DTE Energy 2014.09.30 10Q
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
___________________________________
FORM 10-Q
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d)
OF THE SECURITIES EXCHANGE ACT OF 1934
For the Quarterly Period ended September 30, 2014
Commission file number 1-11607
DTE ENERGY COMPANY
(Exact name of registrant as specified in its charter)
|
| |
Michigan | 38-3217752 |
(State or other jurisdiction of | (I.R.S. Employer |
incorporation or organization) | Identification No.) |
| |
One Energy Plaza, Detroit, Michigan | 48226-1279 |
(Address of principal executive offices) | (Zip Code) |
313-235-4000
(Registrant’s telephone number, including area code)
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes x No o
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes x No o
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. (Check one):
|
| | | | | | |
Large accelerated filer x | | Accelerated filer o | | Non-accelerated filer o | | Smaller reporting company o |
| | | | (Do not check if a smaller reporting company) | | |
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Yes o No x
At September 30, 2014, 176,991,277 shares of DTE Energy’s common stock were outstanding, substantially all of which were held by non-affiliates.
DTE Energy Company
Quarterly Report on Form 10-Q
Quarter Ended September 30, 2014
TABLE OF CONTENTS
|
| |
| Page |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
EX-12-59 |
EX-31-93 |
EX-31-94 |
EX-32-93 |
EX-32-94 |
EX-99-57 |
EX-101.INS XBRL Instance Document |
EX-101.SCH XBRL Taxonomy Extension Schema |
EX-101.CAL XBRL Taxonomy Extension Calculation Linkbase |
EX-101.DEF XBRL Taxonomy Extension Definition Database |
EX-101.LAB XBRL Taxonomy Extension Label Linkbase |
EX-101.PRE XBRL Taxonomy Extension Presentation Linkbase |
|
| |
CFTC | U.S. Commodity Futures Trading Commission |
| |
COA | U.S Court of Appeals for the District of Columbia |
| |
Company | DTE Energy Company and any subsidiary companies |
| |
Customer Choice | Michigan legislation giving customers the option to choose alternative suppliers for electricity and natural gas. |
| |
DOE | U.S. Department of Energy |
| |
DTE Electric | DTE Electric Company (a direct wholly owned subsidiary of DTE Energy Company) and subsidiary companies. |
| |
DTE Energy | DTE Energy Company, directly or indirectly the parent of DTE Electric, DTE Gas and numerous non-utility subsidiaries. |
| |
DTE Gas | DTE Gas Company (an indirect wholly owned subsidiary of DTE Energy) and subsidiary companies. |
| |
EPA | U.S. Environmental Protection Agency |
| |
FASB | Financial Accounting Standards Board |
| |
FERC | Federal Energy Regulatory Commission |
| |
FOV | Finding of Violation |
| |
FTRs | Financial transmission rights are financial instruments that entitle the holder to receive payments related to costs incurred for congestion on the transmission grid. |
| |
GCR | A Gas Cost Recovery mechanism authorized by the MPSC that allows DTE Gas to recover through rates its natural gas costs. |
| |
MDEQ | Michigan Department of Environmental Quality |
| |
MGP | Manufactured Gas Plant |
| |
MISO | Midcontinent Independent System Operator, Inc. |
| |
MPSC | Michigan Public Service Commission |
| |
MTM | Mark-to-market |
| |
NEIL | Nuclear Electric Insurance Limited |
| |
Non-utility | An entity that is not a public utility. Its conditions of service, prices of goods and services and other operating related matters are not directly regulated by the MPSC. |
| |
NOV | Notice of Violation |
| |
NRC | U.S. Nuclear Regulatory Commission |
| |
PLD | City of Detroit's Public Lighting Department |
| |
Production tax credits | Tax credits as authorized under Sections 45K and 45 of the Internal Revenue Code that are designed to stimulate investment in and development of alternate fuel sources. The amount of a production tax credit can vary each year as determined by the Internal Revenue Service. |
| |
PSCR | A Power Supply Cost Recovery mechanism authorized by the MPSC that allows DTE Electric to recover through rates its fuel, fuel-related and purchased power costs. |
| |
REF | Reduced Emissions Fuel |
| |
Securitization | DTE Electric financed specific stranded costs at lower interest rates through the sale of rate reduction bonds by a wholly-owned special purpose entity, The Detroit Edison Securitization Funding LLC. |
| |
TRIA | Terrorism Risk Insurance Extension Act of 2005 |
| |
|
| |
TRM | Transitional Reconciliation Mechanism |
| |
VIE | Variable Interest Entity |
|
| |
Units of Measurement | |
| |
Bcf | Billion cubic feet of natural gas |
| |
BTU | Heat value (energy content) of fuel |
| |
kWh | Kilowatthour of electricity |
| |
MMBtu | One million BTU |
| |
MWh | Megawatthour of electricity |
FORWARD-LOOKING STATEMENTS
Certain information presented herein includes “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 with respect to the financial condition, results of operations and business of DTE Energy. Words such as “anticipate,” “believe,” “expect,” “projected,” “aspiration” and “goals” signify forward-looking statements. Forward-looking statements are not guarantees of future results and conditions, but rather are subject to numerous assumptions, risks and uncertainties that may cause actual future results to be materially different from those contemplated, projected, estimated or budgeted. Many factors may impact forward-looking statements including, but not limited to, the following:
| |
• | impact of regulation by the FERC, MPSC, NRC, CFTC and other applicable governmental proceedings and regulations, including any associated impact on rate structures; |
| |
• | the amount and timing of cost recovery allowed as a result of regulatory proceedings, related appeals or new legislation, including legislative amendments and Customer Choice programs; |
| |
• | economic conditions and population changes in our geographic area resulting in changes in demand, customer conservation and thefts of electricity and natural gas; |
| |
• | environmental issues, laws, regulations, and the increasing costs of remediation and compliance, including actual and potential new federal and state requirements; |
| |
• | health, safety, financial, environmental and regulatory risks associated with ownership and operation of nuclear facilities; |
| |
• | changes in the cost and availability of coal and other raw materials, purchased power and natural gas; |
| |
• | the potential for losses on investments, including nuclear decommissioning and benefit plan assets and the related increases in future expense and contributions; |
| |
• | volatility in the short-term natural gas storage markets impacting third-party storage revenues; |
| |
• | volatility in commodity markets, deviations in weather and related risks impacting the results of our energy trading operations; |
| |
• | access to capital markets and the results of other financing efforts which can be affected by credit agency ratings; |
| |
• | instability in capital markets which could impact availability of short and long-term financing; |
| |
• | the timing and extent of changes in interest rates; |
| |
• | the level of borrowings; |
| |
• | the potential for increased costs or delays in completion of significant construction projects; |
| |
• | changes in and application of federal, state and local tax laws and their interpretations, including the Internal Revenue Code, regulations, rulings, court proceedings and audits; |
| |
• | the effects of weather and other natural phenomena on operations and sales to customers, and purchases from suppliers; |
| |
• | the cost of protecting assets against, or damage due to, terrorism or cyber attacks; |
| |
• | employee relations and the impact of collective bargaining agreements; |
| |
• | the availability, cost, coverage and terms of insurance and stability of insurance providers; |
| |
• | cost reduction efforts and the maximization of plant and distribution system performance; |
| |
• | the effects of competition; |
| |
• | changes in and application of accounting standards and financial reporting regulations; |
| |
• | changes in federal or state laws and their interpretation with respect to regulation, energy policy and other business issues; |
| |
• | contract disputes, binding arbitration, litigation and related appeals; and |
| |
• | the risks discussed in our public filings with the Securities and Exchange Commission. |
New factors emerge from time to time. We cannot predict what factors may arise or how such factors may cause our results to differ materially from those contained in any forward-looking statement. Any forward-looking statements speak only as of the date on which such statements are made. We undertake no obligation to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made or to reflect the occurrence of unanticipated events.
Part I — Financial Information
Item 1. Financial Statements
DTE Energy Company
Consolidated Statements of Operations (Unaudited)
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions, except per share amounts) |
Operating Revenues | $ | 2,595 |
| | $ | 2,387 |
| | $ | 9,223 |
| | $ | 7,128 |
|
| | | | | | | |
Operating Expenses | | | | | |
| | |
|
Fuel, purchased power and gas | 1,119 |
| | 967 |
| | 4,550 |
| | 2,931 |
|
Operation and maintenance | 860 |
| | 728 |
| | 2,512 |
| | 2,168 |
|
Depreciation and amortization | 293 |
| | 284 |
| | 855 |
| | 811 |
|
Taxes other than income | 86 |
| | 84 |
| | 268 |
| | 262 |
|
Asset (gains) and losses, reserves and impairments, net | (2 | ) | | (5 | ) | | (10 | ) | | (6 | ) |
| 2,356 |
| | 2,058 |
| | 8,175 |
| | 6,166 |
|
Operating Income | 239 |
| | 329 |
| | 1,048 |
| | 962 |
|
| | | | | | | |
Other (Income) and Deductions | | | | | |
| | |
|
Interest expense | 107 |
| | 106 |
| | 323 |
| | 327 |
|
Interest income | (2 | ) | | (2 | ) | | (7 | ) | | (7 | ) |
Other income | (55 | ) | | (58 | ) | | (136 | ) | | (148 | ) |
Other expenses | 11 |
| | 7 |
| | 29 |
| | 23 |
|
| 61 |
| | 53 |
| | 209 |
| | 195 |
|
Income Before Income Taxes | 178 |
| | 276 |
| | 839 |
| | 767 |
|
| | | | | | | |
Income Tax Expense | 21 |
| | 76 |
| | 229 |
| | 225 |
|
| | | | | | | |
Net Income | 157 |
| | 200 |
| | 610 |
| | 542 |
|
| | | | | | | |
Less: Net Income Attributable to Noncontrolling Interests | 1 |
| | 2 |
| | 4 |
| | 5 |
|
| | | | | | | |
Net Income Attributable to DTE Energy Company | $ | 156 |
| | $ | 198 |
| | $ | 606 |
| | $ | 537 |
|
| | | | | | | |
Basic Earnings per Common Share | | | | | | | |
Net Income Attributable to DTE Energy Company | $ | 0.88 |
| | $ | 1.13 |
| | $ | 3.42 |
| | $ | 3.07 |
|
| | | | | | | |
| | | | | | | |
Diluted Earnings per Common Share | | | | | | | |
Net Income Attributable to DTE Energy Company | $ | 0.88 |
| | $ | 1.13 |
| | $ | 3.42 |
| | $ | 3.07 |
|
| | | | | | | |
| | | | | | | |
Weighted Average Common Shares Outstanding | | | | | |
| | |
|
Basic | 177 |
| | 175 |
| | 177 |
| | 174 |
|
Diluted | 177 |
| | 176 |
| | 177 |
| | 175 |
|
Dividends Declared per Common Share | $ | 0.69 |
| | $ | 0.66 |
| | $ | 2.00 |
| | $ | 1.93 |
|
See Notes to Consolidated Financial Statements (Unaudited)
DTE Energy Company
Consolidated Statements of Comprehensive Income (Unaudited)
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Net income | $ | 157 |
| | $ | 200 |
| | $ | 610 |
| | $ | 542 |
|
| | | | | | | |
Other comprehensive income (loss), net of tax: | | | | | | | |
Benefit obligations, net of taxes of $1, $2, $2 and $4, respectively | 2 |
| | 2 |
| | 3 |
| | 7 |
|
Net unrealized gains on investments during the period, net of taxes of $—, $1, $— and $1, respectively | — |
| | 1 |
| | 1 |
| | 1 |
|
Foreign currency translation, net of taxes of $(1), $—, $(1) and $(1), respectively | (1 | ) | | 1 |
| | (1 | ) | | (1 | ) |
Other comprehensive income | 1 |
| | 4 |
| | 3 |
| | 7 |
|
| | | | | | | |
Comprehensive income | 158 |
| | 204 |
| | 613 |
| | 549 |
|
Less comprehensive income attributable to noncontrolling interests | 1 |
| | 2 |
| | 4 |
| | 5 |
|
Comprehensive income attributable to DTE Energy Company | $ | 157 |
| | $ | 202 |
| | $ | 609 |
| | $ | 544 |
|
See Notes to Consolidated Financial Statements (Unaudited)
DTE Energy Company
Consolidated Statements of Financial Position (Unaudited)
|
| | | | | | | |
| September 30, | | December 31, |
| 2014 | | 2013 |
| (In millions) |
ASSETS |
Current Assets | | | |
Cash and cash equivalents | $ | 60 |
| | $ | 52 |
|
Restricted cash, principally Securitization | 61 |
| | 123 |
|
Accounts receivable (less allowance for doubtful accounts of $60 and $55, respectively) | | | |
Customer | 1,257 |
| | 1,542 |
|
Other | 120 |
| | 127 |
|
Inventories | | | |
Fuel and gas | 511 |
| | 363 |
|
Materials and supplies | 282 |
| | 265 |
|
Derivative assets | 68 |
| | 99 |
|
Regulatory assets | 91 |
| | 26 |
|
Other | 305 |
| | 209 |
|
| 2,755 |
| | 2,806 |
|
Investments | | | |
Nuclear decommissioning trust funds | 1,229 |
| | 1,191 |
|
Other | 618 |
| | 603 |
|
| 1,847 |
| | 1,794 |
|
Property | | | |
Property, plant and equipment | 26,169 |
| | 25,123 |
|
Less accumulated depreciation and amortization | (9,670 | ) | | (9,323 | ) |
| 16,499 |
| | 15,800 |
|
Other Assets | | | |
Goodwill | 2,018 |
| | 2,018 |
|
Regulatory assets | 2,704 |
| | 2,837 |
|
Securitized regulatory assets | 86 |
| | 231 |
|
Intangible assets | 108 |
| | 122 |
|
Notes receivable | 87 |
| | 102 |
|
Derivative assets | 29 |
| | 27 |
|
Other | 243 |
| | 198 |
|
| 5,275 |
| | 5,535 |
|
Total Assets | $ | 26,376 |
| | $ | 25,935 |
|
See Notes to Consolidated Financial Statements (Unaudited)
DTE Energy Company
Consolidated Statements of Financial Position (Unaudited) — (Continued)
|
| | | | | | | |
| September 30, | | December 31, |
| 2014 | | 2013 |
| (In millions, except shares) |
LIABILITIES AND EQUITY |
Current Liabilities | | | |
Accounts payable | $ | 873 |
| | $ | 962 |
|
Accrued interest | 110 |
| | 90 |
|
Dividends payable | 122 |
| | 116 |
|
Short-term borrowings | 653 |
| | 131 |
|
Current portion long-term debt, including capital leases | 274 |
| | 898 |
|
Derivative liabilities | 134 |
| | 195 |
|
Regulatory liabilities | 164 |
| | 302 |
|
Other | 475 |
| | 495 |
|
| 2,805 |
| | 3,189 |
|
Long-Term Debt (net of current portion) | | | |
Mortgage bonds, notes and other | 7,426 |
| | 6,618 |
|
Securitization bonds | — |
| | 105 |
|
Junior subordinated debentures | 480 |
| | 480 |
|
Capital lease obligations | 3 |
| | 11 |
|
| 7,909 |
| | 7,214 |
|
Other Liabilities | |
| | |
|
Deferred income taxes | 3,546 |
| | 3,321 |
|
Regulatory liabilities | 715 |
| | 862 |
|
Asset retirement obligations | 1,911 |
| | 1,827 |
|
Unamortized investment tax credit | 43 |
| | 47 |
|
Derivative liabilities | 19 |
| | 43 |
|
Accrued pension liability | 499 |
| | 653 |
|
Accrued postretirement liability | 286 |
| | 350 |
|
Nuclear decommissioning | 179 |
| | 178 |
|
Other | 278 |
| | 297 |
|
| 7,476 |
| | 7,578 |
|
Commitments and Contingencies (Notes 7 and 11) | | | |
| | | |
Equity | | | |
Common stock, without par value, 400,000,000 shares authorized, 176,991,277 and 177,087,230 shares issued and outstanding, respectively | 3,900 |
| | 3,907 |
|
Retained earnings | 4,402 |
| | 4,150 |
|
Accumulated other comprehensive loss | (133 | ) | | (136 | ) |
Total DTE Energy Company Equity | 8,169 |
| | 7,921 |
|
Noncontrolling interests | 17 |
| | 33 |
|
Total Equity | 8,186 |
| | 7,954 |
|
Total Liabilities and Equity | $ | 26,376 |
| | $ | 25,935 |
|
See Notes to Consolidated Financial Statements (Unaudited)
DTE Energy Company
Consolidated Statements of Cash Flows (Unaudited)
|
| | | | | | | |
| Nine Months Ended September 30, |
| 2014 | | 2013 |
| (In millions) |
Operating Activities | | | |
Net income | $ | 610 |
| | $ | 542 |
|
Adjustments to reconcile net income to net cash from operating activities: | | | |
Depreciation and amortization | 855 |
| | 811 |
|
Nuclear fuel amortization | 33 |
| | 25 |
|
Allowance for equity funds used during construction | (16 | ) | | (10 | ) |
Deferred income taxes | 244 |
| | 162 |
|
Asset (gains) and losses, reserves and impairments, net | (10 | ) | | (5 | ) |
Changes in assets and liabilities: | | | |
Accounts receivable, net | 273 |
| | 177 |
|
Inventories | (165 | ) | | 35 |
|
Accounts payable | 48 |
| | (16 | ) |
Accrued pension obligation | (154 | ) | | (44 | ) |
Accrued postretirement obligation | (64 | ) | | (191 | ) |
Derivative assets and liabilities | (56 | ) | | (23 | ) |
Regulatory assets and liabilities | (211 | ) | | 327 |
|
Other assets | (66 | ) | | (62 | ) |
Other liabilities | (23 | ) | | (13 | ) |
Net cash from operating activities | 1,298 |
| | 1,715 |
|
Investing Activities | | | |
Plant and equipment expenditures — utility | (1,295 | ) | | (1,101 | ) |
Plant and equipment expenditures — non-utility | (207 | ) | | (270 | ) |
Proceeds from sale of assets | 36 |
| | 20 |
|
Restricted cash for debt redemption, principally Securitization | 62 |
| | 58 |
|
Proceeds from sale of nuclear decommissioning trust fund assets | 652 |
| | 477 |
|
Investment in nuclear decommissioning trust funds | (665 | ) | | (489 | ) |
Other | (40 | ) | | (32 | ) |
Net cash used for investing activities | (1,457 | ) | | (1,337 | ) |
Financing Activities | | | |
Issuance of long-term debt, net of issuance costs | 1,289 |
| | 768 |
|
Redemption of long-term debt | (1,222 | ) | | (855 | ) |
Short-term borrowings, net | 522 |
| | 31 |
|
Issuance of common stock | — |
| | 29 |
|
Repurchase of common stock | (52 | ) | | — |
|
Dividends on common stock | (348 | ) | | (329 | ) |
Other | (22 | ) | | (16 | ) |
Net cash from (used for) financing activities | 167 |
| | (372 | ) |
Net Increase in Cash and Cash Equivalents | 8 |
| | 6 |
|
Cash and Cash Equivalents at Beginning of Period | 52 |
| | 65 |
|
Cash and Cash Equivalents at End of Period | $ | 60 |
| | $ | 71 |
|
| | | |
Supplemental disclosure of non-cash investing and financing activities | | | |
Plant and equipment expenditures in accounts payable | $ | 192 |
| | $ | 263 |
|
See Notes to Consolidated Financial Statements (Unaudited)
DTE Energy Company
Consolidated Statements of Changes in Equity (Unaudited)
|
| | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | Accumulated Other Comprehensive Loss | | Non-Controlling Interests | | |
| Common Stock | | Retained Earnings | | | | |
| Shares | | Amount | | | | | Total |
| (Dollars in millions, shares in thousands) |
Balance, December 31, 2013 | 177,087 |
| | $ | 3,907 |
| | $ | 4,150 |
| | $ | (136 | ) | | $ | 33 |
| | $ | 7,954 |
|
Net income | — |
| | — |
| | 606 |
| | — |
| | 4 |
| | 610 |
|
Dividends declared on common stock | — |
| | — |
| | (354 | ) | | — |
| | — |
| | (354 | ) |
Repurchase of common stock | (713 | ) | | (52 | ) | | — |
| | — |
| | — |
| | (52 | ) |
Benefit obligations, net of tax | — |
| | — |
| | — |
| | 3 |
| | — |
| | 3 |
|
Net change in unrealized losses on investments, net of tax | — |
| | — |
| | — |
| | 1 |
| | — |
| | 1 |
|
Foreign currency translation, net of tax | — |
| | — |
| | — |
| | (1 | ) | | — |
| | (1 | ) |
Stock-based compensation, distributions to noncontrolling interests and other | 617 |
| | 45 |
| | — |
| | — |
| | (20 | ) | | 25 |
|
Balance, September 30, 2014 | 176,991 |
| | $ | 3,900 |
| | $ | 4,402 |
| | $ | (133 | ) | | $ | 17 |
| | $ | 8,186 |
|
See Notes to Consolidated Financial Statements (Unaudited)
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited)
NOTE 1 — ORGANIZATION AND BASIS OF PRESENTATION
Corporate Structure
DTE Energy owns the following businesses:
| |
• | DTE Electric, an electric utility engaged in the generation, purchase, distribution and sale of electricity to approximately 2.1 million customers in southeastern Michigan; |
| |
• | DTE Gas, a natural gas utility engaged in the purchase, storage, transportation, distribution and sale of natural gas to approximately 1.2 million customers throughout Michigan and the sale of storage and transportation capacity; and |
| |
• | Other businesses involved in 1) natural gas pipelines, gathering and storage; 2) power and industrial projects; and 3) energy marketing and trading operations. |
DTE Electric and DTE Gas are regulated by the MPSC. Certain activities of DTE Electric and DTE Gas, as well as various other aspects of businesses under DTE Energy are regulated by the FERC. In addition, the Company is regulated by other federal and state regulatory agencies including the NRC, the EPA, the MDEQ and the CFTC.
