united states
Securities and Exchange Commission
Washington, D. C. 20549

FORM 10-K

☑   Annual Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
for the fiscal year ended December 31, 2016

OR

☐   Transition Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
for the transition period from …… to …….

Commission File Number 0-12114

Cadiz Inc.
(Exact name of registrant specified in its charter)

DELAWARE
77-0313235
(State or other jurisdiction of
(I.R.S. Employer
incorporation or organization)
Identification No.)

550 S. Hope Street, Suite 2850
 
Los Angeles, CA
90071
(Address of principal executive offices)
(Zip Code)

(213) 271-1600
(Registrant's telephone number, including area code)

Securities Registered Pursuant to Section 12(b) of the Act:

Common Stock, par value $0.01 per share
The NASDAQ Global Market
(Title of Each Class)
(Name of Each Exchange on Which Registered)

Securities Registered Pursuant to Section 12(g) of the Act: None

Indicate by check mark if the Registrant is a well-known seasoned issuer, as defined in rule 405 under the Securities Act of 1933.
Yes    No 
Indicate by a check mark if the Registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Exchange Act.
Yes   No 
Indicate by check mark whether the Registrant:  (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes   No
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes   No
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K (§220.405 of this chapter) is not contained herein, and will not be contained to the best of Registrant's knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment of this Form 10-K.  ☐
Indicate by check mark whether the Registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer or a smaller reporting company (as defined in Exchange Act Rule 12b-2).
Large accelerated filer    Accelerated filer    Non-accelerated filer   Smaller Reporting Company
Indicate by check mark whether the Registrant is a shell company (as defined in Exchange Act Rule 12b-2).
Yes   No ☒
The aggregate market value of the common stock held by nonaffiliates as of June 30, 2016 was approximately $92,899,031 based on 15,826,070 shares of common stock outstanding held by nonaffiliates and the closing price on that date.  Shares of common stock held by each executive officer and director and by each entity that owns more than 5% of the outstanding common stock have been excluded in that such persons may be deemed to be affiliates. This determination of affiliate status is not necessarily a conclusive determination for other purposes.

As of March 10, 2017, the Registrant had 22,174,925 shares of common stock outstanding.

Documents Incorporated by Reference

Portions of the Registrant's definitive Proxy Statement to be filed for its 2017 Annual Meeting of Stockholders are incorporated by reference into Part III of this Report.  The Registrant is not incorporating by reference any other documents within this Annual Report on Form 10-K except those footnoted in Part IV under the heading "Item 15. Exhibits, Financial Statement Schedules".
 
Cadiz Inc.

Table of Contents

Part I
   
     
Item 1.
1
     
Item 1A.
13
     
Item 1B.
17
     
Item 2.
17
     
Item 3.
19
     
Item 4.
20
     
Part II
   
     
Item 5.
21
     
Item 6.
23
     
Item 7.
24
     
Item 7A.
40
     
Item 8.
41
     
Item 9.
41
     
Item 9A.
41
     
Item 9B.
42
     
Part III
   
     
Item 10.
43
     
Item 11.
43
     
Item 12.
43
     
Item 13.
43
     
Item 14.
43
     
Part IV
   
     
Item 15.
44
 
 
PART I

ITEM 1.  Business
 
  This Form 10-K contains forward-looking statements with regard to financial projections, proposed transactions such as those concerning the further development of our land and water assets, information or expectations about our business strategies, results of operations, products or markets, or otherwise makes statements about future events.  Such forward-looking statements can be identified by the use of words such as "intends", "anticipates", "believes", "estimates", "projects", "forecasts", "expects", "plans" and "proposes".  Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements.  These include, among others, the cautionary statements under the caption "Risk Factors", as well as other cautionary language contained in this Form 10-K.  These cautionary statements identify important factors that could cause actual results to differ materially from those described in the forward-looking statements.  When considering forward-looking statements in this Form 10-K, you should keep in mind the cautionary statements described above.

