Form 10-K
Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 


FORM 10-K

 


(Mark One)

x ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2006

 

¨ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from                      to                     

Commission File Number 1-9936

 


EDISON INTERNATIONAL

(Exact name of registrant as specified in its charter)

 


 

California   95-4137452

(State or other jurisdiction of

incorporation or organization)

 

(I.R.S. Employer

Identification No.)

 

2244 Walnut Grove Avenue  
(P.O. Box 976)  
Rosemead, California   91770
(Address of principal executive offices)   (Zip Code)

(626) 302-2222

Registrant’s telephone number, including area code:

 


Securities registered pursuant to Section 12(b) of the Act:

 

Title of each class

 

Name of each exchange

on which registered

Common Stock, no par value

  New York

Securities registered pursuant to Section 12(g) of the Act: None

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.     Yes  x    No  ¨

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Exchange Act.     Yes  ¨     No    x

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.    Yes  x    No  ¨

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.  x

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer or a non-accelerated filer. See definition of “accelerated filer” and “large accelerated filer” in Rule 12b-12 of the Exchange Act. (Check One):

Large Accelerated Filer  x                Accelerated Filer   ¨                Non-accelerated filer  ¨

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes  ¨    No  x

The aggregate market value of registrant’s voting stock held by non-affiliates was approximately $12,706,637,034 on or about June 30, 2006, based upon prices reported on the New York Stock Exchange. As of February 23, 2007, there were 325,811,206 shares of Common Stock outstanding.

DOCUMENTS INCORPORATED BY REFERENCE

Portions of the following documents listed below have been incorporated by reference into the parts of this report so indicated.

 

(1)    Designated portions of the registrant’s Annual Report to Shareholders for the year ended December 31, 2006

   Parts I and II

(2)    Designated portions of the Proxy Statement relating to registrant’s 2007 Annual Meeting of Shareholders

   Part III

 



Table of Contents

TABLE OF CONTENTS

 

Item

   Page

Forward-Looking Statements

   1
Part I

1.

 

Business

   4
 

Business of Edison International

   4
 

Regulation of Edison International

   4
 

Environmental Matters Affecting Edison International

   5
 

Financial Information About Geographic Areas

   6
 

Business of Southern California Edison Company

   6
 

Regulation of SCE

   6
 

Competition of SCE

   7
 

Properties of SCE

   8
 

Nuclear Power Matters of SCE

   9
 

SCE Purchased Power and Fuel Supply

   10
 

Seasonality of SCE

   11
 

Environmental Matters Affecting SCE

   11
 

Business of Edison Mission Group Inc.

   15
 

Business of Mission Energy Holding Company

   15
 

Business of Edison Mission Energy

   15
 

Competition and Market Conditions of EME

   16
 

Power Plants of EME

   18
 

Business Development of EME

   19
 

Discontinued Operations of EME

   20
 

Hedging and Trading Activities of EME

   20
 

Significant Customers

   21
 

Insurance of EME

   21
 

Seasonality of EME

   22
 

Discontinued Operations of EME

   22
 

Regulation of EME

   22
 

Environmental Matters Affecting EME

   27
 

Employees of EME

   31
 

Business of Edison Capital

   32
 

Energy and Infrastructure Investments of Edison Capital

   32
 

Affordable Housing Investments of Edison Capital

   34
 

Business Environment of Edison Capital

   34

1A.

 

Risk Factors

   34
 

Risks Relating to Edison International

   34
 

Risks Relating to SCE

   35
 

Risks Relating to EMG

   39

1B.

 

Unresolved Staff Comments

   46

2.

 

Properties

   46

3.

 

Legal Proceedings

   46
 

Navajo Nation Litigation

   46
 

Department of the Army, Los Angeles District, Corps of Engineers/Notice of Violation of Clean Water Act

   47
 

FERC Notice Regarding Investigatory Proceeding Against EMMT

   47
 

CPUC Investigation Regarding Performance Incentives Rewards

   47


Table of Contents

TABLE OF CONTENTS

 

Item

   Page

4.

 

Submission of Matters to a Vote of Security Holders

   48
 

Executive Officers of the Registrant

   48
Part II

5.

 

Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities

   51

6.

 

Selected Financial Data

   52

7.

 

Management’s Discussion and Analysis of Financial Condition and Results of Operations

   52

7A.

 

Quantitative and Qualitative Disclosures About Market Risk

   52

8.

 

Financial Statements and Supplementary Data

   53

9.

 

Changes in and Disagreements With Accountants on Accounting and Financial Disclosure

   53

9A.

 

Controls and Procedures

   53

9B.

 

Other Information

   53
Part III

10.

 

Directors, Executive Officers and Corporate Governance

   54

11.

 

Executive Compensation

   54

12.

 

Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters

   54

13.

 

Certain Relationships and Related Transactions, and Director Independence

   55

14.

 

Principal Accountant Fees and Services

   55

15.

 

Exhibits and Financial Statement Schedules

   55
 

Financial Statements

   55
 

Report of Independent Registered Public Accounting Firm and Schedules Supplementing Financial Statements

   56
 

Exhibits

   56

Signatures

   64


Table of Contents

FORWARD-LOOKING STATEMENTS

This Annual Report on Form 10-K contains “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements reflect Edison International’s current expectations and projections about future events based on Edison International’s knowledge of present facts and circumstances and assumptions about future events and include any statement that does not directly relate to a historical or current fact. Other information distributed by Edison International that is incorporated in this report, or that refers to or incorporates this report, may also contain forward-looking statements. In this report and elsewhere, the words “expects,” “believes,” “anticipates,” “estimates,” “projects,” “intends,” “plans,” “probable,” “may,” “will,” “could,” “would,” “should,” and variations of such words and similar expressions, or discussions of strategy or of plans, are intended to identify forward-looking statements. Such statements necessarily involve risks and uncertainties that could cause actual results to differ materially from those anticipated. See “Risk Factors” in Part I, Item 1A of this report and “Introduction” in the MD&A for cautionary statements that accompany those forward-looking statements and identify important factors that could cause results to differ. Readers should carefully review those cautionary statements as they identify important factors that could cause results to differ, or that otherwise could impact Edison International or its subsidiaries.

Additional information about risks and uncertainties, including more detail about the factors described in this report, is contained throughout this report, in the MD&A that appears in the Annual Report, the relevant portions of which are filed as Exhibit 13 to this report, and which is incorporated by reference into Part II, Item 7 of this report, and in Notes to Consolidated Financial Statements. Readers are urged to read this entire report, including the information incorporated by reference, and carefully consider the risks, uncertainties and other factors that affect Edison International’s business. Forward-looking statements speak only as of the date they are made and Edison International is not obligated to publicly update or revise forward-looking statements. Readers should review future reports filed by Edison International with the SEC.

Except when otherwise stated, references to each of Edison International, SCE, EMG, MEHC, EME or Edison Capital mean each such company with its subsidiaries on a consolidated basis. References to “Edison International (parent)” or “parent company” or “MEHC (parent)” mean Edison International or MEHC on a stand-alone basis, not consolidated with its subsidiaries. Since the second quarter of 2004, MEHC (parent) and EME are presented as one business segment on a consolidated basis due primarily to the elimination of EME’s so-called “ring fencing” provisions in EME’s certificate of incorporation and bylaws discussed in the MD&A under the heading “EMG: Liquidity—MEHC (parent)’s Liquidity.”

 

1


Table of Contents

GLOSSARY

When the following terms and abbreviations appear in the text of this report, they have the meanings indicated below.

 

Annual Report

   Edison International’s 2006 Annual Report to Shareholders

BART

   Best Available Retrofit Technology

CAIR

   Clean Air Interstate Rule

CAMR

   Clean Air Mercury Rule

CDWR

   California Department of Water Resources

Corps

   Army Corps of Engineers

CO2

   carbon dioxide

CPS

   Combined Pollutant Standard

CPUC

   California Public Utilities Commission

EME

   Edison Mission Energy

EME Homer City

   EME Homer City Generation L.P.

EMF

   electric and magnetic fields

EMG

   Edison Mission Group Inc.

EMMT

   Edison Mission Marketing & Trading, Inc.

EPAct 2005

   Energy Policy Act of 2005

EWG

   exempt wholesale generator

Exchange Act

   Securities Exchange Act of 1934

FERC

   Federal Energy Regulatory Commission

Four Corners

   Four Corners Generating Station

GHG

   Greenhouse Gas

Illinois EPA

   Illinois Environmental Protection Agency

ISO

   Independent System Operator

MD&A

   Management’s Discussion and Analysis of Financial Condition and Results of Operations

MEHC

   Mission Energy Holding Company

Midwest Generation

   Midwest Generation, LLC

MISO

   Midwest Independent Transmission System Operator

Mohave

   Mohave Generating Station

Mountainview

   Mountainview Power Company LLC

MW

   megawatts

 

2


Table of Contents

GLOSSARY (continued)

 

NOX

   nitrogen oxide

NPDES

   National Pollutant Discharge Elimination System

NRC

   Nuclear Regulatory Commission

NSR

   New Source Review

PADEP

   Pennsylvania Department of Environmental Protection

Palo Verde

   Palo Verde Nuclear Generating Station

PG&E

   Pacific Gas & Electric Company

PJM

   PJM Interconnection, LLC

PUHCA 1935

   Public Utility Holding Company Act of 1935 (as amended)

PUHCA 2005

   Public Utility Holding Company Act of 2005

PURPA

   Public Utility Regulatory Policies Act of 1978 (as amended)

QF(s)

   qualifying facility(ies)

RPM

   reliability pricing model

RTO

   regional transmission organizations

San Onofre

   San Onofre Nuclear Generating Station

SCE

   Southern California Edison Company

SEC

   Securities Exchange Commission

SIP

   State Implementation Plan

SO2

   sulfur dioxide

US EPA

   United States Environmental Protection Agency

 

3


Table of Contents

PART I

 

ITEM 1. BUSINESS

BUSINESS OF EDISON INTERNATIONAL

Edison International was incorporated on April 20, 1987, under the laws of the State of California for the purpose of becoming the parent holding company of SCE, a California public utility corporation, and of nonutility companies. SCE comprises the largest portion of the assets and revenue of Edison International. The principal nonutility companies are: EME, which is an independent power producer engaged in the business of developing, acquiring, owning or leasing, operating and selling energy and capacity from independent power production facilities and also conducts price risk management and energy trading activities in power markets open to competition; MEHC, which holds the common stock of EME; and Edison Capital, which has investments in energy and infrastructure projects worldwide and in affordable housing projects located throughout the United States. Beginning in 2006, MEHC and Edison Capital are presented on a consolidated basis as EMG in order to reflect the integration of management and personnel at MEHC and Edison Capital.

Edison International is engaged in the business of holding, for investment, the common stock of its subsidiaries. At December 31, 2006, Edison International and its subsidiaries had an aggregate of 16,139 full-time employees, of which 26 were employed directly by Edison International.

The principal executive offices of Edison International are located at 2244 Walnut Grove Avenue, P.O. Box 976, Rosemead, California 91770, and the telephone number is (626) 302-2222.

Edison International’s internet website address is http://www.edisoninvestor.com. Edison International makes available, free of charge on its internet website, its Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, Proxy Statement and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act, as soon as reasonably practicable after Edison International electronically files such material with, or furnishes it to, the SEC. Such reports are also available on the SEC’s internet website at http://www.sec.gov. The information contained in our website, or connected to that site, is not incorporated by reference into this report.

Edison International has three business segments for financial reporting purposes: an electric utility operation segment (SCE), a nonutility power generation segment (MEHC (parent) and EME), and a financial services provider segment (Edison Capital). Financial information about these segments and about geographic areas, for fiscal years 2006, 2005, and 2004, is contained in Note 17 of Notes to Consolidated Financial Statements and incorporated herein by this reference. Additional information about each of these business segments appears below under the headings “Business of Southern California Edison Company,” “Business of Edison Mission Group Inc.,” and “Business of Edison Capital.”

Regulation of Edison International

A comprehensive energy bill was passed by the United States House of Representatives and Senate in July 2005 and was signed by the President on August 8, 2005. Known as “EPAct 2005,” this comprehensive legislation includes provisions for the repeal of the PUHCA 1935 and amendments to the PURPA, for merger review reform, for the introduction of new regulations regarding “Transmission Operations Improvements,” for FERC authority to impose civil penalties for violation of its regulations, for transmission rate reform, for incentives for various generation technologies and for the extension through December 31, 2007 of production tax credits for wind and other specified types of generation. The FERC finalized rules to implement the Congressionally mandated repeal of PUHCA 1935, that became effective February 8, 2006, and enacted the PUHCA 2005. PUHCA 2005 is primarily a “books and records access” statute and does not give the FERC any new substantive authority under the Federal Power Act or Natural Gas Act. The FERC also issued final rules to implement the electric company merger and acquisition provisions of EPAct 2005.

 

4


Table of Contents

Edison International is not a public utility under the laws of the State of California and is not subject to regulation as such by the CPUC. See “Business of Southern California Edison Company—Regulation of SCE” below for a description of the regulation of SCE by the CPUC. The CPUC decision authorizing SCE to reorganize into a holding company structure, however, contains certain conditions, which, among other things: (1) ensure the CPUC access to books and records of Edison International and its affiliates which relate to transactions with SCE; (2) require Edison International and its subsidiaries to employ accounting and other procedures and controls to ensure full review by the CPUC and to protect against subsidization of nonutility activities by SCE’s customers; (3) require that all transfers of market, technological, or similar data from SCE to Edison International or its affiliates be made at market value; (4) preclude SCE from guaranteeing any obligations of Edison International without prior written consent from the CPUC; (5) provide for royalty payments to be paid by Edison International or its subsidiaries in connection with the transfer of product rights, patents, copyrights, or similar legal rights from SCE; and (6) prevent Edison International and its subsidiaries from providing certain facilities and equipment to SCE except through competitive bidding. In addition, the decision provides that SCE shall maintain a balanced capital structure in accordance with prior CPUC decisions, that SCE’s dividend policy shall continue to be established by SCE’s board of directors as though SCE were a stand-alone utility company, and that the capital requirements of SCE, as determined to be necessary to meet SCE’s service obligations, shall be given first priority by the boards of directors of Edison International and SCE.

On October 27, 2005, the CPUC issued an Order Instituting Rulemaking to allow the CPUC to re-examine the relationships of the major California energy utilities with their parent holding companies and non-regulated affiliates. The OIR was issued in part in response to the repeal of the PUHCA 1935. On December 14, 2006 the CPUC issued a decision. Additional information about the Order Instituting Rulemaking appears in the MD&A under the heading “SCE: Regulatory Matters – Current Regulatory Developments – Holding Company Order Instituting Rulemaking.”

Environmental Matters Affecting Edison International

Because Edison International does not own or operate any assets, except the stock of its subsidiaries, it does not have any direct environmental obligations or liabilities. However, legislative and regulatory activities by federal, state, and local authorities in the United States result in the imposition of numerous restrictions on the operation of existing facilities by Edison International’s subsidiaries, on the timing, cost, location, design, construction, and operation of new facilities by Edison International’s subsidiaries, and on the cost of mitigating the effect of past operations on the environment. These laws and regulations, relating to air and water pollution, waste management, hazardous chemical use, noise abatement, land use, aesthetics, nuclear control, and climate change substantially affect future planning and will continue to require modifications of existing facilities and operating procedures by Edison International’s subsidiaries. Edison International is unable to predict with certainty the extent to which additional regulations may affect its operations and capital expenditure requirements.

Edison International’s projected environmental capital expenditures and additional information about environmental matters affecting Edison International appear in the MD&A under the heading “Other Developments—Environmental Matters” and in Note 6 of Notes to Consolidated Financial Statements

 

5


Table of Contents

under “Environmental Remediation.” For details about the environmental liabilities and other business risks from environmental regulation of SCE and EME, see “Business of Southern California Edison Company—Environmental Matters Affecting SCE” and “Business of Edison Mission Group Inc.—Environmental Matters and Regulations Affecting EME.”

Financial Information About Geographic Areas

Financial information for geographic areas for Edison International can be found in Notes 17 and 18 of Notes to Consolidated Financial Statements. Edison International’s consolidated financial statements for all years presented reflect the reclassification of the results of MEHC’s international power generation portfolio that was sold or held for sale as discontinued operations in accordance with an accounting standard related to the impairment and disposal of long-lived assets.

BUSINESS OF SOUTHERN CALIFORNIA EDISON COMPANY

SCE was incorporated in 1909 under the laws of the State of California. SCE is a public utility primarily engaged in the business of supplying electric energy to a 50,000-square-mile area of central, coastal and southern California, excluding the City of Los Angeles and certain other cities. This SCE service territory includes approximately 430 cities and communities and a population of more than 13 million people. In 2006, SCE’s total operating revenue was derived as follows: 41% commercial customers, 37% residential customers, 4% resale sales, 7% industrial customers, 5% other electric revenue, 5% public authorities, and 1% agricultural and other customers. At December 31, 2006, SCE had consolidated assets of $26.1 billion and total shareholder’s equity of $6.4 billion. SCE had 14,362 full-time employees at year-end 2006.

Regulation of SCE

SCE’s retail operations are subject to regulation by the CPUC. The CPUC has the authority to regulate, among other things, retail rates, issuance of securities, and accounting practices. SCE’s wholesale operations are subject to regulation by the FERC. The FERC has the authority to regulate wholesale rates as well as other matters, including retail transmission service pricing, accounting practices, and licensing of hydroelectric projects.

Additional information about the regulation of SCE by the CPUC and the FERC, and about SCE’s competitive environment, appears in the MD&A under the heading “SCE: Regulatory Matters” and in this section under the sub heading “—Competition of SCE.”

SCE is subject to the jurisdiction of the United States NRC with respect to its nuclear power plants. United States NRC regulations govern the granting of licenses for the construction and operation of nuclear power plants and subject those power plants to continuing review and regulation.

The construction, planning, and siting of SCE’s power plants within California are subject to the jurisdiction of the California Energy Commission (for plants 50 mw or greater) and the CPUC. SCE is subject to the rules and regulations of the California Air Resources Board, State of Nevada, and local air pollution control districts with respect to the emission of pollutants into the atmosphere; the regulatory requirements of the California State Water Resources Control Board and regional boards with respect to the discharge of pollutants into waters of the state; and the requirements of the California Department of Toxic Substances Control with respect to handling and disposal of hazardous materials and wastes. SCE is also subject to regulation by the US EPA, which administers certain federal statutes relating to environmental matters. Other federal, state, and local laws and regulations relating to environmental protection, land use, and water rights also affect SCE.

 

6


Table of Contents

The construction, planning and siting of SCE’s transmission lines and substation facilities require the approval of many governmental agencies and compliance with various laws, depending upon the attributes of each particular project. These agencies include utility regulatory commissions such as the CPUC and other state regulatory agencies depending on the project location; the California location and other environmental, land management and resource agencies such as the Bureau of Land Management, the U.S. Fish and Wildlife Service, the U.S. Forest Service, and the California Department of Fish and Game; Regional Water Quality Control Boards; and the States’ Offices of Historic Preservation. In addition, to the extent that SCE transmission line projects pass through lands owned or controlled by Native American tribes, consent and approval from the affected tribes and the Bureau of Indian Affairs will also be necessary for the project to proceed. The agencies’ approval processes, implemented through their respective regulations and other statutes that impose requirements on the approvals of such projects, may adversely affect and delay the schedule for these projects.

The California Coastal Commission issued a coastal permit for the construction of the San Onofre Units 2 and 3 in 1974. This permit, as amended, requires mitigation for impacts to fish and the San Onofre kelp bed. California Coastal Commission jurisdiction will continue for several years due to ongoing implementation and oversight of these permit mitigation conditions, consisting of restoration of wetlands and construction of an artificial reef for kelp. SCE has a coastal permit from the California Coastal Commission to construct a temporary dry cask spent fuel storage installation for San Onofre Units 2 and 3. The California Coastal Commission also has continuing jurisdiction over coastal permits issued for the decommissioning of San Onofre Unit 1, including for the construction of a temporary dry cask spent fuel storage installation for spent fuel from that unit.

The United States Department of Energy has regulatory authority over certain aspects of SCE’s operations and business relating to energy conservation, power plant fuel use and disposal, electric sales for export, public utility regulatory policy, and natural gas pricing.

SCE is subject to CPUC affiliate transaction rules and compliance plans governing the relationship between SCE and its affiliates. See “Business of Edison International—Regulation of Edison International” above for further discussion of these rules.

Competition of SCE

Because SCE is an electric utility company operating within a defined service territory pursuant to authority from the CPUC, SCE faces competition only to the extent that federal and California laws permit other entities to provide electricity and related services to customers within SCE’s service territory. California law currently provides only limited opportunities for customers to choose to purchase power directly from an energy service provider other than SCE. SCE also faces some competition from cities that create municipal utilities or community choice aggregators. In addition, customers may install their own on-site power generation facilities. Competition with SCE is conducted mainly on the basis of price as customers seek the lowest cost power available. The effect of competition on SCE generally is to reduce the size of SCE’s customer base, thereby creating upward pressure on SCE’s rate structure to cover fixed costs, which in turn may cause more customers to leave SCE in order to obtain lower rates.