References in this Report to “we”, “us”, “our”, “Company” or “DTE” are to DTE Energy and its subsidiaries, collectively.
Basis of Presentation
These Consolidated Financial Statements should be read in conjunction with the Notes to Consolidated Financial Statements included in the 2013 Annual Report on Form 10-K.
The accompanying Consolidated Financial Statements are prepared using accounting principles generally accepted in the United States of America. These accounting principles require management to use estimates and assumptions that impact reported amounts of assets, liabilities, revenues and expenses, and the disclosure of contingent assets and liabilities. Actual results may differ from the Company’s estimates.
The Consolidated Financial Statements are unaudited, but in the Company's opinion include all adjustments necessary to present a fair statement of the results for the interim periods. All adjustments are of a normal recurring nature, except as otherwise disclosed in these Consolidated Financial Statements and Notes to Consolidated Financial Statements. Financial results for this interim period are not necessarily indicative of results that may be expected for any other interim period or for the fiscal year ending December 31, 2014.
Prior year balances were revised to reflect an increase of $437 million in the Consolidated Statements of Cash Flows line items for (i) Proceeds from sale of nuclear decommissioning trust funds, and (ii) Investment in nuclear decommissioning trust funds for the nine months ended September 30, 2013. These revisions were needed to properly state the gross purchases and sales activity in the nuclear decommissioning trust fund for the nine months ended September 30, 2013. The total of Net cash used for investing activities for the nine months ended September 30, 2013 was unchanged by these revisions. The revisions noted above are not deemed material, individually or in the aggregate, to the prior period Consolidated Financial Statements.
Principles of Consolidation
The Company consolidates all majority-owned subsidiaries and investments in entities in which it has controlling influence. Non-majority owned investments are accounted for using the equity method when the Company is able to influence the operating policies of the investee. When the Company does not influence the operating policies of an investee, the cost method is used. These Consolidated Financial Statements also reflect the Company's proportionate interests in certain jointly owned utility plants. The Company eliminates all intercompany balances and transactions.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
The Company evaluates whether an entity is a VIE whenever reconsideration events occur. The Company consolidates VIEs for which it is the primary beneficiary. If the Company is not the primary beneficiary and an ownership interest is held, the VIE is accounted for under the equity method of accounting. When assessing the determination of the primary beneficiary, the Company considers all relevant facts and circumstances, including: the power, through voting or similar rights, to direct the activities of the VIE that most significantly impact the VIE's economic performance and the obligation to absorb the expected losses and/or the right to receive the expected returns of the VIE. The Company performs ongoing reassessments of all VIEs to determine if the primary beneficiary status has changed.
Legal entities within the Company's Power and Industrial Projects segment enter into long-term contractual arrangements with customers to supply energy-related products or services. The entities are generally designed to pass-through the commodity risk associated with these contracts to the customers, with the Company retaining operational and customer default risk. These entities generally are VIEs and consolidated when the Company is the primary beneficiary. In addition, we have interests in certain VIEs through which we share control of all significant activities for those entities with our partners, and therefore are accounted for under the equity method.
The Company has variable interests in VIEs through certain of its long-term purchase and sale contracts. As of September 30, 2014, the carrying amount of assets and liabilities in the Consolidated Statements of Financial Position that relate to its variable interests under long-term purchase and sale contracts are predominately related to working capital accounts and generally represent the amounts owed by or to the Company for the deliveries associated with the current billing cycle under the contracts. The Company has not provided any significant form of financial support associated with these long-term contracts. There is no significant potential exposure to loss as a result of its variable interests through these long-term purchase and sale contracts.
In 2001, DTE Electric financed a regulatory asset related to Fermi 2 and certain other regulatory assets through the sale of rate reduction bonds by a wholly-owned special purpose entity, Securitization. DTE Electric performs servicing activities including billing and collecting surcharge revenue for Securitization. This entity is a VIE and is consolidated by the Company.
The maximum risk exposure for consolidated VIEs is reflected on the Company's Consolidated Statements of Financial Position. For non-consolidated VIEs, the maximum risk exposure is generally limited to its investment and amounts which it has guaranteed.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
The following table summarizes the major balance sheet items for consolidated VIEs as of September 30, 2014 and December 31, 2013. All assets and liabilities of a consolidated VIE are presented where it has been determined that a consolidated VIE has either (1) assets that can be used only to settle obligations of the VIE or (2) liabilities for which creditors do not have recourse to the general credit of the primary beneficiary. VIEs, in which the Company holds a majority voting interest and is the primary beneficiary, that meet the definition of a business and whose assets can be used for purposes other than the settlement of the VIE's obligations have been excluded from the table below.
|
| | | | | | | | | | | | | | | | | | | | | | | |
| September 30, 2014 | December 31, 2013 |
| Securitization | | Other | | Total | | Securitization | | Other | | Total |
| (In millions) |
ASSETS | | | | | | | | | | | |
Cash and cash equivalents | $ | — |
| | $ | 12 |
| | $ | 12 |
| | $ | — |
| | $ | 12 |
| | $ | 12 |
|
Restricted cash | 40 |
| | 6 |
| | 46 |
| | 100 |
| | 8 |
| | 108 |
|
Accounts receivable | 40 |
| | 15 |
| | 55 |
| | 34 |
| | 16 |
| | 50 |
|
Inventories | — |
| | 34 |
| | 34 |
| | — |
| | 118 |
| | 118 |
|
Property, plant and equipment, net | — |
| | 84 |
| | 84 |
| | — |
| | 99 |
| | 99 |
|
Securitized regulatory assets | 86 |
| | — |
| | 86 |
| | 231 |
| | — |
| | 231 |
|
Other current and long-term assets | 2 |
| | 7 |
| | 9 |
| | 4 |
| | 9 |
| | 13 |
|
| $ | 168 |
| | $ | 158 |
| | $ | 326 |
| | $ | 369 |
| | $ | 262 |
| | $ | 631 |
|
| | | | | | | | | | | |
LIABILITIES | | | | | | | | | | | |
Accounts payable and accrued current liabilities | $ | 1 |
| | $ | 9 |
| | $ | 10 |
| | $ | 7 |
| | $ | 23 |
| | $ | 30 |
|
Current portion long-term debt, including capital leases | 105 |
| | 9 |
| | 114 |
| | 196 |
| | 9 |
| | 205 |
|
Current regulatory liabilities | 44 |
| | — |
| | 44 |
| | 43 |
| | — |
| | 43 |
|
Mortgage bonds, notes and other | — |
| | 17 |
| | 17 |
| | — |
| | 21 |
| | 21 |
|
Securitization bonds | — |
| | — |
| | — |
| | 105 |
| | — |
| | 105 |
|
Capital lease obligations | — |
| | 3 |
| | 3 |
| | — |
| | 7 |
| | 7 |
|
Other current and long-term liabilities | 9 |
| | 5 |
| | 14 |
| | 8 |
| | 6 |
| | 14 |
|
| $ | 159 |
| | $ | 43 |
| | $ | 202 |
| | $ | 359 |
| | $ | 66 |
| | $ | 425 |
|
Amounts for non-consolidated VIEs as of September 30, 2014 and December 31, 2013 are as follows:
|
| | | | | | | |
| September 30, 2014 | | December 31, 2013 |
| (In millions) |
Other investments | $ | 134 |
| | $ | 141 |
|
Notes receivable | $ | 14 |
| | $ | 8 |
|
NOTE 2 — SIGNIFICANT ACCOUNTING POLICIES
Other Income
Other income is recognized for non-operating income such as equity earnings, allowance for equity funds used during construction and contract services. Power & Industrial Projects also recognizes Other income in connection with the sale of membership interests in reduced emissions fuel facilities to investors. In exchange for the cash received, the investors will receive a portion of the economic attributes of the facilities, including income tax attributes. The transactions are not treated as a sale of membership interests for financial reporting purposes. Other income is considered earned when refined coal is produced and tax credits are generated. Power & Industrial Projects recognized approximately $25 million of Other income for the three months ended September 30, 2014 and 2013, respectively, and approximately $57 million and $60 million of Other income for the nine months ended September 30, 2014 and 2013, respectively.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Changes in Accumulated Other Comprehensive Loss
For the three and nine months ended September 30, 2014 and 2013, reclassifications out of accumulated other comprehensive loss for the Company were not material. Changes in accumulated other comprehensive loss are presented in the Consolidated Statements of Changes in Equity.
Intangible Assets
The Company has certain intangible assets relating to emission allowances, renewable energy credits and non-utility contracts as shown below:
|
| | | | | | | |
| September 30, 2014 | | December 31, 2013 |
| (In millions) |
Emission allowances | $ | 1 |
| | $ | 2 |
|
Renewable energy credits | 50 |
| | 51 |
|
Contract intangible assets | 123 |
| | 126 |
|
| 174 |
| | 179 |
|
Less accumulated amortization | 54 |
| | 45 |
|
Intangible assets, net | 120 |
| | 134 |
|
Less current intangible assets | 12 |
| | 12 |
|
| $ | 108 |
| | $ | 122 |
|
Emission allowances and renewable energy credits are charged to expense, using average cost, as the allowances and credits are consumed in the operation of the business. The Company amortizes contract intangible assets on a straight-line basis over the expected period of benefit, ranging from 1 to 28 years.
Income Taxes
The Company's effective tax rate for the three months ended September 30, 2014 was 12% as compared to 28% for the three months ended September 30, 2013. The Company's effective tax rate for the nine months ended September 30, 2014 was 27% as compared to 29% for the nine months ended September 30, 2013. The 16% decrease in the effective tax rate for the three months ended September 30, 2014 is due to higher production tax credits. The 2% decrease in effective tax rate for the nine months ended September 30, 2014 is due to higher production tax credits, partially offset by $8 million of deferred tax expense resulting from New York state income tax reform enacted on March 31, 2014.
The Company had $2 million of unrecognized tax benefits at September 30, 2014, that, if recognized, would favorably impact its effective tax rate. The Company believes that it is possible that there will be a decrease in the unrecognized tax benefits of up to $1 million in the next twelve months.
NOTE 3 — NEW ACCOUNTING PRONOUNCEMENTS
In May 2014, the FASB issued Accounting Standards Update (ASU) No. 2014-09, Revenue from Contracts with Customers. The objectives of this ASU are to improve upon revenue recognition requirements by providing a single comprehensive model to determine the measurement of revenue and timing of recognition. The core principle is that an entity will recognize revenue to depict the transfer of goods or services to customers at an amount that the entity expects to be entitled to in exchange for those goods or services. This ASU also requires expanded qualitative and quantitative disclosures regarding the nature, amount, timing, and uncertainty of revenues and cash flows arising from contracts with customers. The revenue standard is effective for the first interim period within annual reporting periods beginning after December 15, 2016 and is to be applied retrospectively. Early adoption is not permitted. The Company is currently assessing the impact of this ASU on its Consolidated Financial Statements.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
NOTE 4 — FAIR VALUE
Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date in a principal or most advantageous market. Fair value is a market-based measurement that is determined based on inputs, which refer broadly to assumptions that market participants use in pricing assets or liabilities. These inputs can be readily observable, market corroborated or generally unobservable inputs. The Company makes certain assumptions it believes that market participants would use in pricing assets or liabilities, including assumptions about risk, and the risks inherent in the inputs to valuation techniques. Credit risk of the Company and its counterparties is incorporated in the valuation of assets and liabilities through the use of credit reserves, the impact of which was immaterial at September 30, 2014 and December 31, 2013. The Company believes it uses valuation techniques that maximize the use of observable market-based inputs and minimize the use of unobservable inputs.
A fair value hierarchy has been established that prioritizes the inputs to valuation techniques used to measure fair value in three broad levels. The fair value hierarchy gives the highest priority to quoted prices (unadjusted) in active markets for identical assets or liabilities (Level 1) and the lowest priority to unobservable inputs (Level 3). In some cases, the inputs used to measure fair value might fall in different levels of the fair value hierarchy. All assets and liabilities are required to be classified in their entirety based on the lowest level of input that is significant to the fair value measurement in its entirety. Assessing the significance of a particular input may require judgment considering factors specific to the asset or liability, and may affect the valuation of the asset or liability and its placement within the fair value hierarchy. The Company classifies fair value balances based on the fair value hierarchy defined as follows:
| |
• | Level 1 — Consists of unadjusted quoted prices in active markets for identical assets or liabilities that the Company has the ability to access as of the reporting date. |
| |
• | Level 2 — Consists of inputs other than quoted prices included within Level 1 that are directly observable for the asset or liability or indirectly observable through corroboration with observable market data. |
| |
• | Level 3 — Consists of unobservable inputs for assets or liabilities whose fair value is estimated based on internally developed models or methodologies using inputs that are generally less readily observable and supported by little, if any, market activity at the measurement date. Unobservable inputs are developed based on the best available information and subject to cost-benefit constraints. |
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
The following table presents assets and liabilities measured and recorded at fair value on a recurring basis as of September 30, 2014 and December 31, 2013:
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| September 30, 2014 | | December 31, 2013 |
| Level 1 | | Level 2 | | Level 3 | | Netting (a) | | Net Balance | | Level 1 | | Level 2 | | Level 3 | | Netting (a) | | Net Balance |
| (In millions) |
Assets: | | | | | | | | | | | | | | | | | | | |
Cash equivalents (b) | $ | 11 |
| | $ | 51 |
| | $ | — |
| | $ | — |
| | $ | 62 |
| | $ | 10 |
| | $ | 115 |
| | $ | — |
| | $ | — |
| | $ | 125 |
|
Nuclear decommissioning trusts | 789 |
| | 440 |
| | — |
| | — |
| | 1,229 |
| | 779 |
| | 412 |
| | — |
| | — |
| | 1,191 |
|
Other investments (c) (d) | 95 |
| | 51 |
| | — |
| | — |
| | 146 |
| | 92 |
| | 44 |
| | — |
| | — |
| | 136 |
|
Derivative assets: | |
| | |
| | |
| | |
| | | | |
| | |
| | |
| | |
| | |
Commodity Contracts: | |
| | |
| | |
| | |
| | | | | | | | | | | | |
Natural Gas | 118 |
| | 98 |
| | 38 |
| | (225 | ) | | 29 |
| | 273 |
| | 89 |
| | 34 |
| | (382 | ) | | 14 |
|
Electricity | — |
| | 312 |
| | 74 |
| | (322 | ) | | 64 |
| | — |
| | 261 |
| | 139 |
| | (291 | ) | | 109 |
|
Other | 46 |
| | 2 |
| | 4 |
| | (48 | ) | | 4 |
| | 33 |
| | 1 |
| | 3 |
| | (34 | ) | | 3 |
|
Other derivative contracts (e) | — |
| | 1 |
| | — |
| | (1 | ) | | — |
| | — |
| | — |
| | — |
| | — |
| | — |
|
Total derivative assets | 164 |
| | 413 |
| | 116 |
| | (596 | ) | | 97 |
| | 306 |
| | 351 |
| | 176 |
| | (707 | ) | | 126 |
|
Total | $ | 1,059 |
| | $ | 955 |
| | $ | 116 |
| | $ | (596 | ) | | $ | 1,534 |
| | $ | 1,187 |
| | $ | 922 |
| | $ | 176 |
| | $ | (707 | ) | | $ | 1,578 |
|
| | | | | | | | | | | | | | | | | | | |
Liabilities: | | | | | | | | | | | | | | | | | | | |
Derivative liabilities: | | | | | | | | | | | | | | | | | | | |
Commodity Contracts: | |
| | |
| | |
| | |
| | | | |
| | |
| | |
| | |
| | |
Natural Gas | $ | (129 | ) | | $ | (147 | ) | | $ | (66 | ) | | $ | 268 |
| | $ | (74 | ) | | $ | (277 | ) | | $ | (140 | ) | | $ | (86 | ) | | $ | 395 |
| | $ | (108 | ) |
Electricity | — |
| | (303 | ) | | (91 | ) | | 317 |
| | (77 | ) | | — |
| | (272 | ) | | (126 | ) | | 269 |
| | (129 | ) |
Other | (39 | ) | | (8 | ) | | (1 | ) | | 48 |
| | — |
| | (32 | ) | | (2 | ) | | — |
| | 34 |
| | — |
|
Other derivative contracts (e) | — |
| | (3 | ) | | — |
| | 1 |
| | (2 | ) | | — |
| | (1 | ) | | — |
| | — |
| | (1 | ) |
Total derivative liabilities | (168 | ) | | (461 | ) | | (158 | ) | | 634 |
| | (153 | ) | | (309 | ) | | (415 | ) | | (212 | ) | | 698 |
| | (238 | ) |
Total | $ | (168 | ) | | $ | (461 | ) | | $ | (158 | ) | | $ | 634 |
| | $ | (153 | ) | | $ | (309 | ) | | $ | (415 | ) | | $ | (212 | ) | | $ | 698 |
| | $ | (238 | ) |
Net Assets (Liabilities) at the end of the period | $ | 891 |
| | $ | 494 |
| | $ | (42 | ) | | $ | 38 |
| | $ | 1,381 |
| | $ | 878 |
| | $ | 507 |
| | $ | (36 | ) | | $ | (9 | ) | | $ | 1,340 |
|
Assets: | | | | | | | | | | | | | | | | | | | |
Current | $ | 155 |
| | $ | 419 |
| | $ | 93 |
| | $ | (537 | ) | | $ | 130 |
| | $ | 277 |
| | $ | 400 |
| | $ | 139 |
| | $ | (592 | ) | | $ | 224 |
|
Noncurrent (f) | 904 |
| | 536 |
| | 23 |
| | (59 | ) | | 1,404 |
| | 910 |
| | 522 |
| | 37 |
| | (115 | ) | | 1,354 |
|
Total Assets | $ | 1,059 |
| | $ | 955 |
| | $ | 116 |
| | $ | (596 | ) | | $ | 1,534 |
| | $ | 1,187 |
| | $ | 922 |
| | $ | 176 |
| | $ | (707 | ) | | $ | 1,578 |
|
Liabilities: | | | | | | | | | | | | | | | | | | | |
Current | $ | (146 | ) | | $ | (405 | ) | | $ | (145 | ) | | $ | 562 |
| | $ | (134 | ) | | $ | (268 | ) | | $ | (328 | ) | | $ | (177 | ) | | $ | 578 |
| | $ | (195 | ) |
Noncurrent | (22 | ) | | (56 | ) | | (13 | ) | | 72 |
| | (19 | ) | | (41 | ) | | (87 | ) | | (35 | ) | | 120 |
| | (43 | ) |
Total Liabilities | $ | (168 | ) | | $ | (461 | ) | | $ | (158 | ) | | $ | 634 |
| | $ | (153 | ) | | $ | (309 | ) | | $ | (415 | ) | | $ | (212 | ) | | $ | 698 |
| | $ | (238 | ) |
Net Assets (Liabilities) at the end of the period | $ | 891 |
| | $ | 494 |
| | $ | (42 | ) | | $ | 38 |
| | $ | 1,381 |
| | $ | 878 |
| | $ | 507 |
| | $ | (36 | ) | | $ | (9 | ) | | $ | 1,340 |
|
_______________________________________
| |
(a) | Amounts represent the impact of master netting agreements that allow the Company to net gain and loss positions and cash collateral held or placed with the same counterparties. |
| |
(b) | At September 30, 2014, available-for-sale securities of $62 million included $46 million and $16 million of cash equivalents included in Restricted cash and Other investments on the Consolidated Statements of Financial Position, respectively. At December 31, 2013, available-for-sale securities of $125 million, included $109 million and $16 million of cash equivalents included in Restricted cash and Other investments on the Consolidated Statements of Financial Position, respectively. |
| |
(c) | Excludes cash surrender value of life insurance investments. |
| |
(d) | Available-for-sale equity securities of $7 million at both September 30, 2014 and December 31, 2013, are included in Other investments on the Consolidated Statements of Financial Position. |
| |
(e) | Primarily includes Foreign currency exchange contracts. |
| |
(f) | Includes $146 million and $136 million at September 30, 2014 and December 31, 2013, respectively, of other investments that are included in the Consolidated Statements of Financial Position in Other investments. |
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Cash Equivalents
Cash equivalents include investments with maturities of three months or less when purchased. The cash equivalents shown in the fair value table are comprised of short-term investments and money market funds.
Nuclear Decommissioning Trusts and Other Investments
The nuclear decommissioning trusts and other investments hold debt and equity securities directly and indirectly through institutional mutual funds. Exchange-traded debt and equity securities held directly are valued using quoted market prices in actively traded markets. The institutional mutual funds hold exchange-traded equity or debt securities and are valued based on stated net asset values (NAV). Non-exchange-traded fixed income securities are valued based upon quotations available from brokers or pricing services. A primary price source is identified by asset type, class or issue for each security. The trustee monitors prices supplied by pricing services and may use a supplemental price source or change the primary price source of a given security if the trustee determines that another price source is considered to be preferable. DTE Energy has obtained an understanding of how these prices are derived, including the nature and observability of the inputs used in deriving such prices. Additionally, DTE Energy selectively corroborates the fair value of securities by comparison of market-based price sources. Investment policies and procedures are determined by the Company's Trust Investments Department which reports to the Company's Vice President and Treasurer.
