U.S. SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 10-K
x |
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES |
|
EXCHANGE ACT OF 1934 |
For the fiscal year ended December 31, 2007
o |
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from _________ to __________
Commission File Number 0-50218
BEKEM METALS, INC.
(Name of Small Business Issuer in its charter)
Utah |
|
87-0669131 |
||
(State or other jurisdiction of |
|
(I.R.S. Employer |
||
incorporation or organization) |
|
Identification No.) |
||
|
|
|
||
170 Tchaikovsky Street, 4th Floor |
|
|
||
Almaty, Kazakhstan |
|
050000 |
||
(Address of principal executive offices) |
|
(Zip code) |
||
|
|
|
||
|
+7 7272 582 386 |
|
||
|
(Registrant’s telephone number, including area code) |
|
||
Securities registered pursuant to section 12(b) of the Exchange Act: None
Securities registered pursuant to section 12(g) of the Exchange Act: Common, $0.001 par value
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
o Yes x No
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Exchange Act from their obligations under those Sections.
o Yes x No
Indicate by check mark whether the registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
x Yes o No
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. o
Indicate by check mark whether the registrant is a large accelerated filed, an accelerated filer, a non-accelerated filer or a smaller reporting company.
Large accelerated Filer o |
Accelerated Filer o |
Non-accelerated Filer o |
Smaller Reporting Company x |
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act.)
|
o Yes x No |
The aggregate market value of the voting stock held by non-affiliates of the registrant as of June 30, 2007 was $49,503,740 based upon the closing stock price of $1.70 (the closing price on June 29, 2007) per share as reported on the Over-the-Counter Bulletin Board.
As of April 7, 2008, the registrant had 125,172,011 shares of common stock, par value $0.001, issued and outstanding.
DOCUMENTS INCORPORATED BY REFERENCE: None
2
Table of Contents
|
|
Page |
|
PART I |
|
|
|
|
Item 1. |
Business |
4 |
|
|
|
Item 1A. |
Risk Factors |
27 |
|
|
|
Item 1B. |
Unresolved Staff Comments |
30 |
|
|
|
Item 2. |
Properties |
30 |
|
|
|
Item 3. |
Legal Proceedings |
30 |
|
|
|
Item 4. |
Submission of Matters to a Vote of Security Holders |
31 |
|
|
|
|
PART II |
|
|
|
|
Item 5. |
Market for Registrant’s Common Equity, Related Stockholder Matters and |
|
|
Issuer Purchases of Equity Securities |
31 |
|
|
|
Item 6. |
Selected Financial Data |
34 |
|
|
|
Item 7. |
Management’s Discussion and Analysis of Financial Condition |
|
|
and Results of Operations |
35 |
|
|
|
Item 7A. |
Quantitative and Qualitative Disclosures About Market Risk |
44 |
|
|
|
Item 8. |
Financial Statements and Supplementary Data |
45 |
|
|
|
Item 9. |
Changes in and Disagreements with Accountants on Accounting |
|
|
and Financial Disclosure |
45 |
|
|
|
Item 9A(T). |
Controls and Procedures |
45 |
|
|
|
Item 9B. |
Other Information |
46 |
|
|
|
|
PART III |
|
|
|
|
Item 10. |
Directors, Executive Officers and Corporate Governance |
47 |
|
|
|
Item 11. |
Executive Compensation |
52 |
|
|
|
Item 12. |
Security Ownership of Certain Beneficial Owners and Management |
|
|
and Related Stockholder Matters |
62 |
|
|
|
Item 13. |
Certain Relationships and Related Transactions, and Director Independence |
64 |
|
|
|
Item 14. |
Principal Accounting Fees and Services |
64 |
|
|
|
Item 15. |
Exhibits and Financial Statement Schedules |
65 |
|
|
|
|
SIGNATURES |
66 |
3
BEKEM METALS, INC.
Unless otherwise indicated by the context, references herein to the “Company”, “BMI”, “we”, our” or “us” means Bekem Metals, Inc., a Utah corporation, and its corporate subsidiaries and predecessors.
Forward Looking Statements
Certain statements contained herein including, but not limited to those relating to our plan of operations, future potential revenue, future expenses, future exploration of our mineral properties, the development and commercial viability of our processing technology, our ability to obtain future governmental approvals, expansion of our activities, our ability to generate cash flow, future demand for nickel, cobalt and brown coal, future commodity prices, integration of new technologies into operations, credit facilities, future capital expenditures and working capital, sufficiency of future working capital, borrowings and capital resources and liquidity, expectations of timing, satisfaction of contingencies, the impact of any change in accounting policies on our financial statements, future acquisitions, management’s assessment of internal control over financial reporting, financial results, opportunities, growth, business plans and strategy and other statements that are not historical facts contained in this report are forward-looking statements. When used in this document, words like “believe,” “expect,” “project,” “intend,” “estimate,” “budget,” “plan,” “forecast,” “predict,” “may,” “will,” “could,” “should,” or “anticipates” and similar expressions or the negative thereof, or other variations thereon, or comparable terminology, or discussions of strategy that involve risk and uncertainties are also intended to identify forward-looking statements. Such statements involve known and unknown risks, uncertainties, and other factors that may cause the actual results, performance or achievements of the Company or industry to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, but are not limited to, market factors, market prices (including regional basis differentials) of nickel, cobalt and brown coal, results of future exploration and extraction activities, future costs, unsettled political conditions, civil unrest and governmental actions, foreign currency fluctuations, and environmental and labor laws and other factors detailed herein. Given these uncertainties, prospective investors are cautioned not to place undue reliance on such forward-looking statements. These forward-looking statements are based on current expectations, and we assume no obligation to update this information. We undertake no obligation to publicly update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.
PART I
Item 1. |
Business |
Bekem Metals, Inc. is engaged in the exploration of nickel, cobalt and brown coal in the Republic of Kazakhstan.
We incorporated in the state of Utah under the name EMPS Research Corporation on January 30, 2001. Until the end of the 2004 fiscal year, our primary business focus was the development, marketing and licensing of our patented technology for use in commercially separating nonmagnetic particulate material by building and testing a high frequency eddy-current separator (“HFECS”).
4
We changed our name to Bekem Metals, Inc., on March 16, 2005 following our acquisition of Condesa Pacific, S.A., a British Virgin Islands international business company, and its wholly owned subsidiary Kaznickel, LLP in January 2005. With the acquisition of Kaznickel, our primary business focus shifted from the development of our HFECS technology to exploring for nickel and cobalt in Kazakhstan. On July 24, 2006 Condesa transferred its interest in Kaznickel to Bekem, making Kaznickel a wholly-owned subsidiary of Bekem. On October 1, 2006 Bekem sold Condesa to a third party for nominal value.
The primary asset of Kaznickel is an exploration and production concession issued by the government of the Republic of Kazakhstan which grants Kaznickel the exclusive right, through February 2008, to explore for nickel, cobalt and other minerals in a 12,232 acre area in northeastern Kazakhstan known as the Gornostayevskoye (“Gornostai”) deposit. In January 2008 Kaznickel agreed with the Expert Committee of the Ministry of Energy and Mineral Resources of the Republic of Kazakhstan (the “MEMR”) to an extension of the exploration period to February 2010. Currently, Kaznickel is in the process of signing the addendum to its subsoil use contract to reflect these changes. The concession further provides that if we make a commercial discovery of nickel, cobalt or other minerals within the concession territory, we can apply for and receive the exclusive rights to commercially produce and sell nickel and cobalt ore through February 2026.
On October 24, 2005 we acquired Kazakh Metals, Inc. (“KMI”), and its wholly owned subsidiary Kyzyl Kain Mamyt (“KKM”), LLP in exchange for 61,200,000 shares of our common stock. KKM holds the exclusive subsoil use contract to extract and process nickel and cobalt ore from its Kempirsai deposit, which is comprised of the Kara-Obinskoye, and Stepninskoye sections (collectively referred to as the “Kara-Obinskoye section”) and Novo-Shandashinskoye section, and brown coal from its Mamyt deposit. Unless otherwise indicated by the context of the disclosure, the Kara-Obinskoye section, the Novo-Shandashinskoye section and the Mamyt deposit are collectively referred to herein as the “Kempirsai deposit.” Under the applicable accounting reporting rules, KMI was considered the accounting acquirer.
On December 10, 2007, the MEMR unilaterally terminated KKM’s contracts and licenses to explore for nickel, cobalt, brown coal, and other minerals within the Kempirsai and the Mamyt deposits on the basis that KKM had material failures in execution of the work programs associated with the contacts and licenses but did not detail those failures. In January 2008, KKM filed an action in the Court of Astana city against the MEMR challenging the legality of the unilateral termination of the KKM contracts and licenses by the MEMR for several reasons, including that the contracts and licenses had been terminated on grounds not provided for in the subsoil use contracts and legislation and there were no material failures in the execution of the work programs associated with the contracts and licenses. In February 2008, the Court of Astana city acknowledged that the unilateral termination of the contracts and licenses by the MEMR was illegitimate. The Court canceled the order of the MEMR relating to the unilateral termination of the licenses and reinstated the KKM contracts and licenses. In March 2008, the MEMR appealed the Court’s decision to the Republic of Kazakhstan Supreme Court. The Supreme Court decision is expected by the end of April 2008.
5
Business of the Company
The Nickel Market
In January 2008 the United States Geological Survey (“USGS”) reported the world mine reserves of nickel and the world mine reserves base of nickel in 2007 were 67 million tons and 150 million tons, respectively.
|
Mine production |
Reserves (1) |
Reserve base (2) |
|
2006 |
2007 |
|||
United States |
— |
— |
— |
150,000 |
Australia |
185,000 |
180,000 |
24,000,000 |
27,000,000 |
Botswana |
38,000 |
35,000 |
490,000 |
920,000 |
Brazil |
82,500 |
75,300 |
4,500,000 |
8,300,000 |
Canada |
233,000 |
258,000 |
4,900,000 |
15,000,000 |
China |
82,100 |
80,000 |
1,100,000 |
7,600,000 |
Colombia |
94,100 |
99,500 |
830,000 |
1,100,000 |
Cuba |
75,000 |
77,000 |
5,600,000 |
23,000,000 |
Dominican Republic |
46,500 |
47,000 |
720,000 |
1,000,000 |
Greece |
21,700 |
20,100 |
490,000 |
900,000 |
Indonesia |
140,000 |
145,000 |
3,200,000 |
13,000,000 |
New Caledonia |
103,000 |
119,000 |
7,100,000 |
15,000,000 |
Philippines |
58,900 |
88,400 |
940,000 |
5,200,000 |
Russia |
320,000 |
322,000 |
6,600,000 |
9,200,000 |
South Africa |
41,600 |
42,000 |
3,700,000 |
12,000,000 |
Venezuela |
20,000 |
20,000 |
560,000 |
630,000 |
Zimbabwe |
8,820 |
9,000 |
15,000 |
260,000 |
Other countries |
34,300 |
41,000 |
2,100,000 |
5,900,000 |
World total (rounded) |
1,580,000 |
1,660,000 |
67,000,000 |
150,000,000 |
(1) |
Reserves - that part of the reserve base which could be economically extracted or produced at the time of determination. The term reserves need not signify that extraction facilities are in place and operative. Reserves include only recoverable materials; thus, terms such as “extractable reserves” and “recoverable reserves” are redundant and are not a part of this classification system. |
6
(2) |
Reserve Base - that part of an identified resource that meets specified minimum physical and chemical criteria related to current mining and production practices, including those for grade, quality, thickness, and depth. The reserve base is the inplace demonstrated resource from which reserves are estimated. It may encompass those parts of the resources that have a reasonable potential for becoming economically available within planning horizons beyond those that assume proven technology and current economics. The reserve base includes those resources that are currently economic (reserves), marginally economic (marginal reserves), and some of those that are currently subeconomic (subeconomic resources). |
With demand growth averaging approximately 4% per annum over the past seven years, nickel consumption has outpaced most other industrial metals. World nickel production reached an all-time high in 2007. Total nickel production in 2007 was approximately 1,660,000 tons. The price of nickel hit a record high of $51,800 per ton in May 2007 before price fell nearly 50% during the ensuing months. The average price for nickel in 2007 was about $37,181 per ton, up from $24,287 in 2006. The average London Metal Exchange (“LME”) price for nickel in January and February 2008 were $27,690 per ton and $27,955 per ton, respectively.
There are several factors that can affect overall world nickel demand and price. These factors include the following:
|
• |
expansion of new nickel mining capacity; |
|
• |
new processing technologies; |
|
• |
world demand for stainless-steel; and |
|
• |
nickel substitutes. |
Expansion of New Nickel Mining Capacity
As demand and nickel prices increase, companies have sought to expand their mining and production capacity. In 2007, the leading nickel producer in the world - a Russian company - created an entire overseas production operation by acquiring and then integrating existing facilities in Australia, Botswana, and Finland. The larger of the two Canadian takeover targets is preparing to commission a laterite mining complex at Goro, New Caledonia. Several other companies are also considering employing some form of acid leach technology to recover nickel at greenfield sites in Brazil, Cuba, Guatemala, Indonesia, Madagascar, and the Philippines. A new type of heap-leaching process is being used to recover nickel in Turkey. Work is also underway on a more traditional, ferronickel plant in Goias, Brazil.
New Processing Technologies
While demand for nickel has been and is expected to continue to be strong, expansion of nickel production capacity has not increased as rapidly as anticipated. Of the identified land-based nickel resources averaging 1% nickel or greater, about 70% is in laterite deposits and 30% in sulfide deposits. Historically, nickel production has come from higher-grade sulphide deposits because processing is less energy-intensive and therefore less expensive. However, as sulphide deposits are limited, interest in developing laterite deposits is increasing.
To date the success rate of laterite deposits has not been encouraging. Several laterite mines have closed down, restructured or faced a number of issues affecting development of new laterite deposits including technological problems such as:
7
|
• |
developing economic processing techniques; |
|
• |
high investment in infrastructure due to remote locations of mines; and |
|
• |
environmental concerns due to surface mining methods. |
Many New Caledonian nickel projects were to be recovered onsite using advanced high pressure acid leach (“HPAL”) technology. However, the significant time and cost overruns that have been encountered in trying to bring HPAL facilities onstream have resulted in continuous delays of these projects. As a result of these factors, capital expenditure costs for laterite operations have been nearly double initial estimates. These extra costs are the result of the larger plants and tailings facilities required for the beneficiation process. Some existing laterite projects are also suffering from significantly higher operating costs as smelters have very high energy requirements. Together with nickel price volatility, this has had a significant impact on the timing and cost of project completion.
World Demand for Stainless Steel
Stainless steel accounts for two-thirds of global primary nickel use. Since 1993, global stainless steel production has been growing at an average rate of 5.6% per year. Leading metal consultants CRU note that world production of stainless steel has grown from 5 million tons per annum in 1975 to 25 million tons per annum in 2005. By 2011, they expect demand to reach 35 million tons per annum. This growth estimate is almost entirely attributed to Chinese demand as off-take from other major consumers is expected to stabilize. This represents a predicted growth rate of 5% per annum, with the conclusion being that over 320,000 tons of additional primary nickel supply will be required by 2011 over 2006. Also, continued high prices for gasoline and other petroleum products have spurred development and production of novel hydrogen storage and battery materials, such as lanthanum-nickel-cobalt alloys. Nickel-metal hydride (NiMH) batteries continue to be widely used in hybrid motor vehicles, despite inroads made by lithium-ion batteries.
Nickel Substitutes
As noted above, nickel prices climbed to unprecedented levels in the first half of 2007 before falling back almost 50 percent over the following few months as stainless steel producers cut back production and replaced refined nickel by nickel pig iron for stainless steel production. Nickel pig iron and refined nickel share the market, as long as there is high demand from stainless steel producers and shortage of refined nickel supply. However, nickel pig iron producers face environmental challenges, as their facilities are still regarded as environmentally damaging. Engineers have also begun substituting low-nickel, duplex, or ultrahigh-chromium stainless steels for austenitic grades in a few construction applications. Nickel-free specialty steels are sometimes used in place of stainless steel within the power generating and petrochemical industries. Titanium alloys or specialty plastics can substitute for nickel metal or nickel-base alloys in highly corrosive chemical environments.
8
Our Properties
As discussed above, through our subsidiaries, we hold the rights to the Kempirsai nickel, cobalt and brown coal deposits, which are located in northwestern Kazakhstan and the Gornostai nickel and cobalt deposit located in northeastern Kazakhstan.
|
Location and access to our properties |
Kempirsai
The Kempirsai deposit is located in the Khromtausky region of northwestern Kazakhstan, approximately 130 kilometers northeast of Aktobe, Kazakhstan. The nickel and cobalt deposits are located approximately 35 kilometers south of Badamsha village, Aktobe region, Kazakhstan. The brown coal deposit is located approximately 30 kilometers east of Badamsha village, Aktobe region, Kazakhstan. Badamsha is a village of approximately 6,000 people. The Aktubinsk-Karabutak asphalt highway runs within 14 kilometers to the south of the nickel and cobalt deposit. The nickel, cobalt and brown coal deposits can be accessed through a network of country roads. The Orsk-Kandagash state railway runs nearby the Kempirsai deposit and, through our subsidiary KKM, we own 55 kilometers of our own railway. Our railway connects the Kempirsai deposit to a reloading station and to a Russian railway.
9
Gornostai
The Gornostai deposit is located in the Beskaragaiskiy region of northeastern Kazakhstan, approximately 110 kilometers west of Semey, Kazakhstan and 30 kilometers east of Kurchatov, Kazakhstan. The Gornostai deposit is divided into the South and North sections by the navigable Irtysh River. The Gornostai deposit may be accessed by an asphalt highway that crosses the northern part of the South section of the deposit. The Semey-Astana railway also passes through the northern part of the South section of the deposit.
10
Title to Properties
We hold several subsoil use contracts that grant us the right to explore for and extract nickel, cobalt and brown coal at the Kempirsai deposit. We also hold a subsoil use contract that currently grants us the right to explore for nickel, cobalt and other minerals within the Gornostai deposit. Upon discovery of commercially producible reserves we can apply to move to commercial production. For additional information regarding our contracts please see the following table.
Territory Name |
Size of Territory |
Primary Minerals |
License Type |
License or Contract # |
License and Subsoil Use Contract Term |
|
|
|
|
|
|
Kempirsai |
575,756 acres |
Nickel and cobalt ore |
Production |
MG #420 MG #426 |
Expires Oct, 12, 2011 unless extended (1). |
|
|
|
|
|
|
Mamyt |
116 acres |
Brown coal |
Production |
MG #9-D |
Expires Dec, 11 2018 unless extended (1).
|
Gornostai |
12,232 acres |
Nickel and cobalt ore |
Exploration and Production |
1349 |
Exploration period expires Feb. 26, 2010 (2). Production period expires Feb. 26, 2026 unless extended. |
11
(1) |
On December 10, 2007, the MEMR unilaterally terminated KKM’s contracts and licenses to explore for nickel, cobalt, brown coal, and other minerals within the Kempirsai and the Mamyt deposits on the basis that KKM had material failures in execution of the work programs associated with the contacts and licenses but did not detail those failures. In January 2008, KKM filed an action in the Court of Astana city against the MEMR challenging the legality of the unilateral termination of the KKM contracts and licenses by the MEMR for several reasons, including that the contracts and licenses had been terminated on grounds not provided for in the subsoil use contracts and legislation and there were no material failures in the execution of the work programs associated with the contracts and licenses. In February 2008, the Court of Astana city acknowledged that the unilateral termination of the contracts and licenses by the MEMR was illegitimate. The Court canceled the order of the MEMR relating to the unilateral termination of the licenses and reinstated the KKM contracts and licenses. In March 2008, the MEMR appealed the Court’s decision to the Republic of Kazakhstan Supreme Court. A final decision from the Supreme Court is expected by the end of April 2008. |
(2) |
In January 2008 Kaznickel agreed with the Expert Committee of the MEMR the extension of the exploration period up to February 2010. Currently, Kaznickel is in the process of signing the addendum to the subsoil use contract to reflect these changes. |
The term of each of our subsoil use contracts vary. Under our contracts we have the right to negotiate with the MEMR for extensions of the terms of those contracts. If we are unsuccessful in negotiating extensions, upon the expiration of those contracts our interest in and rights to those properties terminates and reverts back to the government of the Republic of Kazakhstan, but we retain the rights to all tangible and intangible assets we acquire for exploration, extraction and production at these deposits.
