax purposes, to report income subject to Canadian tax in Canadian dollars. We have a
number of long-term debt obligations denominated in currencies other than Canadian dollars.
Fluctuations in the value of the relevant foreign currencies in relation to the Canadian dollar can
give rise to capital and/or income gains or losses for Canadian income tax purposes on the
repayment of any such foreign currency-denominated long-term debt obligations. Since the U.S.
dollar is both our functional and reporting currency, no gains or losses on the settlement or
marking to market of U.S. dollar-based obligations (representing the primary dollar denomination of
our long-term debt obligations) is reported in computing income reported in our 2005 consolidated
financial statements. For reporting purposes, we reflect the Canadian taxes potentially payable on
the settlement of our non-Canadian dollar-denominated debt in computing our long-term deferred tax
assets and liabilities for unrealized gains and losses and as a current tax expense for realized
gains and losses. No taxable event in respect of the debt occurs until the debt is settled by
payment or other form of discharge for Canadian tax purposes.
Should a fluctuation in the value between the Canadian dollar and the relevant foreign
currencies result in us being subject to reporting a capital and/or income gain for Canadian income
tax purposes when a debt were repaid, we would report as either a current tax expense in respect of
realized gains, or a deferred tax expense in respect of unrealized gains, for the Canadian income
taxes payable, in respect of such a gain. This increase in our tax provision may distort our
effective tax rate, since no such foreign currency gain would be reported in our consolidated
financial statements.
Interest Rate Risk
Our exposure to changes in interest rates results from investing and borrowing activities
undertaken to manage our liquidity and capital requirements. We generally have used fixed-rate
debt to finance long-term investments, while variable-rate debt has been used to meet working
capital requirements and related requirements on a more near-term basis. At December 31, 2005,
taking into account our interest rate swap discussed below, approximately 14 per cent of our total
debt was subject to variable interest rates. Based upon the level of floating or variable-rate
debt at December 31, 2005, the impact of a 10 per cent change in underlying interest rates, or 45
basis points, would change interest expense by about $1 million over a full year. As noted under
Cash Flows, Liquidity and Capital Resources 2005 Compared with 2004 above, we could be required
to raise additional debt in the future to meet our capital expenditures and other requirements, and
we could experience higher interest costs as a result of a downgrade in our credit ratings and,
accordingly, in such cases our results of operations and cash flow from operations could be
materially adversely affected by changes in interest rates in the future despite any interest rate
swaps we might then have in effect.
As at December 31, 2005, we had an outstanding interest rate swap in respect of our $200
million term loan due 2011 whereby we receive a floating rate of interest at certain London
interbank offered rates plus 0.875 per cent and pay a fixed rate of 5.098 per cent.
Counterparty Risk
Our interest rate swap, metals and foreign currency risk management activities expose us
to the risk of default by the counterparties to such arrangements. Any such default could have a
material adverse effect on our results of operations and financial condition. We do not obtain
collateral or other security to support derivative instruments subject to credit risk but mitigate
this risk by dealing only with counterparties that we believe, based upon an assessment of each
such counterpartys financial history and experience, to be financially sound and, accordingly, we
do not anticipate a loss for non-performance by any counterparty with whom we have a commercial
relationship.
Environment Risk
Environmental legislation and regulations affect nearly all aspects of our operations and
development projects worldwide. Such legislation and regulations apply to us along with other
companies in the mining and metals industry. These types of legislation and regulations require us
to obtain operating licences, permits and other approvals and impose standards and controls on
activities relating to mining, exploration, development, production, reclamation, closure and the
refining, distribution and marketing of nickel and other metal products. Environmental assessments
are required before initiating most new projects or undertaking significant changes to existing
operations. In addition to current requirements, we expect that additional environmental
regulations will likely be implemented to protect the environment and quality of life, given issues
of sustainable development and other similar requirements which governmental and supragovernmental
organizations and other bodies have been pursuing. Some of the issues currently under review by
environmental regulatory agencies include (i) further reductions in, or requiring enhanced
stabilization of, various emissions, including sulphur dioxide, metals and greenhouse gas
emissions, (ii) additional mine reclamation and restoration, and (iii) more restrictive water, air
and soil quality and waste, tailings and other materials treatment and disposal.
123
We account for asset retirement obligations as discussed in note 2 to the consolidated
financial statements. The estimate of the total liability for asset retirement obligations has
been developed from independent environmental studies, which include an evaluation of, among other
factors, information available at that time with respect to closure plans and closure alternatives,
the anticipated method and extent of site restoration using current costs and existing technology,
and compliance required by presently enacted laws, regulations and existing industry standards.
The total liability for asset retirement obligations represents estimated expenditures associated
with closure, progressive rehabilitation and post-closure care and maintenance. Potential
recoveries of cash or other payments from the future sale of assets upon the ultimate closure of
operations have not been reflected in the estimate of the total liability or related annual
provisions or charges. Future changes, if any, to the estimated total liability, as a result of
changes in requirements, laws, regulations and operating assumptions may be significant and would
be recognized prospectively as a change in accounting estimate, when applicable. Although the
ultimate amount to be incurred is uncertain, the total present value of the liability for asset
retirement obligations in respect of our worldwide operations to be incurred primarily after
cessation of operations was estimated to be $171 million (including a current portion of such total
obligation of $3 million) at December 31, 2005 based upon certain discount rates and timing with
respect to when these costs would be expected to be incurred.
Changes made in 2000 to mining regulations in the Province of Ontario require us to provide
letters of credit or other forms of financial assurance intended to secure our ability to meet
future reclamation and restoration costs, which are not expected to be incurred for many years, if
we were to no longer meet certain minimum investment grade credit ratings for our outstanding
publicly traded debt securities. Although our debt securities are currently rated investment
grade, they were rated below investment grade in recent times and there can be no assurance that
this situation will not reoccur. If we are not able to maintain the minimum investment grade
credit ratings, it is currently estimated that letters of credit or other forms of financial
assurance associated with the currently estimated costs of the eventual future closure of our mines
and other facilities in Ontario would have to cover approximately $790 million in such closure
costs on an undiscounted basis. Due to the closure of three mines in Ontario, in 2002 we were
required under such mining regulations to provide letters of credit in the amount of $23 million at
that time to secure these near-term closure costs as discussed below. In addition, we are subject
to certain Indonesian regulations which require us to provide security for the reclamation of land
areas that have been mined. In the case of our Manitoba operations, in 2003 we submitted closure
and reclamation plans for all our operations in that province and in 2004 we provided financial
assurance in the form of a letter of credit in the amount of approximately $0.4 million for certain
future reclamation and restoration costs in that province. In 2005 the reclamation and closure
plan for the mine and concentrator and related facilities at Voiseys Bay was approved by the
Province of Newfoundland and Labrador, resulting in an increase in the financial assurance covering
both the construction and operating phases of the initial phase of the project to $8 million. As
discussed above, we believe that the financial assurance in the form of one or more letters of
credit we will be required to provide to the Province of Newfoundland and Labrador will increase to
in the order of $60 million. We do not currently know what, if any, changes in the security for
reclamation costs in Indonesia or Manitoba might be made in the future. However, beyond the
expected increase for our Voiseys Bay project referred to above, it is not currently expected that
such financial assurance as might be required to be provided for our Indonesian, Manitoba and
Voiseys Bay operations will be of a material amount. These potential costs might not be incurred
until many years in the future. If these requirements for letters of credit or other forms of
financial security had to be satisfied, they could have an adverse effect on the amounts available
for borrowing by us under our bank credit facilities.
In February 2002, the Ontario government issued a control order (February 2002 Order) that
requires us to reduce sulphur dioxide emissions by 34 per cent from the current limit of 265,000
tonnes to 175,000 tonnes at our Ontario smelting operations by the end of 2006. We are currently
implementing an investment of approximately $90 million in fluid bed roaster off-gas scrubbing
technology intended to reduce sulphur dioxide emissions to the new levels mandated by this new
control order by the end of 2006. As part of the control order, we will also be required to (i)
reduce ground level concentrations of sulphur dioxide, (ii) continue research into the technology
and economics of further reductions in sulphur dioxide emissions and (iii) report annually to the
Ontario Ministry of the Environment and the public on the progress of this research program. The
February 2002 Order calls for a final report on achieving the additional reductions to be submitted
by December 31, 2010. We do not currently expect that compliance with the annual sulphur dioxide
emission levels from our smelter operations or ground level concentrations as set forth in the
February 2002 Order will have any significant effect on our costs, operating procedures or annual
production of nickel and other primary metals from our Ontario operations.
In October 2005, the Ontario government enacted legislation that created new ceilings or caps
on sulphur dioxide emissions from our Sudbury smelter to be applicable over the 2006 2015 period.
This legislation also established emission allowances that could be banked or traded (bought or
sold) in an emissions trading market. In 2006 the ceiling or cap under this legislation that
applies to our Sudbury smelter is approximately 256,000 tonnes. This cap declines to no higher
than 175,000 tonnes in 2007 and could be lower depending upon actual production rates over the 2004
2006 period. Beyond 2007 and through 2014, this annual cap could be lower than 175,000 tonnes
depending upon actual production rates over a three year rolling period. In 2015, this cap will
fall to 66,000
124
tonnes. We believe that, given the implementation of the fluid bed roaster technology
referred to above and our ability to bank and purchase emission allowances over this period, we
will be able to meet the caps over the 2006 2014 period without seriously affecting our currently
planned production rates at our Ontario operations or requiring significant capital expenditures
beyond what we currently estimate. We cannot, however, predict at this time what additional
capital expenditures would be required and the technology that could be implemented to meet the
2015 cap and what impact that cap would have on our production in Ontario, results of operations
and cash flow from operations.
In September 2004, the Canadian federal environmental agency, Environment Canada, published a
notice indicating its intention, under the requirements of the Canadian Environmental Protection
Act (CEPA), to control emissions from base metal smelters and refineries using pollution
prevention planning and a code of best practices for this sector. The notice also indicated a set
of emission targets that each smelter in Canada, including our facilities in Ontario and Manitoba,
would be expected to meet. Environment Canada provided for an eighteen-month period from September
2004 for companies to indicate whether they could develop a plan to meet their proposed new targets
on certain emissions. In response to this initiative, we have proposed that target levels for such
emissions to be established by Environment Canada for our Ontario operations mirror the target
levels developed by the Ontario Government and for our Manitoba operations they defer any reduced
target levels until 2020. We do not know at this time what target levels Environment Canada may
decide to set for our Canadian operations and over what period of time. Depending upon the
difference in those target levels from what currently applies to our Ontario and Manitoba
operations for the currently applicable periods and beyond, we may not be able to meet such levels
without making very significant capital expenditures, and compliance with such levels could
materially adversely affect our production levels, our financial results and cash flow from
operations.
As of December 31, 2005, we had outstanding letters of credit in the amount of $23 million to
secure a portion of our closure costs related to the closure of three mines in Ontario. These
letters of credit have a term of one year and will automatically renew without any action by either
us or the counterparty until the earlier of (i) Inco having complied with the terms of the
certified closure plans or (ii) funds from such letters of credit being utilized by the Ontario
Ministry of Northern Development and Mines, the ministry responsible for overseeing such closure
plans, to perform rehabilitation work if we did not meet the requirements with respect to such
closure plans. We are required to submit annual updates on changes to the closure plans, including
any decommissioning and rehabilitation work completed during the previous year. We have also
provided letters of credit or similar forms of financial assurance to secure future closure costs
associated with certain other operations or projects in North America and elsewhere which currently
have, or are expected to have, fairly extended useful lives. As noted above, we have also provided
a letter of credit in the amount of approximately $8 million covering certain remediation costs
covering the construction and current operating phases of our Voiseys Bay project.
Canada signed and ratified the Kyoto Protocol to the United Nations Framework Convention on
Climate Change (Kyoto Protocol) in December 2002. The Kyoto Protocol calls for significant
reductions in the emissions of greenhouse gases, such as carbon dioxide, and nationwide ceilings on
such emissions. In November 2002, the federal government of Canada released an initiative to
address certain causes of climate changes. The specific requirement of this initiative is also to
limit the discharge of carbon dioxide and other greenhouse gases. Neither the Kyoto Protocol nor
this other initiative has as yet established what the specific allocation of reductions among
various sources of greenhouse gases would be. In August 2003, the federal government of Canada
released certain principles covering the Kyoto Protocol intended to be used to implement the
objective of having the oil and gas, thermal energy and mining and manufacturing sectors reduce
greenhouse gases by certain specified limits. While during 2004 there was relatively little
progress made by the federal government of Canada on advancing the implementation of greenhouse gas
emission reductions as part of the Kyoto Protocol, in April 2005 Canada announced its so-called
Project Green as part of the federal budget, intended to implement at least certain aspects of the
Kyoto Protocol. This project provided for the overall reduction of greenhouse gases (GHGs) by
so-called large final emitters (LFEs) such as leading metals and mining, energy and other
companies, including ourselves, by 45 million tonnes. In July 2005 the federal government
published a notice intended to outline certain principles for this project, including exactly what
types of companies would be viewed as LFEs, and the level of GHGs reductions to be implemented by
LFEs over the 2008 2012 first phase of the Kyoto Protocol. It is currently expected that we, as
an LFE, could be required to reduce our GHGs intensity (based upon direct energy used and actual
production) by 12 to 17 per cent from the base year of 2000 to be calculated for and applicable
only for smelting and refining emissions. This reduction could result in a cost to us, based upon
how these reductions are to be assessed, of in the order of $2 million. In November 2005, the
federal government designated GHGs as toxic under CEPA, thus giving it the authority to regulate
GHGs such as carbon dioxide under CEPA. We do not know what additional steps the federal
government might take through CEPA to reduce GHGs and the impact those steps could have on our
operations and cash flow.
125
While the precise impact of the Kyoto Protocol on our operations in Canada and the
operations of others who provide energy or other products or services to us is uncertain at this
time, we anticipate that compliance with these requirements could have a significant adverse effect
on our results of operations and costs.
In 2002, the Danish Environmental Protection Agency (the Danish EPA), as part of the
authority granted to it under certain environmental regulations of the European Union Commission
intended to control the risk to humans and the environment from certain chemicals and other
substances, published draft risk assessment reports, including certain conclusions concerning
potential human health hazards associated with nickel metal and certain soluble nickel compounds,
including nickel sulphate, nickel chloride and nickel nitrate. Under this European regulatory
framework, there are generally four stages associated with the risk assessment process covering
substances such as chemicals and other materials: data collection, priority setting, risk
assessment and risk reduction. The Danish EPA determined that, based on certain animal studies,
soluble nickel is a reproductive toxin and has proposed certain product labelling requirements as a
result of this determination. It has also assessed certain other environmental issues. In
addition, based upon the draft reports released in 2002 and taking into consideration certain
studies, the Danish EPA has proposed that soluble nickel be classified under its hazard
classification system as a known human carcinogen. In 2004, European Union member states agreed
that soluble nickel compounds should be classified as a category 1 (known human carcinogen)
carcinogen and a category 2 (based on animal studies) reproductive toxin. It was also proposed
that metallic nickel will be classified as a category 3 (suspected) carcinogen. These revised
classifications would mean changes in product labelling, communication to workers and customers and
the development of risk management measures for these forms of nickel. The Danish EPA has,
however, concluded that there was insufficient information to complete its environmental risk
assessment, and in 2004 collaborative studies were undertaken to collect data on the behaviour of
nickel in the environment and European background levels and emission sources. The environmental
section of the risk assessment was initiated after the human health risk assessment. The
environmental risk assessment consists of a hazard identification section, an exposure section, and
an effects section and will conclude with a risk assessment section. The hazard identification and
exposure sections were finalized in September 2005, with the exception of minor areas of
clarification. The results of these sections have focused on data collection and analysis. The
remaining sections of this risk assessment process are scheduled for completion in 2006. Once
these sections of this risk assessment are completed, the next stage in this regulatory process
will be the implementation of risk management and risk reduction practices for those nickel
substances considered in the risk assessment. In the development of such requirements, the
authorities are obligated to take into account technical feasibility and socio-economic
considerations. Some of the risk reduction practices that may be considered include modifications
to material safety data sheets, the introduction of labelling describing the hazards and more
restrictive packaging of soluble nickel compounds, lowering of the European occupational exposure
limit for nickel and stricter engineering controls, including total containment of nickel
processes. If the requirements currently being considered as part of such risk assessments were to
come into effect, it could result in use restrictions and other requirements which could have a
material adverse effect on certain nickel producers and end users of the forms of nickel covered by
such classifications, and on our business, results of operations, financial condition and
liquidity. The revised classification would also mean changes in labelling, communication to
workers and customers and the development of risk management measures. Member states of the
European Union will have until 2010 to achieve certain target limit values for nickel, after which
more stringent binding limit values may be considered. The technical and socio-economic
feasibility of meeting such limits are currently being considered by the European Union Commission
and those industries that would be affected, including nickel producers.
Further changes in environmental laws, restrictions on our discharge of GHGs as a result of
Canadas program to comply with the Kyoto Protocol and similar developments that may be imposed, as
well as the collection of new information on existing environmental conditions and other events,
including legal proceedings brought based upon such conditions or an inability to obtain necessary
permits, could require us to make significant other expenditures or could otherwise have a material
adverse effect on our business, results of operations, financial condition and liquidity.
The changes outlined above and other changes in environmental legislation could have a
material adverse effect on demand for our products, product quality and methods of production and
distribution. The complexity and breadth of these issues make it extremely difficult to predict
their future impact on us. We currently anticipate capital expenditures and operating expenses
will increase in the future as a result of the implementation of existing and new and increasingly
stringent environmental regulations. Compliance with environmental legislation can require
significant expenditures and failure to comply with environmental legislation may result in the
imposition of fines and penalties, liability for clean up costs, damages and the loss of important
permits.
There can be no assurance that we will at all times be in compliance with all environmental
regulations or that steps to bring us into compliance would not materially adversely affect our
business, results of operations, financial condition or liquidity. We may also be subject to
claims from persons alleging that they have suffered significant damages as a result of the
environmental impact of our operations, including facilities that have ceased to operate for many
years.
126
Other Risks and Uncertainties
PT Inco
Our investment in PT Inco at book value as of December 31, 2005 totalled $392 million.
In addition, a lender to PT Inco currently has the right, under certain circumstances, to require
one of our wholly-owned subsidiaries to purchase approximately $6 million in debt extended to PT
Inco by that lender. In 1999, to meet PT Incos cash shortfalls attributable principally to the
increase in the capital cost of the Balambano hydroelectric facilities which were part of PT Incos
expansion project, the relatively low nickel prices, and constraints on PT Incos production
attributable to the then reduced hydroelectric power generation caused by below average rainfall,
we advanced $88 million to PT Inco. These advances were effectively repaid in 2002. To the extent
that PT Inco would experience cash shortfalls in the future, particularly if there were to be a
significant decline in primary nickel demand and nickel prices, we may again conclude that it would
be necessary to advance cash to PT Inco in order to meet PT Incos cash needs.
For 2006, PT Incos production is expected to represent about 30 per cent of our total planned
production. The uncertain political situation and security concerns in Indonesia, primarily as a
result of the ongoing economic, political and social problems facing that country, could adversely
affect PT Incos ability to operate. Based upon recent regulations issued by the Indonesian
Minister of Forestry relating to mining activities in areas designated as protected forests, PT
Inco could be restricted from mining in certain areas it is authorized to mine under its Contract
of Work with the Indonesian government and such a development could adversely affect PT Incos
long-term mine plans and overall production levels. In addition, PT Inco is awaiting receipt of an
amendment to a forestry permit in connection with its new dam and related project. While there has
been no indication that the Government of the Republic of Indonesia is considering currency
controls, nationalization of certain properties or facilities or other similar actions, regional
and local governmental authorities have sought to take greater control of the development of their
resources and these or other political developments, including, but not limited to, the possibility
of disruptions in PT Incos operations arising out of the actions of non-governmental organizations
or community activist groups, could have a material adverse effect on PT Incos, and our overall,
nickel production levels, business, results of operations, financial condition and cash flow from
operations.
Risks Associated with, and Importance of, Future Low-Cost Nickel Projects
As part of our strategy to be the worlds lowest cost and most profitable nickel
producer, we have continued our efforts to develop new low-cost sources of nickel. Following the
completion of the PT Inco expansion project in late 1999, we have focused, as discussed above, on
our Voiseys Bay nickel-copper-cobalt project and our Goro nickel-cobalt project. A number of
risks and uncertainties are associated with the development of these projected low-cost sources of
nickel and other metals, including political, regulatory, design, construction, labour, operating,
technical and technological risks, uncertainties relating to capital and other costs and financing
risks and, in the case of Goro, risks related to the possible future transition to independence of
New Caledonia. There have been periodic attempts by certain local groups in the area of the Goro
project site to disrupt operations and activities at that site and related areas, most recently in
late 2005. We cannot predict whether these local groups will continue to seek to disrupt such
operations and activities and what effect, if any, such actions will have on the construction and
start-up of the Goro project.
In addition to the risks and uncertainties referred to above, there are certain issues that
must be resolved to enable the commercial development of the Goro project. We still need to
receive certain remaining construction, environmental and operating permits. While we currently
anticipate that we will be able to obtain all such remaining permits on a timely basis, any failure
to obtain, or delay in the issuance of, such permits could adversely affect the construction and
initial operation of the Goro project. In addition, we will need to continue to meet the terms and
conditions under the definitive agreements covering the development of the Voiseys Bay project
reached in October 2002 between the Government of Newfoundland and Labrador and us. Depending upon
the levels of cash flows we are able to generate, we may also need to secure financing for the
completion of the Goro project on acceptable terms.
In connection with the significant financing required for completion of the development of the
Goro project, we currently expect that, in order to be able to meet such financing needs, we could
be required to borrow additional funds, issue additional equity, and/or enter into strategic or
other arrangements. As discussed under Uncertainty of Production and Capital and Other Cost
Estimates below, while we have certain potential new mine development projects at our existing
operations in Canada, as well as additional resources that could be developed in Indonesia in
addition to the Voiseys Bay and Goro projects, if sufficient new low-cost sources of nickel were
not developed by us on a timely basis, we currently believe that our overall nickel production,
particularly at our Manitoba operations notwithstanding certain projects at those operations such
as the development of the 1D Lower orebody, as noted below, could decline beginning as early as
2012 and our nickel unit cost of production could increase significantly with any material decline
in mine production from our Ontario and Manitoba operations if such operations were not
significantly restructured. These developments could materially adversely affect our business,
results of operations, financial condition and liquidity.
127
Uncertainty of Production and Capital and Other Cost Estimates
A decrease in the amount of and a change in the timing of our production outlook for the
metals we produce, in particular nickel, will directly impact the amount and timing of our cash
flow from operations. A 10 per cent reduction in the amount of consolidated planned production of
all metals produced would decrease cash flow from operations estimated for 2006 by approximately
$240 million based on metal prices and costs at December 31, 2005. The actual impact of such a
decrease on such cash flow from operations would depend on the timing of any changes in production
and on actual prices and costs. In the case of our Canadian and United Kingdom operations, the
time from initial production to collection of cash from the sale of nickel products produced by
these operations is approximately 20 weeks, while the time between production of copper and cash
collection from copper sales is about 19 weeks. The production of most of our precious metals
requires the transfer of precious metals-containing materials to our Acton refinery in the United
Kingdom and the processing time at that facility generally results in cash collection taking about
27 weeks from first production of such materials in our Ontario operations. In the case of PT
Inco, the time between nickel-in-matte production, refining of that intermediate product through
our Asian refineries and collection of cash from the sale of such refined products is approximately
9 weeks. Any change in the timing of these cash flows that would occur due to production
shortfalls or labour disruptions would, in turn, result in delays in receipt of such cash flows and
in using such cash to reduce debt levels and may require additional borrowings to fund capital
expenditures, including capital for our development projects, in the future. In addition, a number
of these and other developments or events, including changes in credit terms, product mix, demand
for our products and production disruptions, could make historic trends in our cash flows lose
their predictive value.
The level of production and capital and operating cost estimates relating to our Goro and
Voiseys Bay projects and other projects, which are used in establishing ore/mineral reserve
estimates and for determining and obtaining financing and other purposes, are based on certain
assumptions and are inherently subject to significant uncertainties. It is very likely that actual
results for our Voiseys Bay and Goro projects will differ from our current estimates and
assumptions, and these differences may be material. In addition, as discussed below, experience
from actual mining or processing operations may identify new or unexpected conditions which could
reduce production below, and/or increase capital and/or operating costs above, our current
estimates. If actual results are less favorable than we currently estimate, our business, results
of operations, financial condition and liquidity could be materially adversely impacted.
Goro
In October 2004, we announced that, having completed and successfully achieved the key
objectives of the second phase, or Phase 2, of the Goro project review, we would proceed with the
development of our Goro nickel-cobalt project in New Caledonia. A key objective of this second
phase of the Goro review was to achieve a reliable and acceptable capital cost estimate for the
project. This review, which proceeded in two phases, had begun following the decision made in
December 2002 to suspend the project. The final results of the review included an updated capital
cost estimate of $1,878 million for the mine, process plant and related infrastructure, within a
minus 5 per cent to plus 15 per cent confidence level. This estimate included $294 million for
mine, process plant and related infrastructure capital expenditures that had already been made
through September 30, 2004 and which will continue to have use in the reconfigured project scope.
This capital cost estimate also included $40 million for assumed escalation in costs during the
construction phase of the project, an amount that was not in previous capital cost estimates, and
also reflected favourable currency hedging gains realized by Inco of about $31 million which were
also not included in previous estimates. The principal reasons for the increase from the $1,850
million capital cost estimate we had announced on May 25, 2004 were for a range of construction
materials and labour required for construction and the incorporation of a new tailings storage area
as part of the project. The project experienced cost pressures in 2005 and continues to experience
cost pressures related principally to commodities and other materials required for construction,
including fuel and hydro carbon-based products. We currently believe that, if we undertook an
updated capital cost estimate at this time for the Goro mine, process plant and infrastructure, it
would expect to be $1,878 million plus at the upper end of the plus 15 per cent confidence level.
As discussed above, we expect to have a definitive cost estimate, subject to such qualifications as
may apply, in the second quarter of 2006, when engineering will be at least 80 per cent complete
and all major contracts will have been awarded.
Phase 2 of the project review also focused on a number of other key objectives, including (1)
a viable project implementation schedule and clear project execution plan, (2) a prudent financing
plan taking into account Incos projected cash flow potential to fund its expected share of the
capital costs of the project, (3) an experienced and dedicated team for both the construction and
operating phases and (4) optimizing the Goro projects planned process plant design and engineering
requirements while also meeting specific
objectives on project operability, maintainability, risk mitigation and environmental
protection. The final results of Phase 2 of the review met all of these key objectives. The
projects process plant footprint area was reduced by approximately 50 per cent from its
128
original
plan, reducing the quantities of bulk materials required, enhancing the efficiency of the planned
process plant from an operational and maintenance perspective, and reducing any potentially adverse
environmental effects.
We currently plan that, as part of the project schedule, the Goro project would reach about 75
per cent of its expected annual capacity of 60,000 tonnes of nickel within 12 months after initial
production, and would be at approximately 90 per cent of that expected annual nickel capacity
within two years after initial production. As part of the results of the Phase 2 review, the Goro
projects expected cobalt capacity was revised to a current range of 4,300 to 5,000 tonnes per year
to take into account the optimized mine plan for the project.
Operations
Since 2002, as mine production at our Manitoba operations transitioned from the Thompson
Mine to the lower grade Birchtree Mine, we experienced lower mine production. We have relied upon
the availability of purchased nickel intermediates to maintain Manitobas nickel production at
around the 45,000 tonne annual level. With the availability of Voiseys Bay nickel concentrates
for processing at our Manitoba operations, these operations are expected to produce finished nickel
products at or above the 45,000 tonne annual level over at least the 2006 2011 period. In
August 2005, we announced plans to develop the 1D Lower orebody at the Thompson Mine. Work has
commenced on the development of the 1D Lower orebody, which would increase the availability of
local concentrates and, assuming the current diamond drilling program for lateral and deeper
extensions is successful, would provide a platform for ongoing production once Voiseys Bay
concentrates are no longer supplied to Manitoba. The cost to develop the 1D Lower orebody is
approximately $34 million and production is expected to begin in 2008.
Starting in early 2006, we will be relying on our Voiseys Bay nickel concentrates to maintain
production at or near capacity at our Manitoba and Ontario operations. If our Voiseys Bay
operations experience problems in producing or shipping to Sudbury or Thompson its nickel
concentrates, these events would have an adverse effect on our ability to produce and sell the
nickel products we plan to produce in 2006 and would adversely affect our results of operations,
financial condition, profitability and cash flows. Extended strikes, such as the one we
experienced at our Ontario operations in 2003, other labour disruptions and unforeseen events would
also adversely affect our production plans and costs and these developments would also adversely
affect our results of operations, financial condition and cash flows.
Construction Risks and Technological Risks
The mine, processing plant and related infrastructure required for the development of the
Goro project has not yet been constructed and no commercial mining has commenced. Certain of the
necessary construction permits remain to be obtained in respect of the Goro project. While
detailed exploration and related studies with respect to the Goro project have been completed based
on (1) significant surface exploratory drilling, (2) extensive investigations of certain of the
mineralization delineated to date, (3) construction and mine plans, and (4) production and cost
estimates, we are not currently in a position to predict with certainty when all of the required
remaining approvals would be in place for us to complete and start up the Goro project by late
2007.
Unforeseen conditions or developments could arise during the construction period which could
delay or prevent completion, and/or substantially increase the cost of construction of the
necessary facilities and infrastructure to develop the project. Such events may include, without
limitation, shortages of equipment, materials or labour, delays in delivery of equipment or
materials, labour disruptions, political events, local or political opposition, civil disturbances,
litigation, adverse weather conditions, unanticipated increases in costs, natural or man-made
disasters, accidents and unforeseen engineering, technical and technological, design,
environmental, geological or geotechnical problems. Any delay in construction would delay the
production of nickel and other products from the Goro project, and the expected significant source
of revenue for us that production from this project would represent. Any such delay could also
materially adversely impact our business, results of operations, financial condition and liquidity.
Our Goro project will involve the application of new processing and other technologies and,
depending upon the results of the hydrometallurgical research and development program we are
conducting for our Voiseys Bay project, the remaining phases of that project could also utilize
new processing and other technologies to produce one or more refined or finished nickel products.
There can be no assurance that these technologies will be successfully developed and applied on a
commercial basis or that the costs associated with and/or the timing of their implementation will
not have a material adverse effect on the timing of the start-up of commercial production, the
capital and/or operating costs for either or both projects and on other factors impacting the
profitability of these projects. These events could materially adversely impact our business,
results of operations, financial condition and liquidity.
129
Governmental Regulations
In addition to environmental regulations referred to above, the mining and metals
industry in Canada operates under federal, provincial and municipal legislation, regulation and
intervention by governments in such matters as land tenure, limitations on areas in which mining
can be conducted, production rates, income and other taxes and the export of ore and other
products, as well as other matters. Our operations in Indonesia, the United Kingdom, New Caledonia
and in other countries outside Canada are also subject to various environmental, operating and
other applicable laws and regulations and governmental interventions, some of which are similar to
those in Canada and all of which are subject to change. The mining and metals industry is also
subject to regulation and intervention by governments in such matters as control over the
development and abandonment of mine sites (including restrictions on production) and possible
expropriation or cancellation of contract and mineral rights. Before proceeding with major
projects, including significant changes to existing operations, we must obtain certain regulatory
approvals. The regulatory approval process can involve stakeholder consultation, environmental
impact assessments and public hearings, among other things. In addition, regulatory approvals may
be subject to conditions, including the obligation to post security deposits and other financial
commitments. Failure to obtain regulatory approvals, or failure to obtain them on a timely basis,
could result in delays and abandonment or restructuring of projects and increased costs, all of
which could negatively affect our profitability and cash flows. In addition, such regulations may
be changed from time to time in response to economic or political conditions, and the
implementation of new regulations or the modification of existing regulations affecting the mining
and metals industry could increase our costs and have a material adverse impact on business,
results of operations, financial condition and liquidity.
There can be no assurance that we will be in compliance with all applicable laws or
regulations at all times or that steps to bring us into compliance would not materially adversely
impact our business, results of operations, liquidity or financial condition. Reference is made to
Risks and Uncertainties Environmental Risks above.
Capital Requirements and Operating Risks
As discussed under Cash Flows, Liquidity and Capital Resources and Off-Balance Sheet
Arrangements and Aggregate Contractual Obligations above, each of our two current principal
primary metals business units, the Canadian and United Kingdom operations and PT Inco, has
required, and is expected to continue to require, certain levels of investment to sustain their
current levels of production. For 2006, as discussed under Outlook 2006 Planned Capital
Expenditures below, we currently forecast capital expenditures totalling approximately $1,820
million, covering sustaining capital expenditures for our current primary metals business units as
well as planned expenditures for our Goro project and the additional phases of our Voiseys Bay
project and other development projects. This total amount assumes a level of capital expenditures,
including capitalized interest, in 2006 for our Goro project of $1,140 million of which we expect
our share of funding such total amount to be about $670 million. To meet such capital expenditures
requirements for 2006 and at least for 2007 in the case of the Goro and Voiseys Bay projects and
for our PT Inco expansion program to increase its production as discussed above given the current
projected total capital expenditures for these development projects and programs, we must generate
sufficient internal cash flows and/or be able to utilize available financing sources.
If we do not realize satisfactory prices for the nickel and other metals that we produce, we
could be required to raise very significant additional capital through the capital markets and/or
incur significant borrowings to meet our capital requirements. These financing requirements could
adversely affect our credit ratings and our ability to access the capital markets in the future to
meet any external financing requirements we might have.
If there are significant delays in when these projects are completed and are producing on a
commercial and consistent scale, and/or their capital costs were to be significantly higher than
estimated, these events could have a significant adverse effect on our results of operations, cash
flow from operations and financial condition.