Overview
 
  We are a land and water resource development company with 45,000 acres of land in three areas of eastern San Bernardino County, California.  Virtually all of this land is underlain by high-quality, naturally recharging groundwater resources, and is situated in proximity to the Colorado River and the Colorado River Aqueduct ("CRA"), California's primary mode of water transportation for imports from the Colorado River into the State.   Our properties are suitable for various uses, including large-scale agricultural development, groundwater storage and water supply projects. Our main objective is to realize the highest and best use of our land and water resources in an environmentally responsible way.
 
  We believe that the long-term highest and best use of our land and water assets can best be realized through the development of a combination of water supply and storage projects at our properties. Therefore, the Company has been primarily focused on the development of the Cadiz Valley Water Conservation, Recovery and Storage Project ("Water Project" or "Project"), which will capture and conserve millions of acre-feet1 of native groundwater currently being lost to evaporation from the aquifer system beneath our 34,000-acre property in the Cadiz and Fenner valleys of eastern San Bernardino County (the "Cadiz/Fenner Property"), and deliver it to water providers throughout Southern California (see "Water Resource Development"). A second phase of the Water Project would offer storage of up to one million acre-feet of imported water in the aquifer system.   We believe that the ultimate implementation of this Water Project will provide a significant source of future cash flow.
___________________________________
 
1 One acre-foot is equal to approximately 326,000 gallons or the volume of water that will cover an area of one acre to a depth of one-foot.  An acre-foot is generally considered to be enough water to meet the annual water needs of one average California household.
1
 
  The primary factor driving the value of such projects is ongoing pressure on California's traditional water supplies and the resulting demand for new, reliable supply solutions that can meet both immediate and long-term water needs.  Available supply is constrained by environmental and regulatory restrictions on each of the State's three main water sources:  the CRA, the State Water Project, which provides water supplies from Northern California to the central and southern parts of the state, and the Los Angeles Aqueduct, which delivers water from the eastern Sierra Nevada mountains to Los Angeles.  Southern California's water providers rely on imports from these systems for a majority of their water supplies, but deliveries from all three into the region have been below capacity over the last several years.
 
  Availability of supplies in California also differs greatly from year to year due to natural hydrological variability.  Over the last several years, California has struggled through an historic drought featuring record-low winter precipitation and reservoir storage levels. However, following a series of strong storms through the 2016-2017 winter, California has received record amounts of rain and snow, eliminating drought conditions in much of Northern California and easing drought in the South. The rapid swing from drought to an extremely wet year has challenged California's traditional infrastructure system, and deliveries into Southern California from the State Water Project, Colorado River Aqueduct and Los Angeles Aqueduct remain below capacity.
 
  The Water Project is a local supply option in Southern California that could help address the region's water supply challenges by providing new reliable supply and local groundwater storage opportunities (see "Water Resource Development" below) in both dry and wet years. The Project has received permits in accordance with the California Environmental Quality Act ("CEQA") which allow the capture and conservation of 2.5 million acre-feet of groundwater over 50 years under the terms of a groundwater management plan approved by San Bernardino County, which is responsible for groundwater use at the Project area. 
 
  Our 2017 working capital requirements relate largely to the final development activities associated with the Water Project and those activities consistent with the Water Project related to further development of our land and agricultural assets.  While we continue to believe that the ultimate implementation of the Water Project will provide the primary source of our future cash flow, we also believe there is significant additional value in our underlying agricultural assets.  Demand for agricultural land with water rights is at an all-time high; therefore, in addition to our Water Project proposal, we are engaged in agricultural joint ventures at the Cadiz/Fenner Property that put some of the groundwater currently being lost to evaporation from the underlying aquifer system to immediate beneficial use. We have farmed portions of the Cadiz/Fenner Property since the late 1980s relying on groundwater from the aquifer system for irrigation and have found the site is well suited for various permanent and seasonal crops. Presently, the property has 2,100 acres leased to third parties for a variety of crops, including citrus, dried-on-the-vine raisins and seasonal vegetables.
 