 

7


Table of Contents

Properties of SCE

SCE supplies electricity to its customers through extensive transmission and distribution networks. Its transmission facilities, which deliver power from generating sources to the distribution network, consist of approximately 7,200 circuit miles of 33 kilovolt (kV), 55 kV, 66 kV, 115 kV, and 161 kV lines and 3,475 circuit miles of 220 kV lines (all located in California), 1,238 circuit miles of 500 kV lines (1,040 miles in California, 86 miles in Nevada, and 112 miles in Arizona), and 858 substations. SCE’s distribution system, which takes power from substations to the customer, includes approximately 60,000 circuit miles of overhead lines, 39,000 circuit miles of underground lines, 1.5 million poles, 588 distribution substations, 704,000 transformers, and 790,000 area and streetlights, all of which are located in California.

SCE owns and operates the following generating facilities: (1) an undivided 78.21% interest (1,690 MW) in San Onofre Units 2 and 3, which are large pressurized water nuclear units located on the California coastline between Los Angeles and San Diego; (2) 36 hydroelectric plants (1,178.9 MW) located in California’s Sierra Nevada, San Bernardino and San Gabriel mountain ranges, three of which (2.7 MW) are no longer operational and will be decommissioned; and (3) a diesel-fueled generating plant (9 MW) located on Santa Catalina island off the southern California coast.

SCE also owns an undivided 56% interest (884.8 MW net) in Mohave, which consists of two coal-fueled generating units located in Clark County, Nevada near the California border. The plant ceased operating on December 31, 2005. On June 19, 2006, SCE announced that it had decided not to move forward with its efforts to return Mohave to service. Additional information regarding Mohave appears in the MD&A under the heading “SCE: Regulatory Matters—Mohave Generating Station and Related Proceedings.”

In addition, SCE acquired in 2004 Mountainview, which consisted of a natural gas-fueled two unit power plant in the early stages of construction in Redlands, California. The first unit commenced commercial operations in December 2005, and the second unit commenced commercial operations in January 2006. Mountainview has a generating capacity of 1,050 MW.

SCE also owns an undivided 15.8% interest (601 MW) in Palo Verde, which is located near Phoenix, Arizona, and an undivided 48% interest (720 MW) in Units 4 and 5 at Four Corners, which is a coal-fueled generating plant located near the City of Farmington, New Mexico. Palo Verde and Four Corners are operated by Arizona Public Service Company.

At year-end 2006, the SCE-owned generating capacity (summer effective rating) was divided approximately as follows: 43% nuclear, 23% hydroelectric, 20% natural gas, 14% coal, and less than 1% diesel. The capacity factors in 2006 for SCE’s nuclear and coal-fired generating units were: 72% for San Onofre; 87% for Four Corners; and 71% for Palo Verde. For SCE’s hydroelectric plants, generating capacity is dependent on the amount of available water. SCE’s hydroelectric plants operated at a 50% capacity factor in 2006. These plants were operationally available for 91% of the year.

San Onofre, Four Corners, certain of SCE’s substations, and portions of its transmission, distribution and communication systems are located on lands of the United States or others under (with minor exceptions) licenses, permits, easements or leases, or on public streets or highways pursuant to franchises. Certain of such documents obligate SCE, under specified circumstances and at its expense, to relocate transmission, distribution, and communication facilities located on lands owned or controlled by federal, state, or local governments.

 

8


Table of Contents

Thirty-one of SCE’s 36 hydroelectric plants (some with related reservoirs) are located in whole or in part on United States lands pursuant to 30- to 50-year FERC licenses that expire at various times between 2007 and 2039 (the remaining five plants are located entirely on private property and are not subject to FERC jurisdiction). Such licenses impose numerous restrictions and obligations on SCE, including the right of the United States to acquire projects upon payment of specified compensation. When existing licenses expire, the FERC has the authority to issue new licenses to third parties that have filed competing license applications, but only if their license application is superior to SCE’s and then only upon payment of specified compensation to SCE. New licenses issued to SCE are expected to contain more restrictions and obligations than the expired licenses because laws enacted since the existing licenses were issued require the FERC to give environmental purposes greater consideration in the licensing process. SCE’s has filed applications for the relicensing of certain hydroelectric projects with an aggregate capacity of approximately 915 MW. Annual licenses have been issued to SCE hydroelectric projects that are undergoing relicensing and whose long-term licenses have expired. Federal Power Act Section 15 requires that the annual licenses be renewed until the long-term licenses are issued or denied.

Substantially all of SCE’s properties are subject to the lien of a trust indenture securing first and refunding mortgage bonds, of which approximately $4.5 billion in principal amount was outstanding on February 28, 2007. Such lien and SCE’s title to its properties are subject to the terms of franchises, licenses, easements, leases, permits, contracts, and other instruments under which properties are held or operated, certain statutes and governmental regulations, liens for taxes and assessments, and liens of the trustees under the trust indenture. In addition, such lien and SCE’s title to its properties are subject to certain other liens, prior rights and other encumbrances, none of which, with minor or insubstantial exceptions, affect SCE’s right to use such properties in its business, unless the matters with respect to SCE’s interest in Four Corners and the related easement and lease referred to below may be so considered.

SCE’s rights in Four Corners, which is located on land of the Navajo Nation of Indians under an easement from the United States and a lease from the Navajo Nation, may be subject to possible defects. These defects include possible conflicting grants or encumbrances not ascertainable because of the absence of, or inadequacies in, the applicable recording law and the record systems of the Bureau of Indian Affairs and the Navajo Nation, the possible inability of SCE to resort to legal process to enforce its rights against the Navajo Nation without Congressional consent, the possible impairment or termination under certain circumstances of the easement and lease by the Navajo Nation, Congress, or the Secretary of the Interior, and the possible invalidity of the trust indenture lien against SCE’s interest in the easement, lease, and improvements on Four Corners.

Nuclear Power Matters of SCE

Information about operating issues related to San Onofre appears in the MD&A under the heading “SCE: Regulatory Matters—Current Regulatory Developments—San Onofre Nuclear Generating Station Steam Generators and Changes in Ownership.” Information about Palo Verde appears in the MD&A under the headings “SCE: Regulatory Matters—Current Regulatory Developments—Palo Verde Generating Station Steam Generators” and “SCE: Other Developments—Palo Verde Nuclear Generating Station Outage and Inspection”. Information about nuclear decommissioning can be found in Notes 1 and 6 of Notes to Consolidated Financial Statements. Information about nuclear insurance can be found in Note 6 of Notes to Consolidated Financial Statements.

 

9


Table of Contents

SCE Purchased Power and Fuel Supply

SCE obtains the power needed to serve its customers from its generating facilities and from purchases from qualifying facilities, independent power producers, renewable power producers, the California ISO, and other utilities. In addition, power is provided to SCE’s customers through purchases by the CDWR under contracts with third parties. Sources of power to serve SCE’s customers during 2006 were as follows: 44.6% purchased power; 25.6% CDWR; and 29.8% SCE-owned generation consisting of 16.9% nuclear, 6.8% coal, and 6.1% hydro.

Natural Gas Supply

SCE’s natural gas requirements in 2006 were to meet contractual obligations for power tolling agreements (power contracts in which SCE has agreed to provide the natural gas needed for generation under those power contracts) and to serve demand for gas at Mountainview, which commenced operations in December 2005. All of the physical gas purchased by SCE in 2006 was purchased under North American Energy Standards Board agreements (master gas agreements) that define the terms and conditions of transactions with a particular supplier prior to any financial commitment.

SCE contracted for firm access rights onto the Southern California Gas Company system at Wheeler Ridge for 198,863 million British thermal units per day in a 13-year contract entered into in August 1993, effective November 1, 1993. SCE had the unilateral right to renew this contract for an equivalent term upon the expiration of its initial term on October 31, 2006. SCE has elected to not exercise its unilateral right to renew this contract.

In 2005, SCE secured a one-year natural gas storage capacity contract with Southern California Gas Company for the 2005/2006 storage season. Storage capacity was secured to provide operation flexibility and to mitigate potential costs associated with the dispatch of SCE’s tolling agreements. SCE has negotiated another one-year natural gas capacity contract with Southern California Gas Company for the 2006/2007 storage season.

Nuclear Fuel Supply

For San Onofre Units 2 and 3, contractual arrangements are in place covering 100% of the projected nuclear fuel requirements through the years indicated below:

 

Uranium concentrates

   2010

Conversion

   2010

Enrichment

   2012

Fabrication

   2014

 

10


Table of Contents

For Palo Verde, contractual arrangements are in place covering 100% of the projected nuclear fuel requirements through the years indicated below:

 

Uranium concentrates

   2007

Conversion

   2007

Enrichment

   2010

Fabrication

   2015

Spent Nuclear Fuel

Information about Spent Nuclear Fuel appears in Note 6 of Notes to Consolidated Financial Statements.

Coal Supply

SCE has purchased coal pursuant to long-term contracts to provide stable and reliable fuel supplies to its two coal-fired generating stations, Four Corners and Mohave. However, Mohave ceased operating on December 31, 2005 and on June 19, 2006, SCE announced that it had decided not to move forward with its efforts to return Mohave to service. Additional information regarding Mohave appears in the MD&A under the heading “SCE: Regulatory Matters—Mohave Generating Station and Related Proceedings.” SCE entered into a coal contract, dated September 1, 1966, with the Utah Construction & Mining Company, the predecessor to the current owner of the Navajo mine, the BHP Navajo Coal Company, to supply coal to Four Corners Units 4 and 5. The initial term of this coal supply contract for Four Corners was through 2004 and included extension options for up to 15 additional years. On January 1, 2005 SCE and the other Four Corners participants entered into a Restated and Amended Four Corners Fuel Agreement under which coal will be supplied until July 6, 2016. The Restated and Amended Agreement contains an option to extend for not less than five additional years or more than 15 years.

Seasonality of SCE

Due to warmer weather during the summer months, electric utility revenue during the third quarter of each year is generally significantly higher than other quarters.

Environmental Matters Affecting SCE

SCE is subject to environmental regulation by federal, state and local authorities in the jurisdictions in which it operates in the United States. This regulation, including in the areas of air and water pollution, waste management, hazardous chemical use, noise abatement, land use, aesthetics, nuclear control and climate change, continues to result in the imposition of numerous restrictions on SCE’s operation of existing facilities, on the timing, cost, location, design, construction, and operation by SCE of new facilities, and on the cost of mitigating the effect of past operations on the environment.

SCE believes that it is in substantial compliance with environmental regulatory requirements and that maintaining compliance with current requirements will not materially affect its financial position or results of operations. However, possible future developments, such as the promulgation of more stringent environmental laws and regulations, future proceedings that may be initiated by environmental authorities, and settlements agreed to by other companies could affect the costs and the manner in which SCE conducts its business and could cause it to make substantial additional capital or operational expenditures. There is no assurance that SCE would be able to recover these increased costs from its

 

11


Table of Contents

customers or that SCE’s financial position and results of operations would not be materially adversely affected. SCE is unable to predict the extent to which additional regulations may affect its operations and capital expenditure requirements.

Typically, environmental laws and regulations require a lengthy and complex process for obtaining licenses, permits and approvals prior to construction, operation or modification of a project. Meeting all the necessary requirements can delay or sometimes prevent the completion of a proposed project as well as require extensive modifications to existing projects, which may involve significant capital or operational expenditures. Furthermore, if SCE fails to comply with applicable environmental laws, it may be subject to injunctive relief, penalties and fines imposed by regulatory authorities.

The laws and regulations discussed below primarily impact SCE’s coal-fired, gas-fired and nuclear generation facilities. The air quality and climate change laws and regulations primarily impact SCE’s coal-fired facilities, Mohave and Four Corners. The discussions below focus on the Four Corners plant in light of the fact that Mohave has suspended operation and SCE is no longer pursuing efforts to return it to service. Developments in the air quality and climate change areas may also have an impact on SCE’s gas-fired plants, but this impact is less likely to be substantial because SCE’s gas-fired plants were recently constructed or are now under development with current generating and pollution control technology and because of the lower emissions, including lower CO2 emissions, from natural gas as compared to coal. SCE’s gas-fired generation facilities include Mountainview and five gas-fired peaker units currently under development. The water quality discussion primarily impacts San Onofre.

Air Quality Regulation

Various air quality regulations, including the Federal Clean Air Act and similar state and local statutes apply to SCE’s plants, and have their largest impact on the operation of the coal-fired plants, Mohave and Four Corners. These regulations are expected to have a lesser impact on SCE operations in the future in light of the decision by SCE not to move forward in its efforts to return Mohave to service.

Suspension of Mohave Operations and SCE Decision to Discontinue Its Participation in Efforts to Resume Operations

Information regarding the suspension of Mohave operations and SCE’s decision to discontinue its participation in efforts to resume such operations appears in the MD&A under the heading “Other Developments—Environmental Matters—Air Quality Standards—Suspension of Mohave Operations and SCE Decision to Discontinue Its Participation in Efforts to Resume Operations.” Additional information regarding Mohave appears in the MD&A under the heading “SCE: Regulatory Matters—Mohave Generating Station and Related Proceedings.”

Clean Air Act Interstate Rule

At this time, the US EPA’s CAIR, does not have an impact on SCE’s facilities. CAIR, issued by the US EPA on March 10, 2005,

applies to 28 eastern states and the District of Columbia, and is intended to address ozone attainment issues by reducing regional SO2 and NOx emissions. The CAIR has been challenged in court by state, environmental, and industry groups, which may result in changes to the substance of the rule and to the timetables for implementation. While the US EPA has not adopted a rule comparable to CAIR for the western United States, where SCE has facilities, SCE cannot predict what action the US EPA will take in the future with regard to the western United States, and what impact those actions would have on its facilities.

 

12


Table of Contents

Mercury Regulation

The US EPA’s CAMR was issued on March 15, 2005 and published in the Federal Register on May 18, 2005. CAMR creates a national framework for a market-based cap-and-trade program to reduce mercury emissions from existing coal-fired power plants down to a national cap of 38 tons by 2010 and to 15 tons by 2018. Emissions of mercury are to be reduced primarily by taking advantage of mercury reductions achieved by reducing SO2 and NOx emissions under the CAIR. States may join the trading program by adopting the CAMR model trading rules in state regulations, or they may adopt regulations that mirror the necessary components of the model trading rule. States are not required to adopt a cap-and-trade program and may promulgate alternative regulations, such as command and control regulations, that are equivalent to or more stringent than the CAMR’s suggested cap-and-trade program. Any program adopted by a state must be approved by the US EPA.

Contemporaneous with the adoption of the CAMR, the US EPA rescinded its previous finding that mercury emissions from coal-fired power plants had to be regulated as a hazardous air pollutant pursuant to Section 112 of the federal Clean Air Act, which would have imposed technology-based standards. Both the US EPA’s recession action and the CAMR are being challenged in the courts. Depending on the results of these challenges, the CAMR rules and timetables may change. SCE is working with Arizona Public Service Company, the operator of Four Corners, to assess the potential impact of the CAMR on Four Corners and cannot currently estimate the expenditures that may be required.

Regional Haze

The goal of the 1999 regional haze regulations is to restore visibility in mandatory federal Class I areas, such as national parks and wilderness areas, to natural background conditions in 60 years. Sources such as power plants that are reasonably anticipated to contribute to visibility impairment in Class I areas may be required to install BART or implement other control strategies to meet regional haze control requirements. The US EPA issued a final rulemaking on regional haze on June 15, 2005. Under the rule, by December 2007, each state must file with the US EPA, as part of its SIP, plans for regional haze improvement. The US EPA has

proposed alternate rules for the area where Four Corners is located. SCE is working with Arizona Public Service Company, the operator of Four Corners, to evaluate the impact of these rules on Four Corners and cannot currently predict such impact.

Climate Change

To date, the US has chosen to pursue a voluntary GHG emissions reduction program to meet its obligations as a signatory to the UN Framework Convention on Climate Change. Currently a number of bills are proposed or under discussion in Congress to mandate reductions of GHG emissions. At this point, SCE is unable to determine whether any of these proposals will be enacted into law or to estimate their potential effect on SCE.

There have been petitions from states and other parties to compel the US EPA to regulate GHG under CAIR. In Massachusetts v. U.S. EPA, the United States Supreme Court currently is considering whether, under existing law, including the Clean Air Act, the US EPA is authorized or compelled to regulate greenhouse gas emissions. Oral arguments were heard in November 2006, and a decision is pending. In addition, other global climate-related lawsuits have been filed around the nation against various private parties, include utilities, oil and chemical companies, and automobile manufacturers, under various theories including public nuisance for damages caused by the alleged contribution to global warming resulting from CO2 emissions from coal-fired power plants owned and operated by these companies or their subsidiaries by the alleged contribution of those parties to global warming.

 

13


Table of Contents

Information regarding current developments on climate change and GHG regulation appears in the MD&A under the heading “Other Developments—Environmental Matters—Climate Change.”

Hazardous Substances and Hazardous Waste Laws

Under various federal, state and local environmental laws and regulations, a current or previous owner or operator of any facility, including an electric generating facility, may be required to investigate and remediate releases or threatened releases of hazardous or toxic substances or petroleum products located at that facility, and may be held liable to a governmental entity or to third parties for property damage, personal injury, natural resource damages, and investigation and remediation costs incurred by these parties in connection with these releases or threatened releases. Many of these laws, including the Comprehensive Environmental Response, Compensation and Liability Act of 1980, and the Resource Conservation and Recovery Act, impose liability without regard to whether the owner knew of or caused the presence of the hazardous substances, and courts have interpreted liability under these laws to be strict and joint and several.

In addition, the federal Toxic Substances Control Act and accompanying regulations govern the manufacturing, processing, distribution in commerce, use, and disposal of listed compounds, including polychlorinated biphenyls, a toxic substance. Federal, state, and local laws, regulations and ordinances also govern the removal, encapsulation or disturbance of asbestos-containing materials when these materials are in poor condition or in the event of construction, remodeling, renovation or demolition of a building and other structures containing asbestos.

In connection with the ownership and operation of its facilities, SCE may be liable for costs associated with hazardous waste compliance and remediation required by the laws and regulations identified herein. The CPUC allows SCE to recover in retail rates paid by its customers partial environmental remediation costs at certain sites through an incentive mechanism. Additional information about these laws and regulations appears in Note 6 of Notes to Consolidated Financial Statements.

Water Quality Regulation

Regulations under the federal Clean Water Act require permits for the discharge of pollutants into United States waters and permits for the discharge of storm water flows from certain facilities. The Clean Water Act also regulates the thermal component (heat) of effluent discharges and the location, design, and construction of cooling water intake structures at generating facilities. California has a US EPA approved program to issue individual or group (general) permits for the regulation of Clean Water Act discharges. California also regulates certain discharges not regulated by the US EPA. SCE incurs additional expenses and capital expenditures in order to comply with guidelines and standards applicable to certain of its facilities.

Cooling Water Intake Structures

Information regarding the cooling water intake structure standards appears in the MD&A under the heading “Other Developments—Environmental Matters—Water Quality Regulation—Clean Water Act—Cooling Water Intake Structures.”

The U.S. Court of Appeals for the Second Circuit recently struck down major provisions of the US EPA Phase II regulations in Riverkeeper, Inc. v. EPA, and remanded the regulations to US EPA for further consideration and action. While SCE believed that this rule, as originally drafted, would not have a

 

14


Table of Contents

material impact on SCE’s operations at San Onofre, until the US EPA adopts final rules consistent with the court’s decision, SCE cannot determine the full financial impact of this rule.

Electric and Magnetic Fields

Electric and magnetic fields naturally result from the generation, transmission, distribution and use of electricity. Since the 1970s, concerns have been raised about the potential health effects of EMF. After 30 years of research, a health hazard has not been established to exist. Potentially important public health questions remain about whether there is a link between EMF exposures in homes or work and some diseases, and because of these questions, some health authorities have identified EMF exposures as a possible human carcinogen.

In January 2006, the CPUC issued its decision updating its policies and procedures related to EMF emanating from regulated utility facilities. The decision concluded that a direct link between exposure to EMF and human health effects has yet to be proven, and affirmed the CPUC’s existing “low-cost/no-cost” EMF policies to mitigate EMF exposure for new utility transmission and substation projects.

BUSINESS OF EDISON MISSION GROUP INC.

EMG is a wholly owned subsidiary of Edison International. EMG is the holding company for its principal wholly owned subsidiaries, MEHC and Edison Capital.

Business of Mission Energy Holding Company

MEHC was formed to hold the common stock of EME. On July 2, 2001, EMG contributed to MEHC all the outstanding common stock of EME. The contribution of EME’s common stock to MEHC has been accounted for as a transfer of ownership of companies under common control. MEHC’s only substantive liabilities are its obligations under the senior secured notes and corporate overhead, including fees of its legal counsel, auditors and other advisors. MEHC does not have any substantive operations other than through EME and its subsidiaries and other investments. Beginning in 2006, MEHC and Edison Capital are presented on a consolidated basis as EMG in order to reflect the integration of management and personnel at MEHC and Edison Capital.

Business of Edison Mission Energy

Since the second quarter of 2004, MEHC (parent) and EME are presented as one business segment on a consolidated basis due primarily to the elimination of EME’s so-called “ring fencing” provisions in EME’s certificate of incorporation and bylaws discussed in the MD&A under the heading “EMG: Liquidity—MEHC (parent)’s Liquidity.”

EME is an independent power producer engaged in the business of developing, acquiring, owning or leasing, operating and selling energy and capacity from independent power production facilities. EME also conducts price risk management and energy trading activities in power markets open to competition. EME is a wholly owned subsidiary of MEHC. Edison International is EME’s ultimate parent company.

EME was formed in 1986 with two domestic operating power plants. As of December 31, 2006, EME’s continuing operations consisted of owned or leased interests in 29 domestic operating power plants with an aggregate net physical capacity of 10,473 MW, of which EME’s capacity pro rata share was 9,303 MW.