In addition, our mining operations and processing and related infrastructure facilities are
subject to risks normally encountered in the mining and metals industry. Such risks include,
without limitation, environmental hazards, industrial accidents, labour disputes, changes in laws,
technical difficulties or failures, late delivery of supplies or equipment, unusual or unexpected
geological formations or pressures, cave-ins, pit-wall failures, rock falls, unanticipated ground,
grade or water conditions, flooding, periodic or extended interruptions due to the unavailability
of materials and force majeure events. Such risks could result in damage to, or destruction of,
mineral properties or producing facilities, personal injury, environmental damage, delays in mining
or processing, losses and possible legal liability. Any prolonged downtime or shutdowns at our
mining or processing operations could materially adversely affect our business, results of
operations, financial condition and liquidity.
130
The wholesale electricity markets in Ontario were deregulated for a portion of 2002 and as a
result we have experienced fluctuations in our electricity costs primarily at the Ontario
operations. On February 9, 2006 the Ontario government announced new electricity rates for
industrial users for electricity produced from certain of the Provinces power generating assets.
These new rates, representing about a two per cent reduction from the rates that prevailed in 2005
for power produced and sold from these assets, are expected to come into effect on May 1, 2006.
These rates are expected to increase by about 2 per cent as of May 1, 2007, with a further increase
of about two per cent in April 2008. Depending upon future changes in the regulatory environment
for electricity markets, we could experience future fluctuations in such costs. We have from time
to time experienced adverse production and production cost trends at our operations in Canada and
elsewhere and could experience similar adverse trends in the future.
Labour Relations
On September 16, 2005, a new three-year collective agreement with our unionized workers
at our Manitoba operations was successfully negotiated. This agreement expires in September 2008.
New collective agreements with unionized hourly production and maintenance workers at our Ontario
operations were entered into on August 29, 2003 and will expire on May 31, 2006. These agreements
were reached following a three-month strike that had a material adverse effect on our 2003
production of nickel, copper and certain other metals and our results of operations, financial
condition, profitability and cash flow from operations for 2003. A three-year collective agreement
with our unionized office, clerical and technical employees at our Ontario operations was
negotiated in the first quarter of 2004 and remains in effect until March 31, 2007. Our PT Inco
subsidiary entered into a new two-year collective labour agreement with its union in the fourth
quarter of 2004 which expires in December 2006. While there were no significant problems in
reaching this latest agreement with PT Incos labour force, with the increased potential for
actions of non-government organizations and other activist groups, the continuing uncertain
economic and political situation in Indonesia and the general increase in labour activism in that
country, there can be no assurance that such activism will not adversely affect PT Incos ability
to successfully operate. Any disruption in PT Incos operations as a result of labour issues or
other issues may adversely affect its operations and could materially adversely impact our
business, results of operations, financial conditions and liquidity. At Goro, we currently have
two unions representing some of our employees. In early September 2002, Goro experienced labour
disruptions by personnel associated with certain project construction subcontractors. As a result
of these disruptions, the decision was made in late September 2002 to curtail certain activities at
the projects site to enable the project company, Goro Nickel S.A.S., contractors, subcontractors
and other interested parties to develop procedures to avoid future disruptions. A number of
procedures were put in place prior to the start of the Goro project comprehensive review in late
2002 and over the past three years we have been seeking to complete the implementation of these and
other procedures as part of the negotiation of labour, site or other accords to help minimize any
such disruptions in the future. Through an employers association, of which we are the controlling
member, we negotiated a collective agreement effective September 2002 covering the construction of
the first phase of the Voiseys Bay project. Currently, we are in the process of negotiating the
first collective agreement with operations employees at Voiseys Bay.
There can be no assurance that we will be able to maintain positive relationships with our
employees at our operations in Canada, Indonesia, New Caledonia, and elsewhere or that new
collective agreements will be entered into without work interruptions as in the case of the
three-month strike at our Ontario operations in 2003. We could also be adversely affected by
labour disruptions involving third parties who may provide us with goods or services at our
operations in Canada and elsewhere. For example, as discussed above, our Goro project experienced
labour disruptions by certain employees of the projects construction subcontractors. Strikes and
other labour disruptions at any of our operations and lengthy work interruptions at our Goro
project could materially adversely affect the timing of completion and the cost of that project, as
well as our business, results of operations, financial condition and liquidity.
Uncertainty of Ore/Mineral Reserve Estimates
Our reported ore/mineral reserves as of December 31, 2005 are estimated quantities of
proven and probable ore that, under present and anticipated conditions, can be legally and
economically mined and processed by the extraction of their mineral content. The volume and grade
of reserves actually recovered and rates of production from our present ore reserves may be less
than geological measurements of the reserves. Furthermore, market price fluctuations in nickel,
other metals and exchange rates, and changes in operating and capital costs may in the future
render certain ore/mineral reserves uneconomic to mine and could, accordingly, result in
significant reductions in our reported estimates of proven and probable ore/mineral reserves. We
determine the amount of our estimated ore/mineral reserves in accordance with the requirements of
the applicable securities regulatory authorities and established industry practices. To the extent
that we are required by regulatory authorities to change the metal prices, expenditures and other
assumptions we use in preparing these estimates, then these estimates could change significantly.
No assurance can be given that the indicated amount of ore will be recovered or that it will
be recovered at the rates anticipated by us. Our ore/mineral reserve estimates are based on
limited sampling and, consequently, are uncertain because the samples may not be
131
representative of the entire orebody. As more knowledge and understanding of the orebody is
obtained, the reserve estimates may change significantly, either positively or negatively.
The Falconbridge Transaction
The completion of the pending acquisition of Falconbridge is dependent upon a number of
conditions, including receipt of certain remaining regulatory clearances. We may not be able to
obtain the required approvals or clearances from regulatory and other agencies and bodies on a
timely basis, or divestitures or other remedies required by regulatory agencies may not be
acceptable or may not be completed in a timely manner, and we may not meet the other remaining
conditions of our offer. We may not realize the anticipated annualized benefits and operational
and other synergies and cost savings from the acquisition or related divestitures, restructurings,
integration and other initiatives associated with the planned combination of Inco and Falconbridge
and we may realize unanticipated costs and/or delays or difficulties relating to such integration.
Certain other risks and uncertainties relating to this pending transaction include those associated
with the level of cash payments to common shareholders of Falconbridge who exercise their statutory
dissenters rights in connection with the expected eventual combination of the two companies and
the possible delay in the completion of the steps required to be taken for the eventual combination
of the two companies.
Sensitivities
Our financial results are sensitive to, among other things, changes in prices for nickel
and other metals, the Canadian-U.S. dollar exchange rate and interest rates and certain energy
costs. Our financial results are also affected by changes in the Indonesian rupiah-U.S. dollar
exchange rate, but to a lesser extent since PT Incos revenues and many of its expenses are
denominated in U.S. dollars. We have calculated the impact on our basic net earnings per share of
a 10 per cent change in the market risk exposures that we believe have the most significant impact
on our net earnings. The following table shows the approximate full-year impact of a 10 per cent
change in our principal market risk exposures on our basic net earnings per share based on planned
2006 deliveries of Inco-source metals and after taking into consideration our principal derivative
instrument positions as of December 31, 2005. These market risk exposures have been selected as
management believes they have had, and are currently expected to continue to have, the most
significant impact on our net earnings per share:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Impact on Basic |
|
|
|
|
|
|
Net Earnings |
Sensitivities as of December 31, 2005 |
|
10% change |
|
per Share1 |
|
Metals |
|
|
|
|
|
|
|
|
Nickel |
|
$0.60 per pound |
|
$ |
0.84 |
|
Copper |
|
0.21 per pound |
|
|
0.18 |
|
Cobalt |
|
1.17 per pound |
|
|
0.02 |
|
Platinum |
|
96 per troy ounce |
|
|
0.05 |
|
Palladium |
|
25 per troy ounce |
|
|
0.02 |
|
Energy |
|
|
|
|
|
|
|
|
Fuel Oil |
|
4.56 per bbl |
|
|
0.03 |
|
Natural Gas |
|
1.05 per MM BTU |
|
|
0.02 |
|
Currencies |
|
|
|
|
|
|
|
|
U.S. $1.00 per Cdn$2 |
|
0.086 cents |
|
|
0.47 |
|
U.S. $1.00 per Indonesian rupiah (per thousand) |
|
0.01 cents |
|
|
0.01 |
|
Share appreciation rights |
|
4.36 per share |
|
|
0.02 |
|
|
|
|
(1) |
|
Canadian GAAP basic net earnings per share. Each sensitivity assumes other factors
are held constant. |
|
(2) |
|
Represents the impact on Canadian dollar-denominated operating costs and excludes the
translation effect relating to the Canadian dollar-denominated liabilities and to accrued
taxes for Canadian dollar currency translation effects associated with U.S.
dollar-denominated liabilities. |
As indicated in the table above, the most significant sensitivities in terms of the
effect on our basic net earnings per share are nickel prices and the Canadian dollar-U.S. dollar
exchange rate.
Cash expenditures for our development projects will be incurred primarily in Australian
dollars and Euros for our Goro project. Although changes in these currencies will affect the
ultimate carrying value of the related assets in U.S. dollar terms, they will not have any impact
on our earnings until such projects are fully developed and operating. A 10 per cent change in
each of the value of the Australian dollar and Euro relative to the U.S. dollar as at December 31,
2005 would change currently planned 2006 capital
132
expenditures for the Goro project by $10 million and $12 million, respectively, after taking
into consideration outstanding derivative contracts as at December 31, 2005. Reference is made to
Foreign Exchange Risk under Risks and Uncertainties above.
The following represents the sensitivity analysis as of December 31, 2004 prepared using the
same methodology as above for comparative purposes:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Impact on Basic |
|
|
|
|
|
|
Net Earnings |
Sensitivities as of December 31, 2004 |
|
10% change |
|
per Share1 |
|
Metals |
|
|
|
|
|
|
|
|
Nickel |
|
$0.68 per pound |
|
$ |
0.80 |
|
Copper |
|
0.15 per pound |
|
|
0.12 |
|
Cobalt |
|
1.86 per pound |
|
|
0.02 |
|
Platinum |
|
86 per troy ounce |
|
|
0.05 |
|
Palladium |
|
18 per troy ounce |
|
|
0.01 |
|
Energy |
|
|
|
|
|
|
|
|
Fuel Oil |
|
2.83 per bbl |
|
|
0.02 |
|
Natural Gas |
|
0.74 per MM BTU |
|
|
0.01 |
|
Currencies |
|
|
|
|
|
|
|
|
U.S. $1.00 per Cdn$2 |
|
0.083 cents |
|
|
0.36 |
|
U.S. $1.00 per Indonesian rupiah (per thousand) |
|
0.01 cents |
|
|
0.01 |
|
Share appreciation rights |
|
3.70 per share |
|
|
0.02 |
|
|
|
|
(1) |
|
Canadian GAAP basic net earnings per share. Each sensitivity assumes other factors
are held constant. |
|
(2) |
|
Represents the impact on Canadian dollar-denominated operating costs and excludes the
translation effect relating to the Canadian dollar-denominated liabilities and to accrued
taxes for Canadian dollar currency translation effects associated with U.S.
dollar-denominated liabilities. |
While the sensitivity analyses presented in the tables above represent our best estimate
of the impact of specified assumed changes in the identified market risk scenarios, actual results
could differ from those reflected. The sensitivity analyses presented are subject to various
limitations and uncertainties which may affect the impact on basic net earnings per share.
These sensitivity analyses have been prepared based on a change of 10 per cent in the market
rates or prices at December 31, 2005 and 2004. The impact on basic net earnings per share has been
determined based on discrete changes in the identified risks. If there are changes in two or more
of the identified risks, the above impact on basic net earnings per share may not accurately
reflect the actual impact on our net earnings per share.
These sensitivity analyses also include assumptions relating to our current projected
operations during 2006 in the case of the sensitivity analyses as of December 31, 2005 and our
original plan for 2005 in the case of the sensitivity analysis as of December 31, 2004. As we are
affected and influenced by changes in the business and economic environments in which we operate,
the changes reflected in the sensitivity analyses above may be different or may prove to be
inaccurate, including in relation to their impact on basic net earnings per share. The most
significant assumptions which may be affected relate to levels of production, consumption rates,
forecasted costs of production, tax rates and deliveries.
These sensitivity analyses provided are not intended to fully reflect the net market risk
exposures since certain exposures would encompass events that are uncertain or could not be
foreseen. Some of these events are outlined in our discussion above on Risks and Uncertainties
affecting our business. For example, with respect to metal prices, extended declines in prices,
particularly nickel prices, due to unusual economic developments or other unforeseen events would
have a material adverse effect on our results of operations, financial condition and cash flows.
In addition, unusual or irrational actions by competitors could, for example, change the nickel
market supply-demand relationship and other factors fundamental to our business causing declines in
metal prices. In addition, significant and prolonged increases in energy prices and/or the
Canadian dollar relative to the U.S. dollar would have a material adverse effect on our costs of
production, results of operations and financial condition. There are also a wide range of other
uncertainties in the business environment including the impacts of the proposed acquisition of
Falconbridge that could result in material limitations with respect to the accuracy of the
sensitivity analyses for net market risk exposures, including cost inflation, relations with our
employees, avoidance of major accidents at our producing locations, and the average grades of ore
mined and the certainty of estimated proven and probable ore reserves at our operations.
Unanticipated changes in environmental laws and regulations could also result in limits on
production and/or significantly increased capital spending to meet such changes.
133
Critical Accounting Policies and Estimates
The preparation of financial statements requires management to make estimates and
assumptions that affect the reported amounts of assets, liabilities, revenues and expenses.
Critical accounting estimates are those that require us to make assumptions about matters (a) that
are highly uncertain at the time the accounting estimate is made, (b) for which we could have
reasonably used a different estimate in the current period and/or (c) where changes in the
accounting estimate are reasonably likely to occur from period to period and such changes would
have a material impact on the presentation of the Companys financial condition, changes in
financial condition or results of operations. Our estimates are based upon historical experience
and on various other assumptions that we believe to be reasonable under the circumstances. The
results of our ongoing evaluation of these estimates form the basis for making judgments about the
carrying value of assets and liabilities and the reported amounts for revenues and expenses.
Actual results may differ from these estimates. A summary of our significant accounting policies,
including critical accounting policies that require critical accounting estimates, is set forth in
note 1 to our 2005 consolidated financial statements.
Depreciation and Depletion
Expenditures for new facilities or equipment and expenditures that extend the useful
lives of existing facilities or equipment are capitalized and depreciated using the declining
balance or straight-line method at rates sufficient to depreciate such costs over the estimated
future lives of such facilities or equipment. These lives do not exceed the estimated operating
mine life based upon estimated proven and probable ore/mineral reserves unless we believe the asset
can be utilized in another facility after the mining operations have ended.
Depletion of the deferred mine development costs is calculated on a units-of-production basis
over the estimated proven and probable ore/mineral reserves which relate to the particular category
of development, either life of mine plan or area specific. No future development costs are
taken into account in calculating the amortization charge.
Life of mine plan development costs represent capital expenditures that will be utilized in
the extraction of all the estimated proven and probable ore/mineral reserves in the current
detailed mine plan. These expenditures are predominantly incurred up front and in advance of any
ore extraction or in advance of major expansions. The types of development costs included in this
category include mine acquisitions costs, ore haulage shafts, initial decline, ore passes and
chutes and underground ore crusher cavities and are intended to be used for the extraction of all
ore within the current mine plan. These costs are depleted on a units-of-production basis over the
total estimated proven and probable ore/mineral reserves in the current mine plan.
Area specific development costs consist of capital expenditures to provide access to various
areas within the mine to allow the extraction of ore to commence. The types of development costs
that are within this category include access and perimeter drives, ventilation drives and rises,
and progressive declining subsequent to initial contact with the ore body. These costs are
depleted on a units-of-production basis over the related production from our estimated proven and
probable ore/mineral reserves that can be currently accessed without future capital development
costs being incurred.
The calculation of the units-of-production rate of depletion and, accordingly, the annual
depletion charge to operations, could be materially affected to the extent that actual production
in the future is different from current forecasts of production based on estimated proven and
probable ore/mineral reserves. This would generally be the case where there were significant
changes in any of the factors or assumptions used in estimating proven and probable ore/mineral
reserves. These factors could include (i) an expansion of estimated proven and probable
ore/mineral reserves through exploration activities, (ii) differences between estimated and actual
cash costs of mining, due to differences in grade, metal recovery rates and foreign currency
exchange rates from those assumed, and (iii) differences between actual commodity prices and the
commodity price assumptions used in the estimation of proven and probable ore/mineral reserves.
Such changes in estimated ore/mineral reserves could similarly impact the useful lives of assets
depreciated on a straight-line basis, where those lives are limited to the life of the mine. The
accounting estimates related to depreciation and depletion are critical accounting estimates and
are influenced by our estimates of proven and probable ore/mineral reserves. Historically, the
Company has been successful in replacing a portion of the ore/mineral reserves depleted through
mining operations. During the past six years, excluding major development projects, on average
about one-half of the aggregate ore mined from our sulphide mineral deposits has been replaced
through further exploration and development activities. Depreciation and depletion charges are
adjusted prospectively based on annual year-end assessments of our estimated proven and probable
ore/mineral reserves. If our estimated proven and probable ore/mineral reserves were to be
decreased by 10 per cent, there would be an increase of $35 million in our annual depreciation and
depletion expense.
134
Impairment
We review and evaluate our long-lived assets for impairment when events or changes in
circumstances indicate the related carrying amounts may not be recoverable. An asset impairment is
considered to exist if the total estimated future cash flows on an undiscounted basis are less than
the carrying amount of the asset. An impairment loss is measured and recorded based on discounted
estimated future cash flows. Future cash flows are estimated based on estimated quantities of
recoverable minerals, expected commodity prices (considering current and historical prices, price
trends and related factors), production levels, cash costs of production, capital and reclamation
costs, all based on detailed life-of-mine plans. The term recoverable minerals refers to the
estimated amount of nickel or other commodities that will be obtained from estimated proven and
probable ore/mineral reserves and all related mineral interests, after taking into account losses
during ore processing and treatment. Significant management judgment is involved in estimating
these factors, which include inherent risks and uncertainties. The assumptions we use are
consistent with our internal planning. Management periodically evaluates and updates the estimates
based on the conditions that influence these factors. The variability of these factors depends on
a number of conditions, including uncertainty about future events, and thus our accounting
estimates may change from period to period. If other assumptions and estimates had been used in
the current period, the balances for non-current assets could have been materially impacted.
Furthermore, if management uses different assumptions or if different conditions occur in future
periods, future operating results could be materially impacted.
In estimating future cash flows, assets are grouped at the lowest levels for which there are
identifiable cash flows that are largely independent of future cash flows from other asset groups,
taking into consideration movements of intermediate products to ensure the utilization of available
capacity across our operations. All assets at a particular operation are considered together for
purposes of estimating future cash flows.
We periodically review our equity method investments to determine whether a decline in fair
value below the carrying amount is other than temporary. In making this determination, we consider
a number of factors related to the financial condition and prospects of the investee, including (i)
a decline in the valuation of the equity investee for an extended period of time, (ii) an inability
to recover the carrying amount of the investment or inability of the equity investee to sustain an
earnings capacity which would justify the carrying amount of the investment, and (iii) the period
of time over which we intend to hold the investment. If the decline in fair value is deemed to be
other than temporary, the carrying value is written down to fair value. In situations where the
fair value of an investment is not evident due to a lack of a public market price or other factors,
we use our best estimates and assumptions to arrive at the estimated fair value of such investment,
based on future cash flows of the equity investee and other relevant factors. As significant
judgment is required in assessing these factors, it is possible that changes in any of these
factors in the future could result in an other than temporary decline in value of an equity
investment and could require us to record an impairment charge to operations in future periods.
In the second quarter of 2005, we recorded a $25 million impairment charge with respect to the
planned closure of our copper refining facility at our Ontario operations in December 2005
following a decision to cease production of copper cathode.
In 2004, we recorded an impairment loss in respect of our Goro project in the amount of $201
million. This loss was determined based on managements judgment regarding the net realizable
value for supplies and equipment that no longer had any use for the project. A 10 per cent
reduction in the assumed net recoverable value for these items would have increased the impairment
charge by $2 million.
There were no impairment losses on long-lived assets recorded in 2003.
Asset Retirement Obligations
Our mining operations involve activities that have a significant effect on the area
surrounding such operations. We estimated that our ultimate reclamation and closure costs on an
undiscounted basis would total $1.1 billion as of December 31, 2005. We record the fair value of
our estimated asset retirement obligations when a legal obligation is incurred. These liabilities
are accreted to full value over time through charges to income.
These estimates related to reclamation and closure costs are critical accounting estimates
because (i) we will not incur most of these costs for a number of years, requiring us to make
estimates over a relatively long period; (ii) reclamation and closure laws and regulations could
change in the future or circumstances affecting our operations could change, either of which could
result in significant changes to our current plans and future costs; (iii) calculating the fair
value of our asset retirement obligations requires us to make long-term assumptions about inflation
rates, to determine our long-term credit-adjusted, risk-free interest rates and to
135
determine market risk premiums that are appropriate for our operations over long periods of
time; and (iv) given the magnitude of our estimated reclamation and closure costs, changes in any
or all of these estimates could have a material impact on our results of operations and/or our
financial condition.
To calculate the fair value of these obligations, we discounted the projected cash flows at
our estimated credit-adjusted, risk-free interest rates which ranged from 4 per cent to 8 per cent
for the corresponding time periods over which these costs would be incurred. The inflation rates
and discount rates we used to calculate the fair value of our asset retirement obligations are
critical factors in the calculation of future value and discounted present value costs. We
estimated the cash flows for our asset retirement obligations assuming a single set of assumptions.
In general, given the nature of our business and specificity of our assets, there are very
restrictive ways in which to retire our assets and conform to the applicable environmental
regulations, including closure and related requirements. Therefore, in such instances, a range of
likely outcomes was not used because multiple approaches to retire our assets were not appropriate.
We applied a market risk premium to the total obligations to reflect what a third party might
demand to assume our asset retirement obligations. The market risk premium was based on
market-based estimates of rates that a third party would have to pay or insure its exposure to
possible future increases in the value of these obligations. The extent and timing of expenditures
on closure and reclamation activities are critical estimates for the determination of our asset
retirement obligations and the related annual charges to earnings. These are also influenced by
our estimates of our proven and probable ore/mineral reserves. As the closure period for a
substantial portion of our mines is not for a number of years, we have no historical experience
which would indicate that our current asset retirement obligations are either understated or
overstated. We continue to believe that our current closure cost estimates represent our best
estimates. If we were to advance the date of retirement of our assets by 10 per cent from our
current estimate, the impact would be an increase in our asset retirement obligations of $25
million and the annual charge to earnings would have increased by $1 million per year. If our
estimates of the cost of closure and reclamation activities were to change by 10 per cent, our
ultimate reclamation and closure costs would change by $109 million.
In addition, there are certain environmental issues pertaining to former industrial sites that
were retained by us relating to former businesses that had been sold by us. In determining whether
a liability exists in respect of these environmental issues, we apply the criteria for liability
recognition set forth in applicable accounting standards. We regularly review the status of
environmental issues to determine whether a liability should be established or an additional
liability recognized with the corresponding charge to our earnings.
Future Employee Benefits and Costs
Pension expense is determined separately for each of our pension plans and other
post-retirement arrangements based on the principles outlined in the applicable accounting
standards. Assets are valued using a market-related value, determined based on the current market
value and the market values in the previous four years (that is, with an averaging of experience
gains and losses over the five year period). As discussed in note 10 to our 2005 consolidated
financial statements, we determine our return on plan assets using a formula approach. The
expected return on plan assets assumption is based on current bond yields, an expected equity risk
premium and an allowance for expected value added as a result of active management, where
applicable. Each year we update our return on plan assets for the most recent historical
benchmarks. Application of the respective historical benchmarks to our formula resulted in a
decrease in the assumed rate of return on assets from 8 per cent in 2004 to 7.75 per cent in 2005
and to 7.5 per cent for 2006.
Liabilities are determined as a present value of future anticipated cash flows using a
discount rate based on corporate AA bond yields at the valuation date and an inflation expectation
consistent with the corporate AA bond yield curve. Differences between the estimated future
results and actual future results are amortized (to the extent that the cumulative experience gain
or loss is in excess of the permitted 10 per cent corridor under Canadian GAAP) over the expected
average remaining service life of the active members. This 10 per cent corridor, as defined by
Canadian GAAP, represents 10 per cent of the greater of the post-retirement benefits obligations
and the fair value of plan assets. The return on plan assets assumption and the discount rate,
salary and inflation assumptions used to value the liabilities are reviewed annually and are
determined based on a consistent framework from year-to-year. The most significant risk is that
the assumptions will prove to be either too high or too low in the long term. It is reasonable to
assume that there will be a significant variation between the assumptions and actual experience in
any one year. Over the long-term, cumulative pension expense is expected to produce an appropriate
reflection of the costs associated with the pension program.
The expense for other post-retirement benefits or non-pension benefits is based on a similar
methodology and similar determination of the liability value. The discount rate used is the same
as that determined for the pension obligations. The inflation rate assumed for medical costs is
based on our history of healthcare spending. The assumption for the ultimate health care trend
rates relates to the overall economic trends and takes into consideration that the health care
expenditure growth rate is currently expected to be 1.5 to 2.0 per cent higher than the inflation
rate over the long-term.
136
We currently estimate that a 0.5 per cent increase or decrease in the return on plan assets
assumption would result in a corresponding $13 million decrease or increase, in annual pension
expense. Changes to the return on plan assets assumption would have no significant effect on
required funding requirements, as our required contributions are primarily determined based on the
applicable Canadian regulatory solvency funding requirements (that is, the windup valuation).
Under this valuation methodology, liabilities for solvency valuation are based on market bond
yields and the excess of liabilities over assets must be amortized over a five-year period. We
estimate that a 0.5 per cent increase or decrease in the discount rate assumption would result in a
corresponding $12 million decrease or increase in annual pension expense. We estimate that a 0.5
per cent decrease in the long-term bond yield would result in a corresponding $6 million increase
in our required contributions.
Income and Mining Taxes
Significant judgment, estimates and assumptions are required in determining the Companys
consolidated tax provision. In addition, in evaluating the ability of the Company to realize the
deferred tax assets, significant judgment, estimates and assumptions are required in establishing
deferred income tax asset valuation allowances.
The provision or relief for income and mining taxes is calculated based on the expected tax
treatment of transactions recorded in our 2005 consolidated financial statements. The objectives
of accounting for income and mining taxes are to recognize the amount of taxes payable or
refundable for the current year and deferred tax liabilities and assets for the future tax
consequences of events that have been recognized in our 2005 consolidated financial statements or
tax returns. In determining both the current and future components of income and mining taxes, we
interpret tax legislation in a variety of jurisdictions, recognize liabilities for anticipated tax
audit issues based on estimates of whether additional taxes would be payable as well as make
assumptions about the expected timing of the reversal of future tax assets and liabilities. If our
interpretations differ from those of tax authorities or if the timing of reversals is not as
anticipated, the provision or relief for income and mining taxes could increase or decrease in
future periods.
In estimating deferred income and mining tax assets, a valuation allowance is determined to
reduce the future income tax assets to the amount that is more likely than not to be realized.
This valuation allowance for 2005 amounted to $23 million, representing (i) $3 million in respect
of non-capital losses available to Goro Nickel S.A.S., (ii) $11 million in respect of net capital
losses available in the United Kingdom, (iii) $3 million in respect of reduction in the benefits of
write-downs of certain investments and (iv) $6 million reduction in the benefit of alternative
minimum tax relating to our subsidiaries in the United States. This valuation allowance for 2004
amounted to $29 million, representing (i) $6 million in respect of non-capital losses available to
Goro Nickel S.A.S., (ii) $12 million in respect of net capital losses available in the United
Kingdom, (iii) $5 million in respect of reduction in the benefits of write-downs of certain
investments and (iv) $6 million reduction in the benefit of alternative minimum tax relating to our
subsidiaries in the United States. This valuation allowance for 2003 amounted to $27 million,
representing (i) $3 million in respect of non-capital losses available to Goro Nickel S.A.S., (ii)
$12 million in respect of net capital losses available in the United States and United Kingdom, and
(iii) $12 million in respect of unrealized capital losses arising from the write-down of certain
investments and other assets. These valuation allowances have been provided for as it is more
likely than not that these non-capital and net capital losses will not be realized for tax purposes
in the future. In each year, the amount of the valuation allowance reduces the future income tax
assets and effectively increases the amount of the net deferred income tax liabilities and,
accordingly, the provision for income and mining taxes on the earnings statement. Additional
information regarding our accounting for income and mining taxes is contained in note 5 to our 2005
consolidated financial statements.
Accounting Changes
In 2005, on a retroactive basis, we adopted revisions to CICA Section 3860, Financial
Instruments Disclosure and Presentation. The revisions related to the accounting for
instruments for which the issuer has the right to settle in cash or its own shares. Such an
instrument must be bifurcated between debt and equity in accordance with this revised standard.
This change impacted the accounting treatment for our LYON Notes, Convertible Debentures due 2023
and 3 1/2% Subordinated Convertible Debentures due 2052 which were previously treated as equity in
accordance with EIC-71, Financial Instruments that may be Settled at the Issuers Option in Cash or
its own Equity Instruments. Consistent with this change, we record interest expense in lieu of
accretion charges with respect to these convertible debt securities. We also adopted EIC No. 155,
The Effects of Contingently Convertible Instruments on the Computation of Diluted Earnings Per
Share. This abstract requires that the effects of contingently convertible instruments be included
in the computation of diluted earnings per share regardless of whether the market price trigger for
conversion has been met.
In 2004, we adopted three new accounting pronouncements for the purposes of our Canadian GAAP
reporting. These new pronouncements related to the accounting for variable interest entities, the
application of Canadian GAAP and hedging relationships.
137
In 2004, we also changed our methodology used to calculate depletion and depreciation expense.
A similar change was made for United States GAAP reporting effective January 1, 2003, therefore,
the 2004 adoption of this change for Canadian GAAP purposes eliminated a significant GAAP
difference between United States and Canadian GAAP. Accounting changes made to our consolidated
financial statements during 2005, 2004 and 2003 are discussed further in note 2 to our consolidated
financial statements.
For a complete discussion of current and future accounting changes as they relate to our
United States GAAP reporting, reference is made to note 24 to our 2005 consolidated financial
statements.
Outlook
Nickel Market Conditions
Over the past few years, particularly in 2005 and as currently projected for 2006, the
stainless steel industry, the principal end-use market for nickel, has been making significant
investments, or has announced commitments to projects, to increase production capacity to meet
continued and projected demand growth, especially in China. Demand for stainless steel is
currently expected to remain strong over at least the next few years based upon the expected strong
growth in industrial production in a number of geographic regions, in particular continued strong
growth in China and other parts of Asia. We believe that strong nickel demand, driven by stainless
steel production growth in China and the completion of the correction in inventories in stainless
steel which began in the second half of 2005, a number of non-stainless steel end uses for nickel
such as nickel-based alloys for the aerospace market, coupled with relatively low total (LME and
producer) nickel inventories, tighter stainless steel scrap conditions and limited production
growth, are currently expected to result in a continuation of relatively high and volatile nickel
prices in 2006.
With most nickel producers having operated at or near capacity in 2005 and taking into account
that there currently exists, we believe, no shutdown capacity available to be restarted and there
are only limited new projects or expansions expected to bring on new supply in 2006, we currently
estimate that, as discussed above, there will be an insufficient amount of additional nickel supply
prior to at least 2008 to meet the expected growth in underlying nickel demand which would occur at
long-term nickel prices.
Nickel demand in 2006 is currently anticipated to be relatively strong for several reasons.
First, the production of nickel-containing stainless steel in China is expected to continue to
increase due to the ramp-up in production of several new large stainless steel production
facilities in that country in an effort to meet expected strong economic growth and demand for
stainless steel in China. Nickel demand growth in China is expected to be supported by the
increased growth in non-stainless nickel demand, driven by domestic growth in, and western-world
relocation of, plating facilities as well as continued growth in battery applications. For 2006,
the currently projected strong nickel demand in China is expected to be complemented by the
continued economic strength in other Asia regions as well as in the United States and the beginning
of an economic recovery in the European Union. Second, the continued strength in nickel-based
alloys for the aerospace, the oil and gas and liquid natural gas and land-based gas turbine
applications and other energy-related markets is expected to generate an increase in demand for
nickel. Third, reported nickel inventories, both producer and LME, are at relatively low levels
relative to prior nickel cycles. We currently estimate that total LME and producer inventory
levels at December 31, 2005 represented approximately six weeks of demand, which is considered
relatively low. Fourth, the availability of nickel-containing stainless steel scrap, as an
alternative source of nickel for the stainless steel industry, is not expected to keep pace with
nickel demand growth in 2006. We anticipate that the above average growth in stainless steel scrap
collection in prior years, as well as the expected increase in stainless steel production, will
create relatively less scrap supply than existed in 2005. The expected supply-demand imbalance for
such scrap is due to the strong growth experienced in the usage and liquidation of inventories of
such scrap in 2004 and 2005, which we believe will not be sustainable.
Operations
Our 2006 nickel production is currently expected to be approximately 256,000 tonnes (565
million pounds), up from the 220,727 tonnes (487 million pounds) level in 2005. The increase in
production is primarily due to finished nickel products produced from our Voiseys Bay nickel
concentrates at our Canadian operations and to the toll smelting and refining arrangements covering
purchased intermediates with certain third parties as noted above. We expect our purchases of
nickel intermediates processed through our Canadian operations to decrease by 45 per cent from 2005
levels to approximately 15,400 tonnes (34 million pounds) in 2006. Finished copper production for
2006, including anodes production, is currently expected to be approximately 124,700 tonnes (275
million pounds) compared to 125,595 tonnes (277 million pounds) in 2005. Production of copper in
concentrate at Voiseys Bay is currently expected to be approximately 29,500 tonnes (65 million
pounds) compared with 4,406 tonnes (10 million pounds) of copper in concentrate in 2005. Total
production of PGMs is expected to be 400,000 troy ounces for 2006.