For additional details regarding the terms and obligations associated with our subsoil use contracts and licenses please see “Tax and Royalty Scheme in the Republic of Kazakhstan” and “Working Programs of our Subsidiaries” in Item 1 “Business”, “Summary of Material Contractual Commitments” in Item 6 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and “Note 4 – Property, Plant and Mineral Interests”, “Note 7 – Asset Retirement Obligation” and “Note 10 – Commitments and Contingencies” contained in the Notes to our Consolidated Financial Statements.
Kempirsai
The Kempirsai deposit was discovered and actively explored during the Soviet era. In the 1980s, the State Reserves Committee approved the reserves (based on Soviet standards) and approved the Kempirsai deposit for commercial production. The Kempirsai deposit was actively mined during the 1980s and early 1990s. Active mining at the Kempirsai deposit ceased in 1996. The working program associated with these licenses for the Kempirsai nickel, cobalt and Mamyt brown coal deposits are production contracts, those contracts do not require us to undertake significant exploration activities. While we do not have fixed exploration obligations, in order to retain our licenses we are required to engage in certain activities. For details regarding our mine production requirements see “Working Programs of our Subsidiaries” in this Item 1 “Business.”
Gornostai
The subsoil use contract to the Gornostai deposit was issued in February 2004. At the time it was issued, the MEMR determined that additional exploration of the deposit was necessary to determine the existence of commercially producible mineral reserves. Therefore, the subsoil use contract provides a period for exploration. Under the terms of the contract for the Gornostai deposit, we were granted the right to explore for nickel and cobalt for two years. The exploration term provides for two two-year extensions upon our request. We requested and were granted our first extension, extending the current exploration period to February 2008. In January 2008 Kaznickel agreed with the Expert Committee of the MEMR additional two two-year extension period up to February 2010. Currently, Kaznickel is in the process of signing the addendum to the subsoil use contract to reflect these changes.
12
Upon discovery of commercially producible nickel and/or cobalt reserves, we may notify the MEMR and convert from exploration stage to commercial production stage. If we make no commercial discoveries before the end of the exploration period, as extended, our rights to the territory will revert back to Republic of Kazakhstan. Upon completion of exploration, we will return to the Republic of Kazakhstan the rights to all areas within the licensed territory wherein no commercial discoveries of nickel and/or cobalt were made. When we complete exploration of the Gornostai deposit, assuming we make commercial discoveries, we will apply to the MEMR to move to commercial production. At that time we will be required to pay a 0.1% commercial discovery bonus based on the initial determination of our mineral resources by the MEMR.
Annual Work Program of our Subsidiaries
Each year we must submit an annual work program to the MEMR’s Territorial Division under the State Body for Subsurface Use and Protection. The annual work program indicates the scope of exploration and or production works and finance costs.
Kempirsai
Prior to the litigation associated with the licenses to our Kempirsai deposits, our contracts and licenses called for KKM to extract the following amounts of ore from the Kempirsai deposit and brown coal from the Mamyt deposit:
|
Tons of Ore |
Tons of Brown Coal |
2008 |
350,000 |
200,000 |
2009 |
1,000,000 |
200,000 |
2010 |
1,000,000 |
200,000 |
2011 |
1,000,000 |
200,000 |
2012 |
|
200,000 |
2013 |
|
200,000 |
2014 |
|
200,000 |
2015 |
|
200,000 |
2016 |
|
200,000 |
2017 |
|
200,000 |
2018 |
|
200,000 |
As a result of the litigation, the 2008 annual work program for KKM is under discussion and negotiation with the MEMR’s Territorial Division under the State Body for Subsurface Use and Protection. If the Supreme Court decision is made in KKM’s favor, we will continue negotiations with the MEMR of the 2008 annual work program requirements. Based on initial conversations with the MEMR, we anticipate the financial obligations associated with our 2008 annual work program will include financial obligations of up to $15 million.
Gornostai
The 2008 annual work programs for Kaznickel is currently under discussion with the MEMR. We expect the 2008 work program will require us to continue to perform exploratory drilling, sampling and assaying of core samples, metallurgical testing and preparation of reports for the State Resource Reserves Committee. We anticipate the financial commitment in 2008 will be approximately $1,500,000 including exploration drilling and sampling and assaying (2,000 meters to be drilled and 1,000 core samples to be made during 2008 and 2009), metallurgical tests and preparation of the report to the State Resource Committee.
13
For us to maintain our rights to the Kempirsai and Gornostai deposits we must satisfy the work program requirements for each property. As evidenced by the litigation associated with our Kempirsai deposits, if we fail to satisfy our working program requirements we could be subject to fines and penalties or even to the potential forfeiture of our contracts, licenses and all rights we have thereunder.
Geology and Mineralization
Nickel ferrous laterites make up approximately 70% of all land based nickel resources, though currently they constitute about 45% of the primary nickel production. Nickel laterite deposits are formed as a result of prolonged weathering of ‘ultramafic’ rocks containing ferromagnesian silicate minerals. Under conditions of warm temperatures and high, frequent rainfall, nickel leaches from the upper layers and precipitates in the lower layers in a lattice of silicate and iron oxide minerals.
If an ore deposit is outcropping or occurs near the surface, it can be extracted using open cut methods. Open cut methods allow for lower cost extraction and operating costs, which can allow low-grade deposits to be economically viable. The topsoil and overburden are removed and stockpiled for later rehabilitation and, as the mine increases in depth, the walls of the excavation are left at an angle to avoid collapse. Open cut mines use large mobile machinery that enables high production rates. Large haul trucks carry the ore and waste to surface stockpiles. Rapid rates of mining in shallow weathered parts of the deposits slow down as the depths increase due to the increased hardness of the material. Nickel laterites are generally mined by surface operations up to 60 meters deep.
Kempirsai
The Kempirsai nickel and cobalt deposit is comprised of two deposits: Kara-Obinskoye, and Novo-Shandashinskoye. These deposits are located approximately 5-10 kilometers from each other. The results of exploration carried out during the Soviet era show that nickel and cobalt ore is located within the Kempirsai ultramafic massif. The minerals are found in laterite form and are associated with leached nontronized serpentinites. The ore bodies have a blanket-like shape and tend to lie conformably on the underlying rocks. The depth of ore bodies from the surface is 0-40 meters. In vertical section they are mainly horizontal in attitude and show variable thickness. Thickness varies from 2.0 meters to 30.0 meters, with an average thickness of 6.0 meters. Average stripping ratio is 1.5 cubic meters per ton. The nickel content of the ore within the Kempirsai deposit varies from 0.8% to 3.0% and cobalt – from 0.025% to 0.08%. The average nickel and cobalt content for the Kara-Obinskoye are 1.1% and 0.066% respectively. The average nickel and cobalt content for the Novo-Shandashinskoye deposit are 1.38% and 0.045%.
The ore reserves of the Kempirsai deposit were evaluated during the Soviet era based on Soviet standards. The Soviet standards, however, are not consistent with the standards established by the United States Securities and Exchange Commission (“SEC”). Therefore, during 2007 we retained Wardell Armstrong International, an independent engineering firm to perform a feasibility study, including an estimation of mineable reserves for the Kempirsai deposit. We anticipate the results of the feasibility study, including an estimation of mineable reserves during the second half of the 2008 fiscal year. As we have not yet established reserves at the Kempirsai deposit, this project should be deemed exploratory in nature. For additional information regarding reserves please see “Reserves” in this Item 1 “Business”.
14
Gornostai
Exploration activities conducted during the Soviet era and by us since we acquired the rights to the deposit have identified 21 ore bodies through drilling within the South section of the deposit and two ore bodies in the North section. The area of the deposit is located within the Gornostai ultramafic belt. The deposit is characterized by three distinct zones of ochre, nontronite, and leached and disintegrated serpentinite:
|
• |
Ochre zone represents the upper part of the serpentinite weathered crust. |
|
• |
Nontronite zone is more widespread than the ochre zone with thickness varying from 2 up to 10 m (sometimes reaching 30 m) |
|
• |
Zone of leached and disintegrated serpentinite is the most widespread amongst the three zones. The zone mean thickness is 15-20 m (in some cases up to 50 m). |
The minerals are found mainly in laterite form. The ore bodies have embedded form, are mainly horizontal in attitude and show variable thickness. The nickel content in the ore bodies varies from 0.7% to 2.3% and cobalt from 0.05% to 0.37%. The ore bodies are typically located at depths between 0 to 20 meters from the surface, which should allow for strip mining. The lengths of the ore bodies range from 200 meters to 4,050 meters and widths range from 200 meters to 2,000 meters. Thickness varies from 0.8 meters to 15 meters. Average ore body thickness is around 4.2 meters, with an estimated average stripping ratio of 1.8 cubic meters per ton. Of the drilling done to date, the average content of nickel is 0.85% and cobalt 0.059%.
Based on the exploration activities undertaken on the deposit, we believe the size of the ore bodies, their simple form and shallow bedding will allow the deposit to be mined by open pit method with a low stripping ratio.
Despite the exploration work completed during the Soviet time and by us since acquiring this deposit, we do not have a current ore reserve estimate for the Gornostai deposit that complies with the standards established by the SEC. Accordingly, and consistent with SEC Industry Guide 7, we provide no claims as to the ore reserves that may be contained within the Gornostai deposit. Moreover, because we are currently in the exploration stage of our contract and have not yet established commercially producible reserves, the Gornostai project should be deemed exploratory in nature.
Wardell Armstrong International also evaluated the Gornostai deposit in connection with a scoping study and preliminary resource estimation. We plan to undertake a preliminary feasibility study on the Gornostai deposit during 2008 with completion in 2009, including a reserve estimate that will comply with the standards established by the SEC. For additional information regarding reserves please see “Reserves” in this Item 1 “Business.”
History and current state of our deposits
Kempirsai
The KKM subsoil use contract to the nickel and cobalt deposits covers a 575,756 acre territory, in northwestern Kazakhstan. This contract was issued by the MEMR and incorporates License series MG#420 and MG#426. These licenses to the nickel and cobalt deposits cover a period expiring on October 12, 2011. This contract may be extended upon agreement between KKM and the MEMR. KKM also holds a subsoil use contract that incorporates License series MG #9-D for a brown coal deposit located within 40 kilometers of its nickel and cobalt deposit. This contract expires on December 11, 2018 with the possibility of further extensions.
15
In November 2007 KKM submitted to the MEMR the request for the extension of the subsoil use contract to the nickel and cobalt deposits up to 2018 and corresponding changes in the working program. Despite this fact, on December 10, 2007, the MEMR unilaterally terminated KKM’s contracts and licenses to explore for nickel, cobalt, brown coal and other minerals within the Kempirsai and Mamyt deposits on the basis that KKM had material failures in the execution of the work programs associated with the contacts and licenses. The MEMR did not, however, detail those failures. In January 2008, KKM filed an action in the Court of Astana city against the MEMR challenging the legality of the unilateral termination of the KKM contracts and licenses by the MEMR for several reasons, including that the contracts and licenses had been terminated on grounds not provided for in the subsoil use contracts and legislation and there were no material failures in the execution of the work programs associated with the contracts and licenses. In February 2008, the Court of Astana city acknowledged that the unilateral termination of the contracts and licenses by the MEMR was inconsistent with the terms of the contracts and licenses. The Court canceled the order of the MEMR relating to the unilateral termination of the licenses and reinstated the KKM contracts and licenses. In March 2008, the MEMR appealed the decision of the Court of Astana city to the Republic of Kazakhstan Supreme Court. We expect the Supreme Court to announce its final decision on this matter by the end of April 2008.
Historical exploration and production activities
The first nickel deposits of the Kempirsai group were discovered in the 1930s. 44 deposits in total were discovered and explored since this period. The Kara-Obinskoye and Novo-Shandashinskoye sections were explored during the late 1970s by core drilling on a 12.5-25m x 25m grid. The volume of exploration works done on the deposits were as follows:
Deposit |
|
Number of Holes |
|
Meters |
|
Samples |
Kara-Obinskoye |
|
4,498 |
|
79,400 |
|
46,490 |
Novo-Shandashinskoye |
|
780 |
|
7,770 |
|
6,135 |
The State Reserves Committee approved the Kara-Obinskoye and Novo-Shandashinskoye reserves for commercial production in the 1980s. These deposits, along with others in the region, were assigned to YuzhUralNickel during the Soviet era. YuzhUralNickel is a Russian company with a nickel processing plant in Russia located approximately 90 kilometers north of the Kempirsai deposits. Approximately 171 million tons of nickel ore have been mined from these deposits, including 770,000 tons from the Kara-Obinskoye and Novo-Shandashinskoye sections. During peak production in the late 1980s, almost five million tons of ore were mined annually from the Kempirsai deposits. Active mining of the Kempirsai deposits was discontinued in 1996.
The Kempirsai deposits remained the property of YuzhUralNickel after the break up of the Soviet Union until 1996, when a joint venture between YuzhUralNickel and the Kazakhstan State Property Committee was formed. Because of a lack of Russian interest in developing this deposit in Kazakhstan, the joint venture was unsuccessful. In 1999 the rights to the Kara-Obinskoye and Novo-Shandashinskoye nickel deposits and Mamyt coal deposit were acquired by KKM from the joint venture. Due to a lack of funding and processing capability, combined with market conditions and the nickel content of Kempirsai ore, KKM has not engaged in active or significant mining activity since acquiring the deposits.
16
Historically, the Kempirsai deposit was open-pit mined, with maximum mining depths of approximately 20 meters. We anticipate that the Kempirsai deposit will be open-pit mined in the future.
Plant, equipment and infrastructure
KKM owns fuel tanks, locomotives, rail cars, railway cranes, bridge cranes, railway cisterns, maintenance equipment, excavators, motor graders, passenger vehicles, passenger buses, heavy dump trucks, hoppers, scales, lathes, forging hammers, presses, grinding, milling and boring machines, boilers, electrical substations, office equipment, business machines, portable communication equipment, laboratory equipment and multiple buildings. The machinery was manufactured between 1950 and the present. The buildings were built between the 1940’s and the early 1990’s. Our equipment and infrastructure in its current state has the capacity to mine approximately 250,000 tons of ore annually. Much of our existing equipment and buildings will need repair and refurbishing prior to being put into active operation. We estimate the cost of these repairs to be approximately $1,000,000. Once repaired, we expect our infrastructure and equipment to have a standing capacity to mine up to 500,000 tons of ore annually. According to a preliminary feasibility study prepared by Wardell Armstrong International, to meet a production rate of 3,400,000 tons of ore annually, our mining fleet will need to be enhanced with several new pieces of equipment, including primary digging machines, ancillary front end loaders and railway rolling stock in the amount of $14.4 million.
In addition to the rail and road infrastructure discussed above, 220 and 110 kilovolt high voltage power lines run nearby the Kempirsai deposits and the Buhara-Ural gas pipeline runs approximately 10 km to the east of our nickel deposits, (see “Kempirsai Project Location Map” included in “Location and access to our properties” in this Item 1 “Business.”) We can access water from the lakes around Badamsha. In the future, we also plan to use coal from our Mamyt deposit to supply power for an ore processing plant.
Costs
Since the date we acquired KMI in October 2005 through December 31, 2007, KKM has expended approximately $17,740,000 at the Kempirsai deposits. We anticipate future planned costs to be up to $600 million, depending on technology and capacity of the processing plant we plan to build at the Kempirsai deposit as discussed herein greater detail in the “Processing” section of this Item 1 “Business.” We plan to spend approximately $20 million in 2008, depending on ore sells, in the further development of the Kempirsai deposit and in the “Plan of Operations” section of Item 6. “Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
Gornostai
In February 2004, Kaznickel acquired a concession for exploration and development of the Gornostai nickel and cobalt deposit (contract No. 1349 registered by the MEMR), covering 12,232 acres in eastern Kazakhstan.
17
Historical exploration activities
We are at the exploration stage on the Gornostai deposit. This deposit was discovered in 1958. From 1960 to 1968 a series of geological and prospecting surveys and evaluation work was performed on both sections of the deposit by the Semipalatinsk Expedition to evaluate available nickel and cobalt ore reserves. The surveys identified and explored 21 ore bodies on the South section and two ore bodies on the North section of the deposit. These exploration works tested the deposit to depths of around 50-75 meters in the South section and up to 150 meters in the North section.
In the South section, drilling was undertaken on a 200-400 meter x 100-200 meter grid. In total 2,067 shallow depth holes with a total length of about 60,000 m and several deep holes with a total length of 2,857 meters were drilled. 48 pits varying in depth between 4.3 – 24.6 meters (570 meters in total) were explored around drill hole to check core sample results. In 1965 two pits were explored for metallurgical samples. Sample weights were 1.3 and 3.6 tons. Samples were tested at the VNIITzvetmet Institute in Ust-Kamenogorsk, Kazakhstan. Metallurgical tests were carried out at pilot-plant scale using four options; ferronickel electro smelting, matte electro smelting, sulphuric acid, and carbonate – ammonia leaching.
In the North section, drilling was undertaken primarily on a 1,600 meter x 400 meter grid. Ore bodies of significant thickness, up to 40 meters, with nickel content up to 3.64% (average 1.55%) were identified. These deposits were located at depths between 40-90 meters.
The Gornostai deposit, however, was abandoned as reserves around Norilsk in Russia were considered more attractive because of larger reserves and higher nickel content. Moreover, the Norilsk reserves were already at the production stage. In addition, a Soviet army nuclear test site, similar to the Nevada Test Site, was located near the Gornostai deposit. The surrounding territory, including the deposit, was considered a secret military zone. For these reasons, further exploration of the deposit was discontinued in 1968.
The last nuclear testing in the area was conducted in 1989. Recent tests show that the radiation levels in the soil, water and air are within normal ranges.
Exploration activities
Since acquiring Kaznickel, consistent with the terms of the current three-year work program for the deposit approved by the MEMR in 2005, we have engaged in exploration activities within the Gornostai licensed territory to determine the characteristics of this deposit. During 2007 we drilled 619 holes to a total depth of 15,625 meters, and an average depth of 25 meters per hole, and have taken 8,370 geochemical and core samples. 14 exploration pits (173 meters total depth) were made on the South section and 340 channel samples were collected. During 2006 we drilled 488 holes to a total depth of 12,652 meters, and an average depth of 30 meters per hole, and have taken 6,755 geochemical and core samples All samples collected in 2006-2007 were assayed by CenterGeoAnalit LLP, a nationally accredited independent laboratory located in Karaganda, Kazakhstan, to perform spectrum and quantity analysis to identify the content of nickel, cobalt and iron. During 2005 we drilled 42 holes to a total depth of 1,065 meters, and an average depth of 30 meters and have taken 595 samples to the Institute of Nonferrous Metals, located in Ust-Kamenogorsk, Kazakhstan where these samples represent ordinary core samples for nickel and cobalt content
18
As discussed above, currently the exploration stage of our license runs through February 2010 due to the second two-year extension of exploration stage. During the exploration stage we are required to engage in certain activities to determine the existence of commercially producible mineral reserves. We have planned the following exploration activities for 2008 and 2009, which we believe will be sufficient to both satisfy our Annual Work Program requirements and to help us establish commercially producible reserves within the Gornostai deposit. Once we establish commercially producible reserves, we plan to move to commercial production at the Gornostai deposit.