Derivative Assets and Liabilities
Derivative assets and liabilities are comprised of physical and financial derivative contracts, including futures, forwards, options and swaps that are both exchange-traded and over-the-counter traded contracts. Various inputs are used to value derivatives depending on the type of contract and availability of market data. Exchange-traded derivative contracts are valued using quoted prices in active markets. DTE Energy considers the following criteria in determining whether a market is considered active: frequency in which pricing information is updated, variability in pricing between sources or over time and the availability of public information. Other derivative contracts are valued based upon a variety of inputs including commodity market prices, broker quotes, interest rates, credit ratings, default rates, market-based seasonality and basis differential factors. DTE Energy monitors the prices that are supplied by brokers and pricing services and may use a supplemental price source or change the primary price source of an index if prices become unavailable or another price source is determined to be more representative of fair value. DTE Energy has obtained an understanding of how these prices are derived. Additionally, DTE Energy selectively corroborates the fair value of its transactions by comparison of market-based price sources. Mathematical valuation models are used for derivatives for which external market data is not readily observable, such as contracts which extend beyond the actively traded reporting period. The Company has established a Risk Management Committee whose responsibilities include directly or indirectly ensuring all valuation methods are applied in accordance with predefined policies. The development and maintenance of our forward price curves has been assigned to our Risk Management Department, which is separate and distinct from the trading functions within the Company.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
The following tables present the fair value reconciliation of Level 3 assets and liabilities measured at fair value on a recurring basis for the three and nine months ended September 30, 2014 and 2013:
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Three Months Ended September 30, 2014 | | Three Months Ended September 30, 2013 |
| Natural Gas | | Electricity | | Other | | Total | | Natural Gas | | Electricity | | Other | | Total |
| (In millions) |
Net Assets (Liabilities) as of June 30 | $ | (20 | ) | | $ | (27 | ) | | $ | 7 |
| | $ | (40 | ) | | $ | (30 | ) | | $ | 12 |
| | $ | 2 |
| | $ | (16 | ) |
Transfers into Level 3 | 1 |
| | — |
| | — |
| | 1 |
| | — |
| | — |
| | — |
| | — |
|
Transfers out of Level 3 | (4 | ) | | — |
| | — |
| | (4 | ) | | — |
| | (1 | ) | | — |
| | (1 | ) |
Total gains (losses): | | | | | | | | | | | | | | | |
Included in earnings | (2 | ) | | 13 |
| | (1 | ) | | 10 |
| | 8 |
| | 17 |
| | — |
| | 25 |
|
Recorded in regulatory assets/liabilities | — |
| | — |
| | (3 | ) | | (3 | ) | | — |
| | — |
| | 3 |
| | 3 |
|
Purchases, issuances and settlements: | | | | | | | | | | | | | | | |
Settlements | (3 | ) | | (3 | ) | | — |
| | (6 | ) | | 8 |
| | (23 | ) | | — |
| | (15 | ) |
Net Assets (Liabilities) as of September 30 | $ | (28 | ) | | $ | (17 | ) | | $ | 3 |
| | $ | (42 | ) | | $ | (14 | ) | | $ | 5 |
| | $ | 5 |
| | $ | (4 | ) |
The amount of total gains (losses) included in net income attributed to the change in unrealized gains (losses) related to assets and liabilities held at September 30, 2014 and 2013 and reflected in Operating revenues and Fuel, purchased power and gas in the Consolidated Statements of Operations | $ | (7 | ) | | $ | 14 |
| | $ | (1 | ) | | $ | 6 |
| | $ | (8 | ) | | $ | 8 |
| | $ | — |
| | $ | — |
|
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Nine Months Ended September 30, 2014 | | Nine Months Ended September 30, 2013 |
| Natural Gas | | Electricity | | Other | | Total | | Natural Gas | | Electricity | | Other | | Total |
| (In millions) |
Net Assets (Liabilities) as of December 31 | $ | (52 | ) | | $ | 13 |
| | $ | 3 |
| | $ | (36 | ) | | $ | (38 | ) | | $ | 23 |
| | $ | 2 |
| | $ | (13 | ) |
Transfers into Level 3 | — |
| | — |
| | — |
| | — |
| | — |
| | — |
| | — |
| | — |
|
Transfers out of Level 3 | 2 |
| | — |
| | — |
| | 2 |
| | (2 | ) | | — |
| | — |
| | (2 | ) |
Total gains (losses): | | | | | | | | | | | | | | | |
Included in earnings | (45 | ) | | 26 |
| | (2 | ) | | (21 | ) | | (1 | ) | | 44 |
| | — |
| | 43 |
|
Recorded in regulatory assets/liabilities | — |
| | — |
| | 9 |
| | 9 |
| | — |
| | — |
| | 7 |
| | 7 |
|
Purchases, issuances and settlements: | | | | | | | | | | | | | | | |
Purchases | — |
| | 1 |
| | — |
| | 1 |
| | — |
| | (1 | ) | | — |
| | (1 | ) |
Issuances | — |
| | (2 | ) | | — |
| | (2 | ) | | — |
| | — |
| | — |
| | — |
|
Settlements | 67 |
| | (55 | ) | | (7 | ) | | 5 |
| | 27 |
| | (61 | ) | | (4 | ) | | (38 | ) |
Net Assets (Liabilities) as of September 30 | $ | (28 | ) | | $ | (17 | ) | | $ | 3 |
| | $ | (42 | ) | | $ | (14 | ) | | $ | 5 |
| | $ | 5 |
| | $ | (4 | ) |
The amount of total gains (losses) included in net income attributed to the change in unrealized gains (losses) related to assets and liabilities held at September 30, 2014 and 2013 and reflected in Operating revenues and Fuel, purchased power and gas in the Consolidated Statements of Operations | $ | (23 | ) | | $ | (6 | ) | | $ | (1 | ) | | $ | (30 | ) | | $ | (14 | ) | | $ | 36 |
| | $ | — |
| | $ | 22 |
|
Derivatives are transferred between levels primarily due to changes in the source data used to construct price curves as a result of changes in market liquidity. Transfers in and transfers out are reflected as if they had occurred at the beginning of the period. There were no transfers between levels 1 and 2 during the three and nine months ended September 30, 2014 and 2013.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
The following table presents the unobservable inputs related to Level 3 assets and liabilities as of September 30, 2014:
|
| | | | | | | | | | | | | | | | | | | | | | | | |
| | September 30, 2014 | | | | | | | | | | |
Commodity Contracts | | Derivative Assets | | Derivative Liabilities | | Valuation Techniques | | Unobservable Input | | Range | | Weighted Average |
| | (In millions) | | | | | | | | | | |
Natural Gas | | $ | 38 |
| | $ | (66 | ) | | Discounted Cash Flow | | Forward basis price (per MMBtu) | | $ | (2.28 | ) — | | $ | 9.97 | /MMBtu | | $ | (0.13 | )/MMBtu |
Electricity | | $ | 74 |
| | $ | (91 | ) | | Discounted Cash Flow | | Forward basis price (per MWh) | | $ | (15 | ) — | | $ | 24 | /MWh | | $ | 4 | /MWh |
The following table presents the unobservable inputs related to Level 3 assets and liabilities as of December 31, 2013:
|
| | | | | | | | | | | | | | | | | | | | | | | | |
| | December 31, 2013 | | | | | | | | | | |
Commodity Contracts | | Derivative Assets | | Derivative Liabilities | | Valuation Techniques | | Unobservable Input | | Range | | Weighted Average |
| | (In millions) | | | | | | | | | | |
Natural Gas | | $ | 34 |
| | $ | (86 | ) | | Discounted Cash Flow | | Forward basis price (per MMBtu) | | $ | (0.88 | ) — | | $ | 5.07 | /MMBtu | | $ | (0.16 | )/MMBtu |
Electricity | | $ | 139 |
| | $ | (126 | ) | | Discounted Cash Flow | | Forward basis price (per MWh) | | $ | (7 | ) — | | $ | 15 | /MWh | | $ | 3 | /MWh |
The unobservable inputs used in the fair value measurement of the electricity and natural gas commodity types consist of inputs that are less observable due in part to lack of available broker quotes, supported by little, if any, market activity at the measurement date or are based on internally developed models. Certain basis prices (i.e. the difference in pricing between two locations) included in the valuation of natural gas and electricity contracts were deemed unobservable.
The inputs listed above would have a direct impact on the fair values of the above security types if they were adjusted. A significant increase (decrease) in the basis price would result in a higher (lower) fair value for long positions, with offsetting impacts to short positions.
Fair Value of Financial Instruments
The fair value of financial instruments included in the table below is determined by using quoted market prices when available. When quoted prices are not available, pricing services may be used to determine the fair value with reference to observable interest rate indexes. DTE Energy has obtained an understanding of how the fair values are derived. DTE Energy also selectively corroborates the fair value of its transactions by comparison of market-based price sources. Discounted cash flow analyses based upon estimated current borrowing rates are also used to determine fair value when quoted market prices are not available. The fair values of notes receivable, excluding capital leases, are estimated using discounted cash flow techniques that incorporate market interest rates as well as assumptions about the remaining life of the loans and credit risk. Depending on the information available, other valuation techniques may be used that rely on internal assumptions and models. Valuation policies and procedures are determined by DTE Energy's Treasury Department which reports to the Company's Vice President and Treasurer.
The following table presents the carrying amount and fair value of financial instruments as of September 30, 2014 and December 31, 2013:
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| September 30, 2014 | | December 31, 2013 |
| Carrying | | Fair Value | | Carrying | | Fair Value |
| Amount | | Level 1 | | Level 2 | | Level 3 | | Amount | | Level 1 | | Level 2 | | Level 3 |
| (In millions) |
Notes receivable, excluding capital leases | $ | 45 |
| | $ | — |
| | $ | — |
| | $ | 45 |
| | $ | 41 |
| | $ | — |
| | $ | — |
| | $ | 41 |
|
Dividends payable | $ | 122 |
| | $ | 122 |
| | $ | — |
| | $ | — |
| | $ | 116 |
| | $ | 116 |
| | $ | — |
| | $ | — |
|
Short-term borrowings | $ | 653 |
| | $ | — |
| | $ | 653 |
| | $ | — |
| | $ | 131 |
| | $ | — |
| | $ | 131 |
| | $ | — |
|
Long-term debt, excluding capital leases | $ | 8,171 |
| | $ | 474 |
| | $ | 7,107 |
| | $ | 1,412 |
| | $ | 8,094 |
| | $ | 425 |
| | $ | 7,551 |
| | $ | 499 |
|
For further fair value information on financial and derivative instruments see Note 5 to the Consolidated Financial Statements, "Financial and Other Derivative Instruments".
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Nuclear Decommissioning Trust Funds
DTE Electric has a legal obligation to decommission its nuclear power plants following the expiration of their operating licenses. This obligation is reflected as an asset retirement obligation on the Consolidated Statements of Financial Position. Rates approved by the MPSC provide for the recovery of decommissioning costs of Fermi 2 and the disposal of low-level radioactive waste. DTE Electric is continuing to fund FERC jurisdictional amounts for decommissioning even though explicit provisions are not included in FERC rates.
The following table summarizes the fair value of the nuclear decommissioning trust fund assets:
|
| | | | | | | |
| September 30, 2014 | | December 31, 2013 |
| (In millions) |
Fermi 2 | $ | 1,205 |
| | $ | 1,172 |
|
Fermi 1 | 3 |
| | 3 |
|
Low level radioactive waste | 21 |
| | 16 |
|
Total | $ | 1,229 |
| | $ | 1,191 |
|
The costs of securities sold are determined on the basis of specific identification. The following table sets forth the gains and losses and proceeds from the sale of securities by the nuclear decommissioning trust funds:
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Realized gains | $ | 8 |
| | $ | 11 |
| | $ | 24 |
| | $ | 30 |
|
Realized losses | $ | (3 | ) | | $ | (11 | ) | | $ | (14 | ) | | $ | (25 | ) |
Proceeds from sales of securities | $ | 177 |
| | $ | 168 |
| | $ | 652 |
| | $ | 477 |
|
Realized gains and losses from the sale of securities for the Fermi 2 and the low-level radioactive waste funds are recorded to the Regulatory asset and Nuclear decommissioning liability. The following table sets forth the fair value and unrealized gains for the nuclear decommissioning trust funds:
|
| | | | | | | | | | | | | | | |
| September 30, 2014 | | December 31, 2013 |
| Fair Value | | Unrealized Gains | | Fair Value | | Unrealized Gains |
| (In millions) |
Equity securities | $ | 748 |
| | $ | 209 |
| | $ | 730 |
| | $ | 201 |
|
Debt securities | 465 |
| | 18 |
| | 442 |
| | 12 |
|
Cash and cash equivalents | 16 |
| | — |
| | 19 |
| | — |
|
| $ | 1,229 |
| | $ | 227 |
| | $ | 1,191 |
| | $ | 213 |
|
The debt securities at September 30, 2014 and December 31, 2013 had an average maturity of approximately 7 years, respectively. Securities held in the nuclear decommissioning trust funds are classified as available-for-sale. As DTE Electric does not have the ability to hold impaired investments for a period of time sufficient to allow for the anticipated recovery of market value, all unrealized losses are considered to be other-than-temporary impairments.
Unrealized losses incurred by the Fermi 2 trust are recognized as a Regulatory asset. DTE Electric recognized $37 million and $31 million of unrealized losses as Regulatory assets at September 30, 2014 and December 31, 2013, respectively.
Other Securities
At September 30, 2014 and December 31, 2013, the securities were comprised primarily of money market and equity securities. During the three and nine months ended September 30, 2014 and 2013, no amounts of unrealized losses on available-for-sale securities were reclassified out of other comprehensive income and realized into net income for the periods. Gains related to trading securities held at September 30, 2014 and 2013 were $9 million and $14 million, respectively.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
NOTE 5 — FINANCIAL AND OTHER DERIVATIVE INSTRUMENTS
The Company recognizes all derivatives at their fair value as Derivative assets or liabilities on the Consolidated Statements of Financial Position unless they qualify for certain scope exceptions, including the normal purchases and normal sales exception. Further, derivatives that qualify and are designated for hedge accounting are classified as either hedges of a forecasted transaction or the variability of cash flows to be received or paid related to a recognized asset or liability (cash flow hedge), or as hedges of the fair value of a recognized asset or liability or of an unrecognized firm commitment (fair value hedge). For cash flow hedges, the portion of the derivative gain or loss that is effective in offsetting the change in the value of the underlying exposure is deferred in Accumulated other comprehensive income and later reclassified into earnings when the underlying transaction occurs. Gains or losses from the ineffective portion of cash flow hedges are recognized in earnings immediately. For fair value hedges, changes in fair values for the derivative and hedged item are recognized in earnings each period. For derivatives that do not qualify or are not designated for hedge accounting, changes in fair value are recognized in earnings each period.
The Company’s primary market risk exposure is associated with commodity prices, credit, and interest rates. The Company has risk management policies to monitor and manage market risks. The Company uses derivative instruments to manage some of the exposure. The Company uses derivative instruments for trading purposes in its Energy Trading segment. Contracts classified as derivative instruments include electricity, natural gas, oil and certain coal forwards, futures, options and swaps, and foreign currency exchange contracts. Items not classified as derivatives include natural gas inventory, pipeline transportation contracts, renewable energy credits and natural gas storage assets.
Electric — DTE Electric generates, purchases, distributes and sells electricity. DTE Electric uses forward energy contracts to manage changes in the price of electricity and fuel. Substantially all of these contracts meet the normal purchases and sales exemption and are therefore accounted for under the accrual method. Other derivative contracts are MTM and recoverable through the PSCR mechanism when settled. This results in the deferral of unrealized gains and losses as Regulatory assets or liabilities until realized.
Gas — DTE Gas purchases, stores, transports, distributes and sells natural gas and sells storage and transportation capacity. DTE Gas has fixed-priced contracts for portions of its expected natural gas supply requirements through March 2017. Substantially all of these contracts meet the normal purchases and sales exemption and are therefore accounted for under the accrual method. DTE Gas may also sell forward transportation and storage capacity contracts. Forward transportation and storage contracts are generally not derivatives and are therefore accounted for under the accrual method.
Gas Storage and Pipelines — This segment is primarily engaged in services related to the transportation and storage of natural gas. Primarily fixed-priced contracts are used in the marketing and management of transportation and storage services. Generally these contracts are not derivatives and are therefore accounted for under the accrual method.
Power and Industrial Projects — This segment manages and operates energy and pulverized coal projects, coke batteries, reduced emissions fuel projects, landfill gas recovery and power generation assets. Primarily fixed-price contracts are used in the marketing and management of the segment assets. These contracts are generally not derivatives and are therefore accounted for under the accrual method.
Energy Trading — Commodity Price Risk — Energy Trading markets and trades electricity, natural gas physical products and energy financial instruments, and provides energy and asset management services utilizing energy commodity derivative instruments. Forwards, futures, options and swap agreements are used to manage exposure to the risk of market price and volume fluctuations in its operations. These derivatives are accounted for by recording changes in fair value to earnings unless hedge accounting criteria are met.
Energy Trading — Foreign Currency Exchange Risk — Energy Trading has foreign currency exchange forward contracts to economically hedge fixed Canadian dollar commitments existing under natural gas and power purchase and sale contracts and natural gas transportation contracts. The Company enters into these contracts to mitigate price volatility with respect to fluctuations of the Canadian dollar relative to the U.S. dollar. These derivatives are accounted for by recording changes in fair value to earnings unless hedge accounting criteria are met.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Corporate and Other — Interest Rate Risk — The Company uses interest rate swaps, treasury locks and other derivatives to hedge the risk associated with interest rate market volatility.
Credit Risk — The utility and non-utility businesses are exposed to credit risk if customers or counterparties do not comply with their contractual obligations. The Company maintains credit policies that significantly minimize overall credit risk. These policies include an evaluation of potential customers’ and counterparties’ financial condition, credit rating, collateral requirements or other credit enhancements such as letters of credit or guarantees. The Company generally uses standardized agreements that allow the netting of positive and negative transactions associated with a single counterparty. The Company maintains a provision for credit losses based on factors surrounding the credit risk of its customers, historical trends, and other information. Based on the Company’s credit policies and its September 30, 2014 provision for credit losses, the Company’s exposure to counterparty nonperformance is not expected to have a material adverse effect on the Company’s financial statements.
Derivative Activities
The Company manages its MTM risk on a portfolio basis based upon the delivery period of its contracts and the individual components of the risks within each contract. Accordingly, it records and manages the energy purchase and sale obligations under its contracts in separate components based on the commodity (e.g. electricity or natural gas), the product (e.g. electricity for delivery during peak or off-peak hours), the delivery location (e.g. by region), the risk profile (e.g. forward or option), and the delivery period (e.g. by month and year). The following describes the categories of activities represented by their operating characteristics and key risks:
| |
• | Asset Optimization — Represents derivative activity associated with assets owned and contracted by DTE Energy, including forward natural gas purchases and sales, natural gas transportation and storage capacity. Changes in the value of derivatives in this category typically economically offset changes in the value of underlying non-derivative positions, which do not qualify for fair value accounting. The difference in accounting treatment of derivatives in this category and the underlying non-derivative positions can result in significant earnings volatility. |
| |
• | Marketing and Origination — Represents derivative activity transacted by originating substantially hedged positions with wholesale energy marketers, producers, end users, utilities, retail aggregators and alternative energy suppliers. |
| |
• | Fundamentals Based Trading — Represents derivative activity transacted with the intent of taking a view, capturing market price changes, or putting capital at risk. This activity is speculative in nature as opposed to hedging an existing exposure. |
| |
• | Other — Includes derivative activity at DTE Electric related to FTRs. Changes in the value of derivative contracts at DTE Electric are recorded as Derivative Assets or Liabilities, with an offset to Regulatory Assets or Liabilities as the settlement value of these contracts will be included in the PSCR mechanism when realized. |
The following tables present the fair value of derivative instruments as of September 30, 2014 and December 31, 2013:
|
| | | | | | | | | | | | | | | |
| September 30, 2014 | | December 31, 2013 |
| Derivative Assets | | Derivative Liabilities | | Derivative Assets | | Derivative Liabilities |
| (In millions) |
Derivatives not designated as hedging instruments: | | | | | | | |
Foreign currency exchange contracts | $ | 1 |
| | $ | (3 | ) | | $ | — |
| | $ | (1 | ) |
Commodity Contracts: | | | | | |
| | |
|
Natural Gas | 254 |
| | (342 | ) | | 396 |
| | (503 | ) |
Electricity | 386 |
| | (394 | ) | | 400 |
| | (398 | ) |
Other | 52 |
| | (48 | ) | | 37 |
| | (34 | ) |
Total derivatives not designated as hedging instruments: | $ | 693 |
| | $ | (787 | ) | | $ | 833 |
| | $ | (936 | ) |
Total derivatives: | | | | | | | |
Current | $ | 605 |
| | $ | (696 | ) | | $ | 691 |
| | $ | (773 | ) |
Noncurrent | 88 |
| | (91 | ) | | 142 |
| | (163 | ) |
Total derivatives | $ | 693 |
| | $ | (787 | ) | | $ | 833 |
| | $ | (936 | ) |
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Certain of the Company's derivative positions are subject to netting arrangements which provide for offsetting of asset and liability positions as well as related cash collateral. Such netting arrangements generally do not have restrictions. Under such netting arrangements, the Company offsets the fair value of derivative instruments with cash collateral received or paid for those contracts executed with the same counterparty, which reduces the Company's total assets and liabilities. Cash collateral is allocated between the fair value of derivative instruments and customer accounts receivable and payable with the same counterparty on a pro rata basis to the extent there is exposure. Any cash collateral remaining, after the exposure is netted to zero, is reflected in accounts receivable and accounts payable as collateral paid or received, respectively.