138
2006 Planned Capital Expenditures
Our total 2006 capital expenditures for our existing operations and development projects,
as discussed above, are currently expected to total $1,820 million before any contributions that
may be made by the other shareholders in Goro Nickel and receipt of certain government assistance
under programs relating to our development projects. This estimate includes, as discussed above,
approximately $1,140 million for the Goro project, including capitalized interest, $55 million for
Voiseys Bay, $60 million for the program to increase production at PT Inco and approximately $80
million for mine development, $120 million for environmental measures, $50 million for
discretionary capital expenditures and $315 million for sustaining capital. Total depreciation,
depletion and amortization expenses for our existing operations are currently projected to be $455
million in 2006, including an estimated $175 million in respect of the Voiseys Bay operations.
Pending Acquisition of Falconbridge
We believe that the successful completion of the pending acquisition of Falconbridge and
subsequent combination of Inco and Falconbridge will create significant benefits and opportunities
that will allow the combined company to better serve its customers, to provide it with enhanced
financial and other resources and to better compete in the global metals and mining industry than
either company could alone.
The combined company would be one of the worlds largest metals and mining companies, ranking
as the second largest North American metals and mining company in terms of enterprise value based
upon the respective share prices of the two companies as of early October 2005, shortly before our
offer to acquire all of the Falconbridge Shares was announced. The combined company would be the
worlds largest producer of nickel and a leading producer of copper and cobalt. It would also
become the worlds third largest producer of zinc, and would also supply approximately l0 per cent
of current annual aluminum consumption in the United States. The combined company would have
processing facilities around the world and the ability to enhance efficiency by directing ore and
intermediate products to facilities on a global basis.
Inco and Falconbridge have jointly identified the potential to realize annual pre-tax
operating and corporate synergies. Both companies believe that a significant portion of these
synergies are available only from a combination of Inco and Falconbridge given the contiguous
nature of their nickel mining operations within the Sudbury basin and, to a lesser extent, the
proximity of each companys headquarters in Toronto. Operating synergies are expected to consist
mainly of (i) optimization of material feeds and other intermediate product flows and processing
facilities, (ii) cost improvements from the more efficient operations, streamlined procurement
practices and economies of scale, and (iii) maximizing throughput by accelerating mine development
to match assets to processes and feeds. Corporate synergies consist primarily of cost savings
relating to reduction of overhead and support services. We believe that these synergy estimates
for this transaction are realistic, although there can be no assurance that they will ultimately be
realized, or that they will not be materially different than estimated.
The combined company would also feature enhanced production and geographic diversification.
The combined companys production and marketing operations would also become more geographically
diversified. The combined companys marketing offices would span over 40 countries, giving it a
presence in North and South America, Asia, the South Pacific and Europe. As a result, it would
also be better able to serve the worlds most attractive markets, particularly in new and emerging
regions such as China.
Due to its increased size and diversification, the combined company should have greater
flexibility and financial resources to pursue future growth opportunities than either Inco and
Falconbridge would have alone. In addition, the combined company would be better positioned to
compete for acquisition opportunities, which has become increasingly important as the global metals
and mining industry continues to consolidate.
Non-GAAP Financial Measure
We have referred to nickel unit cash cost of sales before and after by-product credits
because we understand that certain investors use this information to assess our performance and
also determine our ability to generate cash flow for use in investing activities. The inclusion of
these two unit cost measurements, nickel unit cash cost of sales before and after by-product
credits, enables investors to better understand our year-to-year changes in production costs using
metrics that reflect our key ongoing cash production costs which, in turn, affect our profitability
and cash flows. These measurements capture all of the important components of our production and
related costs. The reason for providing the nickel unit cash cost of sales on the basis of before
as well as after by-product credits is to allow investors to see the impact on these metrics of
changes in copper, cobalt and precious metals contributions which have
139
historically largely been driven by the prices for these metals. In addition, as
discussed above, management utilizes these metrics as an important management tool to monitor cost
performance of each of our key operations relative to planned and prior period results. These
measurements are intended to provide additional information and should not be considered in
isolation or as a substitute for measures of performance prepared in accordance with Canadian GAAP.
The following table provides for the periods indicated a reconciliation between nickel unit
cash cost of sales before and after by-product credits, two key measurements we use to monitor our
cost performance, and Canadian GAAP cost of sales:
Reconciliation of Nickel Unit Cash Cost of Sales Before and After By-Product Credits
to Canadian GAAP Cost of Sales
|
|
|
|
|
|
|
|
|
|
|
|
|
($ millions except per pound and per tonne data) |
|
2005 |
|
2004 |
|
2003 |
|
Cost of sales and other operating expenses,
excluding depreciation and depletion |
|
$ |
2,633 |
|
|
$ |
2,348 |
|
|
$ |
1,735 |
|
By-product costs |
|
|
(635 |
) |
|
|
(572 |
) |
|
|
(383 |
) |
Purchased finished nickel |
|
|
(331 |
) |
|
|
(234 |
) |
|
|
(279 |
) |
Delivery expense |
|
|
(35 |
) |
|
|
(33 |
) |
|
|
(25 |
) |
Other businesses cost of sales |
|
|
(39 |
) |
|
|
(38 |
) |
|
|
(25 |
) |
Strike expense, excluding depreciation |
|
|
|
|
|
|
|
|
|
|
(88 |
) |
Non-cash items1 |
|
|
(32 |
) |
|
|
(28 |
) |
|
|
(24 |
) |
Remediation, demolition and other related expenses |
|
|
(57 |
) |
|
|
(30 |
) |
|
|
(55 |
) |
Adjustments associated with affiliate transactions |
|
|
34 |
|
|
|
(54 |
) |
|
|
(28 |
) |
Asset write-offs and related charges 2 |
|
|
(32 |
) |
|
|
|
|
|
|
|
|
Other |
|
|
(9 |
) |
|
|
(11 |
) |
|
|
(8 |
) |
|
Nickel cash cost of sales before by-product credits 3 |
|
|
1,497 |
|
|
|
1,348 |
|
|
|
820 |
|
By-product net sales |
|
|
(825 |
) |
|
|
(719 |
) |
|
|
(330 |
) |
By-product costs |
|
|
635 |
|
|
|
572 |
|
|
|
383 |
|
|
Nickel cash cost of sales after by-product credits 3 |
|
$ |
1,307 |
|
|
$ |
1,201 |
|
|
$ |
873 |
|
|
Inco-source nickel deliveries (millions of pounds) |
|
|
493 |
|
|
|
518 |
|
|
|
406 |
|
|
Nickel unit cash cost of sales before by-product credits per pound |
|
$ |
3.04 |
|
|
$ |
2.60 |
|
|
$ |
2.02 |
|
|
Nickel unit cash cost of sales before by-product credits per tonne |
|
$ |
6,702 |
|
|
$ |
5,732 |
|
|
$ |
4,453 |
|
|
Nickel unit cash cost of sales after by-product credits per pound |
|
$ |
2.65 |
|
|
$ |
2.32 |
|
|
$ |
2.15 |
|
|
Nickel unit cash cost of sales after by-product credits per tonne |
|
$ |
5,842 |
|
|
$ |
5,115 |
|
|
$ |
4,740 |
|
|
|
|
|
(1) |
|
Post-retirement benefits other than pensions. |
|
(2) |
|
Relates to certain assets at PT Inco that had no future value to PT Incos operations and
the write-off of the book values of certain equipment assessed to be beyond economic repair
and to PT Incos change in accounting for asset sales and other dispositions. |
|
(3) |
|
Nickel cash cost of sales before and after by-product credits includes costs for both
Inco-source and purchased nickel intermediates. |
Other Information
Reference is made to Other Information above for certain information on governmental
and other policies and factors affecting our operations and investments by non-Canadians in our
securities. Reference is also made to Quarterly Financial Information below for our quarterly
net sales, net earnings and earnings per share data for 2005 and 2004.
140
Item 7A. Quantitative and Qualitative Disclosures About Market Risk
The information under Risks and Uncertainties and Sensitivities in Managements
Discussion and Analysis of Financial Condition and Results of Operations under Item 7 of this
Report is incorporated herein by reference to such information.
141
Item 8. Financial Statements and Supplementary Data
Managements Report on Internal Control Over Financial Reporting
The management of Inco Limited is responsible for establishing and maintaining adequate
internal control over financial reporting. Our internal control over financial reporting is a
process designed under the supervision and with the participation of our management to provide
reasonable assurance regarding the reliability of financial reporting and the preparation of our
consolidated financial statements, for external purposes, in accordance with generally accepted
accounting principles in Canada.
As of December 31, 2005, management conducted an assessment of the effectiveness of our
internal control over financial reporting based on the framework established in Internal Control
Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission
(COSO). Based on this evaluation, management concluded that our internal control over financial
reporting was effective as of December 31, 2005.
Our internal control over financial reporting includes policies and procedures that pertain to
the maintenance of records that, in reasonable detail, accurately and fairly reflect transactions
and dispositions of assets, provide reasonable assurances that transactions are recorded as
necessary to permit the preparation of our consolidated financial statements in accordance with
generally accepted accounting principles in Canada, and that receipts and expenditures are being
made only in accordance with authorizations of management and our Board of Directors, and provide
reasonable assurance regarding the prevention or timely detection of an unauthorized acquisition,
use or disposition of assets that could have a material effect on our consolidated financial
statements.
Our internal control over financial reporting and managements assessment of the effectiveness
of internal control over financial reporting as of December 31, 2005 have been audited by our
auditors, PricewaterhouseCoopers LLP, an independent registered public accounting firm, as stated
in their report which is set forth below.
142
Auditors Report
To the Shareholders of Inco Limited
We have audited the accompanying consolidated balance sheets of Inco Limited (the Company)
as at December 31, 2005, 2004 and 2003 and the related consolidated statements of earnings,
retained earnings (deficit) and cash flows for each of the years in the three-year period ended
December 31, 2005. In addition, we have audited Schedule VIII Valuation Accounts and Reserves
under Item 8 of this Report. We have also audited the effectiveness of the Companys internal
control over financial reporting as at December 31, 2005, based on the criteria established in
Internal Control Integrated Framework issued by the Committee of Sponsoring Organizations of the
Treadway Commission (COSO) and managements assessment thereof included in Managements Report on
Internal Control Over Financial Reporting, appearing above. The Companys management is
responsible for these financial statements and the financial statement schedule, for maintaining
effective internal control over financial reporting and for its assessment of the effectiveness of
internal control over financial reporting. Our responsibility is to express an opinion on the
Companys December 31, 2005, 2004 and 2003 consolidated financial statements and the financial
statement schedule, an opinion on managements assessment as at December 31, 2005 and an opinion on
the effectiveness of the Companys internal control over financial reporting as at December 31,
2005 based on our audits.
A companys internal control over financial reporting is a process designed to provide reasonable
assurance regarding the reliability of financial reporting and the preparation of financial
statements for external purposes in accordance with generally accepted accounting principles. A
companys internal control over financial reporting includes those policies and procedures that (1)
pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the
transactions and dispositions of the assets of the company; (2) provide reasonable assurance that
transactions are recorded as necessary to permit preparation of financial statements in accordance
with generally accepted accounting principles, and that receipts and expenditures of the company
are being made only in accordance with authorizations of management and directors of the company;
and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized
acquisition, use, or disposition of the companys assets that could have a material effect on the
financial statements.
We conducted our audits of the Companys financial statements in accordance with Canadian generally
accepted auditing standards and the standards of the Public Company Accounting Oversight Board
(United States) (PCAOB). Those standards require that we plan and perform an audit to obtain
reasonable assurance about whether the financial statements are free of material misstatement. An
audit of financial statements includes examining, on a test basis, evidence supporting the amounts
and disclosures in the financial statements. A financial statement audit also includes assessing
the accounting principles used and significant estimates made by management, and evaluating the
overall financial statement presentation. We conducted our audit of the effectiveness of the
Companys internal control over financial reporting and managements assessment thereof in
accordance with the standards of the PCAOB. Those standards require that we plan and perform the
audit to obtain reasonable assurance about whether effective internal control over financial
reporting was maintained in all material respects. Our audit included obtaining an understanding
of internal control over financial reporting, evaluating managements assessment, testing and
evaluating the design and operating effectiveness of internal control and performing such other
procedures as we considered necessary in the circumstances. We believe that our audits provide a
reasonable basis for our opinions.
In our opinion, the consolidated financial statements referred to above, after the restatements
described in Notes 2 and 24, present fairly, in all material respects, the financial position of
the Company as at December 31, 2005, 2004 and 2003 and the results of its operations and its cash
flows for each of the years in the three-year period ended December 31, 2005 in accordance with
Canadian generally accepted accounting principles. In addition, in our opinion, Schedule VIII
Valuation Accounts and Reserves presents fairly, in all material respects, the financial
information set forth therein when read in conjunction with the related consolidated financial
statements. Also, in our opinion, managements assessment that the Company maintained effective
internal control over financial reporting as at December 31, 2005 is fairly stated, in all material
respects, based on criteria established in Internal Control Integrated Framework issued by the
COSO. Furthermore, in our opinion, the Company maintained, in all material respects, effective
internal control over financial reporting as at December 31, 2005 based on criteria established in
Internal Control Integrated Framework issued by the COSO.
Because of its inherent limitations, internal control over financial reporting may not prevent or
detect misstatements. Also, projections of any evaluation of effectiveness to future periods are
subject to the risk that controls may become inadequate because of changes in conditions, or that
the degree of compliance with the policies or procedures may deteriorate.
PRICEWATERHOUSE COOPERS LLP
Chartered Accountants
Toronto, Ontario
February 28, 2006
143
Consolidated Statement of Earnings
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
2004 |
|
2003 |
(in millions of United States dollars except per share amounts) |
|
|
|
|
|
(Restated) |
|
(Restated) |
|
Net sales (Note 18) |
|
$ |
4,518 |
|
|
$ |
4,278 |
|
|
$ |
2,474 |
|
Costs and operating expenses |
|
|
|
|
|
|
|
|
|
|
|
|
Cost of sales and other expenses, excluding
depreciation and depletion |
|
|
2,633 |
|
|
|
2,348 |
|
|
|
1,735 |
|
Depreciation and depletion |
|
|
256 |
|
|
|
248 |
|
|
|
227 |
|
Selling, general and administrative |
|
|
207 |
|
|
|
192 |
|
|
|
169 |
|
Research and development |
|
|
35 |
|
|
|
29 |
|
|
|
27 |
|
Exploration |
|
|
43 |
|
|
|
32 |
|
|
|
27 |
|
Currency translation adjustments |
|
|
59 |
|
|
|
85 |
|
|
|
177 |
|
Interest expense |
|
|
26 |
|
|
|
36 |
|
|
|
56 |
|
Asset impairment charges (Note 3) |
|
|
25 |
|
|
|
201 |
|
|
|
|
|
|
|
|
|
3,284 |
|
|
|
3,171 |
|
|
|
2,418 |
|
|
Other income, net (Note 4) |
|
|
83 |
|
|
|
49 |
|
|
|
108 |
|
|
Earnings before income and mining taxes and minority interest |
|
|
1,317 |
|
|
|
1,156 |
|
|
|
164 |
|
Income and mining taxes (Note 5) |
|
|
408 |
|
|
|
432 |
|
|
|
(27 |
) |
|
Earnings before minority interest |
|
|
909 |
|
|
|
724 |
|
|
|
191 |
|
Minority interest (Note 22) |
|
|
73 |
|
|
|
105 |
|
|
|
45 |
|
|
Net earnings |
|
|
836 |
|
|
|
619 |
|
|
|
146 |
|
Dividends on preferred shares (Note 14) |
|
|
|
|
|
|
|
|
|
|
(6 |
) |
Premium on redemption of preferred shares (Note 14) |
|
|
|
|
|
|
|
|
|
|
(15 |
) |
|
Net earnings applicable to common shares |
|
$ |
836 |
|
|
$ |
619 |
|
|
$ |
125 |
|
|
Net earnings per common share (Note 6) |
|
|
|
|
|
|
|
|
|
|
|
|
Basic |
|
$ |
4.41 |
|
|
$ |
3.30 |
|
|
$ |
0.68 |
|
Diluted |
|
$ |
3.75 |
|
|
$ |
2.95 |
|
|
$ |
0.64 |
|
|
Consolidated Statement of Retained Earnings (Deficit)
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
2004 |
|
2003 |
(in millions of United States dollars) |
|
|
|
|
|
(Restated) |
|
(Restated) |
|
Retained earnings (deficit) at beginning of year,
as previously reported |
|
$ |
390 |
|
|
$ |
(206 |
) |
|
$ |
(331 |
) |
Change in accounting policies and restatements (Note 2) |
|
|
38 |
|
|
|
15 |
|
|
|
15 |
|
|
Retained earnings (deficit) at beginning of year, as restated |
|
|
428 |
|
|
|
(191 |
) |
|
|
(316 |
) |
Net earnings |
|
|
836 |
|
|
|
619 |
|
|
|
146 |
|
Cash settlement of LYON Notes tendered for conversion (Note 13) |
|
|
(26 |
) |
|
|
|
|
|
|
|
|
Dividends on common shares $0.30 per share (2004-nil; 2003-nil) |
|
|
(57 |
) |
|
|
|
|
|
|
|
|
Dividends on preferred shares |
|
|
|
|
|
|
|
|
|
|
(6 |
) |
Premium on redemption of preferred shares (Note 14) |
|
|
|
|
|
|
|
|
|
|
(15 |
) |
|
Retained earnings (deficit) at end of year |
|
$ |
1,181 |
|
|
$ |
428 |
|
|
$ |
(191 |
) |
|
The Notes to Consolidated Financial Statements below are an integral part of these
statements.
144
Consolidated Balance Sheet
|
|
|
|
|
|
|
|
|
|
|
|
|
December 31 |
|
2005 |
|
2004 |
|
2003 |
(in millions of United States dollars ) |
|
|
|
|
|
(Restated) |
|
(Restated) |
|
ASSETS |
|
|
|
|
|
|
|
|
|
|
|
|
Current assets |
|
|
|
|
|
|
|
|
|
|
|
|
Cash and cash equivalents (Note 21) |
|
$ |
958 |
|
|
$ |
1,076 |
|
|
$ |
418 |
|
Accounts receivable |
|
|
673 |
|
|
|
601 |
|
|
|
435 |
|
Inventories (Note 7) |
|
|
996 |
|
|
|
834 |
|
|
|
746 |
|
Other |
|
|
68 |
|
|
|
42 |
|
|
|
98 |
|
|
Total current assets |
|
|
2,695 |
|
|
|
2,553 |
|
|
|
1,697 |
|
Property, plant and equipment (Note 8) |
|
|
8,459 |
|
|
|
7,587 |
|
|
|
7,035 |
|
Accrued pension benefits asset (Note 10) |
|
|
611 |
|
|
|
422 |
|
|
|
226 |
|
Deferred charges and other assets (Note 19) |
|
|
245 |
|
|
|
154 |
|
|
|
100 |
|
|
Total assets |
|
$ |
12,010 |
|
|
$ |
10,716 |
|
|
$ |
9,058 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIABILITIES AND SHAREHOLDERS EQUITY |
|
|
|
|
|
|
|
|
|
|
|
|
Current liabilities |
|
|
|
|
|
|
|
|
|
|
|
|
Long-term debt due within one year (Notes 9 and 19) |
|
$ |
122 |
|
|
$ |
107 |
|
|
$ |
103 |
|
Accounts payable |
|
|
253 |
|
|
|
331 |
|
|
|
253 |
|
Accrued payrolls and benefits |
|
|
221 |
|
|
|
208 |
|
|
|
165 |
|
Other accrued liabilities |
|
|
533 |
|
|
|
399 |
|
|
|
332 |
|
Income and mining taxes payable |
|
|
36 |
|
|
|
279 |
|
|
|
27 |
|
|
Total current liabilities |
|
|
1,165 |
|
|
|
1,324 |
|
|
|
880 |
|
Deferred credits and other liabilities |
|
|
|
|
|
|
|
|
|
|
|
|
Long-term debt (Notes 9 and 19) |
|
|
1,852 |
|
|
|
1,761 |
|
|
|
1,603 |
|
Deferred income and mining taxes (Note 5) |
|
|
2,018 |
|
|
|
1,891 |
|
|
|
1,718 |
|
Accrued post-retirement benefits liability (Note 10) |
|
|
732 |
|
|
|
671 |
|
|
|
603 |
|
Asset retirement obligation (Note 11) |
|
|
168 |
|
|
|
171 |
|
|
|
141 |
|
Deferred credits and other liabilities (Note 12) |
|
|
131 |
|
|
|
58 |
|
|
|
|
|
|
Total liabilities |
|
|
6,066 |
|
|
|
5,876 |
|
|
|
4,945 |
|
|
Minority interest |
|
|
761 |
|
|
|
470 |
|
|
|
404 |
|
|
Commitments and contingencies (Note 20) |
|
|
|
|
|
|
|
|
|
|
|
|
Shareholders equity |
|
|
|
|
|
|
|
|
|
|
|
|
Convertible debt (Note 13) |
|
|
362 |
|
|
|
418 |
|
|
|
418 |
|
|
Common shareholders equity |
|
|
|
|
|
|
|
|
|
|
|
|
Common shares issued and outstanding 192,237,394
(2004 - 188,133, 439; 2003 - 186,915,865) (Notes 16 and 17) |
|
|
3,000 |
|
|
|
2,891 |
|
|
|
2,858 |
|
Warrants (Note 15) |
|
|
62 |
|
|
|
62 |
|
|
|
62 |
|
Contributed surplus (Note 17) |
|
|
578 |
|
|
|
571 |
|
|
|
562 |
|
Retained earnings (deficit) |
|
|
1,181 |
|
|
|
428 |
|
|
|
(191 |
) |
|
|
|
|
4,821 |
|
|
|
3,952 |
|
|
|
3,291 |
|
|
Total shareholders equity |
|
|
5,183 |
|
|
|
4,370 |
|
|
|
3,709 |
|
|
Total liabilities and shareholders equity |
|
$ |
12,010 |
|
|
$ |
10,716 |
|
|
$ |
9,058 |
|
|
The Notes to Consolidated Financial Statements below are an integral part of these
statements.
145
Consolidated Statement of Cash Flows
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
2004 |
|
2003 |
(in millions of United States dollars) |
|
|
|
|
|
(Restated) |
|
(Restated) |
|
Operating activities |
|
|
|
|
|
|
|
|
|
|
|
|
Earnings before minority interest |
|
$ |
909 |
|
|
$ |
724 |
|
|
$ |
191 |
|
Charges (credits) not affecting cash
|
|
|
|
|
|
|
|
|
|
|
|
|
Depreciation and depletion |
|
|
256 |
|
|
|
248 |
|
|
|
227 |
|
Deferred income and mining taxes |
|
|
77 |
|
|
|
63 |
|
|
|
43 |
|
Asset impairment charges (Note 3) |
|
|
25 |
|
|
|
201 |
|
|
|
|
|
Other |
|
|
57 |
|
|
|
114 |
|
|
|
93 |
|
Contributions greater than post-retirement benefits expense |
|
|
(137 |
) |
|
|
(140 |
) |
|
|
(23 |
) |
Decrease (increase) in non-cash working capital related to operations
|
|
|
|
|
|
|
|
|
|
|
|
|
Accounts receivable |
|
|
(72 |
) |
|
|
(166 |
) |
|
|
(184 |
) |
Inventories |
|
|
(149 |
) |
|
|
(88 |
) |
|
|
(170 |
) |
Accounts payable and accrued liabilities |
|
|
34 |
|
|
|
126 |
|
|
|
124 |
|
Income and mining taxes payable |
|
|
(235 |
) |
|
|
249 |
|
|
|
(140 |
) |
Other |
|
|
(26 |
) |
|
|
62 |
|
|
|
(30 |
) |
|
Net cash provided by operating activities |
|
|
739 |
|
|
|
1,393 |
|
|
|
131 |
|
|
Investing activities |
|
|
|
|
|
|
|
|
|
|
|
|
Capital expenditures |
|
|
(1,168 |
) |
|
|
(876 |
) |
|
|
(591 |
) |
Partial sale of interest in Goro Nickel S.A.S. (Note 22) |
|
|
150 |
|
|
|
|
|
|
|
|
|
Proceeds from the sale of an investment |
|
|
103 |
|
|
|
|
|
|
|
|
|
Other |
|
|
23 |
|
|
|
(5 |
) |
|
|
26 |
|
|
Net cash used for investing activities |
|
|
(892 |
) |
|
|
(881 |
) |
|
|
(565 |
) |
|
Financing activities |
|
|
|
|
|
|
|
|
|
|
|
|
Long-term borrowings |
|
|
214 |
|
|
|
205 |
|
|
|
314 |
|
Repayments of long-term debt |
|
|
(105 |
) |
|
|
(100 |
) |
|
|
(574 |
) |
French government-sponsored Girardin Act financing (Note 12) |
|
|
49 |
|
|
|
41 |
|
|
|
|
|
Cash settlement of LYON Notes tendered for conversion |
|
|
(76 |
) |
|
|
|
|
|
|
|
|
Convertible debt issued |
|
|
|
|
|
|
|
|
|
|
470 |
|
Preferred shares redeemed (Note 14) |
|
|
|
|
|
|
|
|
|
|
(487 |
) |
Common shares issued |
|
|
40 |
|
|
|
30 |
|
|
|
60 |
|
Common dividends paid |
|
|
(57 |
) |
|
|
|
|
|
|
|
|
Preferred dividends paid |
|
|
|
|
|
|
|
|
|
|
(6 |
) |
Dividends paid to minority interest |
|
|
(49 |
) |
|
|
(20 |
) |
|
|
(7 |
) |
Other |
|
|
19 |
|
|
|
(10 |
) |
|
|
(5 |
) |
|
Net cash provided by (used for) financing activities |
|
|
35 |
|
|
|
146 |
|
|
|
(235 |
) |
|
Net increase (decrease) in cash and cash equivalents |
|
|
(118 |
) |
|
|
658 |
|
|
|
(669 |
) |
Cash and cash equivalents at beginning of year |
|
|
1,076 |
|
|
|
418 |
|
|
|
1,087 |
|
|
Cash and cash equivalents at end of year (Note 21) |
|
$ |
958 |
|
|
$ |
1,076 |
|
|
$ |
418 |
|
|
The Notes to Consolidated Financial Statements below are an integral part of these
statements.
146
Notes to Consolidated Financial Statements
(Tabular amounts in millions of United States dollars except number of shares and per
share amounts)
Note 1. Summary of significant accounting policies
The consolidated financial statements of Inco Limited (Inco) and its subsidiaries
(referred to as we, us and our) are prepared in accordance with generally accepted accounting
principles (GAAP) in Canada, consistently applied which, in our case, conform in all material
respects with GAAP in the United States, except as explained in Note 24.
Principles of consolidation
The financial statements of entities which are controlled by Inco either directly or
indirectly are consolidated. Control is established by our ability to determine strategic,
operating, investing and financing policies without the co-operation of others. The criteria we
use include an analysis of our level of ownership, voting rights and our level of representation on
the board of directors. We evaluate these criteria in terms of determining whether the existence
of one of the criteria alone (such as a majority ownership of all voting securities), or a
combination of the criteria when taken together, would result in having control, or the ability to
exercise control, of the management, business focus or strategy and/or critical policies of the
particular entity. The financial statements also include the financial statements of entities that
are considered variable interest entities (VIEs) for which we are the primary beneficiary. The
primary beneficiary is the variable interest holder obligated to absorb a majority of the risk of
loss from the VIEs activities, or is entitled to receive the majority of the VIEs residual
returns, or both. We have no entities for which we own greater than 50 per cent of all voting
securities but do not consolidate. We do not have subsidiaries or joint ventures for which we use
the proportionate consolidation method. Entities which are not controlled and for which our
ownership in all voting securities is greater than 20 per cent and we are able to exercise
significant influence are accounted for using the equity method and are included in deferred
charges and other assets. We have no entities for which we have used the equity method and own
less than 20 per cent of all voting securities. Investments in other entities are accounted for
using the cost method.
Estimates
Financial statements prepared in accordance with GAAP in Canada require management to
make estimates and assumptions that affect the reported amounts of assets and liabilities at the
date of the financial statements and the reported amounts of revenues and expenses during the
reporting period. Actual results could differ from those estimates.
Translation of consolidated financial statements into United States dollars
These consolidated financial statements are expressed in United States dollars. The
United States dollar is our functional currency. As our operations are considered integrated for
accounting purposes, we use the temporal method of translation. Monetary assets and liabilities
are translated into United States dollars using year-end rates of exchange. All other assets and
liabilities are translated at applicable historical rates of exchange. Revenues, expenses and
certain costs are translated at monthly average exchange rates except for inventoried costs,
depreciation and depletion which are translated at historical rates. Realized foreign currency
exchange gains and losses are included in other income (expense) and currency translation
adjustments are included in earnings as a separate line item.
Cash and cash equivalents
Cash and cash equivalents comprise cash, time deposits and other interest bearing
instruments with original maturity dates of less than three months.
Inventories
Inventories consist of finished metal products, work in process and operating supplies.
Inventories are stated at the lower of cost and estimated net realizable value.
The point in our production cycle that costs related to mine and other property, plant and
equipment begin to be capitalized as a cost of inventory is at the mine head. In-process includes
inventory at all stages in the production process. Broken ore in our mines is not recognized as
inventory until delivered to the mine head or temporary storage areas for blending. Cost includes
all direct costs
147
incurred through to the applicable stage of production, including direct labour and materials,
depreciation and depletion as well as an allocated portion of acquisition costs and overheads.
Costs are allocated based on contained metal.
The costing of metals produced at our Ontario and Voiseys Bay operations is primarily to
establish values for metals in inventory and cost of sales. Copper and nickel are treated as
co-products and share expenses pro rata based on pounds of metal produced unless a plant is
specifically used for the upgrading of only one metal or the other. Common costs incurred by nickel
and copper mined are apportioned between the metals on the basis of pounds of metal produced
through the common mine and mill processes. Once expenditures are required to further finish a
particular metal, all such expenditures are assigned to that metal. The remaining metals (cobalt
and precious metals) are by-products and incur expenses only when some specific steps are taken
towards their recovery. Co-product costing for copper is used because of the significant quantities
of copper contained in the ores at our Ontario and Voiseys Bay operations.
We do not have significant quantities of stockpiled ore on hand due to the integrated nature
of our operations. In addition, we do not use leach pads as a processing method at any of our
operations.
Period costs such as shutdown expenses, standby costs, property write-offs, costs of
delivering the product to the end customer, including freight and sales administration and strike
expenses, if any, are not allocated to inventory but charged directly to cost of sales and other
expenses. Strike expenses are those ongoing costs, such as salaries and certain employment
benefits, depreciation, property taxes, utilities and maintenance incurred during the strike period
which would normally be treated as production costs and charged to inventory but, in the absence of
production, are expensed because commercial production at the related facilities over the period of
the strike is not achieved.
Property, plant and equipment
Property, plant and equipment are stated at cost. Such cost, in the case of mines,
mineral rights and undeveloped properties, represents related acquisition and development
expenditures. Costs are capitalized for an undeveloped property when it is probable that such
costs will be recovered from the exploitation of the property. Financing costs, including
interest, are capitalized when they arise from indebtedness incurred to finance the development,
construction or expansion of significant mineral properties and facilities. Certain currency
translation gains and losses have been capitalized in respect of Voiseys Bay mineral properties in
the development phase. Capitalization of such gains and losses ceases when the development phase
of the mineral property is substantially complete and ready for use. Development costs are charged
as an expense in the period incurred unless we believe a development project meets generally
accepted criteria for deferral and amortization.
Research and development costs
Research costs are expensed in the period in which they are incurred. Development costs
are deferred where the product or process is clearly defined, the technical feasibility has been
established and we are committed to, and have the resources to, complete the project.
Asset impairment
When the net carrying value of an item or group of items of property, plant and
equipment, less its related provision for asset retirement obligations and deferred income and
mining taxes, exceeds the estimated undiscounted future net cash flows (which includes payments
required to meet asset retirement obligations) together with its residual value, the excess of the
carrying value over the fair value is charged to earnings. Evaluation of the future cash flows
from major development projects such as the Goro project entails a number of assumptions regarding
project scope, the timing, receipt and terms of regulatory approvals, estimates of future metals
prices, estimates of the size of the deposits, ore grades and recoverability, timing of commercial
production, commercial viability of new technological processes, production volumes, operating and
capital costs, and foreign currency exchange rates. In estimating future net cash flows, assets
are grouped at the lowest level for which there are identifiable cash flows that are largely
independent of cash flows from other asset groups taking into consideration movements of
intermediate products to ensure the utilization of available capacity across our operations.
Generally, all assets at a particular operation are used together to generate cash flow. Estimates
of future cash flows are subject to risks and uncertainties.
We periodically review our equity method investments to determine whether a decline in fair
value below the carrying amount is other than temporary.
148
Revenue recognition
Our primary products are nickel and copper. Most of our nickel is sold as refined nickel
and our copper is predominantly sold as copper anode or, prior to the closure of our copper
refinery in December 2005, as cathode. Copper is also sold as copper concentrates from our
Voiseys Bay operations. We also sell precious metals, cobalt and other by-products. Sales of all
commodities are recognized as revenue when title has passed under the terms of the relevant
contracts or sale, which is generally when shipped. Net sales include revenues from the sale of
all metals produced by us, including metals which we refer to as by-products as well as sulphuric
acid and liquid sulphur.
For most of our sales, the price is fixed at the time revenue is recognized, and is based on
quoted commodity prices on recognized exchanges. At the end of each period, a portion of our
revenues are provisionally priced. For provisionally priced sales, final settlement is generally
based on the average London Metal Exchange (LME) cash or other such benchmark price for a
specified future period generally after the month of arrival at the customers facility which is
generally within 60 to 90 days of sale. As such any proceeds received represent provisional sales
proceeds and not final sales proceeds.
Exploration
Exploration properties that contain estimated proven and probable ore/mineral reserves,
but for which a development decision has not yet been taken, are subject to periodic review for
impairment in accordance with our accounting policy when events or changes in circumstances
indicate the related carrying value may not be recoverable.
Exploration expenditures are expensed as incurred except in areas currently under development,
where production is probable, or in areas under feasibility study, where there is a reasonable
expectation to convert existing estimated mineral resources to estimated ore/mineral reserves and
add additional mineral resources with additional drilling and evaluations in areas near existing
ore/mineral reserves, and existing or planned production facilities, in which case they are
capitalized and amortized using the units-of-production method.