Activity |
|
Quantity |
|
Anticipated Timetable |
|
Estimated Cost |
|
|
|
|
|
|
|
Core drilling on North |
|
2,000 meters 15 holes |
|
April 2008 - June 2009 |
|
$250,000
|
|
|
|
|
|
|
|
Core sampling and sample preparation |
|
1,000 samples |
|
April 2008 - July 2009 |
|
$10,800 |
|
|
|
|
|
|
|
Assaying and metallurgical tests |
|
1,000 samples |
|
January 2008 - October 2008 |
|
$95,000 |
|
|
|
|
|
|
|
Interpretation of exploration results and preparation of the report and reserve estimate for submission to the State Reserves Committee |
|
|
|
January 2008 - December 2008 |
|
$145,000 |
|
|
|
|
|
|
|
The PFS for getting the reserve estimate that complies with the standards established by the SEC |
|
|
|
July 2008 - July 2009 |
|
$400,000 |
|
|
|
|
|
|
|
A local drilling company will be contracted for drilling activities. Core sampling, core logging and results interpretation will be carried out by our own in-house geologists, who have 10-30 years experience in such activities. Core preparation will be conducted by the preparation laboratory of SemGeo LLP, a third party with years of experience in the local market. CenterGeoAnalit LLP will carry out the assaying. Wardell Armstrong International will be contracted for performance of the feasibility study.
Core sampling, assaying and quality assurance/quality control
We have and will continue to conduct core sampling over the full length of the exploration hole. In general, sample intervals were 1-2 meters, which produced 2-5 kilograms of sample from each interval. Cores are not cut because cutting fractures the rocks. Samples are undertaken of the whole core.
All sample preparation done to date has been done at the SemGeo LLP laboratory, which is located approximately 120 kilometers from the Gornostai deposit. Whole core samples are sent to SemGeo in 2-5 kilogram labeled Hessian bags which are stacked in racks and dried at approximately 90° C. Samples are then sent to a small jaw crusher that reduces the whole sample to 4-5 millimeters. The sample is then sent to a roll crusher where it is reduced to 1-2 millimeters. The equipment is cleaned with compressed air between samples. Samples are then split by cone and quartering with opposite quadrants combined before being sent to the disc grinder where the sample is reduced in size to 74 micrometers. Every fifth sample is checked by sieving to see if it complies with this grain size. As an additional check, every thirtieth sample is waste rock to act as a “blank” control.
19
From the sample preparation facility, approximately 60 grams of pulverized sample was sent to the CenterGeoAnalit LLP laboratory for assay, while the pulps are kept at the sample preparation facility. Assaying includes the quantitative determination of the main ore components, including nickel, cobalt and iron.
Composite samples were produced to determine the chemical composition of slag-forming oxides, detrimental impurities and accompanying components in the ores. Composites are made up from three to five individual samples from one intersection by taking material from duplicates of analytical samples proportional to their length. The maximum weight of a composite sample was 250 grams.
For quality control, each of 30 samples includes approximately 10% checks comprising of one blank, one duplicate and one standard. As standards, we use the certified Reference Samples from GEOSTATS PTY LTD (Australia). We have 11 standards with nickel grade varying from 0.02% to 1.51%. In the event an assay result of the Reference Sample shows >2 or <2 standard deviations from the accredited value, the whole batch will be re-assayed.
Submission of report and reserves estimate to the State Reserves Committee
We will retain a third party to work with our in-house geologists to prepare the report and reserve estimate for submission to the State Reserves Committee in connection with our application to move the Gornostai deposit from exploration phase to commercial production phase. We have not yet selected a party to provide this service.
Infrastructure
In addition to the road and rail infrastructure discussed above, low tension power lines follow the railway and run within the Gornostai deposit. A high tension power line is located approximately 6-7 km to the south of the central part of the South deposit. We have access to water from Irtysh River. Unlike the Kempirsai deposit, there are no buildings and only minimal equipment at the Gornostai deposit.
Costs
From January 2005, when we acquired Kaznickel, to December 31, 2007, Kaznickel has spent approximately $5,140,000 in exploration activities at the Gornostai deposit. As with the Kempirsai deposit, we anticipate costs to be as high as $600,000,000, depending on capacity and technology of the type of processing plant we build at the Gornostai deposit as discussed herein greater detail in the “Processing” section of this Item 1 “Business.” We plan to spend approximately $1,500,000 in exploration activities and further development of the Gornostai deposit during fiscal 2008. For additional details please see the “Plan of Operations” section of Item 6. “Management’s Discussion and Analysis of Financial Condition and Results of Operations”.
Reserves
We do not have a current estimate of the ore reserves contained within our contract territories. While we have reserve estimates prepared during Soviet times, we do not know the accuracy of those reserve estimates and do not believe them to be to the standards established by the SEC. As discussed above, we are working with Wardell Armstrong International, an independent engineering firm, to provide us with an ore reserve estimate of our Kempirsai deposit. We anticipate releasing the result of this report during the 2008 fiscal year. We have also retained Wardell Armstrong International to undertake a feasibility study on the Gornostai deposit during 2008 with completion in 2009.
20
In accordance with SEC Industry Guide 7 mineral deposits qualify as “reserves” only to the extent some part of the deposit can be economically and legally extracted or produced at the time of the reserve determination. At the present time, we do not know whether the ore in our deposits can be economically extracted or produced. For this purpose, we have retained Wardell Armstrong International to conduct feasibility studies of our deposits to provide information on mining, processing, metallurgical, economic and other relevant factors to determine whether any of our deposits can be economically produced.
Because our deposits are without known reserves, you should consider our proposed programs to be exploratory in nature.
Processing
The design of the processing technology is highly dependent on the chemistry of the laterite ore specifically the iron, magnesium and silicon content and whether the metals are locked in a clay lattice. These factors will control metal recovery and processing economics in terms of energy consumption and acid consumption where leaching technologies are to be employed. High iron, low magnesium ores are traditionally processed by leaching (hydrometallurgical) methods whereas, high magnesium, low iron ores are traditionally processes by high temperature (pyrometallurgical) smelting methods.
High iron, low magnesia ores (limonite or nontronite / smectite) are typical of Australia and dryer climates. The nickel is relatively loosely bonded to goethite (hydrated iron oxide) and is usually suitable for hydrometallurgical processing. The nickel can be recovered by pressure acid leaching (“PAL”) and in some cases by selective reduction followed by ammonia-ammonium carbonate leaching.
High magnesia, relatively low iron ores (saprolite, serpentinite or garnierite) are typical of tropical climates such as Indonesia. These ores are traditionally processed by pyrometallurgical techniques, particularly smelting, as generally the nickel replaces magnesium in the magnesium-silicate lattice. In order to recover the nickel, the lattice has to be broken down thereby freeing the nickel. This is achieved by smelting under reducing conditions, i.e. drying, calcining/reduction and electric furnace smelting to produce ferronickel or nickel sulphide matte, which are further processed / refined to recover metal. High pressure acid leaching (“HPAL”) is also possible but large amounts of MgSO4 and MgCl2 are produced increasing the cost of regenerating acid; therefore heap leaching is more suitable to low clay content laterites.
There are three main treatment processes for nickel laterites:
|
• |
Conventional smelting (pyrometallurgical); |
|
• |
Reduction roast / ammonia leach processing (Caron Process); and |
|
• |
High pressure acid leaching (HPAL). |
21
Following is a diagram of the key component steps in each of these treatment processes:
Conventional Smelting
This process is typically used for the high nickel and low iron saprolite ores, and involves furnace smelting to form an iron-nickel product typically with 20%-40% contained nickel. Further treatment can increase this to around 78% nickel. The classic pyrometallurgical process for nickel laterite ores is commonly referred to as the RKEF process (Rotary Kiln-Electric Furnace). Ore is calcined and pre-reduced in a rotary kiln prior to smelting to produce FeNi (ferronickel) and slag. The RKEF process is widely used and there is a relatively good understanding of the process flow scheme. This technique is very simple and is used at the PT Inco mine in Indonesia, the Falcondo mine in Dominican Republic and the Cerro Matoso mine in Columbia. In recent years modifications to the RKEF route have been attempted, replacing the rotary kiln element with flash calcining and utilizing DC ARC furnace technology for the smelting stage (so-called NST process). These recent technologies have been studied at bench scale and proposed for full sized commercial installations, but, they are not widely practiced and regarded as emerging rather than established technology.
22
Reduction Roast / Ammonia Leach Processing (Caron Process)
The Caron process is used for ores with high iron and high magnesium content. The ore is roasted and then cooled in a non-oxidizing environment. The resulting material is leached with an ammonia solution and further treated to produce a nickel-rich product (75% nickel) which can then be refined to produce nickel metal and other by products. This process usually yields lower nickel recoveries than with other types of laterite ore processing, an example is BHP Billiton’s Yabulu refinery in Queensland, Australia.
High Pressure Acid Leaching (HPAL)
The HPAL process is used where there is high iron, limonitic ores with low magnesium and silica such as the dry laterites found in Australia. The process involves the dissolution of limonite ores in acid under high pressures and temperatures. This liberates the nickel and other metals in solution and allows concentration and processing to produce an intermediate nickel product which can be further refined. Leaching occurs at 250°C to 270°C, with high acid consumption. Existing operations include plants at Murrin Murrin, Cawse (Australia), Moa Bay (Cuba) and Rio Tuba (Philippines). Upcoming projects include Goro (New Caledonia) and Ravensthorpe (Australia). HPAL technology was expected to change the shape of the industry cost curve. However, existing equipment has proven inadequate for the required high temperatures, pressures and acid strengths. This has resulted in longer than expected ramp-up schedules and significant cost overruns at a number of proposed HPAL facilities.
In addition, several low-tech processes are currently in development. A description of each process follows:
Heap Leaching
Heap leaching is a process currently in development that has been designed to process a range of ore types. The process is low-tech, with modest capital and operating costs. Ore is leached for between 150 and 700 days. The process uses a reductant for cobalt extraction. During downstream processing, iron is removed from goethite, jarosite and hematite, with the precipitate nickel forming as mixed sulphide or hydroxide. Minara Resources is currently undertaking an R&D project at Murrin Murrin to allow nickel/cobalt heap leaching, initially to process ore rejects (scats) to run in parallel with its HPAL operation. The other committed project is European Nickel’s Caldag deposit in Turkey which is currently under construction.
Atmospheric Leaching
An alternative lower cost method of processing ore is atmospheric leaching, where limonite ores are leached with the addition of sulphur dioxide for cobalt extraction. Atmospheric leaching requires very high acid usage. This process is in the early stages of development and is not currently used operationally.
23
Hydrochlorination
The KMI acquisition gave us the rights to a proprietary technology for processing nickel and cobalt ores. While this technology has not previously been used to process nickel and cobalt ores, it is based on the same principles used to process titanium and other rare earth metals in Kazakhstan and Russia. The processing technique utilizes hydrogen chloride to leach out the nickel and cobalt ores with sublimation of the nickel and cobalt chlorides occurring at 1,050-1,100 (Degrees) Celsius. This technology utilizes a closed-circle utilization chamber, which results in no emissions while achieving extraction rates comparable to pyrometallurgy and hydrometallurgy.
During 2006 we constructed a pilot plant at our Kempirsai deposit to test our hydrochlorination process. Our pilot processing plant has a processing capacity of 12.5 tons of ore per day. We performed initial testing and processed an aggregate of 10 tons of ore through the pilot plant from October 2006 to January 2007. The test results indicated the following issues that we are trying to resolve:
|
• |
the necessary equipment for the pilot plant is difficult to design, locate and procure; |
|
• |
the use of chlorides in the process creates a risk to personnel and the environment; |
|
• |
the difficulties in accomplishing isolation in the rotating kiln; and |
|
• |
winter weather conditions at our Kempirsai deposit, including up to 13 feet of snow and temperature as low as 31 to 40 degrees below zero Fahrenheit, require appropriate equipment to operate the pilot plant in harsh weather conditions. |
The initial tests of the pilot plant used head ore from our Kempirsai deposit. The average nickel content of our Kempirsai head ore is approximately 1.1 percent per ton. PIT Geoanalitika, an independent Kazakh company, conducted chemical analysis of several different samples of the pilot plant concentrates and found that nickel content following the hydrochlorination process increased 10 to 15 percent. We feel these initial results justify further research and development to optimize the process at the scale of the pilot plant with a view to employing the technology in commercial production in the future. Irrespective of our decision regarding the feasibility of a pyrometallurgical or hydrometallurgical processing plant at the Kempirsai deposit, we plan to continue testing and development of our hydrochlorination process in 2008.
Smelting in a Liquid Bath (Pyrometallurgical - Russian Technology or Vanyukov Process)
In 1949, the Moscow State Institute of Steel and Alloys proposed a process based on smelting in a liquid bath. This technology has been developed and, although little used in the West, has for more than 25 years been applied successfully as a standard metallurgical melting process, especially for the production of copper from both oxide and sulphide ores in the CIS countries. The first commercial application of this technology for the processing of nickel oxide ores to produce ferronickel commenced at Kombinat YuzhUralNickel (Russia) on July 12, 2004. Coal, coke or even methane can be used as the reducing agent. An advantage of the Vanyukov process over the more widely known RKEF process is that reduction and melting occurs in a single unit as opposed to having separate units (rotary kiln and electric furnace), thereby enabling potential capital cost savings. The ability to use coal, coke and/or methane as both a fuel and a reductant offers potential operational cost savings compared to the more traditional routes. Another possible advantage of the Vanyukov process is the considerably lower electrical power requirement compared to RKEF technologies. YuzhUralNickel is currently undergoing upgrading and once complete should demonstrate the commercial applicability of this process flow scheme.
24
Bioleaching
Low grade ores can also be treated through the environmentally safe hydrometallurgical process of bioleaching, a process currently undergoing successful trials at Radio Hill nickel mine by Titan Resources (Western Australia). Unlike other processes that release noxious sulphur gases, all the sulphides are converted into water-soluble sulphates.
Our Plans on Processing Technology
We currently have no processing facilities at either the Kempirsai or Gornostai deposits. We plan to construct processing facilities to process our ores. Soviet era data and our own activities indicate that the Gornostai and Kempirsai ores appear to be high magnesia, low iron ores. Based on this, the processing technique that has historically been most commonly used with ore like ours is pyrometallurgical processing. Heap leaching may also be possible.
We are working with Wardell Armstrong International, an independent engineering firm, to provide us with a feasibility study and an ore reserve estimate of our Kempirsai deposit. We anticipate releasing the result of this report during the 2008 fiscal year.
The feasibility study addresses relevant factors such as location, geology and mineralization, resources, mining, processing (which includes a review of available technologies), environmental issues and financial appraisal. The feasibility study considers the following production options:
|
• |
construction of a Rotary-Kiln-Electro-Furnace processing plant and integrated power station; |
|
• |
construction of a processing plant utilizing the Vanyukov process (Russian technology); and |
|
• |
construction of a heap or tank acid leaching processing plant. |
Currently, Wardell Armstrong International is conducting hydrometallurgical pilot test on a sample of the Kempirsai ore to determine whether nickel can be recovered using acid leach technologies. Also, we are waiting for pilot test results from a Russian institute and Wardell Armstrong International on the Vanyukov process. Once we receive the results of these tests we will be in the position to finalize our decision on the technology to be used for processing of the Kempirsai ore and develop a detailed plan for construction of a processing plant.
Tax and Royalty Scheme in the Republic of Kazakhstan
We are subject to the following taxes and royalties payable to the Republic of Kazakhstan:
Class of Tax or Royalty |
Basis of Tax |
Payable Period |
Annual Rate |
Corporate Income Tax |
Profits |
Monthly |
30% |
Social Tax |
Payroll |
Monthly |
21-26% |
VAT |
Value added |
Monthly |
14-20% |
Property Tax |
Property |
Quarterly |
1% |
Royalty (ore) |
Output volume |
Monthly/Quarterly |
2.21% |
Royalty (brown coal) |
Output volume |
Monthly/Quarterly |
0.9% |
Excess Profit Tax |
Net income |
Annually |
4-60% |
25
Competition
Total nickel production worldwide was approximately 1,660,000 tons in 2007, according to USGS. Norilsk Nickel is the largest nickel producer followed by CVRD, BHP Billiton Plc, Eramet Group and Xtrata. These five companies account for approximately 59% of the world’s primary nickel production, while more than 30 medium to small size companies produce the remaining 41%.
Until recently, there were no nickel-producing companies in Kazakhstan. In February 2004, Oriel Resources, a London-based company, acquired 90% of Muzbel LLC, which holds exploration and extraction rights for the Shevchenko nickel deposit in northern Kazakhstan. Formed in July 2003, Oriel’s primary focus is the acquisition and development of advanced and high-quality chrome, nickel and other alloying commodities in the countries of the Former Soviet Union, primarily Kazakhstan and the Russian Federation. Oriel Resources owns Tikhvin chrome smelter near St Petersburg and has two deposits in Kazakhstan, including the Voskhod chrome and the Shevchenko nickel projects. The Shevchenko nickel project feasibility study showed that proven and probable nickel laterite ore reserves were 104.4 million tons of 0.79% nickel. In October 2006, Oriel Resources was acquired by IPH Polychrom Holding BV and Croweley International Limited. In March 2008, Mechel issued a statement, confirming its interest in acquisition of Oriel Resources. Mechel is the leading Russian coking coal and long steel producer, however recently its interest has expanded into utilities and ferroalloy manufacturing. Being the second-largest nickel producer in Russia after Norilsk Nickel and a significant ferrosilicon producer, Mechel is likely to derive some synergies from Oriel Resources assets.
Companies compete with each other generally across the globe and are best categorized by their size, reserve base, ore richness and production method, due to different extracting technologies applied, and the final product. Competition in this industry focuses largely on price and nickel content, whether it is sold in unwrought or chemical form. High nickel content material is sold at higher prices and is most sought after among customers. We do not anticipate direct competition from Oriel Resources should they pursue the plan to build a nickel processing plant. Nickel and cobalt are part of a global market and a worldwide demand, in which the supply is limited and the number of industries that use nickel and cobalt is increasing, thus ensuring a constant demand for additional production of nickel and cobalt.
We believe that the proximity of our Gornostai deposit to China and other Asian countries will provide us a competitive advantage. We have already been approached by Chinese metal companies interested in purchasing finished product once we reach production stage. As of this date we have not entered into definitive negotiations with any party.
Other Properties
Bekem leases approximately 400 square feet of office space located at 324 South 400 West, Suite 225, Salt Lake City, Utah 84101 for its administrative and registered office in the United States. We pay annual rents of approximately $7,800 for this space pursuant to a lease agreement that expires December 31, 2008 with an option to extend the lease for an additional year.
We also maintain a representative office in Almaty, Kazakhstan, where we lease 1,880 square feet of office space. The lease agreement expires on November 30, 2008. The monthly lease payment is $7,000. Upon consent of both parties, the agreement may be prolonged further.