The Company also provides and receives collateral in the form of letters of credit which can be offset against net derivative assets and liabilities as well as accounts receivable and payable. The Company had issued letters of credit of approximately $21 million and $19 million at September 30, 2014 and December 31, 2013, respectively, which could be used to offset net derivative liabilities. Letters of credit received from third parties which could be used to offset our net derivative assets were not material for the periods presented. Such balances of letters of credit are excluded from the tables below and are not netted with the recognized assets and liabilities in the Consolidated Statements of Financial Position.
For contracts with certain clearing agents the fair value of derivative instruments is netted against realized positions with the net balance reflected as either 1) a derivative asset or liability or 2) an account receivable or payable. Other than certain clearing agents, accounts receivable and accounts payable that are subject to netting arrangements have not been offset against the fair value of derivative assets and liabilities. Certain contracts that have netting arrangements have not been offset in the Consolidated Statements of Financial Position. The impact of netting these derivative instruments and cash collateral related to such contracts is not material. Only the gross amounts for these derivative instruments are included in the table below.
As of September 30, 2014, the total cash collateral posted, net of cash collateral received, was $40 million. As of December 31, 2013, the total cash collateral posted, net of cash collateral received, was $12 million. As of September 30, 2014, derivative assets and derivative liabilities are shown net of cash collateral of $4 million and $42 million, respectively. As of December 31, 2013, derivative assets and derivative liabilities are shown net of cash collateral of $26 million and $17 million, respectively. The Company recorded cash collateral paid of $4 million and cash collateral received of $2 million not related to unrealized derivative positions as of September 30, 2014. The Company recorded cash collateral paid of $34 million and cash collateral received of $13 million not related to unrealized derivative positions as of December 31, 2013. These amounts are included in accounts receivable and accounts payable and are recorded net by counterparty.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
The following table presents the netting offsets of derivative assets and liabilities at September 30, 2014 and December 31, 2013:
|
| | | | | | | | | | | | | | | | | | | | | | | |
| September 30, 2014 | | December 31, 2013 |
| Gross Amounts of Recognized Assets (Liabilities) | | Gross Amounts Offset in the Consolidated Statements of Financial Position | | Net Amounts of Assets (Liabilities) Presented in the Consolidated Statements of Financial Position | | Gross Amounts of Recognized Assets (Liabilities) | | Gross Amounts Offset in the Consolidated Statements of Financial Position | | Net Amounts of Assets (Liabilities) Presented in the Consolidated Statements of Financial Position |
| (In millions) |
Derivative assets: | | | | | | | | | | | |
Commodity Contracts: | | | | | | | | | | | |
Natural Gas | $ | 254 |
| | $ | (225 | ) | | $ | 29 |
| | $ | 396 |
| | $ | (382 | ) | | $ | 14 |
|
Electricity | 386 |
| | (322 | ) | | 64 |
| | 400 |
| | (291 | ) | | 109 |
|
Other | 52 |
| | (48 | ) | | 4 |
| | 37 |
| | (34 | ) | | 3 |
|
Other derivative contracts (a) | 1 |
| | (1 | ) | | — |
| | — |
| | — |
| | — |
|
Total derivative assets | $ | 693 |
| | $ | (596 | ) | | $ | 97 |
| | $ | 833 |
| | $ | (707 | ) | | $ | 126 |
|
| | | | | | | | | | | |
Derivative liabilities: | | | | | | | | | | | |
Commodity Contracts: | | | | | | | | | | | |
Natural Gas | $ | (342 | ) | | $ | 268 |
| | $ | (74 | ) | | $ | (503 | ) | | $ | 395 |
| | $ | (108 | ) |
Electricity | (394 | ) | | 317 |
| | (77 | ) | | (398 | ) | | 269 |
| | (129 | ) |
Other | (48 | ) | | 48 |
| | — |
| | (34 | ) | | 34 |
| | — |
|
Other derivative contracts (a) | (3 | ) | | 1 |
| | (2 | ) | | (1 | ) | | — |
| | (1 | ) |
Total derivative liabilities | $ | (787 | ) | | $ | 634 |
| | $ | (153 | ) | | $ | (936 | ) | | $ | 698 |
| | $ | (238 | ) |
_______________________________________
| |
(a) | Primarily includes Foreign currency exchange contracts. |
The following table presents the netting offsets of derivative assets and liabilities at September 30, 2014 and December 31, 2013:
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| September 30, 2014 | | December 31, 2013 |
| Derivative Assets | | Derivative Liabilities | | Derivative Assets | | Derivative Liabilities |
| Current | | Noncurrent | | Current | | Noncurrent | | Current | | Noncurrent | | Current | | Noncurrent |
| (In millions) |
Reconciliation of derivative instruments to Consolidated Statements of Financial Position: | | | | | | | | | | | | | | | |
Total fair value of derivatives | $ | 605 |
| | $ | 88 |
| | $ | (696 | ) | | $ | (91 | ) | | $ | 691 |
| | $ | 142 |
| | $ | (773 | ) | | $ | (163 | ) |
Counterparty netting | (533 | ) | | (59 | ) | | 533 |
| | 59 |
| | (566 | ) | | (115 | ) | | 566 |
| | 115 |
|
Collateral adjustment | (4 | ) | | — |
| | 29 |
| | 13 |
| | (26 | ) | | — |
| | 12 |
| | 5 |
|
Total derivatives as reported | $ | 68 |
| | $ | 29 |
| | $ | (134 | ) | | $ | (19 | ) | | $ | 99 |
| | $ | 27 |
| | $ | (195 | ) | | $ | (43 | ) |
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
The effect of derivatives not designated as hedging instruments on the Consolidated Statements of Operations for the three and nine months ended September 30, 2014 and 2013 is as follows:
|
| | | | | | | | | | | | | | | | | | |
| | Location of Gain (Loss) Recognized in Income on Derivatives | | Gain (Loss) Recognized in Income on Derivatives for the Three Months Ended September 30, | | Gain (Loss) Recognized in Income on Derivatives for the Nine Months Ended September 30, |
Derivatives not Designated as Hedging Instruments | | | 2014 | | 2013 | | 2014 | | 2013 |
| | | | (In millions) |
Foreign currency exchange contracts | | Operating Revenue | | $ | (1 | ) | | $ | — |
| | $ | (2 | ) | | $ | (1 | ) |
Commodity Contracts: | | | | | | | | | | |
Natural Gas | | Operating Revenue | | (38 | ) | | 1 |
| | (10 | ) | | 37 |
|
Natural Gas | | Fuel, purchased power and gas | | 12 |
| | (1 | ) | | 23 |
| | (33 | ) |
Electricity | | Operating Revenue | | 12 |
| | 22 |
| | 100 |
| | 52 |
|
Other | | Operating Revenue | | (1 | ) | | 1 |
| | (5 | ) | | 1 |
|
Total | | | | $ | (16 | ) | | $ | 23 |
| | $ | 106 |
| | $ | 56 |
|
Revenues and energy costs related to trading contracts are presented on a net basis in the Consolidated Statements of Operations. Commodity derivatives used for trading purposes, and financial non-trading commodity derivatives, are accounted for using the mark-to-market method with unrealized and realized gains and losses recorded in Operating revenues. Non-trading physical commodity sale and purchase derivative contracts are generally accounted for using the mark-to-market method with unrealized and realized gains and losses for sales recorded in Operating revenue and purchases recorded in Fuel, purchased power and gas.
The following represents the cumulative gross volume of derivative contracts outstanding as of September 30, 2014:
|
| | |
Commodity | | Number of Units |
Natural Gas (MMBtu) | | 865,462,971 |
Electricity (MWh) | | 15,291,188 |
Oil (Gallons) | | 10,290,000 |
Foreign Currency Exchange (Canadian dollars) | | 81,310,582 |
Various subsidiaries of the Company have entered into contracts which contain ratings triggers and are guaranteed by DTE Energy. These contracts contain provisions which allow the counterparties to require that the Company post cash or letters of credit as collateral in the event that DTE Energy’s credit rating is downgraded below investment grade. Certain of these provisions (known as “hard triggers”) state specific circumstances under which the Company can be required to post collateral upon the occurrence of a credit downgrade, while other provisions (known as “soft triggers”) are not as specific. For contracts with soft triggers, it is difficult to estimate the amount of collateral which may be requested by counterparties and/or which the Company may ultimately be required to post. The amount of such collateral which could be requested fluctuates based on commodity prices (primarily natural gas, power and coal) and the provisions and maturities of the underlying transactions. As of September 30, 2014, DTE Energy's contractual obligation to post collateral in the form of cash or letter of credit in the event of a downgrade to below investment grade, under both hard trigger and soft trigger provisions, was approximately $327 million.
As of September 30, 2014, the Company had approximately $894 million of derivatives in net liability positions, for which hard triggers exist. Collateral of approximately $13 million has been posted against such liabilities, including cash and letters of credit. Associated derivative net asset positions for which contractual offset exists were approximately $744 million. The net remaining amount of approximately $137 million is derived from the $327 million noted above.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
NOTE 6 — ASSET RETIREMENT OBLIGATIONS
A reconciliation of the asset retirement obligations for the nine months ended September 30, 2014 follows:
|
| | | |
| (In millions) |
Asset retirement obligations at December 31, 2013 | $ | 1,827 |
|
Accretion | 84 |
|
Liabilities incurred | 11 |
|
Liabilities settled | (5 | ) |
Revision in estimated cash flows | (6 | ) |
Asset retirement obligations at September 30, 2014 | $ | 1,911 |
|
NOTE 7 — REGULATORY MATTERS
Refundable Revenue Decoupling (RDM)/ Deferred Gain Amortization
In September 2012, the MPSC approved DTE Electric's accounting application to defer for future amortization the gain resulting from the reversal of the Company's $127 million regulatory liability associated with the operation of the RDM. The approved application provided for the amortization of the regulatory liability to income, at a monthly rate of approximately $10.6 million, beginning January 2014. On April 1, 2014, the MPSC approved DTE Electric's accounting application to suspend the amortization of the RDM regulatory liability as of June 30, 2014 and to complete the amortization over the period January 2015 to June 2015. If DTE Electric's base rates are increased prior to July 1, 2015, the Company will cease amortization and refund to customers the remaining unamortized balance of the regulatory liability.
Transition of PLD Customers to DTE Electric's Distribution System
On July 19, 2013, DTE Electric filed its TRM application proposing a transitional tariff option for certain former PLD customers and a modified line extension provision. The application also proposed a recovery mechanism for the deferred net incremental revenue requirement associated with the transition. The net incremental revenue requirement includes costs to install meters and attach customers; system and customer facility upgrades and repairs; and the difference between DTE Electric's tariff rates and any transitional rates approved in the future. On May 13, 2014, the MPSC approved the TRM as requested and also ordered DTE Electric to include in the TRM the PLD transmission delivery service costs incurred while DTE Electric is temporarily relying upon PLD to operate and maintain PLD's system during the system conversion period. The meter installation phase of the transition was completed in June 2014. On July 1, 2014, former PLD customers became customers of DTE Electric.
PSCR Proceedings
The PSCR process is designed to allow DTE Electric to recover all of its power supply costs if incurred under reasonable and prudent policies and practices. DTE Electric's power supply costs include fuel and related transportation costs, purchased and net interchange power costs, nitrogen oxide and sulfur dioxide emission allowances costs, urea costs, transmission costs and MISO costs. The MPSC reviews these costs, policies and practices for prudence in annual plan and reconciliation filings.
2012 PSCR Year — In March 2013, DTE Electric filed the 2012 PSCR reconciliation calculating a net under-recovery of approximately $87 million that includes an under-recovery of approximately $148 million for the 2011 PSCR year. The reconciliation includes purchased power costs related to the manual shutdown of our Fermi 2 nuclear power plant in June 2012 caused by the failure of one of the plant's two non-safety related feed-water pumps. The plant was restarted on July 30, 2012, which restored production to nominal 68% of full capacity. In September 2013, the repair to the plant was completed and production was returned to full capacity. DTE Electric was able to purchase sufficient power from MISO to continue to provide uninterrupted service to our customers. Certain intervenors in the reconciliation case have challenged the recovery of up to $32 million of the Fermi 2 related purchased power costs. Resolution of this matter is expected by early 2015.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
NOTE 8 — EARNINGS PER SHARE
The Company reports both basic and diluted earnings per share. The calculation of diluted earnings per share assumes the issuance of potentially dilutive common shares outstanding during the period from the exercise of stock options. A reconciliation of both calculations is presented in the following table for the three and nine months ended September 30:
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions, except per share amounts) |
Basic Earnings per Share | | | | | | | |
Net income attributable to DTE Energy Company | $ | 156 |
| | $ | 198 |
| | $ | 606 |
| | $ | 537 |
|
Average number of common shares outstanding | 177 |
| | 175 |
| | 177 |
| | 174 |
|
Weighted average net restricted shares outstanding | — |
| | — |
| | — |
| | 1 |
|
Dividends declared — common shares | $ | 122 |
| | $ | 115 |
| | $ | 353 |
| | $ | 337 |
|
Dividends declared — net restricted shares | — |
| | 1 |
| | 1 |
| | 1 |
|
Total distributed earnings | $ | 122 |
| | $ | 116 |
| | $ | 354 |
| | $ | 338 |
|
Net income less distributed earnings | $ | 34 |
| | $ | 82 |
| | $ | 252 |
| | $ | 199 |
|
Distributed (dividends per common share) | $ | 0.69 |
| | $ | 0.66 |
| | $ | 2.00 |
| | $ | 1.93 |
|
Undistributed | 0.19 |
| | 0.47 |
| | 1.42 |
| | 1.14 |
|
Total Basic Earnings per Common Share | $ | 0.88 |
| | $ | 1.13 |
| | $ | 3.42 |
| | $ | 3.07 |
|
Diluted Earnings per Share | | | | | | | |
Net income attributable to DTE Energy Company | $ | 156 |
| | $ | 198 |
| | $ | 606 |
| | $ | 537 |
|
Average number of common shares outstanding | 177 |
| | 176 |
| | 177 |
| | 175 |
|
Weighted average net restricted shares outstanding | — |
| | — |
| | — |
| | 1 |
|
Dividends declared — common shares | $ | 122 |
| | $ | 115 |
| | $ | 353 |
| | $ | 337 |
|
Dividends declared — net restricted shares | — |
| | 1 |
| | 1 |
| | 1 |
|
Total distributed earnings | $ | 122 |
| | $ | 116 |
| | $ | 354 |
| | $ | 338 |
|
Net income less distributed earnings | $ | 34 |
| | $ | 82 |
| | $ | 252 |
| | $ | 199 |
|
Distributed (dividends per common share) | $ | 0.69 |
| | $ | 0.66 |
| | $ | 2.00 |
| | $ | 1.93 |
|
Undistributed | 0.19 |
| | 0.47 |
| | 1.42 |
| | 1.14 |
|
Total Diluted Earnings per Common Share | $ | 0.88 |
| | $ | 1.13 |
| | $ | 3.42 |
| | $ | 3.07 |
|
NOTE 9 — LONG-TERM DEBT
Debt Issuances
In 2014, the following debt was issued:
|
| | | | | | | | | | | | |
Company | | Month | | Type | | Interest Rate | | Maturity | | Amount |
| | | | | | | | | | (In millions) |
DTE Energy | | May | | Senior Notes (a) | | 3.50% | | 2024 | | $ | 350 |
|
DTE Electric | | June | | Mortgage Bonds (a) | | 3.77% | | 2026 | | 100 |
|
DTE Electric | | June | | Mortgage Bonds (a) | | 4.60% | | 2044 | | 150 |
|
DTE Electric | | July | | Mortgage Bonds (a) | | 3.375% | | 2025 | | 350 |
|
DTE Electric | | July | | Mortgage Bonds (a) | | 4.30% | | 2044 | | 350 |
|
| | | | | | | | | | $ | 1,300 |
|
_______________________________________
| |
(a) | Proceeds were used for the redemption of long-term debt, for the repayment of short-term borrowings and for general corporate purposes. |
In September 2014, DTE Gas agreed to issue $150 million of 4.35% mortgage bonds due 2044 to a group of institutional investors in a private placement transaction. These bonds are expected to close and fund in December 2014. Proceeds will be used for general corporate purposes.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Debt Redemptions
In 2014, the following debt was redeemed:
|
| | | | | | | | | | | | |
Company | | Month | | Type | | Interest Rate | | Maturity | | Amount |
| | | | | | | | | | (In millions) |
DTE Electric | | March | | Mortgage Bonds | | Various | | 2014 | | $ | 13 |
|
DTE Electric | | March | | Securitization Bonds | | 6.62% | | 2014 | | 100 |
|
DTE Electric | | April | | Tax Exempt Revenue Bonds (a) | | 2.35% | | 2024 | | 31 |
|
DTE Electric | | April | | Tax Exempt Revenue Bonds (a) | | 4.65% | | 2028 | | 32 |
|
DTE Gas | | May | | Mortgage Bonds | | 8.25% | | 2014 | | 80 |
|
DTE Energy | | May | | Senior Notes | | 7.625% | | 2014 | | 300 |
|
DTE Electric | | June | | Tax Exempt Revenue Bonds (a) | | 4.875% | | 2029 | | 36 |
|
DTE Electric | | June | | Tax Exempt Revenue Bonds (a) | | 6.00% | | 2036 | | 69 |
|
DTE Electric | | July | | Senior Notes | | 4.80% | | 2015 | | 200 |
|
DTE Electric | | August | | Senior Notes | | 5.40% | | 2014 | | 200 |
|
DTE Electric | | August | | Tax Exempt Revenue Bonds (a) | | 5.25% | | 2029 | | 60 |
|
DTE Electric | | September | | Securitization Bonds | | 6.62% | | 2014 | | 96 |
|
DTE Energy | | Various | | Other Long Term Debt | | Various | | 2014 | | 5 |
|
| | | | | | | | | | $ | 1,222 |
|
_______________________________________
| |
(a) | DTE Electric Tax Exempt Revenue Bonds are issued by a public body that loans the proceeds to DTE Electric on terms substantially mirroring the Tax Exempt Revenue Bonds. |
NOTE 10 — SHORT-TERM CREDIT ARRANGEMENTS AND BORROWINGS
DTE Energy and its wholly owned subsidiaries, DTE Electric and DTE Gas, have unsecured revolving credit agreements with a syndicate of 19 banks that can be used for general corporate borrowings, but are intended to provide liquidity support for each of the companies’ commercial paper programs. No one bank provides more than 8.7% of the commitment in any facility. Borrowings under the facilities are available at prevailing short-term interest rates. Additionally, DTE Energy has other facilities to support letter of credit issuance.
The agreements require the Company to maintain a total funded debt to capitalization ratio of no more than 0.65 to 1. In the agreements, “total funded debt” means all indebtedness of the Company and its consolidated subsidiaries, including capital lease obligations, hedge agreements and guarantees of third parties’ debt, but excluding contingent obligations, nonrecourse and junior subordinated debt and certain equity-linked securities and, except for calculations at the end of the second quarter, certain DTE Gas short-term debt. “Capitalization” means the sum of (a) total funded debt plus (b) “consolidated net worth,” which is equal to consolidated total stockholders’ equity of the Company and its consolidated subsidiaries (excluding pension effects under certain FASB statements), as determined in accordance with accounting principles generally accepted in the United States of America. At September 30, 2014, the total funded debt to total capitalization ratios for DTE Energy, DTE Electric and DTE Gas were 0.49 to 1, 0.52 to 1 and 0.45 to 1, respectively, and are in compliance with this financial covenant. The availability under the facilities in place at September 30, 2014 is shown in the following table:
|
| | | | | | | | | | | | | | | |
| DTE Energy | | DTE Electric | | DTE Gas | | Total |
| (In millions) |
Unsecured letter of credit facility, expiring in February 2015 | $ | 100 |
| | $ | — |
| | $ | — |
| | $ | 100 |
|
Unsecured letter of credit facility, expiring in August 2015 | 125 |
| | — |
| | — |
| | 125 |
|
Unsecured revolving credit facility, expiring April 2018 | 1,200 |
| | 300 |
| | 300 |
| | 1,800 |
|
| 1,425 |
| | 300 |
| | 300 |
| | 2,025 |
|
Amounts outstanding at September 30, 2014: | | | | | | | |
Commercial paper issuances | 207 |
| | 254 |
| | 192 |
| | 653 |
|
Letters of credit | 200 |
| | — |
| | — |
| | 200 |
|
| 407 |
| | 254 |
| | 192 |
| | 853 |
|
Net availability at September 30, 2014 | $ | 1,018 |
| | $ | 46 |
| | $ | 108 |
| | $ | 1,172 |
|
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
The Company has other outstanding letters of credit which are not included in the above described facilities totaling approximately $35 million which are used for various corporate purposes.