Depreciation and depletion
Property, plant and equipment is generally depreciated on a straight line basis over the
following estimated economic lives:
|
|
|
|
|
Mine and mobile equipment |
|
|
3 to 10 years |
|
Processing facilities and smelter equipment |
|
|
15 to 20 years |
|
Refinery equipment |
|
|
5 to 20 years |
|
Power generation facilities and equipment |
|
|
10 to 40 years |
|
Furniture and fixtures |
|
10 years |
|
Port facilities and transportation equipment |
|
14 years |
|
The estimated economic life is assessed on an annual basis, taking into account the state of
the equipment, technological changes and the related facilities or the estimated proven and
probable ore/mineral reserves where the equipment is located. Some equipment has an estimated
economic life in excess of 20 years, and is being amortized on a 5 per cent declining balance
basis. When an assessment is made that the remaining life of that equipment is less than 20 years,
the depreciation method is switched to straight line. Depreciation starts when an asset is ready
for use or, in the case of a new mining operation, when an asset achieves commercial production.
Depletion of deferred mine development costs, including costs of acquired mineral rights, is
calculated on a units-of-production basis over the estimated proven and probable ore/mineral
reserves which relate to the particular category of development, either life of mine plan or
area-specific. No future development costs are taken into account in calculating the depletion
charge.
Life of mine plan development costs represent capital expenditures that will be utilized in
the extraction of all the estimated proven and probable ore/mineral reserves in the current
detailed mine plan. These expenditures are predominantly incurred up front and in advance of any
ore extraction or in advance of major expansions. The types of development included in this
category are acquisition costs, ore haulage shafts, initial decline, ore passes, ventilation, and
chutes and underground ore crusher cavities and are intended to be used for the extraction of all
ore within the current mine plan. These costs are depleted on a units-of-production basis over the
total estimated proven and probable ore/mineral reserves.
149
Area-specific development costs, which are depleted over the related production from estimated
proven and probable ore/mineral reserves for which no further capital is required, consist of
capital expenditures to provide access to various areas within the mine to allow the extraction of
ore to commence. The types of development costs that are within this category include: access and
perimeter drives, ventilation drives and rises, and progressive declining subsequent to initial
contact with the orebody. Annual deferred mine development costs incurred to access specific ore
blocks or areas are depleted on a units-of-production basis over the estimated proven and probable
ore/mineral reserves that can be currently accessed in those areas without future capital
development costs being incurred.
Ongoing mine development costs that provide access to ore for less than two years production
are expensed as incurred.
Asset retirement obligations
The accounting for asset retirement obligations encompasses the accounting for legal
obligations associated with the retirement of a tangible long-lived asset that results from the
acquisition, construction or development and/or the normal operation of a long-lived asset. The
retirement of a long-lived asset is its other than temporary removal from service, including its
sale, abandonment, recycling or disposal in some other manner.
We recognize asset retirement obligations as liabilities when a legal obligation with respect
to the retirement of an asset is incurred, with the initial measurement of the obligation at fair
value calculated based on discounted cash flows. These obligations are accreted to full value over
time through charges to cost of sales and other expenses. In addition, an asset retirement cost
equivalent to the liabilities is capitalized as part of the related assets carrying value and is
subsequently depreciated or depleted over the assets useful life. A liability for an asset
retirement obligation is incurred over more than one reporting period when the events that create
the obligation occur over more than one reporting period. Any incremental liability incurred in a
subsequent reporting period is considered to be an additional layer of the original liability.
Each layer is initially measured at fair value. As required, a separate layer is measured,
recognized and accounted for prospectively. Our asset retirement obligations consist primarily of
costs associated with mine reclamation and closure activities.
Our operations have been, and may in the future be, affected from time to time in varying
degrees by changes in environmental laws and regulations, including those for asset retirement
obligations. Both the likelihood of future changes in laws and regulations and their overall
effect upon us vary greatly from country to country and are not predictable. Our policy is to meet
or, if possible, surpass environmental standards set by relevant legislation, by the application of
technically proven and economically feasible measures.
For environmental issues that may not involve the retirement of an asset, where we are a
responsible party and it is determined that a liability exists, and amounts can be quantified, we
accrue for the estimated liability. In determining whether a liability exists in respect of such
environmental issues, we apply the criteria for liability recognition under applicable accounting
standards.
Income and mining taxes
Income and mining taxes comprise the provision (relief) for taxes actually paid or
payable (received or receivable) and deferred taxes. Deferred income and mining taxes are computed
using the asset and liability method whereby deferred income and mining tax assets and liabilities
are recognized for the expected future tax consequences attributable to temporary differences
between the tax bases of assets and liabilities and their reported amounts in the financial
statements. Deferred income and mining tax assets and liabilities are computed using current
foreign currency exchange rates and using income tax rates in effect when the temporary differences
are expected to reverse. The effect on deferred income and mining tax assets and liabilities of a
change in tax rates is recognized in earnings in the period of substantive enactment. The
provision (relief) for deferred income and mining taxes is based on the changes in deferred income
and mining tax assets and liabilities during the period. In estimating deferred income and mining
tax assets, a valuation allowance is determined to reduce the deferred income tax assets to the
amount that is more likely than not to be realized.
Investment tax credits are accounted for by the cost reduction method whereby investment tax
credits related to the acquisition of assets are deferred and recognized in earnings as the related
assets are depreciated, while those related to research and development expenses are included in
earnings.
150
Financial instruments and commodities contracts
Hedge accounted financial instruments are documented and periodic effectiveness tests are
performed. Absent such documentation and testing, changes in the fair value of financial
instruments are recorded in earnings. Forward, option and swap contracts may be used to hedge the
effect of exchange rate changes on our future currency requirements. In addition, forward, option
and swap contracts may be used to hedge the effect of price changes on a portion of the metals we
sell. Fuel oil swap contracts may be used to hedge the effect of price changes in respect of a
portion of our energy requirements in Indonesia. Gains and losses on these contracts are deferred
and recognized as a component of the related transaction. Interest rate swaps may be used to hedge
interest rate risk exposure. Amounts receivable or payable related to the swaps are recorded in
interest expense concurrently with the interest expense of the underlying debt. We also purchase
and sell foreign currencies and metals by using forward contracts which have not been specifically
identified as hedges. The values of these contracts are marked to market with resulting gains and
losses included in earnings.
Post-retirement benefits
The cost of providing benefits through defined benefit pensions and post-retirement
benefits other than pensions is actuarially determined and recognized in earnings using the
projected benefit method prorated on service. Differences arising from plan amendments are
recognized in earnings over the expected average remaining service life of employees. Differences
arising from changes in assumptions, experience gains and losses and investment gains and losses
are recognized in earnings by amortizing the excess of the net actuarial and investment gains and
losses over 10 per cent of the greater of the post-retirement benefits obligation and the fair
value of plan assets over the expected average remaining service life of employees. The cost of
providing benefits through defined contribution pension plans is charged to earnings in the period
in respect of which contributions become payable.
Stock compensation plans
In respect of our stock options, we recognize an expense based on the estimated fair
value of the stock options over the vesting period. The fair value of each stock option granted is
estimated on the date of the grant using an option-pricing model. Cash received from employees
upon exercise of options to purchase Common Shares is credited to then issued and outstanding
Common Shares. In respect of Common Share appreciation rights, compensation expense is determined
and accrued over the vesting period of the options based on the excess of the quoted market value
of the respective shares over the exercise price.
Net earnings per Common Share
Basic earnings per Common Share is computed by dividing net earnings applicable to Common
Shares by the weighted-average number of Common Shares issued and outstanding for the relevant
period. Diluted earnings per Common Share is computed by dividing net earnings applicable to
Common Shares, as adjusted for the effects of dilutive convertible securities, by the sum of the
weighted-average number of Common Shares issued and outstanding and all additional Common Shares
that would have been outstanding if potentially dilutive Common Shares had been issued. For
convertible securities we use the if-converted method whereas the treasury stock method is used
for stock options and warrants.
Note 2. Changes in accounting policies and restatements
Changes in accounting policies
(a) Convertible Debentures
Effective January 1, 2005, on a retroactive basis, we adopted revisions to Canadian
Institute of Chartered Accountants (CICA) Section 3860, Financial Instruments Disclosure and
Presentation. The revisions relate to the accounting for instruments for which the issuer has the
right to settle in cash or its own shares. Such an instrument is bifurcated between debt and equity
in accordance with this revised standard. This change impacted the accounting treatment for our
LYON notes, Convertible Debentures due 2023 (Convertible Debentures) and 3 1/2% Subordinated
Convertible Debentures due 2052 (Subordinated Debentures) which were previously treated as equity
in accordance with EIC No. 71, Financial Instruments that may be Settled at the Issuers Option in
Cash or its own Equity Instruments. Consistent with this change, we record interest expense in lieu
of accretion charges with respect to these convertible debt securities. The impact on our balance
sheet as at December 31, 2004 was an increase in long-term debt of $210 million (2003 $194
million), an increase in deferred income and mining taxes of $11 million (2003 $12 million), a
decrease in
151
convertible debt classified as equity of $201 million (2003 $188 million), an increase in
deferred charges of $7 million (2003 $7 million) and a reduction in retained earnings of $13
million (2003 $11 million). In addition, as the revisions resulted in the retroactive restatement
of our interest expense, there was an increase in the amount of interest capitalized in respect of
our Voiseys Bay and Goro projects. The impact in respect of the adjustment to capitalized interest
was an increase in property, plant and equipment of $7 million (2003 $2 million); an increase in
deferred income and mining taxes of $1 million (2003 nil) and an increase in retained earnings of
$6 million (2003 $2 million).
(b) Earnings per share
We adopted EIC No. 155, The Effects of Contingently Convertible Instruments on the
Computation of Diluted Earnings per Share, on a retroactive basis. The new abstract, which is
effective for interim and annual periods beginning after October 1, 2005, requires that the effects
of contingently convertible instruments be included in the computation of diluted earnings per
share regardless of whether the market price trigger has been met. The impact on 2004 earnings per
share was a reduction of 12 cents (2003 2 cents).
(c) Variable interest entities
Effective January 1, 2004, we early adopted Accounting Guideline No. 15, Consolidation of
Variable Interest Entities, (AcG No. 15). AcG No. 15 provides a new framework for identifying
variable interest entities (VIEs) and determining when a company should include the assets,
liabilities, non-controlling interests and results of operations of a VIE in its consolidated
financial statements. In general, a VIE is a legal structure used to conduct activities or hold
assets that either (i) has insufficient equity to carry out its principal activities without
additional subordinated financial support, (ii) has a group of equity owners that do not have
sufficient rights or the ability to make significant decisions about the VIEs activities, or (iii)
has a group of equity owners that do not have the obligation to absorb losses or the right to
receive returns generated by its operations. AcG No. 15 requires a VIE to be consolidated if a
party with an ownership, contractual or other financial interest in the VIE (a variable interest
holder) is obligated to absorb a majority of risk of loss from the VIEs activities, or is
entitled to receive a majority of the VIEs residual returns (if no party absorbs the majority of
the VIEs losses), or both. A variable interest holder that consolidates the VIE is called the
primary beneficiary.
We early adopted AcG No. 15 as a result of the French government-sponsored Girardin Act
financing arrangements (See Note 12). The effect of adopting the provisions of AcG No. 15 is to
increase both total assets and total liabilities by approximately $41 million as of December 31,
2004. Reference is made to Note 12 for further information.
(d) Depreciation and depletion expense
Effective January 1, 2004, on a retroactive basis, we changed the method by which we
calculate depreciation and depletion expense. Under the previous method, we depleted mine
development costs on a composite basis. Total historical capitalized costs and estimated future
development costs relating to our developed and undeveloped estimated proven and probable
ore/mineral reserves were depleted using the units-of-production method based on total developed
and undeveloped estimated proven and probable ore/mineral reserves. Under the new method,
depletion of the deferred mine development costs is calculated on a units-of-production basis over
the estimated proven and probable ore/mineral reserves which relate to the particular category of
development, either life of mine plan or area-specific. No future development costs are taken into
account in calculating the depletion charge. In addition, the depreciation method covering certain
other assets of our 61 per cent owned subsidiary, PT International Nickel Indonesia Tbk (PT
Inco), has been changed to a straight line basis to conform its depreciation method used to the
depreciation methods used for similar assets in other company locations.
The impact of this change on 2003 depreciation and depletion expense was a reduction of $38
million.
(e) Generally accepted accounting principles
Effective January 1, 2004, we adopted CICA Section 1100, Generally Accepted Accounting
Principles. CICA 1100 describes what constitutes GAAP in Canada and its sources. Adoption of this
standard did not have a significant impact on our results of operations or financial condition for
2004.
152
(f) Hedging Relationships
Effective January 1, 2004, we adopted AcG No. 13, Hedging Relationships which provides
guidance concerning documentation and effectiveness testing for derivative contracts. Adoption of
this guideline did not have a significant impact on our results of operations or financial
condition for 2004.
(g) Stock-based compensation
Effective January 1, 2003, we changed our accounting for stock options from the intrinsic
value method to one that recognizes as an expense the cost of stock-based compensation based on the
estimated fair value of new stock options granted to employees in 2003 and in future years. The
fair value of each stock option granted is estimated on the date of the grant using an
option-pricing model. As a result of this change in accounting policy, which was applied
prospectively, an expense of $3 million was recorded in 2003, to reflect the fair value of stock
options granted to employees in 2003.
(h) Impairment of long-lived assets
Effective January 1, 2003, we adopted CICA Section 3063, Impairment of Long-Lived Assets.
This section establishes standards for the recognition, measurement and disclosure of the
impairment of long-lived assets that are held for use. An impairment loss would be recognized if
the carrying amount of a long-lived asset was not recoverable from its undiscounted cash flows and
would be measured as the difference between the carrying amount and the fair value of the asset.
The initial adoption of the new standard had no impact on our results of operations or financial
condition.
(i) Asset retirement obligations
Effective January 1, 2003, on a retroactive basis, we adopted CICA Section 3110, Asset
Retirement Obligations. This standard significantly changed the method of accounting for asset
retirement obligation costs. Under this new standard, asset retirement obligations are recognized
when incurred and recorded as liabilities at fair value. The liability is accreted over time
through periodic charges to earnings. In addition, the asset retirement cost is capitalized as
part of the assets carrying value and depreciated or depleted over the assets useful life.
Recent Accounting Pronouncements
In January 2005, the CICA issued three new standards relating to financial instruments.
Section 3855, Financial Instruments Recognition and Measurement, prescribes when a financial
asset, financial liability, or non-financial derivative is to be recognized on the balance sheet
and at what amount sometimes using fair value; other times using cost-based measures. It also
specifies how financial instrument gains and losses are to be presented. Section 3865, Hedges, is
applicable whenever a company chooses to designate a hedging relationship for accounting purposes.
It builds on AcG No. 13, Hedging Relationships, and Section 1650, Foreign Currency Translation, by
specifying how hedge accounting is applied and what disclosures are necessary when it is applied.
Section 1530, Comprehensive Income, introduces new rules for the reporting and display of
comprehensive income. Comprehensive income, which we currently report for United States GAAP, is
the change in equity (net assets) of an enterprise during a reporting period from transactions and
other events and circumstances from non-owner sources. It includes all changes in equity during a
period except those resulting from investments by owners and distributions to owners.
These standards are applicable for fiscal years beginning on or after October 1, 2006. If a
company elects to early adopt such standards the early adoption election must be applied to all
three standards at the same time. We are currently reviewing the impact of these new standards.
Restatements
Effective January 1, 2005, on a retroactive basis, we restated our minority interest and
current deferred income taxes to correct an error in the allocation of net earnings to minority
interests. The impact of the correction for our December 31, 2004 balance sheet was a decrease in
minority interest of $59 million (2003 $38 million), a decrease in current deferred taxes of $21
million (2003 $14 million) and an increase in retained earnings of $38 million (2003 $24
million). The net impact on 2004 net earnings was an increase of $14 million (2003 $10 million),
or 7 cents per share (2003 5 cents per share).
153
Note 3. Asset impairment charges
During 2005, we announced that we had entered into a long-term agreement with
Falconbridge Limited under which we would sell all of our copper production from our Ontario
operations in anode form to them. In connection with this decision, a pre-tax impairment charge of
$25 million was recorded which primarily relates to a reduction in the carrying value of our copper
refining facility in Sudbury, Ontario since this facility was closed at the end of 2005.
On May 25, 2004 we announced the preliminary findings reached to that date as part of the
second phase, or Phase 2, of the comprehensive review of our then approximately 85 per cent owned
Goro nickel-cobalt project in New Caledonia. We also announced that the principal changes in the
planned Goro project configuration resulting from such findings as part of Phase 2 of our review,
moving from indirect to direct heating of ore feed and other changes intended to reduce the capital
cost estimate and enhance the operating efficiency of the planned process plant and the process to
be used to recover nickel and cobalt, would result in certain assets being written off in the
second quarter of 2004. Following our review of the affected assets, we recorded a non-cash charge
of $201 million. The affected assets were primarily comprised of engineering and related work
associated with the original project configuration and equipment purchased for the indirect heating
of ore feed which no longer had future use to the Goro project or otherwise.
Note 4. Other income, net
Other income, net is comprised of the following:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Interest and dividend income |
|
$ |
29 |
|
|
$ |
13 |
|
|
$ |
16 |
|
Gains from sales of securities and other assets |
|
|
88 |
|
|
|
9 |
|
|
|
59 |
|
Gains (losses) from derivative positions in metals |
|
|
(12 |
) |
|
|
(4 |
) |
|
|
12 |
|
Gain from closure of derivative foreign currency contracts |
|
|
|
|
|
|
10 |
|
|
|
11 |
|
Loss from cash settlement of LYON Notes
tendered for conversion (Note 13) |
|
|
(9 |
) |
|
|
|
|
|
|
|
|
Interest from a tax refund |
|
|
|
|
|
|
|
|
|
|
7 |
|
Goro project suspension, net |
|
|
|
|
|
|
1 |
|
|
|
4 |
|
Earnings from affiliates accounted for using equity method |
|
|
2 |
|
|
|
5 |
|
|
|
2 |
|
Loss on redemption of securities |
|
|
|
|
|
|
|
|
|
|
(2 |
) |
Other, net |
|
|
(15 |
) |
|
|
15 |
|
|
|
(1 |
) |
|
Other income, net |
|
$ |
83 |
|
|
$ |
49 |
|
|
$ |
108 |
|
|
In 2005, a gain in the amount of $88 million was realized from the sale of a non-core
investment in a junior mining company.
In 2004, gains in the amount of $10 million were realized on certain foreign currency
derivative contracts entered into in anticipation of the expenditures on the Goro project. Gains
from sales of securities and other assets of $9 million includes a gain of $6 million which was
realized on our sale of a subsidiary operation in Guatemala.
In 2003, gains from sales of securities and other assets included a milestone payment received
in the fourth quarter of 2003 under the terms of sale of a non-core exploration property in 1998 in
the amount of $24 million as well as $35 million realized from the sale or transfer of shares and
other interests contributed to or received in conjunction with strategic and other collaborations
relating to our primary metals operations.
154
Note 5. Income and mining taxes
In carrying on our Canadian mining operations, we are subject to both income and mining
taxes. The amount of such taxes will vary depending on the provisions set out by the relevant
legislative authority. Generally, most expenditures incurred by us are deductible in computing
income tax, whereas mining tax legislation, although based on a measure of profitability from
carrying on mining operations, is more restrictive in respect of the deductions permitted in
computing income subject to mining tax. In most jurisdictions deductions for financing expenses,
such as interest and royalties, are not allowed to be claimed in computing income subject to mining
tax. In addition, income unrelated to carrying on mining operations would not be subject to mining
tax.
The provision (relief) for income and mining taxes was as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
|
|
|
|
(Restated) |
|
|
(Restated) |
|
|
Current taxes
|
|
|
|
|
|
|
|
|
|
|
|
|
Canadian |
|
$ |
241 |
|
|
$ |
165 |
|
|
$ |
(47 |
) |
Foreign |
|
|
123 |
|
|
|
147 |
|
|
|
11 |
|
|
|
|
|
364 |
|
|
|
312 |
|
|
|
(36 |
) |
|
Deferred taxes
|
|
|
|
|
|
|
|
|
|
|
|
|
Canadian |
|
|
50 |
|
|
|
123 |
|
|
|
(33 |
) |
Foreign |
|
|
(6 |
) |
|
|
(3 |
) |
|
|
42 |
|
|
|
|
|
44 |
|
|
|
120 |
|
|
|
9 |
|
|
Income and mining taxes |
|
$ |
408 |
|
|
$ |
432 |
|
|
$ |
(27 |
) |
|
Earnings before income and mining taxes and minority interest, by geographic source, were as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
|
|
|
|
(Restated) |
|
|
(Restated) |
|
|
Canada |
|
$ |
875 |
|
|
$ |
830 |
|
|
$ |
55 |
|
Foreign |
|
|
442 |
|
|
|
326 |
|
|
|
109 |
|
|
|
|
$ |
1,317 |
|
|
$ |
1,156 |
|
|
$ |
164 |
|
|
155
The reconciliation between taxes at the combined Canadian federal-provincial statutory income
tax rate and the effective income and mining tax rate was as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
|
|
|
|
(Restated) |
|
|
(Restated) |
|
|
Provision at Combined Canadian federal-
provincial statutory income tax rate |
|
$ |
510 |
|
|
$ |
461 |
|
|
$ |
66 |
|
Resource and depletion allowances |
|
|
(64 |
) |
|
|
(77 |
) |
|
|
(12 |
) |
|
Adjusted income taxes |
|
|
446 |
|
|
|
384 |
|
|
|
54 |
|
Mining taxes |
|
|
48 |
|
|
|
66 |
|
|
|
17 |
|
|
|
|
|
494 |
|
|
|
450 |
|
|
|
71 |
|
Currency translation adjustments |
|
|
2 |
|
|
|
(7 |
) |
|
|
42 |
|
Currency translation adjustments on long-term debt |
|
|
13 |
|
|
|
23 |
|
|
|
58 |
|
Non-taxable gains |
|
|
(41 |
) |
|
|
(1 |
) |
|
|
(33 |
) |
Benefit of net capital losses not previously recognized |
|
|
|
|
|
|
(42 |
) |
|
|
|
|
Adjustment of prior year tax issues and tax rate changes |
|
|
(19 |
) |
|
|
(17 |
) |
|
|
(142 |
) |
Foreign tax rate differences |
|
|
(39 |
) |
|
|
(39 |
) |
|
|
(17 |
) |
Asset impairment charges |
|
|
|
|
|
|
70 |
|
|
|
|
|
Other |
|
|
(2 |
) |
|
|
(5 |
) |
|
|
(6 |
) |
|
Effective income and mining taxes |
|
$ |
408 |
|
|
$ |
432 |
|
|
$ |
(27 |
) |
|
Deferred income and mining tax liabilities and assets consisted of the following:
|
|
|
|
|
|
|
|
|
|
|
|
|
December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
|
|
|
|
(Restated) |
|
|
(Restated) |
|
|
Liabilities: |
|
|
|
|
|
|
|
|
|
|
|
|
Property, plant and equipment |
|
$ |
2,130 |
|
|
$ |
2,038 |
|
|
$ |
1,889 |
|
Deferred charges and other assets |
|
|
215 |
|
|
|
135 |
|
|
|
65 |
|
Long-term debt |
|
|
97 |
|
|
|
90 |
|
|
|
60 |
|
Other |
|
|
13 |
|
|
|
1 |
|
|
|
3 |
|
|
|
|
|
2,455 |
|
|
|
2,264 |
|
|
|
2,017 |
|
|
Assets: |
|
|
|
|
|
|
|
|
|
|
|
|
Post-retirement benefits |
|
|
236 |
|
|
|
217 |
|
|
|
204 |
|
Asset retirement obligations |
|
|
71 |
|
|
|
69 |
|
|
|
45 |
|
Tax loss carryforwards |
|
|
129 |
|
|
|
86 |
|
|
|
70 |
|
Tax credit carryforwards |
|
|
9 |
|
|
|
12 |
|
|
|
7 |
|
Other |
|
|
15 |
|
|
|
18 |
|
|
|
|
|
|
|
|
|
460 |
|
|
|
402 |
|
|
|
326 |
|
Valuation allowance |
|
|
(23 |
) |
|
|
(29 |
) |
|
|
(27 |
) |
|
|
|
|
437 |
|
|
|
373 |
|
|
|
299 |
|
|
Net deferred income and mining tax liability |
|
$ |
2,018 |
|
|
$ |
1,891 |
|
|
$ |
1,718 |
|
|
During 2001, tax legislation was passed in New Caledonia covering projects meeting certain
criteria. Goro Nickel S.A.S. qualifies for certain tax incentives under this legislation in
connection with its Goro project. These incentives include an income tax holiday during the
construction phase of the project and throughout a 15-year period commencing in the first year in
which commercial production, as defined by the applicable legislation, is achieved followed by a
five-year, 50 per cent income tax holiday. In addition, Goro Nickel S.A.S. qualifies for certain
exemptions from indirect taxes such as import duties during the construction phase and throughout
the commercial life of the project. Certain of these tax benefits, including the income tax
holiday, are subject to an earlier phase out should the project achieve a specified cumulative rate
of return. We are subject to a branch profit tax commencing in the first year in which commercial
production is achieved, as defined by the applicable legislation. To date, we have not realized
any net income for New Caledonia tax purposes. The benefits of this legislation are expected to
apply with respect to any taxes otherwise payable once the Goro project is in operation.
156
In determining the likelihood of realizing an income tax asset we take into account a number
of factors, including current conditions and anticipated changes in mine or production plans.
We have tax loss carryforwards in the amount of $325 million available for New Caledonia
income and branch profit tax purposes. Of these total tax loss carryforwards, the benefit of losses
in the amount of $57 million have not been recognized.
We have capital loss carryforwards in the amount of $37 million available for United Kingdom
income tax purposes to reduce taxable income in certain circumstances. The capital losses may be
carried forward indefinitely. The benefits of these tax loss carryforwards have not been
recognized for accounting purposes.
In computing our income tax liability, no amount has been recorded in respect of additional
potential taxes which might arise should we distribute income realized in certain of our foreign
subsidiaries on the basis that it is our intention to reinvest such income in the foreign
operations of the relevant subsidiary. Should managements intentions change in respect of such
distribution, additional taxes, if any, would be recorded in respect of the distribution from, or
disposition or liquidation of, the relevant foreign entity. For those foreign entities from which
distributions occur on a regular basis, any additional taxes that would arise on such
distributions, if any, have been included in deriving the annual income tax provision for the year
in which the income is earned by the foreign subsidiary.
Note 6. Net earnings per Common Share
The computation of basic and diluted earnings per share was as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
|
|
|
|
(Restated) |
|
|
(Restated) |
|
|
Basic earnings per share computation |
|
|
|
|
|
|
|
|
|
|
|
|
Numerator: |
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings |
|
$ |
836 |
|
|
$ |
619 |
|
|
$ |
146 |
|
Dividends on preferred shares |
|
|
|
|
|
|
|
|
|
|
(6 |
) |
Premium on redemption of preferred shares |
|
|
|
|
|
|
|
|
|
|
(15 |
) |
|
Net earnings applicable to common shares |
|
$ |
836 |
|
|
$ |
619 |
|
|
$ |
125 |
|
|
Denominator: |
|
|
|
|
|
|
|
|
|
|
|
|
Weighted-average common shares outstanding (thousands) |
|
|
189,425 |
|
|
|
187,550 |
|
|
|
184,500 |
|
|
Basic earnings per common share |
|
$ |
4.41 |
|
|
$ |
3.30 |
|
|
$ |
0.68 |
|
|
Diluted earnings per share computation |
|
|
|
|
|
|
|
|
|
|
|
|
Numerator: |
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings applicable to common shares |
|
$ |
836 |
|
|
$ |
619 |
|
|
$ |
125 |
|
Dilutive effect of: |
|
|
|
|
|
|
|
|
|
|
|
|
Convertible debentures |
|
|
|
|
|
|
2 |
|
|
|
3 |
|
|
Net earnings applicable to common shares, assuming dilution |
|
$ |
836 |
|
|
$ |
621 |
|
|
$ |
128 |
|
|
Denominator: |
|
|
|
|
|
|
|
|
|
|
|
|
Weighted-average common shares outstanding (thousands) |
|
|
189,425 |
|
|
|
187,550 |
|
|
|
184,500 |
|
Dilutive effect of: |
|
|
|
|
|
|
|
|
|
|
|
|
Convertible debentures |
|
|
28,055 |
|
|
|
17,440 |
|
|
|
13,080 |
|
Stock options |
|
|
1,008 |
|
|
|
1,426 |
|
|
|
1,707 |
|
Warrants |
|
|
4,218 |
|
|
|
3,740 |
|
|
|
1,308 |
|
|
Weighted-average common shares outstanding, assuming dilution |
|
|
222,706 |
|
|
|
210,156 |
|
|
|
200,595 |
|
|
Diluted earnings per common share |
|
$ |
3.75 |
|
|
$ |
2.95 |
|
|
$ |
0.64 |
|
|
157
At December 31, 2005, options on nil Common Shares (2004 nil; 2003 819,000) were excluded
from the computation of diluted earnings per Common Share because their effects were not dilutive.
We adopted EIC No. 155, The Effects of Contingently Convertible Instruments on the Computation
of Diluted Earnings per Share, on a retroactive basis (see Note 2).
Note 7. Inventories
Inventories consisted of the following:
|
|
|
|
|
|
|
|
|
|
|
|
|
December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Finished metals |
|
$ |
259 |
|
|
$ |
228 |
|
|
$ |
193 |
|
In-process metals |
|
|
608 |
|
|
|
511 |
|
|
|
478 |
|
Supplies |
|
|
129 |
|
|
|
95 |
|
|
|
75 |
|
|
|
|
$ |
996 |
|
|
$ |
834 |
|
|
$ |
746 |
|
|
Note 8. Property, plant and equipment
Property, plant and equipment consisted of the following:
|
|
|
|
|
|
|
|
|
|
|
|
|
December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
|
|
|
|
(Restated) |
|
|
(Restated) |
|
|
Mines and mining plants |
|
$ |
6,452 |
|
|
$ |
3,003 |
|
|
$ |
2,902 |
|
Processing facilities |
|
|
3,546 |
|
|
|
3,399 |
|
|
|
3,383 |
|
Voiseys Bay project under development |
|
|
1,371 |
|
|
|
4,399 |
|
|
|
3,817 |
|
Goro project |
|
|
1,085 |
|
|
|
703 |
|
|
|
804 |
|
Other |
|
|
751 |
|
|
|
723 |
|
|
|
598 |
|
|
Total property, plant and equipment, at cost |
|
|
13,205 |
|
|
|
12,227 |
|
|
|
11,504 |
|
|
Accumulated depreciation |
|
|
3,359 |
|
|
|
3,317 |
|
|
|
3,185 |
|
Accumulated depletion |
|
|
1,387 |
|
|
|
1,323 |
|
|
|
1,284 |
|
|
Total accumulated depreciation and depletion |
|
|
4,746 |
|
|
|
4,640 |
|
|
|
4,469 |
|
|
Property, plant and equipment, net |
|
$ |
8,459 |
|
|
$ |
7,587 |
|
|
$ |
7,035 |
|
|
At December 31, 2005, property, plant and equipment, at cost included capitalized development
costs relating to infill drilling, gathering geological and geotechnical data, further reserve and
other mineralized material evaluation and other related activities of $35 million (2004 $29
million; 2003 $27 million).
In December 2005, coincident with the achievement of commercial production, a significant
portion of the Voiseys Bay assets were reclassified from Voiseys Bay project under development to
mines and mining plants and to processing facilities. As at December 31, 2005, Voiseys Bay under
development represents the carrying value of underground mineral properties. At December 31, 2005,
the net carrying value of property, plant and equipment under construction or development not
subject to amortization, depreciation or depletion was $2,777 million (2004 $5,230 million; 2003
$4,722 million) which is comprised of amounts for the Voiseys Bay project totalling $1,371
million (2004 $4,348 million; 2003 $3,777 million), the Goro project of $1,085 million (2004
$703 million; 2003 $804 million) and other assets under construction at our operations of $321
million (2004 $179 million; 2003 $141 million). Depreciation, depletion and amortization for
the open pit mine, concentrator and related facilities completed under phase one of the Voiseys
Bay project commenced in 2005. It is currently expected that depreciation, depletion and
amortization for the Goro project will commence in 2008 in line with the planned start of
operations. Capitalized interest costs included in capital expenditures were $103 million in 2005
(2004 $70 million; 2003 $55 million).
158
Note 9. Long-term debt
Long-term debt consisted of the following (repayment periods or maturities are shown in
parentheses):
|
|
|
|
|
|
|
|
|
|
|
|
|
December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
|
|
|
|
(Restated) |
|
|
(Restated) |
|
|
Inco Limited |
|
|
|
|
|
|
|
|
|
|
|
|
15.75% Sterling Unsecured Loan Stock (2006) (a) |
|
$ |
45 |
|
|
$ |
45 |
|
|
$ |
45 |
|
Term loan (2009-2011) (b) |
|
|
400 |
|
|
|
200 |
|
|
|
|
|
7.75% Notes (2012) (c) |
|
|
400 |
|
|
|
400 |
|
|
|
400 |
|
5.70% Debentures (2015) (d) |
|
|
300 |
|
|
|
300 |
|
|
|
300 |
|
LYON Notes (2021) (e) |
|
|
75 |
|
|
|
109 |
|
|
|
100 |
|
Convertible Debentures (2006-2023) (f) |
|
|
113 |
|
|
|
108 |
|
|
|
104 |
|
7.20% Debentures (2032) (g) |
|
|
400 |
|
|
|
400 |
|
|
|
400 |
|
Subordinated Convertible Debentures (2006-2052) (h) |
|
|
106 |
|
|
|
106 |
|
|
|
105 |
|
PT International Nickel Indonesia Tbk |
|
|
|
|
|
|
|
|
|
|
|
|
Loan facilities (5.3%) (2006) (i) |
|
|
38 |
|
|
|
115 |
|
|
|
192 |
|
Other |
|
|
|
|
|
|
|
|
|
|
|
|
Other (7.6%) (2006-2031) |
|
|
97 |
|
|
|
85 |
|
|
|
60 |
|
|
|
|
|
1,974 |
|
|
|
1,868 |
|
|
|
1,706 |
|
Long-term debt due within one year |
|
|
122 |
|
|
|
107 |
|
|
|
103 |
|
|
|
|
$ |
1,852 |
|
|
$ |
1,761 |
|
|
$ |
1,603 |
|
|
(a) The 15.75 per cent Sterling Unsecured Loan Stock is redeemable in 2006 in sterling or, at
the option of the holders, in U.S. dollars at a fixed exchange rate of one pound sterling to $1.98.