26
Kaznickel LLP rents approximately 2,200 square feet office in Semey, Kazakhstan, for approximately $4,000 per month. Semey is the closest city to the Gornostai deposit. Kaznickel also rents approximately 5,300 square feet of warehouse space in Semey for $4,250 per month. Kaznickel uses this space to store test ore. These lease agreements expire in March 31, 2008. If at any time the owner of this space decides they need or want the space for other purposes, Kaznickel has no right to continue to occupy the space and could be forced to move.
KKM rents approximately 2,120 square feet of office space in Aktobe, Kazakhstan. KKM pays approximately US $5,500 per month for this space under a one-year lease agreement. This space is leased on a year-to-year basis. If at any time the owner of this space decides they need or want the space for other purposes, KKM has no right to continue to occupy the space and could be forced to move.
We believe each of the various office spaces rented by us and our subsidiaries are suitable and adequate for our needs.
Employees
We currently have approximately 259 full-time employees. We hire our employees under local labor contracts complying with the governing laws of the Republic of Kazakhstan. We believe we have satisfactory relations with our employees. We anticipate the need to hire additional personnel as operations expand. To date, neither our operations nor the operations of any of our subsidiaries have been interrupted by strikes or work stoppages. We have managed to maintain turnover of our work force at a low level. With the ongoing labor market monitoring, we believe that future new labor requirements can be satisfied and there is no significant risk of labor shortage.
Reports to Security Holders
We file annual and quarterly reports with the SEC. The public may read and copy any materials filed by the Company with the SEC at the SEC’s Public Reference Room at 100 F Street, N.E., Washington, D.C. 20549. The public may obtain information on the operation of the Public Reference Room by calling the SEC at (202) 551-8090. We are an electronic filer and the SEC maintains an Internet site that contains reports and other information regarding the Company that may be viewed at http://www.sec.gov.
Item 1A. |
Risk Factors |
Need for Additional Capital. We have no proven mineral reserves that conform to U.S. standards. The Gornostai and Kempirsai deposits have not yet entered the development stage with respect to our mineral interests and we have no production. We have realized only limited revenue from our Kempirsai deposit and no revenue from Gornostai and have very little ability to generate revenue. We do not expect this to change until we build and begin operating a nickel ore processing plant.
27
Management expects that the Company will need $50 million to $300 million to fund construction of a processing plant depending upon which technology and the size of the plant is deemed appropriate for processing our ores. We plan to begin construction in 2008 and, assuming funding is available, expect a processing plant to be operational in 2011. As we generate no revenue, we will need to raise additional capital through the sale of our equity and/or debt securities to fund plant construction.
While certain shareholders of the Company have indicated a willingness to provide us line of credit to assist us in meeting our 2008 annual work program expenses, we will likely need additional funds. Currently, we do not have any formal agreement with said shareholders to provide this line of credit and the shareholders are under no obligation to enter into any agreement or make available to us any funds.
We expect to be totally dependent upon investment funds to support our operations and satisfy our mineral license annual work program until such time as we begin to generate sufficient revenue to fund operations. We expect these funds will consist primarily of funds raised in equity and/or debt financing activities. We currently have no firm commitment from any party to provide us additional equity or debt financing and there is no guarantee that we will obtain additional financing on acceptable terms, or at all. If we are unsuccessful in obtaining additional funding during 2008, we will likely have insufficient funds to continue operations or to meet our annual work program requirements. If we cannot fulfill our annual work program requirement, we could be subjected to fines and penalties and even to the possible forfeiture of our subsoil use contracts and licenses.
Failure to Satisfy the Terms of Our Subsoil Use Contracts. Under our subsoil use contracts, we are required to satisfy our annual minimum work program requirements. There is no guarantee that we will be able to continue to meet these commitments in the future. If we fail to satisfy these commitments we may be subject to penalties and fines and/or the loss of one or more of our subsoil use contracts. The cancellation of our contracts would have a material adverse effect on our business, results of operations and financial condition. Although we would seek waivers of any breaches or seek to renegotiate the terms of our commitments in the event we do not believe we can meet such commitments, we cannot assure you that we would be successful in doing so.
For many years it was the practice of the MEMR that if a subsurface user for any reason could not fulfill certain conditions for a specific year, then such actions were extended to the next year. During the latter part of 2007, however, this practice was terminated by order of the president of Kazakhstan. This change in practice has created great uncertainty as to how the government will proceed in the future. This problem is enhanced by the fact that there exists no legislatively fixed mechanism for independent determination at a detail level, of the compliance by subsurface users with the parameters of their annual work program. Currently, this determination is made at the discretion of officials employed by authorized governmental body. These officials are authorized to suspend the activities of the subsurface user even for a minor breach of the detailed annual program. This fact coupled with the right of the competent body to unilaterally terminate a subsoil users contract if the contractor materially breaches the subsoil use contract obligations, indicates there is a risk that penalties and fines and/or the loss of one or more of our subsoil use contracts.
28
Foreign Operations. In recent years, the Republic of Kazakhstan has undergone substantial political and economic change. As an emerging market, Kazakhstan does not possess the well-developed business infrastructure that generally exists in more mature free market economies. As a result, operations carried out in Kazakhstan can involve significant risks that are not typically associated with developed markets. Instability in the market reform process could subject us to unpredictable changes in the basic business infrastructure in which we currently operate. Therefore, we face risks inherent in conducting business internationally, such as:
|
• |
Foreign currency exchange fluctuations or imposition of currency exchange controls; |
|
• |
Legal and governmental regulatory requirements; |
|
• |
Disruption of tenders resulting from disputes with governmental authorities; |
|
• |
Potential seizure or nationalization of assets; |
|
• |
Import-export quotas or other trade barriers; |
|
• |
Difficulties in collecting accounts receivable and longer collection periods; |
|
• |
Political and economic instability; |
|
• |
Difficulties and costs of staffing and managing international operations; and |
|
• |
Language and cultural differences. |
Any of these factors could materially adversely affect our business and financial condition. At this time, we are unable to estimate what, if any, changes may occur or the resulting effect of any such changes on us.
We also face a significant potential risk of unfavorable tax treatment and currency law violations. Legislation and regulations regarding taxation, foreign currency transactions and licensing of foreign currency loans in the Republic of Kazakhstan continue to evolve as the central government manages the transformation from a command to a market-oriented economy. The legislation and regulations are not always clearly written and their interpretation is subject to the opinions of local tax inspectors. Instances of inconsistent opinions between local, regional and national tax authorities are not unusual.
The current regime of penalties and interest related to reported and discovered violations of Kazakhstan’s laws, decrees and related regulations can be severe. Penalties include confiscation of the amounts at issue for currency law violations, as well as fines of generally 100% of the taxes unpaid. Interest is assessable at rates of generally 0.3% per day. As a result, penalties and interest can result in amounts that are multiples of any unreported taxes.
We may be adversely affected by Kazakh political developments, including the application of existing and future legislation and tax regulations.
Environmental Regulations. We are subject to stringent state and local laws and regulations relating to the release or disposal of materials into the environment or otherwise relating to environmental protection. These laws and regulations may require the acquisition of permits before extraction activities commence, restrict the types, quantities and concentration of substances that can be released into the environment in connection with extraction and production activities and impose substantial liabilities for pollution resulting from our operations. Failure to comply with these laws and regulations may result in the assessment of administrative, civil and criminal penalties, incurrence of investigatory or remedial obligations or the imposition of injunctive relief. Changes in environmental laws and regulations occur frequently, and any changes that result in more stringent or costly waste handling, storage, transport, disposal or cleanup requirements could require us to make significant expenditures to maintain compliance, and may otherwise have a material adverse effect on us as well as the industry in general. Under these environmental laws and regulations, we could be held strictly liable for the removal or remediation of previously released materials or property contamination regardless of whether we were responsible.
29
Liquidity of Common Shares. Our common stock has limited trading volume on the Over-the-Counter Bulletin Board and is not listed on a national exchange. Moreover, a significant percentage of the outstanding common stock is “restricted” and therefore subject to the resale restrictions set forth in Rule 144 of the rules and regulations promulgated by the U.S. Securities and Exchange Commission under the Securities Act of 1933. These factors could adversely affect the liquidity, trading volume, price and transferability of our common shares.
Nickel and Cobalt Prices can be Volatile. Commodity prices for nickel and cobalt fluctuate according to the influence of diverse market conditions that can affect the supply or demand for a commodity such as political and economic conditions and uncertainties; advances in exploration and development technology; introduction of competing products; and governmental restrictions on exploration, production and export of natural resources.
Competition. Our principal competitors are large established companies with substantial financial resources and market share. If we establish commercially producible reserves and move to production stage, we will have to compete for customers with these companies.
Item 1B. |
Unresolved Staff Comments |
|
None. |
Item 2. |
Properties |
The information set forth above in Item 1. Business is incorporated by reference herein.
Item 3. |
Legal Proceedings |
As discussed above, on December 10, 2007, the MEMR unilaterally terminated KKM’s contracts and licenses to explore for nickel, cobalt, brown coal, and other minerals within the Kempirsai and the Mamyt deposits on the basis that KKM had material failures in execution of the work programs associated with the contacts and licenses but did not detail those failures. In January 2008, KKM filed an action in the Court of Astana city against the MEMR challenging the legality of the unilateral termination of the KKM contracts and licenses by the MEMR for several reasons, including that the contracts and licenses had been terminated on grounds not provided for in the subsoil use contracts and legislation and there were no material failures in the execution of the work programs associated with the contracts and licenses. In February 2008, the Court of Astana city acknowledged that the unilateral termination of the contracts and licenses by the MEMR was illegitimate. The Court canceled the order of the MEMR relating to the unilateral termination of the licenses and reinstated the KKM contracts and licenses. In March 2008, the MEMR appealed the Court’s decision to the Republic of Kazakhstan Supreme Court. We anticipate the Supreme Court will announce its final decision on this matter by the end of April 2008.
We are not aware of any other material pending or threatened litigation or governmental agency proceeding to which Bekem or any of our directors, officers or affiliates are, or would be, a party.
30
Item 4. |
Submission of Matters to a Vote of Security Holders |
No matters were submitted to a vote of security holders during the quarter ended December 31, 2007.
Item 5. |
Market for Registrant's Common Equity, Related Stockholder Matters and |
|
Issuer Purchases of Equity Securities |
Our shares are currently traded on the Over-the-Counter Bulletin Board ("OTCBB") under the symbol BKMM. As of April 7, 2008 we had approximately 158 shareholders holding 125,172,011 common shares. Of the issued and outstanding common stock, approximately 13,358,592 are free trading, the balance are “restricted securities” as that term is defined in Rule 144 promulgated by the Securities and Exchange Commission.
Published bid and ask quotations from January 1, 2006 through December 31, 2007 are included in the chart below. These quotations represent prices between dealers and do not include retail markup, markdown or commissions. In addition, these quotations do not represent actual transactions.
|
Bid |
Ask |
||
2007 |
High |
Low |
High |
Low |
Oct. 1 thru Dec. 31 |
$1.90 |
$0.41 |
$2.00 |
$0.65 |
July 2 thru Sept. 28 |
1.90 |
1.25 |
2.00 |
1.35 |
Apr. 2 thru June 29 |
1.60 |
1.37 |
1.72 |
1.70 |
Jan. 3 thru Mar. 30 |
1.90 |
1.40 |
2.00 |
1.72 |
|
|
|
|
|
2006 |
High |
Low |
High |
Low |
Oct. 2 thru Dec. 29 |
1.80 |
1.75 |
2.00 |
1.85 |
July 3 thru Sept. 29 |
2.00 |
1.60 |
2.25 |
1.70 |
Apr. 3 thru June 30 |
1.95 |
1.05 |
2.20 |
1.50 |
Jan. 3 thru Mar. 31 |
2.00 |
1.25 |
10.01 |
1.35 |
The above information was obtained from Pink Sheets LLC, 304 Hudson Street, 2nd Floor, New York, New York 10013.
Dividends
We have not paid, nor declared, any dividends since our inception and do not intend to declare any such dividends in the foreseeable future. Our ability to pay dividends is subject to limitations imposed by Utah law. Under Utah law, dividends may be paid to the extent that the corporation's assets exceed its liabilities and the corporation is able to pay its debts as they become due in the usual course of business.
31
Securities Authorized for Issuance Under Equity Compensation Plans
Plan category |
Number of securities to be issued upon exercise of outstanding options, warrants and rights |
Weighted-average exercise price of outstanding options, warrants and rights |
Number of securities remaining available for future issuance under equity compensation plans (excluding securities reflected in column (a)) |
|
(a) |
(b) |
(c) |
Equity compensation plans approved by security holders |
-0- |
$-0- |
1,916,877 |
Equity compensation plans not approved by security holders |
-0- |
$-0- |
-0- |
Total |
-0- |
$-0- |
1,916,877 |
In March 2003, we adopted the EMPS Research Corporation 2003 Stock Option Plan (the "Plan") reserving 5,000,000 common shares for distribution under the Plan. The purpose of the Plan is to allow us to offer key employees, officers, directors, consultants and sales representatives an opportunity to acquire a proprietary interest in the Company. The various types of incentive awards which may be provided under the Stock Option Plan enable us to respond to changes in compensation practices, tax laws, accounting regulations and the size and diversity of our business.
On October 20, 2006 and March 25, 2008 the board agreed to award restricted stock grants to the following four officers or employees of the Company;
Name |
|
Position with the Company |
|
Number of Shares |
Yermek Kudabayev |
|
Chief Executive Officer, President, Director |
|
421,772 |
Zhassulan Bitenov |
|
Chief Financial Officer |
|
383,429 |
Nurlan Tajibayev |
|
Vice President, Director |
|
191,715 |
Alexander Rassokhin |
|
Exploration Manager |
|
86,207 |
The stock grants were valued at $1.95 per share, which represented the closing market price of our stock on October 20, 2006. The stock grants were made under our 2003 Stock Option Plan. The shares have been issued and are outstanding and are being held in escrow by the Company subject to the applicable vesting schedule for each grant. The grantees have the right to vote the shares, receive dividends and enjoy all other rights of ownership over the entire grant amount from the grant date, except for the right to dispose of or otherwise encumber the shares prior to satisfying the applicable vesting schedule. Shares will only vest to the grantee if the grantee is employed by the Company on the applicable vesting date. Any unvested shares at the time a grantee’s employment with the Company ceases, for any reason, shall be forfeited back to the Company.
Mr. Kudabayev’s shares vest as follows: 95,857 shares vested in April 2007, 115,029 shares vested in April 2008, and the final 210,886 shares will vest in April 2009 provided that the Company timely files its reports with Securities and Exchange Commission.
Mr. Bitenov’s shares vest as follows: one-fourth (95,857 shares) in January 2009 and one-fourth (95,857 shares) in January 2010, provided that the Company has timely filed its reports with Securities and Exchange Commission. The final one-half (191,715 shares) will vest in January 2011. Vesting during each year is contingent upon the Company timely filing of its reports with the Securities and Exchange Commission each year. Moreover, vesting in the third year is also contingent upon the Company having commenced commercial operations.
32
Mr. Tajibayev’s shares vest as follows: one-fourth (47,929 shares) vested on October 20, 2007, and one-fourth (47,929 shares) will vest on October 20, 2008, provided that the Company starts construction of the processing plant by October 20, 2008. The final one-half (95,857 shares) will vest on October 20, 2009 conditioned upon the Company having commenced commercial operations.
Mr. Rassokhin’s shares vest as follows: one-fourth (21,552 shares) vested on October 20, 2007 and one-fourth (21,552 shares) will vest on October 20, 2008, provided that in each year the Company timely performs the drilling work program requirements as dictated by the Republic of Kazakhstan’s Ministry of Energy and Mineral Resources. The final one-half (43,103 shares) will vest on October 20, 2009, conditioned upon the Company timely performing the drilling work program requirements, as dictated by the Republic of Kazakhstan’s Ministry of Energy and Mineral Resources during the third year and the Company having commenced commercial operations.
We have issued no other securities under the Plan.
In connection with a private placement we concluded on July 14, 2006, we issued to Aton Securities, the placement agent for the private placement, warrants to purchase up to 2,400,000 shares of our restricted common stock. The exercise price of the warrants is $1.17 per share. The warrants were immediately exercisable. These warrants expired unexercised on January 14, 2008.
Unregistered Sales of Equity Securities
We issued no securities during the quarter ended December 31, 2007. Subsequent to the quarter end, on March 25, 2008 the board agreed to increase the restricted stock grant to Yermek Kudabayev, our Chief Executive Officer, by an additional 38,343. On March 25, 2008 the board also made a restricted stock grant to Zhassulan Bitenov, our Chief Financial Officer, of 383,429 shares. For details regarding the terms and conditions of those restricted stock grants please see “Securities Authorized for Issuance Under Equity Compensation Plans” immediately preceding this section. Each of these individuals is a non US person resident in Kazakhstan. The restricted stock grants were made pursuant to an exemption from the registration requirements of the Securities Act of 1933, provided under Regulation S of the Securities Act of 1933.
Repurchases of Equity Securities
We did not repurchase any of our equity securities during the year ended December 31, 2007.
Transfer Agent
Our transfer agent and registrar is Interwest Transfer Company, Inc., 1981 East 4800 South, Suite 100, Salt Lake City, Utah 84117, Telephone (801) 272-9294.
33
Item 6. |
Selected Financial Data |
The selected consolidated financial information set forth below is derived from our consolidated balance sheets and statements of operations as of and for the years ended December 31, 2007, 2006 and 2005 and for the period from March 5, 2004 (the date of Inception) until December 31, 2004. The data set forth below should be read in conjunction with Item 6. “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and the consolidated financial statements and related notes thereto included in this Annual Report.
Consolidated Statements of Operations Data: |
|
|
For the Period from |
|
For the Period from |
|
|
|
|
|
March 5, 2004 |
|
March 5, 2004 |
|
|
|
|
(Date of Inception) |
|
(Date of Inception) |
|
For the Years Ended December 31, |
through |
|
through |
||
|
2007 |
2006 |
2005 |
December 31, 2004 |
|
December 31, 2007 |
General and administrative expenses |
$ 4,268,793 |
$ 3,136,715 |
$ 1,018,148 |
$ 99,509 |
|
$ 8,523,165 |
Research and development costs |
296,070 |
389,507 |
131,562 |
271,099 |
|
1,088,238 |
Exploratory costs at Gornostai deposit |
1,584,428 |
1,118,115 |
697,496 |
- |
|
3,400,039 |
Exploratory costs at Kempirsai deposit |
2,601,807 |
352,132 |
- |
- |
|
2,954,670 |
Loss from operations |
(9,259,321) |
(5,220,917) |
(1,907,838) |
(370,608) |
|
(16,758,684) |
Interest expense |
(1,018) |
(1,382,972) |
(293,451) |
- |
|
(1,677,441) |
Interest income |
324,976 |
85,337 |
- |
- |
|
410,313 |
Net loss |
(8,701,550) |
(4,706,122) |
(1,271,137) |
(245,090) |
|
(14,923,899) |
Basic loss per common share |
(0.07) |
(0.04) |
(0.03) |
(0.05) |
|
|
Balance Sheet Data: |
|
As of December 31, |
|||
|
|
2007 |
2006 |
2005 |
2004 |
Total current assets |
|
$ 1,919,931 |
$ 9,855,647 |
$ 452,406 |
$ 25,527 |
Property, plant and mineral interests, net |
|
14,226,359 |
13,870,563 |
10,938,368 |
777,051 |
Total assets |
|
16,450,637 |
25,097,927 |
11,430,015 |
817,695 |
Notes payable |
|
- |
- |
8,532,420 |
- |
Total liabilities |
|
1,958,446 |
2,200,048 |
12,347,567 |
880,111 |
Total shareholders' equity (deficit) |
|
14,492,191 |
22,897,879 |
(917,552) |
(62,416) |
The increase in our general and administrative expenses in fiscal 2006 and 2007 is mainly related to the acquisition of the Kempirsai deposit on October 24, 2005. This increase in general and administrative expenses is attributable to the significant increase in employees and employee-related costs as a result of the acquisition of KKM, as well as, costs associated with having licensed territories in both northeastern and northwestern Kazakhstan, increased office rents and consulting and travel expenses.