 

15


Table of Contents

Competition and Market Conditions of EME

The United States electric industry, including companies engaged in providing generation, transmission, distribution and ancillary services, has undergone significant deregulation, which has led to increased competition. Until the enactment of PURPA, utilities and government-owned power agencies were the only producers of bulk electric power intended for sale to third parties in the United States. PURPA encouraged the development of independent power by removing regulatory constraints relating to the production and sale of electric energy by certain non-utilities and requiring electric utilities to buy electricity from specified types of non-utility power producers, known as qualifying facilities, under specified conditions. The passage of the Energy Policy Act of 1992 further encouraged the development of independent power by significantly expanding the options available to independent power producers with respect to their regulatory status and by liberalizing transmission access. In addition, in EPAct 2005, Congress made several changes to PURPA and other statutory provisions recognizing that a significant market for electric power produced by independent power producers, such as EME, has developed in the United States, and indicating that competitive wholesale electricity markets have become accepted as a fundamental aspect of the electricity industry.

As part of the regulatory developments discussed above, the FERC encouraged the formation of ISOs and RTOs. In those areas where ISOs and RTOs have been formed, market participants have expanded access to transmission service. ISOs and RTOs may also operate real-time and day-ahead energy and ancillary service markets, which are governed by FERC-approved tariffs and market rules. The development of such organized markets into which independent power producers are able to sell has reduced their dependence on bilateral contracts with electric utilities. See further discussion of regulations under “—Regulation of EME—United States Federal Energy Regulation.”

EME’s largest power plants are its fossil fuel power plants located in Illinois, which are collectively referred to as the Illinois plants in this report, and the Homer City electric generating station located in Pennsylvania, which is referred to as the Homer City facilities in this report. The Illinois plants and the Homer City facilities sell power into PJM. PJM operates a wholesale spot energy market and determines the market-clearing price for each hour based on bids submitted by participating generators which indicate the minimum prices a bidder is willing to accept to be dispatched at various incremental generation levels. PJM conducts both day-ahead and real-time energy markets. PJM’s energy markets are based on locational marginal pricing, which establishes hourly prices at specific locations throughout PJM. Locational marginal pricing is determined by considering a number of factors, including generator bids, load requirements, transmission congestion and transmission losses. PJM requires all load serving entities to maintain prescribed levels of capacity, including a reserve margin, to ensure system reliability. PJM also determines the amount of capacity available from each specific generator and operates capacity markets. PJM’s capacity markets have a single market-clearing price. Load serving entities and generators, such as EME’s subsidiaries Midwest Generation, with respect to the Illinois plants and EME Homer City, with respect to the Homer City facilities may participate in PJM’s capacity markets or transact capacity sales on a bilateral basis.

The Homer City facilities have direct, high voltage interconnections to both PJM and the New York Independent System Operator, which controls the transmission grid and energy and capacity markets for New York State and is commonly referred to as the NYISO. As in PJM, the market-clearing price for the NYISO’s day-ahead and real-time energy markets is set by supplier generation bids and customer demand bids.

On April 1, 2005, the MISO commenced operation, linking portions of Illinois, Wisconsin, Indiana, Michigan, and Ohio, as well as other states in the region, in the MISO, where there is a bilateral market

 

16


Table of Contents

and day-ahead and real-time markets based on locational marginal pricing similar to that of PJM. While EME does not own generating facilities within MISO, its opening has further facilitated transparency of prices and provided additional market liquidity to support risk management and trading strategies.

For a discussion of the market risks related to the sale of electricity from these generating facilities, see “EMG: Market Risk Exposures” in the MD&A.

EME is subject to intense competition from energy marketers, utilities, industrial companies and other independent power producers. For a number of years until the recent upturn in its price, natural gas has been the fuel of choice for new power generation facilities for economic, operational and environmental reasons. While natural gas-fired facilities will continue to be an important part of the nation’s generation portfolio, some regulated utilities are now constructing clean coal units and units powered by renewable resources, often with subsidies or under legislative mandate. These utilities generally have a lower cost of capital than most independent power producers and often are able to recover fixed costs through rate base mechanisms, allowing them to build, buy and upgrade generation without relying exclusively on market clearing prices to recover their investments.

Where EME sells power from plants from which the output is not committed to be sold under long-term contracts, commonly referred to as merchant plants, EME is subject to market fluctuations in prices based on a number of factors, including the amount of capacity available to meet demand, the price and availability of fuel and the presence of transmission constraints. Some of EME’s competitors, such as electric utilities and distribution companies have their own generation capacity, including nuclear generation. These companies, generally larger than EME, have a lower cost of capital and may have competitive advantages as a result of their scale and the location of their generation facilities.

 

17


Table of Contents

Power Plants of EME

EME’s power plants are located within the United States, except for the Doga project in Turkey. As of December 31, 2006, EME’s operations consisted of ownership or leasehold interests in the following operating power plants:

 

Power Plants

   Location    Primary
Electric
Purchaser(2)
   Fuel Type    Ownership
Interest
  Net Physical
Capacity (in
MW)
   EME’s
Capacity
Pro Rata
Share
(in MW)

Merchant Power Plants

                

Illinois Plants (6 plants)(1)

   Illinois    PJM    Coal/Oil/Gas    100%   5,918    5,918

Homer City(1)

   Pennsylvania    PJM    Coal    100%   1,884    1,884

Contracted Power Plants

                

Big 4 Projects

                

Kern River(1)

   California    SCE    Natural Gas    50%   300    150

Midway-Sunset(1)

   California    SCE    Natural Gas    50%   225    113

Sycamore(1)

   California    SCE    Natural Gas    50%   300    150

Watson

   California    SCE    Natural Gas    49%   385    189

Westside Projects

                

Coalinga(1)

   California    PG&E    Natural Gas    50%   38    19

Mid-Set(1)

   California    PG&E    Natural Gas    50%   38    19

Salinas River(1)

   California    PG&E    Natural Gas    50%   38    19

Sargent Canyon(1)

   California    PG&E    Natural Gas    50%   38    19

American Bituminous(1)

   West Virginia    MPC    Waste Coal    50%   80    40

March Point

   Washington    PSE    Natural Gas    50%   140    70

Sunrise(1)

   California    CDWR    Natural Gas    50%   572    286

Huntington

   New York    LIPA    Biomass    385   25    9
                    

Wind Projects

                

San Juan Mesa(1)

   New Mexico    SPS    Wind    75%   120    90
                    

Minnesota Wind Projects

   Minnesota    NSPC/IPLC    Wind    75-99%   83    75
                    

Storm Lake

   Iowa    MEC    Wind    100%   109    109
                    

International

                

Doga(1)

   Turkey    TEDAS    Natural Gas    80%   180    144
                    

Total

              10,473    9,303
                    

(1) Plant is operated under contract by an EME operations and maintenance subsidiary (partially owned plants) or plant is operated directly by an EME subsidiary (wholly owned plants).

 

(2) Electric purchaser abbreviations are as follows:

 

PJM

   PJM Interconnection, LLC    LIPA    Long Island Power Authority

SCE

   Southern California Edison Company    SPS    Southwestern Public Service

PG&E

   Pacific Gas & Electric Company    NSPC    Northern States Power Company

MPC

   Monongahela Power Company    IPLC    Interstate Power and Light Company

PSE

   Puget Sound Energy, Inc.    MEC    Mid-American Energy Company

CDWR

   California Department of Water Resources    TEDAS    Türkiye Elektrik Dagitim Anonim Sirketi

In addition to the facilities and power plants that EME owns, EME uses the term “its” in regard to facilities and power plants that EME or an EME subsidiary operates under sale-leaseback arrangements.

 

18


Table of Contents

Business Development of EME

Wind Projects

EME expects to make significant investments in wind projects during the next several years. Historically, wind projects have received federal subsidies in the form of production tax credits. In August 2005, production tax credits were made available for new wind projects placed in service by December 31, 2007 under EPAct 2005. In December 2006, the production tax credit was extended for one year to apply to new wind projects placed in service by December 31, 2008.

In seeking to find and invest in new wind projects, EME has teamed with third-party development companies through agreements that provide for funding of development costs through loans and joint decision-making on key contractual agreements (e.g., power purchase contracts, site agreements and permits). Joint development agreements and development loans may be for a specific project

or a group of identified and future projects and generally grant EME the exclusive right to acquire related projects. At December 31,

2006, joint development agreements were in place for multiple potential projects located in Pennsylvania, Illinois, Maine, Maryland, New York, West Virginia and Wisconsin.

In general, EME funds development costs under joint development agreements through loans (referred to as development loans) which are secured by project specific assets. A project’s development loans are repaid upon the completion of the project. If the project is purchased by EME, repayment is made from proceeds received from EME in connection with the purchase. In the event

EME declines to purchase a project, repayment is made from proceeds received from the sale of the project to third parties or from

other sources as available.

In addition to joint development agreements, EME may purchase wind projects from third-party developers in various stages of development, construction or operation. In order to support investment in wind projects, EME has negotiated turbine supply agreements in advance of specific project requirements. As of December 31, 2006, EME has purchased turbines for future wind projects totaling 487 MW.

See “Commitments, Guarantees and Indemnities—Other Commitments” in the MD&A for further discussion.

Thermal Projects

EME also expects to make investments in thermal projects during the next several years. As part of this development effort, EME has begun the process of obtaining permits for two sites in southern California for peaker plants. Generally, it is expected that the thermal projects in which EME invests will sell electricity under long-term power purchase contracts. EME actively participates in bids to utilities in response to requests for proposals to build new generation and may acquire existing generation in selected markets.

In June 2006, subsidiaries of EME and BP America Inc. formed Carson Hydrogen Power LLC for the development of a power project to be located in Carson, California. Carson Hydrogen is a development stage enterprise for a planned industrial gasification project that will integrate proven gasification, power generation and enhanced oil recovery technologies. On November 29, 2006, the project was allocated $90 million of qualifying gasification project credits under Section 48B of the Internal Revenue Code. Carson Hydrogen is conducting preliminary development, including engineering, financial analysis and commercial arrangements, required for project implementation.

 

19


Table of Contents

Discontinued Operations of EME

Information regarding EME’s discontinued operations appears in Note 18 of Notes to Consolidated Financial Statements.

Hedging and Trading Activities of EME

EME’s power marketing and trading subsidiary, EMMT, markets the energy and capacity of EME’s merchant generating fleet and, in addition, trades electric power and energy and related commodity and financial products, including forwards, futures, options and swaps. EMMT segregates its marketing and trading activities into two categories:

 

 

Hedging — EMMT engages in the sale and hedging of electricity and purchase of fuels (other than coal) through intercompany contracts with EME’s subsidiaries that own or lease the Illinois plants and the Homer City facilities. The objective of these activities is to sell the output of the power plants on a forward basis or to hedge the risk of future change in the price of electricity, thereby increasing the predictability of earnings and cash flows. EMMT also conducts hedging associated with the purchase of fuels, including natural gas and fuel oil. Transactions entered into related to hedging activities are designated separately from EMMT’s trading activities and are recorded in what EMMT calls its hedge book. Not all of the contracts entered into by EMMT for hedging activities qualify for hedge accounting under SFAS No. 133. See “EMG: Market Risk Exposures—MEHC’s Accounting for Energy Contracts” for a discussion of accounting for derivative contracts in the MD&A for further discussion.

 

 

Trading — As part of its trading activities, EMMT seeks to generate profit from the volatility of the price of electricity, fuels and transmission by buying and selling contracts for their sale or provision, as the case may be, in wholesale markets under limitations approved by EME’s risk management committee. EMMT records these transactions in what it calls its proprietary book.

In conducting EME’s hedging and trading activities, EMMT contracts with a number of utilities, energy companies and financial institutions. In the event a counterparty were to default on its trade obligation, EME would be exposed to the risk of possible loss associated with reselling the contracted product at a lower price if the non-performing counterparty were unable to pay the resulting liquidated damages owed to EME. Further, EME would be exposed to the risk of non-payment of accounts receivable accrued for products delivered prior to the time such counterparty defaulted.

To manage credit risk, EME looks at the risk of a potential default by its counterparties. Credit risk is measured by the loss EME would record if its counterparties failed to perform pursuant to the terms of their contractual obligations. EME has established controls to determine and monitor the creditworthiness of counterparties and uses master netting agreements whenever possible to mitigate its exposure to counterparty risk. EME requires counterparties to pledge collateral when deemed necessary. EME uses published credit ratings of counterparties and other publicly disclosed information, such as financial statements, regulatory filings and press releases, to guide it in the process of setting credit levels, risk limits and contractual arrangements, including master netting agreements. The credit quality of EME’s counterparties is reviewed regularly by EME’s risk management committee. In addition to continuously monitoring its credit exposure to its counterparties, EME also takes appropriate steps to limit or lower credit exposure. Despite this, there can be no assurance that EME’s actions to mitigate risk will be wholly successful or that collateral pledged will be adequate.

 

20


Table of Contents

EME’s merchant power plants and energy trading activities expose EME to commodity price risks. Commodity price risks are actively monitored by EME’s risk management committee to ensure compliance with EME’s risk management policies. Policies are in place which define risk tolerances, and procedures exist which allow for monitoring of all commitments and positions with regular reviews by the risk management committee. EME uses “value at risk” to identify, measure, monitor and control its overall market risk exposure in respect of its Illinois plants, its Homer City facilities and its proprietary positions. The use of value at risk allows management to aggregate overall commodity risk, compare risk on a consistent basis and identify risk factors. Value at risk measures the possible loss over a given time interval, under normal market conditions, at a given confidence level. Given the inherent limitations of value at risk and reliance on a single risk measurement tool, EME supplements this approach with the use of stress testing and worst-case scenario analysis for key risk factors, as well as stop loss limits and counterparty credit exposure limits. Despite this, there can be no assurance that all risks have been accurately identified, measured and/or mitigated.

In executing agreements with counterparties to conduct hedging or trading activities, EME generally provides credit support when necessary through margining arrangements (agreements to provide or receive collateral, letters of credit or guarantees based on changes in the market price of the underlying contract under specific terms). To manage its liquidity, EME assesses the potential impact of future price changes in determining the amount of collateral requirements under existing or anticipated forward contracts. There is no assurance that EME’s liquidity will be adequate to meet margin calls from counterparties in the case of extreme market changes or that the failure to meet such cash requirements would not have a material adverse effect on its liquidity. See “Item 1A. Risk Factors—Risks Relating to MEHC.”

Significant Customers

In the past three fiscal years, EME derived a significant source of its operating revenues from electric power sold into the PJM market from the Homer City facilities and the Illinois plants in the past three fiscal years. Sales into the PJM pool accounted for approximately 58%, 69% and 23% of EME’s consolidated operating revenues for the years ended December 31, 2006, 2005 and 2004, respectively. For the year ended December 31, 2004, approximately 15% of EME’s consolidated operating revenues generated at the Homer City facilities and Illinois plants were from sales to BP Energy Company, a third-party customer. In 2004, EME also derived a significant source of its revenues from the sale of energy and capacity generated at the Illinois plants to Exelon Generation Company LLC primarily under three power purchase agreements. These power purchase agreements had all expired by the end of 2004. Exelon Generation Company LLC accounted for approximately 35% of EME’s consolidated operating revenues for the year ended December 31, 2004.

Insurance of EME

EME maintains insurance policies consistent with those normally carried by companies engaged in similar businesses and owning similar properties. EME’s insurance program includes all-risk property insurance, including business interruption, covering real and personal property, including losses from boilers, machinery breakdowns, and the perils of earthquake and flood, subject to specific sub limits. EME also carries general liability insurance covering liabilities to third parties for bodily injury or property damage resulting from operations, automobile liability insurance and excess liability insurance. Limits and deductibles in respect of these insurance policies are comparable to those carried by other electric generating facilities of similar size. However, no assurance can be given that EME’s insurance will be adequate to cover all losses.

 

21


Table of Contents

The Homer City facilities property insurance program currently covers losses up to $1 billion. Under the terms of the participation agreements entered into on December 7, 2001 as part of the sale-leaseback transaction of the Homer City facilities, EME Homer City is required to maintain specified minimum insurance coverages if and to the extent that such insurance is available on a commercially reasonable basis. Although the insurance covering the Homer City facilities is comparable to insurance coverages normally carried by companies engaged in similar businesses, and owning similar properties, the insurance coverages that are in place do not meet the minimum insurance coverages required under the participation agreements. Due to the current market environment, the minimum insurance coverage is not commercially available at reasonable prices. EME Homer City has obtained a waiver under the participation agreements which permit it to maintain its current insurance coverage through June 1, 2007.

Seasonality of EME

Due to higher electric demand resulting from warmer weather during the summer months and cold weather during the winter months, electric revenues from the Illinois plants and the Homer City facilities vary substantially on a seasonal basis. In addition, maintenance outages generally are scheduled during periods of lower projected electric demand (spring and fall) further reducing generation and increasing major maintenance costs which are recorded as an expense when incurred. Accordingly, earnings from the Illinois plants and the Homer City facilities are seasonal and have significant variability from quarter to quarter. Seasonal fluctuations may also be affected by changes in market prices. See “EMG: Market Risk Exposures—MEHC’s Commodity Price Risk—Energy Price Risk Affecting Sales from the Illinois Plants” and “—Energy Price Risk Affecting Sales from the Homer City Facilities” in the MD&A for further discussion regarding market prices.

EME’s third quarter equity in income from its energy projects is materially higher than equity in income related to other quarters of the year due to warmer weather during the summer months and because a number of EME’s energy projects located on the West Coast have power sales contracts that provide for higher payments during the summer months.

Discontinued Operations of EME

Information regarding EME’s discontinued operations appears in Note 18 of the Notes to the Financial Statements.

Regulation of EME

General

EME’s operations are subject to extensive regulation by governmental agencies. EME’s operating projects are subject to energy, environmental and other governmental laws and regulations at the federal, state and local levels in connection with the ownership and operation of its projects, and the use of electric energy, capacity and related products, including ancillary services from its projects. Federal laws and regulations govern, among other things, transactions by and with purchasers of power, including utility companies, the operation of a power plant and the ownership of a power plant. Under limited circumstances where exclusive federal jurisdiction is not applicable or specific exemptions or waivers from state or federal laws or regulations are otherwise unavailable, federal and/or state utility regulatory commissions may have broad jurisdiction over non-utility owned electric power plants. Energy-producing projects are also subject to federal, state and local laws and regulations that govern the geographical location, zoning, land use and operation of a project. Federal, state and local environmental requirements generally require that a wide variety of permits and other approvals be obtained before the

 

22


Table of Contents

commencement of construction or operation of an energy-producing facility and that the facility then operate in compliance with these permits and approvals.

EME is subject to a varied and complex body of laws and regulations that are in a state of flux. Intricate and changing environmental and other regulatory requirements could necessitate substantial expenditures and could create a significant risk of expensive delays or significant loss of value in a project if it were to become unable to function as planned due to changing requirements or local opposition.

United States Federal Energy Regulation

The FERC has ratemaking jurisdiction and other authority with respect to interstate wholesale sales and transmission of electric energy (other than transmission that is “bundled” with retail sales) under the Federal Power Act and with respect to certain interstate sales, transportation and storage of natural gas under the Natural Gas Act of 1938. Prior to February 8, 2006, the SEC had regulatory powers with respect to upstream owners of electric and natural gas utilities under PUHCA 1935, which was repealed as of that date by EPAct 2005. The enactment of PURPA and the adoption of regulations under that Act by the FERC provided incentives for the development of cogeneration facilities and small power production facilities using alternative or renewable fuels by establishing certain exemptions from the Federal Power Act and PUHCA 1935 for the owners of qualifying facilities. The passage of the Energy Policy Act in 1992 further encouraged independent power production by providing additional exemptions from PUHCA 1935 for EWGs and foreign utility companies. See “Business of Edison International—Regulation of Edison International” above.

The Energy Policy Act of 2005

Information on the EPAct 2005 appears under the heading “Business of Edison International—Regulation of Edision International.”

Federal Power Act

The Federal Power Act grants the FERC exclusive jurisdiction over the rates, terms and conditions of wholesale sales of electricity and transmission services in interstate commerce (other than transmission

 

23


Table of Contents

that is “bundled” with retail sales), including ongoing, as well as initial, rate jurisdiction. This jurisdiction allows the FERC to revoke or modify previously approved rates after notice and opportunity for hearing. These rates may be based on a cost-of-service approach or, in geographic and product markets determined by the FERC to be workably competitive, may be market based. Most qualifying facilities, as that term is defined in PURPA, are exempt from the ratemaking and several other provisions of the Federal Power Act. EWGs certified in accordance with the FERC’s rules under PUHCA 2005 and other non-qualifying facility independent power projects are subject to the Federal Power Act and to the FERC’s ratemaking jurisdiction thereunder, but the FERC typically grants EWGs the authority to charge market-based rates to purchasers which are not affiliated electric utility companies as long as the absence of market power is shown. In addition, the Federal Power Act grants the FERC jurisdiction over the sale or transfer of jurisdictional facilities, including wholesale power sales contracts and, after EPAct 2005, generation facilities, and in some cases, jurisdiction over the issuance of securities or the assumption of specified liabilities and some interlocking directorates. In granting authority to make sales at market-based rates, the FERC typically also grants blanket approval for certain obligations, such as those related to the issuance of securities.