In 1981, we issued Pound Sterling 25 million aggregate principal amount of unsecured bonds which
were called unsecured loan stock in the United Kingdom. These bonds were issued under a Trust
Deed which contained many of the same provisions that are included in a trust indenture covering
the issuance of unsecured bonds in the United States. These bonds rank equally and ratably with
all of Incos other unsecured and unsubordinated debt. Holders of these debt securities were
defined as bondholders under the Trust Deed. Under United Kingdom law, unsecured loan stock
represent an unsecured bond issued in bearer form.
(b) On December 23, 2004, we concluded a $400 million term loan facility that matures on
December 23, 2011. The borrowings under the facility may be made in United States dollars in the
form of (i) United States Base Rate loans or (ii) London Interbank Offered Rate (LIBOR) loans.
Borrowings under this facility bear interest, when drawn, at a rate which varies based on the type
of borrowing and our credit ratings at the time of borrowing. As of December 31, 2005, there was
$400 million drawn under the facility. The floating rate interest payments with respect to $200
million of the facility were swapped in exchange for a fixed rate of 5.098 per cent. As described
in part (j) below, the term loan facility requires that we maintain a ratio of Consolidated
Indebtedness, as defined in the term loan facility, to Tangible Net Worth, as defined in the term
loan facility, not to exceed 50:50.
(c) On May 13, 2002, we issued and sold through an underwritten public offering in the United
States $400 million aggregate principal amount of 7.75% Notes due 2012 (Notes). The Notes are
redeemable, at our option, at any time at a price equal to the greater of the principal amount of
the Notes and the sum of the present values of the remaining scheduled payments of principal and
interest. The interest payments under the Notes were swapped in exchange for a floating rate equal
to LIBOR plus 3.25 per cent up to June 7, 2005. During the second quarter of 2005, we terminated
our interest rate swap in respect of these Notes (see Note 19).
(d) On September 26, 2003, we issued and sold through an underwritten public offering in the
United States $300 million aggregate principal amount of our 5.70% Debentures due 2015
(Debentures). The Debentures are redeemable, at our option, at any time at a price equal to the
greater of the principal amount of the Debentures and the sum of the present values of the
remaining scheduled payments of principal and interest. The interest payments under the Debentures
were swapped in exchange for a floating rate equal to LIBOR plus 0.57 per cent up to June 7, 2005.
During the second quarter of 2005, we terminated our interest rate swap in respect of our
Debentures (see Note 19).
(e) In March 2001, we issued and sold $438 million amount payable at maturity of LYON Notes.
During 2005, a portion of the LYON Notes were settled. Reference is made to Note 13 for the
details of the LYON Notes and the settlement. The remaining balance of the LYON Notes payable at
maturity is $75 million.
159
(f) In March 2003, we issued and sold $273 million amount payable at maturity of Convertible
Debentures due 2023. Reference is made to Note 13 for the details of the Convertible Debentures.
(g) On September 23, 2002, we issued and sold through an underwritten public offering in the
United States $400 million aggregate principal amount of 7.20% Debentures due 2032 (7.20%
Debentures). The 7.20% Debentures are redeemable, at our option, at any time at a price equal to
the greater of the principal amount of the Debentures and the sum of the present values of the
remaining scheduled payments of principal and interest.
(h) In March 2003, we issued and sold $227 million aggregate principal amount of 31/2%
Subordinated Convertible Debentures due 2052. Reference is made to Note 13 for the details of the
Subordinated Debentures.
(i) Our 61 per cent-owned subsidiary, PT Inco, had outstanding at December 31, 2005 loan
facilities aggregating $38 million consisting of a $26 million expansion loan (2004 $78 million;
2003 $131 million); a $6 million loan (2004 $19 million; 2003 $31 million) and a second $6
million loan (2004 $18 million; 2003 $30 million). All loans under the loan facilities are
repayable in 13 equal semi-annual instalments commencing March 31, 2000. The expansion loan and
the first $6 million loan bear interest, when drawn, equal to LIBOR plus 7/8 per cent in the first
five years and LIBOR plus one per cent in the last five years. The second $6 million loan bears
interest equal to LIBOR plus 11/2 per cent. As security for these loans, PT Inco has assigned and
pledged certain of its cash and cash equivalents, sales agreements, service agreements and
insurance policies.
(j) On May 28, 2004, we concluded a $750 million syndicated revolving credit facility with a
maturity date of May 28, 2009. This syndicated facility replaced several bilateral bank credit
agreements under which we had an aggregate of $680 million of available credit as of year-end 2003,
where $273 million of such $680 million would have otherwise expired on June 1, 2004 and the
balance in either June 2005, June 2006 or June 2007. Subject to the approval of the lenders
representing not less than 66 2/3 per cent in total commitments under this $750 million syndicated
facility, the maturity date of the syndicated revolving credit facility may be extended for the
commitments of those lenders who have approved such extension for an additional one-year period on
each May 28 anniversary date, beginning May 28, 2005. Effective May 28, 2005, the lenders under the
$750 million syndicated revolving credit facility agreed to extend the maturity date of the
facility from May 28, 2009 by an additional year to May 28, 2010.
The borrowings under the facility may be made in either Canadian dollars in the form of (a)
Prime Rate loans (as defined under the credit facility) or (b) in Bankers Acceptances (as defined
under the credit facility) or in United States dollars in the form of (i) United States Base Rate
loans (as defined under the credit facility) or (ii) London Interbank Offered Rate (LIBOR) loans
(as defined under the credit facility). Borrowings under these facilities bear interest, when
drawn, at a rate which varies based on the type of borrowing and our credit ratings at the time of
borrowing. As of December 31, 2005, there were no amounts drawn under the facility.
This syndicated credit facility provides that, so long as advances are outstanding or any
letters of credit or guarantees issued pursuant to the terms of the facility are outstanding, we
will be required to maintain a ratio of Consolidated Indebtedness, as defined in the credit
facility, to Tangible Net Worth, as defined in the credit facility, not to exceed 50:50. At
December 31, 2005 the ratio of Consolidated Indebtedness to Tangible Net Worth was 25:75. The
syndicated facility does not require any acceleration or prepayment of outstanding balances if our
credit ratings on outstanding debt securities were downgraded or if there were a significant
decline in our earnings, cash flow or in the price of our publicly traded common shares or other
equity securities. A downgrade in our rating would, however, increase the interest rate payable on
borrowings under the facility and, conversely, any upgrade in our rating would reduce the interest
rate payable on borrowings. As of December 31, 2005, our outstanding debt securities were rated as
investment grade by Moodys Investors Service and Standard & Poors Ratings Services, with the
specific ratings being Baa3 (stable outlook) by Moodys Investors Service and BBB (positive
outlook) by Standard & Poors.
(k) After the announcement of our offer to purchase all of the common shares of Falconbridge
Limited on October 11, 2005, as referred to in Note 23 below, Standard & Poors Rating Services
placed our rating on credit watch with negative implications while Moodys affirmed our Baa3 rating
(with a stable outlook). In connection with this offer, we have arranged debt financing sufficient
to fund the cash portion (approximately $2.4 billion) of the offer we have made. In connection with
this offer, on December 22, 2005, we entered into a loan agreement (the Loan Agreement) with a
group of banks and financial institutions. The loan facilities under the Loan Agreement are in an
amount sufficient for us to meet, directly or through subsidiaries who can borrow under the Loan
Agreement, the total amount of cash, approximately $2.6 billion, we would need to acquire all of
the issued and outstanding common shares of Falconbridge Limited (the Falconbridge Shares)
pursuant to the terms of our pending offer made to acquire the Falconbridge Shares and pay the fees
and expenses associated with such offer.
160
Interest expense on long-term debt for the years 2005, 2004 and 2003 was $19 million, $29
million and $48 million, respectively. Taking into account the aforementioned interest rate swaps,
the weighted average effective interest rate on long-term debt at December 31, 2005 was 6.1 per
cent and approximately 14 per cent of long-term debt bears interest at rates that are subject to
periodic adjustments based on market interest rates. Approximately 96 per cent of long-term debt is
effectively payable in U.S. dollars.
At December 31, 2005, long-term debt maturities for each of the five years through 2010 are:
2006 $122 million; 2007 $20 million; 2008 $15 million; 2009 $113 million; 2010 $113
million.
Note 10. Post-retirement benefits
Our pension plans cover essentially all employees. We also provide certain health care
and life insurance benefits for retired employees.
The change in the funded status of post-retirement defined benefit plans was as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Post-retirement benefits |
|
|
|
Pension benefits |
|
|
other than pensions |
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Change in post-retirement benefits obligation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Obligation at beginning of year |
|
$ |
3,049 |
|
|
$ |
2,734 |
|
|
$ |
2,172 |
|
|
$ |
999 |
|
|
$ |
894 |
|
|
$ |
677 |
|
Service cost |
|
|
44 |
|
|
|
38 |
|
|
|
33 |
|
|
|
19 |
|
|
|
10 |
|
|
|
10 |
|
Interest cost |
|
|
169 |
|
|
|
160 |
|
|
|
153 |
|
|
|
56 |
|
|
|
50 |
|
|
|
49 |
|
Plan amendments |
|
|
9 |
|
|
|
2 |
|
|
|
20 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Changes in assumptions |
|
|
265 |
|
|
|
82 |
|
|
|
73 |
|
|
|
128 |
|
|
|
47 |
|
|
|
36 |
|
Actuarial losses (gains) |
|
|
13 |
|
|
|
31 |
|
|
|
1 |
|
|
|
(16 |
) |
|
|
(26 |
) |
|
|
11 |
|
Benefits paid |
|
|
(212 |
) |
|
|
(193 |
) |
|
|
(184 |
) |
|
|
(44 |
) |
|
|
(41 |
) |
|
|
(38 |
) |
Currency translation adjustments |
|
|
72 |
|
|
|
195 |
|
|
|
466 |
|
|
|
36 |
|
|
|
65 |
|
|
|
149 |
|
|
Obligation at end of year |
|
$ |
3,409 |
|
|
$ |
3,049 |
|
|
$ |
2,734 |
|
|
$ |
1,178 |
|
|
$ |
999 |
|
|
$ |
894 |
|
|
Change in pension plan assets |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fair value of plan assets at beginning of year |
|
$ |
2,273 |
|
|
$ |
1,857 |
|
|
$ |
1,367 |
|
|
$ |
|
|
|
$ |
|
|
|
$ |
|
|
Actual return on plan assets |
|
|
274 |
|
|
|
193 |
|
|
|
231 |
|
|
|
1 |
|
|
|
|
|
|
|
|
|
Employer contributions |
|
|
271 |
|
|
|
265 |
|
|
|
142 |
|
|
|
3 |
|
|
|
|
|
|
|
|
|
Benefits paid |
|
|
(196 |
) |
|
|
(177 |
) |
|
|
(165 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
Currency translation adjustments |
|
|
62 |
|
|
|
135 |
|
|
|
282 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fair value of plan assets at end of year |
|
$ |
2,684 |
|
|
$ |
2,273 |
|
|
$ |
1,857 |
|
|
$ |
4 |
|
|
$ |
|
|
|
$ |
|
|
|
Unfunded status of plans at end of year |
|
$ |
(725 |
) |
|
$ |
(776 |
) |
|
$ |
(877 |
) |
|
$ |
(1,174 |
) |
|
$ |
(999 |
) |
|
$ |
(894 |
) |
Unrecognized actuarial and investment losses |
|
|
1,246 |
|
|
|
1,106 |
|
|
|
1,007 |
|
|
|
385 |
|
|
|
277 |
|
|
|
252 |
|
Unrecognized prior service costs |
|
|
75 |
|
|
|
77 |
|
|
|
84 |
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
Net post-retirement benefits asset
(liability) at end of year |
|
$ |
596 |
|
|
$ |
407 |
|
|
$ |
214 |
|
|
$ |
(788 |
) |
|
$ |
(722 |
) |
|
$ |
(642 |
) |
|
The net post-retirement benefits asset (liability) is reflected in the Consolidated Balance
Sheet as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Post-retirement benefits |
|
|
|
Pension benefits |
|
|
other than pensions |
|
December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Accrued benefits pension asset |
|
$ |
611 |
|
|
$ |
422 |
|
|
$ |
226 |
|
|
$ |
|
|
|
$ |
|
|
|
$ |
|
|
Accrued payrolls and benefits |
|
|
(15 |
) |
|
|
(15 |
) |
|
|
(12 |
) |
|
|
(56 |
) |
|
|
(51 |
) |
|
|
(39 |
) |
Accrued post-retirement benefits liability |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(732 |
) |
|
|
(671 |
) |
|
|
(603 |
) |
|
Net post-retirement benefits asset (liability) |
|
$ |
596 |
|
|
$ |
407 |
|
|
$ |
214 |
|
|
$ |
(788 |
) |
|
$ |
(722 |
) |
|
$ |
(642 |
) |
|
161
Post-retirement benefits expense included the following components:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Post-retirement benefits |
|
|
|
Pension benefits |
|
|
other than pensions |
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Service cost |
|
$ |
44 |
|
|
$ |
38 |
|
|
$ |
33 |
|
|
$ |
19 |
|
|
$ |
10 |
|
|
$ |
10 |
|
Interest cost |
|
|
169 |
|
|
|
160 |
|
|
|
153 |
|
|
|
56 |
|
|
|
50 |
|
|
|
49 |
|
Expected return on plan assets |
|
|
(182 |
) |
|
|
(169 |
) |
|
|
(162 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
Loss on plan settlement |
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Amortization of actuarial and investment losses |
|
|
67 |
|
|
|
64 |
|
|
|
62 |
|
|
|
14 |
|
|
|
14 |
|
|
|
11 |
|
Amortization of unrecognized prior service costs |
|
|
12 |
|
|
|
14 |
|
|
|
16 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Defined benefit pension and post-retirement
benefits other than pensions expense |
|
|
110 |
|
|
|
109 |
|
|
|
102 |
|
|
|
89 |
|
|
|
74 |
|
|
|
70 |
|
Defined contribution pension expense |
|
|
4 |
|
|
|
5 |
|
|
|
5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Post-retirement benefits expense |
|
$ |
114 |
|
|
$ |
114 |
|
|
$ |
107 |
|
|
$ |
89 |
|
|
$ |
74 |
|
|
$ |
70 |
|
|
The weighted-average assumptions used in the determination of the post-retirement benefits
expense and obligation were as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Post-retirement benefits |
|
|
|
Pension benefits |
|
|
other than pensions |
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Discount rate |
|
|
5.75 |
% |
|
|
6.0 |
% |
|
|
6.5 |
% |
|
|
5.75 |
% |
|
|
6.0 |
% |
|
|
6.5 |
% |
Expected return on plan assets |
|
|
7.75 |
% |
|
|
8.0 |
% |
|
|
8.5 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
Rate of compensation increase |
|
|
3.0 |
% |
|
|
3.0 |
% |
|
|
3.0 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
Effective December 31, 2005, the assumption for the discount rates used to determine the
pension benefits obligation were changed to 5.0 per cent for Canadian plans and 5.5 per cent for
United States plans. Effective January 1, 2006, the assumption for the expected return on plan
assets for the Canadian plans was changed to 7.5 per cent.
The pension plan weighted-average asset allocations, by asset category were as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
2004 |
|
2003 |
|
Equity securities |
|
|
59 |
% |
|
|
60 |
% |
|
|
57 |
% |
Debt securities |
|
|
41 |
% |
|
|
40 |
% |
|
|
43 |
% |
|
Total |
|
|
100 |
% |
|
|
100 |
% |
|
|
100 |
% |
|
For the year ending December 31, 2006, we currently expect that our employer contributions
will amount to approximately $180 million. Estimated benefit payments for each of the next five
years through 2010 and the aggregate of the five years thereafter are as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Post-retirement benefits |
|
|
Pension benefits |
|
other than pensions |
|
2006 |
|
$ |
222 |
|
|
$ |
56 |
|
2007 |
|
|
213 |
|
|
|
54 |
|
2008 |
|
|
220 |
|
|
|
58 |
|
2009 |
|
|
224 |
|
|
|
60 |
|
2010 |
|
|
220 |
|
|
|
61 |
|
2011-2015 |
|
|
991 |
|
|
|
298 |
|
|
The measurement date for the post-retirement benefits obligations and the fair value of plan
assets for all plans was December 31, 2005. The most recent actuarial valuation for purposes of
calculating funding requirements for all significant plans was completed during 2005 based on the
plan positions at December 31, 2004. The next planned actuarial valuation for purposes of
calculating funding requirements for all significant plans will be completed during 2006 based on
the plan positions at December 31, 2005.
162
The asset allocation policy for the plans is 40 per cent fixed income and 60 per cent equities
for all of the Companys pension plans with the exception of the plan at PT Inco. The actual asset
mix is maintained fairly close to the policy mix at most times by the use of a rigorous rebalancing
policy.
Equity securities include Inco Limited common shares in the amount of $3 million (2004 $7
million; 2003 $7 million). The decision to invest in Inco Limited shares is made by independent
investment managers acting at their own discretion.
The return on plan assets assumption has been based on an estimate of the future long-term
average return that can reasonably be earned on the assets of the pension fund. The starting point
for the calculation of this assumption is the current yield obtainable from the fixed income
portion of the portfolio. The yield available on the benchmark used, the Scotia Capital Universe
Bond Index (50% of the bond component) and the Scotia Capital Long Bond Index (the remainder of the
bond component), is used as the expected return on the bond indices since, in our view, this
represents the best estimate of long-term future returns for the fixed income portion of the
portfolio. Equity investments are assumed in aggregate to have an expected long-term future return
of 3% in excess of the yield available on long-term Government of Canada bonds; for 2003 the
10-Year+ index was used, and for 2004 and 2005 the 10-Year benchmark bond yield was used (this
change reflects the marketplace change and significant lack of issuance for 30 year maturities).
For the portion of the assets that are invested actively with investment managers, an additional
return expectation is included to recognize each managers target anticipated long-term value added
above the index return. We note that actual added value over the past periods has, in aggregate,
been substantially in excess of this amount. The weighted average of the returns determined for
each portion of the fund becomes the return on assets assumption (rounded to the nearest 0.25%).
The projected pension benefits obligation and fair value of plan assets for pension plans with
accumulated benefits obligations in excess of plan assets were as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pension benefits |
|
December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Projected benefits obligation |
|
$ |
3,409 |
|
|
$ |
3,049 |
|
|
$ |
2,734 |
|
Fair value of plan assets |
|
|
2,684 |
|
|
|
2,273 |
|
|
|
1,857 |
|
|
Unfunded status |
|
$ |
(725 |
) |
|
$ |
(776 |
) |
|
$ |
(877 |
) |
|
The composite health care cost trend rate used in measuring post-retirement benefits other
than pensions was assumed to begin at 7.0 per cent, gradually declining to 4.0 per cent by 2014 and
remaining at that level thereafter.
A one per cent change in the assumed composite health care cost trend rate would have the
following effects:
|
|
|
|
|
|
|
|
|
|
|
Post-retirement benefits |
|
|
|
other than pensions |
|
|
|
1% Increase |
|
|
1% Decrease |
|
|
Effect on accumulated benefits obligation |
|
$ |
159 |
|
|
$ |
(121 |
) |
Effect on net periodic expense |
|
|
12 |
|
|
|
(9 |
) |
|
Note 11. Asset retirement obligation
The estimation of asset retirement obligation costs depends on the development of
environmentally acceptable closure and post-closure plans, which, in some cases, may require
significant research and development to identify preferred methods for such plans which are
economically sound and which, in many cases, may not be implemented for several decades. We have
continued to utilize appropriate technical resources, including outside consultants, to develop
specific site closure and post-closure plans in accordance with the requirements of the various
jurisdictions in which we operate. Typical closure and progressive rehabilitation activities
include, where applicable, demolition of buildings, removal of underground equipment, sealing of
mine openings, treatment to reduce or prevent acid generation from stockpiled waste materials such
as tailings, general clean-up activities aimed at returning the area to an environmentally
acceptable condition, and post-closure care and maintenance.
Although the ultimate amount to be incurred is uncertain, the total amount for asset
retirement obligations in respect of worldwide operations, to be paid primarily after cessation of
operations, is estimated to be approximately $1.1 billion at December 31, 2005 on an undiscounted
basis. The estimate of the total liability for asset retirement obligations has been developed
from independent
163
environmental studies including an evaluation of, among other factors, currently available
information with respect to closure plans and closure alternatives, the anticipated method and
extent of site restoration using current costs and existing technology, and compliance with
presently enacted laws, regulations and existing industry standards. The total liability
represents estimated expenditures associated with closure, progressive rehabilitation and
post-closure care and maintenance.
Asset retirement obligations are recognized when incurred and recorded as liabilities at fair
value assuming credit-adjusted risk-free interest rates which ranged from four per cent to eight
per cent for the corresponding time periods over which these costs would be incurred. Due to the
nature of our closure plans, the timing of such cash expenditures is expected to occur over a
significant period of time being from one year for plans which are already in progress and over 100
years for the longest plan. The following table shows the movement in the liability for asset
retirement obligations.
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Obligation at beginning of year |
|
$ |
174 |
|
|
$ |
149 |
|
|
$ |
127 |
|
Accretion expense |
|
|
8 |
|
|
|
8 |
|
|
|
6 |
|
Liabilities settled |
|
|
(5 |
) |
|
|
(5 |
) |
|
|
(6 |
) |
Revisions in estimated cash flows |
|
|
(6 |
) |
|
|
22 |
|
|
|
22 |
|
|
Obligation at end of year |
|
|
171 |
|
|
|
174 |
|
|
|
149 |
|
Current portion of asset retirement obligations |
|
|
(3 |
) |
|
|
(3 |
) |
|
|
(8 |
) |
|
|
|
$ |
168 |
|
|
$ |
171 |
|
|
$ |
141 |
|
|
As of December 31, 2005, we had outstanding letters of credit in the amount of $23 million to
secure a portion of our closure costs related to the closure of three mines in Ontario. These
letters of credit have a term of one year and will automatically renew without any action by either
Inco or the counterparty until the earlier of (i) Inco having complied with the terms of the
certified closure plans or (ii) funds from such letters of credit being utilized by the government
authority responsible for overseeing such closure plans, to perform rehabilitation work if we did
not meet the requirements with respect to such closure plans. We are required to submit annual
updates on changes to the closure plans, including any decommissioning and rehabilitation work
completed during the previous year.
In view of the uncertainties concerning environmental remediation, the ultimate cost of asset
retirement obligations could differ materially from the estimated amounts provided. The estimate
of the total liability for asset retirement obligation costs is subject to change based on
amendments to laws and regulations and as new information concerning our operations becomes
available. Future changes, if any, to the estimated total liability as a result of amended
requirements, laws, regulations and operating assumptions may be significant and would be
recognized prospectively as a change in accounting estimate, when applicable. Environmental laws
and regulations are continually evolving in all regions in which we operate. We are not able to
determine the impact, if any, of environmental laws and regulations that may be enacted in the
future on our results of operations or financial condition due to the uncertainty surrounding the
ultimate form that such future laws and regulations may take.
Note 12. Girardin Act financing
On December 30, 2004, we entered into agreements covering the Girardin Act tax-advantaged
lease financing program (Girardin Financing) sponsored by the French Government for the Companys
nickel-cobalt project in New Caledonia. The Girardin Financing is subject to a ruling issued by
the French Minister of Economy, Finance and Industry (the Ruling). The Ruling provides that
certain investors who are French qualified investors under the Girardin Financing (Tax Investors)
may utilize certain tax deductions in connection with assets representing a portion of the Goro
nickel-cobalt projects processing plant which are financed by the Girardin Financing (Girardin
Assets). The Ruling requires that Goro Nickel S.A.S. (Goro), our subsidiary, and Inco, satisfy
certain conditions, including operating the Goro nickel-cobalt project for a minimum of five years.
As part of the Girardin Financing, a special purpose entity (SPE), a variable interest
entity, was formed by the Tax Investors to finance the purchase, construction and installation of
the Girardin Assets. As we are the primary beneficiary of the SPE, our consolidated accounts
include the accounts of the SPE. The purchase, construction and installation of the Girardin
Assets by the SPE is funded by a combination of (a) non-refundable loans (Tax Advances) provided
by the Tax Investors pursuant to a tax loan agreement (Tax Loan Agreement) between the Tax
Investors and the SPE, and (b) loans provided to the SPE by a subsidiary of ours pursuant to a loan
agreement (Loan Agreement).
Under a construction agreement between the SPE and Goro (Construction Agreement), Goro has
been appointed the construction agent on behalf of the SPE and is responsible for the purchase,
construction, installation and commissioning of the Girardin Assets. The costs for the
construction, installation and commissioning of the Girardin Assets total approximately $500
164
million and are payable in three instalments. In the event of a cost overrun, a fourth
instalment would be made to Goro with the additional funds provided pursuant to the Loan Agreement.
Goro is required to give notice of substantial completion of the Girardin Assets to the SPE by
December 31, 2008 or such later date as may be approved by the French tax authorities. Upon such
substantial completion, the SPE will lease the Girardin Assets to Goro under an agreement between
the SPE and Goro (Lease Agreement). While the term of the Lease Agreement is twelve years, the
related agreements covering the Girardin Financing extend certain call and put options to Goro and
the SPE, respectively, covering both the Girardin Assets and the ownership interests in the SPE
whereby, assuming no default by Goro under the arrangements covering the Girardin Financing, one of
these options is expected to be exercised after five years, resulting in the termination of the
Lease Agreement and the ownership of the Girardin Assets reverting to Goro.
The Construction Agreement and the Lease Agreement contain certain events of default and
termination rights for the benefit of the SPE, including the failure of Goro to meet certain terms
and conditions of the Ruling. Following any termination of the Lease Agreement, (1) certain
termination compensation could be payable by Goro to the Tax Investors pursuant to the Add-Back
Indemnity (as defined below) and (2) Goro would be required to either (a) repay the entire then
outstanding amount drawn under the Loan Agreement or (b) assume all of the SPEs obligations under
the Loan Agreement. Upon the occurrence of such events, Goro would continue to have the right to
use the Girardin Assets, with the SPE retaining ownership thereof until all termination
compensation due by Goro under the Lease Agreement is paid. In addition, each of the Lease
Agreement and the Construction Agreement provides that Goro must indemnify the SPE and the Tax
Investors with respect to (1) the Add-Back Indemnity (as defined below), (2) increased taxes
incurred by the SPE or Tax Investors in respect of certain changes in tax laws or the imposition of
certain unanticipated taxes in New Caledonia and (3) operational losses incurred by the SPE or Tax
Investors arising out of third party claims in their capacity as owners of the Girardin Assets. In
the event of a termination of the Construction Agreement or the Lease Agreement or in the event
that the Tax Investors exercise their put option upon the occurrence of certain material adverse
environmental events relating to Goro prior to the fifth anniversary of substantial completion of
the Goro project, it is possible that the Tax Investors could lose their tax deductions in respect
of the Girardin Assets, thereby triggering an indemnity whereby Goro would be required to reimburse
the Tax Investors for the denial or reversal of their tax deductions under the Girardin Financing
by the French tax authorities and for any interest and penalties levied thereon by such authorities
(the Add-Back Indemnity). In connection with any termination event, the Tax Investors will
receive certain priorities relating to Goros assets over other creditors.
Cumulative to December 31, 2005, the Tax Investors provided $90 million in Tax Advances. It
is currently estimated that such Tax Advances will total $148 million, before fees to be paid to
the Tax Investors, with the balance of the Girardin Financing to be provided under the Loan
Agreement. The SPE expects to receive the balance of the Tax Advances in December 2006 pursuant to
the terms of the Tax Loan Agreement. Of the remaining Tax Advances to be made in 2006,
approximately 65 per cent of these amounts have been committed by the Tax Investors, with the
balance expected to be placed with additional investors. Tax Advances are initially shown in
deferred credits as the advances represent government assistance in the form of a forgivable loan.
The Tax Advances are then reclassified from deferred credits to property, plant and equipment as
they are expended on the project on a prorated basis.
Included in Other Deferred Credits of $131 million is $58 million in respect of the Girardin
Financing.
Note 13. Convertible debt
Changes in the equity component of convertible debt were as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Subordinated |
|
|
|
|
|
|
LYON |
|
|
Convertible |
|
|
Convertible |
|
|
|
|
|
|
Notes (a) |
|
|
Debentures (b) |
|
|
Debentures (b) |
|
|
Total |
|
|
|
(Restated) |
|
|
(Restated) |
|
|
(Restated) |
|
|
(Restated) |
|
|
December 31, 2002 |
|
$ |
148 |
|
|
$ |
|
|
|
$ |
|
|
|
$ |
148 |
|
Convertible debt issued |
|
|
|
|
|
|
148 |
|
|
|
122 |
|
|
|
270 |
|
|
December 31, 2003 and December 31, 2004 |
|
|
148 |
|
|
|
148 |
|
|
|
122 |
|
|
|
418 |
|
Tendered for conversion |
|
|
(56 |
) |
|
|
|
|
|
|
|
|
|
|
(56 |
) |
|
December 31, 2005 |
|
$ |
92 |
|
|
$ |
148 |
|
|
$ |
122 |
|
|
$ |
362 |
|
|
(a) On March 29, 2001, we issued and sold, on a bought deal basis, zero-coupon convertible
notes (LYON Notes), representing an aggregate amount payable at maturity of $438 million, which
are due and payable March 29, 2021, for net cash proceeds of $226 million. No interest is payable
on the LYON Notes prior to maturity except in connection with any term or condition where the
holder receives the then accreted value of the LYON Notes.
165
The LYON Notes are convertible, at the option of the holder, at any time on or prior to their
maturity date into Common Shares at a fixed conversion rate of 26.5530 Common Shares per LYON Note,
representing an initial conversion price of $19.76 per share, with such conversion rate and price
being subject to certain anti-dilution adjustment provisions. Holders of LYON Notes also have a
special conversion right, exercisable on March 29 in 2007, 2011 and 2016, giving such holders the
right to convert the then accreted value of their LYON Notes into Common Shares based upon the then
market price for such shares. The LYON Notes are also subject to redemption at our option on or
after March 29, 2007 at their then accreted value.
We have the right, subject to certain conditions, in connection with the exercise by a holder
of such conversion or special conversion rights, to pay such holders cash, in whole or in part, in
lieu of Common Shares. We also have the right, subject to certain conditions, in connection with
any redemption or certain purchases of the LYON Notes, to pay the redemption or purchase price in
Common Shares, based upon the then market price thereof, or in cash or any combination of Common
Shares and cash. We are required to offer to purchase the LYON Notes if there is a change in
control of Inco, as defined in the Trust Indenture dated as of March 29, 2001 between Inco and The
Bank of New York, as Trustee, occurring before March 29, 2007.
In 2004 and prior years, the LYON Notes were not dilutive for purposes of calculating diluted
earnings per share based on our right to and then current intention that we would eventually meet
the redemption and conversion terms of these LYON Notes in cash.
During 2005, LYON Notes representing approximately, $163 million aggregate principal amount
were tendered for conversion. At our option, we elected to settle a portion of the obligations in
respect of these notes in accordance with their terms for cash in lieu of shares in the amount of
$76 million. The difference between the cash settlement price of $76 million and the book value of
$41 million represents a charge of $35 million. For accounting purposes, the LYON notes are
bifurcated between debt and equity, the equity portion representing the value of the holders
conversion options. Consequently, the charge of $35 million has been bifurcated between earnings
and a direct charge to retained earnings. The split is a charge to earnings of $9 million and a
charge to retained earnings of $26 million. The remainder of the LYON Notes tendered for
conversion were, at our option, settled in shares with no impact on net earnings.
(b) In March 2003, we issued and sold in concurrent private offerings (i) $273 million amount
payable at maturity of Convertible Debentures due March 14, 2023 (Convertible Debentures),
representing $249 million in gross proceeds to us, and (ii) $227 million aggregate principal amount
of Subordinated Convertible Debentures due March 14, 2052 (Subordinated Convertible Debentures).
The total combined gross proceeds were $476 million from these two issues of convertible debt
securities and the net cash proceeds were $470 million after deduction of commissions and other
after-tax expenses. The Convertible Debentures and Subordinated Convertible Debentures pay a cash
coupon of 1.0943 per cent and 3.5 per cent, respectively.
The Convertible Debentures and the Subordinated Convertible Debentures are convertible at the
option of the holders into Common Shares at the conversion rates referred to below, subject to
certain anti-dilution adjustment provisions, only in the following circumstances: (i) if our Common
Share price, calculated over a specified period, has exceeded 120 per cent of the effective
conversion price of the Convertible Debentures or the Subordinated Convertible Debentures, as
applicable; (ii) if the trading price of the Convertible Debentures or the Subordinated Convertible
Debentures, as applicable, over a specified period has fallen below 95 per cent of the amount equal
to our then prevailing Common Share price times the applicable conversion rate; (iii) if we were to
call the Convertible Debentures or the Subordinated Convertible Debentures, as applicable, for
redemption; or (iv) if certain specified corporate events were to occur. Each Convertible
Debenture will be convertible into 31.9354 Common Shares, representing an initial conversion price
of approximately $28.61 per Common Share, and each Subordinated Convertible Debenture will be
convertible into 38.4423 Common Shares, representing a conversion price of approximately $26.01 per
Common Share.
Holders of the Convertible Debentures have the right to have us redeem these debentures at
their issue price plus accrued interest on March 14 in each of 2010, 2014 and 2018. We have the
right to redeem the Convertible Debentures at any time on or after March 19, 2010. We have the
right to redeem the Subordinated Convertible Debentures on or after March 19, 2008 if our Common
Shares trade over a specified period above 125 per cent of the conversion price for these
securities. Holders of the Subordinated Convertible Debentures have no right to require us to
redeem these subordinated securities. In meeting the conversion, redemption, payment at maturity
and other related terms of these convertible debt securities, we have the right, at our option, to
satisfy these obligations in cash, Common Shares or any combination thereof.