  We also continue to explore additional uses of our land and water resource assets, including renewable energy development, the marketing of our approved desert tortoise land conservation bank, which is located on our properties outside the Water Project area, and other long-term legacy uses of our properties, such as habitat conservation and cultural development.
2
 
(a)     General Development of Business
 
  We are a Delaware corporation formed in 1992.  As part of our historical business strategy, we have conducted our land acquisition, water development activities, agricultural operations, and other land development initiatives to maximize the long-term value of our properties and future prospects (see "Narrative Description of Business").
 
  Our initial focus was on the acquisition of land and the assembly of contiguous land holdings through property exchanges to prove the quantity and quality of water resources in this Mojave Desert region of eastern San Bernardino County.  We subsequently established agricultural operations on our properties in the Cadiz/Fenner Valley and sought to develop the water resources underlying that site.  In 1993, we secured permits to develop up to 9,600 acres of agriculture at the Cadiz/Fenner Property and withdraw more than one million acre-feet of groundwater from the underlying aquifer system.  The agricultural operations initially began on 1,900 acres and featured vineyards, citrus orchards and seasonal vegetables.
 
  The agricultural development demonstrated that the geology and hydrology of the property is also uniquely suited and able to support a project that could offer additional water supplies and water storage opportunities in Southern California.
 
  In 1997, we entered into the first of a series of agreements with the Metropolitan Water District of Southern California ("Metropolitan"), the largest water wholesaler in the region and owner of the nearby CRA, to jointly design, permit, and build such a project ("2002 Project").  Between 1997 and 2002, we and Metropolitan received substantially all of the state and federal approvals required to construct and operate the 2002 Project, including a Record of Decision ("ROD") from the U.S. Department of the Interior, which approved the 2002 Project and offered a right-of-way for construction of facilities, including a 35-mile water conveyance pipeline from the Cadiz/Fenner Property to the CRA across federal lands.  In October 2002, Metropolitan's staff brought the right-of-way matter before its Board of Directors.  By a very narrow margin, the Metropolitan Board voted not to accept the right-of-way grant nor proceed with the 2002 Project.
 
  Following Metropolitan's decision, we began to pursue new partnerships and redesigned the 2002 Project to meet the changing needs of Southern California's water providers.  We refocused on the safe and sustainable management of the aquifer system beneath our Cadiz/Fenner Property with the goal of providing a reliable, annual water supply for the region.  To assist with these sustainable management priorities, we entered into a Memorandum of Understanding with the Natural Heritage Institute, a leading global environmental organization committed to protecting aquatic ecosystems.  As part of this "Green Compact", we follow stringent plans for groundwater management and habitat conservation.
 
  In September 2008 we entered into a lease agreement with the Arizona & California Railroad Company ("ARZC") to utilize its existing right-of-way between the Cadiz property and the CRA to construct a pipeline able to deliver water from the property into the existing Southern California water transportation system. In 2009, the Department of the Interior evaluated the Water Project's proposed use of an existing railroad right-of-way for a water conveyance pipeline and summarized that the proposed pipeline was within the scope of the right-of-way and required no federal BLM permitting.
3
 
  Before we began state and local permitting, we commissioned environmental consulting firm CH2M HILL to complete a comprehensive study of the water resources at the Project area.  Following more than one year of analysis, CH2M HILL released its study of the aquifer system in February 2010.  Utilizing new models produced by the U.S. Geological Survey in 2006 and 2008, the study estimated the total groundwater in storage in the aquifer system to be between 17 and 34 million acre-feet, a quantity on par with Lake Mead, the nation's largest surface reservoir.  The study also identified a renewable annual supply of native groundwater in the aquifer system currently being lost to evaporation.  CH2M HILL's findings, which were peer reviewed by leading groundwater experts, confirmed that the aquifer system could sustainably support the Water Project.
 