In conjunction with maintaining certain exchange traded risk management positions, the Company may be required to post cash collateral with its clearing agent. The Company has a demand financing agreement for up to $100 million with its clearing agent. The agreement, as amended, also allows for up to $50 million of additional margin financing provided that the Company posts a letter of credit for the incremental amount. At September 30, 2014, a $50 million letter of credit was in place, raising the capacity under this facility to $150 million. The $50 million letter of credit is included in the table above. The amount outstanding under this agreement was $78 million and $138 million at September 30, 2014 and December 31, 2013, respectively.
NOTE 11 — COMMITMENTS AND CONTINGENCIES
Environmental
Electric
Air - DTE Electric is subject to the EPA ozone and fine particulate transport and acid rain regulations that limit power plant emissions of sulfur dioxide and nitrogen oxides. Since 2005, the EPA and the State of Michigan have issued additional emission reduction regulations relating to ozone, fine particulate, regional haze, mercury, and other air pollution. These rules have led to additional controls on fossil-fueled power plants to reduce nitrogen oxide, sulfur dioxide, mercury and other emissions. To comply with these requirements, DTE Electric spent approximately $2 billion through 2013. The Company estimates DTE Electric will make capital expenditures of approximately $200 million in 2014 and up to approximately $1.2 billion of additional capital expenditures through 2021 based on current regulations.
Additional rulemakings are expected over the next few years which could require additional controls for sulfur dioxide, nitrogen oxides and other hazardous air pollutants. The Cross State Air Pollution Rule (CSAPR), finalized in July 2011, required further reductions of sulfur dioxide and nitrogen oxides emissions beginning in 2012. On December 30, 2011, the COA granted the motions to stay the rule, leaving DTE Electric temporarily subject to the previously existing Clean Air Interstate Rule (CAIR). On August 21, 2012, the COA issued its decision, vacating CSAPR and leaving CAIR in place. The EPA's petition seeking a rehearing of the COA's decision regarding the CSAPR was denied on January 24, 2013. On June 24, 2013, the U.S. Supreme Court granted EPA's petition for a review of the COA's decision on CSAPR. On April 29, 2014, the U.S. Supreme Court issued its ruling reversing the COA's stay decision and remanding the case for further proceedings. The EPA has since requested the COA to lift the stay on CSAPR and proposed that phase one of the rule would start effective January 2015. Notwithstanding the U.S. Supreme Court remand decision and potential decision by the COA to lift the stay, DTE Electric expects to meet its obligations under CSAPR beginning in 2015. Furthermore, the EPA and a number of states, including Michigan, have started working on the framework of revised CSAPR regulations which may still be proposed in the next few years to address other challenges to the existing CSAPR regulations. DTE Electric will continue to monitor these developments and adjust its compliance strategy accordingly.
The Mercury and Air Toxics Standard (MATS) rule, formerly known as the Electric Generating Unit Maximum Achievable Control Technology (EGU MACT) Rule was finalized on December 16, 2011. The MATS rule requires reductions of mercury and other hazardous air pollutants beginning in April 2015, with a potential extension to April 2016. DTE Electric has requested and been granted compliance date extensions for all relevant units to April 2016, with the exception of Monroe Power Plant. All Monroe Power Plant units will be in compliance with MATS requirements by April 2015. DTE Electric has tested technologies to determine technological and economic feasibility as MATS compliance alternatives to Flue Gas Desulfurization (FGD) systems. Implementation of Dry Sorbent Injection (DSI) and Activated Carbon Injection (ACI) technologies will allow several units that would not have been economical for FGD installations to continue operation in compliance with MATS.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
In July 2009, DTE Energy received a NOV/FOV from the EPA alleging, among other things, that five DTE Electric power plants violated New Source Performance standards, Prevention of Significant Deterioration requirements, and operating permit requirements under the Clean Air Act. In June 2010, the EPA issued a NOV/FOV making similar allegations related to a project and outage at Unit 2 of the Monroe Power Plant. In March 2013, DTE Energy received a supplemental NOV from the EPA relating to the July 2009 NOV/FOV. The supplemental NOV alleged additional violations relating to the New Source Review provisions under the Clean Air Act, among other things.
In August 2010, the U.S. Department of Justice, at the request of the EPA, brought a civil suit in the U.S. District Court for the Eastern District of Michigan against DTE Energy and DTE Electric, related to the June 2010 NOV/FOV and the outage work performed at Unit 2 of the Monroe Power Plant, but not relating to the July 2009 NOV/FOV. Among other relief, the EPA requested the court to require DTE Electric to install and operate the best available control technology at Unit 2 of the Monroe Power Plant. Further, the EPA requested the court to issue a preliminary injunction to require DTE Electric to (i) begin the process of obtaining the necessary permits for the Monroe Unit 2 modification and (ii) offset the pollution from Monroe Unit 2 through emissions reductions from DTE Electric's fleet of coal-fired power plants until the new control equipment is operating. On August 23, 2011, the U.S. District Court judge granted DTE Energy's motion for summary judgment in the civil case, dismissing the case and entering judgment in favor of DTE Energy and DTE Electric. On October 20, 2011, the EPA caused to be filed a Notice of Appeal to the U.S. Court of Appeals for the Sixth Circuit. On March 28, 2013, the Court of Appeals remanded the case to the U.S. District Court for review of the procedural component of the New Source Review notification requirements. On September 3, 2013, the EPA caused to be filed a motion seeking leave to amend their complaint regarding the June 2010 NOV/FOV adding additional claims related to outage work performed at the Trenton Channel and Belle River power plants as well as additional claims related to work performed at the Monroe Power Plant. In addition, the Sierra Club caused to be filed a motion to add a claim regarding the River Rouge Power Plant. On March 3, 2014, the U.S. District Court judge granted again DTE Energy's motion for summary judgment dismissing the civil case related to Monroe Unit 2. On April 3, 2014, the U.S. District Court judge granted motions filed by the EPA and the Sierra Club to amend their New Source Review complaint adding additional claims for Monroe Units 1, 2 and 3, Belle River Units 1 and 2, Trenton Channel Unit 9 and denied the claims related to River Rouge that were brought by the Sierra Club. On June 30, 2014, the EPA filed a motion requesting certification for appeal of the March 3, 2014 summary judgment decision. On October 3, 2014, the EPA and the U.S. Department of Justice filed the anticipated notice of appeal of the U.S. District Court judge's dismissal of the Monroe Unit 2 case. This will officially start the appellate process. The amended New Source Review claims are all stayed until the appeal is resolved by the U.S. Court of Appeals for the Sixth Circuit.
DTE Energy and DTE Electric believe that all the plants and generating units identified by the EPA and the Sierra Club have complied with all applicable federal environmental regulations. Depending upon the outcome of discussions with the EPA regarding the two NOVs/FOVs, DTE Electric could be required to install additional pollution control equipment at some or all of the power plants in question, implement early retirement of facilities where control equipment is not economical, engage in supplemental environmental programs, and/or pay fines. The Company cannot predict the financial impact or outcome of this matter, or the timing of its resolution.
In March 2013, the Sierra Club filed suit against DTE Energy and DTE Electric alleging violations of the Clean Air Act at four of DTE Electric's coal-fired power plants. The plaintiffs alleged 1,499 six-minute periods of excess opacity of air emissions from 2007-2012 at those facilities. The suit asks that the court enjoin DTE Energy and DTE Electric from operating the power plants except in complete compliance with applicable laws and permit requirements, pay civil penalties, conduct beneficial environmental mitigation projects, pay attorney fees and require the installation of any necessary pollution controls or to convert and/or operate the plants' boilers on natural gas to avoid additional violations and to off-set historic unlawful emissions. In December 2013, a U.S. District Court judge issued an order dismissing, without prejudice, the plaintiff's complaint allowing them to file an amended complaint by January 17, 2014. The order dismissing the complaint resulted from a considerable number of plaintiff's claims being time barred based on the statute of limitations. On January 17, 2014, the plaintiffs filed an amended complaint for the period January 13, 2008 - June 30, 2012, reducing the total number of six-minute periods from 1,499 to 1,139. DTE Energy and DTE Electric filed an answer to the amended complaint on March 11, 2014. On October 16, 2014, the Sierra Club, DTE Energy and DTE Electric filed a stipulation to voluntary dismiss the litigation in its entirety.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Water — In response to an EPA regulation, DTE Electric would be required to examine alternatives for reducing the environmental impacts of the cooling water intake structures at several of its facilities. Based on the results of completed studies and expected future studies, DTE Electric may be required to install technologies to reduce the impacts of the water intake structures. The initial rule published in 2004 was subsequently remanded and a proposed rule published in 2011. The final rule was issued on May 19, 2014. The final rule specifies a time period exceeding three years to complete studies to determine the type of technology needed to reduce impacts to fish. Final compliance for the installation of the required technology will be determined by each state on a case by case basis. We are currently evaluating the compliance options and working with the State of Michigan on evaluating whether any controls are needed. These evaluations/studies may require modifications to some existing intake structures. It is not possible to quantify the impact of this rulemaking at this time.
On April 19, 2013, the EPA proposed revised steam electric effluent guidelines regulating wastewater streams from coal-fired power plants including multiple possible options for compliance. The rules are expected to be finalized by September 2015. DTE Electric has provided comments to the EPA. However, it is not possible at this time to quantify the impacts of these developing requirements.
Contaminated and Other Sites — Prior to the construction of major interstate natural gas pipelines, gas for heating and other uses was manufactured locally from processes involving coal, coke or oil. The facilities, which produced gas, have been designated as MGP sites. DTE Electric conducted remedial investigations at contaminated sites, including three former MGP sites. The investigations have revealed contamination related to the by-products of gas manufacturing at each MGP site. In addition to the MGP sites, the Company is also in the process of cleaning up other contaminated sites, including the area surrounding an ash landfill, electrical distribution substations, electric generating power plants, and underground and aboveground storage tank locations. The findings of these investigations indicated that the estimated cost to remediate these sites is expected to be incurred over the next several years. At September 30, 2014 and December 31, 2013, the Company had $10 million and $8 million accrued for remediation, respectively. Any change in assumptions, such as remediation techniques, nature and extent of contamination and regulatory requirements, could impact the estimate of remedial action costs for the sites and affect the Company’s financial position and cash flows. The Company believes the likelihood of a material change to the accrued amount is remote based on current knowledge of the conditions at each site.
DTE Electric owns and operates three permitted engineered ash storage facilities to dispose of fly ash from the coal fired power plants. The EPA has published proposed rules to regulate coal ash under the authority of the Resources Conservation and Recovery Act (RCRA). The proposed rule published in June 2010 contains two primary regulatory options to regulate coal ash residue. The EPA is currently considering either designating coal ash as a “Hazardous Waste” as defined by RCRA or regulating coal ash as non-hazardous waste under RCRA. Agencies and legislatures have urged the EPA to regulate coal ash as a non-hazardous waste. If the EPA designates coal ash as a hazardous waste, the agency could apply some, or all, of the disposal and reuse standards that have been applied to other existing hazardous wastes to disposal and reuse of coal ash. Some of the regulatory actions currently being contemplated could have a significant impact on our operations and financial position and the rates we charge our customers. The rules are expected to be finalized by December 2014. It is not possible to quantify the impact of those expected rulemakings at this time.
Gas
Contaminated and Other Sites — Gas segment owns or previously owned, 15 former MGP sites. Investigations have revealed contamination related to the by-products of gas manufacturing at each site. Cleanup of two of the MGP sites is complete and the sites are closed. We expect complete closure of two additional sites and partial closure of two sites by the end of 2014. Cleanup activities associated with the remaining sites will be continued over the next several years. The MPSC has established a cost deferral and rate recovery mechanism for investigation and remediation costs incurred at former MGP sites. In addition to the MGP sites, the Company is also in the process of cleaning up other contaminated sites, including gate stations, gas pipeline releases and underground storage tank locations. As of September 30, 2014 and December 31, 2013, the Company had $26 million and $28 million accrued for remediation, respectively. Any change in assumptions, such as remediation techniques, nature and extent of contamination and regulatory requirements, could impact the estimate of remedial action costs for the sites and affect the Company’s financial position and cash flows. The Company anticipates the cost amortization methodology approved by the MPSC for DTE Gas, which allows DTE Gas to amortize the MGP costs over a ten-year period beginning with the year subsequent to the year the MGP costs were incurred will prevent environmental costs from having a material adverse impact on the Company’s results of operations.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Non-utility
The Company’s non-utility businesses are subject to a number of environmental laws and regulations dealing with the protection of the environment from various pollutants.
The Michigan coke battery facility received and responded to information requests from the EPA that resulted in the issuance of a NOV in June 2007 alleging potential maximum achievable control technologies and new source review violations. The EPA is in the process of reviewing the Company’s position of demonstrated compliance and has not initiated escalated enforcement. At this time, the Company cannot predict the impact of this issue. Furthermore, the Michigan coke battery facility is the subject of an investigation by the MDEQ concerning visible emissions readings that resulted from the Company self reporting to MDEQ questionable activities by an employee of a contractor hired by the Company to perform the visible emissions readings. At this time, the Company cannot predict the impact of this investigation.
The Company received two NOVs from the Pennsylvania Department of Environmental Protection (PADEP) in 2010 alleging violations of the permit for the Pennsylvania coke battery facility in connection with coal pile storm water runoff. The Company settled the alleged violations by implementing best management practices to address the issues and repair/upgrade their wastewater treatment plant. The Company recently received a permit to upgrade its existing waste water treatment system and is currently seeking a permit from the PADEP to upgrade its wastewater treatment technology to a biological treatment facility. The Company expects to spend $2 million on the existing waste water treatment system to comply with existing water discharge requirements and to upgrade its coal pile storm water runoff management program. The Company will also spend up to an additional $13 million over the next few years to upgrade the treatment technology to biological treatment to meet future regulatory requirements and gain other operational improvement savings.
The Company also received an NOV from the Allegheny County (PA) Health Department pertaining to excessive opacity readings from fugitive sources (mainly pushing emissions) in excess of its opacity standards for the Pennsylvania coke battery facility. Fugitive sources at the plant are in full compliance with the applicable Federal Opacity Standards. In February 2014, the Company received from the Group Against Smog & Pollution (GASP) a 60 day Notice of Intent to sue letter under the Federal Clean Air Act and/or Article XXI of the Allegheny County (PA) Health Department's Rules and Regulations. GASP alleged in the letter that the Company's coke battery facility in Pennsylvania was in violation of visible emissions limits from charging activities, door leaks, the combustion stack and pushing operations and hydrogen sulfide emission limits on flared, mixed or combusted coke oven gas. To resolve these issues, the Company agreed to a Consent Order and Agreement with Allegheny County pursuant to which the Company paid a fine of $300,000 and will spend $300,000 for a supplemental environmental project to enhance particulate collection efficiency from the coke battery's quench tower. Notwithstanding the agreement reached with the County, GASP proceeded with the filing of their complaint. The Company believes that the GASP suit is without merit and filed a motion to dismiss on June 18, 2014.
The Company believes that its non-utility businesses are substantially in compliance with all environmental requirements, other than as noted above.
Other
In December 2012, the EPA finalized a new set of regulations regarding the identification of non-hazardous secondary materials that are considered solid waste, industrial boiler and process heater maximum achievable control technologies (IBMACT) for major and area sources, and commercial/industrial solid waste incinerator new source performance standard and emission guidelines (CISWI). Capital costs for pollution controls and/or boiler conversions and the expenses for the one-time energy assessments are not expected to be material.
In 2010, the EPA finalized a new 1-hour sulfur dioxide ambient air quality standard that requires states to submit plans for non-attainment areas to be in compliance by 2017. Michigan's non-attainment area includes DTE Energy facilities in southwest Detroit and areas of Wayne County. Preliminary modeling runs by the MDEQ suggest that emission reductions may be required by significant sources of sulfur dioxide emissions in these areas, including DTE Electric power plants and our Michigan coke battery. The state implementation plan process is in the information gathering stage, and DTE Energy is unable to estimate any required emissions reductions at this time.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Nuclear Operations
Property Insurance
DTE Electric maintains property insurance policies specifically for the Fermi 2 plant. These policies cover such items as replacement power and property damage. NEIL is the primary supplier of the insurance policies.
DTE Electric maintains a policy for extra expenses, including replacement power costs necessitated by Fermi 2’s unavailability due to an insured event. This policy has a 12-week waiting period and provides an aggregate $490 million of coverage over a three-year period.
DTE Electric has $1.5 billion in primary coverage and $1.25 billion of excess coverage for stabilization, decontamination, debris removal, repair and/or replacement of property and decommissioning. The combined coverage limit for total property damage is $2.75 billion, subject to a $1 million deductible. The total limit for property damage for non-nuclear events is $2 billion and an aggregate of $327 million of coverage for extra expenses over a two-year period.
In 2007, the TRIA was extended through December 31, 2014. A major change in the extension is the inclusion of “domestic” acts of terrorism in the definition of covered or “certified” acts. For multiple terrorism losses caused by acts of terrorism not covered under the TRIA occurring within one year after the first loss from terrorism, the NEIL policies would make available to all insured entities up to $3.2 billion, plus any amounts recovered from reinsurance, government indemnity, or other sources to cover losses.
Under the NEIL policies, DTE Electric could be liable for maximum assessments of up to approximately $35 million per event if the loss associated with any one event at any nuclear plant should exceed the accumulated funds available to NEIL.
Public Liability Insurance
As required by federal law, DTE Electric maintains $375 million of public liability insurance for a nuclear incident. For liabilities arising from a terrorist act outside the scope of TRIA, the policy is subject to one industry aggregate limit of $300 million. Further, under the Price-Anderson Amendments Act of 2005, deferred premium charges up to $127.3 million could be levied against each licensed nuclear facility, but not more than $19 million per year per facility. Thus, deferred premium charges could be levied against all owners of licensed nuclear facilities in the event of a nuclear incident at any of these facilities.
Nuclear Fuel Disposal Costs
In accordance with the Federal Nuclear Waste Policy Act of 1982, DTE Electric has a contract with the DOE for the future storage and disposal of spent nuclear fuel from Fermi 2 that required DTE Electric to pay the DOE a fee of 1 mill per kWh of Fermi 2 electricity generated and sold. The fee was a component of nuclear fuel expense. The DOE's Yucca Mountain Nuclear Waste Repository program for the acceptance and disposal of spent nuclear fuel was terminated in 2011. DTE Electric currently employs a spent nuclear fuel storage strategy utilizing a fuel pool and a newly completed dry cask storage facility. The initial dry cask loading campaign planned for 2014 has been completed. The dry cask storage facility is expected to provide sufficient spent fuel storage capability for the life of the plant as defined by the original operating license.
DTE Electric is a party in the litigation against the DOE for both past and future costs associated with the DOE's failure to accept spent nuclear fuel under the timetable set forth in the Federal Nuclear Waste Policy Act of 1982. In July 2012, DTE Electric executed a settlement agreement with the federal government for costs associated with the DOE's delay in acceptance of spent nuclear fuel from Fermi 2 for permanent storage. The settlement agreement, including extensions, provides for a claims process and payment of delay-related costs experienced by DTE Electric through 2016. DTE Electric has begun the claims process and claims are being settled and paid on a timely basis. The settlement proceeds reduce the cost of the dry cask storage facility assets and provide reimbursement for related operating expenses. The federal government continues to maintain its legal obligation to accept spent nuclear fuel from Fermi 2 for permanent storage. Issues relating to long-term waste disposal policy and to the disposition of funds contributed by DTE Electric ratepayers to the federal waste fund await future governmental action.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
In February 2013, the COA granted a motion to reopen the fee adequacy litigation to review the DOE's latest fee adequacy report which was released in January 2013. In November 2013, the COA issued a decision ordering the DOE to submit a proposal to Congress to reduce the nuclear waste fee to zero until the DOE enacts an alternative nuclear waste management plan. In January 2014, the DOE submitted such a proposal to Congress that was scheduled to take effect in 90 legislative calendar days, absent legislative action to the contrary. Simultaneously, the DOE filed a petition for rehearing of the November 2013 decision with the COA. In March 2014, the COA denied DOE's petition for rehearing. The 1 mill per kWh fee was reduced to zero effective May 16, 2014.
Synthetic Fuel Guarantees
The Company discontinued the operations of its synthetic fuel production facilities throughout the United States as of December 31, 2007. The Company provided certain guarantees and indemnities in conjunction with the sales of interests in its synfuel facilities. The guarantees cover potential commercial, environmental, oil price and tax-related obligations and will survive until 90 days after expiration of all applicable statutes of limitations. The Company estimates that its maximum potential liability under these guarantees at September 30, 2014 is approximately $1 billion. Payment under these guarantees is considered remote.
REF Guarantees
The Company has provided certain guarantees and indemnities in conjunction with the sales of interests in its REF facilities. The guarantees cover potential commercial, environmental, and tax-related obligations and will survive until 90 days after expiration of all applicable statutes of limitations. The Company estimates that its maximum potential liability under these guarantees at September 30, 2014 is approximately $150 million. Payment under these guarantees is considered remote.
Other Guarantees
In certain limited circumstances, the Company enters into contractual guarantees. The Company may guarantee another entity’s obligation in the event it fails to perform. The Company may provide guarantees in certain indemnification agreements. Finally, the Company may provide indirect guarantees for the indebtedness of others. The Company’s guarantees are not individually material with maximum potential payments totaling $60 million at September 30, 2014. Payment under these guarantees is considered remote.