In the case of the Convertible Debentures, these securities rank equally and rateably with all
of our existing and future unsecured and unsubordinated indebtedness. The Subordinated Convertible
Debentures are subordinated to all of our senior indebtedness, which includes, among other
obligations, all of our existing and future unsecured and unsubordinated indebtedness.
166
Effective January 1, 2005, on a retroactive basis, we adopted revisions to CICA Section 3860,
Financial Instruments Disclosure and Presentation (See Note 2).
Note 14. Preferred shares
On March 28, 2003, we announced that we would exercise our optional right to redeem all
of our issued and outstanding Preferred Shares Series E having a $472 million aggregate liquidation
preference and which were subject to mandatory redemption in 2006, with such redemption to be
effective May 1, 2003. Pursuant to their terms, we redeemed the Preferred Shares Series E by
paying the optional redemption price of $51.10 per share plus all accrued and unpaid dividends to
the May 1, 2003 redemption date. Holders of the Preferred Shares Series E had the right to convert
their shares into Common Shares at a fixed conversion rate of 1.19474 Common Shares for each
Preferred Share Series E held at any time prior to the May 1, 2003 redemption date. The conversion
rate represented an effective conversion price of $41.85 per Common Share. The total aggregate
redemption price for the Preferred Shares Series E was $487 million, including a redemption premium
of $11 million based upon the $50 issue price per Preferred Share Series E and $4 million in
accrued dividends.
Changes in the Preferred Shares Series E were as follows:
|
|
|
|
|
|
|
|
|
|
|
Number |
|
|
|
|
|
|
of shares |
|
|
Amount |
|
|
December 31, 2002 |
|
|
9,439,600 |
|
|
$ |
472 |
|
Shares converted to Common Shares |
|
|
(1,193 |
) |
|
|
|
|
Shares redeemed |
|
|
(9,438,407 |
) |
|
|
(472 |
) |
|
December 31, 2003, December 31, 2004 and December 31, 2005 |
|
|
|
|
|
$ |
|
|
|
Note 15. Warrants
On December 14, 2000, we issued warrants upon the redemption of our Class VBN Shares.
Each Common Share purchase warrant (a Warrant) has an exercise price, for each whole Warrant, of
Cdn.$30.00 (or the equivalent in U.S. dollars) for the purchase of one Common Share at any time on
or before August 21, 2006. The exercise price and/or the number and kind of securities issuable on
the exercise of the Warrants are subject to adjustment in certain events, as set forth in the
Warrant Agreement dated as of December 1, 2000 among Inco Limited, CIBC Mellon Trust Company and
Chase Mellon Shareholder Services, LLC, as Canadian and U.S. Warrant Agents, respectively, covering
the issuance of the Warrants. These adjustments include, among others, certain changes in our
capital structure such as any subdivision or consolidation of Common Shares, stock dividends or
other distributions, the consolidation, amalgamation or merger of Inco with another company, or the
transfer of all or substantially all of our assets.
Changes in the Warrants were as follows:
|
|
|
|
|
|
|
|
|
|
|
Number |
|
|
|
|
|
|
of Warrants |
|
|
Amount |
|
|
December 31, 2002 |
|
|
11,023,497 |
|
|
$ |
62 |
|
Warrants issued |
|
|
416 |
|
|
|
|
|
Warrants exercised |
|
|
(849 |
) |
|
|
|
|
|
December 31, 2003 |
|
|
11,023,064 |
|
|
|
62 |
|
Warrants issued |
|
|
1,878 |
|
|
|
|
|
Warrants exercised |
|
|
(2,184 |
) |
|
|
|
|
|
December 31, 2004 |
|
|
11,022,758 |
|
|
|
62 |
|
Warrants issued |
|
|
186 |
|
|
|
|
|
Warrants exercised |
|
|
(6,927 |
) |
|
|
|
|
|
December 31, 2005 |
|
|
11,016,017 |
|
|
$ |
62 |
|
|
167
Note 16. Common shares
We are authorized to issue an unlimited number of Common Shares without nominal or par
value.
Changes in the Common Shares were as follows:
|
|
|
|
|
|
|
|
|
|
|
Number |
|
|
|
|
|
|
of shares |
|
|
Amount |
|
|
December 31, 2002 |
|
|
183,238,351 |
|
|
$ |
2,771 |
|
Options exercised |
|
|
3,130,556 |
|
|
|
68 |
|
Shares issued under incentive plans |
|
|
40,249 |
|
|
|
1 |
|
Shares issued on conversion of Preferred Shares Series E |
|
|
1,424 |
|
|
|
|
|
Shares issued upon exercise of former Diamond Fields stock options |
|
|
485,471 |
|
|
|
17 |
|
Shares issued on conversion of debentures |
|
|
18,965 |
|
|
|
1 |
|
Shares issued on exercise of Warrants |
|
|
849 |
|
|
|
|
|
|
December 31, 2003 |
|
|
186,915,865 |
|
|
|
2,858 |
|
Options exercised |
|
|
1,175,525 |
|
|
|
31 |
|
Shares issued under incentive plans |
|
|
39,865 |
|
|
|
1 |
|
Shares issued on exercise of Warrants |
|
|
2,184 |
|
|
|
|
|
Transfer from contributed surplus in respect of options exercised |
|
|
|
|
|
|
1 |
|
|
December 31, 2004 |
|
|
188,133,439 |
|
|
|
2,891 |
|
Options exercised |
|
|
1,477,969 |
|
|
|
40 |
|
Shares issued under incentive plans |
|
|
61,698 |
|
|
|
2 |
|
Shares issued on exercise of Warrants |
|
|
6,927 |
|
|
|
|
|
Shares issued on conversion of LYON Notes |
|
|
2,557,361 |
|
|
|
59 |
|
Transfer from contributed surplus in respect of options exercised |
|
|
|
|
|
|
5 |
|
Transfer from accrued liabilities in respect of stock appreciation rights exercised |
|
|
|
|
|
|
3 |
|
|
December 31, 2005 |
|
|
192,237,394 |
|
|
$ |
3,000 |
|
|
In September 1998, our Board of Directors, given the expiration of a shareholder rights plan
which had been implemented in October 1988, adopted a new shareholder rights plan that took effect
on October 3, 1998. This new plan, set forth in a Rights Plan Agreement entered into between Inco
Limited and CIBC Mellon Trust Company, as Rights Agent, is designed to (i) encourage the fair and
equal treatment of shareholders in connection with any take-over offer for Inco by providing them
with more time than the minimum statutory period during which such bid must remain open in order to
fully consider their options, and (ii) provide the Board of Directors with additional time, if
appropriate, to pursue other alternatives to maximize shareholder value.
The new plan, amended in certain respects by the Board of Directors in February 1999, was
approved by shareholders at the 1999 Annual and Special Meeting of Shareholders and was recently
reconfirmed by the shareholders at the 2005 Annual and Special Meeting and will remain in effect
until October 2008. The following represents a summary of some of the key terms of the plan.
The rights issued under the plan will attach to and trade with the Common Shares and no
separate certificates will be issued unless an event triggering these rights occurs. Certificates
evidencing Common Shares will be legended to reflect that they evidence the rights until the
Separation Time (as defined below). Holders of the Convertible Debentures, Subordinated
Convertible Debentures and LYON Notes and the certificates of entitlement attached thereto (which
entitle their holders to receive rights in the event that the related security is converted into
Common Shares) will generally be entitled to receive, upon conversion of the relevant security and
presentment of the certificate of entitlement, respectively, rights in an amount equal to the
number of Common Shares issued upon conversion of such securities.
The rights will separate from the Common Shares (Separation Time) and be transferable, trade
separately from the Common Shares and become exercisable only when a person, including any party
acting jointly or in concert with such person, acquires, or announces its intention to acquire,
beneficial ownership of 20 per cent or more of (i) the then outstanding Voting Securities, or (ii)
the then outstanding Common Shares alone, in either case without complying with the permitted bid
provisions of the plan (as summarized below), or without the approval of the Board of Directors.
Should such an acquisition occur, each right would entitle its holder, other than the acquiring
person or persons related to or acting jointly or in concert with such person, to purchase
additional Common Shares at a 50 per cent discount to the then current market price. The
acquisition by any person (an Acquiring Person) of
168
20 per cent or more of the Common Shares or Voting Securities, other than by way of a
permitted bid, is referred to as a Flip-in-Event. Any rights held by an Acquiring Person will
become void upon the occurrence of a Flip-in-Event.
A permitted bid is a bid made to all holders of the outstanding Voting Securities that is
open for at least 60 days. If, at the end of such 60-day period, more than 50 per cent of the then
outstanding Common Shares, other than those securities owned by the party making the bid and
certain related persons, have been tendered, such party may take up and pay for the Common Shares
but must extend the bid for a further 10 business days to allow other shareholders to tender, thus
providing shareholders who had not tendered to the bid with enough time to tender to the bid once
it is clear that a majority of Common Shares have been tendered.
Under this plan, we can (i) waive our application to enable a particular takeover bid to
proceed, in which case the plan will be deemed to have been waived with respect to any other
takeover bid made prior to the expiry of any bid subject to such waiver or (ii) with the prior
approval of the holders of Voting Securities or rights, redeem the rights for nominal consideration
at any time prior to a Flip-in-Event.
Note 17. Stock compensation plans
The stock option plans authorize the granting of options to key employees to purchase
Common Shares at prices not less than 100 per cent of their market value on the day the option is
granted. The 2005 employee plan, which will replace the 2001 employee plan, has a term of five
years and authorizes the granting of options to purchase up to 6,000,000 Common Shares. A
Non-Employee Director Share Option Plan, which came into effect in April 2002 and has a term of
five years, authorized the granting of options to the non-employee members of our Board of
Directors to purchase up to 300,000 Common Shares. In February 2004, our Board of Directors
suspended the operation of this plan. The stock option plans provide that no shares subject to any
options granted shall be purchasable after 10 years from the date of grant and also include an
anti-dilution provision to protect the option holder in the event of stock splits or other
significant capital changes.
At December 31, 2005, outstanding options for 799,300 Common Shares also carry share
appreciation rights (SARs). These SARs entitle an optionee, in lieu of exercising an option to
purchase Common Shares, to surrender all or a portion of the related option in exchange for an
amount equal to the difference between the then market price per share and the exercise price per
share specified in the stock option, multiplied by the number of shares covered by the stock
option, or portion thereof so surrendered. We may elect to deliver Common Shares, cash, or a
combination of Common Shares and cash, equal in value to such difference. Compensation expense in
respect of SARs for the years 2005, 2004 and 2003 was $8 million, $(3) million and $36 million,
respectively.
One-half of stock options granted are exercisable on or after six months from the grant date,
with the remaining options exercisable on or after 18 months from the grant date.
Pursuant to our mid-term incentive plans (MTIPs), awards in the form of Common Shares are made
to certain key employees subject to transfer, sale and encumbrance restrictions for a three-year
period from the date of the award. In the year ended December 31, 2005, 61,698 Common Shares were
awarded in respect of MTIPs (2004 39,865; 2003 40,249).
Changes in Common Share options outstanding are summarized as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Number of Common Shares |
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Outstanding at beginning of year |
|
|
4,082,030 |
|
|
|
4,572,605 |
|
|
|
7,476,506 |
|
Options granted |
|
|
1,059,750 |
|
|
|
1,047,500 |
|
|
|
1,155,000 |
|
Options exercised |
|
|
(1,938,769 |
) |
|
|
(1,251,325 |
) |
|
|
(3,867,151 |
) |
Options terminated |
|
|
(86,750 |
) |
|
|
(286,750 |
) |
|
|
(191,750 |
) |
|
Outstanding at end of year |
|
|
3,116,261 |
|
|
|
4,082,030 |
|
|
|
4,572,605 |
|
|
Available for grant at December 31 |
|
|
7,973,950 |
|
|
|
2,792,750 |
|
|
|
3,785,000 |
|
|
Exercisable at December 31 |
|
|
2,606,635 |
|
|
|
3,540,780 |
|
|
|
3,954,107 |
|
|
169
Changes in the weighted-average exercise price of Common Share options are summarized as
follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Weighted-average exercise price |
|
|
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Outstanding at beginning of year |
|
$ |
26.45 |
|
|
$ |
23.43 |
|
|
$ |
21.42 |
|
Options granted |
|
|
39.67 |
|
|
|
36.40 |
|
|
|
20.90 |
|
Options exercised |
|
|
(26.06 |
) |
|
|
(23.63 |
) |
|
|
(18.63 |
) |
Options terminated |
|
|
(33.81 |
) |
|
|
(26.91 |
) |
|
|
(26.74 |
) |
|
Outstanding at end of year |
|
$ |
30.98 |
|
|
$ |
26.45 |
|
|
$ |
23.43 |
|
|
The following table summarizes information about Common Share options outstanding at December
31, 2005.
The following table summarizes information about Common Share options outstanding at
December 31, 2005.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Common Share Options Outstanding |
|
Common Share Options Exercisable |
|
|
|
Number |
|
Weighted-average |
|
|
|
|
|
Number |
|
|
Range of |
|
outstanding |
|
remaining |
|
|
|
|
|
exercisable |
|
|
exercise |
|
at December |
|
contractual life |
|
Weighted-average |
|
at December |
|
Weighted-average |
prices |
|
31, 2005 |
|
(years) |
|
exercise price |
|
31, 2005 |
|
exercise price |
|
$11-16 |
|
|
138,350 |
|
|
|
2.6 |
|
|
$ |
13.49 |
|
|
|
138,350 |
|
|
$ |
13.49 |
|
17-19 |
|
|
492,750 |
|
|
|
5.0 |
|
|
|
17.66 |
|
|
|
492,750 |
|
|
|
17.66 |
|
20-22 |
|
|
445,700 |
|
|
|
7.1 |
|
|
|
20.76 |
|
|
|
445,700 |
|
|
|
20.76 |
|
32-35 |
|
|
311,286 |
|
|
|
1.0 |
|
|
|
34.01 |
|
|
|
311,286 |
|
|
|
34.01 |
|
36-37 |
|
|
739,300 |
|
|
|
8.1 |
|
|
|
36.40 |
|
|
|
739,300 |
|
|
|
36.40 |
|
39-41 |
|
|
988,875 |
|
|
|
9.1 |
|
|
|
39.67 |
|
|
|
479,249 |
|
|
|
39.67 |
|
|
$11-41 |
|
|
3,116,261 |
|
|
|
6.8 |
|
|
$ |
30.98 |
|
|
|
2,606,635 |
|
|
$ |
29.28 |
|
|
The expiration dates of Common Share options outstanding at December 31, 2005 ranged from June
3, 2006 to February 21, 2015. At December 31, 2005, there were 633 employees participating in the
Common Share option plans.
For 2005, an expense of $12 million (2004 $10 million; 2003 $3 million) was charged to
earnings with an equivalent offset credited to contributed surplus to reflect the fair value of
stock options granted to employees. For 2005, a transfer of $5 million (2004 $1 million; 2003
nil) was made from contributed surplus to common shares in respect of exercised options. The fair
value of each stock option granted is estimated on the date of grant using the Black-Scholes
option-pricing model with the following assumptions:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Stock price at grant date |
|
$ |
39.67 |
|
|
$ |
36.40 |
|
|
$ |
20.85 |
|
Exercise price |
|
$ |
39.67 |
|
|
$ |
36.40 |
|
|
$ |
20.85 |
|
Weighted-average fair value of
options granted during the year |
|
$ |
12.21 |
|
|
$ |
10.37 |
|
|
$ |
6.29 |
|
Expected life of options (years) |
|
|
3.6 |
|
|
|
3.4 |
|
|
|
3.0 |
|
Expected stock price volatility |
|
|
34.8 |
% |
|
|
35.0 |
% |
|
|
41.1 |
% |
Expected dividend yield |
|
|
|
% |
|
|
|
% |
|
|
|
% |
Risk-free interest rate |
|
|
3.6 |
% |
|
|
2.5 |
% |
|
|
2.1 |
% |
|
170
Note 18. Nature of operations and segment information
We are a leading producer of nickel and an important producer of copper, precious metals
and cobalt. Our operations consist of the finished products segment, which comprises the mining and
processing operations in Ontario, Manitoba and Newfoundland and Labrador, Canada, and refining
operations in the United Kingdom and interests in refining operations in Japan and other Asian
countries, and the intermediates segment, which comprises the mining and processing operations in
Indonesia, where nickel-in-matte, an intermediate product, is produced and sold primarily into the
Japanese market. In addition, we hold mineral claims and licenses for the Goro nickel-cobalt
project under development in the French Overseas Territory of New Caledonia and have certain
mineral deposits under development at Voiseys Bay.
Net sales to customers by product were as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
Nickel Finished |
|
$ |
3,655 |
|
|
$ |
3,503 |
|
|
$ |
2,109 |
|
Copper |
|
|
463 |
|
|
|
364 |
|
|
|
171 |
|
Precious metals |
|
|
267 |
|
|
|
246 |
|
|
|
114 |
|
Cobalt |
|
|
57 |
|
|
|
72 |
|
|
|
17 |
|
Other |
|
|
76 |
|
|
|
93 |
|
|
|
63 |
|
|
|
|
$ |
4,518 |
|
|
$ |
4,278 |
|
|
$ |
2,474 |
|
|
Net sales to customers include sales at market prices to affiliates in Taiwan and South Korea
aggregating $738 million in 2005, $759 million in 2004 and $547 million in 2003. No single
non-affiliated customer accounted for more than 10 per cent of total sales in 2005, 2004 or 2003.
At December 31, 2005, accounts receivable included amounts due from affiliates of $157 million
(2004 $202 million; 2003 $100 million).
At December 31, 2005, we had provisionally priced sales of 57 million pounds of nickel and 21
million pounds of copper.
Data by operating segments
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Finished products |
|
|
Intermediates |
|
|
Development Projects |
|
|
Eliminations |
|
|
Total |
|
|
|
Year ended December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
|
|
|
|
(Restated) |
|
|
|
|
|
|
(Restated) |
|
|
|
|
|
|
(Restated) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Restated) |
|
|
Net sales to customers |
|
$ |
4,342 |
|
|
|
4,120 |
|
|
|
2,369 |
|
|
$ |
176 |
|
|
|
158 |
|
|
|
105 |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
|
$ |
|
|
|
|
|
|
|
|
|
|
|
$ |
4,518 |
|
|
|
4,278 |
|
|
|
2,474 |
|
Intersegment sales |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
709 |
|
|
|
634 |
|
|
|
404 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(709 |
) |
|
|
(634 |
) |
|
|
(404 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Net sales |
|
$ |
4,342 |
|
|
|
4,120 |
|
|
|
2,369 |
|
|
$ |
885 |
|
|
|
792 |
|
|
|
509 |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
|
$ |
(709 |
) |
|
|
(634 |
) |
|
|
(404 |
) |
|
$ |
4,518 |
|
|
|
4,278 |
|
|
|
2,474 |
|
|
Earnings (loss) before income
and mining taxes and minority
interest by segment |
|
$ |
1,077 |
|
|
|
1,154 |
|
|
|
266 |
|
|
$ |
382 |
|
|
|
430 |
|
|
|
190 |
|
|
$ |
|
|
|
|
(220 |
) |
|
|
(18 |
) |
|
$ |
8 |
|
|
|
(8 |
) |
|
|
(31 |
) |
|
$ |
1,467 |
|
|
|
1,356 |
|
|
|
407 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenses (income) not specifically allocable to segments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Corporate selling, general and administrative expenses |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
148 |
|
|
|
128 |
|
|
|
118 |
|
Currency translation adjustments |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
59 |
|
|
|
85 |
|
|
|
177 |
|
Interest expense |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
26 |
|
|
|
36 |
|
|
|
56 |
|
Other income, net |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(83 |
) |
|
|
(49 |
) |
|
|
(108 |
) |
|
Earnings before income and mining taxes and minority interest |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
1,317 |
|
|
|
1,156 |
|
|
|
164 |
|
|
Depreciation and depletion |
|
$ |
191 |
|
|
|
186 |
|
|
|
167 |
|
|
$ |
65 |
|
|
|
62 |
|
|
|
60 |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
|
$ |
|
|
|
|
|
|
|
|
|
|
|
$ |
256 |
|
|
|
248 |
|
|
|
227 |
|
|
Capital expenditures |
|
$ |
381 |
|
|
|
217 |
|
|
|
158 |
|
|
$ |
108 |
|
|
|
119 |
|
|
|
45 |
|
|
$ |
759 |
|
|
|
601 |
|
|
|
343 |
|
|
$ |
|
|
|
|
|
|
|
|
|
|
|
$ |
1,248 |
|
|
|
937 |
|
|
|
546 |
|
|
Identifiable assets at December 31 |
|
$ |
6,586 |
|
|
|
2,793 |
|
|
|
2,496 |
|
|
$ |
1,568 |
|
|
|
1,559 |
|
|
|
1,373 |
|
|
$ |
2,798 |
|
|
|
5,394 |
|
|
|
4,650 |
|
|
$ |
(46 |
) |
|
|
(54 |
) |
|
|
(46 |
) |
|
$ |
10,906 |
|
|
|
9,692 |
|
|
|
8,473 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other assets |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1,104 |
|
|
|
1,024 |
|
|
|
585 |
|
|
Total assets at December 31 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$ |
12,010 |
|
|
|
10,716 |
|
|
|
9,058 |
|
|
Reference is made to Note 3 which discusses an asset impairment charge included above
under loss before income and mining taxes and minority interest for Development Projects in 2004.
For Development Projects, in respect of Voiseys Bay, capital expenditures includes those
expenditures incurred up to the date of achieving commercial levels of production. The balance
remaining in identifiable assets for Voiseys Bay relates to the carrying value of a portion of the
mineral properties which remain in the development phase.
171
Other assets, which are not allocated to operating segments, consist of corporate assets,
principally cash and cash equivalents, investments, deferred charges, pension assets and certain
receivables.
Data by geographic location
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net sales to customers |
|
|
Property, plant and equipment |
|
|
|
Year ended December 31 |
|
|
at December 31 |
|
|
|
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Restated) |
|
|
Canada |
|
$ |
231 |
|
|
$ |
100 |
|
|
$ |
71 |
|
|
$ |
6,104 |
|
|
$ |
5,637 |
|
|
$ |
5,048 |
|
|
United States |
|
|
1,434 |
|
|
|
1,353 |
|
|
|
669 |
|
|
|
21 |
|
|
|
21 |
|
|
|
22 |
|
United Kingdom |
|
|
724 |
|
|
|
691 |
|
|
|
357 |
|
|
|
19 |
|
|
|
20 |
|
|
|
26 |
|
Indonesia |
|
|
175 |
|
|
|
158 |
|
|
|
104 |
|
|
|
1,183 |
|
|
|
1,166 |
|
|
|
1,108 |
|
New Caledonia |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1,081 |
|
|
|
699 |
|
|
|
800 |
|
Japan |
|
|
610 |
|
|
|
618 |
|
|
|
374 |
|
|
|
18 |
|
|
|
18 |
|
|
|
19 |
|
China |
|
|
617 |
|
|
|
583 |
|
|
|
379 |
|
|
|
31 |
|
|
|
25 |
|
|
|
11 |
|
Other |
|
|
727 |
|
|
|
775 |
|
|
|
520 |
|
|
|
2 |
|
|
|
1 |
|
|
|
1 |
|
|
Total foreign |
|
|
4,287 |
|
|
|
4,178 |
|
|
|
2,403 |
|
|
|
2,355 |
|
|
|
1,950 |
|
|
|
1,987 |
|
|
Total |
|
$ |
4,518 |
|
|
$ |
4,278 |
|
|
$ |
2,474 |
|
|
$ |
8,459 |
|
|
$ |
7,587 |
|
|
$ |
7,035 |
|
|
Net sales to customers by geographic location are based on the location in which the sale
originated.
Note 19. Financial instruments and commodities contracts
The carrying values and fair values for all financial instruments and commodities
contracts are as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
December 31 |
|
2005 |
|
|
2004 |
|
|
2003 |
|
|
|
|
|
|
|
|
Carrying |
|
|
Fair |
|
|
Carrying |
|
|
Fair |
|
|
Carrying |
|
|
Fair |
|
|
|
value |
|
|
value |
|
|
value |
|
|
value |
|
|
value |
|
|
value |
|
|
Financial assets: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Deferred charges and other assets |
|
$ |
245 |
|
|
$ |
278 |
|
|
$ |
154 |
|
|
$ |
235 |
|
|
$ |
100 |
|
|
$ |
170 |
|
Financial liabilities: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Long-term debt including amount due
within one year |
|
|
1,974 |
|
|
|
2,305 |
|
|
|
1,868 |
|
|
|
2,315 |
|
|
|
1,706 |
|
|
|
2,121 |
|
Derivatives: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LME forward nickel contracts |
|
|
|
|
|
|
9 |
|
|
|
|
|
|
|
16 |
|
|
|
|
|
|
|
30 |
|
Copper put options |
|
|
|
|
|
|
6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copper call options |
|
|
|
|
|
|
(106 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Platinum put options |
|
|
|
|
|
|
1 |
|
|
|
|
|
|
|
5 |
|
|
|
|
|
|
|
1 |
|
Platinum call options |
|
|
|
|
|
|
(18 |
) |
|
|
|
|
|
|
(13 |
) |
|
|
|
|
|
|
(4 |
) |
Palladium fixed price swaps |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
|
|
|
|
|
|
1 |
|
Platinum fixed price swaps |
|
|
|
|
|
|
(4 |
) |
|
|
|
|
|
|
(9 |
) |
|
|
|
|
|
|
(11 |
) |
Gold fixed price swaps |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(2 |
) |
|
|
|
|
|
|
(2 |
) |
Fuel oil swaps |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
4 |
|
Forward currency contracts |
|
|
6 |
|
|
|
13 |
|
|
|
14 |
|
|
|
52 |
|
|
|
|
|
|
|
47 |
|
Interest rate swaps |
|
|
|
|
|
|
6 |
|
|
|
|
|
|
|
8 |
|
|
|
|
|
|
|
2 |
|
|
The fair value of financial instruments at December 31 is based on relevant market
information, the contractual terms of the applicable instrument or contract and, in some cases the
application of a financial model. The fair value of investments, including debt securities and
equity investments, is based on market prices at the reporting date for those or similar
investments. The fair value of long-term debt, platinum put and call options, copper put and call
options and the interest rate swaps are estimated based on market prices. The fair value of LME
forward nickel, fuel oil swaps, palladium swaps, platinum swaps, gold swaps and forward currency
contracts generally reflect the estimated amounts that we would receive (pay) to terminate such
contracts at the reporting date, thereby taking into account the current unrealized gains or losses
in respect of open contracts.
We are exposed to credit risk in the event of non-performance by counterparties in connection
with our derivative contracts. We do not obtain collateral or other security to support derivative
instruments subject to credit risk but mitigate this risk by dealing only
172
with financially sound counterparties and, accordingly, do not anticipate loss for
non-performance. There is no substantial concentration of credit risk resulting from these
contracts.
We had a limited recourse liability in respect of the sale of undivided interests in certain
accounts receivable in the amount of $39 million at December 31, 2005.
The following table shows the notional amounts, average price, contract amount and fair value
of our principal derivative instrument positions as at December 31, 2005:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
As at December 31, 2005 |
|
2006 |
|
2007 |
|
2008 |
|
2009 |
|
Total |
|
Metals |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LME forward nickel purchase
contracts1 (tonnes)
|
|
|
12,462 |
|
|
|
420 |
|
|
|
|
|
|
|
|
|
12,882 |
|
Average price ($ per tonne)
|
|
|
12,795 |
|
|
|
10,496 |
|
|
|
|
|
|
|
|
|
12,720 |
|
Contract amount (in $ millions)
|
|
|
160 |
|
|
|
4 |
|
|
|
|
|
|
|
|
|
164 |
|
Fair value (in $ millions)
|
|
|
8 |
|
|
|
1 |
|
|
|
|
|
|
|
|
|
9 |
|
|
LME forward nickel sell contracts1
(tonnes)
|
|
|
4,086 |
|
|
|
|
|
|
|
|
|
|
|
|
|
4,086 |
|
Average price ($ per tonne)
|
|
|
13,342 |
|
|
|
|
|
|
|
|
|
|
|
|
|
13,342 |
|
Contract amount (in $ millions)
|
|
|
55 |
|
|
|
|
|
|
|
|
|
|
|
|
|
55 |
|
Fair value (in $ millions)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COMEX forward copper sell contracts2
(tonnes)
|
|
|
181 |
|
|
|
|
|
|
|
|
|
|
|
|
|
181 |
|
Average price ($ per tonne)
|
|
|
4,003 |
|
|
|
|
|
|
|
|
|
|
|
|
|
4,003 |
|
Contract amount (in $ millions)
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
Fair value (in $ millions)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copper range forward options2
(tonnes)
|
|
|
19,500 |
|
|
|
58,992 |
|
|
|
48,384 |
|
|
|
|
|
126,876 |
|
Average (minimum-maximum)
($ per tonne)
|
|
|
2,535-3,400 |
|
|
|
2,205-2,988 |
|
|
|
2,205-2,773 |
|
|
|
|
|
2,256-2,969 |
|
Contract amount (in $ millions)
|
|
|
49-66 |
|
|
|
130-177 |
|
|
|
107-134 |
|
|
|
|
|
286-377 |
|
Fair value (in $ millions)
|
|
|
(20 |
) |
|
|
(46 |
) |
|
|
(35 |
) |
|
|
|
|
(101 |
) |
|
Copper put options2 (tonnes)
|
|
|
15,000 |
|
|
|
|
|
|
|
9,996 |
|
|
|
|
|
24,996 |
|
Average price ($ per tonne)
|
|
|
2,425 |
|
|
|
|
|
|
|
2,491 |
|
|
|
|
|
2,451 |
|
Contract amount (in $ millions)
|
|
|
36 |
|
|
|
|
|
|
|
25 |
|
|
|
|
|
61 |
|
Fair value (in $ millions)
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
|
Platinum fixed price swaps3
(troy ounces)
|
|
|
12,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
12,000 |
|
Average price ($ per troy ounce)
|
|
|
651 |
|
|
|
|
|
|
|
|
|
|
|
|
|
651 |
|
Contract amount (in $ millions)
|
|
|
8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
|
Fair value (in $ millions)
|
|
|
(4 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
(4 |
) |
|
Platinum range forward options3
(troy ounces)
|
|
|
20,009 |
|
|
|
24,174 |
|
|
|
34,644 |
|
|
|
|
|
78,827 |
|
Average (minimum-maximum)
($ per troy ounce)
|
|
|
688-802 |
|
|
|
720-823 |
|
|
|
700-808 |
|
|
|
|
|
703-811 |
|
Contract amount (in $ millions)
|
|
|
14-16 |
|
|
|
17-20 |
|
|
|
24-28 |
|
|
|
|
|
55-64 |
|
Fair value (in $ millions)
|
|
|
(4 |
) |
|
|
(5 |
) |
|
|
(8 |
) |
|
|
|
|
(17 |
) |
|
Fuel oil swaps4 (tonnes)
|
|
|
32,150 |
|
|
|
|
|
|
|
|
|
|
|
|
|
32,150 |
|
Average price ($ per tonne)
|
|
|
290 |
|
|
|
|
|
|
|
|
|
|
|
|
|
290 |
|
Contract amount (in $ millions)
|
|
|
9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
|
Fair value (in $ millions)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Currencies |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cdn.$ forward contracts5 (millions)
|
|
|
21 |
|
|
|
|
|
|
|
|
|
|
|
|
|
21 |
|
Average price (U.S.$)
|
|
|
0.845 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0.845 |
|
Contract amount (in $ millions)
|
|
|
18 |
|
|
|
|
|
|
|
|
|
|
|
|
|
18 |
|
Fair value (in $ millions)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
173
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
As
at December 31, 2005 |
|
2006 |
|
|
2007 |
|
|
2008 |
|
2009 |
|
Total |
|
|
Aus.$ forward contracts5 (millions)
|
|
|
155 |
|
|
|
45 |
|
|
|
|
|
|
|
|
|
200 |
|
Average price (U.S.$)
|
|
|
0.668 |
|
|
|
0.712 |
|
|
|
|
|
|
|
|
|
0.678 |
|
Contract amount (in $ millions)
|
|
|
102 |
|
|
|
32 |
|
|
|
|
|
|
|
|
|
134 |
|
Fair value (in $ millions)
|
|
|
11 |
|
|
|
1 |
|
|
|
|
|
|
|
|
|
12 |
|
|
Euro forward contracts5 (millions)
|
|
|
86 |
|
|
|
30 |
|
|
|
|
|
|
|
|
|
116 |
|
Average price (U.S.$)
|
|
|
1.193 |
|
|
|
1.213 |
|
|
|
|
|
|
|
|
|
1.198 |
|
Contract amount (in $ millions)
|
|
|
103 |
|
|
|
36 |
|
|
|
|
|
|
|
|
|
139 |
|
Fair value (in $ millions)
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
|
Pounds sterling forward contracts5
(millions)
|
|
|
8 |
|
|
|
1 |
|
|
|
|
|
|
|
|
|
9 |
|
Average price (U.S.$)
|
|
|
1.743 |
|
|
|
1.766 |
|
|
|
|
|
|
|
|
|
1.746 |
|
Contract amount (in $ millions)
|
|
|
14 |
|
|
|
2 |
|
|
|
|
|
|
|
|
|
16 |
|
Fair value (in $ millions)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Interest rate swap6 (notional principal
amount in $ millions) (maturity 2011)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
200 |
|
Fair value (in $ millions)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
|
|
|
|
|
(1) |
|
In general, we do not use derivative instruments to hedge our exposure to fluctuating
nickel prices. We do enter into LME forward purchase contracts which are substantially
offset by fixed price customer contracts in order to more fully expose us to nickel price
risk. We also enter into LME forward sales contracts to minimize nickel price risk
associated with purchased nickel inventories of intermediates and finished nickel products. |
|
(2) |
|
We had outstanding put option contracts, giving us the right but not the obligation to
sell copper, and sold call option contracts, giving the buyer the right but not the
obligation to purchase copper, during the period extending to 2008. We also enter into
forward sell contracts based upon quotations for copper on the COMEX Division of the New
York Mercantile Exchange. |
|
(3) |
|
Depending on market conditions, we enter into precious metals hedging contracts. These
contracts, in the form of swap contracts (whereby we simultaneously sell at a fixed price
and buy the same quantities for the same maturity dates at a floating price), are intended
to provide certain minimum price realizations in respect of a portion of our future
production of such metals. Under these swap contracts, we receive fixed prices for platinum
and pay a floating price based on monthly average spot prices. We also had outstanding put
option contracts, giving us the right but not the obligation to sell platinum and sold call
option contracts, giving the buyer the right but not the obligation, to purchase platinum
during the same time period. |
|
(4) |
|
We use fuel oil swap contracts to reduce the effect of fuel oil price changes in respect
of a portion of our energy requirements at PT Inco. Under the swap contracts, we pay fixed
prices for fuel oil and receive a floating price based on monthly average spot price
quotations. |
|
(5) |
|
We use forward currency contracts to eliminate the risk of exchange rate movements on a
portion of our future construction costs of capital assets at our Ontario operations and the
planned production facilities for the Goro project. |
|
(6) |
|
As at December 31, 2005, we had an outstanding interest rate swap of a notional amount of
$200 million on our term loan due 2011, whereby we initially receive a floating rate at
0.875 per cent over 3-month LIBOR and pay a fixed rate of 5.098 per cent. |
During 2005, we terminated our interest rates swaps in respect of our 7.75% Notes due
2012 and our 5.70% Debentures due 2015. The termination of these swaps resulted in payments to us
totalling approximately $23 million which is included in cash from financing activities on our
consolidated statement of cash flows under Financing activities Other. For accounting
purposes, the gain realized from the termination of these swaps will be amortized over the
respective remaining terms of the related debt instruments.