As of December 31, 2006, a number of EME’s operating projects, including the Homer City facilities and the Illinois plants, were subject to the FERC ratemaking regulation under the Federal Power Act. EME’s future domestic non-qualifying facility independent power projects will also be subject to the FERC jurisdiction on rates.

PJM Reliability Pricing Model

On August 31, 2005, PJM filed under sections 205 and 206 of the Federal Power Act a proposal for a RPM to replace its existing construct. PJM’s proposal offered RPM as a way to address deficiencies in PJM’s current structure in a comprehensive and integrated manner. On April 20, 2006, the FERC issued an Initial Order on RPM, finding PJM’s existing capacity construct to be unjust and unreasonable as a long-term capacity solution, because it fails to set prices adequate to ensure energy resources to meet PJM’s reliability responsibilities. Although the FERC did not find the RPM proposal, as filed by PJM, to be a just and reasonable replacement for the current capacity construct, because some elements of the proposal need further development and elaboration, it did find that certain elements of the RPM proposal, with some adjustment and clarification, could form the basis for a just and reasonable capacity market. Accordingly, in the order the FERC provided guidance on PJM’s RPM proposal, noted other features that need to be included in a just and reasonable capacity market, and established further proceedings to resolve these issues. On September 29, 2006, a comprehensive settlement agreement among PJM and many of its stakeholders, including EME, embodying a proposed capacity market construct for PJM, was submitted to FERC for approval. On December 22, 2006, the FERC issued an order conditionally approving the RPM settlement. EME continues to review and evaluate the FERC order, but believes at this time that the implementation of the settlement will benefit the Illinois plants and the Homer City facilities.

FERC Order Regarding PJM Marginal Losses

On May 1, 2006, the FERC issued an order in response to a complaint filed by Pepco Holdings, Inc. against PJM regarding marginal losses for transmission. The FERC concluded that PJM had violated its tariff by not implementing marginal losses and further directed PJM to implement marginal losses by October 2, 2006. On June 19, 2006, the FERC issued an order delaying implementation of marginal losses in PJM until June 1, 2007. On August 3, 2006, PJM filed its Tariff and Operating Agreement changes to implement marginal losses. On November 6, 2006, the FERC issued an order accepting those Tariff and Operating Agreement changes.

 

24


Table of Contents

Implementation of marginal losses will adjust the algorithm that calculated locational marginal prices to include a component for marginal transmission losses in addition to the already included component for congestion. This may reduce market prices for sellers in the Western PJM and Northern Illinois regions, including the Homer City facilities and the Illinois plants.

Public Utility Regulatory Policies Act of 1978

PURPA provides two primary benefits to qualifying facilities. First, all cogeneration facilities that are qualifying facilities are exempt from certain provisions of the Federal Power Act and regulations of the FERC thereunder. Second, the FERC regulations promulgated under PURPA require that electric utilities purchase electricity generated by qualifying facilities at a price based on the purchasing utility’s avoided cost, (unless, pursuant to EPAct 2005, the FERC determines that the relevant market meets certain conditions for competitive, nondiscriminatory access), and that the utilities sell back-up power to the qualifying facility on a nondiscriminatory basis. The FERC’s regulations also permit qualifying facilities and utilities to negotiate agreements for utility purchases of power at prices different from the utility’s avoided costs. While it had been common for utilities to enter into long-term contracts with qualifying facilities in order to, among other things, facilitate project financing of independent power facilities and to reflect the deferral by the utility of capital costs for new plant additions, increasing competition and the development of new power markets have resulted in a trend toward shorter term power contracts that would place greater risk on the project owner.

If one of the projects in which EME has an interest were to lose its status as a qualifying cogeneration facility, the project would no longer be entitled to the qualifying facility-related exemptions from regulation. As a result, the project could become subject to rate regulation by the FERC under the Federal Power Act and additional state regulation. Loss of qualifying facility status could also trigger defaults under covenants to maintain qualifying facility status in the project’s power sales agreements, steam sales agreements and financing agreements and result in termination, penalties or acceleration of indebtedness under such agreements. If a power purchaser were to cease taking and paying for electricity or were to seek to obtain refunds of past amounts paid because of the loss of qualifying facility status, EME cannot provide assurance that the costs incurred in connection with the project could be recovered through sales to other purchasers. Moreover, EME’s business and financial condition could be adversely affected if regulations or legislation were modified or enacted that changed the standards applicable to EME’s facilities for maintaining qualifying facility status or that eliminated or reduced the benefits and exemptions currently enjoyed by EME’s qualifying facilities. Loss of qualifying facility status on a retroactive basis could lead to, among other things, fines and penalties, or claims by a utility customer for the refund of payments previously made.

EPAct 2005 made several important amendments to PURPA, including the elimination of qualifying facility ownership restrictions, elimination of the requirement that electric utilities enter into new contracts to purchase electricity from qualifying facilities that have access to wholesale power markets that meet specified criteria or sell energy to existing qualifying facilities in states where there is retail electricity competition and no obligation under state law to make power sales, the granting of new authority to the FERC to ensure recovery by electric utilities of all prudently incurred costs associated with purchases of energy and capacity from qualifying facilities, and certain obligations upon electric utilities for interconnection and metering for qualifying facilities. The FERC has initiated several proceedings to promulgate rules and regulations to implement the mandates of EPAct 2005 with respect to PURPA, and EME is continuing to evaluate the effect of the legislation and proposed regulations on its business activities.

 

25


Table of Contents

EME endeavors to monitor regulatory compliance by its qualifying facility projects in a manner that minimizes the risks of losing these projects’ qualifying facility status. However, some factors necessary to maintain qualifying facility status are subject to risks of events outside EME’s control. For example, loss of a thermal energy customer or failure of a thermal energy customer to take required amounts of thermal energy from a cogeneration facility that is a qualifying facility could cause a facility to fail to meet the requirements regarding the minimum level of useful thermal energy output. Upon the occurrence of this type of event, EME would seek to replace the thermal energy customer or find another use for the thermal energy that meets the requirements of PURPA.

Natural Gas Act

Many of the operating facilities that EME owns, operates or has investments in use natural gas as their primary fuel. Under the Natural Gas Act, the FERC has jurisdiction over certain sales of natural gas and over transportation and storage of natural gas in interstate commerce. The FERC has granted blanket authority to all persons to make sales of natural gas without restriction but continues to exercise significant oversight with respect to transportation and storage of natural gas services in interstate commerce.

Transmission of Wholesale Power

Generally, projects that sell power to wholesale purchasers other than the local utility to which the project is interconnected require the transmission of electricity over power lines owned by others. This transmission service over the lines of intervening transmission owners is also known as wheeling. The prices and other terms and conditions of transmission contracts are regulated by the FERC when the entity providing the transmission service is a jurisdictional public utility under the Federal Power Act.

The Energy Policy Act of 1992 laid the groundwork for a competitive wholesale market for electricity by, among other things, expanding the FERC’s authority to order electric utilities to transmit third-party electricity over their transmission lines, thus allowing qualifying facilities under PURPA, power marketers and those qualifying as EWGs under PUHCA 1935 to more effectively compete in the wholesale market.

In 1996, the FERC issued Order No. 888, also known as the Open Access Rules, which require utilities to offer eligible wholesale transmission customers open access on utility transmission lines on a comparable basis to the utilities’ own use of the lines and directed jurisdictional public utilities that control a substantial portion of the nation’s electric transmission networks to file uniform, non-discriminatory open access tariffs containing the terms and conditions under which they would provide such open access transmission service. The FERC subsequently issued Order Nos. 888-A, 888-B and 888-C to clarify the terms that jurisdictional transmitting utilities are required to include in their open access transmission tariffs and Order No. 889, which required those transmitting utilities to abide by specified standards of conduct when using their own transmission systems to make wholesale sales of power, and to post specified transmission information, including information about transmission requests and availability, on a publicly available computer bulletin board.

On February 15, 2007, the FERC issued Order No. 890 with the stated intent of promoting competition in wholesale power markets and strengthening the electric power grids. Order No. 890 is designed to strengthen the Open Access Rules embodied in Order No. 888, increase transparency in the rules applicable to planning and use of the transmission system, make undue discrimination in transmission easier to detect, and facilitate the FERC’s enforcement efforts in remedying such discrimination. Public utility transmission providers, including RTOs and ISOs, are required to make

 

26


Table of Contents

changes in their tariffs to comply with Order No. 890. Order No. 890 will take effect within 60 days of its publication in the Federal Register, which is expected to occur within 30 days of its issuance.

Environmental Matters and Regulations Affecting EME

The construction and operation of power plants are subject to environmental regulation by federal, state and local authorities. EME believes that it is in substantial compliance with existing environmental regulatory requirements. Typically, environmental laws and regulations require a lengthy and complex process for obtaining licenses, permits and approvals prior to construction, operation or modification of a project or generating facility. Meeting all the necessary requirements can delay or sometimes prevent the completion of a proposed project, as well as require extensive modifications to existing projects, which may involve significant capital expenditures. If EME fails to comply with applicable environmental laws, it may be subject to injunctive relief or penalties and fines imposed by regulatory authorities.

Air Quality Regulation

Federal environmental regulations require reductions in emissions beginning in 2009 and require states to adopt implementation plans that are equal to or more stringent than the federal requirements. Compliance with these regulations and SIPs will affect the costs and the manner in which EME conducts its business, and will require EME to make substantial additional capital expenditures. There is no assurance that EME would be able to recover these increased costs from its customers or that EME’s financial position and results of operations would not be materially adversely affected as a result.

Clean Air Act

Information on the CAIR and its impact on EME appears in the MD&A under the heading “Other Developments—Environmental Matters—Air Quality Standards—Clean Air Act.”

Illinois

Information regarding Midwest Generation’s agreement with the Illinois EPA appears in MD&A under the heading “Other Developments—Environmental Matters—Air Quality Standards—Clean Air Act—Illinois.”

Pennsylvania

Information regarding Pennsylvania’s compliance with CAIR appears in MD&A under the heading “Other Developments—Environmental Matters—Air Quality Standards—Clean Air Act—Pennsylvania.”

Mercury Regulation

See “Business of Southern California Edison Company—Environmental Matters Affecting SCE—Mercury Regulation” for a general description of the CAMR.

Illinois

Information regarding Midwest Generation’s compliance with the State rule for reduction of mercury emissions in Illinois appears in the MD&A under the heading “Other Developments—Environmental Matters—Mercury Regulation—Illinois.”

 

27


Table of Contents

Pennsylvania

Information regarding the Homer City facilities’ compliance with the State rule for reduction of mercury emissions in Pennsylvania appears in the MD&A under the heading “Other Developments—Environmental Matters—Mercury Regulation—Pennsylvania.”

Ambient Air Quality Standards

The US EPA designated non-attainment areas for its 8-hour ozone standard on April 30, 2004, and for its fine particulate matter standard on January 5, 2005. Almost all of EME’s facilities are located in counties that have been identified as being in non-attainment with both standards. States are required to revise their SIPs for the ozone and particulate matter standards within three years of the effective date of the respective non-attainment designations. The revised SIPs are likely to require additional emission reductions from facilities that are significant emitters of ozone precursors and particulates. Any additional obligations on EME’s facilities to further reduce their emissions of SO2, NOx and fine particulates to address local non-attainment with the 8-hour ozone and fine particulate matter standards will not be known until the states revise their SIPs. Depending upon the final standards that are adopted, EME may incur substantial costs or experience financial impacts resulting from required capital improvements or operational changes.

On September 22, 2006 the US EPA issued a final rule that implements the revisions to its fine particulate standard originally proposed on January 17, 2006. Under the new rule, the annual standard remains the same but the 24-hour fine particulate standard is significantly more stringent. The rule may require states to impose further emission reductions beyond those necessary to meet the existing standards. EME anticipates that any such further emissions reduction obligations would not be imposed under this standard until 2015 at the earliest, and intends to consider such rules as part of its overall plan for environmental compliance.

Illinois

Beginning with the 2003 ozone season (May 1 through September 30), EME has been required to comply with an average NOX emission rate of 0.25 lb NOX/mm British Thermal Units of heat input. This limitation is commonly referred to as the East St. Louis SIP. This regulation is a State of Illinois requirement. Each of the Illinois plants complied with this standard in 2004. Beginning with the 2004 ozone season, the Illinois Plants became subject to the federally mandated “NOX SIP Call” regulation that provided ozone-season NOX emission allowances to a 19-state region east of the Mississippi. This program provides for NOX allowance trading similar to the SO2 (acid rain) trading program already in effect.

During 2004, the Illinois plants stayed within their NOX allocations by augmenting their allocation with early reduction credits generated within the fleet. In 2005, the Illinois plants used banked allowances, along with some purchased allowances, to stay within their NOX allocations. In 2006, the Illinois plants used purchased allowances to stay within their NOx allocations. Midwest Generation plans to continue to purchase allowances as it implements the agreement it reached with the Illinois EPA.

The Illinois EPA has begun to develop SIPs to meet National Ambient Air Quality Standards for 8-hour ozone and fine particulates with the intent of bringing non-attainment areas, such as Chicago, into attainment. The SIPs are expected to deal with all emission sources, not just power generators, and to address emissions of NOX, SO2, and volatile organic compounds. These SIPs are to be submitted to the US EPA by June 15, 2007 for 8-hour ozone, and by April 5, 2008 for fine particulates.

 

28


Table of Contents

Midwest Generation’s agreement with the Illinois EPA and the pending CPS include emission controls that will contribute to ozone and fine particulate attainment. Midwest Generation expects, but cannot guarantee, that the reductions required under the agreement and the pending CPS will be sufficient for compliance with future ozone and particulate matter regulations. Additional information regarding Midwest Generation’s agreement with the Illinois EPA appears in the MD&A under the heading “Air Quality Standards—Clean Air Act—Illinois.”

Pennsylvania

The Homer City facilities comply with current ozone requirements due to the selective catalytic reduction systems installed at each unit. Particulate requirements are met using a combination of scrubber reductions from Unit 3 and the purchase of SO2 allowances. Pennsylvania has not yet proposed new regulations to implement the National Ambient Air Quality Standards for 8-hour ozone or for fine particulates. These SIPs are to be submitted to the US EPA by June 15, 2007 and April 5, 2008, respectively. Although the final form of the SIPs is not yet known, at this time EME anticipates that current treatment will be sufficient to meet the SIP requirements for 8-hour ozone, and that the SIP for fine particulates will require the continued use of the existing scrubber supplemented by the purchase of SO2 allowances.

Regional Haze

See “Business of Southern California Edison Company—Environmental Matters Affecting SCE—Regional Haze” for a general description of the regional haze regulations. States are required to revise their SIPs to demonstrate reasonable further progress towards meeting regional haze goals. Emission reductions achieved through other ongoing control programs may be sufficient to demonstrate reasonable progress toward the long-term goal, particularly for the first 10 to 15 year phase of the program. States must develop SIPs by December 2007. It is possible that sources subject to the CAIR will be able to satisfy their obligations under the regional haze regulations through compliance with the CAIR. However, until the SIPs are revised, EME cannot predict whether it will be required to install BART or implement other control strategies, and cannot identify the financial impacts of any additional control requirements.

The CPS, discussed in the MD&A under the heading “Other Developments— Environmental Matters— Air Quality Standards—Clean Air Act—Illinois,” addresses emissions reductions at BART affected sources. In Pennsylvania, the PADEP considers the CAIR to meet the BART requirements and the Homer City facilities are only required to consider reductions in emissions of suspended particulate matter (PM10), which at this time have not been developed by the state.

New Source Review Requirements

Since 1999, the US EPA has pursued a coordinated compliance and enforcement strategy to address Clean Air Act NSR compliance issues at the nation’s coal-fired power plants. The NSR regulations impose certain requirements on facilities, such as electric generating stations, in the event that modifications are made to air emissions sources at a facility. The US EPA’s strategy included both the filing of a number of suits against power plant owners, and the issuance of a number of administrative notices of violation to power plant owners alleging NSR violations. Neither EME nor any of its subsidiaries have been named as a defendant in these lawsuits and have not received any administrative Notices of Violation alleging NSR violations at any of their facilities.

On October 13, 2005, the US EPA proposed a change to the NSR program. The proposal put forth several options for a new emissions test based on the impact of a facility modification on a facility’s

 

29


Table of Contents

maximum hourly emissions or its emissions per unit of energy produced. The existing NSR emissions test is based on the impact of a modification on a generating station’s net annual emissions.

In October 2005, the US EPA announced a revised NSR strategy to take account of recent US EPA rulemakings, such as the CAIR and regional haze rules, affecting coal-fired power plants. Under the revised strategy, while the US EPA will continue to pursue filed cases and cases in active negotiation, it intends to shift its future enforcement focus from coal-fired power plants to other sectors where compliance assurance activities have the potential to produce significant environmental benefits.

Prior to EME’s purchase of the Homer City facilities, the US EPA requested information under Section 114 of the Clean Air Act from the prior owners of the plant concerning physical changes at the plant. This request was part of the US EPA’s industry-wide investigation of compliance by coal-fired plants with the Clean Air Act NSR requirements. On February 21, 2003, Midwest Generation received a request for information under Section 114 regarding past operations, maintenance and physical changes at the Illinois plants from the US EPA. On July 28, 2003, Commonwealth Edison Company received a substantially similar request for information from the US EPA related to the same plants. In a request dated February 1, 2005, the US EPA submitted a request for additional information to Midwest Generation. Midwest Generation has provided responses to these requests. Other than these requests for information, no NSR enforcement-related proceedings have been initiated by the US EPA with respect to any of EME’s facilities.

EME will continue to monitor developments with respect to changes to the NSR program and NSR enforcement to assess what implications, if any, they will have on its facilities, its results of operations or financial position.

Water Quality Regulation

Clean Water Act—Cooling Water Intake Structures

See “Business of Southern California Edison Company—Environmental Matters Affecting SCE—Water Quality Regulation” for a general description of Section 316(b) of the Clean Water Act and the challenge to the US EPA regulations implementing Section 316(b). Information regarding cooling water intake structure standards, water quality issues in Illinois and Pennsylvania, and their effect on EME appear in the MD&A under the heading “Other Developments—Environmental Matters—Water Quality Regulation.”

Climate Change

For a discussion of the laws and regulations relating to climate change, see “Business of Southern California Edison Company—Environmental Matters Affecting SCE—Climate Change.”

Information regarding current developments on climate change and GHG regulation appears in the MD&A under the heading “Other Developments—Environmental Matters—Climate Change.”

The ultimate outcome of the climate change debate could have a significant economic effect on EME. Any legal obligation that would require EME to reduce substantially its emissions of CO2 or would impose additional costs or charges for the emission of CO2 could have a materially adverse effect on EME.

 

30


Table of Contents

Employees of EME

MEHC has no full-time employees. At December 31, 2006, EME and its subsidiaries employed 1,751 people, including:

 

 

approximately 732 employees at the Illinois plants covered by a collective bargaining agreement governing wages, certain benefits and working conditions. This collective bargaining agreement expired on December 31, 2005. A new agreement was reached with the union representing the Illinois employees, with an expiration date of December 31, 2009. Midwest Generation also has a separate collective bargaining agreement governing retirement, health care, disability and insurance benefits that expires on June 15, 2006. Despite extensive negotiations, Midwest Generation and Local 15 were not able to reach agreement on changes in this benefits agreement. Midwest Generation will continue to provide benefits under the expired agreement until a determination is made to implement the proposed new terms over which the parties are at impasse; and

 

 

approximately 196 employees at the Homer City facilities covered by a collective bargaining agreement governing wages, benefits and working conditions. This collective bargaining agreement, which expired on December 31, 2006, was extended to December 31, 2007 by mutual agreement.

 

31


Table of Contents

Business of Edison Capital

Edison Capital has investments worldwide in energy and infrastructure projects, including power generation, electric transmission and distribution, transportation, and telecommunications. Edison Capital also has investments in affordable housing projects located throughout the United States.

At the end of 2005, the employees of Edison Capital were transferred to EME and a services agreement was executed effective December 26, 2005 to provide for intercompany charges for services provided by EME to Edison Capital. During December 2005, Edison Capital dividended a portion of its wind projects to its parent company, Edison Mission Group Inc. The projects were then contributed to EME. During the first half of 2006, Edison Capital dividended its remaining wind projects to Edison Mission Group Inc., and the projects were subsequently contributed to EME.

At the present time, no new investments are expected to be made by Edison Capital and the focus will be on managing the existing investment portfolio.

Energy and Infrastructure Investments of Edison Capital

Edison Capital’s energy and infrastructure investments are in the form of domestic and cross-border leveraged leases, partnership interests in international infrastructure funds and operating companies in the United States.