Exploratory costs at the Gornostai deposit commenced after the acquisition of Condesa Pacific, S.A. and its wholly owned subsidiary Kaznickel, LLP in January 2005. The increase in the exploratory costs occurred due to increased exploratory and drilling works at the Gornostai deposit in accordance with the subsoil use contract associated with that deposit.
Exploratory costs at the Kempirsai deposit mainly represent Kempirsai asset maintenance expenses and cost of extraction of ore. These costs are treated as exploratory costs because the Company is deemed to be an exploration stage company. During the twelve months ended December 31, 2007 we extracted 137,724 tons of ore, which cost $858,105, while no ore was extracted during 2006. Also, during 2007 we recognized $1,043,720 of impairment loss as a result of revisions to the recoverability of our long-lived assets.
34
Since we have been conducting exploratory activities and have not been generating revenues, our capital resources have consisted primarily of funds we have borrowed from related and non-related parties and the sale of our equity securities. Interest expenses as well as interest earned are directly dependent on the availability of borrowed resources and assets attracted from sale of equity securities. Losses from operations and net losses have been increasing due to increased exploratory works at the Gornostai deposit and maintenance and repair works of Kempirsai assets. We do not expect further increases in losses from operations.
Total assets and liabilities increased in 2005 with the acquisition of Kempirsai assets and issuance of notes payable to related parties. The notes payable were fully paid in 2006.
Item 7. |
Management's Discussion and Analysis of Financial Condition |
|
and Results of Operations |
For a complete understanding, this Management's Discussion and Analysis of Financial Condition and Results of Operations should be read in conjunction with the Consolidated Financial Statements and Notes to the Consolidated Financial Statements contained in this Form 10-K.
Since inception we have generated no revenue. We have spent millions of dollars to date and anticipate that we will spend significant additional capital before we begin to realize revenue from operations. As discussed above in Item 1 “Business” we have no proven mineral reserves that conform to U.S. standards. The Gornostai and Kempirsai deposits have not yet entered the development stage and we have no production. We have realized only limited revenue from our Kempirsai deposit and no revenue from Gornostai and have very little ability to generate revenue. We do not expect this to change until we build and begin operating a nickel ore processing plant. We are currently investigating the financial viability of various processing technologies for the construction of a processing plant to produce ferronickel at our Kempirsai deposit to allow us to begin realizing revenues. We expect we will need significant additional capital to fund construction of a processing plant in 2008-2011. If we are able to obtain the necessary funding to finance construction of the processing plant, we would not expect the plant to be operational prior to 2011. Because we do not currently generate cash flow and we do not anticipate generating significant cash flow until 2011 or later, if at all, we will be completely dependent on external funding, if any, to support our activities until such time as we are able to generate sufficient revenues to cover our expenses.
In July 2006 we raised $28,000,000 through a private placement of our equity securities which resulted in net proceeds to us of approximately $26,400,000 after deducting fees and costs. This represents only a small portion of the funds we will need to reach commercial production. Of the $26,400,000, as of December 31, 2007, we had spent approximately $25,700,000. Approximately $12,200,000 was used to repay loans, $4,200,000 was used on capital expenditures as a part of our annual work program obligations, approximately $2,300,000 was spent researching and developing our hydrochlorination technology and $7,000,000 was used as working capital. At December 31, 2007, we had cash on hand of $756,943.
We incurred net losses of $8,701,550 and $4,706,122 for the years ended December 31, 2007 and 2006, respectively and $14,923,899 for the period from March 5, 2004 (date of inception) through December 31, 2007. Current assets exceeded current liabilities by $1,000,533 and by $9,040,599 at December 31, 2007 and 2006, respectively. We anticipate the need to seek significant additional funding during fiscal 2008 to satisfy our annual work program obligations for this year. While certain shareholders have indicated an interest in extend to us a credit line to satisfy at least part of that obligation, we do not, at this time, have any signed agreement with said shareholders. There is no assurance that we will be able to obtain this credit line or additional funding on favorable terms, or at all. If we are unsuccessful in obtaining additional funding during 2008, we will likely have insufficient funds to continue operations or to meet our annual work program requirements. If we cannot fulfill our annual work program requirement, we could be subjected to fines and penalties and even to the possible forfeiture of our subsoil use contracts and licenses.
35
Results of Operations
As you read this Results of Operations section it is important to keep in mind that we acquired KMI and its operating subsidiary KKM on October 24, 2005. While KKM has not engaged in significant activity in recent years, it has engaged in significantly greater activity than Bekem or Kaznickel in years past. Prior to the acquisition of KMI, we were engaged in exploration of our Gornostai deposit.
General and Administrative Expenses
Our general and administrative expenses increased from $3,136,715 during 2006 to $4,268,793 during 2007. This 36% increase in general and administrative expenses is mainly attributable to an $840,000 increase in salary expense and related taxes as a result of an increase in the number of personnel we employ and salary increases for existing employees, as our subsidiary KKM hired a number of personnel to carry out development and testing of the pilot plant and additional geologists, metallurgists and ecology supervisors. We also hired additional in-house accounting, finance, legal and information technology personnel. We do not expect to hire a significant number of additional employees until such time as revenue or funding so justifies. Another contributing factor to the increase in general and administrative expenses was a $447,000 increase in professional fees, primarily attributable to increased legal and accounting fees and costs associated with a resource estimation prepared by a third party consulting firm.
Research and Development Costs
During 2007 we incurred research and development cost of $390,370. Of this amount $296,070 was related to preparation of the feasibility study on the Kempirsai deposits and $94,300 is related the development of our pilot processing plant. The cost of development of the pilot processing plant was capitalized as it represents tangible assets with alternative future use. During 2006 we realized research and development costs of $2,389,507 related to the pilot processing plant, $2,000,000 of which was capitalized and added to the cost of the pilot plant and $389,507 was expensed. We expect our research and development costs during the upcoming fiscal year will be higher than in 2007 as we continue research on processing technologies.
Exploratory Costs
Our exploratory costs increased from $1,470,247 during the twelve months ended December 31, 2006 to $4,186,235 incurred during the twelve months ended December 31, 2007. The increase occurred due to increased exploratory and drilling works at our Gornostai deposit and an increase in volumes of extracted ore and brown coal at our Kempirsai and Mamyt deposits. Because the Company is currently an exploration stage entity, extraction costs were expensed. During the twelve months of 2007 we completed drilling of 619 test holes (611 test holes in the South section and 8 test holes in the North section of the Gornostai deposit) to an aggregate depth of 15,625 meters (14,965 meters in the South section and 660 meters in the North section). By comparison, during the twelve months ended December 31, 2006, we drilled 488 holes in the South section (no holes in the North section of the Gornostai deposit) to an aggregate depth of 12,652 meters. During 2007 and 2006 the cost of exploratory drilling works at the Gornostai deposit amounted to $1,584,428 and $1,118,115, respectively.
36
During the twelve months ended December 31, 2007 we extracted 137,724 tons of ore. By comparison, during the twelve months ended December 31, 2006, we extracted no ore. The ore extraction costs of $858,105 were included into exploratory costs since the Company is in the exploration stage.
Also, during 2007 the Company recognized $1,043,720 of impairment loss as a result of a revision of recoverability of its long-lived assets. The balance of exploratory cost of $726,736 and $352,132 for 2007 and 2006, respectively, represent the cost of maintenance and repair works of Kempirsai assets.
Accretion Expense
We realized accretion expense of $79,288 during the twelve months ended December 31, 2007. During the twelve months ended December 31, 2006 we realized accretion expenses of $72,865. This increase in accretion expense is due to the normal increase in the asset retirement obligation balance over time. We believe accretion expense during upcoming fiscal year will continue to increase at a rate consistent with the rate experienced during the 2007 fiscal year.
Grant Compensation Expense
During the year ended December 31, 2007 we incurred $428,935 in grant compensation expense for restricted stock grants issued to certain officers and key employees. During 2006 the grant compensation expense amounted to $151,583. The increase occurred because, as noted above, the grants were not made until the fourth quarter 2006. The increase is less than initially expected due to the resignation of Marat Cherdabayev who served as our Chief Executive Officer and President from May 2005 to June 2007 and whose shares did not vest because he resigned his positions with the Company prior to the vesting dates of his grant.
Total Operating Expenses and Loss from Operations
As a result of reasons described above, our total expenses and loss from operations increased by 77%, from $5,220,917 during fiscal 2006 to $9,259,321 during fiscal 2007. We expect our total expenses in 2008 will continue to increase but at a lower rate than experienced during the 2007 fiscal year. Also, we expect we will continue to generate losses until such time as we engage in significant revenue generating activities, which most likely will not occur before 2011.
Interest Income
During the twelve months ended December 31, 2007, we realized interest on deposits of $324,976. By comparison during the twelve months ended December 31, 2006 we earned $85,337 of interest on deposits. Interest on deposits increased in 2007 because the deposit accounts in which our funds are held provide for higher rates of return, varying from 3% to 8%, the longer the funds are left on deposit, with determination of the interest rate and recognition of the interest earned at the time the funds are withdrawn or upon the maturity date of the deposit. All deposits matured by the end of 2007 which resulted in the realization of higher rates of return as compared to the fiscal 2006.
37
Interest Expense
During 2007 we realized interest expense of $1,018 compared to $1,382,972 during 2006. The reduction in interest expenses occurred due to retirement of our outstanding notes payable and related party notes during 2006. During 2006 interest expense resulted from retiring notes payable prior to their due dates and the full recognition of the debt discount of $885,970 on notes attracted at the below market rates. As we experience shortages of funds to finance future activities, we expect that interest expenses will increase if our activities are financed by borrowings.
Translation Adjustment
The consolidated financial statements are presented in U.S. dollars. The functional currency of our subsidiary Kaznickel is U.S. dollars. The functional currency of our subsidiary KKM is Kazakh tenge. Results of operations are translated into U.S. dollars at the average exchange rates during the reporting period. All balance sheet accounts of KKM are translated at exchange rates on the date of the financial statements and translation differences are included in stockholders’ equity as cumulative translation adjustments. The translation adjustment balance recorded in the consolidated statement of shareholders’ equity (deficit) also includes foreign exchange differences arising from intercompany transactions that are of long-term-investment nature (long-term intercompany loans) in accordance with the requirements of FAS 52.
Non-monetary assets and liabilities of Kaznickel are translated into U.S. dollars, using historical or average exchange rates and monetary assets and liabilities are translated into U.S. dollars using exchange rates on the date of the financial statements where translation differences are included in results of operations.
Exchange Loss and Gain
During 2007 we realized an exchange loss of $64,280 compared to an exchange loss of $174,278 during 2006. As with translation adjustment, we recognize exchange gain or loss as a result of having subsidiaries operating in foreign countries whose functional currency may or may not be the U.S. dollar. This requires us to translate results of operations from a foreign currency, in this case Kazakh tenge, to U.S. dollars at the average exchange rate, where results of operations include exchange gains or losses on the U.S. dollar monetary assets and liabilities.
Net Loss
For all of the foregoing reasons, during the twelve months ended December 31, 2007 we experienced a net loss of $8,701,550 compared to a net loss of $4,706,122 during the twelve months ended December 31, 2006. We anticipate we will continue to experience increasing net losses until we are able to engage in nickel and cobalt ore extraction, processing and sales.
Liquidity and Capital Resources
Our capital resources have consisted primarily of funds we have borrowed from related and non-related parties and the sale of our equity securities. As discussed above, in July 2006 we raised $28,000,000 through the private placement of our equity securities which resulted in net proceeds to us of approximately $26,400,000 after deducting fees and costs. These funds, however, represent only a portion of the funds we will need to move to commercial production. As of December 31, 2007, we had cash on hand of $756,943. We have used approximately $25,700,000 of the funds raised in the private offering to repay loans to related and unrelated third parties in the amount of $12,200,000; for ongoing drilling and exploration of our Gornostai deposit in the amount of $2,600,000; $2,000,000 for the construction of our hydrochlorination pilot plant, $300,000 for testing of our pilot plant; $1,600,000 was spent on other capital expenditures as a part of our minimal working program and $7,000,000 for working capital.
38
As noted above, we incurred net losses of $8,701,550 and $4,706,122 for the years ended December 31, 2007 and 2006, respectively and $14,923,899 for the period from March 5, 2004 (date of inception) through December 31, 2007. Current assets exceeded current liabilities by $1,000,533 and by $9,040,599 at December 31, 2007 and 2006, respectively.
We anticipate the need for substantial additional capital resources during the 2008 fiscal year to meet the annual work program obligations associated with our Kempirsai and Gornostai deposits. Certain shareholders of the Company have indicated a willingness to provide us a line of credit to satisfy at least part of our 2008 annual work program requirement. We do not, however, have any formal agreement with said shareholders to provide this line of credit and the shareholders are under no obligation to enter into any agreement or make available to us any funds. As discussed above, if we are unsuccessful in obtaining additional funding during 2008, we will likely have insufficient funds to continue operations or to meet our annual work program requirements. If we cannot fulfill our annual work program requirement, we could be subjected to fines and penalties and to the possible forfeiture of our subsoil use contracts and licenses.
During the 2007 and 2006 fiscal years, cash was primarily used to fund operations and repay notes payable to related and non-related parties. See below for additional discussion and analysis of cash flow.
December 31, |
2007 |
2006 |
|
|
|
Net cash used in operating activities |
$(6,900,230) |
$(5,617,395) |
Net cash used in investing activities |
(953,046) |
(2,722,288) |
Net cash provided by financing activities |
– |
16,473,112 |
Effect of exchange rate changes on cash |
26,539 |
360,885 |
NET INCREASE (DECREASE) IN CASH |
$(7,826,737) |
$ 8,494,314 |
In fiscal 2007 net cash used in operating activities was $6,900,230, compared to net cash used in operating activities of $5,617,395 in fiscal 2006. This increase in net cash used is primarily the result of increases in exploratory activities which led to a significant increase in net loss as discussed above. The significant increases in expenses were in the areas of general and administrative expenses and exploratory costs.
Net cash used in investing activities during twelve months ended December 31, 2007 was $953,046. The investments were made mainly on acquisition of machinery and equipment and transport facilities needed for future mining activities at the Kempirsai deposit. During 2006 we invested $2,577,696 to acquire equipment, which is primarily used in KKM’s pilot plant.
There was no cash provided by financing activities in fiscal 2007 compared to net cash provided by financing activities of $16,473,112 in fiscal 2006. As discussed herein, during the third fiscal quarter 2006, we raised $28,000,000 in a private placement of our equity securities. This resulted in net proceeds to us of approximately $26,422,386 after deducting fees and costs. During the 2006 fiscal year, we realized proceeds from notes payable and notes payable to related parties of $1,996,731 and $251,900, respectively. These funds were borrowed prior to our private placement in July 2006 and were used to fund our activities during the first half of the year. We spent $12,727,001 of the funds raised in the private placement to repay notes payable, notes payable to related parties and interest expense. As a result, at December 31, 2006, we had repaid all of our notes payable and notes payable to related parties.
39
Plan of Operations
As of December 31, 2007 we had cash on hand of $756,943. Depending of the result of the litigation process with the MEMR, as discussed above, we anticipate the need to raise an additional $20,000,000 to meet our annual work program requirements and planned activities. We plan to seek these funds through a combination of private equity and debt financing. Following is a brief description of how we plan to allocate such funds during fiscal 2008.
Hydrochlorination Processing Technology Testing
During the next twelve months we expect to spend approximately $200,000 for testing at our pilot plant of the mineral concentrating capability of our proprietary hydrochlorination processing technology and to formulate required procedures, protocols and operational guidelines.
Drilling and Core Analysis
We will allocate approximately $400,000 to drilling and exploration. This includes drilling of approximately 1,000 meters of the North section of the Gornostai deposit, sample assaying, sample selection and handling and preparation of the geological report on the South section for the State Reserves Committee. These services will be performed by local drilling company and research institutes.
Extraction Costs
We plan to spend $1,500,000 for extraction of 350,000 tons in order to meet KKM’s contract obligations.
Feasibility Studies
We anticipate spending approximately $400,000 for the preparation of the feasibility study for the construction of the pyrometallurgical and hydrometallurgical plant in the Gornostai deposit. This study will be prepared by Wardell Armstrong International. Also, we plan to spend approximately $200,000 for completion of the pre-feasibility study for the construction of the pyrometallurgical and hydrometallurgical plant in the Kempirsai deposit. This amount includes involvement of the Russian institute Gipronickel (St Peterburg) for the pilot testing on the Russian technology and Wardell Armstrong International for completion of the pilot testing on the acid leaching technologies. The completion of the study on the Kempirsai is expected by the end of first half of 2008 with indication of estimates for capital and operational expenditures which will allow us to make final decision on the technology to be used for processing of the Kempirsay ore and start the feasibility study and design of the processing plant.
Processing Plant Design
As discussed in the preceding paragraph, we plan to spend approximately $10,700,000 for design of the processing plant in the Kempirsai field during second half of 2008. It also depends on the result of the litigation process with the MEMR and our ability to raise $20,000,000 equity financing.
40
Field Modernization
We have allocated approximately $1,000,000 for modernization of the infrastructure and equipment including rail roads and electricity grid lines at the Kempirsai deposit to allow us to increase our ore extracting capabilities.
Administrative Expenses
We plan to allocate approximately $5,000,000 for administrative expenses during the next twelve months, which include expenses of maintaining offices in the United States and Kazakhstan, for salaries and taxes.
Professional Fees
We expect to incur approximately $600,000 in expenses for services of our financial auditors and securities attorneys during the next twelve months.
Additional Activities
As discussed in Item 1 “Business” we are currently considering alternatives to a hydrochlorination processing plant to allow us to begin to generate cash flow from the Kempirsai deposit. We do not currently have sufficient cash on hand to fund these activities, nor have we budgeted for these items in our 2007 budget. Therefore, to undertake these activities we will need to obtain additional capital either through equity or debt financing. We plan to seek this funding through private equity investments or debt financing to be obtained from banks or shareholders. We currently have no firm commitment from any party to provide us additional funding, except discussed above.
Also, on November 7, 2007 we signed the agreement with a Russian processing plant for sale of 4,500 tons of ore for testing purposes. As of the date of this report, we have shipped approximately 600 tons of ore. The remaining 3,900 tons of ore are in the shipping process. We have agreed with the Russian processing plant to commence negotiations for the sale of up to 500,000 tons of ore annually depending on the test processing results of the initial 4,500 tons of ore. We plan to start this negotiation at the second half of 2008.