174
Note 20. Commitments and contingencies
(a) Commitments
The following table summarizes as of December 31, 2005 certain of our long-term
contractual obligations and commercial commitments for each of the next five years and thereafter:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Payments due in |
|
|
|
|
|
|
|
|
|
|
|
|
|
2006 |
|
|
2007 |
|
|
2008 |
|
|
2009 |
|
|
2010 |
|
|
Thereafter |
|
|
Purchase obligations (1) |
|
$ |
1,081 |
|
|
$ |
282 |
|
|
$ |
204 |
|
|
$ |
215 |
|
|
$ |
9 |
|
|
$ |
24 |
|
Operating leases |
|
|
33 |
|
|
|
24 |
|
|
|
12 |
|
|
|
5 |
|
|
|
3 |
|
|
|
6 |
|
Other |
|
|
2 |
|
|
|
3 |
|
|
|
3 |
|
|
|
3 |
|
|
|
7 |
|
|
|
81 |
|
|
Total |
|
$ |
1,116 |
|
|
$ |
309 |
|
|
$ |
219 |
|
|
$ |
223 |
|
|
$ |
19 |
|
|
$ |
111 |
|
|
|
|
|
(1) |
|
These purchase obligations largely relate to the Goro project with the balance comprising
routine orders to purchase goods and services at current operating locations. |
In connection with our 1996 acquisition of Diamond Fields Resources Inc., we assumed an
obligation to pay to a company retained by Diamond Field Resources Inc. to provide certain
exploration and other services an annual royalty amounting to three per cent of the net proceeds
received from the sale of ores, metals and other minerals produced from our Voiseys Bay project,
after deducting certain costs associated with the production and sale of the ores, metals and
minerals produced. We have not paid any such royalty amounts in 2005.
(b) Contingencies
In the course of our operations, we are subject to routine claims and litigation
incidental to our business, to various environmental proceedings, and to other litigation related
to such business. With respect to the environmental proceedings currently pending or threatened
against us, they include (1) a proceeding brought under the Ontario class action legislation
covering claims relating to the alleged decline in property values in a community where we had
operated a nickel refinery over the 1918 1984 period, (2) claims for personal injuries, (3)
enforcement actions, (4) alleged violations of, including exceeding regulatory limits relating to
discharges under, certain environmental or similar laws and regulations applicable to our
operations in Canada and elsewhere and (5) certain claims dating back a number of years in which
one of our subsidiaries was designated, under the United States federal environmental law known as
Superfund or CERCLA, as a potentially responsible party. We believe that the ultimate
resolution of such proceedings, claims and litigation will not significantly impair our operations
or have a material adverse effect on our financial position or results of operations.
In connection with the Girardin Financing described under Note 12, we provided certain
guarantees on behalf of Goro pursuant to which we guaranteed payments due from Goro of up to a
maximum amount of $100 million (Maximum Amount) in connection with the Add-Back Indemnity. We
also provided an additional guarantee covering the payments due from Goro of (a) amounts exceeding
the Maximum Amount in connection with the Add-Back Indemnity and (b) certain other amounts payable
by Goro under the Lease Agreement covering the Girardin Assets.
We provided a guarantee covering certain termination payments due from Goro to the supplier
under an electricity supply agreement (ESA) entered into in October 2004 for the Goro
nickel-cobalt project. The amount of the termination payments guaranteed depends upon a number of
factors, including whether any termination of the ESA is as a result of a default by Goro and the
date on which an early termination of the ESA were to occur. If Goro defaults under the ESA, the
termination payment could reach up to an amount of 145 million euros. This maximum amount could be
payable if termination of the ESA occurred prior to the anticipated start date for supply of
electricity to the project. Once the supply of electricity under the ESA to the project begins,
the guaranteed amounts will decrease over the life of the ESA.
175
Note 21. Supplemental information
Supplemental information in connection with the Consolidated Statement of Cash Flows
follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
2004 |
|
2003 |
|
Interest paid, net of capitalized interest |
|
$ |
10 |
|
|
$ |
25 |
|
|
$ |
48 |
|
|
Income and mining taxes paid, net |
|
$ |
572 |
|
|
$ |
94 |
|
|
$ |
120 |
|
|
Cash |
|
$ |
342 |
|
|
$ |
240 |
|
|
$ |
42 |
|
Cash equivalents |
|
|
616 |
|
|
|
836 |
|
|
|
376 |
|
|
Cash and cash equivalents |
|
$ |
958 |
|
|
$ |
1,076 |
|
|
$ |
418 |
|
|
Note 22. Sale of Interests in Goro Nickel S.A.S. (Goro Nickel)
(a) For 2005, minority interest included a recovery in respect of Goro Nickel of $25
million, reflecting the recovery of losses previously taken by us due to insufficient minority
interest balances existing in 2004 to absorb the share by the minority interest of the previously
recorded impairment charge associated with the Goro project in the second quarter of 2004.
(b) On February 18, 2005, a company formed by the three provinces of New Caledonia, Société de
Participation Minière du Sud Calédonien S.A.S. (SPMSC), acquired all of the shares of Goro
Nickel, the project company for our Goro project, then held by a subsidiary of a French government
agency, Bureau des Recherches Géologiques et Minières. These shares represented, after the
capitalization by Goro Nickel of certain shareholder advances as of February 18, 2005,
approximately a 9.71 per cent ownership interest in Goro Nickel. At the same time, we sold shares
in Goro Nickel to SPMSC representing approximately a 0.29 per cent interest such that SPMSC would
own, as of February 18, 2005, approximately a 10 per cent ownership interest in Goro Nickel. SPMSC
also entered into a shareholders agreement (the SPMSC Shareholders Agreement) with us on February
18, 2005 setting forth its rights and obligations as a shareholder in Goro Nickel. Under the SPMSC
Shareholders Agreement, SPMSC has the right, but not the obligation, to make capital contributions
on a pro rata basis as required to meet the funding requirements of Goro Nickel until such time as
the Goro project meets certain minimum commercial production and related performance tests (the
SPMSC Threshold Performance Tests). If SPMSC does not make such capital contributions, then Inco
has agreed to provide such capital contributions in addition to its own pro rata contributions,
subject to certain limitations, and SPMSC would, accordingly, suffer dilution of its ownership
interest, with the dilution formula to be subject to a penalty if SPMSCs interest by virtue of
dilution were to fall below five per cent. Once the SPMSC Threshold Performance Tests are met, to
the extent that SPMSC has elected not to make its pro rata capital contributions and, accordingly,
has suffered dilution of its interest in Goro Nickel, SPMSC has under the SPMSC Shareholders
Agreement agreed to purchase from Inco, based upon the price paid by Inco for such shares plus
interest thereon based upon a formula tied to Incos then applicable long-term weighted average
cost of capital, a sufficient number of shares such that SPMSC will then hold a 10 per cent
ownership interest in Goro Nickel. SPMSC has through the end of 2005 elected not to make any such
pro rata capital contributions as and when required by Goro Nickel.
On April 8, 2005 Sumitomo Metal Mining Co., Ltd. (Sumitomo Metal Mining) and Mitsui & Co.,
Ltd. (Mitsui), through a jointly owned company they formed, Sumic Nickel Netherlands B.V. (Sumic
Nickel), acquired a 21 per cent ownership interest in Goro Nickel. Under the terms of a share
purchase agreement entered into with us covering this transaction, Sumitomo Metal Mining and Mitsui
paid to us in total $150 million for the 21 per cent interest. This amount included their pro rata
share of certain project capital and other expenditures made since we announced our initial
decision in July 2001 to proceed with the Goro project and certain advances made by us to fund the
project. Under the terms of a shareholders agreement entered into as of April 8, 2005 (the Sumic
Shareholders Agreement), setting forth the rights and obligations Sumic Nickel (and Sumitomo Metal
Mining and Mitsui) would have as a shareholder in Goro Nickel, including the right to elect two
directors to the board of directors of Goro Nickel so long as Sumic Nickel holds at least a 16 per
cent ownership interest in Goro Nickel and the right to elect one director so long as it holds at
least an eight per cent ownership interest, Sumic Nickel is also obligated to make capital
contributions on a pro rata basis, subject to certain limitations and adjustments tied to the
actual capital cost of the project, as required to meet the funding requirements of Goro Nickel
until such time as the Goro project meets certain minimum commercial production and related
performance tests (the Sumic Threshold Performance Tests). If Sumic Nickel does not make such
capital contributions, it will suffer dilution of its ownership interest based upon a penalty
dilution formula. If the capital cost of the Goro project exceeds a threshold above the current
capital cost estimate prior to when the Sumic Threshold Performance Tests are met, then Sumic
Nickel will not have any obligation to provide capital contributions to meet the Goro projects
funding requirements and we would, subject to certain terms and conditions under the Sumic
Shareholders Agreement, be required to provide certain funding to meet such requirements, up to a
specified level, in the form
176
of interest-bearing debt repayable by Goro Nickel. In addition, under the Sumic Shareholders
Agreement, Sumic Nickel has the right to participate on a pro rata basis in any future expansion of
the Goro project and also has certain rights to approve certain expenditures and other actions
relating to Goro Nickel or the Goro project that would be outside the currently planned scope and
operation of the project. As of April 8, 2005, we, Sumic Nickel, Sumitomo Metal Mining and Mitsui
also entered into an operations agreement which sets forth Goro Nickels role and responsibilities
as the operator of the Goro project and its financial and other reporting obligations to its
shareholders and a product offtake agreement was also executed under which Sumic Nickel has the
right and obligation to purchase its pro rata share of Goros production of nickel product and
cobalt product based on its ownership interest in Goro Nickel, with a subsidiary of ours under a
separate product offtake agreement having the right and obligation to purchase all of Goro Nickels
production not purchased by Sumic Nickel (which would currently represent 79 per cent of such
eventual production).
The transaction with Sumitomo Metal Mining, Mitsui and Sumic Nickel, which had no significant
effect on our net earnings for 2005, was substantially completed as of March 31, 2005 and,
accordingly, the sale of 21 per cent of Goro Nickel was recorded in the period ended March 31,
2005. At December 31, 2005, as a result of SPMSCs election not to make any pro rata capital
contributions, the shares of Goro Nickel were held approximately 71 per cent by Inco Limited, 21
per cent by Sumic Nickel and approximately nine per cent by SPMSC.
Note 23. Outstanding offer to purchase Falconbridge Limited
Inco Limited announced on October 11, 2005 an offer to purchase all the outstanding
common shares of Falconbridge Limited (Falconbridge) by way of a friendly take-over bid. On
October 24, 2005 Inco mailed its offer to purchase to Falconbridge common shareholders and related
take-over bid circular (Offer Documents). Inco has offered Cdn. $34.00 in cash or 0.6713 of an
Inco Common Share plus Cdn. $0.05 in cash for each Falconbridge common share. Under the terms of
this offer, the maximum amount of cash to be paid by us is approximately Cdn. $2.87 billion, and
the maximum number of our common shares to be issued is approximately 201 million. The
consideration payable under the offer will be prorated as necessary to ensure that the total
aggregate consideration will not exceed these maximum amounts. The offer is subject to certain
conditions of completion, including receipt of all necessary regulatory clearances and acceptance
of the offer by Falconbridge common shareholders owning not less than 66 2/3% of the Falconbridge
common shares on a fully diluted basis (as defined in the Offer Documents). Once the conditions to
the offer have been met (or waived by Inco) and Inco has taken up and paid for at least 66 2/3% of
Falconbridges common shares as described in the Offer Documents, Inco currently expects, but is
not required, to take certain steps to acquire all of the remaining outstanding Falconbridge common
shares.
On December 8, 2005 we announced that our offer to purchase all of the common shares of
Falconbridge would remain open for acceptance until January 27, 2006 to allow more time for the
receipt of all necessary regulatory clearances. On January 12, 2006 we announced a further
extension to keep our offer open until February 28, 2006 and on February 21, 2006 we announced a
third extension to keep our offer open until June 30, 2006. These extensions were required to allow
more time to meet one of the conditions of our offer, the receipt of all necessary regulatory
clearances.
Reference should also be made to Note 9 for information on the definitive loan agreements we
have entered into relating to the financing of the cash portion of our offer.
177
Note 24. Significant differences between Canadian and United States GAAP
Our consolidated financial statements are prepared in accordance with Canadian GAAP. The
significant differences between Canadian and United States GAAP, insofar as they affect our
consolidated financial statements are discussed below.
The following table reconciles results as reported under Canadian GAAP with those that would
have been reported under United States GAAP:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
2004 |
|
2003 |
|
|
|
|
|
|
(Restated) |
|
(Restated) |
|
Net earnings Canadian GAAP |
|
$ |
836 |
|
|
$ |
619 |
|
|
$ |
146 |
|
Increased post-retirement benefits expense (a) |
|
|
(64 |
) |
|
|
(53 |
) |
|
|
(45 |
) |
Currency translation losses (b) |
|
|
(62 |
) |
|
|
(89 |
) |
|
|
(219 |
) |
Increased intangible assets amortization expense (c) |
|
|
|
|
|
|
|
|
|
|
(2 |
) |
Increased research and development expense (d) |
|
|
(47 |
) |
|
|
(17 |
) |
|
|
(5 |
) |
Decreased (increased) exploration expense (e) |
|
|
(8 |
) |
|
|
1 |
|
|
|
(4 |
) |
Decreased asset impairment charges (f) |
|
|
|
|
|
|
11 |
|
|
|
|
|
Increased interest expense (g) |
|
|
(23 |
) |
|
|
(14 |
) |
|
|
(13 |
) |
Cash settlement of LYON Notes tendered for conversion (g) |
|
|
(26 |
) |
|
|
|
|
|
|
|
|
Unrealized net gain (loss) on derivative instruments (h) |
|
|
(17 |
) |
|
|
5 |
|
|
|
(1 |
) |
Increased income and mining tax expense (i) |
|
|
|
|
|
|
|
|
|
|
(15 |
) |
Decreased (increased) minority interest (d) (e) (f) |
|
|
9 |
|
|
|
(8 |
) |
|
|
1 |
|
Taxes on United States GAAP differences |
|
|
30 |
|
|
|
22 |
|
|
|
28 |
|
|
Net earnings (loss) before cumulative effect of a change
in accounting principle United States GAAP |
|
|
628 |
|
|
|
477 |
|
|
|
(129 |
) |
Cumulative effect of a change in accounting principle (j) |
|
|
|
|
|
|
|
|
|
|
(17 |
) |
|
Net earnings (loss) United States GAAP |
|
$ |
628 |
|
|
$ |
477 |
|
|
$ |
(146 |
) |
|
Other comprehensive income (loss) (l): |
|
|
|
|
|
|
|
|
|
|
|
|
Reclassification of net gain on derivatives
designated as cash flow hedges (h) |
|
|
(15 |
) |
|
|
(6 |
) |
|
|
(21 |
) |
Reclassification to earnings of net gain on
derivatives due to ineffectiveness (h) |
|
|
|
|
|
|
(9 |
) |
|
|
(8 |
) |
Changes in fair value of derivatives designated
as cash flow hedges (h) |
|
|
(97 |
) |
|
|
25 |
|
|
|
5 |
|
Unrealized gains on long-term investments (k) |
|
|
7 |
|
|
|
11 |
|
|
|
68 |
|
Long-term investments reclassifications (k) |
|
|
(54 |
) |
|
|
|
|
|
|
(18 |
) |
Minimum additional pension liability adjustment (a) |
|
|
(71 |
) |
|
|
(53 |
) |
|
|
(76 |
) |
Taxes on other comprehensive income (loss) |
|
|
79 |
|
|
|
(8 |
) |
|
|
49 |
|
|
Other comprehensive loss United States GAAP (l) |
|
|
(151 |
) |
|
|
(40 |
) |
|
|
(1 |
) |
|
Comprehensive income (loss) United States GAAP (l) |
|
$ |
477 |
|
|
$ |
437 |
|
|
$ |
(147 |
) |
|
Net earnings (loss) per share Basic (m)
|
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) per share before cumulative effect of a
change in accounting principle United States GAAP |
|
$ |
3.32 |
|
|
$ |
2.54 |
|
|
$ |
(0.82 |
) |
Cumulative effect of a change in accounting principle (j) |
|
|
|
|
|
|
|
|
|
|
(0.09 |
) |
|
Net earnings (loss) per share Basic (m) |
|
$ |
3.32 |
|
|
$ |
2.54 |
|
|
$ |
(0.91 |
) |
|
Net earnings (loss) per share Diluted (m)
|
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) per share before cumulative effect of a
change in accounting principle United States GAAP |
|
$ |
2.87 |
|
|
$ |
2.30 |
|
|
$ |
(0.82 |
) |
Cumulative effect of a change in accounting principle (j) |
|
|
|
|
|
|
|
|
|
|
(0.09 |
) |
|
Net earnings (loss) per share Diluted (m) |
|
$ |
2.87 |
|
|
$ |
2.30 |
|
|
$ |
(0.91 |
) |
|
178
(a) Post-retirement benefits
For Canadian reporting purposes, we amortize the excess of the net actuarial and
investment gains and losses over 10 per cent of the greater of the post-retirement benefits
obligation and the fair value of plan assets over the expected average remaining service life of
our employee group. For United States reporting purposes, we amortize all actuarial and investment
gains and losses systematically over the expected average remaining service life of employees.
United States GAAP also requires the recognition of a minimum additional pension liability in
the amount of the excess of the unfunded accumulated benefits obligation over the recorded pension
benefits liability/asset; an offsetting intangible pension asset is recorded equal to the
unrecognized prior service costs, with any difference recorded as a reduction in accumulated other
comprehensive income. At December 31, 2005, the minimum additional pension liability would have
been $1,053 million (2004 $984 million; 2003 $937 million) and the intangible pension asset
would have been $76 million (2004 $78 million; 2003 $84 million), resulting in a $611 million
reduction, after taxes, (2004 $569 million; 2003 $515 million) in accumulated other
comprehensive income. Refer to a discussion regarding restatements below.
(b) Currency translation gains (losses)
Previously, the principal unrealized non-cash currency translation adjustments included
in the determination of earnings arose from the translation into United States dollars of the
Canadian dollar denominated deferred income and mining tax liabilities established in 1996 upon the
acquisition of the Voiseys Bay deposits. For Canadian GAAP reporting purposes, these deferred
income and mining tax liabilities have been deferred and included in property, plant and equipment
as part of development costs in respect of the Voiseys Bay mineral properties in the development
phase. Capitalization of such gains and losses ceases when the development phase of the mineral
properties are substantially complete and ready for use.
In 2005, although not significant, for comparative purposes, we have restated our prior period
currency translation gains and losses to also include the currency translation gains and losses on
other foreign currency denominated assets and liabilities as determined under United States GAAP,
primarily post-retirement benefits and the corresponding tax balances. Refer to a discussion
regarding restatements below.
(c) Intangible assets
Previously, we reported that, under United States GAAP, mineral rights were intangible
assets with respect to balance sheet classification. During the second quarter of 2004, for United
States GAAP the Emerging Issues Task Force (EITF) of the FASB released Issue No. 04-2 which
reached the decision that mineral rights should be reported as tangible assets and disclosed as a
separate component of property, plant and equipment. A FASB staff position paper dated April 30,
2004 also validated this change by means of amendments to Statement of Financial Accounting
Standards (SFAS) Nos. 141 and 142. As a result of this change, we have reclassified, for United
States GAAP purposes, intangible assets to property, plant and equipment. We have also, effective
January 1, 2004, ceased amortization of the residual value of intangible assets referred to in our
2003 Annual Report on Form 10-K, as amended.
As of December 31, 2005, property, plant and equipment included mineral rights of $2,456
million (2004 $2,467 million; 2003 $2,467 million).
(d) Research and development expense
Under Canadian GAAP, development costs are deferred and amortized if the development
project meets certain generally accepted criteria for deferral and amortization. In addition,
fixed assets including equipment may be acquired or constructed in order to provide facilities or
carry out a research and development project. The use of such assets will extend over a number of
accounting periods and, accordingly, are capitalized and amortized over their useful lives. Under
United States GAAP, research and development costs are charged to expense in the period incurred.
(e) Exploration expense
Under Canadian GAAP, capitalized exploration expenditures are classified under property,
plant and equipment with the related mineral claim. For United States GAAP, exploration
expenditures are not capitalized unless proven and probable reserves have been established by a
feasibility study.
179
(f) Asset impairment charges
Net earnings for 2004 under Canadian GAAP included an asset impairment charge in the
amount of $201 million before income and mining taxes and minority interest. Reference is made to
Note 3 above. This charge included the write-off of certain capitalized costs which, in accordance
with (d) above, were previously expensed for United States GAAP purposes. In addition, it included
an adjustment to reduce minority interest to nil. For United States GAAP, the 2004 asset impairment
charge would decrease by $11 million. The adjustment to reduce minority interest to nil would also
be adjusted with a corresponding increase to minority interest expense of $7 million.
(g) Convertible debt
Under Canadian GAAP, convertible debt is bifurcated between debt and equity, the equity
portion representing the value of the holder conversion options. Under United States GAAP,
convertible debt would be accounted for as debt and, accordingly, the measurement of interest and
the amortization of debt issuance costs are not the same. During 2005, as described in Note 13,
certain LYON Note holders tendered for conversion their LYON Notes. At our option, we elected to
settle a portion of the conversion of these notes for cash in lieu of shares which amounted to $76
million. The difference between the $76 million and the book value of $41 million represents a
charge of $35 million. As the LYON notes are bifurcated between debt and equity under Canadian
GAAP, the charge of $35 million has been bifurcated between a direct charge to earnings of $9
million and a direct charge to retained earnings of $26 million. Under United States GAAP, the
entire $35 million loss is a charge to net earnings.
Under United States GAAP, each of our convertible debt securities meets the conditions
necessary as set out in paragraphs 12-33 of EITF 00-19, Accounting for Derivative Financial
Instruments Indexed to, and Potentially Settled in, a Companys Own Stock, for the embedded
conversion option to be exempt from the requirement to be treated as a derivative under SFAS No.
133.
(h) Derivative instruments
Under United States GAAP, all derivatives, whether designated in hedging relationships or
not, are required to be recorded in the balance sheet at fair value. A derivative must be
designated in a hedging relationship in order to qualify for hedge accounting. These standards
include a determination of what portions of hedges are deemed to be effective versus ineffective.
In general, a hedging relationship is effective when a change in the fair value of the derivative
is offset by an equal and opposite change in the fair value of the underlying hedged item. In
accordance with these standards, effectiveness tests are performed in order to assess effectiveness
and quantify ineffectiveness for all designated hedges. At December 31, 2005, we had outstanding
fair value hedges and cash flow hedges. A fair value hedge is a hedge of the change in the fair
value of an asset, liability or firm commitment. If a derivative is designated as a fair value
hedge, changes in the fair value of the derivative and of the hedged item attributable to the
hedged risk are recognized in earnings. A cash flow hedge is a hedge of the exposure in
variability in expected future cash flows that is attributable to a particular risk such as a
forecasted purchase or sale. If a derivative is designated as a cash flow hedge, the effective
portions of the changes in the fair value of the derivative are recorded in other comprehensive
income and are recognized in earnings when the hedged item affects earnings. Ineffective portions
of changes in the fair value of the derivatives designated as hedges are recognized in earnings.
Under Canadian GAAP, we continue to recognize gains and losses on derivative contracts in income
concurrently with the recognition of the transactions being hedged. The requirements for
documentation and effectiveness testing, however, are substantially the same under both Canadian
and United States GAAP. Under United States GAAP, if a portion of a derivative contract is
excluded for purposes of effectiveness testing, such as time value, the value of such excluded
portion is included in earnings. Under Canadian GAAP, the excluded portion is not included in
earnings if the derivative contract is otherwise determined to be effective. At December 31, 2005,
unrealized net losses in respect of derivative instruments which were not specifically designated
as hedges or not qualifying for hedge accounting under United States GAAP amounted to $15 million.
LME forward nickel contracts are used to hedge the effect of fluctuations in the price of
nickel with respect to sales of nickel to customers for delivery three or more months in the
future. These LME forward nickel contracts have been designated as fair value hedges in connection
with firm sale commitments. For the year ended December 31, 2005, a gain of $0.9 million was
credited to net sales due to the ineffectiveness of such fair value hedges and $1 million was
charged to other income, net due to hedged firm commitments no longer qualifying as a fair value
hedge.
At December 31, 2005, we have an interest rate swap outstanding to manage the variability in
cash flows associated with changes in interest rates on a floating rate term loan, which has been
designated as a cash flow hedge.
180
Depending on market conditions, we enter into metals fixed price swap and option contracts
with various financial counterparties who must meet certain established criteria. These contracts,
which have been designated as cash flow hedges, are intended to provide certain minimum price
realizations in respect of a portion of forecasted sales. We have also entered into forward
currency contracts to hedge a portion of the future construction costs of our planned production
facilities in New Caledonia and at our Ontario operations that will be denominated in currencies
other than the U.S. dollar. In addition, we have also entered into fuel oil swaps to manage the
cost of a portion of our energy requirements in Indonesia. At December 31, 2005, $27 million of
deferred net losses on derivative instruments recorded in other comprehensive income are expected
to be reclassified to net sales during the next 12 months. The maximum term over which cash flows
are hedged is 36 months.
(i) Income and mining taxes
There is a difference in the carrying value of the Voiseys Bay project due to the
impairment charge recorded in 2002. Under both Canadian and United States GAAP, deferred income
and mining taxes are recorded at the expected rate of reversal. In 2003, there was a change in tax
rates in the jurisdiction of the Voiseys Bay project. The impact of this change in tax rates is
different for Canadian and United States GAAP due to the temporary difference created by the asset
impairment charge.
(j) Asset retirement obligations
Effective January 1, 2003, we adopted, for United States reporting purposes, SFAS No.
143, Accounting for Asset Retirement Obligations and CICA 3110, Asset Retirement Obligations, which
are substantially identical. Under SFAS No. 143, asset retirement obligations are recognized when
incurred and recorded as liabilities at fair value. The liability is accreted over time through
periodic charges to earnings. In addition, the asset retirement cost is capitalized as part of the
assets carrying value and depreciated using either the straight-line method or the
units-of-production method using estimated proven and probable ore reserves depending on the nature
of the asset being retired. The cumulative effect of adopting SFAS No. 143 was an increase to our
deficit of $17 million, or nine cents per share, in 2003, which is shown as a cumulative effect of
a change in accounting principle. As at January 1, 2003, property, plant and equipment increased
by $39 million, deferred income and mining taxes decreased by $11 million, and asset retirement
obligations increased by $67 million. For Canadian GAAP reporting purposes, financial results of
comparative periods have been restated.
(k) Investments
United States accounting standards for equity investments, which are set forth in SFAS
No. 115, require that certain equity investments not held for trading be recorded at fair value
with unrealized holding gains and losses excluded from the determination of earnings and reported
as a separate component of other comprehensive income. At December 31, 2005, deferred charges and
other assets would have increased by $33 million (2004 $80 million; 2003 $69 million) with a
corresponding change in accumulated other comprehensive loss before taxes.
(l) Comprehensive income
United States accounting standards for reporting comprehensive income are set forth in
SFAS No. 130. Comprehensive income represents the change in equity during a reporting period from
transactions and other events and circumstances from non-owner sources. Components of
comprehensive income include items such as net earnings (loss), changes in the fair value of
investments not held for trading, minimum pension liability adjustments, derivative instruments and
certain foreign currency translation gains and losses.
181
(m) Earnings (loss) per share
The computation of basic and diluted earnings (loss) per share under United States GAAP
was as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
2004 |
|
2003 |
|
|
|
|
|
|
(Restated) |
|
(Restated) |
|
Basic earnings (loss) per share computation |
|
|
|
|
|
|
|
|
|
|
|
|
Numerator: |
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) |
|
$ |
628 |
|
|
$ |
477 |
|
|
$ |
(146 |
) |
Dividends on preferred shares |
|
|
|
|
|
|
|
|
|
|
(6 |
) |
Premium on redemption of preferred shares |
|
|
|
|
|
|
|
|
|
|
(15 |
) |
|
Net earnings (loss) applicable to common shares |
|
$ |
628 |
|
|
$ |
477 |
|
|
$ |
(167 |
) |
|
Denominator: |
|
|
|
|
|
|
|
|
|
|
|
|
Weighted-average common shares outstanding (thousands) |
|
|
189,425 |
|
|
|
187,550 |
|
|
|
184,500 |
|
|
Basic earnings (loss) per common share |
|
$ |
3.32 |
|
|
$ |
2.54 |
|
|
$ |
(0.91 |
) |
|
Diluted earnings (loss) per share computation |
|
|
|
|
|
|
|
|
|
|
|
|
Numerator: |
|
|
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) applicable to common shares |
|
$ |
628 |
|
|
$ |
477 |
|
|
$ |
(167 |
) |
Dilutive effect of
|
|
|
|
|
|
|
|
|
|
|
|
|
Convertible debentures |
|
|
12 |
|
|
|
7 |
|
|
|
|
|
|
Net earnings (loss) applicable to common shares, assuming dilution |
|
$ |
640 |
|
|
$ |
484 |
|
|
$ |
(167 |
) |
|
Denominator: |
|
|
|
|
|
|
|
|
|
|
|
|
Weighted-average common shares outstanding (thousands) |
|
|
189,425 |
|
|
|
187,550 |
|
|
|
184,500 |
|
Dilutive effect of: |
|
|
|
|
|
|
|
|
|
|
|
|
Convertible debentures |
|
|
28,055 |
|
|
|
17,440 |
|
|
|
|
|
Stock options |
|
|
1,008 |
|
|
|
1,426 |
|
|
|
|
|
Warrants |
|
|
4,218 |
|
|
|
3,740 |
|
|
|
|
|
|
Weighted-average common shares outstanding, assuming dilution |
|
|
222,706 |
|
|
|
210,156 |
|
|
|
184,500 |
|
|
Diluted earnings (loss) per common share |
|
$ |
2.87 |
|
|
$ |
2.30 |
|
|
$ |
(0.91 |
) |
|
At December 31, 2005, convertible debt which is convertible into nil Common Shares (2004
nil; 2003 17,440,696), options on nil Common Shares (2004 nil; 2003 4,572,605) and Warrants
exercisable for nil Common Shares (2004 nil; 2003 11,023,064) were excluded from the
computation of diluted earnings (loss) per Common Share because their effects were not dilutive.
The following tables compare results reported under Canadian GAAP with those that would have
been reported under United States GAAP, together with the cumulative effect on balance sheet
accounts. Restatements are discussed in Note 2 above and in the discussion below.