The Company is periodically required to obtain performance surety bonds in support of obligations to various governmental entities and other companies in connection with its operations. As of September 30, 2014, the Company had approximately $46 million of performance bonds outstanding. In the event that such bonds are called for nonperformance, the Company would be obligated to reimburse the issuer of the performance bond. The Company is released from the performance bonds as the contractual performance is completed and does not believe that a material amount of any currently outstanding performance bonds will be called.
Labor Contracts
There are several bargaining units for the Company's approximately 4,900 represented employees. The majority of the represented employees are under contracts that expire in 2016 and 2017.
Purchase Commitments
As of September 30, 2014, the Company was party to numerous long-term purchase commitments relating to a variety of goods and services required for the Company’s business. These agreements primarily consist of fuel supply commitments, renewable energy contracts and energy trading contracts. The Company estimates that these commitments will be approximately $8.3 billion from 2014 through 2051.
The Company also estimates that 2014 capital expenditures will be approximately $2.2 billion. The Company has made certain commitments in connection with expected capital expenditures.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Bankruptcies
The Company purchases and sells electricity, natural gas, coal, coke and other energy products from and to governmental entities and numerous companies operating in the steel, automotive, energy, retail, financial and other industries. Certain of its customers have filed for bankruptcy protection under the U.S. Bankruptcy Code. The Company regularly reviews contingent matters relating to these customers and its purchase and sale contracts and records provisions for amounts considered at risk of probable loss. The Company believes its accrued amounts are adequate for probable loss.
Other Contingencies
The Company is involved in certain other legal, regulatory, administrative and environmental proceedings before various courts, arbitration panels and governmental agencies concerning claims arising in the ordinary course of business. These proceedings include certain contract disputes, additional environmental reviews and investigations, audits, inquiries from various regulators, and pending judicial matters. The Company cannot predict the final disposition of such proceedings. The Company regularly reviews legal matters and records provisions for claims that it can estimate and are considered probable of loss. The resolution of these pending proceedings is not expected to have a material effect on the Company’s operations or financial statements in the periods they are resolved.
For a discussion of contingencies related to derivatives and regulatory matters see Notes 5 and 7 to the Consolidated Financial Statements, "Financial and Other Derivative Instruments" and "Regulatory Matters".
NOTE 12 — RETIREMENT BENEFITS AND TRUSTEED ASSETS
The following table details the components of net periodic benefit costs for pension benefits and other postretirement benefits:
|
| | | | | | | | | | | | | | | |
| Pension Benefits | | Other Postretirement Benefits |
| 2014 | | 2013 | | 2014 | | 2013 |
Three Months Ended September 30 | (In millions) |
Service cost | $ | 19 |
| | $ | 22 |
| | $ | 8 |
| | $ | 9 |
|
Interest cost | 54 |
| | 49 |
| | 22 |
| | 21 |
|
Expected return on plan assets | (69 | ) | | (67 | ) | | (31 | ) | | (28 | ) |
Amortization of: | | | | | | | |
Net actuarial loss | 42 |
| | 55 |
| | 4 |
| | 16 |
|
Prior service credit | — |
| | — |
| | (36 | ) | | (36 | ) |
Net periodic benefit cost (credit) | $ | 46 |
| | $ | 59 |
| | $ | (33 | ) | | $ | (18 | ) |
|
| | | | | | | | | | | | | | | |
| Pension Benefits | | Other Postretirement Benefits |
| 2014 | | 2013 | | 2014 | | 2013 |
Nine Months Ended September 30 | (In millions) |
Service cost | $ | 62 |
| | $ | 71 |
| | $ | 26 |
| | $ | 37 |
|
Interest cost | 159 |
| | 144 |
| | 67 |
| | 66 |
|
Expected return on plan assets | (205 | ) | | (200 | ) | | (92 | ) | | (82 | ) |
Amortization of: | | | | | | | |
Net actuarial loss | 118 |
| | 156 |
| | 15 |
| | 48 |
|
Prior service credit | — |
| | — |
| | (108 | ) | | (95 | ) |
Net periodic benefit cost (credit) | $ | 134 |
| | $ | 171 |
| | $ | (92 | ) | | $ | (26 | ) |
Pension and Other Postretirement Contributions
During the first nine months of 2014, the Company contributed $167 million to its pension plans. At the discretion of management, and depending upon financial market conditions, the Company may make up to an additional $20 million contribution to its pension plans in 2014.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
At the discretion of management, the Company may make up to a $145 million contribution to its other postretirement benefit plans in 2014.
NOTE 13 — STOCK-BASED COMPENSATION
The following table summarizes the components of stock-based compensation:
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Stock-based compensation expense | $ | 22 |
| | $ | 18 |
| | $ | 72 |
| | $ | 81 |
|
Tax benefit | $ | 8 |
| | $ | 7 |
| | $ | 27 |
| | $ | 31 |
|
Stock-based compensation cost capitalized in property, plant and equipment | $ | 4 |
| | $ | 1 |
| | $ | 11 |
| | $ | 5 |
|
Stock Options
The following table summarizes our stock option activity for the nine months ended September 30, 2014:
|
| | | | | | | | | | |
| Number of Options | | Weighted Average Exercise Price | | Aggregate Intrinsic Value (In millions) |
Options outstanding at January 1, 2014 | 723,697 |
| | $ | 42.60 |
| | |
Exercised | (232,751 | ) | | $ | 41.44 |
| | |
Forfeited or expired | (10,730 | ) | | $ | 39.41 |
| | |
Options outstanding and exercisable at September 30, 2014 | 480,216 |
| | $ | 43.24 |
| | $ | 16 |
|
As of September 30, 2014, the weighted average remaining contractual life for the exercisable shares is 3.57 years. As of September 30, 2014, all options were vested.
The intrinsic value of options exercised for the nine months ended September 30, 2014 and 2013 was $7 million and $11 million, respectively. No option expense was recognized for the nine months ended September 30, 2014 and 2013, respectively.
Restricted Stock Awards
The following table summarizes the Company’s restricted stock awards activity for the nine months ended September 30, 2014:
|
| | | | | | |
| Restricted Stock | | Weighted Average Grant Date Fair Value |
Balance at January 1, 2014 | 492,329 |
| | $ | 53.76 |
|
Grants | 158,390 |
| | $ | 70.03 |
|
Forfeitures | (16,014 | ) | | $ | 62.34 |
|
Vested and issued | (217,603 | ) | | $ | 47.71 |
|
Balance at September 30, 2014 | 417,102 |
| | $ | 62.76 |
|
Performance Share Awards
Performance shares awarded under the plan are for a specified number of shares of common stock that entitle the holder to receive a cash payment, shares of common stock or a combination thereof. The final value of the award is determined by the achievement of certain performance objectives and market conditions. The awards vest at the end of a specified period, usually three years. Awards granted in 2014 were primarily deemed to be equity awards. The stock price and number of probable shares attributable to market conditions for such equity awards are fair valued only at the grant date. Performance shares awarded prior to 2014 are liability awards and are remeasured to fair value at each reporting period.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
The following table summarizes the Company’s performance share activity for the nine months ended September 30, 2014:
|
| | | | | | |
| Performance Shares | | Weighted Average Grant Date Fair Value |
Balance at January 1, 2014 | 1,608,789 |
| | $ | — |
|
Grants | 548,892 |
| | $ | 69.24 |
|
Forfeitures | (36,471 | ) | | $ | 69.13 |
|
Payouts | (571,177 | ) | | $ | — |
|
Balance at September 30, 2014 | 1,550,033 |
| | $ | 69.24 |
|
Unrecognized Compensation Costs
As of September 30, 2014, there was $72 million of total unrecognized compensation cost related to non-vested stock incentive plan arrangements. That cost is expected to be recognized over a weighted-average period of 1.24 years.
NOTE 14 — SEGMENT AND RELATED INFORMATION
The Company sets strategic goals, allocates resources and evaluates performance based on the following structure:
Electric segment consists principally of DTE Electric, which is engaged in the generation, purchase, distribution and sale of electricity to approximately 2.1 million residential, commercial and industrial customers in southeastern Michigan.
Gas segment consists principally of DTE Gas, which is engaged in the purchase, storage, transportation, distribution and sale of natural gas to approximately 1.2 million residential, commercial and industrial customers throughout Michigan and the sale of storage and transportation capacity.
Gas Storage and Pipelines consists of natural gas pipeline, gathering and storage businesses.
Power and Industrial Projects is comprised primarily of projects that deliver energy and utility-type products and services to industrial, commercial and institutional customers; produce REF and sell electricity from biomass-fired energy projects.
Energy Trading consists of energy marketing and trading operations.
Corporate and Other, includes various holding company activities, holds certain non-utility debt and energy-related investments.
The federal income tax provisions or benefits of DTE Energy’s subsidiaries are determined on an individual company basis and recognize the tax benefit of production tax credits and net operating losses if applicable. The state and local income tax provisions of the utility subsidiaries are determined on an individual company basis and recognize the tax benefit of various tax credits and net operating losses, if applicable. The subsidiaries record federal, state and local income taxes payable to or receivable from DTE Energy based on the federal, state and local tax provisions of each company.
DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)
Inter-segment billing for goods and services exchanged between segments is based upon tariffed or market-based prices of the provider and primarily consists of the sale of reduced emissions fuel, power sales and natural gas sales in the following segments:
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Inter-segment Revenues | | | | | | | |
Electric | $ | 8 |
| | $ | 6 |
| | $ | 22 |
| | $ | 19 |
|
Gas | 1 |
| | 2 |
| | 5 |
| | 4 |
|
Gas Storage and Pipelines | 1 |
| | (2 | ) | | 9 |
| | 2 |
|
Power and Industrial Projects | 211 |
| | 231 |
| | 593 |
| | 621 |
|
Energy Trading | 8 |
| | 13 |
| | 24 |
| | 36 |
|
Corporate and Other | 1 |
| | (8 | ) | | 2 |
| | (23 | ) |
| $ | 230 |
| | $ | 242 |
| | $ | 655 |
| | $ | 659 |
|
Financial data of the business segments follows:
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Operating Revenues | | | | | | | |
Electric | $ | 1,358 |
| | $ | 1,458 |
| | $ | 4,049 |
| | $ | 3,942 |
|
Gas | 149 |
| | 161 |
| | 1,182 |
| | 1,013 |
|
Gas Storage and Pipelines | 49 |
| | 34 |
| | 146 |
| | 92 |
|
Power and Industrial Projects | 605 |
| | 512 |
| | 1,703 |
| | 1,431 |
|
Energy Trading | 664 |
| | 463 |
| | 2,797 |
| | 1,307 |
|
Corporate and Other | — |
| | 1 |
| | 1 |
| | 2 |
|
Reconciliation & Eliminations | (230 | ) | | (242 | ) | | (655 | ) | | (659 | ) |
Total | $ | 2,595 |
| | $ | 2,387 |
| | $ | 9,223 |
| | $ | 7,128 |
|
|
| | | | | | | | | | | | | | | |
Net Income (Loss) Attributable to DTE Energy by Segment: | | | | | | | |
Electric | $ | 135 |
| | $ | 179 |
| | $ | 400 |
| | $ | 383 |
|
Gas | (16 | ) | | (13 | ) | | 109 |
| | 91 |
|
Gas Storage and Pipelines | 20 |
| | 16 |
| | 59 |
| | 49 |
|
Power and Industrial Projects | 38 |
| | 27 |
| | 66 |
| | 46 |
|
Energy Trading | (22 | ) | | (6 | ) | | 6 |
| | (1 | ) |
Corporate and Other | 1 |
| | (5 | ) | | (34 | ) | | (31 | ) |
Net Income Attributable to DTE Energy Company | $ | 156 |
| | $ | 198 |
| | $ | 606 |
| | $ | 537 |
|
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
OVERVIEW
DTE Energy is a diversified energy company and is the parent company of DTE Electric and DTE Gas, regulated electric and natural gas utilities engaged primarily in the business of providing electricity and natural gas sales, distribution and storage services throughout Michigan. We operate three energy-related non-utility segments with operations throughout the United States.
Net income attributable to DTE Energy in the third quarter of 2014 was $156 million, or $0.88 per diluted share, compared to net income attributable to DTE Energy of $198 million, or $1.13 per diluted share, in the third quarter of 2013. Net income attributable to DTE Energy in the nine months ended September 30, 2014 was $606 million, or $3.42 per diluted share, compared to net income attributable to DTE Energy of $537 million, or $3.07 per diluted share, in the nine months ended September 30, 2013. The decrease in net income in the third quarter is primarily due to decreased earnings in the Electric and Energy Trading segments, partially offset by increased earnings in the Power and Industrial Projects and Gas Storage and Pipelines segments. The increase in net income for the nine months ended September 30, 2014 is due to increased earnings in all segments, with the exception of Corporate and Other.
Please see detailed explanations of segment performance in the following Results of Operations section.
DTE Energy's strategy is to achieve long-term earnings growth, a strong balance sheet and an attractive dividend yield.
Our utilities' growth will be driven by base infrastructure, environmental and renewable investments. We are focused on executing plans to achieve operational excellence and customer satisfaction with a focus on customer affordability. We operate in a constructive regulatory environment and have solid relationships with our regulators.
We have significant investments in our non-utility businesses. We employ disciplined investment criteria when assessing growth opportunities that leverage our assets, skills and expertise and provide diversity in earnings and geography. Specifically, we invest in targeted energy markets with attractive competitive dynamics where meaningful scale is in alignment with our risk profile. We expect growth opportunities in the Gas Storage and Pipelines and Power and Industrial Projects segments.
A key priority for DTE Energy is to maintain a strong balance sheet which facilitates access to capital markets and reasonably priced short-term and long-term financing. Near-term growth will be funded through internally generated cash flows and the issuance of debt. We have an enterprise risk management program that, among other things, is designed to monitor and manage our exposure to earnings and cash flow volatility related to commodity price changes, interest rates and counterparty credit risk.
CAPITAL INVESTMENTS
Our utility businesses require significant base capital investments each year in order to maintain and improve the reliability of asset bases, including power generation plants, distribution systems, storage fields and other facilities and fleets. DTE Electric's capital investments over the 2014-2018 period are estimated at $5.6 billion for base infrastructure, $700 million for environmental compliance requirements and $400 million for renewable energy and energy efficiency expenditures. DTE Electric plans to seek regulatory approval in general rate case filings and renewable energy plan filings for capital expenditures consistent with prior ratemaking treatment.
DTE Gas's capital investments over the 2014-2018 period are estimated at $700 million for base infrastructure and $500 million for gas main renewal and meter move out and pipeline integrity programs. In April 2013, the MPSC issued an order approving an infrastructure recovery mechanism for DTE Gas and authorized the recovery of the cost of service related to $77 million of annual investment in its gas main renewal and meter move out and pipeline integrity programs. DTE Gas plans to seek regulatory approval in general rate case filings for base infrastructure capital expenditures consistent with prior ratemaking treatment.
ENVIRONMENTAL MATTERS
We are subject to extensive environmental regulation. Additional costs may result as the effects of various substances on the environment are studied and governmental regulations are developed and implemented. Actual costs to comply could vary substantially. We expect to continue recovering environmental costs related to utility operations through rates charged to our customers.
DTE Electric is subject to the EPA ozone and fine particulate transport and acid rain regulations that limit power plant emissions of sulfur dioxide and nitrogen oxides. Since 2005, the EPA and the State of Michigan have issued additional emission reduction regulations relating to ozone, fine particulate, regional haze and mercury air pollution. These rules will lead to additional emission controls on fossil-fueled power plants to reduce nitrogen oxide, sulfur dioxide, acid gases, particulate matter and mercury emissions. To comply with these requirements, DTE Electric spent approximately $2 billion through 2013. It is estimated that DTE Electric will make capital expenditures of approximately $200 million in 2014 and up to approximately $1.2 billion of additional capital expenditures through 2021 based on current regulations.
Climate regulation and/or legislation has been proposed and discussed within the U.S. Congress and the EPA. The EPA is implementing regulatory actions under the Clean Air Act to address emissions of greenhouse gases (GHGs). EPA regulation of GHGs requires the best available control technology (BACT) for new major sources or modifications to existing major sources that cause significant increases in GHG emissions. In June 2012, the EPA proposed new source performance standards for carbon dioxide emissions from new fossil-fueled power plants. These new source performance standards were re-proposed on September 20, 2013, under a presidential directive issued on June 25, 2013. Under the same presidential directive, the EPA proposed performance standards for carbon dioxide emissions from existing, reconstructed and modified plants on June 2, 2014 and plans to issue a final standard by July 2015. DTE Energy is an active participant in working with the EPA and other stakeholders to shape the final performance standards for new and existing power plants. The standards for new sources are not expected to have a material impact on the Company, since the Company has no plans to build new coal-fired generation. It is not possible to determine the potential impact of future regulations on existing sources at this time. Pending or future legislation or other regulatory actions could have a material impact on our operations and financial position and the rates we charge our customers. Impacts include expenditures for environmental equipment beyond what is currently planned, financing costs related to additional capital expenditures, the purchase of emission credits from market sources and the retirement of facilities where control equipment is not economical. We would seek to recover these incremental costs through increased rates charged to our utility customers as authorized by the MPSC. Increased costs for energy produced from traditional coal-based sources could also increase the economic viability of energy produced from renewable, natural gas-fired generation and/or nuclear sources, from energy efficiency initiatives, and from the potential development of market-based trading of carbon offsets which could provide new business opportunities for our utility and non-utility segments. A June 23, 2014 U.S. Supreme Court decision on the EPA’s authority to regulate GHG emissions under permitting programs of the Clean Air Act is expected to have little effect on DTE Energy since the Supreme Court's decision upholds the EPA’s authority to regulate GHGs at sources that are already subject to permitting due to emissions of conventional pollutants. In addition, the Supreme Court's ruling does not affect the EPA’s current proposed carbon performance standards at new or existing power plants. At the present time, it is not possible to quantify the financial impacts of these climate related legislative or regulatory initiatives on DTE Energy or its customers.
For further discussion of environmental matters see Note 11 to the Consolidated Financial Statements, "Commitments and Contingencies".
OUTLOOK
The next few years will be a period of rapid change for DTE Energy and for the energy industry. Our strong utility base, combined with our integrated non-utility operations, position us well for long-term growth.
Looking forward, we will focus on several areas that we expect will improve future performance:
| |
• | electric and gas customer satisfaction; |
| |
• | rate competitiveness and affordability; |
| |
• | regulatory stability and investment recovery for our utilities; |
| |
• | growth of our utility asset base; |
| |
• | cost structure optimization across all business segments; |
| |
• | cash, capital and liquidity to maintain or improve our financial strength; and |
| |
• | investments that integrate our assets and leverage our skills and expertise. |
We will continue to pursue opportunities to grow our businesses in a disciplined manner if we can secure opportunities that meet our strategic, financial and risk criteria.
RESULTS OF OPERATIONS
The following sections provide a detailed discussion of the operating performance and future outlook of our segments.
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Net Income (Loss) Attributable to DTE Energy by Segment: | | | | | | | |
Electric | $ | 135 |
| | $ | 179 |
| | $ | 400 |
| | $ | 383 |
|
Gas | (16 | ) | | (13 | ) | | 109 |
| | 91 |
|
Gas Storage and Pipelines | 20 |
| | 16 |
| | 59 |
| | 49 |
|
Power and Industrial Projects | 38 |
| | 27 |
| | 66 |
| | 46 |
|
Energy Trading | (22 | ) | | (6 | ) | | 6 |
| | (1 | ) |
Corporate and Other | 1 |
| | (5 | ) | | (34 | ) | | (31 | ) |
Net Income Attributable to DTE Energy Company | $ | 156 |
| | $ | 198 |
| | $ | 606 |
| | $ | 537 |
|
ELECTRIC
Our Electric segment consists principally of DTE Electric.
Electric results are discussed below:
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Operating Revenues | $ | 1,358 |
| | $ | 1,458 |
| | $ | 4,049 |
| | $ | 3,942 |
|
Fuel and purchased power | 430 |
| | 487 |
| | 1,328 |
| | 1,294 |
|
Gross Margin | 928 |
| | 971 |
| | 2,721 |
| | 2,648 |
|
Operation and maintenance | 352 |
| | 336 |
| | 1,023 |
| | 1,010 |
|
Depreciation and amortization | 239 |
| | 236 |
| | 699 |
| | 671 |
|
Taxes other than income | 67 |
| | 66 |
| | 203 |
| | 200 |
|
Asset (gains) and losses, reserves and impairments, net | — |
| | (3 | ) | | (1 | ) | | (3 | ) |
Operating Income | 270 |
| | 336 |
| | 797 |
| | 770 |
|
Other (Income) and Deductions | 61 |
| | 61 |
| | 170 |
| | 183 |
|
Income Tax Expense | 74 |
| | 96 |
| | 227 |
| | 204 |
|
Net Income Attributable to DTE Energy Company | $ | 135 |
| | $ | 179 |
| | $ | 400 |
| | $ | 383 |
|
Operating Income as a Percent of Operating Revenues | 20 | % | | 23 | % | | 20 | % | | 20 | % |
Gross margin decreased $43 million and increased $73 million in the three and nine months ended September 30, 2014, respectively. Revenues associated with certain tracking mechanisms and surcharges are offset by related expenses elsewhere in the Consolidated Statements of Operations.