Summary of Material Contractual Commitments
The following table lists our significant commitments as of December 31, 2007:
Contractual Commitments |
Total |
Payments Due by Fiscal Year |
||
Less than 1 year |
2-3 years |
4-5 years |
||
|
|
|
|
|
|
|
|
|
|
Kaznickel’s work programs (1) |
$ 4,031,221 |
$ 1,500,000 |
$ 2,531,221 |
-0- |
|
|
|
|
|
KKM’s work programs (2) |
$130,000,000 |
$15,000,000 |
$85,000,000 |
$30,000,000 |
|
|
|
|
|
Operating leases |
$ 328,836 |
$ 328,836 |
-0- |
-0- |
Total |
$134,360,057 |
$16,828,836 |
$87,531,221 |
$30,000,000 |
41
(1) |
Each year we must submit the Annual Work Program to the MEMR. The Annual Work Program indicates scopes of mining works for exploration, production and finance costs. The work programs for Kaznickel represent estimates based on the subsoil use contract and results of the preliminary discussions and negotiations with the MEMR which will be finalized after the extension contract is signed by the MEMR. The estimates include $550,000 for exploration drilling (2,000 meters - in 2008 and 2009), sampling and assaying (1,000 core samples in 2008 and 2009), metallurgical tests and preparation of the report to the State Resource Committee. Also, the estimates include $750,000 for repayment the Republic of Kazakhstan for historical costs incurred by it in undertaking geological and geophysical studies and infrastructure improvements related to the Gornostai deposit. The repayment terms of this obligation will not be determined until such time as we apply for and are granted a contract to engage in commercial production by the Republic of Kazakhstan where we anticipate that we will apply for a commercial production contract within the next 1-3 years. However, there is no guarantee when or if we will discover commercially producible reserves within the Gornostai deposit. Should we decide not to pursue a commercial production contract, we can relinquish the Gornostai deposit to the Republic of Kazakhstan in satisfaction of this obligation. Also, the estimates include the subsoil use contract requirement to donate $300,000 for the ongoing development of Astana and Kurchatov, which are cities in Kazakhstan. |
(2) |
Each year we must submit the Annual Work Program to the MEMR. The Annual Work Program indicates scopes of mining works for exploration, production and finance costs. KKM’s work programs represent estimates based on the subsoil use contract and the financial model which is attached to the working program as a justification of the hydroclorination technology. The contract requires to invest up to $100,000,000 for construction of a processing plant during the contract period. As discussed above, prior to the end of 2007, it has been the practice in Kazakhstan that if the subsurface user, for any reason, could not fulfill the conditions of its annual work program during a given year, those conditions were extended to the next year because the subsoil user’s obligations under its contract were effective throughout the contract duration. This practice, however, was terminated by order of the president of Kazakhstan at the end of 2007. It now appears that the government will impose fines and/or penalties and may cancel subsurface use contracts if the contract holder fails to satisfy the annual work program on a yearly basis. Also, the estimates include $950,000 for removal of all equipment and remediate the property. This remediation work can be done during the term of the subsoil use contract or upon completion of the terms of the contract. The 2008 work program for KKM is under discussion and negotiation and will be finalized after the Supreme Court announces its final decision in connection with our appeal of the unilateral cancelation of our rights to the Kempirsai deposits. |
We are required, under our subsoil use contracts to submit a proposed Annual Work Program to the MEMR for approval. Failure to meet the Annual Work Program requirements could cause us to lose our concessions. For more information regarding this requirement please see Item 1. “Business” in the section “Working Programs of our Subsidiaries.”
Off-Balance Sheet Financing Arrangements
As of December 31, 2007 and 2006 we had no off-balance sheet financing arrangements.
Recent Accounting Pronouncements
In September 2006, the Financial Accounting Standards Board (FASB) issued SFAS No. 157, Fair Value Measurements, which defines fair value, establishes a framework for measuring fair value in generally accepted accounting principles and expands disclosures about fair value measurements. SFAS No. 157 is effective for fiscal years beginning after November 15, 2007, and interim periods within those fiscal years. In February 2008, the FASB issued FASB Staff Position (FSP FIN) No. 157-2 which extended the effective date to fiscal years beginning after November 15, 2008. The Company does not expect the adoption of SFAS No. 157 to have a material impact on our consolidated financial statements.
42
In February 2007, the FASB issued SFAS No. 159, The Fair Value Option for Financial Assets and Financial Liabilities. SFAS No. 159 permits companies to choose to measure many financial instruments and certain other items at fair value. SFAS No. 159 is effective for financial statements issued for fiscal years beginning after November 15, 2007. The Company does not expect the adoption of SFAS No. 159 to have a material impact on our consolidated financial statements.
In December 2007, the FASB issued SFAS No. 141(R), Business Combinations, and SFAS No. 160, Noncontrolling Interests in Consolidated Financial Statements. SFAS No. 141(R) requires an acquirer to measure the identifiable assets acquired, the liabilities assumed and any non-controlling interest in the acquiree at their fair values on the acquisition date, with goodwill being the excess value over the net identifiable assets acquired. SFAS No. 160 clarifies that a non-controlling interest in a subsidiary should be reported as equity in the consolidated financial statements, consolidated net income shall be adjusted to include the net income attributed to the non-controlling interest and consolidated comprehensive income shall be adjusted to include the comprehensive income attributed to the non-controlling interest. The calculation of earnings per share will continue to be based on income amounts attributable to the parent. SFAS No. 141(R) and SFAS No. 160 are effective for financial statements issued for fiscal years beginning after December 15, 2008. Early adoption is prohibited. The Company does not expect the adoption of SFAS No. 160 to have a material impact on our consolidated financial statements.
In March 2008, the FASB issued SFAS No. 161, Disclosures about Derivative Instruments and Hedging Activities. SFAS No. 161 amends SFAS No. 133, Accounting for Derivative Instruments and Hedging Activities to require enhanced disclosures concerning the manner in which an entity uses derivatives (and the reasons it uses them), the manner in which derivatives and related hedged items are accounted for under SFAS No. 133 and interpretations thereof, and the effects that derivatives and related hedged items have on an entity's financial position, financial performance, and cash flows. SFAS No. 161 is effective for financial statements of fiscal years and interim periods beginning after November 15, 2008. The Company does not expect the adoption of SFAS No. 161 to have a material impact on our consolidated financial statements.
Critical Accounting Policies
We prepare our financial statements in conformity with accounting principles generally accepted in the United States of America. As such, we are required to make certain estimates, judgments and assumptions that we believe are reasonable based upon the information available. These estimates and assumptions affect the reported amounts of assets and liabilities at the date of the financial statements and the reported amounts of expenses and revenues, to the extent we generated revenue during the periods presented. Actual results could differ from these estimates. Our significant accounting policies require us to make difficult, subjective or complex judgments or estimates. We consider an accounting estimate to be critical if (1) the accounting estimate requires us to make assumption about matters that were highly uncertain at the time the accounting estimate was made and (2) changes in the estimates that are reasonably likely to occur from period to period, or use different estimates that we reasonably could have used in the current period, would have a material impact on our financial condition or results of operations.
43
There are other items within our financial statements that require estimation, but are not deemed critical as defined above. Changes in estimates used in these and other items could have a material impact on our financial statements. Management has discussed the development of these critical accounting estimates with our board of directors and they have reviewed the foregoing disclosure.
Use of Estimates – In connection with the preparation of our financial statements, we are required to make estimates and assumptions that affect the reported amounts in the financial statements and accompanying notes. One of the significant areas requiring the use of management estimates and assumptions relates to environmental reclamation and closure obligations. Under our licenses with the Republic of Kazakhstan, following completion of exploration and mining activities we are required to reclaim our licensed territories. To prepare our financial statements in accordance with accounting principles generally accepted in the United States of America we are required to account for this obligation. The determination of the amount of the mine retirement and environmental reclamation obligation the Republic of Kazakhstan will impose upon us, however, has not yet been determined. The determination of the mine retirement and environmental reclamation obligation is based, in significant part, on the size of each deposit. Because we are still exploring our Gornostai property and do not yet know the full extent of the Gornostai deposit, the mine retirement and environmental reclamation obligation has not yet been set by the Republic of Kazakhstan. We base our estimate of this obligation on historical experience and on various other assumptions that are believed to be reasonable under the circumstances. Accordingly, actual results may differ significantly from our estimate.
Income Taxes – While we are a Utah corporation, our primary operations are in the Republic of Kazakhstan. The Republic of Kazakhstan was formed in 1991 following the break-up of the former Soviet Union. At the time the Republic of Kazakhstan was formed, it adopted a new tax code. The tax code and the application of tax laws in the Republic of Kazakhstan are still developing and may not be uniformly applied in all instances.
Item 7A. |
Qualitative and Quantitative Disclosures About Market Risk |
Our primary market risks are fluctuations in commodity prices and foreign currency exchange rates. We do not currently use derivative commodity instruments or similar financial instruments to attempt to hedge commodity price risks associated with future crude oil production.
|
Commodity Price Risk |
Our revenues, profitability and future growth will depend substantially on prevailing prices for nickel and cobalt. If and when we commence commercial production, commodity prices will affect the amount of cash flow available for capital expenditures and our ability to either borrow or raise additional capital. Price will also affect our ability to produce, transport and market the nickel and cobalt we produce.
44
Historically, nickel and cobalt prices have been subject to significant volatility in response to changes in supply, market uncertainty and a variety of other factors beyond our control. Nickel and cobalt are likely to continue to be volatile in the future and this volatility makes it difficult to predict future price movements with any certainty. Any declines in nickel and cobalt prices would reduce the revenues we could earn when we begin commercial production, and could also reduce the amount of nickel and cobalt that we can produce economically. As a result, this could have a material adverse effect on our business, financial condition and results of operations.
|
Foreign Currency Risk |
Our functional currency is the U.S. dollar. Our Kazakhstani subsidiary Kaznickel uses the U.S. dollar as its functional currency and KKM uses the Kazakh tenge as its functional currencies. To the extent that business transactions in Kazakhstan are denominated in the Kazakh tenge we are exposed to transaction gains and losses that could result from fluctuations in the U.S. Dollar—Kazakh tenge exchange rate. When the US dollar strengthens in relation to the Kazakh tenge, the US dollar-reported expenses will decrease. We do not engage in hedging transactions to protect us from such risk.
Item 8. |
Financial Statements and Supplementary Data |
See Consolidated Financial Statements listed in the accompanying index to the Consolidated Financial Statements on Page F-1 herein.
Item 9. |
Changes in and Disagreements with Accountants on Accounting and Financial |
|
Disclosure |
We have made no changes in and had no disagreements with our independent registered accounting firm on accounting and financial disclosure during the 2007 fiscal year.
Item 9A(T). |
Controls and Procedures |
Evaluation of Disclosure Controls and Procedures
We maintain disclosure controls and procedures, as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”), that are designed to provide reasonable assurance that information required to be disclosed by us in the reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC rules and forms, and that such information is accumulated and communicated to our management, including our principal executive officer and principal financial officer, as appropriate, to allow timely decisions regarding required financial disclosures. Because of inherent limitations, our disclosure controls and procedures, no matter how well designed and operated, can provide only reasonable, and not absolute, assurance that the objectives of such disclosure controls and procedures are met.
45
As of the end of the period covered by this report we conducted an evaluation, under the supervision and with the participation of our management, including our principal executive officer and principal financial officer, of the effectiveness of the design and operation of our disclosure controls and procedures pursuant to Exchange Act Rules 13a-15(b) and 15d-15(b). Based on this evaluation, our principal executive officer and principal financial officer concluded that our disclosure controls and procedures were effective as of December 31, 2007.
Management's Report on Internal Control over Financial Reporting
Our management, including our Chief Executive Officer and our Chief Financial Officer, is responsible for establishing and maintaining adequate internal control over financial reporting for the Company as defined in Rule 13a-15(f) under the Exchange Act. Our internal control over financial reporting is designed to provide reasonable assurance to management and our board of directors regarding the preparation and fair presentation of published financial statements and the reliability of financial reporting. Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation.
Management assessed the effectiveness of the Company’s internal control over financial reporting as of December 31, 2007. In making this assessment, management used the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission (“COSO”) in Internal Control - Integrated Framework. Based on our assessment, we believe that, as of December 31, 2007, the Company’s internal control over financial reporting is effective based on those criteria.
This annual report does not include an attestation report of the Company’s registered public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by our registered public accounting firm pursuant to temporary rules of the Securities and Exchange Commission that permit us to provide only management’s report in this annual report on Form 10-K.
Changes in Internal Control over Financial Reporting
There were no changes in our internal controls over financial reporting during the quarter ended December 31, 2007 that materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
Item 9B. |
Other Information |
None.
46
PART III
Item 10. |
Directors, Executive Officers and Corporate Governance |
The following table sets forth our directors, executive officers, promoters and control persons, their ages, and all offices and positions held. Directors are elected for a period of one year and thereafter serve until their successor is duly elected by the stockholders and qualified. Officers and other employees serve at the will of the board of directors.
Name of Director or Executive Officer |
|
Age |
|
Positions with the Company |
|
Director Since |
|
|
|
|
|
|
|
Yermek Kudabayev |
|
38 |
|
Chief Executive Officer, President and Director |
|
December 2007 |
|
|
|
|
|
|
|
Zhassulan Bitenov |
|
31 |
|
Chief Financial Officer |
|
|
|
|
|
|
|
|
|
James Kohler |
|
60 |
|
Independent Director |
|
May 2006 |
|
|
|
|
|
|
|
Timothy Adair |
|
43 |
|
Independent Director |
|
May 2006 |
|
|
|
|
|
|
|
Valery Tolkachev |
|
39 |
|
Independent Director |
|
May 2006 |
|
|
|
|
|
|
|
Nurlan Tajibayev |
|
60 |
|
Vice President of Metallurgy and Director |
|
October 2006 |
|
|
|
|
|
|
|
Dossan Kassymkhanuly |
|
39 |
|
Vice President and Director |
|
August 2007 |
The above individuals currently serve as the Company’s officers and/or directors. A brief description of their background and business experience follows:
Yermek Kudabayev. In December 2007 the Company’s board of directors appointed Yermek Kudabayev as the Chief Executive Officer, President of the Company and Chairman of the board of directors. Mr. Kudabayev had served as the Company’s Chief Financial Officer since April 2006 and as interim Chief Executive Officer and interim President since May 2007. Mr. Kudabayev earned a Bachelors degree in Engineer-Economics from the Moscow Institute of Steel and Alloys in 1993. He earned an MBA degree from the Kazakhstan Institute of Management, Economics and Strategic Research in 1996. Mr. Kudabayev is a past member of the Association of Chartered Certified Accountants, an international accountancy body. He was issued a Certified Accounting Practitioner Certificate from the International Counsel of Certified Accountants and Auditors in 2002. He has been a Kazakhstani Certified Accountant since 1998 and a Certified Kazakhstani Auditor since 2000. Prior to joining the Company in 2006, Mr. Kudabayev served as the Finance Director for Kazkhoil Aktobe LLP from 2003 to April 2006. As the Finance Director, Mr. Kudabayev was responsible for budgeting, planning, cash flow forecasting and management, strategic research accounting, taxation and reporting. From 2002 to 2003, Mr. Kudabayev served as the Director of the Astana, Kazakhstan office of Ernst & Young, where he was responsible for auditing and coordination of projects in the Astana, Karaganda and Pavlodar regions of Kazakhstan. From 1997 to 2002 Mr. Kudabayev worked for Arthur Andersen as a Senior Auditor and as a Manager. Mr. Kudabayev was appointed the Chief Financial Officer of Bekem Metals, Inc. in April 2006. Mr. Kudabayev is not a director of any other SEC reporting issuer.
47
Zhassulan Bitenov. In January 2008 Mr. Bitenov accepted appointment as the Company’s Chief Financial Officer. In 1999 Mr. Bitenov earned a Masters of Arts in Economics from Kazahstan Institute of Management, Economics and Strategic Research in Almaty, Kazakshtan, with a specialization in international economics. He earned a Bachelors degree in International Economics from the International Kazakh –Turkish University in Turkestan, Kazakhstan in 1997. Mr. Bitenov passed the U.S. CPA exam in 2001. Mr. Bitenov served in various positions with the Almaty office of the accounting firm of Ernst & Young from November 2001 to October 2003 and from December 2004 through December 2007. While at Ernst & Young, Mr. Bitenov worked as a Senior auditor, Audit manager and Senior manager. Among other things, he was responsible for clients audits, preparation of audit reports, management of current engagements and negotiations with clients. From October 2003 to April 2004 he served as the Vice President of JSC AstanaEnergoService where he was responsible for the daily management and supervision of several company departments including the accounting, planning, sales, legal and marketing departments. From June 2004 to December 2004 he served as the finance director of JSC Interfarma-K.
James F. Kohler. Mr. Kohler received a B.S. in geology in 1970 and an M.S. in geology in 1980 from Utah State University. From 2001 to the present he has been employed as the Branch Chief of Solid Minerals with the U.S. Bureau of Land Management in Salt Lake City, Utah, where he oversees all mining activity on public lands within the State of Utah. He began working at the U.S. Bureau of Land Management in 1988 as a Senior Geologist, providing geologic support for all federal solid mineral leasing actions to establish a basis for economic evaluation of leasing tracts. From 1987-1988 Mr. Kohler served as Senior Geologist with the Utah Office of High Level Nuclear Waste in Salt Lake City, Utah, where he provided oversight for high-level nuclear waste repository characterization in Nevada, Texas, and Washington. From 1981-1986 he was the senior geologist and Manager of coal development and mining geology for Anaconda Minerals/ARCO Coal Company in Denver, Colorado supervising geologic support for operating coal mines and acquisitions in the U.S., Indonesia and China. From 1977 to 1981 Mr. Kohler was a Supervisory Geologist with the U.S. Geological Survey in Salt Lake City, Utah. In 2000 Mr. Kohler was awarded the Utah Governor's Medal for Science and Technology. Mr. Kohler is not a director of any other SEC reporting issuer.
Timothy Adair. Mr. Adair received a Masters in Business Administration (MBA) from Brigham Young University, located in Provo, Utah, in 1990. Mr. Adair also received a Bachelors of Science from the same university in Mechanical Engineering with a minor in Mathematics in 1988. Since 2005, Mr. Adair has been principally engaged as the Owner/President of Cube Office Designs located in Salt Lake City, Utah where he has successfully transferred company ownership and management. Cube Office Designs currently employs 22 persons and has annual revenue of approximately $1.5 million USD. Prior to purchasing Cube Office Designs, from 1989 through 2004 Mr. Adair was principally engaged as the Human Resources Productivity / Efficiency Manager with Intermountain Health Care (IHC) of Salt Lake City, Utah. IHC is a health care provider with 25,000+ employees and annual revenue of 2.5 + billion USD. While with IHC Mr. Adair consistently implemented cost savings improvements, such as the standardizing and automating of employee transactions which resulted in annual savings of $200k. Mr. Adair is also a licensed real estate agent and has been an avid real estate investor and property manager since 1989 as a partner of ADLAW. Mr. Adair was a member of the Oracle Applications User Group (OAUG) and the Intermountain Compensation and Benefits Association (ICBA). Mr. Adair is not a director of any other SEC reporting issuer.
48
Valery Tolkachev. Since 1999, Mr. Tolkachev has been employed with Aton Investment Company in Moscow, Russia, where he currently serves as the Managing Director, Capital Markets. From 1991 to 1999, Mr. Tolkachev served in various positions with various employers including, MDM Bank, InkomBank, InkomCapital and others. Mr. Tolkachev graduated with Honors from the High Military School in Kiev, USSR in 1989. In 2005, he completed his studies at the Academy of National Economy, as a qualified lawyer. Mr. Tolkachev is also a director of BMB Munai, Inc., and Caspian Services, Inc., both SEC reporting issuers.
Nurlan Tajibayev. Mr. Tajibayev has worked in the metallurgy industry since earning a Bachelors degree in Engineer-Metallurgy from the Kazakh State Technical University in 1973. Prior to joining Bekem Metals, Mr. Tajibayev served as the Executive Director of Kyzyl Kain Mamyt, LLP, a wholly-owned subsidiary of Bekem Metals. Before joining Kyzyl Kain Mamyt in 2003, Mr. Tajibayev served as Chairman of Canat UK Ltd., a supplier of metallurgical equipment from Europe and the United States to Kazakhstan, for six years. Mr. Tajibayev also spent twenty years serving in various capacities, including Senior Engineer, for Aktyubinsk Ferroalloys Plant and President of Kazchrome Corporation. Mr. Tajibayev is not a director of any other SEC reporting issuer.