 

32


Table of Contents

Leveraged Leases

As of December 31, 2006, Edison Capital is the lessor with an investment balance of $2.5 billion in the following leveraged leases:

 

Transaction

  

Asset

  

Location

   Basic Lease
Term Ends
  

Investment
Balance

(in millions)

Domestic Leases

MCV • Midland Cogeneration Ventures, selling power to Consumers Energy Company

   1,500 MW gas-fired cogeneration plant    Midland, Michigan    2015    $ 43

Vidalia • selling power to Entergy Louisiana, City of Vidalia

   192 MW hydro power plant    Vidalia, Louisiana    2020    $ 88

Beaver Valley • selling power to Ohio Edison Company, Centerior Energy Corporation

   836 MW nuclear power plant    Shippingport, Pennsylvania    2017    $ 120

American Airlines

   3 Boeing 767 ER aircraft    Domestic and international routes    2016    $ 56

Cross-border Leases

           

EPON • power generation company

   1,675 MW combined cycle, gas-fired power plant (3 of 5 units)    Netherlands    2016    $ 440

EPZ • consortium of government electric distribution companies

   580 MW coal/gas-fired power plant    Netherlands    2016    $ 96

ESKOM • government integrated utility

   4,110 MW coal-fired power plant (3 of 6 units)    South Africa    2018    $ 640

ETSA • government integrated utility

   3,665 miles electric transmission system    South Australia    2022    $ 302

NV Nederlandse Spoorwegen • national rail authority

   40 electric locomotives    Netherlands    2011    $ 39

Swisscom • government telecom utility

   Telecom conduit    Switzerland    2028    $ 710

The rent paid by the lessee is expected to cover debt payments and provide a profit to Edison Capital. As lessor, Edison Capital also claims the tax benefits, such as depreciation of the asset or amortization of lease payments and interest deductions. All regulatory, operating, maintenance, insurance and decommissioning costs are the responsibility of the lessees. The lessees’ performance is secured not only by the project assets, but also by other collateral that was valued as of December 31, 2006, in the aggregate at approximately $1.9 billion against $2.5 billion invested in leveraged leases. The lenders have a priority lien against the assets but the loans are otherwise non-recourse to Edison Capital. Edison Capital’s leveraged lease investments depend upon the performance of the asset, the lessee’s performance of its contract obligations, enforcement of remedies and sufficiency of the collateral in the event of default, and realization of tax benefits.

Infrastructure Funds

Edison Capital holds a minority interest as a limited partner in three separate funds that invest in infrastructure assets in Latin America, Asia and countries in Europe with emerging economies. Edison Capital is also a member of the investment committee of each fund. At year-end 2006, Edison Capital had an investment balance of $25 million in the Latin America fund, $19 million in the

 

33


Table of Contents

Asia fund, and $20 million in the emerging Europe fund. As of December 31, 2006, Edison Capital did not have any additional investment commitments to these funds. The fund managers look to exit the investments on favorable terms which provide a return to the limited partners from appreciation in the value of the investment. The ability to exit investments on favorable terms depends upon many factors, including the economic conditions in each region, the performance of the asset, and whether there is a public or private market for these interests. For some fund investments there may also be foreign currency exchange rate risk.

Affo rdable Housing Investments of Edison Capital

At December 31, 2006, Edison Capital had a net investment of $29 million in approximately 335 affordable housing projects with approximately 27,000 units rented to qualifying low-income tenants in 36 states. These investments are usually in the form of majority interests in limited partnerships or limited liability companies. With a few exceptions, the projects are managed by third parties. For 105 projects, Edison Capital has guaranteed a minimum return to the syndicated investor. Edison Capital continues to consolidate the investment funds subject to the guaranteed minimum return. Edison Capital retained a minority interest in, and continues to monitor, all of the syndicated investments. Edison Capital is entitled to low-income housing tax credits, depreciation and interest deductions, and a small percentage of cash generated from the projects. Edison Capital’s tax credits from these projects could be recaptured by the Internal Revenue Service if, among other things, the project fails to comply with the requirements of the tax credit program, costs are excluded from the eligible basis used to compute the amount of tax credits, or the project changes ownership through foreclosure. In most cases, Edison Capital is indemnified by the project manager (or parties related to it) against some losses, but there is no assurance of collecting against such indemnities. As of year-end 2006, Edison Capital had not experienced any significant recapture of tax credits from its affordable housing projects.

Business Environment of Edison Capital

Edison Capital’s investments may be affected by the financial condition of other parties, the performance of assets, regulatory, economic conditions and other business and legal factors. Information regarding the business environment of Edison Capital appears in the MD&A under the heading “EMG: Market Risk Exposure—Edison Capital’s Credit and Performance Risk.”

Under tax allocation arrangements among Edison International and its subsidiaries, Edison Capital receives cash for federal and state tax benefits from its investments that are utilized on Edison International’s tax return. Information about Edison Capital’s tax allocation payments and tax exposures is contained in the MD&A under the heading “Edison Capital’s: Liquidity—Intercompany Tax-Allocation Payments” and “Other Developments—Federal Income Taxes.”

 

ITEM 1A. RISK FACTORS

Risks Relating to E dison International

Edison International may be unable to meet its ongoing and future financial obligations and to pay dividends on its common stock if its subsidiaries are unable to pay upstream dividends or repay funds to Edison International.

Edison International is a holding company and, as such, Edison International has no operations of its own. Edison International’s ability to meet its financial obligations and to pay dividends on its common stock at the current rate is primarily dependent on the earnings and cash flows of its subsidiaries and their

 

34


Table of Contents

ability to pay upstream dividends or to repay funds to Edison International. Prior to funding Edison International, Edison International’s subsidiaries have financial and regulatory obligations that must be satisfied, including, among others, debt service and preferred stock dividends.

Edison International’s cash flows and earnings could be adversely affected by tax developments relating to Edison Capital’s lease transactions.

Edison Capital entered into certain types of lease transactions which have been challenged by the Internal Revenue Service. If Edison International is not successful in its defense of the tax treatment of those transactions, the payment of taxes could have a significant impact on cash flows. Also, the adoption of changes in accounting policies relating to the accounting for leases could cause a material effect on reported earnings by requiring Edison International to reverse earnings previously recognized as a current period adjustment and to report these earnings over the remaining life of the leases. More information regarding the lease transactions is contained in the MD&A under the heading “Other Developments—Federal Income Taxes.”

Edison International and its subsidiaries are subject to costs and other effects of legal proceedings as well as changes in or additions to applicable tax laws, rates or policies, rates of inflation, and accounting standards.

Edison International and its subsidiaries are subject to costs and other effects of legal and administrative proceedings, settlements, investigations and claims, as well as the effect of new, or changes in, tax laws, rates or policies, rates of inflation and accounting standards.

Risks Relating to SCE

SCE’s financial viability depends upon its ability to recover its costs in a timely manner from its customers through regulated rates.

SCE is a regulated entity subject to CPUC jurisdiction in almost all aspects of its business, including the rates, terms and conditions of its services, procurement of electricity for its customers, issuance of securities, dispositions of utility assets and facilities and aspects of the siting and operations of its electricity distribution systems. SCE’s ongoing financial viability depends on its ability to recover from its customers in a timely manner its costs, including the costs of electricity purchased for its customers, in its CPUC-approved rates and its ability to pass through to its customers in rates its FERC-authorized revenue requirements. SCE’s financial viability also depends on its ability to recover in rates an adequate return on capital, including long-term debt and equity. If SCE is unable to recover any material amount of its costs in rates in a timely manner or recover an adequate return on capital, its financial condition and results of operations could be materially adversely affected.

SCE’s revenues and earnings are substantially affected by regulatory proceedings known as general rate cases and cost of capital proceedings. General rate cases are expected to occur every three years. During those cases, the CPUC determines SCE’s rate base (the value of assets on which SCE earns a rate of return for investors), depreciation rates, operation and maintenance costs, and administrative and general costs that SCE may recover from its customers through its rates. Cost of capital proceedings are conducted annually. During those cases, the CPUC authorizes SCE’s capital structure and the return on

 

35


Table of Contents

common equity applicable to the rate base determined in the general rate case proceedings. More information about these proceedings is set forth in the MD&A under the heading “SCE: Regulatory Matters.”

SCE’s energy procurement activities are subject to regulatory and market risks that could adversely affect its financial condition, liquidity, and earnings.

SCE obtains energy, capacity, and ancillary services needed to serve its customers from its own generating plants and contracts with energy producers and sellers. California law and CPUC decisions allow SCE to recover in customer rates reasonable procurement costs incurred in compliance with an approved procurement plan. Nonetheless, SCE’s cash flows remain subject to volatility resulting from its procurement activities. In addition, SCE is subject to the risks of unfavorable or untimely CPUC decisions about the compliance of procurement activities with its procurement plan and the reasonableness of certain procurement-related costs.

Many of SCE’s power purchase contracts are tied to market prices for natural gas. Some of its contracts also are subject to volatility in market prices for electricity. SCE seeks to hedge its market price exposure to the extent authorized by the CPUC. SCE may not be able to hedge its risk for commodities on favorable terms or fully recover the costs of hedges in rates, which could adversely affect SCE’s liquidity and results of operation.

In its power purchase contracts and other procurement arrangements, SCE is exposed to risks from changes in the credit quality of its counterparties. If a counterparty were to default on its obligations, SCE could be exposed to potentially volatile spot markets for buying replacement power or selling excess power.

SCE relies on access to the capital markets. If SCE were unable to access capital markets or the cost of capital were to substantially increase, its liquidity and operations could be adversely affected.

SCE’s ability to make scheduled payments of principal and interest, refinance debt, and fund its operations and planned capital expenditure projects depends on its cash flow and access to the capital markets. SCE’s ability to arrange financing and the costs of such capital are dependent on numerous factors, including its levels of indebtedness, maintenance of acceptable credit ratings, its financial performance, liquidity and cash flow, and other market conditions. Market conditions which could adversely affect SCE’s financing costs and availability include:

 

 

an economic downturn;

 

 

capital market conditions generally;

 

 

market prices for electricity or gas;

 

 

changes in interest rates and rates of inflation;

 

 

terrorist attacks or the threat of terrorist attacks on SCE’s facilities or unrelated energy companies; and

 

 

the overall health of the utility industry.

SCE may not be successful in obtaining additional capital for these or other reasons. The failure to obtain additional capital from time to time may have a material adverse effect on SCE’s liquidity and operations.

 

36


Table of Contents

SCE is subject to numerous environmental laws and regulations with respect to operation of its facilities. New laws and regulations could adversely affect SCE.

The operation of SCE’s power generation, transmission, and distribution facilities is subject to numerous environmental laws and regulations. Those laws and regulations require SCE to expend substantial sums to mitigate or remove the effect of its operations on the environment and can impede the development of new facilities. Violations of environmental laws and regulations can result in fines, penalties and liability to third parties. In addition, new environmental laws, regulations and standards may be adopted that would impose substantial costs on SCE or impair its future operations. Environmental advocacy groups and regulatory agencies have been focusing considerable attention on CO2 emissions and the effect of those emissions on global warming. The adoption of new laws and regulations to CO2 or other emissions could adversely affect the operation of SCE’s generating plants and other facilities and result in additional costs that could adversely affect SCE’s results of operations.

SCE is subject to extensive regulation and the risk of adverse regulatory decisions and changes in applicable regulations or legislation.

SCE operates in a highly regulated environment. SCE’s business is subject to extensive federal, state and local energy, environmental and other laws and regulations. The CPUC regulates SCE’s retail operations, and the FERC regulates SCE’s wholesale operations. The United States NRC regulates SCE’s nuclear power plants. The construction, planning, and siting of SCE’s power plants and transmission lines in California are also subject to the jurisdiction of the California Energy Commission (for plants 50 MW or greater), and the CPUC. The construction, planning and siting of transmission lines that are outside of California are subject to the regulation of the relevant state agency. Additional regulatory authorities with jurisdiction over some of SCE’s operations and construction projects include the California Air Resources Board, the California State Water Resources Control Board, the California Department of Toxic Substances Control, the California Coastal Commission, the US EPA, the Bureau of Land Management, the U.S. Fish and Wildlife Services, the U.S. Forest Service, Regional Water Quality Boards, the Bureau of Indian Affairs, the United States Department of Energy, the NRC, and various local regulatory districts.

SCE must periodically apply for licenses and permits from these various regulatory authorities and abide by their respective orders. Should SCE be unsuccessful in obtaining necessary licenses or permits or should these regulatory authorities initiate any investigations or enforcement actions or impose penalties or disallowances on SCE, SCE’s business could be adversely affected. Existing regulations may be revised or reinterpreted and new laws and regulations may be adopted or become applicable to SCE or SCE’s facilities in a manner that may have a detrimental effect on SCE’s business or result in significant additional costs because of SCE’s need to comply with those requirements.

There are inherent risks associated with operating nuclear power generating facilities.

Spent fuel storage capacity could be insufficient to permit long-term operation of SCE’s nuclear plants.

SCE operates and is majority owner of San Onofre and is part owner of Palo Verde. The United States Department of Energy has defaulted on its obligation to begin accepting spent nuclear fuel from commercial nuclear industry participants by January 31, 1998. If SCE or the operator of Palo Verde were unable to arrange and maintain sufficient capacity for interim spent-fuel storage now or in the future, it could hinder operation of the plants and impair the value of SCE’s ownership interests until storage could be obtained, each of which may have a material adverse effect on SCE.

 

37


Table of Contents

Existing insurance and ratemaking arrangements may not protect SCE fully against losses from a nuclear incident.

Federal law limits public liability from a nuclear incident to $10.8 billion. SCE and other owners of the San Onofre and Palo Verde nuclear generating stations have purchased the maximum private primary insurance available of $300 million per site. If the public liability limit is insufficient, federal regulations may impose further revenue-raising measures to pay claims, including a possible additional assessment on all licensed reactor operators. In the event of such an under-insured nuclear incident, a tension could exist between the federal government’s attempt to impose revenue-raising measures upon SCE and the CPUC’s willingness to allow SCE to pass this liability along to its customers, resulting in undercollection of SCE’s costs.

SCE’s financial condition and results of operations could be materially adversely affected if it is unable to successfully manage the risks inherent in operating its facilities.

SCE owns and operates extensive electricity facilities that are interconnected to the United States western electricity grid. The operation of SCE’s facilities and the facilities of third parties on which it relies involves numerous risks, including:

 

 

operating limitations that may be imposed by environmental or other regulatory requirements;

 

 

imposition of operational performance standards by agencies with regulatory oversight of SCE’s facilities;

 

 

environmental and personal injury liabilities caused by the operation of SCE’s facilities;

 

 

interruptions in fuel supply;

 

 

blackouts;

 

 

employee work force factors, including strikes, work stoppages or labor disputes;

 

 

weather, storms, earthquakes, fires, floods or other natural disasters;

 

 

acts of terrorism; and

 

 

explosions, accidents, mechanical breakdowns and other events that affect demand, result in power outages, reduce generating output or cause damage to SCE’s assets or operations or those of third parties on which it relies.

The occurrence of any of these events could result in lower revenues or increased expenses, or both, which may not be fully recovered through insurance, rates or other means in a timely manner or at all.

SCE’s insurance coverage may not be sufficient under all circumstances and SCE may not be able to obtain sufficient insurance.

SCE’s insurance may not be sufficient or effective under all circumstances and against all hazards or liabilities to which it may be subject. A loss for which SCE is not fully insured could materially and adversely affect SCE’s financial condition and results of operations. Further, due to rising insurance costs and changes in the insurance markets, insurance coverage may not continue to be available at all or at rates or on terms similar to those presently available to SCE.

 

38


Table of Contents

Risks Relating to EMG

MEHC depends upon cash flows from EME to service its debt.

MEHC’s principal asset is the common stock of EME. In July 2001, MEHC issued $800 million of 13.50% senior secured notes due 2008. The senior secured notes are secured by a first priority security interest in EME’s common stock. Any foreclosure on the pledge of EME’s common stock by the holders of the senior secured notes would result in a change in control of EME, which could have a material adverse effect on MEHC. Dividends from EME are limited based on its earnings and cash flow, the terms of restrictions contained in EME’s corporate credit facility, business and tax considerations and restrictions imposed by applicable law. A discussion of contractual restrictions that could constrain the ability of EMG’s subsidiaries to pay dividends or distributions to EME appears in the MD&A under the heading “EMG: —Liquidity MEHC—Dividend Restrictions in Major Financings.”

EME has substantial interests in merchant energy power plants which are subject to market risks related to wholesale energy prices.

EME’s merchant energy power plants do not have long-term power purchase agreements. Because the output of these power plants is not committed to be sold under long-term contracts, these projects are subject to market forces which determine the amount and price of energy, capacity and ancillary services sold from the power plants.

The factors that influence the market prices for energy, capacity and ancillary services include:

 

 

prevailing market prices for coal, natural gas and fuel oil, emission allowances and associated transportation costs;

 

 

the extent of additional supplies of capacity, energy and ancillary services from current competitors or new market entrants, including the development of new generation facilities or technologies that may be able to produce electricity at a lower cost than EME’s generating facilities and/or increased access by competitors to EME’s markets as a result of transmission upgrades;

 

 

transmission congestion in and to each market area and the resulting differences in prices between delivery points;

 

 

the market structure rules established for each market area and regulatory developments affecting the market areas, including any price limitations and other mechanisms adopted to address volatility or illiquidity in these markets or the physical stability of the system;

 

 

the cost and availability of emission credits or allowances;

 

 

the availability, reliability and operation of competing power generation facilities, including nuclear generating plants where applicable, and the extended operation of such facilities beyond their presently expected dates of decommissioning;

 

 

weather conditions prevailing in surrounding areas from time to time; and

 

 

changes in the demand for electricity or in patterns of electricity usage as a result of factors such as regional economic conditions and the implementation of conservation programs.

In addition, unlike most other commodities, electric power can only be stored on a very limited basis and generally must be produced concurrently with its use. As a result, the wholesale power markets are subject to significant and unpredictable price fluctuations over relatively short periods of time.

There is no assurance that EME’s merchant energy power plants will be successful in selling power into their markets or that the prices received for their power will generate positive cash flows. If EME’s

 

39


Table of Contents

merchant energy power plants do not meet these objectives, they may not be able to generate enough cash to service their own debt and lease obligations, which could have a material adverse effect on EME.

EME’s financial results can be affected by changes in fuel prices, fuel transportation cost increases, and interruptions in fuel supply.

EME’s business is subject to changes in fuel costs, which may negatively affect its financial results and financial position by increasing the cost of producing power. The fuel markets can be volatile, and actual fuel prices can differ from EME’s expectations.

Although EME attempts to purchase fuel based on its known fuel requirements, it is still subject to the risks of supply interruptions, transportation cost increases, and fuel price volatility. In addition, fuel deliveries may not exactly match energy sales, due in part to the need to purchase fuel inventories in advance for reliability and dispatch requirements. The price at which EME can sell its energy may not rise or fall at the same rate as a corresponding rise or fall in fuel costs. See “EMG: Market Risk Exposures—MEHC’s Commodity Price Risk” in the MD&A.

EME may not be able to hedge market risks effectively.

EME is exposed to market risks through its ownership and operation of merchant energy power plants and through its power marketing business. These market risks include, among others, volatility arising from the timing differences associated with buying fuel, converting fuel into energy and delivering energy to a buyer. EME uses forward contracts and derivative financial instruments, such as futures contracts and options, to manage market risks and exposure to fluctuating electricity and fuel prices. However, EME cannot provide assurance that these strategies successfully mitigate market risks, or that they will not result in net losses.

EME may not cover the entire exposure of its assets or positions to market price volatility, and the level of coverage will vary over time. Fluctuating commodity prices may negatively affect EME’s financial results to the extent that assets and positions have not been hedged.

The effectiveness of EME’s hedging activities may depend on the amount of working capital available to post as collateral in support of these transactions, either in support of performance guarantees or as a cash margin. The amount of credit support that must be provided typically is based on the difference between the price of the commodity in a given contract and the market price of the commodity. Significant movements in market prices can result in a requirement to provide cash collateral and letters of credit in very large amounts. Without adequate liquidity to meet margin and collateral requirements, EME could be exposed to the following:

 

 

a reduction in the number of counterparties willing to enter into bilateral contracts, which would result in increased reliance on short-term and spot markets instead of bilateral contracts, increasing EME’s exposure to market volatility; and

 

 

a failure to meet a margining requirement, which could permit the counterparty to terminate the related bilateral contract early and demand immediate payment for the replacement value of the contract.

As a result of these and other factors, EME cannot predict with precision the effect that risk management decisions may have on its businesses, operating results or financial position. See the discussion in the MD&A under the heading “EMG: Liquidity—MEHC’s Margin, Collateral Deposits and Other Credit Support for Energy Contracts.”

 

40


Table of Contents

EME is exposed to credit and performance risk from third parties under supply and transportation contracts.

EME relies on contracts for the supply and transportation of fuel and other services required for the operation of its generation facilities. EME’s operations are exposed to the risk that counterparties will not perform their obligations. If a counterparty failed to perform under a contract, EME would need to obtain alternate suppliers for their requirements of fuel or other services, which could result in higher costs or disruptions in its operations. Furthermore, EME is exposed to credit risk because damages related to a breach of contract may not be recoverable. Accordingly, the failure of a supplier to fulfill its contractual obligations could have a material adverse effect on EME’s financial results.

EME is subject to extensive energy industry regulation.

EME’s operations are subject to extensive regulation by governmental agencies. EME’s projects are subject to federal laws and regulations that govern, among other things, transactions by and with purchasers of power, including utility companies, the development and construction of generation facilities, the ownership and operations of generation facilities, and access to transmission. Under limited circumstances where exclusive federal jurisdiction is not applicable or specific exemptions or waivers from state or federal laws or regulations are otherwise unavailable, federal and/or state utility regulatory commissions may have broad jurisdiction over non-utility owned electric power plants. Generation facilities are also subject to federal, state and local laws and regulations that govern, among other things, the geographical location, zoning, land use and operation of a project.

The FERC may impose various forms of market mitigation measures, including price caps and operating restrictions, where it determines that potential market power might exist and that the public interest requires mitigation. In addition, many of EME’s facilities are subject to rules, restrictions and terms of participation imposed and administered by various RTOs and ISOs. For example, ISOs and RTOs may impose bidding and scheduling rules, both to curb the potential exercise of market power and to facilitate market functions. Such actions may materially affect EME’s results of operations.