The following table details changes in various gross margin components relative to the comparable prior period: |
| | | | | | | |
| Three Months | | Nine Months |
| (In millions) |
Amortization of refundable revenue decoupling/deferred gain | $ | — |
| | $ | 63 |
|
Base sales, inclusive of weather effect | (51 | ) | | (24 | ) |
Securitization bond and tax surcharge | (2 | ) | | 6 |
|
Renewable energy program | 5 |
| | 16 |
|
Low income energy assistance surcharge | 4 |
| | 17 |
|
Regulatory mechanisms and other | 1 |
| | (5 | ) |
Increase (decrease) in gross margin | $ | (43 | ) | | $ | 73 |
|
|
| | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In thousands of MWh) |
Electric Sales | | | | | | | |
Residential | 3,932 |
| | 4,401 |
| | 11,362 |
| | 11,600 |
|
Commercial | 4,541 |
| | 4,504 |
| | 12,757 |
| | 12,585 |
|
Industrial | 2,710 |
| | 2,635 |
| | 7,765 |
| | 7,746 |
|
Other | 62 |
| | 233 |
| | 438 |
| | 701 |
|
| 11,245 |
| | 11,773 |
| | 32,322 |
| | 32,632 |
|
Interconnection sales (a) | 1,416 |
| | 711 |
| | 2,513 |
| | 2,276 |
|
Total Electric Sales | 12,661 |
| | 12,484 |
| | 34,835 |
| | 34,908 |
|
| | | | | | | |
Electric Deliveries | |
| | |
| | | | |
Retail and Wholesale | 11,245 |
| | 11,773 |
| | 32,322 |
| | 32,632 |
|
Electric Customer Choice, including self generators (b) | 1,334 |
| | 1,393 |
| | 3,838 |
| | 3,940 |
|
Total Electric Sales and Deliveries | 12,579 |
| | 13,166 |
| | 36,160 |
| | 36,572 |
|
______________________________
| |
(a) | Represents power that is not distributed by DTE Electric. |
| |
(b) | Represents deliveries for self generators who have purchased power from alternative energy suppliers to supplement their power requirements. |
Operation and maintenance expense increased $16 million and $13 million in the three and nine months ended September 30, 2014, respectively. The increase in the third quarter was due primarily to increased storm restoration expenses of $33 million, partially offset by decreased employee benefit expenses of $14 million, $6 million of decreased power plant generation expenses and $4 million of decreased distribution operations expenses. The increase in the nine-month period was primarily due to increased storm restoration expenses of $37 million, increased power plant generation expenses for planned outages of $21 million and increased low income energy assistance of $17 million, partially offset by decreased employee benefit expenses of $61 million and $7 million of decreased distribution operations expenses. In addition, the 2014 third quarter and nine-month periods included $8 million of expenses related to the transition of PLD customers to DTE Electric’s distribution system effective July 1, 2014. In May 2014, the MPSC approved a TRM that provides for recovery of the deferred net incremental revenue requirement associated with the transition that is reflected in the Depreciation and amortization line in the Consolidated Statements of Operations.
Depreciation and amortization expense increased $3 million and $28 million in the three and nine months ended September 30, 2014, respectively. The increase in the third quarter was due to $8 million of increased expense due to an increased depreciable base, partially offset by decreased amortization of regulatory assets of $5 million. The increase in the nine-month period was due to $20 million of increased expense due to an increased depreciable base and $8 million of increased amortization of regulatory assets, primarily related to Securitization.
Other (income) and deductions decreased by $13 million in the nine months ended September 30, 2014 due primarily to decreased interest expense.
Outlook — We continue to move forward in our efforts to achieve operational excellence, sustained strong cash flows and earn our authorized return on equity. We expect that our planned significant capital investments will result in earnings growth. Looking forward, additional factors may impact earnings such as weather, the outcome of regulatory proceedings, benefit plan design changes, investment returns and changes in discount rate assumptions in benefit plans and health care costs, and uncertainty of legislative or regulatory actions regarding climate change and electric customer choice. We expect to continue our efforts to improve productivity and decrease our costs while improving customer satisfaction with consideration of customer rate affordability.
In May 2014, the Company filed an application with the NRC requesting a renewal of the license for its Fermi 2 nuclear power plant. The Company has requested a 20-year extension of its original license due to expire in 2025.
GAS
Our Gas segment consists principally of DTE Gas.
Gas results are discussed below:
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Operating Revenues | $ | 149 |
| | $ | 161 |
| | $ | 1,182 |
| | $ | 1,013 |
|
Cost of gas | 13 |
| | 29 |
| | 521 |
| | 408 |
|
Gross Margin | 136 |
| | 132 |
| | 661 |
| | 605 |
|
Operation and maintenance | 112 |
| | 105 |
| | 337 |
| | 316 |
|
Depreciation and amortization | 25 |
| | 24 |
| | 73 |
| | 71 |
|
Taxes other than income | 13 |
| | 12 |
| | 46 |
| | 43 |
|
Operating Income (Loss) | (14 | ) | | (9 | ) | | 205 |
| | 175 |
|
Other (Income) and Deductions | 11 |
| | 11 |
| | 34 |
| | 34 |
|
Income Tax Expense (Benefit) | (9 | ) | | (7 | ) | | 62 |
| | 50 |
|
Net Income (Loss) Attributable to DTE Energy Company | $ | (16 | ) | | $ | (13 | ) | | $ | 109 |
| | $ | 91 |
|
Operating Income (Loss) as a Percent of Operating Revenues | (9 | )% | | (6 | )% | | 17 | % | | 17 | % |
Gross margin increased $4 million and $56 million in the three and nine months ended September 30, 2014, respectively. Revenues associated with certain tracking mechanisms and surcharges are offset by related expenses elsewhere in the Consolidated Statements of Operations.
The following table details changes in various gross margin components relative to the comparable prior period:
|
| | | | | | | |
| Three Months | | Nine Months |
| (In millions) |
Weather | $ | — |
| | $ | 41 |
|
Infrastructure recovery mechanism | 3 |
| | 4 |
|
Midstream storage and transportation services | (5 | ) | | 8 |
|
Energy optimization revenue | 3 |
| | (5 | ) |
Other | 3 |
| | 8 |
|
Increase in gross margin | $ | 4 |
| | $ | 56 |
|
|
| | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
Gas Markets (in Bcf) | | | | | | | |
Gas sales | 9 |
| | 10 |
| | 97 |
| | 86 |
|
End user transportation | 28 |
| | 24 |
| | 122 |
| | 111 |
|
| 37 |
| | 34 |
| | 219 |
| | 197 |
|
Intermediate transportation | 70 |
| | 81 |
| | 244 |
| | 233 |
|
| 107 |
| | 115 |
| | 463 |
| | 430 |
|
Operation and maintenance expense increased $7 million and $21 million in the three and nine months ended September 30, 2014, respectively. The increase in the third quarter was due primarily to increased gas operations expenses of $6 million and increased energy optimization expenses of $2 million, partially offset by decreased employee benefit expenses of $2 million. The increase in the nine-month period was primarily due to increased weather-related gas operations expenses of $28 million, increased uncollectible expenses of $4 million and increased corporate administrative expenses of $3 million, partially offset by decreased employee benefit expenses of $10 million and decreased energy optimization expenses of $5 million.
Outlook — We continue to move forward in our efforts to achieve operational excellence, sustained strong cash flows and earn our authorized return on equity. We expect that our planned significant infrastructure capital investments will result in earnings growth. Looking forward, additional factors may impact earnings such as weather, the outcome of regulatory proceedings, benefit plan design changes, and investment returns and changes in discount rate assumptions in benefit plans and health care costs. We expect to continue our efforts to improve productivity and decrease our costs while improving customer satisfaction with consideration of customer rate affordability.
GAS STORAGE AND PIPELINES
Our Gas Storage and Pipelines segment consists of our non-utility gas pipelines and storage businesses.
Gas Storage and Pipelines results are discussed below: |
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Operating Revenues | $ | 49 |
| | $ | 34 |
| | $ | 146 |
| | $ | 92 |
|
Operation and maintenance | 11 |
| | 7 |
| | 32 |
| | 19 |
|
Depreciation and amortization | 9 |
| | 6 |
| | 25 |
| | 14 |
|
Taxes other than income | 1 |
| | 1 |
| | 3 |
| | 3 |
|
Operating Income | 28 |
| | 20 |
| | 86 |
| | 56 |
|
Other (Income) and Deductions | (6 | ) | | (7 | ) | | (14 | ) | | (26 | ) |
Income Tax Expense | 13 |
| | 10 |
| | 39 |
| | 31 |
|
Net Income | 21 |
| | 17 |
| | 61 |
| | 51 |
|
Noncontrolling Interests | 1 |
| | 1 |
| | 2 |
| | 2 |
|
Net Income Attributable to DTE Energy Company | $ | 20 |
| | $ | 16 |
| | $ | 59 |
| | $ | 49 |
|
Operating revenues increased $15 million and $54 million in the three and nine months ended September 30, 2014, respectively. The increases were due primarily to increased volumes on the Bluestone pipeline, additional segments placed in service in the Susquehanna gathering system and, in the nine-month period, increased storage revenue.
Operation and maintenance expenses increased $4 million and $13 million in the three and nine months ended September 30, 2014, respectively. The increases were due primarily to the growth of the Bluestone and Susquehanna projects.
Depreciation and amortization expenses increased $3 million and $11 million in the three and nine months ended September 30, 2014, respectively. The increases were due primarily to the growth of the Bluestone and Susquehanna projects.
Other (income) and deductions decreased by $1 million and $12 million in the three and nine months ended September 30, 2014, respectively. The decreases were due to decreased earnings from a pipeline investment and increased intercompany interest expense. The earnings from the pipeline investment were negatively impacted by a revenue deferral for depreciation collected in FERC-approved tariff rates in excess of depreciation expense.
Outlook — Our Gas Storage and Pipelines business expects to maintain its steady growth by developing an asset portfolio with multiple growth platforms through investment in new projects and expansions. We will continue to look for additional investment opportunities and other storage and pipeline projects at favorable prices. The capacity expansion of Bluestone, a 44-mile lateral pipeline in Susquehanna County, Pennsylvania and Broome County, New York, is progressing as planned. In the 2014 third quarter, a new compressor facility was placed in service. Expansion activities over the next twelve months include a second compressor facility and approximately 9.5 miles of additional pipeline loop to accommodate increased shipper demand. Through our agreement with Southwestern Energy Company and affiliates (Southwestern), we believe Bluestone lateral and Susquehanna gathering system are strategically positioned for future growth of the Marcellus shale.
Progress continues on preliminary development activities on the proposed Nexus pipeline, a transportation path for natural gas from the Utica shale in Ohio to Michigan and Ontario. During the 2014 third quarter, several producers signed agreements as shippers, indicating their firm volume commitment subject to certain conditions customary in the pipeline industry. We are planning to have a partnership interest in the Nexus pipeline.
POWER AND INDUSTRIAL PROJECTS
Power and Industrial Projects is comprised primarily of projects that deliver energy and utility-type products and services to industrial, commercial and institutional customers; produce REF and sell electricity from biomass-fired energy projects.
Power and Industrial Projects results are discussed below:
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Operating Revenues | $ | 605 |
| | $ | 512 |
| | $ | 1,703 |
| | $ | 1,431 |
|
Operation and maintenance | 591 |
| | 499 |
| | 1,695 |
| | 1,402 |
|
Depreciation and amortization | 19 |
| | 18 |
| | 56 |
| | 53 |
|
Taxes other than income | 4 |
| | 4 |
| | 12 |
| | 12 |
|
Asset (gains) and losses, reserves and impairments, net | (3 | ) | | (3 | ) | | (10 | ) | | (2 | ) |
Operating Loss | (6 | ) | | (6 | ) | | (50 | ) | | (34 | ) |
Other (Income) and Deductions | (24 | ) | | (29 | ) | | (45 | ) | | (54 | ) |
Income Taxes | | | | | | | |
Expense (Benefit) | 8 |
| | 7 |
| | (2 | ) | | 6 |
|
Production Tax Credits | (29 | ) | | (12 | ) | | (72 | ) | | (35 | ) |
| (21 | ) | | (5 | ) | | (74 | ) | | (29 | ) |
Net Income | 39 |
| | 28 |
| | 69 |
| | 49 |
|
Noncontrolling Interests | 1 |
| | 1 |
| | 3 |
| | 3 |
|
Net Income Attributable to DTE Energy Company | $ | 38 |
| | $ | 27 |
| | $ | 66 |
| | $ | 46 |
|
Operating revenues increased $93 million and $272 million in the three months and nine months ended September 30, 2014, respectively. The increase in the third quarter was due primarily to an $83 million increase associated with increased volumes from REF projects and a $15 million increase associated with start-up of a biomass-fired power project, partially offset by a $4 million decrease due to the sale of an on-site project. The increase in the nine-month period was due primarily to a $289 million increase associated with increased volumes from REF projects, a $27 million increase associated with start-up of a biomass-fired power project and an $8 million increase primarily due to higher volumes from the steel business, partially offset by a $43 million decrease from lower coal prices associated with the steel business and an $8 million decrease due to the sale of an on-site project.
Operation and maintenance expense increased $92 million and $293 million in the three months and nine months ended September 30, 2014, respectively. The increase in the third quarter was due primarily to an $88 million increase associated with increased volumes from REF projects and a $6 million increase associated with start-up of a biomass-fired power project. The increase in the nine-month period was due primarily to a $299 million increase associated with increased volumes from REF projects, a $20 million increase associated with start-up of a biomass-fired power project and an $18 million increase primarily due to higher volumes and maintenance spending from the steel business, partially offset by a $43 million decrease from lower coal prices associated with the steel business.
Asset (gains) losses, reserves and impairments, net increased by $8 million in the nine months ended September 30, 2014. The increase was due primarily to a gain associated with a sale of an on-site project in 2014 and an asset impairment recorded in the prior year.
Other (income) and deductions decreased by $5 million and $9 million in the three and nine months ended September 30, 2014, respectively. The decrease in the nine-month period was primarily due to lower volumes of refined coal produced at REF sites with investors and lower equity earnings at various projects.
Production tax credits increased by $17 million and $37 million in the three and nine months ended September 30, 2014, respectively. The increases were primarily due to higher production volumes of refined coal that resulted in higher tax credits at REF projects.
Outlook — The Company has constructed and placed in service nine REF facilities including five facilities located at third party owned coal-fired power plants. The Company has sold membership interests in four of the facilities. We continue to optimize these facilities by seeking investors for facilities operating at DTE Electric and other utility sites. We intend to relocate an underutilized facility, located at a DTE Electric site, to an alternative coal-fired power plant which may provide increased production and emission reduction opportunities in future years.
We have five biomass-fired power generation facilities in operation. Our on-site energy services will continue to be delivered in accordance with the terms of long-term contracts. A landfill gas to energy project was placed in service in the 2014 third quarter. We are constructing a new natural gas-fired cogeneration facility which is expected to be completed in the 2014 fourth quarter. We will continue to look for additional investment opportunities and other energy projects at favorable prices.
Power and Industrial Projects will continue to leverage its extensive energy-related operating experience and project management capability to develop additional energy projects to serve energy intensive industrial customers.
ENERGY TRADING
Energy Trading focuses on physical and financial power and natural gas marketing and trading, structured transactions, enhancement of returns from DTE Energy’s asset portfolio, and optimization of contracted natural gas pipeline transportation and storage, and generating capacity positions. Energy Trading also provides natural gas, power and related services, which may include the management of associated storage and transportation contracts on the customers’ behalf, and the supply or purchase of renewable energy credits to various customers.
Energy Trading results are discussed below:
|
| | | | | | | | | | | | | | | |
| Three Months Ended September 30, | | Nine Months Ended September 30, |
| 2014 | | 2013 | | 2014 | | 2013 |
| (In millions) |
Operating Revenues | $ | 664 |
| | $ | 463 |
| | $ | 2,797 |
| | $ | 1,307 |
|
Fuel, purchased power and gas | 679 |
| | 453 |
| | 2,728 |
| | 1,242 |
|
Gross Margin | (15 | ) | | 10 |
| | 69 |
| | 65 |
|
Operation and maintenance | 19 |
| | 17 |
| | 51 |
| | 57 |
|
Depreciation and amortization | 1 |
| | — |
| | 1 |
| | 1 |
|
Taxes other than income | — |
| | 1 |
| | 3 |
| | 3 |
|
Operating Income (Loss) | (35 | ) | | (8 | ) | | 14 |
| | 4 |
|
Other (Income) and Deductions | 1 |
| | 2 |
| | 5 |
| | 6 |
|
Income Tax Expense (Benefit) | (14 | ) | | (4 | ) | | 3 |
| | (1 | ) |
Net Income (Loss) Attributable to DTE Energy Company | $ | (22 | ) | | $ | (6 | ) | | $ | 6 |
| | $ | (1 | ) |
Operating revenues and Fuel, purchased power and gas were impacted by an increase in gas prices and volumes, primarily in our gas structured and gas transportation strategies for both the three and nine months ended September 30, 2014.
Gross margin decreased $25 million and increased $4 million for the three and nine months ended September 30, 2014, respectively. The third quarter decrease in gross margin of $25 million represents a $20 million decrease in realized margins and a $5 million decrease in unrealized margins. The $20 million decrease in realized margins is due to $28 million of unfavorable results, primarily in our gas structured, gas storage and power trading strategies, offset by $8 million of favorable results, primarily in our power full requirements strategy. The $5 million decrease in unrealized margins is due to $31 million of unfavorable results, primarily in our gas structured, gas trading and gas transportation strategies, offset by $26 million of favorable results, primarily in our power full requirements and power trading strategies.
The $4 million increase in gross margin for the nine months ended September 30, 2014 represents a $23 million increase in realized margins and a $19 million decrease in unrealized margins. The $23 million increase in realized margins is due to $119 million of favorable results, primarily in our gas structured and gas transportation strategies, offset by $96 million of unfavorable results, primarily in our power full requirements and gas and power trading strategies. The $19 million decrease in unrealized margins is due to $58 million of unfavorable results, primarily in our gas structured strategy, offset by $39 million of favorable results, primarily in our power full requirements and gas trading strategies.
In the first quarter of 2014, extreme weather conditions occurred in the Midwest and Northeast gas and power markets we serve. Consequently, this led to favorable results in our gas asset optimization strategies due to increased gas prices and volumes which were partially offset by realized losses from our power full requirements strategy due to higher than expected loads, energy prices, and ancillary charges to serve our customers.
Natural gas structured transactions typically involve a physical purchase or sale of natural gas in the future and/or natural gas basis financial instruments which are derivatives and a related non-derivative pipeline transportation contract. These gas structured transactions can result in significant earnings volatility as the derivative components are marked-to-market without revaluing the related non-derivative contracts. During the fourth quarter of 2013 and the third quarter of 2014, we saw significant increases in gas prices which led to the volatility in the accounting earnings due to the physical component being marked-to-market without an offsetting mark on the transportation component. Included in the $119 million of favorable realized results for the nine months ended September 30, 2014 in our gas strategies is $58 million of timing related losses recognized in the fourth quarter of 2013 that reversed primarily during the first three months of 2014 as the underlying contracts were settled. Included in the $31 million and $58 million of unfavorable unrealized results for the three and nine months ended September 30, 2014 in our gas strategies is $40 million and $50 million of timing related losses, respectively, which will reverse in future periods, primarily in the first quarter of 2015 as the underlying contracts settle.
Outlook — In the near-term, we expect market conditions to remain challenging and the profitability of this segment may be impacted by the volatility in commodity prices in the markets we participate in and the uncertainty of impacts associated with financial reform, regulatory changes and changes in operating rules of regional transmission organizations.
The Energy Trading portfolio includes financial instruments, physical commodity contracts and natural gas inventory, as well as contracted natural gas pipeline transportation and storage, and generation capacity positions. Energy Trading also provides natural gas, power and related services, which may include the management of associated storage and transportation contracts on the customers' behalf under FERC Asset Management Arrangements, and the supply or purchase of renewable energy credits to various customers. Significant portions of the Energy Trading portfolio are economically hedged. Most financial instruments and physical power and natural gas contracts are deemed derivatives, whereas natural gas inventory, pipeline transportation, renewable energy credits, and storage assets are not derivatives. As a result, we will experience earnings volatility as derivatives are marked-to-market without revaluing the underlying non-derivative contracts and assets. Our strategy is to economically manage the price risk of these underlying non-derivative contracts and assets with futures, forwards, swaps and options. This results in gains and losses that are recognized in different interim and annual accounting periods.
See Notes 4 and 5 to the Consolidated Financial Statements, "Fair Value" and "Financial and Other Derivative Instruments".
CORPORATE AND OTHER
Corporate and Other includes various holding company activities and holds certain non-utility debt and energy-related investments. The net income of $1 million and net loss of $34 million in the three and nine months ended September 30, 2014, respectively, represents an increase of $6 million and decrease of $3 million, respectively, from the losses of $5 million and $31 million in the comparable 2013 periods. The increased loss in the nine month period was due primarily to increased deferred tax expense related to New York state income tax reform enacted on March 31, 2014.