Dossan Kassymkhanuly. In August 2007, the board of directors appointed Mr. Kassymkhanuly as a director. The board also appointed Mr. Kassymkhanuly as a vice-president of the Company. Mr. Kassymkhanuly served as the Business Manager for Gauhar-Tas Centre from December 1992 to February 1999. Gauhar-Tas Centre was engaged in foreign-economic activity with China, including exportation of non-ferrous metals and importation of building materials and mining engineering. From February 1999 to November 2003 Mr. Kassymkhanuly served as Director of the Semey FPG JSC regional office in Ust-Kamenogorsk. He was responsible for coal sales in Eastern Kazakhstan. Mr. Kassymkhanuly also took part in the development of the Gornostai nickel-cobalt deposit, as well as in the pilot industrial smelting for ferronickel at the Pavlodar tractor plant. He was also responsible for negotiations with the Geology Committee of the Ministry of Energy and Mineral Resources of the Republic of Kazakhstan, including overseeing amendments and addendums to contracts for subsoil use. Mr. Kassymkhanuly chairmanned a group on implementation of new technology. In particular, he took part in the construction project for a briquette plant to produce briquette coal at the Karazhira coal deposit, Eastern Kazakhstan. Mr. Kassymkhanyly served as the Director of the Representative Office of Kaznickel LLP in Astana, Kazakhstan from March 2004 to August 2007. In that position he was primarily responsible for negotiations with various government entities and committees on behalf of Kaznickel. Mr. Kassymkhanuly also served as a member of the board of directors of Bekem Metals, Inc. from August 2005 to October 2006. Mr. Kassymkhanuly earned a degree in Engineer-Construction from Semipalatinsk College of Civil Engineering in 1989. He earned a Bachelors degree in Engineer-Economics from the Eastern Kazakhstan Technical University in 2002. At present, he is a candidate for a PhD degree in Engineering Sciences at the Semey State Institute. Mr. Kassymkhanuly is not a director of any other SEC reporting issuer.
|
Significant Employees |
Aleksandr Rassokhin. In December 2007, Mr. Rassokhin was appointed to the position of Vice President of Geology. Mr. Rassokhin served as the Exploration Manager since October 2006. He has over thirty years experience in solid minerals geology. His work experience includes serving as the President and Exploration Manager of Frontier Mining Ltd. Kazakhstan, where he managed Frontier’s exploration programs and gold processing in Kazakhstan. Prior to joining Frontier in 2005, Mr. Rassokhin spent ten years serving as Chief Geologist for a number of companies operating in Kazakhstan, including Rio Tinto Mining and Exploration, Ltd., Santa Fe Pacific Gold Kazakhstan Corporation and Newmont Kazakhstan Gold, Ltd. As Chief Geologist his duties have included identification of new mineral deposits, preparation of exploration plans and oversight of field explorations. Mr. Rassokhin also spent fourteen years with the Research Institute of Mineral Resources, Kazakhstan. Mr. Rassokhin is 54 years old.
49
There are no family relationships among any of the Company’s executive officers, significant employees or directors.
|
Involvement in Certain Legal Proceedings |
To our knowledge, during the past five years none of our directors or executive officers has been convicted or is currently the subject of a criminal proceeding, excluding traffic violations or similar minor offenses, or has been a party to any judicial or administrative proceeding that resulted in a judgment, decree or final order enjoining the person from future violations of, or prohibiting activities subject to, federal or state securities laws, or a finding of any violation of federal or state securities laws, except for matters that were dismissed without sanction or settlement. Similarly, in the past five years none of our directors or executive officers, or any business in which they were a general partner or executive officer, have been the subject of a bankruptcy proceeding.
Compliance with Section 16(a) of the Exchange Act
Directors and executive officers are required to comply with Section 16(a) of the Securities Exchange Act of 1934, which requires generally that such persons file reports regarding ownership of and transactions in securities of the Company on Forms 3, 4, and 5. A Form 3 is an initial statement of ownership of securities. Form 4 is to report changes in beneficial ownership. Form 5 covers annual statements of change in beneficial ownership.
Based solely on management’s review of these reports during the year ended December 31, 2007, it appears that Dossan Kassymkhanuly failed to timely file a Form 3 when he joined the board of directors of the Company in August 2007. Nurlan Tajibayev failed to timely file a Form 4 in October 2007 when 47,929 shares of his restricted stock grant vested. It is anticipated that Mr. Kassymkhanuly and Mr. Tajibayev will file the required forms to remedy their delinquent filings as soon as practicable.
Code of Ethics
Our board of directors has adopted a code of ethics that applies to all of our officers and employees, including our principal executive officer, principal financial officer, principal accounting officer, controller and persons performing similar functions. Our code of ethics is posted on our website which can be found at www.bekemmetals.com.
Committees of the Board of Directors
|
Audit Committee |
We do not currently have a standing audit committee or other committee performing similar functions, nor have we adopted an audit committee charter. Given the size of the Company, its available resources and the fact that the OTCBB does not require us to have an audit committee, the board of directors has determined that it is in the Company’s best interest to have the full board fulfill the functions that would be performed by the audit committee, including selection, review and oversight of the Company’s independent accountants, the approval of all audit, review and attest services provided by the independent accountants, the integrity of the Company’s reporting practices and the evaluation of the Company’s internal controls and accounting procedures. The board is also responsible for the pre-approval of all non-audit services provided by its independent auditors. Non-audit services are only provided by our independent accountants to the extent permitted by law. Pre-approval is required unless a “de minimus” exception is met. To qualify for the “de minimus” exception, the aggregate amount of all such non-audit services provided to the Company must constitute not more than 5% of the total amount of fees paid by us to our independent auditors during the fiscal year in which the non-audit services are provided; such services were not recognized by us at the time of the engagement to be non-audit services; and the non-audit services are promptly brought to the attention of the board and approved prior to the completion of the audit by the board or by one or more members of the board to whom authority to grant such approval has been delegated.
50
As we do not currently have a standing audit committee, we do not, at this time have an “audit committee financial expert” as defined under the rules of the Securities and Exchange Commission. The board does believe, however, that should the Company form a standing audit committee in the future, Mr. Timothy Adair, an independent director, could qualify as an audit committee expert.
Nominating Committee
We do not currently have a standing nominating committee or other committee performing similar functions, nor have we adopted a nominating committee charter. Given the size of the Company, its available resources and the fact that the OTCBB does not require us to have a nominating committee, the board of directors has determined that it is in the Company’s best interest to have the full board of directors to participate in the consideration for director nominees. In general, when the board determines that expansion of the board or replacement of a director is necessary or appropriate, the board will review through candidate interviews with members of management, consult with the candidate’s associates and through other means determine a candidate’s honesty, integrity, reputation in and commitment to the community, judgment, personality and thinking style, residence, willingness to devote the necessary time, potential conflicts of interest, independence, understanding of financial statements and issues, and the willingness and ability to engage in meaningful and constructive discussion regarding Company issues. The board would review any special expertise, for example, that qualifies a person as an audit committee financial expert, membership or influence in a particular geographic or business target market, or other relevant business experience. To date we have not paid any fee to any third party to identify or evaluate, or to assist it in identifying or evaluating, potential director candidates.
The nominating committee will consider director candidates nominated by shareholders during such times as the Company is actively considering obtaining new directors. Candidates recommended by shareholders will be evaluated based on the same criteria described above. Shareholders desiring to suggest a candidate for consideration should send a letter to the Company’s Secretary and include: (a) a statement that the writer is a shareholder (providing evidence if the person's shares are held in street name) and is proposing a candidate for consideration; (b) the name and contact information for the candidate; (c) a statement of the candidate’s business and educational experience; (d) information regarding the candidate’s qualifications to be director, including but not limited to an evaluation of the factors discussed above which the board would consider in evaluating a candidate; (e) information regarding any relationship or understanding between the proposing shareholder and the candidate; (f) information regarding potential conflicts of interest; and (g) a statement that the candidate is willing to be considered and willing to serve as director if nominated and elected. Because of the small size of the Company and the limited need to seek additional directors, there is no assurance that all shareholder proposed candidates will be fully considered, that all candidates will be considered equally, or that the proponent of any candidate or the proposed candidate will be contacted by the Company or the board, and no undertaking to do so is implied by the willingness to consider candidates proposed by shareholders.
51
Compensation Committee
We do not have a standing compensation committee or a charter; rather our Chief Executive Officer evaluates officer and employee compensation issues subject to the approval of our board of directors. Our Chief Executive Officer makes recommendations to the board of directors as to employee benefit programs and officer and employee compensation. The compensation of our Chief Executive Officer is determined and approved directly by board of directors. Neither the Chief Executive Officer nor the board of directors engaged compensation consultants during the year.
Item 11. |
Executive Compensation |
Compensation Discussion and Analysis
We do not have a standing compensation committee. Our Chief Executive Officer (“CEO”) makes recommendations to our board of directors as to employee benefit programs and officer and employee compensation.
|
Objectives and Philosophy of Our Executive Compensation Program |
The primary objectives of our executive compensation programs are to:
|
• |
attract, retain and motivate skilled and knowledgeable individuals; |
|
• |
ensure that executive compensation is aligned with our corporate strategies and business objectives |
|
• |
promote the achievement of key strategic and financial performance measures by linking short-term and long-term cash and equity incentives to the achievement of measurable corporate and individual performance goals; and |
|
• |
align executives’ incentives with the creation of stockholder value. |
To achieve these objectives, our CEO and board of directors evaluate our executive compensation program with the objective of setting compensation at levels they believe will allow us to attract and retain qualified executives. In addition, a portion of each executive’s overall compensation is tied to key strategic, financial and operational goals set by our board of directors. We also provide a portion of our executive compensation in the form of equity awards that vest over time, which we believe helps us retain our executives and align their interests with those of our stockholders by allowing the executives to participate in our longer term success as reflected in asset growth and stock price appreciation.
|
Components of our Executive Compensation Program |
At this time, the primary elements of our executive compensation program are:
|
• |
base salaries; |
|
• |
cash bonuses; |
52
|
• |
equity incentive awards; and |
|
• |
benefits and other compensation. |
We do not have any formal or informal policy or target for allocating compensation between short-term and long-term compensation, between cash and non-cash compensation or among the different forms of non-cash compensation. Instead, we have determined subjectively on a case-by-case basis the appropriate level and mix of the various compensation components. Similarly, we do not rely on benchmarking against our competitors in making compensation related decisions. In the past, however, we have hired executive recruiters as needed to help locate and identify suitable candidates for hire. In this context we typically discuss compensation packages with the recruiter to structure compensation packages we believe will be attractive to prospective executive employees.
Named Executive Officers
The following table identifies the persons who, during the 2007 fiscal year served as our principal executive officer, our principal financial officer and our most highly paid executive and non-executive officers, who, for purposes of this Compensation Disclosure and Analysis only, are referred to herein as the “named executive officers.”
Name |
|
Corporate Office |
|
|
|
Yermek Kudabayev |
|
Chief Executive Officer, President and Former CFO(1)(2) |
Marat Cherdabayev |
|
Former Chief Executive Officer and Former President(2)(3) |
Zhassulan Bitenov |
|
Chief Financial Officer(4) |
Dossan Kassymkhanuly |
|
Vice President(2) |
Nurlan Tajibayev |
|
Vice President of Metallurgy(2) |
Aleksandr Rassokhin |
|
Vice President of Geology |
(1) |
Mr. Kudabayev served as our Chief Financial Officer from May 2006 to December 2007. He was appointed as interim President and Chief Executive Officer in June 2007 following the resignation of Marat Cherdabayev from those positions. In December 2007, Mr. Kudabayev was appointed as a director and as Chairman of the Board of Directors. At that time he was also named as the President and Chief Executive Officer of the Company. |
(2) |
Mr. Kudabayev, Mr. Cherdabayev, Mr. Kassymkhanuly and Mr. Tajibayev have served as members of the board of directors and received no compensation for services rendered as a director. All compensation amounts paid to these individuals were paid as compensation for services rendered as an employee of the Company. |
(3) |
Mr. Cherdabayev resigned as our Chief Executive Officer, President and Chairman of the Board of Directors in June 2007. |
(4) |
Mr. Bitenov joined the Company and was appointed Chief Financial Officer of the Company in January 2008. |
|
Employment Agreements |
We maintain employment agreements with each of the named executive officers. The employment agreements we have with Mr. Kassymkhanuly, Mr. Tajibayev and Mr. Rassokhin are the standard statutorily required employment agreements for all employees in the Republic of Kazakhstan. These employment agreements are limited in their terms and primarily provide for statutory requirements related to the rights of employees, base salary, payment of income and social taxes and pension fund obligations.
53
We maintain a more detailed employment contracts with Mr. Kudabayev and Mr. Bitenov. As discussed in more detail below, in addition to base salary and payment of income and employment-related taxes, these employment agreements cover a broad range of other components of the executive’s compensation package.
|
Base Salaries |
Base salaries are used to recognize the experience, skills, knowledge and responsibilities required of all our employees, including our executive officers. Base salaries for our executive officers typically have been set in our offer letter to the individual at the outset of employment. Under the terms of these employment agreements base salary and other components of compensation, may be evaluated by our board of directors for adjustment based on an assessment of the individual’s performance and compensation trends in our industry.
As discussed above, we maintain a more detailed employment contract with Mr. Kudabayev, which prior to the end of our fiscal year, governed his employment as our Chief Financial Officer. At the end of our 2007 fiscal year, our board of directors appointed Mr. Kudabayev to serve as the Company’s President and Chief Executive Officer on a permanent basis. Mr. Kudabayev had been serving in these positions on an interim basis since June 2007, while he continued to also serve as the Company’s Chief Financial Officer. In March 2008 in recognition of the fact that Mr. Kudabayev’s position with the Company had changed, the board approved amendments to Mr. Kudabayev’s employment contract to recognize his change in position. In connection with this amendment, the board voted to increase Mr. Kudabayev’s base salary from $120,000 per year net to $180,000 per year net, which is equivalent to the amount the Company had been paying its former President and Chief Executive Officer in salary and housing allowance. Mr. Kudabayev’s agreement does not provide of a housing allowance. This salary increase was made effective retroactive to June 2007, when Mr. Kudabayev began serving as the Company’s President and Chief Executive Officer. The board did not consider salary increases for any of the other named executive officers.
|
Cash Bonuses |
Our board of directors has the discretion to award cash bonuses based on our financial performance and individual objectives. The corporate financial performance measures, which have typically been developed by our board of directors, are given the greatest weight in this bonus analysis. During fiscal 2007 the board of directors did not award cash bonuses to any of the named executive officers.
|
Equity Incentive Awards |
Our equity award program is the primary vehicle for offering long-term incentives to our executives. Our equity awards to executives have typically been made in the form of restricted stock grants. We believe that equity grants provide our executives with a direct link to our long-term performance, create an ownership culture and align the interests of our executives and our stockholders. Typically, we include a restricted stock grant award as part of the executive employee’s compensation package at the time we hire the individual. We do not use a formula to determine the size of our restricted stock grants. This determination is left to the discretion of the board of directors and is made on a case-by-case basis, although the board does consider past awards in making such determination. These restricted stock awards vest over time, typically three years, with one-quarter vesting in each of the first two years and the final one-half vesting in the third year. Vesting of such awards is typically tied to some performance measure directly tied to the responsibilities of the employee, and may also be tied to certain Company landmark events. Should those vesting requirements not be met, the associated shares would not vest to the individual. Similarly, should the individual leave employment with the Company for any reason, any shares that have not vested at that time shall be forfeited back to the Company. While pecuniary interest in and the right to dispose of the shares awarded under our restricted stock grants does not vest to the individual until he has satisfied the vesting conditions, the individual is allowed to vote all of the shares included in the grant and to enjoy all the other benefits associated with ownership of the shares. We believe the vesting features further our objective of executive retention because this feature provides an incentive to our executives to remain in our employ during the vesting period.
54
We may also make discretionary equity awards to the named officers. In determining the size of equity grants to our executives, our board of directors will consider company-level performance, the applicable individual’s performance, the amount of equity previously awarded to the individual, the vesting of such awards and the recommendations of management.
Grants of discretionary equity awards, including those to executives, would be approved by our board of directors and would generally be granted based on the fair market value of our common stock. Our board of directors has not previously granted discretionary equity awards and did not make discretion equity award during 2007.
|
Benefits and Other Compensation |
Under the terms of their employment contracts, our named executive officers are permitted to participate in such health care, disability insurance and other employee benefits plans as may be in effect with the Company from time to time to the extent the executive is eligible under the terms of those plans.
For example, under the terms of their respective employment agreements Mr. Kudabayev and Mr. Bitenov are allowed to participate in such pension, profit sharing, bonus, life insurance, hospitalization, major medical and other employee benefit plans that may be in effect from time to time and to the extent he is eligible to participate under the terms of the particular plan. They are each also entitled to 28 days of paid vacation per year.
During the year we paid rent for housing for Mr. Cherdabayev in the amount of $16,000 and for Mr. Kassymkhanuly in the amount of $24,339. The employment agreements of our other named executive officers do not provide a housing allowance.
Under all of our employment agreements we agree to pay all income and social taxes and dues under applicable laws of Kazakhstan for our named executive officers including income and social taxes and government pension fund payments. This does not include the officer’s home base income or other taxes in the case of expatriates.
|
Income Tax |
As is the custom in Kazakhstan, we pay the income taxes of our employees, including the named executive officers. The income tax rate for individuals in Kazakhstan for is currently 10%.
|
Social Tax |
We make payments of mandatory Kazakhstani social taxes, which typically range between 7% and 20% of an employee’s wages. These costs are recorded in the period when they are incurred and presented as salary related tax expense in the income statement.
55
Summary Compensation Table
The table below summarizes compensation paid to or earned by our Chief Executive Officer, our Chief Financial Officer and our other most highly compensated officers, who we refer to collectively as our “named executive officers.”