There is no assurance that the introduction of new laws or other future regulatory developments will not have a material adverse effect on EME’s business, results of operations or financial condition, nor is there any assurance that EME or its subsidiaries will be able to obtain and comply with all necessary licenses, permits and approvals for its projects. If projects cannot comply with all applicable regulations, EME’s business, results of operations and financial condition could be adversely affected.

EME is subject to extensive environmental regulation and permitting requirements that may involve significant and increasing costs.

EME’s operations are subject to extensive environmental regulation with respect to, among other things, air quality, water quality, waste disposal, and noise. EME is required to comply with these regulations, as well as conditions established by licenses, permits and other approvals, in order to construct, operate or modify its facilities. Failure to comply with these requirements could subject EME to civil or criminal liability, the imposition of liens or fines, or actions by regulatory agencies seeking to curtail EME’s operations.

EME devotes significant resources to environmental monitoring, pollution control equipment and emission allowances to comply with environmental regulatory requirements. EME believes that it is currently in substantial compliance with environmental regulatory requirements and that maintaining

 

41


Table of Contents

compliance with current requirements will not materially affect its financial position or results of operations. However, the current trend is toward more stringent standards, stricter regulation, and more expansive application of environmental regulations. Environmental advocacy groups and regulatory agencies in the United States have been focusing considerable attention on CO2 emissions from coal-fired power plants and their potential role in climate change. The adoption of laws and regulations to implement CO2 controls could adversely affect EME’s coal-fired plants. Also, coal plant emissions of NOX and SO2, mercury and particulates are subject to increased controls and mitigation expenses. Additionally, certain of the states in which EME operates are contemplating air pollution control regulations that are more stringent than existing and proposed federal regulations. The continued operation of EME’s facilities, particularly its coal-fired facilities, will require substantial capital expenditures for environmental controls.

For example, in December 2006, Midwest Generation entered into an agreement with the Illinois EPA to reduce mercury, NOX and SO2 emissions at Midwest Generation’s Illinois coal-fired power plants. Capital expenditures relating to controls contemplated by the agreement are expected (in 2006 dollars) to be in the range of approximately $2.7 billion to $3.4 billion through 2018. Additional information appears in the MD&A under the heading “Other Developments—Environmental Matters—Air Quality Standards—Clean Air Act—Illinois.” There is no assurance that these capital expenditures will not exceed the above estimates.

In addition, future environmental laws and regulations, and future enforcement proceedings that may be taken by environmental authorities, could affect the costs and the manner in which EME conducts its business. There is no assurance that EME would be able to recover these increased costs from its customers or that its business, financial position and results of operations would not be materially adversely affected. Furthermore, changing environmental regulations could make some units uneconomical to maintain or operate. If EME cannot comply with all applicable regulations, it could be required to retire or suspend operations at its facilities, or restrict or modify the operations of its facilities, and its business, results of operations and financial condition could be adversely affected.

Typically, environmental laws require a lengthy and complex process for obtaining licenses, permits and approvals prior to construction, operation or modification of a project or generating facility. Meeting all the necessary requirements can delay or sometimes prevent the completion of a proposed project as well as require extensive modifications to existing projects, which may involve significant capital expenditures. EME cannot provide assurance that it will be able to obtain and comply with all necessary licenses, permits and approvals for its plants. If there is a delay in obtaining required approvals or permits or if EME fails to obtain and comply with such permits, the operation of EME’s facilities may be interrupted or become subject to additional costs.

EME’s development projects or future acquisitions may not be successful.

EME’s future financial condition, results of operation and cash flows will depend in large part upon its ability to successfully implement its long-term strategy, which includes the development and acquisition of electric power generation facilities, with an emphasis on renewable energy (primarily wind) and gas-fired power plants. EME may be unable to identify attractive acquisition or development opportunities and/or to complete and integrate them on a successful and timely basis. Furthermore, implementation of

this strategy may be affected by factors beyond EME’s control, such as increased competition, legal and regulatory developments, price volatility in electric or fuel markets, and general economic conditions.

 

42


Table of Contents

In support of its development activities, EME has entered into commitments of $489 million to purchase turbines for future projects and plans to make substantial additional commitments in the future. In addition, EME expends significant amounts for preliminary engineering, permitting, legal and other expenses before it can determine whether it will win a competitive bid, or whether a project is feasible or economically attractive.

EME’s development activities are subject to risks including, without limitation, risks related to project siting, financing, construction, permitting, and governmental approvals. EME may not be successful in developing new projects or the timing of such development may be delayed beyond the date such turbines are ready for installation. Furthermore, EME may not be able to obtain financing for new projects that are developed and may not be able to obtain sufficient equity capital or additional borrowings to enable it to fund equity commitments for future projects. If a project under development is abandoned, EME would expense all capitalized development costs incurred in connection with that project, and could incur additional losses associated with any related contingent liabilities. If EME is not successful in developing new projects, it may be required to sell turbines that were purchased and such sales may result in substantial losses. For example, in February 2007, EME was advised that it was an unsuccessful bidder in the request for offers conducted by SCE for the supply of generation capacity. EME plans to use the turbines which it had purchased and reserved for this bid for other generation supply opportunities, although there is no assurance that these efforts will be successful.

Finally, EME cannot provide assurance that its development projects or acquired assets will generate sufficient cash flow to support the indebtedness incurred to acquire them or the capital expenditures needed to develop them, or that the rate of return from such projects or assets will be sufficient to justify the decision to invest in them.

Competition could adversely affect EME’s business.

The independent power industry is characterized by numerous capable competitors, some of whom may have more extensive operating experience in the acquisition and development of power projects, larger staffs, and greater financial resources than EME. Several participants in the wholesale markets, including many regulated utilities, have a lower cost of capital than most merchant generators and often are able to recover fixed costs through rate base mechanisms, allowing them to build, buy and upgrade generation assets without relying exclusively on market clearing prices to recover their investments. This could affect EME’s ability to compete effectively in the markets in which those entities operate.

Newer plants owned by EME’s competitors are often more efficient than EME’s facilities. This may put some of EME’s facilities at a competitive disadvantage to the extent that its competitors are able to produce more power from each increment of fuel than EME’s facilities are capable of producing. Over time, some of EME’s facilities may become obsolete in their markets, or be unable to compete, because of the construction of newer, more efficient power plants.

In addition to the competition already existing in the markets in which EME presently operates or may consider operating in the future, EME is likely to encounter significant competition as a result of further consolidation of the power industry by mergers and asset reallocations, which could create powerful new competitors, and new market entrants such as investment companies. In addition, the EPAct 2005 and other regulatory initiatives may result in changes in the power industry to which EME may not be able to respond in as timely and effective manner as its competitors.

 

43


Table of Contents

EME may not be able to raise capital on favorable terms, to refinance existing EME corporate or subsidiary indebtedness or to fund operations, capital expenditures, future acquisitions and development activities, which could affect its results of operations.

The factors that influence EME’s ability to arrange for financing and its costs of capital include:

 

 

general economic and capital market conditions;

 

 

the availability of bank credit;

 

 

investor confidence;

 

 

the financial condition, performance, prospects, and credit rating of EME and/or the subsidiary requiring the financing; and

 

 

changes in tax and securities laws.

While EME believes that its sources of capital will be adequate to meet obligations for the foreseeable future, this belief is based on a number of material assumptions, including without limitation assumptions about EME’s ability to access the capital and commercial lending markets, the operating and financial performance of EME’s subsidiaries, and the ability of EME’s subsidiaries to pay dividends. Any of these assumptions could prove to be incorrect. EME cannot provide assurance that its projected sources of capital will be available when needed or that its actual cash requirements will not be greater than expected.

EME and its subsidiaries have a substantial amount of indebtedness, including long-term lease obligations.

As of December 31, 2006, consolidated debt of EME was $3.2 billion. In addition, EME’s subsidiaries have $4.3 billion of long-term power plant lease obligations that are due over a period ranging up to 29 years. The substantial amount of consolidated debt and financial obligations presents the risk that EME and its subsidiaries might not have sufficient cash to service their indebtedness or long-term lease obligations and that the existing corporate debt, project debt and lease obligations could limit the ability of EME and its subsidiaries to grow their business, to compete effectively or to operate successfully under adverse economic conditions. If EME’s or a subsidiary’s cash flows and capital resources were insufficient to allow it to make scheduled payments on its debt, EME or its subsidiaries might have to reduce or delay capital expenditures, sell assets, seek additional capital, or restructure or refinance the debt. The terms of EME’s or its subsidiaries’ debt may not allow these alternative measures, the debt or equity may not be available on acceptable terms, and these alternative measures may not satisfy all scheduled debt service obligations.

The ability of EME’s largest subsidiary, Midwest Generation, LLC, to make distributions is restricted.

Midwest Generation, which owns or leases the Illinois plants, has entered into financing documents that contain restrictions on its ability to pay dividends. See “EMG: Liquidity—Liquidity and Capital Resources” in the MD&A.

EME is the guarantor of the Powerton and Joliet (Units 7 and 8) leases and is obligated under intercompany notes to make debt service payments to Midwest Generation. Each intercompany note is a general corporate obligation of EME and payments on it are made from distributions from subsidiaries and other sources of cash received by EME. Accordingly, EME must continue to make payments under the intercompany notes regardless of whether or not Midwest Generation makes distributions to EME. If

 

44


Table of Contents

EME were not able to satisfy its obligations under the intercompany notes, it would result in a default under the financing documents of EME and Midwest Generation. This could have a material adverse effect on the results of operations and cash flow of EME.

Restrictions in EME’s certificate of incorporation, its credit facilities and the MEHC financing documents limit the ability of EME and its subsidiaries to enter into specified transactions that they otherwise may enter into and may significantly impede their ability to refinance their debt.

The financing documents entered into by MEHC contain financial and investment covenants restricting EME and its subsidiaries. EME’s certificate of incorporation binds it to the provisions in MEHC’s financing documents by restricting EME’s ability to enter into specified transactions and engage in specified business activities without shareholder approval. The instruments governing EME’s indebtedness also contain financial and investment covenants. Restrictions contained in these documents could affect, and in some cases significantly limit or prohibit, EME and its subsidiaries’ ability to, among other things, incur, refinance, and prepay debt, make capital expenditures, pay dividends and make other distributions, make investments, create liens, sell assets, enter into sale and leaseback transactions, issue equity interests, enter into transactions with affiliates, create restrictions on the ability to pay dividends or make other distributions and engage in mergers and consolidations. These restrictions may significantly impede the ability of EME and its subsidiaries to take advantage of business opportunities as they arise, to grow their business and compete effectively, or to develop and implement any refinancing plans in respect of their indebtedness. See “—EME and its subsidiaries have a substantial amount of indebtedness, including long-term lease obligations” above, for further discussion.

In addition, in connection with the entry into new financings or amendments to existing financing arrangements, EME’s and its subsidiaries’ financial and operational flexibility may be further reduced as a result of more restrictive covenants, requirements for security and other terms that are often imposed on sub-investment grade entities.

EME’s projects may be affected by general operating risks and hazards customary in the power generation industry. EME may not have adequate insurance to cover all these hazards.

The operation of power generation facilities involves many operating risks, including:

 

 

performance below expected levels of output or efficiency;

 

 

interruptions in fuel supply;

 

 

disruptions in the transmission of electricity;

 

 

curtailment of operations due to transmission constraints;

 

 

breakdown or failure of equipment or processes;

 

 

imposition of new regulatory, permitting, or environmental requirements, or violations of existing requirements;

 

 

employee work force factors, including strikes, work stoppages or labor disputes;

 

 

operator/contractor error; and

 

 

catastrophic events such as terrorist activities, fires, tornadoes, earthquakes, explosions, floods or other similar occurrences affecting power generation facilities or the transmission and distribution infrastructure over which power is transported.

These and other hazards can cause significant personal injury or loss of life, severe damage to and destruction of property, plant and equipment, contamination of or damage to the environment, and suspension of operations. The occurrence of one or more of the events listed above could decrease or

 

45


Table of Contents

eliminate revenues generated by EME’s projects or significantly increase the costs of operating them, and could also result in EME’s being named as a defendant in lawsuits asserting claims for substantial damages, potentially including environmental cleanup costs, personal injury, property damage, fines and penalties. Equipment and plant warranties and insurance may not be sufficient or effective under all circumstances to cover lost revenues or increased expenses. A decrease or elimination in revenues generated by the facilities or an increase in the costs of operating them could decrease or eliminate funds available to meet EME’s obligations as they become due and could have a material adverse effect on EME. A default under a financing obligation of a project entity could result in a loss of EME’s interest in the project.

The accounting for EME’s hedging and proprietary trading activities may increase the volatility of its quarterly and annual financial results.

EME engages in hedging activities in order to mitigate its exposure to market risk with respect to electricity sales from its generation facilities, fuel utilized by those facilities and emissions allowances. EME generally attempts to balance its fixed-price physical and financial purchases and sales commitments in terms of contract volumes and the timing of performance and delivery obligations through the use of financial and physical derivative contracts. EME also uses derivative contracts with respect to its limited proprietary trading activities, through which EME attempts to achieve incremental returns by transacting where it has specific market expertise. These derivative contracts are recorded on its balance sheet at fair value pursuant to SFAS No. 133. Some of these derivative contracts do not qualify under SFAS No. 133 for hedge accounting and changes in their fair value are therefore recognized currently in earnings as unrealized gains or losses. As a result, EME’s financial results, including gross margin, operating income and balance sheet ratios, will at times be volatile and subject to fluctuations in value primarily due to changes in electricity and fuel prices. See “MEHC’s Accounting for Energy Contracts” in the MD&A.

 

ITEM 1B. UNRESOLVED STAFF COMMENTS

None.

 

ITEM 2. PROPERTIES

As a holding company, Edison International does not directly own any significant properties other than the stock of its subsidiaries. The principal properties of SCE are described above under “Business of Southern California Edison Company—Properties of SCE.” Properties of EME and Edison Capital are discussed above under “Business of Edison Mission Group Inc.—Business of Edison Mission Energy” and “—Business of Edison Capital,” respectively.

 

ITEM 3. LEGAL PROCEEDINGS

Navajo Nation Litigation

Information about the SCE Navajo Nation litigation appears in the MD&A under the heading “SCE: Other Developments—Navajo Nation Litigation.”

 

46


Table of Contents

Department of the Army, Los Angeles District, Corps of Engineers/Notice of Violation of Clean Water Act

In December 2004, the United States Corps sent SCE a Notice of Violation, alleging that SCE or its contractors had discharged fill material into wetlands adjacent to the Santa Ana River, in the City of Huntington Beach, California. Under Sections 301 and 404 of the Clean Water Act, the discharge of fill material into waters of the United States is unlawful unless first permitted by the Corps pursuant to Section 404 of the Clean Water Act.

The Notice of Violation provided a general description of the area in question but did not specify the location of the violation. Following discussions and correspondence with the Corps, it was determined that the Corps was concerned about the actions of a licensee of SCE on an SCE-owned transmission right-of-way corridor located adjacent to the Santa Ana River. SCE’s licensee, or its predecessor-in-interest, had obtained from the City of Huntington Beach a Conditional Use Permit to locate landscape nursery operations within the right-of-way corridor. The Conditional Use Permit required the licensee to perform certain drainage and grading improvements to the property before locating nursery operations on site. During the course of the grading work, the licensee brought additional soil onto SCE’s property for use as fill material.

Potential penalties for violation of Section 404 of the Clean Water Act include a maximum criminal fine of $50,000 per day and imprisonment for up to three years, and a maximum civil penalty of $25,000 per day of violation. To date, however, the Corps has not proposed to impose any specific fine or penalty on SCE with respect to the subject matter of the Notice of Violation.

In the process of investigating the matter, the Corps requested that SCE perform a wetlands delineation study of the property to determine whether the property in question qualifies as a wetland area subject to the Corps’ jurisdiction. SCE hired a consulting group to perform the wetlands delineation study and delivered the study, which indicated that there are no federally regulated wetlands or waters of the United States associated with the study area in early 2006. Subsequently, SCE, in response to the Corps request, provided additional technical data which concluded that there were no waters of the United States present at the nursery site. The Corps is evaluating this information but has advised that no further action is likely to be taken in this matter until such time as the Corps develops new policies regarding enforcement of the Clean Water Act in light of a recent United States Supreme Court decision interpreting the scope of federal jurisdiction under that Act.

FERC Notice Regarding Investigatory Proceeding Against EMMT

Information about the FERC notice regarding an investigatory proceeding with respect to EMMT appears in the MD&A under the heading “EMG: Other Developments—FERC Notice Regarding Investigation Proceeding Against EMMT.”

CPUC Investigation Regarding Performance Incentives Rewards

Information about the CPUC investigation regarding SCE’s performance-based ratemaking (PBR) rewards for customer satisfaction, injury and illness reporting and system reliability portions of PBR appears in the MD&A under the heading “SCE: Regulatory Matters—Investigations Regarding Performance Incentive Rewards—CPUC Investigation.”

 

47


Table of Contents
ITEM 4. SUBMISSION OF MATTERS TO A VOTE OF SECURITY HOLDERS

No matters were submitted to a vote of shareholders of Edison International during the fourth quarter of 2006.

 


Pursuant to Form 10-K’s General Instruction G(3), the following information is included as an additional item in Part I:

Executive Officers of the Registrant

Edison International

 

Executive Officer(1)

  

Age at

December 31, 2006

  

Company Position

John E. Bryson

   63   

Chairman of the Board, President and Chief Executive Officer

Thomas R. McDaniel

   57   

Executive Vice President, Chief Financial Officer and Treasurer

J. A. Bouknight, Jr.

   62   

Executive Vice President and General Counsel

Polly L. Gault(2)

   53   

Senior Vice President, Public Affairs

Linda G. Sullivan

   43   

Vice President and Controller


(1)

The term “Executive Officers” is defined by Rule 3b-7 of the General Rules and Regulations under the Exchange Act. Pursuant to this rule, the Executive Officers of Edison International include certain elected officers of Edison International and its subsidiaries, all of whom may be deemed significant policy makers of Edison International. None of Edison International’s Executive Officers is related to any other by blood or marriage.

 

(2)

Effective March 1, 2007, Ms. Gault has been elected an Executive Vice President of Edison International and SCE.

 

48


Table of Contents

As set forth in Article IV of Edison International’s Bylaws, the elected officers of Edison International are chosen annually by and serve at the pleasure of Edison International’s Board of Directors and hold their respective offices until their resignation, removal, other disqualification from service, or until their respective successors are elected. All of the officers of Edison International have been actively engaged in the business of Edison International, SCE, and/or the nonutility companies for more than five years, except for Mr. Bouknight. Those officers who have not held their present position with Edison International for the past five years or who have had other or additional principal positions in the past five years had the following business experience during that period:

Edison International

 

Executive Officers

  

Company Position

  

Effective Dates

John E. Bryson    Chairman of the Board, President and Chief Executive Officer, Edison International    January 2000 to present
   Chairman of the Board, SCE    January 2003 to present
   Chairman of the Board, EME    January 2000 to December 2002
Thomas R. McDaniel    Executive Vice President, Chief Financial Officer and Treasurer, Edison International    January 2005 to present
   Chairman of the Board, President and Chief Executive Officer, EME    January 2003 to December 2004
   President and Chief Executive Officer, EME    August 2002 to December 2002
   Chief Executive Officer, Edison Capital    August 2002 to December 2004
   President and Chief Executive Officer, Edison Capital    September 1987 to July 2002
J. A. Bouknight, Jr.    Executive Vice President and General Counsel    July 2005 to present
   Partner, Steptoe & Johnson LLP(1)    December 1994 to July 2005
Polly L. Gault    Senior Vice President, Public Affairs, Edison International and SCE    March 2006 to present(2)
   Vice President, Public Affairs, Edison International and SCE    January 2004 to February 2006
   Regional Vice President, Public Affairs, Edison International    January 2001 to December 2003
Linda G. Sullivan    Vice President and Controller, Edison International and SCE    June 2005 to present
   Assistant Controller, Edison International    May 2002 to May 2005
   Assistant Controller, SCE    March 2005 to May 2005
   Manager, Controllers Department, Edison International    September 1999 to April 2002
         

(1)

Steptoe & Johnson LLP is an international law firm and is not a parent, subsidiary or affiliate of Edison International. Mr. Bouknight served as a Partner and former Chair of the firm and headed the firm’s electric power practice.

 

(2)

Effective March 1, 2007, Ms. Gault has been elected an Executive Vice President of Edison International and SCE.

 

49


Table of Contents

Southern California Edison Company

 

Executive Officer

  

Age at

December 31, 2006

  

Company Position

John E. Bryson(1)    63    Chairman of the Board
Alan J. Fohrer    56    Chief Executive Officer and Director
John R. Fielder    61    President

(1)

Mr. Bryson is also deemed an Executive Officer due to his position at Edison International. Information concerning his Company position and business experience is set forth above under Edison International. Edison International is the parent holding company of SCE.