CAPITAL RESOURCES AND LIQUIDITY
Cash Requirements
We use cash to maintain and expand our electric and natural gas utilities and to grow our non-utility businesses, retire and pay interest on long-term debt and pay dividends. We believe that we will have sufficient internal and external capital resources to fund anticipated capital and operating requirements. We expect that cash from operations in 2014 will be approximately $1.6 billion, or approximately $500 million lower than 2013, due primarily to decreased surcharge collections and increased fuel, purchased power and gas costs. We anticipate base level utility capital investments, environmental, renewable and energy optimization expenditures and expenditures for non-utility businesses in 2014 of approximately $2.2 billion. We plan to seek regulatory approval to include utility capital expenditures in our regulatory rate base consistent with prior treatment. Capital spending for growth of existing or new non-utility businesses will depend on the existence of opportunities that meet our strict risk-return and value creation criteria.
|
| | | | | | | |
| Nine Months Ended September 30, |
| 2014 | | 2013 |
| (In millions) |
Cash and Cash Equivalents | | | |
Cash Flow From (Used For) | | | |
Operating Activities: | | | |
Net income | $ | 610 |
| | $ | 542 |
|
Adjustments to reconcile net income to net cash from operating activities: | | | |
Depreciation and amortization | 855 |
| | 811 |
|
Nuclear fuel amortization | 33 |
| | 25 |
|
Allowance for equity funds used during construction | (16 | ) | | (10 | ) |
Deferred income taxes | 244 |
| | 162 |
|
Asset (gains) and losses, reserves and impairments, net | (10 | ) | | (5 | ) |
Working capital and other | (418 | ) | | 190 |
|
Net cash from operating activities | 1,298 |
| | 1,715 |
|
Investing Activities: | | | |
Plant and equipment expenditures — utility | (1,295 | ) | | (1,101 | ) |
Plant and equipment expenditures — non-utility | (207 | ) | | (270 | ) |
Proceeds from sale of assets | 36 |
| | 20 |
|
Other | 9 |
| | 14 |
|
Net cash used for investing activities | (1,457 | ) | | (1,337 | ) |
Financing Activities: | | | |
Issuance of long-term debt, net of issuance costs | 1,289 |
| | 768 |
|
Redemption of long-term debt | (1,222 | ) | | (855 | ) |
Short-term borrowings, net | 522 |
| | 31 |
|
Issuance of common stock | — |
| | 29 |
|
Repurchase of common stock | (52 | ) | | — |
|
Dividends on common stock and other | (370 | ) | | (345 | ) |
Net cash from (used for) financing activities | 167 |
| | (372 | ) |
Net Increase in Cash and Cash Equivalents | $ | 8 |
| | $ | 6 |
|
Cash from Operating Activities
A majority of our operating cash flow is provided by our electric and natural gas utilities, which are significantly influenced by factors such as weather, electric Customer Choice, regulatory deferrals, regulatory outcomes, economic conditions and operating costs.
Cash from operations in the nine months ended September 30, 2014 decreased by $417 million compared to the nine months ended September 30, 2013. The operating cash flow comparison reflects an increase in cash expenditures for working capital items, partially offset by increased net income after adjusting for non-cash and non-operating items (primarily depreciation and amortization, and deferred income taxes).
Cash used for Investing Activities
Cash inflows associated with investing activities are primarily generated from the sale of assets, while cash outflows are the result of plant and equipment expenditures. In any given year, we will look to realize cash from under-performing or non-strategic assets or matured fully valued assets.
Capital spending within the utility businesses is primarily to maintain and improve our electric generation and electric and natural gas distribution infrastructure and to comply with environmental regulations and renewable energy requirements.
Capital spending within our non-utility businesses is primarily for ongoing maintenance, expansion and growth. We look to make growth investments that meet strict criteria in terms of strategy, management skills, risks and returns. All new investments are analyzed for their rates of return and cash payback on a risk adjusted basis. We have been disciplined in how we deploy capital and will not make investments unless they meet our criteria. For new business lines, we initially invest based on research and analysis. We start with a limited investment, we evaluate results and either expand or exit the business based on those results. In any given year, the amount of growth capital will be determined by the underlying cash flows of the Company with a clear understanding of any potential impact on our credit ratings.
Net cash used for investing activities increased by $120 million in 2014 due primarily to increased capital expenditures by our utility businesses, partially offset by decreased capital expenditures by our non-utility businesses and increased proceeds from sale of assets.
Cash from (used for) Financing Activities
We rely on both short-term borrowing and long-term financing as a source of funding for our capital requirements not satisfied by our operations.
Our strategy is to have a targeted debt portfolio blend of fixed and variable interest rates and maturity. We continually evaluate our leverage target, which is currently 50% to 52%, to ensure it is consistent with our objective to have a strong investment grade debt rating.
Net cash from financing activities increased by $539 million in 2014 due primarily to increases in short-term borrowings and issuances of long-term debt, partially offset by increased redemptions of long-term debt, repurchases of common stock and increased dividends on common stock.
Outlook
We expect cash flow from operations to increase over the long-term primarily as a result of growth from our utilities and non-utility businesses. We expect growth in our utilities to be driven primarily by capital spending to maintain and improve our electric generation and electric and natural gas distribution infrastructure and to comply with new and existing state and federal regulations that will result in additional environmental and renewable energy investments which will increase the base from which rates are determined. Our non-utility growth is expected from additional investments primarily in our Gas Storage and Pipelines and Power and Industrial Projects segments.
We may be impacted by the timing of collection or refund of various recovery and tracking mechanisms as a result of timing of MPSC orders. Energy prices are likely to be a source of volatility with regard to working capital requirements for the foreseeable future. We are continuing our efforts to identify opportunities to improve cash flow through working capital initiatives and maintaining flexibility in the timing and extent of our long-term capital projects.
We have approximately $300 million in long-term debt maturing in the next twelve months. The repayment of the principal amount of the Securitization debt is funded through a surcharge payable by DTE Electric’s customers. The repayment of the other debt is expected to be paid through internally generated funds or the issuance of long-term debt.
DTE Energy has approximately $1.2 billion of available liquidity at September 30, 2014, consisting of cash and amounts available under unsecured revolving credit agreements.
During the first nine months of 2014, we contributed $167 million to our pension plans. At the discretion of management, and depending upon financial market conditions, we may make up to an additional $20 million contribution to our pension plans in 2014. At the discretion of management, we may make up to a $145 million contribution to our other postretirement benefit plans in 2014.
Various subsidiaries of the Company have entered into contracts which contain ratings triggers and are guaranteed by DTE Energy. These contracts contain provisions which allow the counterparties to require that the Company post cash or letters of credit as collateral in the event that DTE Energy’s credit rating is downgraded below investment grade. Certain of these provisions (known as “hard triggers”) state specific circumstances under which the Company can be required to post collateral upon the occurrence of a credit downgrade, while other provisions (known as “soft triggers”) are not as specific. For contracts with soft triggers, it is difficult to estimate the amount of collateral which may be requested by counterparties and/or which the Company may ultimately be required to post. The amount of such collateral which could be requested fluctuates based on commodity prices (primarily natural gas, power and coal) and the provisions and maturities of the underlying transactions. As of September 30, 2014, DTE Energy's contractual obligation to post collateral in the form of cash or letter of credit in the event of a downgrade to below investment grade, under both hard trigger and soft trigger provisions, was approximately $327 million.
We believe we have sufficient operating flexibility, cash resources and funding sources to maintain adequate amounts of liquidity and to meet our future operating cash and capital expenditure needs. However, virtually all of our businesses are capital intensive, or require access to capital, and the inability to access adequate capital could adversely impact earnings and cash flows.
See Notes 7, 9, 10 and 11 to the Consolidated Financial Statements, "Regulatory Matters", "Long-Term Debt", "Short-Term Credit Arrangements and Borrowings" and "Commitments and Contingencies".
NEW ACCOUNTING PRONOUNCEMENTS
See Note 3 to the Consolidated Financial Statements, "New Accounting Pronouncements".
FAIR VALUE
Derivatives are generally recorded at fair value and shown as Derivative Assets or Liabilities. Contracts we typically classify as derivative instruments include power, natural gas, oil and certain coal forwards, futures, options and swaps, and foreign currency exchange contracts. Items we do not generally account for as derivatives include natural gas inventory, pipeline transportation, renewable energy credits and storage assets. See Notes 4 and 5 to the Consolidated Financial Statements, "Fair Value" and "Financial and Other Derivative Instruments".
The tables below do not include the expected earnings impact of non-derivative natural gas storage, transportation, certain power contracts and renewable energy credits which are subject to accrual accounting. Consequently, gains and losses from these positions may not match with the related physical and financial hedging instruments in some reporting periods, resulting in volatility in DTE Energy’s reported period-by-period earnings; however, the financial impact of the timing differences will reverse at the time of physical delivery and/or settlement.
The Company manages its MTM risk on a portfolio basis based upon the delivery period of its contracts and the individual components of the risks within each contract. Accordingly, the Company records and manages the energy purchase and sale obligations under its contracts in separate components based on the commodity (e.g. electricity or natural gas), the product (e.g. electricity for delivery during peak or off-peak hours), the delivery location (e.g. by region), the risk profile (e.g. forward or option), and the delivery period (e.g. by month and year).
The Company has established a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value in three broad levels. The fair value hierarchy gives the highest priority to quoted prices (unadjusted) in active markets for identical assets or liabilities (Level 1) and the lowest priority to unobservable inputs (Level 3). For further discussion of the fair value hierarchy, see Note 4 to Consolidated Financial Statements, "Fair Value".
The following tables provide details on changes in our MTM net asset (or liability) position for the nine months ended September 30, 2014:
|
| | | |
| Total |
| (In millions) |
MTM at January 1, 2014 | $ | (112 | ) |
Reclassify to realized upon settlement | (99 | ) |
Changes in fair value recorded to income | 106 |
|
Amounts recorded to unrealized income | 7 |
|
Changes in fair value recorded in regulatory liabilities | 9 |
|
Change in collateral held by (for) others | 48 |
|
Option premiums paid (received) and other | (8 | ) |
MTM at September 30, 2014 | $ | (56 | ) |
The table below shows the maturity of our MTM positions:
|
| | | | | | | | | | | | | | | | | | | | |
Source of Fair Value | | 2014 | | 2015 | | 2016 | | 2017 and Beyond | | Total Fair Value |
| | (In millions) |
Level 1 | | $ | (9 | ) | | $ | 7 |
| | $ | (2 | ) | | $ | — |
| | $ | (4 | ) |
Level 2 | | (1 | ) | | (32 | ) | | (16 | ) | | 1 |
| | (48 | ) |
Level 3 | | (20 | ) | | (31 | ) | | 2 |
| | 7 |
| | (42 | ) |
MTM before collateral adjustments | | $ | (30 | ) | | $ | (56 | ) | | $ | (16 | ) | | $ | 8 |
| | (94 | ) |
Collateral adjustments | | | | | | | | | | 38 |
|
MTM at September 30, 2014 | | | | | | | | | | $ | (56 | ) |
Item 3. Quantitative and Qualitative Disclosures About Market Risk
Market Price Risk
The Electric and Gas businesses have commodity price risk, primarily related to the purchases of coal, natural gas, uranium, and electricity. However, the Company does not bear significant exposure to earnings risk as such changes are included in the PSCR and GCR regulatory rate-recovery mechanisms. In addition, changes in the price of natural gas can impact the valuation of lost and stolen gas and storage sales revenue at the Gas segment. Gas segment manages its market price risk related to storage sales revenue primarily through the sale of long-term storage contracts. The Company is exposed to short-term cash flow or liquidity risk as a result of the time differential between actual cash settlements and regulatory rate recovery.
Our Gas Storage and Pipelines business segment has exposure to natural gas price fluctuations which impact the pricing for natural gas storage and transportation. The Company manages its exposure through the use of short, medium and long-term storage and transportation contracts.
Our Power and Industrial Projects business segment is subject to electricity, natural gas and coal price risk. The Company manages its exposure through the use of long-term contracts.
Our Energy Trading business segment has exposure to electricity, natural gas, coal, crude oil, heating oil, and foreign currency exchange price fluctuations. These risks are managed by our energy marketing and trading operations through the use of forward energy, capacity, storage, options and futures contracts, within pre-determined risk parameters.
Credit Risk
Bankruptcies
The Company purchases and sells electricity, natural gas, coal, coke and other energy products from and to governmental entities and numerous companies operating in the steel, automotive, energy, retail, financial and other industries. Certain of its customers have filed for bankruptcy protection under the U.S. Bankruptcy Code. The Company regularly reviews contingent matters relating to these customers and its purchase and sale contracts and records provisions for amounts considered at risk of probable loss. The Company believes its accrued amounts are adequate for probable loss.
Other
We engage in business with customers that are non-investment grade. We closely monitor the credit ratings of these customers and, when deemed necessary, we request collateral or guarantees from such customers to secure their obligations.
Trading Activities
We are exposed to credit risk through trading activities. Credit risk is the potential loss that may result if our trading counterparties fail to meet their contractual obligations. We utilize both external and internal credit assessments when determining the credit quality of our trading counterparties.
The following table displays the credit quality of our trading counterparties as of September 30, 2014:
|
| | | | | | | | | | | |
| Credit Exposure Before Cash Collateral | | Cash Collateral | | Net Credit Exposure |
| (In millions) |
Investment Grade (a) | | | | | |
A− and Greater | $ | 139 |
| | $ | — |
| | $ | 139 |
|
BBB+ and BBB | 176 |
| | (5 | ) | | 171 |
|
BBB− | 51 |
| | — |
| | 51 |
|
Total Investment Grade | 366 |
| | (5 | ) | | 361 |
|
Non-investment grade (b) | 1 |
| | — |
| | 1 |
|
Internally Rated — investment grade (c) | 132 |
| | — |
| | 132 |
|
Internally Rated — non-investment grade (d) | 17 |
| | (2 | ) | | 15 |
|
Total | $ | 516 |
| | $ | (7 | ) | | $ | 509 |
|
_______________________________________
| |
(a) | This category includes counterparties with minimum credit ratings of Baa3 assigned by Moody’s Investors Service (Moody’s) or BBB- assigned by Standard & Poor’s Rating Group, a division of McGraw-Hill Companies, Inc. (Standard & Poor’s). The five largest counterparty exposures, combined, for this category represented approximately 16% of the total gross credit exposure. |
| |
(b) | This category includes counterparties with credit ratings that are below investment grade. The five largest counterparty exposures, combined, for this category represented less than 1% of the total gross credit exposure. |
| |
(c) | This category includes counterparties that have not been rated by Moody’s or Standard & Poor’s, but are considered investment grade based on DTE Energy’s evaluation of the counterparty’s creditworthiness. The five largest counterparty exposures, combined, for this category represented approximately 11% of the total gross credit exposure. |
| |
(d) | This category includes counterparties that have not been rated by Moody’s or Standard & Poor’s, and are considered non-investment grade based on DTE Energy’s evaluation of the counterparty’s creditworthiness. The five largest counterparty exposures, combined, for this category represented approximately 2% of the total gross credit exposure. |
Interest Rate Risk
We are subject to interest rate risk in connection with the issuance of debt. In order to manage interest costs, we may use treasury locks and interest rate swap agreements. Our exposure to interest rate risk arises primarily from changes in U.S. Treasury rates, commercial paper rates and London Inter-Bank Offered Rates (LIBOR). As of September 30, 2014, we had a floating rate debt-to-total debt ratio of approximately 7.7% (excluding securitized debt).
Foreign Currency Exchange Risk
We have foreign currency exchange risk arising from market price fluctuations associated with fixed priced contracts. These contracts are denominated in Canadian dollars and are primarily for the purchase and sale of natural gas and power as well as for long-term transportation capacity. To limit our exposure to foreign currency exchange fluctuations, we have entered into a series of foreign currency exchange forward contracts through November 2018.
Summary of Sensitivity Analysis
We performed a sensitivity analysis on the fair values of our commodity contracts, long-term debt obligations and foreign currency exchange forward contracts. The commodity contracts and foreign currency exchange risk listed below principally relate to our energy marketing and trading activities. The sensitivity analysis involved increasing and decreasing forward rates at September 30, 2014 and 2013 by a hypothetical 10% and calculating the resulting change in the fair values.
The results of the sensitivity analysis calculations as of September 30, 2014 and 2013:
|
| | | | | | | | | | | | | | | | | | |
| | Assuming a 10% Increase in Rates | | Assuming a 10% Decrease in Rates | | |
| | As of September 30, | | As of September 30, | | |
Activity | | 2014 | | 2013 | | 2014 | | 2013 | | Change in the Fair Value of |
| | (In millions) | | |
Coal contracts | | $ | — |
| | $ | (1 | ) | | $ | — |
| | $ | 1 |
| | Commodity contracts |
Natural gas contracts | | $ | (25 | ) | | $ | (10 | ) | | $ | 26 |
| | $ | 10 |
| | Commodity contracts |
Electricity contracts | | $ | (2 | ) | | $ | 11 |
| | $ | 1 |
| | $ | (6 | ) | | Commodity contracts |
Interest rate risk | | $ | (327 | ) | | $ | (303 | ) | | $ | 346 |
| | $ | 322 |
| | Long-term debt |
Foreign currency exchange risk | | $ | — |
| | $ | — |
| | $ | — |
| | $ | — |
| | Forward contracts |
Discount rates | | $ | — |
| | $ | — |
| | $ | — |
| | $ | — |
| | Commodity contracts |
For further discussion of market risk, see Note 5 to the Consolidated Financial Statements, "Financial and Other Derivative Instruments".
Item 4. Controls and Procedures
(a) Evaluation of disclosure controls and procedures
Management of the Company carried out an evaluation, under the supervision and with the participation of DTE Energy's Chief Executive Officer (CEO) and Chief Financial Officer (CFO), of the effectiveness of the design and operation of the Company's disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) as of September 30, 2014, which is the end of the period covered by this report. Based on this evaluation, the Company's CEO and CFO have concluded that such disclosure controls and procedures are effective in providing reasonable assurance that information required to be disclosed by the Company in reports that it files or submits under the Exchange Act (i) is recorded, processed, summarized and reported within the time periods specified in the U.S. Securities and Exchange Commission's rules and forms and (ii) is accumulated and communicated to the Company's management, including its CEO and CFO, as appropriate to allow timely decisions regarding required disclosure. Due to the inherent limitations in the effectiveness of any disclosure controls and procedures, management cannot provide absolute assurance that the objectives of its disclosure controls and procedures will be attained.
(b) Changes in internal control over financial reporting
There have been no changes in the Company's internal control over financial reporting during the quarter ended September 30, 2014 that have materially affected, or are reasonably likely to materially affect, the Company's internal control over financial reporting.
Part II — Other Information
Item 1. Legal Proceedings
For more information on material legal proceedings and matters related to us and our subsidiaries, see Notes 7 and 11, to the Consolidated Financial Statements, "Regulatory Matters" and "Commitments and Contingencies".
Item 1A. Risk Factors
There are various risks associated with the operations of DTE Energy's utility and non-utility businesses. To provide a framework to understand the operating environment of DTE Energy, we have provided a brief explanation of the more significant risks associated with our businesses in Part 1, Item 1A. Risk Factors in the Company's 2013 Form 10-K. Although we have tried to identify and discuss key risk factors, others could emerge in the future.
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds
The following table provides information about our purchases of equity securities that are registered by the Company pursuant to Section 12 of the Exchange Act of 1934 for the quarter ended September 30, 2014:
|
| | | | | | | | | | | | | | | |
| Number of Shares Purchased (a) | | Average Price Paid per Share (a) | | Number of Shares Purchased as Part of Publicly Announced Plans or Programs | | Average Price Paid per Share | | Maximum Dollar Value that May Yet Be Purchased Under the Plans or Programs |
07/01/2014 — 07/31/2014 | 2,010 |
| | $ | 63.18 |
| | — |
| | — |
| | — |
|
08/01/2014 — 08/31/2014 | — |
| | $ | — |
| | — |
| | — |
| | — |
|
09/01/2014 — 09/30/2014 | 677 |
| | $ | 70.34 |
| | — |
| | — |
| | — |
|
Total | 2,687 |
| | |
| | — |
| | |
| | |
|
_______________________________________
| |
(a) | Represents shares of common stock purchased on the open market to provide shares to participants under various employee compensation and incentive programs. Also includes shares of common stock withheld to satisfy income tax obligations upon the vesting of restricted stock. |
Item 6. Exhibits
|
| | |
| | (i) Exhibits filed herewith: |
| | |
12-59 | | Computation of Ratio of Earnings to Fixed Charges |
| | |
31-93 | | Chief Executive Officer Section 302 Form 10-Q Certification of Periodic Report |
| | |
31-94 | | Chief Financial Officer Section 302 Form 10-Q Certification of Periodic Report |
| | |
99-57 | | Third Amendment to the Amendment and Restatement of Master Trust Agreement for the DTE Energy Company Master Plan Trust between DTE Energy Corporate Services, LLC and DTE Energy Investment Committee and JP Morgan Chase Bank, N.A., dated as of October 3, 2014. |
| | |
101.INS | | XBRL Instance Document |
| | |
101.SCH | | XBRL Taxonomy Extension Schema |
| | |
101.CAL | | XBRL Taxonomy Extension Calculation Linkbase |
| | |
101.DEF | | XBRL Taxonomy Extension Definition Database |
| | |
101.LAB | | XBRL Taxonomy Extension Label Linkbase |
| | |
101.PRE | | XBRL Taxonomy Extension Presentation Linkbase |
|
| | |
| | (ii) Exhibits furnished herewith: |
| | |
32-93 | | Chief Executive Officer Section 906 Form 10-Q Certification of Periodic Report |
| | |
32-94 | | Chief Financial Officer Section 906 Form 10-Q Certification of Periodic Report |
Signature
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
| | |
| | DTE ENERGY COMPANY |
| | (Registrant) |
| | |
| | |
Date: October 24, 2014 | By | /S/ DONNA M. ENGLAND |
| | Donna M. England Chief Accounting Officer (Principal Accounting Officer) |