182
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Canadian GAAP |
|
|
|
|
|
|
|
|
|
United States GAAP |
|
December 31 |
|
2005 |
|
2004 |
|
2003 |
|
|
|
|
|
2005 |
|
2004 |
|
2003 |
|
|
|
|
|
|
(Restated) |
|
(Restated) |
|
|
|
|
|
|
|
|
|
(Restated) |
|
(Restated) |
|
Assets: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Accounts receivable |
|
|
673 |
|
|
|
601 |
|
|
|
435 |
|
|
|
|
|
|
|
677 |
|
|
|
636 |
|
|
|
474 |
|
Property, plant and equipment |
|
|
8,459 |
|
|
|
7,587 |
|
|
|
7,035 |
|
|
|
|
|
|
|
7,197 |
|
|
|
6,444 |
|
|
|
3,500 |
|
Intangible assets |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2,467 |
|
Accrued pension benefits asset |
|
|
611 |
|
|
|
422 |
|
|
|
226 |
|
|
|
|
|
|
|
76 |
|
|
|
78 |
|
|
|
84 |
|
Deferred charges and other assets |
|
|
245 |
|
|
|
154 |
|
|
|
100 |
|
|
|
|
|
|
|
277 |
|
|
|
242 |
|
|
|
172 |
|
Liabilities: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Long-term debt due within one year |
|
|
122 |
|
|
|
107 |
|
|
|
103 |
|
|
|
|
|
|
|
111 |
|
|
|
107 |
|
|
|
92 |
|
Other accrued liabilities |
|
|
533 |
|
|
|
399 |
|
|
|
332 |
|
|
|
|
|
|
|
669 |
|
|
|
405 |
|
|
|
369 |
|
Long-term debt |
|
|
1,852 |
|
|
|
1,761 |
|
|
|
1,603 |
|
|
|
|
|
|
|
2,209 |
|
|
|
2,194 |
|
|
|
2,035 |
|
Deferred income and mining taxes |
|
|
2,018 |
|
|
|
1,891 |
|
|
|
1,718 |
|
|
|
|
|
|
|
1,357 |
|
|
|
1,338 |
|
|
|
1,154 |
|
Accrued post-retirement benefits liability |
|
|
732 |
|
|
|
671 |
|
|
|
603 |
|
|
|
|
|
|
|
1,445 |
|
|
|
1,430 |
|
|
|
1,445 |
|
Minority interest |
|
|
761 |
|
|
|
470 |
|
|
|
404 |
|
|
|
|
|
|
|
750 |
|
|
|
468 |
|
|
|
394 |
|
Shareholders equity: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Convertible debt |
|
|
362 |
|
|
|
418 |
|
|
|
418 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Retained earnings (deficit) |
|
|
1,181 |
|
|
|
428 |
|
|
|
(191 |
) |
|
|
|
|
|
|
(100 |
) |
|
|
(671 |
) |
|
|
(1,148 |
) |
Accumulated other comprehensive loss |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(641 |
) |
|
|
(490 |
) |
|
|
(450 |
) |
|
Changes in retained earnings and accumulated other comprehensive loss under United States GAAP were as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31 |
|
2005 |
|
2004 |
|
2003 |
|
|
|
|
|
|
(Restated) |
|
(Restated) |
|
Deficit at beginning of year, as previously reported |
|
$ |
(665 |
) |
|
$ |
(1,144 |
) |
|
$ |
(994 |
) |
Restatements |
|
|
(6 |
) |
|
|
(4 |
) |
|
|
13 |
|
|
Deficit at beginning of year, as restated |
|
|
(671 |
) |
|
|
(1,148 |
) |
|
|
(981 |
) |
Net earnings (loss) |
|
|
628 |
|
|
|
477 |
|
|
|
(146 |
) |
Common share dividends |
|
|
(57 |
) |
|
|
|
|
|
|
|
|
Preferred dividends |
|
|
|
|
|
|
|
|
|
|
(6 |
) |
Premium on redemption of preferred shares |
|
|
|
|
|
|
|
|
|
|
(15 |
) |
|
Deficit at end of year |
|
$ |
(100 |
) |
|
$ |
(671 |
) |
|
$ |
(1,148 |
) |
|
Accumulated other comprehensive loss at beginning of year, as previously reported |
|
$ |
(589 |
) |
|
$ |
(516 |
) |
|
$ |
(485 |
) |
Restatements |
|
|
99 |
|
|
|
66 |
|
|
|
36 |
|
|
Accumulated other comprehensive loss at beginning of year, as restated |
|
|
(490 |
) |
|
|
(450 |
) |
|
|
(449 |
) |
Other comprehensive loss |
|
|
(151 |
) |
|
|
(40 |
) |
|
|
(1 |
) |
|
Accumulated other comprehensive loss at end of year |
|
$ |
(641 |
) |
|
$ |
(490 |
) |
|
$ |
(450 |
) |
|
Restatements
As discussed in Note 24(b), we have restated our prior period results to reflect currency
translation gains and losses on other foreign currency denominated assets and liabilities as
determined under United States GAAP, primarily post-retirement benefits and the corresponding tax
balances. Previously, these currency translation effects were not recorded due to their
insignificance but they have become more significant due to the continued strengthening of the
Canadian dollar. The impact of this restatement was a decrease in net earnings of $8 million and
$12 million in 2004 and 2003, respectively. Also, we have corrected errors in the determination of
post-retirement benefits expense and the minimum additional pension liability. Post-retirement
benefits expense was increased by $14 million and $8 million and the related tax recoveries were
increased by $6 million and $3 million in 2004 and 2003, respectively. Such adjustments impacted
the determination of other comprehensive losses (by $33 million and $30 million in 2004 and 2003,
respectively) and such balances were restated accordingly.
Recent Accounting Pronouncements
In February 2006, SFAS No. 155, Accounting for Certain Hybrid Financial Instruments, was
issued. This standard (1) permits fair value measurement for any hybrid financial instrument that
contains an embedded derivative (2) clarifies which interest-only strips and principal-only strips
are not subject to SFAS No. 133 (3) establishes a requirement to evaluate interests in securitized
financial
183
assets to identify interests that are free standing derivatives or that are hybrid financial
instruments that contain an embedded derivative requiring bifurcation (4) clarifies that
concentrations of credit risk in the form of subordination are not derivatives and (5) amends
certain aspects of SFAS No. 144. This standard is effective for fiscal years beginning on or after
September 15, 2006. We are currently studying the impact of this standard.
Effective January 1, 2006, we will adopt, for United States reporting purposes, SFAS No. 151,
Inventory Costs An Amendment of ARB No. 43, Chapter 4. Under SFAS No. 151, abnormal amounts of
idle facility expense, freight, handling costs and spoilage should be recognized as current period
charges. We do no anticipate that the application of SFAS No. 151 will have a material impact on
our results of operation.
During June 2005, the FASB issued SFAS No. 154, Accounting for Changes and Error Corrections.
The new standard requires that entities which make a voluntary change in accounting principle to
apply that change retroactively to prior period financial statements, unless this would be
impracticable. Another significant change in practice under SFAS No. 154 is that if an entity
changes its method of depreciation, amortization or depletion for long-lived assets, the change
must be accounted for prospectively, as a change in estimate. SFAS No. 154 is effective for our
2006 financial statements and is not expected to have a significant impact on earnings.
During December 2004, the FASB issued revisions to SFAS No. 123, Share-Based Payments, which
will be effective for 2006. The primary impact of the revisions is the elimination of the intrinsic
value method for valuing stock-based employee compensation. The revisions will also impact the
manner in which expense is determined for stock appreciation rights. As we adopted the fair value
method in 2003 and ceased issuing stock appreciation rights in 2004, we do not expect that such
revisions will have a significant impact on earnings.
184
SCHEDULE VIII
INCO LIMITED AND SUBSIDIARIES
VALUATION ACCOUNTS AND RESERVES
(in thousands)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additions |
|
|
Deductions |
|
|
|
|
|
|
Balance at |
|
|
Charged to |
|
|
For Accounts |
|
|
Balance |
|
|
|
Beginning |
|
|
Costs and |
|
|
Receivable |
|
|
at End |
|
|
|
of Year |
|
|
Expenses |
|
|
Written Off |
|
|
of Year |
|
|
|
Year ended December 31, 2005 |
|
Allowance for doubtful accounts |
|
$ |
871 |
|
|
$ |
10 |
|
|
$ |
42 |
|
|
$ |
839 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31, 2004 |
|
Allowance for doubtful accounts |
|
$ |
15,406 |
|
|
$ |
7 |
|
|
$ |
14,542 |
|
|
$ |
871 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year ended December 31, 2003 |
|
Allowance for doubtful accounts |
|
$ |
17,456 |
|
|
$ |
636 |
|
|
$ |
2,686 |
|
|
$ |
15,406 |
|
185
SUPPLEMENTAL FINANCIAL INFORMATION
Quarterly Financial Information
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
First |
|
|
Second |
|
|
Third |
|
|
Fourth |
|
|
|
|
|
|
Quarter |
|
|
Quarter |
|
|
Quarter |
|
|
Quarter |
|
|
Year |
|
|
|
(Restated) |
|
|
(Restated) |
|
|
(Restated) |
|
|
|
|
|
|
|
|
|
|
|
(in millions of United States dollars except per share amounts) |
|
2005 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net sales |
|
$ |
1,121 |
|
|
$ |
1,194 |
|
|
$ |
1,082 |
|
|
$ |
1,121 |
|
|
$ |
4,518 |
|
Net earnings |
|
$ |
317 |
|
|
$ |
220 |
|
|
$ |
64 |
|
|
$ |
235 |
|
|
$ |
836 |
|
Net earnings per Common Share
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Basic |
|
$ |
1.68 |
|
|
$ |
1.16 |
|
|
$ |
0.34 |
|
|
$ |
1.23 |
|
|
$ |
4.41 |
|
Diluted |
|
$ |
1.43 |
|
|
$ |
0.99 |
|
|
$ |
0.29 |
|
|
$ |
1.06 |
|
|
$ |
3.75 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
First |
|
|
Second |
|
|
Third |
|
|
Fourth |
|
|
|
|
|
|
Quarter |
|
|
Quarter |
|
|
Quarter |
|
|
Quarter |
|
|
Year |
|
|
|
(Restated) |
|
|
(Restated) |
|
|
(Restated) |
|
|
(Restated) |
|
|
(Restated) |
|
|
|
(in millions of United States dollars except per share amounts) |
|
2004 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net sales |
|
$ |
1,094 |
|
|
$ |
992 |
|
|
$ |
1,031 |
|
|
$ |
1,161 |
|
|
$ |
4,278 |
|
Net earnings (loss) |
|
$ |
259 |
|
|
$ |
(12 |
) |
|
$ |
146 |
|
|
$ |
226 |
|
|
$ |
619 |
|
Net earnings (loss) per Common Share
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Basic |
|
$ |
1.38 |
|
|
$ |
(0.06 |
) |
|
$ |
0.78 |
|
|
$ |
1.20 |
|
|
$ |
3.30 |
|
Diluted |
|
$ |
1.23 |
|
|
$ |
(0.06 |
) |
|
$ |
0.70 |
|
|
$ |
1.08 |
|
|
$ |
2.95 |
|
186
Item 9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure
None.
Item 9A. Controls and Procedures
Managements Report on Internal Control over Financial Reporting and the Report of the
Independent Registered Public Accounting Firm thereon are set forth in Item 8 of this Report.
As of the end of the period covered by this Report, an evaluation was carried out by Incos
management, with the participation of our Chief Executive Officer and Chief Financial Officer, of
the effectiveness of our disclosure controls and procedures (as defined in Rule 13a-15(e) under the
U.S. Securities Exchange Act of 1934). Based upon that evaluation, our Chief Executive Officer and
Chief Financial Officer concluded that these disclosure controls and procedures were effective as
of the end of the period covered by this Report. In addition, no change in our internal control
over financial reporting (as defined in Rule 13a-15(f) under the U.S. Securities Exchange Act of
1934) occurred during the fourth quarter of our fiscal year ended December 31, 2005 that has
materially affected, or is reasonably likely to materially affect, our internal control over
financial reporting.
Item 9B. Other Information
None.
187
PART III
Item 10. Directors and Executive Officers of Inco Limited
Directors
The information under Election of Directors, Board Committees, and Audit Committee Report in Incos Proxy Circular and Statement
dated February 17, 2006 (the 2006 Proxy Statement), filed as Exhibit 99 hereto, is incorporated
herein by reference to such information.
Executive Officers
The names, offices held and ages as of the date of this Report of the executive officers of
Inco Limited are shown below.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Officer |
Name |
|
Office |
|
Age |
|
Since |
Scott M. Hand
|
|
Chairman and Chief Executive Officer
|
|
|
63 |
|
|
|
1984 |
|
Peter C. Jones(1)
|
|
President and Chief Operating Officer
|
|
|
58 |
|
|
|
1997 |
|
Stuart F. Feiner(2)
|
|
Executive Vice-President, General
Counsel and Secretary
|
|
|
57 |
|
|
|
1992 |
|
Peter J. Goudie
|
|
Executive Vice-President, Marketing
|
|
|
57 |
|
|
|
1997 |
|
Robert D. J. Davies
|
|
Executive Vice-President and Chief
Financial Officer
|
|
|
56 |
|
|
|
2005 |
|
Ronald C. Aelick
|
|
Executive Vice-President, Technical Services
|
|
|
57 |
|
|
|
1995 |
|
Mark Cutifani
|
|
Executive Vice-President and President, North
America and Europe |
|
|
47 |
|
|
|
2005 |
|
Stephanie E. Anderson
|
|
Vice-President and Treasurer
|
|
|
44 |
|
|
|
2004 |
|
Subhash Bhandari
|
|
Vice-President and Chief Information Officer
|
|
|
61 |
|
|
|
2001 |
|
Edward H. Bassett
|
|
Vice-President, Capital Projects and Engineering
|
|
|
59 |
|
|
|
2005 |
|
Mark J. Daniel
|
|
Vice-President, Human Resources
|
|
|
59 |
|
|
|
2000 |
|
Bruce R. Drysdale
|
|
Vice-President, Public and Government Affairs
|
|
|
39 |
|
|
|
2004 |
|
Philippus F. du Toit
|
|
Managing Director, Voiseys
Bay Nickel Company Limited
|
|
|
53 |
|
|
|
2003 |
|
Anthony O. Filmer
|
|
Vice-President, Research and Development
|
|
|
52 |
|
|
|
2005 |
|
John B. Jones
|
|
Vice-President, Business Development Asia
|
|
|
63 |
|
|
|
1999 |
|
Gary G. Kaiway
|
|
Vice-President, Taxation
|
|
|
57 |
|
|
|
2001 |
|
William B. Kipkie
|
|
Vice-President, Inco Special Products
|
|
|
60 |
|
|
|
2003 |
|
Ronald A. Lehtovaara
|
|
Vice-President and Comptroller
|
|
|
55 |
|
|
|
1996 |
|
William A. Napier
|
|
Vice-President, Environment and Health
|
|
|
51 |
|
|
|
2000 |
|
S. Nicholas Sheard
|
|
Vice-President, Exploration
|
|
|
56 |
|
|
|
2003 |
|
|
|
|
(1) |
|
Mr. Jones plans to retire from all of his positions with the Company when the pending
acquisition of Falconbridge is completed. |
|
(2) |
|
Mr. Feiner will be succeeded in this position by Simon A. Fish in late March 2006 when
he will then serve as Executive Vice-President, Corporate Affairs, until his planned
retirement in mid-2006. Prior to joining Inco in December 2005, Mr. Fish held senior
management positions, most recently Vice-President, General Counsel and Secretary, with
Shell Canada Limited, an integrated oil and gas company based in Calgary, Alberta from
January 2003 until November 2005, and from
July 2000 until January 2003, Mr. Fish was Secretary to the Committee of Managing Directors
of Royal Dutch Shell plc based in London, England. |
Each executive officer is elected by the Board of Directors of Inco Limited annually, at the
first meeting of such Board (Annual Board Meeting) after the annual meeting of shareholders, for
a term of one year or until a successor shall have been duly chosen and qualified, except in those
cases where an executive officer is elected at other than the Annual Board Meeting, in which event
such executive officers tenure will expire at the next Annual Board Meeting unless re-elected.
Such tenure is subject to an officers resignation or removal as provided in Incos By-law No. 1,
its sole by-law, and Incos standing resolution adopted pursuant thereto.
Except for the officers mentioned below, each executive officer named above has been an officer or
executive or key managerial employee of Inco Limited or one of its subsidiaries during the past
five years. From December 2002 until October 2005, Mr. Davies was Chief Financial Officer of
Alumina Limited, the Australian partner in the Alcoa World Alumina and Chemicals business that was
formed after the December 2002 demerger of WMC Limited, a base metals and phosphate company based
in Melbourne, Australia, and from February 1997 until November 2002 Mr. Davies held senior
management positions with WMC Limited, most recently
188
General Manager Treasury, Tax and Investor Relations. From February 2000 until February 2003, Mr. Cutifani was Managing Director of Sons of
Gwalia Ltd., a tantalum, gold and industrial minerals mining company based in Perth, Western
Australia, and from January 1998 until January 2000 he was Group Executive responsible for all of
the gold operations, project development and technical support for Normandy Mining Ltd., a gold and
base metals mining company based in Adelaide, South Australia. From May 1997 until January 2000,
Mr. du Toit was Operations Director, Voest Alpine Industries Inc., an engineering company based in
Poole, England, and from February 2000 until April 2003 he held senior management positions, most
recently President, with Diavik Diamond Mines Inc., a diamond mining company based in Yellowknife,
Northwest Territories. From October 2004 until October 2005, Dr. Filmer was an advisor providing
assistance with respect to the development of mining projects to Maaden, the Saudi Arabian
state-owned mining company based in Riyadh, Saudi Arabia, and from October 1981 until September
2004 he held a number of senior positions with RioTinto, a diversified mining company based in
London, England and Melbourne, Australia; most recently, from July 1997 until October 2002 he was
Managing Director of Rio Tintos Comalco Smelting operation and from October 2002 until September
2004 was seconded to CSIRO, an Australian research institute, to lead its Light Metal Flagship
Initiative. During the five-year period prior to joining Inco, Mr. Bassett served as Executive
Vice-President of SNC Lavalin Inc., an engineering company based in Montreal, Quebec; Mr. Bhandari
held senior management positions, most recently General Manager, Purchasing and Information
Systems, with Toyota Motor Manufacturing Canada Ltd., an automobile manufacturing company based in
Cambridge, Ontario; Mr. Kaiway held senior management positions, most recently Vice-President,
Taxation, with Placer Dome Inc., a gold mining company based in Vancouver, British Columbia; and
Mr. Sheard held senior management positions, most recently as Global Exploration Manager, with MIM
Holdings Pty Ltd., a base metals, gold and coal mining company based in Brisbane, Australia
acquired by Xstrata plc.
The dates shown in the table extend from the first date of election as an executive officer of
Inco. There are no family relationships among the directors and executive officers of Inco, and no
arrangements or understandings between any executive officer and any other person pursuant to which
he was elected as an executive officer.
Code of Ethics
Inco has adopted a Code of Ethics for Financial Personnel governing its senior officers and
employees with financial reporting and related responsibilities and has posted such code on its web
site, www.inco.com. Within the time period required by the SEC and the New York Stock Exchange, we
will post on our website any amendment to the Code of Ethics for Financial Personnel and any waiver
applicable to our senior financial officers and our executive officers or directors. We have also
posted on our website the Board of Directors Guidelines on Corporate Governance and the charters
of our Audit Committee, Corporate Governance and Nominating Committee, Management and Resources and
Compensation Committee, Pension Committee, Environment, Health and Safety Committee and Capital
Projects Committee. Any of the foregoing documents are available in print upon request of any
shareholder to our investor relations personnel through our website or by telephone at (416)
361-7670.
Item 11. Executive Compensation
The information under Executive Compensation, Report on Executive Compensation and
Comparative Shareholder Return in the 2006 Proxy Statement is incorporated herein by reference to
such information. Reference is also made to Directors and
Executive Officers of Inco Limited Executive Officers above.
Item 12. Security Ownership of Certain Beneficial Owners and Management
Security Ownership of Certain Beneficial Owners and Management
The information under Ownership of Securities in the 2006 Proxy Statement is incorporated
herein by reference to such information. Reference is also made to Directors and
Executive Officers of Inco Limited Executive Officers and Securities Authorized for Issuance under Equity Compensation Plans above.
Changes in Control
There are no arrangements known to Inco the operation of which may at a subsequent date result
in a change of control of the Company.
189
Item 13. Certain Relationships and Related Transactions
None.
Item 14. Principal Accountant Fees and Services
The information under Auditors Fees in the 2006 Proxy Statement is incorporated herein by
reference to such information.
190
PART IV
Item 15. Exhibits, Financial Statement Schedules, and Reports on Form 8-K
|
|
|
|
|
|
|
|
|
(a)1.
|
|
|
|
|
|
|
|
List of Financial Statements Included under Item 8 of this Report
Auditors Report
Consolidated Statement of Earnings
Consolidated Statement of Retained Earnings
Consolidated Balance Sheet
Consolidated Statement of Cash Flows
Notes to Consolidated Financial Statements
Supplementary Financial Information (unaudited) |
(a)2.
|
|
|
|
|
|
|
|
List of Financial Statement Schedules included under Item 8 of
this Report |
(a)3.
|
|
|
|
|
|
|
|
Schedule VIII Valuation accounts and reserves
Exhibits |
|
|
|
(2)(i) |
|
|
|
Support Agreement dated October 10, 2005 between Inco Limited
and Falconbridge Limited relating to the proposed acquisition by
the Company of all of the common shares of Falconbridge
(incorporated by reference to Exhibit 2.1 to the Companys
Current Report on Form 8-K dated October 11, 2005) filed
October 13, 2005 |
|
|
(ii)
|
|
|
|
Amending Agreement dated January 12, 2006 between Inco Limited
and Falconbridge amending the Support Agreement dated October
10, 2005 (incorporated by reference to Exhibit 2.4 to the
Companys Current Report on Form F-8/A dated January 19, 2006) |
|
|
(iii)
|
|
|
|
Second Amending Agreement dated February 20, 2006 between Inco
Limited and Falconbridge amending the Support Agreement dated
October 10, 2005 (incorporated by reference to Exhibit 2.5 to
the Companys Current Report on Form F-8/A dated February 27,
2006) |
|
|
|
(3)(i) |
|
|
|
Restated Articles of Incorporation of Inco Limited dated May 7,
2004 (incorporated by reference to Exhibit 3.1 to the Companys
Originally Filed Quarterly Report on Form 10-Q for the quarterly
period ended March 31, 2004) |
|
|
(ii)
|
|
(a)
|
|
General By-law No. 1 of Inco Limited as amended to February 3,
2004 (incorporated by reference to Exhibit 3(ii)(a) to the
Companys Annual Report on Form 10-K for the year ended December
31, 2003) |
|
|
|
(4)(i) |
|
(b)
(a)
(b)
|
|
Standing Resolution of the Board of
Directors of Inco Limited as amended to July 18, 2005
Reference is made to(3)(i) and (ii) above
Warrant Agreement dated December 1, 2000 among Inco Limited,
CIBC Mellon Trust Company and ChaseMellon Shareholder Services
LLC, as Canadian and U.S. Warrant Agents, respectively
(incorporated by reference to the Registration Statement on Form
F-10 (File No. 333-12748) as filed with the Commission on
December 7, 2000) |
|
|
(ii)
|
|
(c)
|
|
Shareholder Rights Plan Agreement dated as of September 14,
1998, as amended and restated as of April 20, 2005, between Inco
Limited and CIBC Mellon Trust Company, as Rights Agent
(incorporated by reference to Exhibit A to the 2005 Proxy
Statement attached as Exhibit 99 to the Companys Annual Report
on Form 10-K for the year ended December 31, 2004)
Inco Limited hereby agrees to furnish to the Commission a copy
of any instrument relating to outstanding long-term debt of the
Company upon request of the Commission |
|
|
|
(10 |
) |
|
(a)
|
|
Voiseys Bay Development Agreement dated as of September 30,
2002 among Her Majesty the Queen in Right of Newfoundland and
Labrador, Voiseys Bay Nickel Company Limited and Inco Limited
(incorporated by reference to Exhibit 99(i) to the Companys
Current Report on Form 8-K dated October 7, 2002) |
|
|
|
|
|
|
(b)
|
|
Voiseys Bay Industrial and Employment Benefits Agreement dated
as of September 30, 2002 among Her Majesty the Queen in Right of
Newfoundland and Labrador, Voiseys Bay Nickel Company Limited
and Inco Limited (incorporated by reference to Exhibit 99(ii) to
the Companys Current Report on Form 8-K dated October 7, 2002) |
191
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(c)
|
|
2002 Non-Employee Director Share Option Plan (incorporated by
reference to Exhibit B to the Companys 2002 Proxy Statement
filed as Exhibit 99 to the Companys Annual Report on Form 10-K
for the year ended December 31, 2001)(1) |
|
|
|
|
|
|
(d)
|
|
2005 Key Employees Incentive Plan (incorporated by reference to
Exhibit B to the 2005 Proxy Statement attached as Exhibit 99 to
the Companys Annual Report on Form 10-K for the year ended
December 31, 2004)(1) |
|
|
|
|
|
|
(e)
|
|
2001 Key Employees Incentive Plan (incorporated by reference to
Exhibit A to the 2001 Proxy Statement filed as Exhibit 99 to the
Companys Annual Report on Form 10-K for the year ended December
31, 2000)(1) |
|
|
|
|
|
|
(f)
|
|
1997 Key Employees Incentive Plan (incorporated by reference to
Exhibit A to the 1997 Proxy Statement filed as Exhibit 99 to the
Companys Annual Report on Form 10-K for the year ended December
31, 1996 (File No. 1-1143))(1) |
|
|
|
|
|
|
(g)
|
|
1993 Key Employees Incentive Plan (incorporated by reference to
the Prospectus in Registration Statement No.
33-71298)(1) |
|
|
|
|
|
|
(h)
|
|
1998 Non-Employee Director Share Ownership Plan (incorporated by
reference to Exhibit 10(g) to the Companys Annual Report on
Form 10-K for the year ended December 31, 2001)(1) |
|
|
|
|
|
|
(i)
|
|
Forms of two Agreements, each dated as of between March 23, 1998
and December 3, 2002 between certain executive officers of Inco
Limited (all executive officers in the case of the form of
Agreement referred to in (2) below and S.M. Hand, R.C. Aelick,
S.F. Feiner, P.J. Goudie and P.C. Jones in the case of the form
of Agreement referred to in (1) below) and Inco Limited covering
severance payments and continuation of certain benefits in the
event of (1) involuntary termination of employment (except for
cause) or resignation under certain circumstances not wholly
voluntary or (2) involuntary termination of employment (except
for cause) or resignation under certain circumstances not wholly
voluntary within two years following a change in control (as
defined in such agreements) (incorporated by reference to
Exhibit 10(iii)(A) to Inco Limiteds Quarterly Report on Form
10-Q for the quarterly period ended March 31, 1998 (File No.
1-1143))(1) |
|
|
|
|
|
|
(j)
|
|
Description of Inco Limiteds Management Incentive Plans
(incorporated by reference to the first paragraph under
Management Incentive Plans in the 2006 Proxy
Statement)(1) |
|
|
|
|
|
|
(k)
|
|
Electricity Supply Agreement dated October 28, 2004 between
Enercal S.A. and Goro Nickel S.A. relating to the supply of
electricity by Enercal to Goro Nickel for the Goro project.
(incorporated by reference to Exhibit 10(k) to the Companys
Annual Report on Form 10-K for the year ended December 31, 2004) |
|
|
|
|
|
|
(l)
|
|
Lease Agreement dated December 30, 2004 between GNiFi as lessor
and Goro Nickel S.A. as lessee under which GNiFi will lease to
Goro Nickel S.A. a portion of the Goro project processing plant
which is financed under French tax legislation (the Girardin
Act) (incorporated by reference to Exhibit 10(l) to the
Companys Annual Report on Form 10-K for the year ended December
31, 2004) |
|
|
|
|
|
|
(m)
|
|
Construction Agreement dated December 30, 2004 between GNiFi as
owner and Goro Nickel S.A. as project manager under which Goro
Nickel S.A. has been appointed as construction agent on behalf
of GNiFi to purchase, construct and commission a portion of the
Goro project processing plant which is financed under French tax
legislation (the Girardin Act) (incorporated by reference to
Exhibit 10(m) to the Companys Annual Report on Form 10-K for
the year ended December 31, 2004) |
|
|
|
|
|
|
(n)
|
|
Contract of Work between the Government of the Republic of
Indonesia and P.T. International Nickel Indonesia Tbk,
consisting of (i) Agreement on Modification and Extension of
1968 Contract of Work dated January 15, 1996; (ii) Contract of
Work dated as of July 27, 1968, and (iii) Memorandum of
Understanding dated January 15, 1996 Relating to Agreement on
Modification and Extension of 1968 Contract of Work dated
January 15, 1996 (incorporated by reference to Exhibit 10(n) to
the Companys Annual Report on Form 10-K for the year ended
December 31, 2004) |
|
|
|
|
|
|
(o)
|
|
Loan Agreement dated December 22, 2005 between Inco Limited and
a group of banks and financial institutions, including Morgan
Stanley Senior Funding (Nova Scotia) Co., RBC Capital Markets,
Goldman Sachs Canada Credit Partners Co. and The Bank of Nova
Scotia, as lead arrangers, and Morgan Stanley Senior Funding |
192
|
|
|
|
|
|
|
|
|
|
|
|
(21 |
) |
|
|
|
(Nova Scotia) Co. and RBC Capital Markets, as joint book running
managers, providing the Company with loan facilities in
connection with the acquisition of Falconbridge, together with
amendments dated January 13, 2006 and February 20, 2006, portions of which have been omitted
pursuant to a request for confidential treatment. Such
confidential portions have been filed with the SEC
Subsidiaries of Inco Limited |
|
|
|
(23
|
)
|
|
(a)
|
|
Consents of Lawrence B. Cochrane, S. Nicholas Sheard and Olivier
Tavchandjian, each as a Qualified Person named in this Report
pursuant to National Instrument 43-101 issued by the Canadian
Securities Administrators
|
|
|
|
|
|
|
(b)
|
|
Consent of Independent Auditors
|
|
|
|
(24 |
) |
|
(a)
|
|
Powers of Attorney |
|
|
|
|
|
|
(b)
|
|
Resolutions of the Board of Directors |
|
|
|
(31 |
) |
|
|
|
Rule 13a-14(a)/15d-14(a) Certifications |
|
|
|
(32 |
) |
|
|
|
Section 1350 Certifications |
|
|
|
(99 |
) |
|
|
|
2006 Proxy Statement |
|
|
|
(1) |
|
Indicates a management contract or compensatory plan or arrangement. |
193
Signatures
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, as
amended, the Registrant has duly caused this Report to be signed on its behalf by the undersigned,
thereunto duly authorized, in Toronto, Ontario, on the 16th day of March, 2006.
|
|
|
|
|
|
INCO LIMITED
(Registrant)
|
|
|
By: |
(Signed) STUART F. FEINER
|
|
|
|
Stuart F. Feiner |
|
|
|
Executive Vice-President,
General Counsel & Secretary |
|
|
Pursuant to the requirements of the Securities Exchange Act of 1934, as amended, this Report has
been signed below by the following persons on behalf of the Registrant and in the capacities
indicated on the 16th day of March, 2006.
|
|
|
Signature |
|
Title |
|
|
|
|
|
Chairman and Chief Executive Officer |
Scott M. Hand
|
|
and Director |
|
|
(Principal Executive Officer) |
|
|
|
(Signed) ROBERT D.J. DAVIES
|
|
Executive Vice-President and |
Robert D.J. Davies
|
|
Chief Financial Officer |
|
|
(Principal Financial Officer) |
|
|
|
(Signed) RONALD A. LEHTOVAARA
|
|
Vice-President and Comptroller |
Ronald A. Lehtovaara
|
|
(Principal Accounting Officer) |
194
|
|
|
Signature |
|
Title |
|
|
|
|
|
Director |
(Glen A. Barton) |
|
|
|
|
|
|
|
Director |
(Angus A. Bruneau) |
|
|
|
|
|
|
|
Director |
(Ronald C. Cambre) |
|
|
|
|
|
|
|
Director |
(Janice K. Henry) |
|
|
|
|
|
|
|
Director |
(Chaviva
M. Hoek) |
|
|
|
|
|
|
|
Director |
(Peter C. Jones) |
|
|
|
|
|
|
|
Director |
(John T. Mayberry) |
|
|
|
|
|
|
|
Director |
(Francis Mer) |
|
|
|
|
|
Director |
(David P. OBrien) |
|
|
|
|
|
|
|
Director |
(Roger Phillips) |
|
|
|
|
|
|
|
Director |
(Richard E. Waugh) |
|
|
|
|
|
|
|
Authorized Representative in the |
Edward A. Steen
|
|
United States |
International Nickel, Inc. |
|
|
Park 80 West, Plaza Two |
|
|
Saddle Brook, NJ 07663 |
|
|
|
|
|
* |
|
Pursuant to powers of attorney executed by the directors named above whose names are
preceded by an asterisk, Stuart F. Feiner, as attorney-in-fact, does hereby sign this Report on
behalf of each of such directors, in each case in the capacity of director, on the 16th day of March, 2006. |
|
|
|
|
|
(Signed) STUART F. FEINER |
|
|
|
|
|
Stuart F. Feiner, attorney-in-fact |
195
Consent of Independent Auditors
We
hereby consent to the incorporation by reference in the Registration Statements on Form S-3
(Nos. 33-22435 and 33-50816), on Form S-8 (Nos. 33-71298, 333-7798, 333-13714, 333-98601 and
333-125955), on Form F-8 (No. 333-129218) and on Form F-10 (Nos. 333-13470, 333-12588, 333-104688 and 333-104687) of Inco Limited
of our report dated February 28, 2006 relating to the financial statements, the financial statement
schedule, managements assessment of the effectiveness of internal control over financial reporting
and the effectiveness of internal control over financial reporting which appears in this Annual
Report on Form 10-K. We also consent to the reference to us under the heading Experts in each
such Registration Statement on Form S-3 and Form F-10.
PRICEWATERHOUSECOOPERS LLP
Chartered Accountants
Toronto, Ontario
March 16, 2006
196
INCO LIMITED
EXHIBIT INDEX
TO ANNUAL REPORT ON FORM 10-K
FOR THE YEAR ENDED DECEMBER 31, 2005
|
|
|
Exhibit No. |
|
Exhibit |
3(ii)(b)
|
|
Standing Resolution of the Board of Directors of Inco Limited as
amended to July 18, 2005 |
|
|
|
10(o)
|
|
Loan Agreement dated December 22, 2005 between Inco Limited and
a group of banks and financial institutions, including Morgan
Stanley Senior Funding (Nova Scotia) Co., RBC Capital Markets,
Goldman Sachs Canada Credit Partners Co. and The Bank of Nova
Scotia, as lead arrangers, and Morgan Stanley Senior Funding
(Nova Scotia) Co. and RBC Capital Markets, as joint book running
managers, providing the Company with loan facilities in
connection with the acquisition of Falconbridge, together with
amendments dated January 31, 2006 and February 20, 2006,
portions of which have been omitted pursuant to a request for
confidential treatment. |
|
|
|
21
|
|
Subsidiaries of Inco Limited |
|
|
|
23(a)
|
|
Consents of Lawrence B. Cochrane, S. Nicholas Sheard and Olivier
Tavchandjian, each as a Qualified Person named in this Report
pursuant to National Instrument 43-101 |
|
|
|
23(b)
|
|
Consent of Independent Auditors |
|
|
|
24(a)
|
|
Powers of Attorney |
|
|
|
24(b)
|
|
Resolutions of the Board of Directors of Inco Limited |
|
|
|
31
|
|
Rule 13a-14(a)/15d-14(a) Certifications |
|
|
|
32
|
|
Section 1350 Certifications |
|
|
|
99
|
|
Proxy Circular and Statement dated February 17, 2006 1 |
|
|
|
1 |
|
Portions of the Proxy circular and Statement are incorporated by reference in Part III of this Report. |