As set forth in Article IV of SCE’s Bylaws, the elected officers of SCE are chosen annually by and serve at the pleasure of SCE’s Board of Directors and hold their respective offices until their resignation, removal, other disqualification from service, or until their respective successors are elected. All of the above officers of SCE have been actively engaged in the business of SCE, Edison International and/or the nonutility companies for more than five years. Those officers who have not held their present position with SCE for the past five years had the following business experience during that period:

Southern California Edison Company

 

Executive Officer

  

Company Position

   Effective Dates
Alan J. Fohrer   

Chief Executive Officer and Director, SCE

Chairman of the Board and Chief Executive

Officer, SCE

   January 2003 to present
January 2002 to December 2002
John R. Fielder   

President, SCE

Senior Vice President, Regulatory Policy and Affairs, SCE

   October 2005 to present
February 1998 to October 2005

 

50


Table of Contents

The Nonutility Companies

 

Executive Officer

  

Age at

December 31, 2006

  

Company Position

Theodore F. Craver, Jr.    55    Chairman of the Board, President and Chief Executive Officer, EMG

As set forth in Article IV of their respective Bylaws, the elected officers of the nonutility companies are chosen annually by and serve at the pleasure of the respective Boards of Directors and hold their respective offices until their resignation, removal, other disqualification from service, or until their respective successors are elected. The above officer of the nonutility companies has been actively engaged in the business of the respective nonutility companies, Edison International, and/or SCE for more than five years. The above officer who has not held his present position with the nonutility companies for the past five years, had the following business experience during that period:

The Nonutility Companies

 

Executive Officer

  

Company Position

  

Effective Dates

Theodore F. Craver, Jr.   

Chairman of the Board, President and Chief Executive Officer, EMG

Chairman of the Board, President and Chief Executive Officer, EME

  

November 2005 to present

January 2005 to present

   President, Chief Executive Officer and Director, Edison Capital    June 2005 to present
   Chief Executive Officer and Director, Edison Capital    January 2005 to June 2005
   Executive Vice President, Chief Financial Officer and Treasurer, Edison International    January 2002 to December 2004

PART II

 

ITEM 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

Edison International Common Stock is traded on the New York Stock Exchange under the symbol “EIX.”

Market information responding to Item 5 is included in the Annual Report under the heading “Quarterly Financial Data (Unaudited)” on page 163 and is incorporated herein by this reference. There are restrictions on the ability of Edison International’s subsidiaries to transfer funds to Edison International that currently materially limit the ability of Edison International to pay cash dividends. Such restrictions are discussed in the MD&A under the heading “Edison International (Parent): Liquidity” and Note 3 of Notes to Consolidated Financial Statements. The number of common stock shareholders of record of Edison International was 54,187 on December 31, 2006. Additional information concerning the market for Edison International’s Common Stock is set forth on the cover page hereof.

Purchases of Equity Securities by the Issuer and Affiliated Purchasers

The following table contains information about all purchases made by or on behalf of Edison International or any affiliated purchaser (as defined in Rule 10b-18(a)(3) under the Exchange Act) of shares or other units of any class of Edison International’s equity securities that is registered pursuant to Section 12 of the Exchange Act.

 

51


Table of Contents

Period

  

(a) Total

Number of
Shares

(or Units)

Purchased(1)

  

(b) Average

Price Paid per

Share
(or Unit)(1)

   (c) Total
Number of Shares
(or Units)
Purchased as Part
of Publicly
Announced Plans
or Programs
   (d) Maximum
Number (or
Approximate
Dollar Value) of
Shares
(or Units) that May
Yet Be Purchased
Under the Plans or
Programs

October 1, 2006 to October 31, 2006

     310,387    $ 43.16    —      —  

November 1, 2006 to November 30, 2006

     740,935    $ 45.09    —      —  

December 1, 2006 to December 31, 2006

     579,856    $ 45.74    —      —  
                       

Total

   $ 1,631,178    $ 44.95    —      —  
                       

(1)

The shares were purchased by agents acting on Edison International’s behalf for delivery to plan participants to fulfill requirements in connection with Edison International’s: (i) 401(k) Savings Plan; (ii) Dividend Reinvestment and Direct Stock Purchase Plan; and (iii) long-term incentive compensation plans. The shares were purchased in open-market transactions pursuant to plan terms or participant elections. The shares were never registered in Edison International’s name and none of the shares purchased were retired as a result of the transactions.

 

ITEM 6. SELECTED FINANCIAL DATA

Information responding to Item 6 is included in the Annual Report under “Selected Financial Data: 2002–2006” on page 164, and is incorporated herein by this reference.

 

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Information responding to Item 7 is included in the Annual Report on pages 1 through 88 and is incorporated herein by this reference.

 

ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Information responding to Item 7A is included in the MD&A under the headings “SCE: Market Risk Exposures” on pages 24 through 26, “EMG: Market Risk Exposures” on pages 35 through 48.

 

52


Table of Contents
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

Certain information responding to Item 8 is set forth after Item 15 in Part III. Other information responding to Item 8 is included in the Annual Report on pages 92 through 163 and is incorporated herein by this reference.

 

ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

None.

 

ITEM 9A. CONTROLS AND PROCEDURES

Disclosure Controls and Procedures

Edison International’s management, under the supervision and with the participation of the company’s Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of Edison International’s disclosure controls and procedures (as that term is defined in Rule 13a-15(e) or 15d-15(e) under the Exchange Act) as of the end of the period covered by this report. Based on that evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that, as of the end of the period, Edison International’s disclosure controls and procedures are effective.

Management’s Report on Internal Control Over Financial Reporting

Edison International’s management is responsible for establishing and maintaining adequate internal control over financial reporting (as that term is defined in Rule 13a-15(f) under the Exchange Act) for Edison International. Under the supervision and with the participation of its Chief Executive Officer and Chief Financial Officer, Edison International’s management conducted an evaluation of the effectiveness of Edison International’s internal control over financial reporting based on the framework set forth in Internal Control – Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on its evaluation under the COSO framework, Edison International’s management concluded that Edison International’s internal control over financial reporting was effective as of December 31, 2006. Management’s assessment of the effectiveness of Edison International’s internal control over financial reporting as of December 31, 2006 has been audited by PricewaterhouseCoopers LLP, an independent registered public accounting firm, as stated in their report on the financial statements in Edison International’s Annual Report, which is incorporated herein by this reference.

Changes in Internal Controls

There were no changes in Edison International’s internal control over financial reporting (as such term is defined in Rules 13a-15(f) or 15d-15(f) under the Exchange Act) during the fiscal quarter ended December 31, 2006 that have materially affected, or are reasonably likely to materially affect, Edison International’s internal control over financial reporting.

 

ITEM 9B. OTHER INFORMATION

None.

 

53


Table of Contents

PART III

 

ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

Information concerning executive officers of Edison International is set forth in Part I in accordance with General Instruction G(3), pursuant to Instruction 3 to Item 401(b) of Regulation S-K. Other information responding to Item 10 will appear in Edison International’s definitive Proxy Statement to be filed with the SEC in connection with Edison International’s Annual Shareholders’ Meeting to be held on April 26, 2007, under the headings “Election of Directors, Nominees for Election,” “Board Committees and Subcommittees,” and “Ethics and Compliance Code” and is incorporated herein by this reference.

 

ITEM 11. EXECUTIVE COMPENSATION

Information responding to Item 11 will appear in the Proxy Statement under the headings “Compensation Discussion and Analysis,” “Compensation Committees’ Report,” “Compensation Committees’ Interlocks and Insider Participation,” “Summary Compensation Table—Fiscal 2006,” “Grants of Plan-Based Awards in Fiscal 2006,” “Outstanding Equity Awards at Fiscal 2006 Year-End,” “Option Exercises and Stock Vested in Fiscal 2006,” “Pension Benefits,” “Non-qualified Deferred Compensation,” “Potential Payments Upon Termination or Change in Control,” and “Director Compensation,” and is incorporated herein by this reference.

 

ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

Information responding to Item 12 will appear in the Proxy Statement under the headings “Management Proposal to Approve Edison International 2007 Performance Incentive Plan—Equity Compensation Plan Information,” “Stock Ownership of Directors, Director Nominee, and Executive Officers,” and “Stock Ownership of Certain Shareholders,” and is incorporated herein by this reference.

 

54


Table of Contents
ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

Information responding to Item 13 will appear in the Proxy Statement under the headings “Certain Relationships and Transactions,” and “Questions and Answers on Corporate Governance — Q: How do the Edison International and SCE Boards determine which Directors are considered independent? and — Q: Which Directors have the Edison International and SCE Boards determined are independent?” and is incorporated herein by this reference.

 

ITEM 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES

Information responding to Item 14 will appear in the Proxy Statement under the heading “Independent Registered Public Accounting Firm Fees,” and is incorporated herein by this reference.

 

ITEM 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES

(a)(1) Financial Statements

The following items contained in the Annual Report are found on pages 1 through 163, and are incorporated herein by this reference.

Management’s Discussion and Analysis of Financial Condition and Results of Operations

Management’s Responsibility for Financial Reporting

Management’s Report on Internal Control Over Financial Reporting

Report of Independent Registered Public Accounting Firm

Consolidated Statements of Income – Years Ended December 31, 2006, 2005 and 2004

Consolidated Statements of Comprehensive Income – Years Ended December 31, 2006, 2005 and 2004

 

55


Table of Contents

Consolidated Balance Sheets – December 31, 2006 and 2005

Consolidated Statements of Cash Flows – Years Ended December 31, 2006, 2005 and 2004

Consolidated Statements of Changes in Common Shareholders’ Equity – Years Ended December 31, 2006, 2005 and 2004

Notes to Consolidated Financial Statements

 

(a)(2) Report of Independent Registered Public Accounting Firm and Schedules Supplementing Financial Statements

The following documents may be found in this report at the indicated page numbers:

 

     Page
Report of Independent Registered Public Accounting Firm on Financial Statement Schedules    57
Schedule I – Condensed Financial Information of Parent    58
Schedule II – Valuation and Qualifying Accounts for the   

Year Ended December 31, 2006

   61

Year Ended December 31, 2005

   62

Year Ended December 31, 2004

   63

Schedules III through V, inclusive, are omitted as not required or not applicable.

 

(a)(3) Exhibits

See “Exhibit Index” beginning on page 65 of this report.

Edison International will furnish a copy of any exhibit listed in the accompanying Exhibit Index upon written request and upon payment to Edison International of its reasonable expenses of furnishing such exhibit, which shall be limited to photocopying charges and, if mailed to the requesting party, the cost of first-class postage.

 

56


Table of Contents

Report of Independent Registered Public Accounting Firm on

Financial Statement Schedules

To the Board of Directors and

Shareholders of Edison International

Our audits of the consolidated financial statements, of management’s assessment of the effectiveness of internal control over financial reporting and of the effectiveness of internal control over financial reporting referred to in our report dated February 28, 2007 appearing in the 2006 Annual Report to Shareholders of Edison International (which report, consolidated financial statements and assessment are incorporated by reference in this Annual Report on Form 10-K) also included an audit of the financial statement schedules listed in Item 15(a)(2) of this Form 10-K. In our opinion, these financial statement schedules present fairly, in all material respects, the information set forth therein when read in conjunction with the related consolidated financial statements.

 

/s/ PricewaterhouseCoopers LLP

Los Angeles, California

February 28, 2007

 

57


Table of Contents

SCHEDULE I – CONDENSED FINANCIAL INFORMATION OF PARENT

CONDENSED BALANCE SHEETS

 

     December 31,

In millions

   2006    2005

Assets:

     

Cash and equivalents

   $ 84    $ 53

Other current assets

     1,800      1,725
             

Total current assets

     1,884      1,778

Investments in subsidiaries

     7,698      7,732

Other

     125      16
             

Total assets

   $ 9,707    $ 9,526
             

Liabilities and Shareholders’ Equity:

     

Accounts payable

   $ 5    $ 6

Other current liabilities

     1,901      1,743
             

Total current liabilities

     1,906      1,749

Long-term debt

     13      885

Other deferred credits

     179      61

Shareholders’ equity

     7,609      6,831
             

Total liabilities and shareholders’ equity

   $ 9,707    $ 9,526
             

 

58


Table of Contents

Edison International

SCHEDULE I – CONDENSED FINANCIAL INFORMATION OF PARENT

CONDENSED STATEMENTS OF INCOME

For the Years Ended December 31, 2006, 2005 and 2004

 

In millions, except per-share amounts

   2006     2005     2004  

Operating revenue and other income

   $ 55     $ 57     $ 60  

Operating expenses and interest expense

     82       89       125  
                        

Loss before equity in earnings of subsidiaries

     (27 )     (32 )     (65 )

Equity in earnings of subsidiaries

     1,208       1,169       981  
                        

Net income

   $ 1,181     $ 1,137     $ 916  
                        

Weighted-average shares of common stock outstanding

     325,811       325,811       325,811  

Basic earnings per share

   $ 3.58     $ 3.47     $ 2.81  

Diluted earnings per share

   $ 3.57     $ 3.43     $ 2.77  

 

59


Table of Contents

Edison International

SCHEDULE I – CONDENSED FINANCIAL INFORMATION OF PARENT

CONDENSED STATEMENTS OF CASH FLOWS

For the Years Ended December 31, 2006, 2005 and 2004

 

In millions

   2006     2005     2004  

Cash Flows From Operating Activities

   $ (40 )   $ (10 )   $ (57 )
                        

Cash Flows From Financing Activities

     71       (43 )     (925 )
                        

Cash Flows From Investing Activities

     —         —         1  
                        

Net increase (decrease) in cash and equivalents

     31       (53 )     (981 )

Cash and equivalents at beginning of year

     53       106       1,087  
                        

Cash and equivalents at the end of year

   $ 84     $ 53     $ 106  
                        

Cash dividends received from Consolidated Subsidiaries

   $ 359     $ 214     $ 825  

 

60


Table of Contents

Edison International

SCHEDULE II – VALUATION AND QUALIFYING ACCOUNTS

For the Year Ended December 31, 2006

 

           Additions           

Description

   Balance at
Beginning of
Period
   Charged to
Costs and
Expenses
   Charged to
Other
Accounts
   Deductions    

Balance at
End of

Period

In millions

             

Uncollectible accounts

             

Customers

   $ 22.1    $ 7.0    $ —      $ 10.6     $ 18.5

All other

     13.3      5.5      —        5.8       13.0
                                   

Total

   $ 35.4    $ 12.5    $ —      $ 16.4 (a)   $ 31.5
                                   

(a)

Accounts written off, net.

 

61


Table of Contents

Edison International

SCHEDULE II – VALUATION AND QUALIFYING ACCOUNTS

For the Year Ended December 31, 2005

 

           Additions           

Description

   Balance at
Beginning of
Period
   Charged to
Costs and
Expenses
   Charged to
Other
Accounts
   Deductions    

Balance at
End of

Period

In millions

             

Uncollectible accounts

             

Customers

   $ 24.1    $ 8.5    $ —      $ 10.5     $ 22.1

All other

     9.4      8.6      —        4.7       13.3
                                   

Total

   $ 33.5    $ 17.1    $ —      $ 15.2 (a)   $ 35.4
                                   

(a)

Accounts written off, net.

 

62


Table of Contents

Edison International

SCHEDULE II – VALUATION AND QUALIFYING ACCOUNTS

For the Year Ended December 31, 2004

 

           Additions           

Description

   Balance at
Beginning of
Period(1)
   Charged to
Costs and
Expenses
   Charged to
Other
Accounts
   Deductions    

Balance at
End of

Period

In millions

             

Uncollectible accounts

             

Customers

   $ 23.8    $ 16.7    $ —      $ 16.4     $ 24.1

All other

     9.9      3.5      —        4.0       9.4
                                   

Total

   $ 33.7    $ 20.2    $ —      $ 20.4 (a)   $ 33.5
                                   

(1)

Excludes allowance for doubtful account of discontinued operations of $6.5 million.

 

(a)

Accounts written off, net.

 

63


Table of Contents

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

EDISON INTERNATIONAL
By:
/s/ Linda G. Sullivan

Linda G. Sullivan

Vice President and Controller

Date: February 28, 2007

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the date indicated.

 

Signature

  

Title

Principal Executive Officer:
John E. Bryson*

  

Chairman of the Board, President,
Chief Executive Officer and Director

Principal Financial Officer:
Thomas R. McDaniel*

  

Executive Vice President,
Chief Financial Officer and Treasurer

Controller or Principal Accounting Officer:
Linda G. Sullivan

  

Vice President and Controller

Board of Directors:

  

Charles B. Curtis*

France A. Córdova*

Bradford M. Freeman*

Luis Nogales*

Ronald L. Olson*

James M. Rosser*

Richard T. Schlosberg, III*

Robert H. Smith*

Thomas C. Sutton*

  

Director

Director

Director

Director

Director

Director

Director

Director

Director

 

*By:
/s/ Linda G. Sullivan

Linda G. Sullivan

Vice President and Controller

Date: February 28, 2007

 

64


Table of Contents

EXHIBIT INDEX

 

Exhibit

Number

 

Description

Edison International
3.1   Restated Articles of Incorporation of Edison International, effective December 19, 2006
3.2   Amended Bylaws of Edison International, as Adopted by the Board of Directors effective October 20, 2005 (File No. 1-9936, filed as Exhibit 3.1 to Edison International’s Form 8-K dated October 20, 2005 and filed October 26, 2005)*
Edison International
4.1   Senior Indenture, dated September 28, 1999 (File No. 1-9936, filed as Exhibit 4.1 to Edison International’s Form 10-Q for the quarter ended September 30, 1999)*
Southern California Edison Company
4.7   Southern California Edison Company First Mortgage Bond Trust Indenture, dated as of October 1, 1923 (Registration No. 2-1369)*
4.8   Supplemental Indenture, dated as of March 1, 1927 (Registration No. 2-1369)*
4.9   Third Supplemental Indenture, dated as of June 24, 1935 (Registration No. 2-1602)*
4.10   Fourth Supplemental Indenture, dated as of September 1, 1935 (Registration No. 2-4522)*
4.11   Fifth Supplemental Indenture, dated as of August 15, 1939 (Registration No. 2-4522)*
4.12   Sixth Supplemental Indenture, dated as of September 1, 1940 (Registration No. 2-4522)*
4.13   Eighth Supplemental Indenture, dated as of August 15, 1948 (Registration No. 2-7610)*
4.14   Twenty-Fourth Supplemental Indenture, dated as of February 15, 1964 (Registration No. 2-22056)*
4.15   Eighty-Eighth Supplemental Indenture, dated as of July 15, 1992 (File No. 1-2313, Form 8-K dated July 22, 1992)*
4.16   Indenture, dated as of January 15, 1993 (File No. 1-2313, Form 8-K dated January 28, 1993)*
Mission Energy Holding Company
4.17   Indenture, dated as of July 2, 2001, by and between Mission Energy Holding Company and Wilmington Trust Company with respect to $900 million aggregate principal amount of 13.50% Senior Secured Notes due 2008 (File No. 333-68632, filed as Exhibit 4.1 to Mission Energy Holding Company’s Registration Statement on Form S-4 to the SEC on August 29, 2001)*
4.18   Registration Rights Agreement, dated as of July 2, 2001, by and between Mission Energy Holding Company and Goldman, Sachs & Co. (File No. 333-68632, filed as Exhibit 4.2 to Mission Energy Holding Company’s Registration Statement on Form S-4 to the SEC on August 29, 2001)*
4.19   Indenture Escrow and Security Agreement, dated as of July 2, 2001, by and among Mission Energy Holding Company, Wilmington Trust Company, as Trustee, and Wilmington Trust Company, as Indenture Escrow Agent (File No. 333-68632, filed as Exhibit 4.3 to Mission Energy Holding Company’s Registration Statement on Form S-4 to the SEC on August 29, 2001)*
4.20   Loan Escrow and Security Agreement, dated as of July 2, 2001, by and among Mission Energy Holding Company, Goldman, Sachs & Co., as Collateral Agent, Goldman Sachs Credit Partners L.P., as Administrative Agent, and Wilmington Trust Company, as Loan

 

65


Table of Contents
  Escrow Agent (File No. 333-68632, filed as Exhibit 4.5 to Mission Energy Holding Company’s Registration Statement on Form S-4 to the SEC on August 29, 2001)*
4.21   Pledge and Security Agreement, dated as of July 2, 2001, by and among Mission Energy Holding Company, Goldman Sachs Credit Partners L.P., as Administrative Agent, and Wilmington Trust Company, as Trustee and Joint Collateral Agent (File No. 333-68632, filed as Exhibit 4.6 to Mission Energy Holding Company’s Registration Statement on Form S-4 to the SEC on August 29, 2001)*
Edison Mission Energy
4.22   Indenture, dated as of June 6, 2006, among Edison Mission Energy and Wells Fargo Bank, National Association as Trustee (File No. 333-68630, filed as Exhibit 4.1 to Edison Mission Energy’s Form 8-K dated June 6, 2006 and filed on June 8, 2006)*
4.22.1   First Supplemental Indenture, dated as of June 6, 2006, among Edison Mission Energy and Wells Fargo Bank, National Association as Trustee, supplementing the Indenture, dated as of June 6, 2006 (File No. 333-68630, filed as Exhibit 4.1.1 to Edison Mission Energy’s Form 8-K dated June 6, 2006 and filed on June 8, 2006)*
4.22.2   Second Supplemental Indenture, dated as of June 6, 2006, among Edison Mission Energy and Wells Fargo Bank, National Association as Trustee, supplementing the Indenture, dated as of June 6, 2006 (File No. 333-68630, filed as Exhibit 4.1.2 to Edison Mission Energy’s Form 8-K dated June 6, 2006 and filed on June 8, 2006)*
4.23   Registration Rights Agreement, dated as of June 6, 2006, among Edison Mission Energy and J.P. Morgan Securities Inc., as representatives of the Initial Purchasers (File No. 333-68630, filed as Exhibit 4.2 to Edison Mission Energy’s Registration Statement on Form S-4 to the Securities and Exchange Commission on September 25, 2006)*
4.24   Guarantee, dated as of August 17, 2000, made by Edison Mission Energy, as Guarantor in favor of Powerton Trust I, as Owner Lessor (File No. 333-59348-01, filed as Exhibit 4.9 to Edison Mission Energy’s and Midwest Generation, LLC’s Registration Statement on Form S-4 to the SEC on April 20, 2001)*
4.24.1   Schedule identifying substantially identical agreement to Guarantee constituting Exhibit 4.24 hereto (File No. 333-59348-01, filed as Exhibit 4.9.1 to Edison Mission Energy’s and Midwest Generation, LLC’s Registration Statement on Form S-4 to the SEC on April 20, 2001)*
4.25   Guarantee, dated as of August 17, 2000, made by Edison Mission Energy, as Guarantor in favor of Joliet Trust I, as Owner Lessor (File No. 333-59348-01, filed as Exhibit 4.31 to Edison Mission Energy’s and Midwest Generation, LLC’s Registration Statement on Form S-4 to the SEC on April 20, 2001)*
4.25.1   Schedule identifying substantially identical agreement to Guarantee constituting Exhibit 4.25 hereto (File No. 333-59348-01, filed as Exhibit 4.9 to Edison Mission Energy’s and Midwest Generation, LLC’s Registration Statement on Form S-4 to the SEC on April 20, 2001)*
4.26   Registration Rights Agreement, dated as of August 17, 2000, among Edison Mission Energy, Midwest Generation, LLC and Credit Suisse First Boston Corporation and Lehman Brothers Inc., as representatives of the Initial Purchasers (File No. 333-59348-01, filed as Exhibit 4.11 to Edison Mission Energy’s and Midwest Generation, LLC’s Registration Statement on Form S-4 to the SEC on April 20, 2001)*
4.27   Participation Agreement (T1), dated as of August 17, 2000, by and among, Midwest Generation, LLC, Powerton Trust I, as the Owner Lessor, Wilmington Trust Company, as the Owner Trustee, Powerton Generation I, LLC, as the Owner Participant, Edison Mission Energy, United States Trust Company of New York, as the Lease Indenture Trustee, and United States Trust Company of New York, as the Pass Through Trustees (File No.