Name and |
Year |
Salary |
Stock |
All Other |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
Marat Cherdabayev (1) |
2007 |
$ 55,000 |
$ (54,830)(2) |
$56,343 |
$111,343 |
Former CEO and President |
2006 |
$119,000 |
$ 54,830(2) |
$77,038 |
$250,868 |
|
2005(5) |
$110,000 |
$-0- |
$ -0- |
$110,000 |
|
|
|
|
|
|
Yermek Kudabayev(3) |
2007 |
$155,000 |
$332,650 |
$72,493 |
$560,143 |
CEO, President and former CFO |
2006 |
$ 90,000 |
$ 31,089 |
$40,555 |
$161,644 |
|
|
|
|
|
|
Zhassulan Bitenov(4) |
2007 |
$ -0- |
$ -0- |
$ -0- |
$ -0- |
CFO |
|
|
|
|
|
|
|
|
|
|
|
Dossan Kassymkhanuly(5) |
2007 |
$ 91,300 |
$ -0- |
$53,411 |
$144,711 |
Vice-President |
|
|
|
|
|
|
|
|
|
|
|
Nurlan Tajibayev(6) |
2007 |
$ 60,000 |
$124,615 |
$22,800 |
$207,415 |
Vice-President of Metallurgy |
2006 |
$ 35,000 |
$ 24,923 |
$15,957 |
$ 75,880 |
|
|
|
|
|
|
Aleksandr Rassokhin(7) |
2007 |
$ 60,000 |
$ 56,035 |
$23,366 |
$139,401 |
Vice-President of Geology |
2006 |
$ 20,000 |
$ 11,207 |
$ 9,728 |
$ 40,935 |
(1) |
Mr. Cherdabayev served as the Chief Executive Officer and President from May 2005 to June 2007. On October 20, 2006, Mr. Cherdabayev was granted 421,772 shares with the following vesting terms: 105,443 shares in October 2007; 105,443 shares in October 2008 and 210,886 shares in October 2009. In June 2007 Mr. Cherdabayev resigned as an officer and director of the Company prior to the vesting of any of his restricted stock grants. In accordance with the terms of his restricted stock grant, the entire grant was forfeited back to the Company upon his resignation. |
(2) |
In 2006 we recognized deferred compensation expense associated with Mr. Cherdabayev’s stock grant of $54,830. In 2007, when the stock grant was forfeited back to the Company we reversed the expense. |
(3) |
Mr. Kudabayev served as the Chief Financial Officer from April 2006 to December 2007. Mr. Kudabayev has served as the Chief Executive Officer and President, initially on an interim basis since June 2007. His employment agreement was amended in March 2008, with effect from June 1, 2007, to reflect his new responsibilities. The amended employment agreement provides for an annual salary of $180,000 net of taxes. On October 20, 2006, with amendments made on March 25, 2008, Mr. Kudabayev was granted 421,772 shares, which vest as follows: 95,857 shares vested in April 2007; 115,029 shares vested in April 2008. The final 210,886 shares will vest in April 2009 provided the Company timely files its reports with U.S. Securities and Exchange Commission. Mr. Kudabayev forfeits any unvested grants at the time his employment with the Company terminates. |
(4) |
Mr. Bitenov joined the Company and was named Chief Financial Officer of the Company in January 2008. Subsequent to the fiscal year end, on March 25, 2008, the board of directors Mr. Bitenov was granted a restricted stock grant of 383,429 shares, which vest as follows: 98,857 shares on January 3, 2009, 95,857 shares on January 3, 2010 and 191,715 shares on January 3, 2011. Vesting of Mr. Bitenov’s stock grants is contingent upon the Company timely filing its reports with the U.S. Securities and Exchange Commission during each fiscal year. Mr. Bitenov forfeits any unvested grants at the time his employment with the Company terminates. |
(5) |
Mr. Kassymkhanuly has served as a member of the board of directors and Vice-President of the Company since August 2007. Mr. Kassymkhanuly also served as a member of the board of directors of Bekem Metals, Inc. from August 2005 to October 2006. |
56
(6) |
Mr. Tajibayev has served as a member of the board of directors and Vice-President of Metallurgy since October 2006. On October 20, 2006, with amendments made on March 25, 2008, Mr. Tajibayev was granted 191,715 shares, which vest as follows: 47,292 shares vested in October 2007 provided that the Company met the deadlines for the pilot plant construction, 47,292 shares will vest in October 2008 provided the Company starts construction of the processing plant by October, 2008, and the final 95,857 shares will vest in October 2009 conditioned upon the Company having commenced commercial operations. Mr. Tajibayev forfeits any unvested grants at the time his employment with the Company terminates. |
(7) |
Mr. Rassokhin has served as a vice-president on geology from December 2007. On October 20, 2006, Mr. Rassokhin was granted 86,207 shares, which vest as follows: 21,552 shares vested in October 2007 provided that the Company timely performed the drilling work program requirements as dictated by the MEMR, 21,552 shares will vest in October 2008 provided the Company timely performs the drilling work program requirements as dictated by the MEMR, and the final 43,103 shares will vest in October 2009 conditioned upon the Company having commenced commercial operations. Mr. Rassokhin forfeits any unvested grants at the time his employment with the Company terminates. |
(8) |
Represents the dollar amount recognized for financial statement reporting purposes in accordance with FAS 123(R) with respect to restricted stock grants awarded on October 20, 2006. The restricted stock grants were valued at $1.95 per share, which represented the closing market price for our common stock on the date of grant. |
All Other Compensation
The table below provides additional information regarding “all other compensation” awarded to the named executive officers as disclosed in the “All Other Compensation” column of the “Summary Compensation Table” above.
Name |
Year |
Income |
Social |
Medical |
Pension |
Rent |
Total |
|
|
|
|
|
|
|
|
Marat Cherdabayev |
2007 |
$ 20,648 |
$ 16,655 |
$ -0- |
$ 3,040 |
$ 16,000 |
$ 56,343 |
|
2006 |
21,289 |
10,857 |
3,596 |
5,296 |
36,000 |
77,038 |
|
|
|
|
|
|
|
|
Yermek Kudabayev |
2007 |
35,713 |
27,240 |
2,244 |
7,296 |
-0- |
72,493 |
|
2006 |
22,175 |
10,087 |
3,947 |
4,346 |
-0- |
40,555 |
|
|
|
|
|
|
|
|
Dossan Kassumkhanuly |
2007 |
10,645 |
9,089 |
2,244 |
7,094 |
24,339 |
53,411 |
|
|
|
|
|
|
|
|
Nurlan Tajibayev |
2007 |
7,068 |
7,189 |
1,247 |
7,296 |
-0- |
22,800 |
|
2006 |
5,854 |
4,663 |
1,637 |
3,803 |
-0- |
15,957 |
|
|
|
|
|
|
|
|
Aleksandr Rassokhin |
2007 |
7,401 |
7,422 |
1,247 |
7,296 |
-0- |
23,366 |
|
2006 |
4,309 |
2,384 |
861 |
2,173 |
-0- |
9,728 |
Annual Base Salary
The following table discloses the annual salary set forth in the employment agreement of each of the individual named executive officers for fiscal 2008.
Name |
|
Annual Salary(1) |
|
|
|
Yermek Kudabayev |
|
$180,000 |
Zhassulan Bitenov |
|
$108,000 |
Dossan Kassymkhanuly |
|
$120,000 |
Nurlan Tajibayev |
|
$ 60,000 |
Aleksandr Rassokin |
|
$ 60,000 |
(1) |
Annual salary is net of all taxes and dues required under applicable laws of the Republic of Kazakhstan, which is the responsibility of the Company. |
57
As discussed above, our employment agreements provide for an annual salary. Base salary may be increased from time to time with the approval of the board of directors. Base salary may not be decreased without the written consent of the named executive officer. The agreements provide for statutory requirements related to the rights of employees, base salary, payment of income and social taxes and pension fund obligations.
Grants of Plan-Based Awards Table for Fiscal Year 2007
No grants of any plan-based awards were made to any of the named executive officers during the 2007 fiscal year.
Outstanding Equity Awards at Fiscal Year End 2007
None of the named executive officers held unexercised stock options at December 31, 2007. The following table sets forth information concerning all unvested restricted stock grants and equity incentive plan awards for each of the named executive officers as of December 31, 2007.
|
Stock Awards |
|
Name |
Equity Incentive Plan Awards: Number of Unearned Shares, Units or Other Rights That Have Not Vested (#) |
Equity Incentive Plan Awards: Market or Payout Value of Unearned Shares, Units or Other Rights That Have Not Vested ($) |
|
|
|
Yermek Kudabayev(1) |
287,572(2) |
575,144 (3) |
Marat Cherdabayev(1) |
-0-(4) |
-0- |
Zhassulan Bitenov |
-0- |
-0- |
Dossan Kassymkhanuly |
-0- |
-0- |
Nurlan Tajibayev(1) |
143,786(5) |
287,572(3) |
Aleksandr Rassokhin(1) |
64,655(6) |
129,310(3) |
(1) |
On October 20, 2006, our board of directors awarded restricted stock grants to the following individuals in the following amounts: i) Yermek Kudabayev – 383,429 shares; ii) Marat Cherdabayev – 421,772 shares; iii) Nurlan Tajibayev – 191,715 shares; and iv) Aleksandr Rassokhin – 86,207 shares. These restricted stock grants were made under the Company’s 2003 Stock Option Plan made under the Company’s 2003 Stock Option Plan. Vesting of the awards was to occur over a period of three years and is contingent upon performance based metrics as described in more detail below. Any unvested shares at the time such individual’s employment with the Company ceases, for any reason, shall be forfeited back to the Company. All shares underlying the awards were issued at the time of grant and are being held in escrow by the Company subject to the vesting schedule placed on the grant. The grant holders have the right to vote the shares, receive dividends and enjoy all other rights of ownership over the entire grant amount, except for the right to dispose of or otherwise encumber the shares prior to satisfying the applicable vesting requirement. |
(2) |
Mr. Kudabayev’s restricted stock award vests as follows: 95,857 shares vested in April 2007; 95,857 shares vest in April 2008 and the final 191,715 shares will vest in April 2009 provided that the Company timely files its reports with U.S. Securities and Exchange Commission during each year. Subsequent to the year end, in March 2008 the board of directors voted to increase Mr. Kudabayev’s restricted stock grant to an aggregate of 421,772 shares, with the additional shares vesting 50% in April 2008 and 50% in April 2009. |
(3) |
The market value of the unearned shares is computed by multiplying the closing market price of the Company’s stock at the end of the last completed fiscal year ($2.00 per share) by the number of unearned shares that have not vested. |
58
(4) |
In June 2007 Mr. Cherdabayev resigned as an officer and director of the Company prior to the vesting of any of his restricted stock grants. In accordance with the terms of his restricted stock grant, the entire grant was forfeited back to the Company upon his resignation. |
(5) |
Mr. Tajibayev’s restricted stock award vests as follows: 47,929 shares vested in October 2007; 47,929 shares will vest in October 2008 provided that the Company begins construction of a processing plant by October 2007 and the final 95,857 shares will vest in October 2009 provided that the Company has commenced commercial operations by October 2009. |
(6) |
Mr. Rassokhin’s restricted stock award vests as follows: 21,552 shares vested in October 2007; 21,552 shares will vest in October 2008 and the final 43,103 shares will vest in October 2009 provided that each year the Company timely completes the annual drilling requirements associated with its annual work program and that the Company has commenced commercial operations by October 2009. |
Option Exercises and Stock Vested for Fiscal Year 2007
None of the named executive officers exercised options during the 2007 fiscal year. The following table sets forth the number of restricted stock awards that vested to our named executive officer during fiscal 2007 and the aggregate dollar amount realized by our named executive officer on vesting.
|
Stock Awards |
|
Name |
Number of Shares Acquired on Vesting (#) |
Value Realized on Vesting ($) |
Yermek Kudabayev |
95,857(1) |
164,874(2) |
Marat Cherdabayev |
-0-(3) |
-0- |
Zhassulan Bitenov |
-0- |
-0- |
Dossan Kassymkhanuly |
-0- |
-0- |
Nurlan Tajibayev |
47,929(4) |
50,325(2) |
Aleksandr Rassokhin |
21,552(5) |
22,630(2) |
(1) |
As noted above, 95,857 shares of the restricted stock grant awarded to Mr. Kudabayev on October 20, 2006 vested on April 7, 2007. |
(2) |
The value realized on vesting is computed by multiplying the number of shares of stock by the market value of the underlying shares on the vesting date. The closing market price of our common stock on April 7, 2007 was $1.72 per share. The market price of our common stock on October 20, 2007 was $1.05 per share. |
(3) |
As noted above, Mr. Cherdabayev resigned as his positions and an officer of the Company prior to the vesting of any portion of his restricted stock grant. Therefore, his entire restricted stock grant reverted back to the Company. |
(4) |
As noted above, 47,929 shares of the restricted stock grant awarded to Mr. Tajibayev on October 20, 2006 vested on October 20, 2007. |
(5) |
As noted above, 21,552 shares of the restricted stock grant awarded to Mr. Rassokhin on October 20, 2006 vested on October 20, 2007. |
Pension Benefits
In accordance with the legislative requirements of the Republic of Kazakhstan during 2007 we paid government mandated pension fund payments for each of the named executive officers, excluding Mr. Bitenov who did not commence employment with the Company until January 2008. We do not have any other liabilities related to any supplementary pensions, post retirement health care, insurance benefits or retirement indemnities for any of the named executive officers.
We offer no pension or other specified retirement payments or benefits, including but not limited to tax-qualified deferred benefit plans and supplemental executive retirement plans to its named executive officers.
59
Nonqualified Deferred Compensation
We offer no defined contribution or other plan that provide for the deferral of compensation on a basis that is not tax-qualified to any of our employees including the named executive officers.
Potential Payments upon Termination or Change-in-Control
|
Termination of Employment Agreements |
With the exception of the employment agreements of Mr. Kudabayev and Mr. Bitenov, none of the other named executive officers employment agreements provide for potential payments upon the termination of their employment.
Should the Company terminate the employment agreements of Mr. Kudabayev or Mr. Bitenov for good reason, they shall be entitled to salary for the month in which he is terminated and for the succeeding three calendar months. An additional month will be added up to a maximum of twelve months for each year of completed service beginning after two full years of service. This amount may be reduced in the event Mr. Kudabayev or Mr. Bitenov obtains new employment prior to the completion of the payment period. If he is terminated for cause he shall only be entitled to compensation through the date of termination. If he is terminated for disability he shall be compensated for the remainder of the month and for three succeeding months or until disability insurance benefits commence. If employment is terminated because of death he shall be entitled to compensation through the end of the calendar month in which his death occurs. The phrase “for good reason” means any of the following: (a) the Company’s material breach of the employment agreement; (b) the assignment of the Executive without his consent to a position, responsibilities, or duties of a materially lesser status or degree of responsibility than his position, responsibilities, or duties; or (c) the relocation of the Company’s principal executive offices outside the Kazakhstan area; or (d) the requirement by the Company that the Executive be based anywhere other than the Company’s principal executive offices, in either case without the Executive’s consent.
|
Change-in-Control |
None of the employment agreements of our named executive officers provide for potential payouts or other change in control benefits.
Compensation of Directors
We offer cash compensation to attract and retain candidates to serve on our board of directors. We do not compensate directors who are also our employees for their service on our board of directors. Therefore, Mr. Kudabayev, Mr. Kassymkhanuly and Mr. Tajibaev did not receive any compensation for their service on our board of directors.
60
Meeting Fees
Members of the board of directors who are not also employees of the Company or one of its subsidiaries are paid a $16,000 stipend per year, payable quarterly. Non-employee directors are also paid $1,000 for each board meeting attended in person plus reimbursement for travel expenses.
|
Equity Compensation |
We do not currently have a fixed plan for the award of equity compensation to our non-employee directors.
Director Compensation Table
The following table sets forth a summary of the compensation we paid to our directors for services on our board during our 2007 fiscal year.
Name |
Fees Earned or Paid in Cash ($) |
All Other Compensation ($) |
Total ($) |
|
|
|
|
Timothy Adair |
$16,000 |
$500(1) |
$16,500 |
James Kohler |
$16,000 |
$500(1) |
$16,500 |
Valery Tolkachev |
$16,000 |
-0- |
$16,000 |
Nurlan Tajibaev(1) |
-0- |
-0- |
-0- |
Yermek Kudabayev(1) |
-0- |
-0- |
-0- |
Dossan Kassymkhanuly(1) |
-0- |
-0- |
-0- |
(1) |
Represents compensation for in person attendance at board meetings held in Almaty, Kazakhstan. |
(2) |
In addition to being directors Mr. Kudabayev, Mr. Tajibaev and Mr. Kasymkhanuly are also Company employees, and therefore do not qualify for compensation as non-employee directors. |
Compensation Committee Interlocks and Insider Participation
We do not currently have a standing Compensation Committee, rather our entire board of directors participates in deliberations concerning executive officer compensation. Yermek Kudabayev, Dossan Kassymkhanuly and Nurlan Tajibaev, members of our board of directors, are currently or have previously been officers of the Company or one or more of its subsidiaries.
Board of Directors Report
The board of directors has reviewed and discussed the Compensation Discussion and Analysis required by Item 402(b) of Regulation S-K with management and, based on such review and discussions, the board of directors recommended that this Compensation Discussion and Analysis be included in this Annual Report on Form 10-K.
|
BOARD OF DIRECTORS |
|
Yermek Kudabayev |
Dossan Kassymkhanuly |
Nurlan Tajibaev |
Timothy Adair |
James Kohler |
Valery Tolkachev |
61
Item 12. |
Security Ownership of Certain Beneficial Owners and
Managment and |
The term “beneficial owner” refers to both the power of investment and the right to buy and sell our shares. It also refers to rights of ownership or the right to receive distributions from the Company and proceeds from the sale of our shares. Since these rights may be held or shared by more than one person, each person who has a beneficial ownership interest in shares is deemed to be the beneficial owner of the same shares because there is shared power of investment or shared rights of ownership.
The following table sets forth as of April 7, 2008 the name and the number of shares of our common stock, par value of $0.001 per share, held of record or beneficially by each person who held of record, or was known by us to own beneficially, more than 5% of the 125,172,011 issued and outstanding shares of our common stock, and the name and shareholdings of each director and of all officers and directors as group.
Type of Security |
Name and Address |
Amount & Nature of Beneficial Ownership |
% of Class |
|
|
|
|
Common |
Hsuih Chi Hun(1) |
36,306,120 |
29% |
|
1/F., Chap Biu Building |
|
|
|
Tai Po Market, 15 On Fu Road |
|
|
|
New Territories, Hong Kong, S.A.R. |
|
|
|
China |
|
|
|
|
|
|
Common |
Brisa Equities Corporation(1) |
21,000,000 |
17% |
|
1020 East 900 South |
|
|
|
Bountiful, Utah 84010 |
|
|
|
|
|
|
Common |
Central Asian Metals, Inc.(2) |
15,504,408 |
12% |
|
P.O. Box 5251 |
|
|
|
CH 6901 |
|
|
|
Lugano, Switzerland |
|
|
|
|
|
|
Common |
GLG Emerging Markets Fund(3) |
28,000,000 |
21% |
|
c/o GLG Partnership |
|
|
|
One Curzon Street |
|
|
|
London W1J 5HB |
|
|
|
|
|
|
Common |
Jamestown Financial, Inc. (4) |
21,093,880 |
17% |
|
Akara Building, 24 de Castro St. |
|
|
|
Wickhams Cay I, PO Box 36 |
|
|
|
Road Town, Tortola, BVI |
|
|
|
|
|
|
Common |
Yermek Kudabayev(5) (6) |
421,772 |
* |
|
170 Tchaikovsky Street |
|
|
|
4th Floor |
|
|
|
Almaty, Kazakhstan 050000 |
|
|
|
|
|
|
Common |
Zhassulan Bitenov(5) (6) |
383,429 |
* |
|
170 Tchaikovsky Street |
|
|
|
4th Floor |
|
|
|
Almaty, Kazakhstan 050000 |
|
|
|
|
|
|
Common |
Nurlan Tajibaev (5) (6) |
191,715 |
* |
|
170 Tchaikovsky Street |
|
|
|
4th Floor |
|
|
|
Almaty, Kazakhstan 050000 |
|
|
62
|
|
|
|
Common |
Dossan Kassymkhanuly (6) |
-0- |
* |
|
170 Tchaikovsky Street |
|
|
|
4th Floor |
|
|
|
Almaty, Kazakhstan 050000 |
|
|
|
|
|
|
Common |
James Kohler (6) |
-0- |
* |
|
2011 Maple View Drive |
|
|
|
Bountiful, Utah 84101 |
|
|
|
|
|
|
Common |
Timothy Adair (6) |
-0- |
* |
|
5062 W. Amelia Earhart Drive |
|
|
|
Salt Lake City, Utah 84116 |
|
|
|
|
|
|
Common |
Valery Tolkachev (6) |
-0- |
* |
|
27 Pokrovka St., Bldg.6 |
|