 

66


Table of Contents
  333-59348-01, filed as Exhibit 4.12 to Edison Mission Energy’s and Midwest Generation, LLC’s Registration Statement on Form S-4 to the SEC on April 20, 2001)*
4.27.1   Schedule identifying substantially identical agreement to Participation Agreement constituting Exhibit 4.27 hereto (File No. 333-59348-01, filed as Exhibit 4.12.1 to Edison Mission Energy’s and Midwest Generation, LLC’s Registration Statement on Form S-4 to the SEC on April 20, 2001)*
4.28   Participation Agreement (T1), dated as of August 17, 2000, by and among, Midwest Generation, LLC, Joliet Trust I, as the Owner Lessor, Wilmington Trust Company, as the Owner Trustee, Joliet Generation I, LLC, as the Owner Participant, Edison Mission Energy, United States Trust Company of New York, as the Lease Indenture Trustee and United States Trust Company of New York, as the Pass Through Trustees (File No. 333-59348-01, filed as Exhibit 4.13 to Edison Mission Energy’s and Midwest Generation, LLC’s Registration Statement on Form S-4 to the SEC on April 20, 2001)*
4.28.1   Schedule identifying substantially identical agreement to Participation Agreement constituting Exhibit 4.28 hereto (File No. 333-59348-01, filed as Exhibit 4.13.1 to Edison Mission Energy’s and Midwest Generation, LLC’s Registration Statement on Form S-4 to the SEC on April 20, 2001)*
4.29   Indenture, dated as of June 28, 1999, between Edison Mission Energy and The Bank of New York, as Trustee (File No. 333-30748, filed as Exhibit 4.1 to Edison Mission Energy’s Registration Statement on Form S-4 to the SEC on February 18, 2000)*
4.29.1   First Supplemental Indenture, dated as of June 28, 1999, to Indenture dated as of June 28, 1999, between Edison Mission Energy and The Bank of New York, as Trustee (File No. 333-30748, filed as Exhibit 4.2 to Edison Mission Energy’s Registration Statement on Form S-4 to the SEC on February 18, 2000)*
4.30   Registration Rights Agreement, dated as of June 23, 1999, to Indenture dated as of June 28, 1999, between Mission Energy and the Initial Purchasers specified therein (File No. 333-30748, filed as Exhibit 10.1 to Edison Energy’s Registration Statement on Form S-4 to the Securities and Exchange Commission on February 18, 2000)*
4.31   Promissory Note ($499,450,800), dated as of August 24, 2000, by Edison Mission Energy in favor of Midwest Generation, LLC (File No. 000-24890, filed as Exhibit 4.5 to Edison Mission Energy’s Form 10-K for the year ended December 31, 2000)*
4.31.1   Schedule identifying substantially identical agreements to Promissory Note constituting Exhibit 4.31 hereto (File No. 000-24890, filed as Exhibit 4.5.1 to Edison Mission Energy’s Form 10-K for the year ended December 31, 2000)*
4.32   Participation Agreement, dated as of December 7, 2001, among EME Homer City Generation L.P., Homer City OLI LLC, as Facility Lessor and Ground Lessee, Wells Fargo Bank Northwest National Association, General Electric Capital Corporation, The Bank of New York as the Security Agent, The Bank of New York as Lease Indenture Trustee, Homer City Funding LLC and The Bank of New York as Bondholder Trustee (File No. 333-92047-03, filed as to Exhibit 4.4 to the EME Homer City Generation L.P. Form 10-K for the year ended December 31, 2001)*
4.32.1   Schedule identifying substantially identical agreements to Participation Agreement constituting Exhibit 4.32 hereto (File No. 333-92047-03, filed as Exhibit 4.4.1 to the EME Homer City Generation L.P. Form 10-K for the year ended December 31, 2001)*
4.32.2   Appendix A (Definitions) to the Participation Agreement constituting Exhibit 4.32 hereto, incorporated by reference to Exhibit 4.4.2 to the EME Homer City Generation L.P. Form 10-K for the year ended December 31, 2004*
4.33   Open-End Mortgage, Security Agreement and Assignment of Rents, dated as of December 7, 2001, among Homer City OLI LLC, as the Owner Lessor to The Bank of New York, as

 

67


Table of Contents
  Security Agent and Mortgagee (File No. 333-92047-03, filed as Exhibit 4.9 to the EME Homer City Generation L.P. Form 10-K for the year ended December 31, 2001)*
4.33.1   Schedule identifying substantially identical agreements to Open-End Mortgage, Security Agreement and Assignment of Rents constituting Exhibit 4.33 hereto (File No. 333-92047-03, filed as Exhibit 4.9.1 to the EME Homer City Generation L.P. Form 10-K for the year ended December 31, 2003)*
Edison International
10.1**   Form of 1981 Deferred Compensation Agreement (File No. 1-2313, filed as Exhibit 10.2 to Southern California Edison Company’s Form 10-K for the year ended December 31, 1981)*
10.2**   Form of 1985 Deferred Compensation Agreement for Executives (File No. 1-2313, filed as Exhibit 10.3 to Southern California Edison Company’s Form 10-K for the year ended December 31, 1985)*
10.3**   Form of 1985 Deferred Compensation Agreement for Directors (File No. 1-2313, filed as Exhibit 10.4 to Southern California Edison Company’s Form 10-K for the year ended December 31, 1985)*
10.4**   Director Deferred Compensation Plan as restated May 14, 2002 (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended June 30, 2002)*
10.4.1**   Director Deferred Compensation Plan Amendment No. 1, effective January 1, 2003 (File No. 1-9936, filed as Exhibit 10.4.1 to Edison International’s Form 10-K for the year ended December 31, 2002)*
10.5**   Director Grantor Trust Agreement, dated August 1995 (File No. 1-9936, filed as Exhibit 10.10 to Edison International’s Form 10-K for the year ended December 31, 1995)*
10.5.1**   Director Grantor Trust Agreement Amendment 2002-1, effective May 14, 2002 (File No. 1-9936, filed as Exhibit 10.4 to Edison International’s Form 10-Q for the quarter ended June 30, 2002)*
10.6**   Executive Deferred Compensation Plan, as amended and restated January 1, 1998 (File No. 1-9936, filed as Exhibit 10.2 to Edison International’s Form 10-Q for the quarter ended March 31, 1998)*
10.6.1**   Executive Deferred Compensation Plan Amendment No. 1, effective January 1, 2003 (File No. 1-9936, filed as Exhibit 10.6.1 to Edison International’s Form 10-K for the year ended December 31, 2002)*
10.7**   Executive Grantor Trust Agreement, dated August 1995 (File No. 1-9936, filed as Exhibit 10.12 to Edison International’s Form 10-K for the year ended December 31, 1995)*
10.7.1**   Executive Grantor Trust Agreement Amendment 2002-1, effective May 14, 2002 (File No. 1-9936, filed as Exhibit 10.3 to Edison International’s Form 10-Q for the quarter ended June 30, 2002)*
10.8**   Executive Supplemental Benefit Program, as amended January 30, 1990 (File No. 1-9936, filed as Exhibit 10.2 to Edison International’s Form 10-Q for the quarter ended September 30, 1999)*
10.9**   Dispute resolution amendment, adopted November 30, 1989 of 1981 Executive Deferred Compensation Plan and 1985 Executive and Director Deferred Compensation Plans (File No. 1-9936, filed as Exhibit 10.21 to Edison International’s Form 10-K for the year ended December 31, 1998)*
10.10**   Executive Retirement Plan as restated effective April 1, 1999 (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended September 30, 1999)*
10.10.1**   Executive Retirement Plan Amendment 2001-1, effective March 12, 2001 (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended March 31, 2001)*

 

68


Table of Contents
10.10.2**   Executive Retirement Plan Amendment 2002-1, effective January 1, 2003 (File No. 1-9936, filed as Exhibit 10.10.2 to Edison International’s Form 10-K for the year ended December 31, 2002)*
10.10.3**   Executive Retirement Plan Amendment 2006-1, effective January 1, 2007
10.11**   Executive Incentive Compensation Plan, effective January 1, 1997 (File No. 1-9936, filed as Exhibit 10.12 to Edison International’s Form 10-K for the year ended December 31, 1997)*
10.12**   Executive Disability and Survivor Benefit Program, effective January 1, 1994 (File No. 1-9936, filed as Exhibit 10.22 to Edison International’s Form 10-K for the year ended December 31, 1994)*
10.13**   Retirement Plan for Directors, as amended February 19, 1998 (File No. 1-9936, filed as Exhibit 10.2 to Edison International’s Form 10-Q for the quarter ended June 30, 1998)*
10.14**   Officer Long-Term Incentive Compensation Plan as amended January 1, 1998 (File No. 1-9936, filed as Exhibit 10.3 to Edison International’s Form 10-Q for the quarter ended March 31, 1998)*
10.15**   Equity Compensation Plan as restated effective January 1, 1998 (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended June 30, 1998)*
10.15.1**   Equity Compensation Plan Amendment No. 1, effective May 18, 2000 (File No. 1-9936, filed as Exhibit 10.4 to Edison International’s Form 10-Q for the quarter ended June 30, 2000)*
10.16**   2000 Equity Plan, effective May 18, 2000 (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended June 30, 2000)*
10.17**   Terms and conditions for 1996 long-term compensation awards under the Officer Long-Term Incentive Compensation Plan (File No. 1-9936, filed as Exhibit 10.16.2 to Edison International’s Form 10-K for the year ended December 31, 1996)*
10.18**   Terms and conditions for 1997 long-term compensation awards under the Officer Long-Term Incentive Compensation Plan (File No. 1-9936, filed as Exhibit 10.16.3 to Edison International’s Form 10-K for the year ended December 31, 1997)*
10.19**   Terms and conditions for 1998 long-term compensation awards under the Equity Compensation Plan (File No. 1-9936, filed as Exhibit 10.4 to Edison International’s Form 10-Q for the quarter ended June 30, 1998)*
10.20**   Terms and conditions for 1999 long-term compensation awards under the Equity Compensation Plan (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended March 31, 1999)*
10.21**  

Terms and conditions for 2000 basic long-term incentive compensation awards under the Equity Compensation Plan, as restated (File No. 1-9936, filed as Exhibit 10.2 to Edison International’s Form 10-Q for the quarter ended March 31,

2000)*

10.22**   Terms and conditions for 2000 special stock option awards under the Equity Compensation Plan and 2000 Equity Plan (File No. 1-9936, filed as Exhibit 10.2 to Edison International’s Form 10-Q for the quarter ended June 30, 2000)*
10.23**   Terms and conditions for 2001 retention incentives under the Equity Compensation Plan (File No. 1-9936, filed as Exhibit 10.5 to Edison International’s Form 10-Q for the quarter ended March 31, 2001)*
10.24**   Terms and conditions for 2001 exchange offer deferred stock units under the Equity Compensation Plan (File No. 1-9936, filed as Attachment C of Exhibit (a)(1) to Edison International’s Schedule TO-I dated October 26, 2001)*
10.25**   Terms and conditions for 2002 long-term compensation awards under the Equity Compensation Plan and 2000 Equity Plan (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended March 31, 2002)*
10.26**   Terms and conditions for 2003 long-term compensation awards under the Equity Compensation Plan and 2000 Equity Plan (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended March 31, 2003)*

 

69


Table of Contents
10.27**   Terms and conditions for 2004 long-term compensation awards under the Equity Compensation Plan and 2000 Equity Plan (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended March 31, 2004)*
10.28**   Terms and conditions for 2005 long-term compensation award under the Equity Compensation Plan and 2000 Equity Plan (File No. 1-9936, filed as Exhibit 99.2 to Edison International’s Form 8-K dated December 16, 2004 and filed on December 22, 2004)*
10.29**   Terms and conditions for 2006 long-term compensation awards under the Equity Compensation Plan and 2000 Equity Plan (File No. 1-9936, filed as Exhibit 10.29 to Edison International’s Form 10-K for the year ended December 31, 2005)*
10.29.1**   Terms and conditions for 2007 long-term compensation awards under the Equity Compensation Plan and 2000 Equity Plan (File No. 1-9936, filed as Exhibit 99.1 to Edison International’s Form 8-K dated February 22, 2007 and filed on February 26, 2007)
10.30**   Special Grant Certificate and Award Agreement with Bryant C. Danner related to a May 2000 stock option award under the Equity Compensation Plan (File No. 1-9936, filed as Exhibit 10.19 to Edison International’s Form 10-K for the year ended December 31, 2000)*
10.31**   Director Nonqualified Stock Option Terms and Conditions under the Equity Compensation Plan (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended June 30, 2002)*
10.32**   Director 2004 Nonqualified Stock Option Terms and Conditions under the Equity Compensation Plan (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended June 30, 2004.)*
10.33**   Edison International and Edison Capital Affiliate Option Exchange Offer Circular, dated July 3, 2000 (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended September 30, 2000)*
10.34**   Edison International and Edison Capital Affiliate Option Exchange Offer Summary of Deferred Compensation Alternatives, dated July 3, 2000 (File No. 1-9936, filed as Exhibit 10.2 to Edison International’s Form 10-Q for the quarter ended September 30, 2000)*
10.35**   Edison International and Edison Mission Energy Affiliate Option Exchange Offer Circular, dated July 3, 2000 (File No. 1-13434, filed as Exhibit 10.93 to the Edison Mission Energy’s Form 10-K for the year ended December 31, 2001)*
10.36**   Edison International and Edison Mission Energy Affiliate Option Exchange Offer Summary of Deferred Compensation Alternatives, dated July 3, 2000 (File No. 1-13434, filed as Exhibit 10.94 to the Edison Mission Energy’s Form 10-K for the year ended December 31, 2001)*
10.37**   Estate and Financial Planning Program as amended April 23, 1999 (File No. 1-9936, filed as Exhibit 10.2 to Edison International’s Form 10-Q for the quarter ended June 30, 1999)*
10.38**   Resolution regarding the computation of disability and survivor benefits prior to age 55 for Alan J. Fohrer dated February 17, 2000 (File No. 1-9936, filed as Exhibit 10.2 to Edison International’s Form 10-Q for the quarter ended March 31, 2000)*
10.39**   Executive Severance Plan as adopted effective January 1, 2001 (File No. 1-9936, filed as Exhibit 10.34 to Edison International’s Form 10-K for the year ended December 31, 2001)*
10.40**   Director Deferred Compensation Plan Authorization of Edison International (File No. 1-9936, filed in Edison International’s Form 8-K dated December 30, 2004, and filed on January 5, 2005)*
10.41**   Amendment to 1985 Deferred Compensation Plan Agreement for Executives and Deferred Compensation Plan Deferred Compensation Agreement with John E. Bryson, dated December 31, 2003 (File No. 1-2313, filed as Exhibit 10.34 to Southern California Edison Company’s Form 10-K for the year ended December 31, 2003)*

 

70


Table of Contents
10.42**   Agreement between Edison International and Southern California Edison Company, dated December 31, 2003, addressing responsibility for the prospective costs of participation of John E. Bryson under the 1985 Deferred Compensation Plan Agreement for Executives, dated September 27, 1985, as amended, and the Deferred Compensation Plan Deferred Compensation Agreement, dated November 28, 1984, as amended (File No. 1-2313, filed as Exhibit 10.35 to Southern California Edison Company’s Form 10-K for the year ended December 31, 2003)*
10.43**   Amendment to 1985 Deferred Compensation Plan Agreement for Directors with James M. Rosser, dated December 31, 2003 (File No. 1-2313, filed as Exhibit 10.36 to Southern California Edison Company’s Form 10-K for the year ended December 31, 2003)*
10.44   Amended and Restated Agreement for the Allocation of Income Tax Liabilities and Benefits among Edison International, Southern California Edison Company and The Mission Group dated September 10, 1996 (File No. 1-9936, filed as Exhibit 10.3 to Edison International’s Form 10-Q for the quarter ended September 30, 2002)*
10.45   Amended and Restated Tax Allocation Agreement among The Mission Group and its first-tier subsidiaries dated September 10, 1996 (File No. 1-9936, filed as Exhibit 10.3.1 to Edison International’s Form 10-Q for the quarter ended September 30, 2002)*
10.45.1   Amended and Restated Tax Allocation Agreement between Edison Capital and Edison Funding Company (formerly Mission First Financial and Mission Funding Company) dated May 1, 1995 (File No. 1-9936, filed as Exhibit 10.3.2 to Edison International’s Form 10-Q for the quarter ended September 30, 2002)*
10.45.2   Tax Allocation Agreement between Mission Energy Holding Company and Edison Mission Energy dated July 2, 2001 (File No. 1-9936, filed as Exhibit 10.3.3 to Edison International’s Form 10-Q for the quarter ended September 30, 2002)*
10.45.3   Administrative Agreement re Tax Allocation Payments among Edison International, Southern California Edison Company, The Mission Group, Edison Capital, Mission Energy Holding Company, Edison Mission Energy, Edison O&M Services, Edison Enterprises, and Mission Land Company dated July 2, 2001 (File No. 1-9936, filed as Exhibit 10.3.4 to Edison International’s Form 10-Q for the quarter ended September 30, 2002)*
10.46   Amended and Restated Credit Agreement, dated as of February 23, 2007, among Edison International and JPMorgan Chase Bank, N.A., as Administrative Agent, Citicorp North America, Inc., as Syndication Agent, and Credit Suisse, Lehman Commercial Paper Inc., and Wells Fargo Bank, N.A., as Documentation Agents and the lenders thereto (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 8-K dated February 23, 2007 and filed on February 27, 2007)*
10.47**   Edison International Director Compensation Schedule, as adopted May 19, 2005, as amended (File No. 1-9936, filed as Exhibit 10.48 to Edison International’s Form 10-K for the year ended December 31, 2005)*
10.48**   Edison International Director Nonqualified Stock Options 2005 Terms and Conditions (File No. 1-9936, filed as Exhibit 99.3 to Edison International’s Form 8-K dated May 19, 2005, and filed on May 25, 2005)*
10.49**   Form of Indemnity Agreement between Edison International and its Directors and any officer, employee or other agent designated by the Board of Directors (File No. 1-9936, filed as Exhibit 10.5 to Edison International’s Form 10-Q for the period ended June 30, 2005, and filed on August 9, 2005)*
10.50**   Amended Director Retirement Plan, dated December 2006
10.52**   Amendment of Equity Compensation Plans, adopted October 25, 2006

 

71


Table of Contents
10.53**   Edison International Executive Perquisites
10.54**   Edison International 2006 Bonus Awards (File No. 1-9936, filed in Edison International’s Form 8-K dated February 22, 2007 and filed February 27, 2007)*
12   Computation of Ratios of Earnings to Fixed Charges
13   Selected portions of the Annual Report to Shareholders for year ended December 31, 2006
21   Subsidiaries of the Registrant
23   Consent of Independent Registered Public Accounting Firm – PricewaterhouseCoopers LLP
24.1   Power of Attorney
24.2   Certified copy of Resolution of Board of Directors Authorizing Signature
31.1   Certification of the Chief Executive Officer pursuant to Section 302 of the Sarbanes-Oxley Act
31.2   Certification of the Chief Financial Officer pursuant to Section 302 of the Sarbanes-Oxley Act
32   Statement Pursuant to 18 U.S.C. Section 1350

* Incorporated by reference pursuant to Rule 12b-32.
** Indicates a management contract or compensatory plan or arrangement, as required by Item 15(a)3.

 

72