  Between 2010 and 2011 six Southern California water providers executed option agreements to participate in the new Water Project.  Under our lease agreement, the ARZC also reserved water from the Water Project to further a variety of critical railroad purposes.
 
  In accordance with the CEQA, the Water Project began an environmental review and permitting process in 2011 led by Santa Margarita Water District ("SMWD"), one of the Project participants.  After an extensive review process, the SMWD Board of Directors certified the Final Environmental Impact Report on July 31, 2012 and became the first participating agency to convert its option agreement to a Water Purchase and Sale Agreement for firm supplies from the Water Project. On October 1, 2012, San Bernardino County ("County"), a Responsible Agency under CEQA, also adopted CEQA findings and approved the Project's Groundwater Monitoring, Management and Mitigation Plan ('GMMMP", "Plan") and the withdrawal of 50,000 acre-feet (AF) of water per year for 50 years.
 
  Following receipt of these important approvals, we were named as a real-party-in-interest in nine lawsuits brought by parties seeking a reconsideration of the environmental documents and limitation of the Project approvals granted by SMWD and the County.  Three of these cases were subsequently dismissed or otherwise settled and six lawsuits brought by two petitioners proceeded to trial in Orange County Superior Court ("Court") before one judge in December 2013.  In September 2014, the Court issued final signed judgments ("Judgments") formally denying all claims brought in the six remaining lawsuits.  The Judgments upheld the environmental review and approvals of the Water Project and also awarded costs to SMWD, the County, Cadiz and Fenner Valley Mutual Water Company as the prevailing parties in the cases. 
 
  During the fourth quarter of 2014, the petitioners in the six original Court cases filed independent appeals of the six Judgments with the California Court of Appeals, Fourth District. The appeals cases were heard before a three-judge panel in March 2016. In May 2016, the panel unanimously ruled in favor of the Water Project and in sweeping opinions sustained the lower court rulings. Thereafter, the Petitioners did not seek any additional judicial review and in July 2016, the opportunity for the California State Supreme Court to independently review the six Appellate Court opinions on its own motion passed and all litigation was dismissed. As a result, the County of San Bernardino's approval of the Project is now final and the Company's conservation and extraction of 2.5 million acre-feet of groundwater over 50 years under the terms of the groundwater management plan has vested under applicable law.
4
 
  While defending the Project's CEQA permits, the Company and the Water Project participants also worked to complete transportation arrangements to convey Project supplies to end users via a pipeline to be constructed within the ARZC right-of-way and the Colorado River Aqueduct ("CRA"), owned by the Metropolitan Water District of Southern California ("Metropolitan").  Following approval of the Project's permits in 2012, the Company and the Project participants began a dialogue with BLM regarding the Project pipeline in response to federal appropriations language that required the Interior Department to certify that the Project's proposed use of the ARZC right-of-way was within its scope.  The dialogue with the BLM occurred over more than two years and culminated in a controversial guidance opinion issued by the BLM California office in October 2015 that did not certify the Project's proposed use. The Company, the ARZC, Water Project participants, Water Project supporters and members of Congress immediately voiced concern about the guidance opinion via letters, statements and meetings with the BLM.  As a result, legislation is pending before Congress that contains provisions that would clarify the scope of the railroad right-of-way to allow third parties to co-locate infrastructure without additional BLM right-of-way permitting. We believe that if signed into law, the language now contained in the House appropriations bill will enable third parties, including the Company, to carry on existing and future activities within existing railroad ROWs over federal lands without the need to secure a separate ROW grant from BLM.
 
  In 2017, we have continued our efforts in support of this legislation and expect to finalize contracts with Project participating agencies, as well as continue final design and implementation planning for Project construction.
 
  Given the strong demand for agricultural land with access to water, in addition to our ongoing efforts to implement the Water Project, we also continue to farm the Cadiz/Fenner Property.  In February 2016 we entered into lease arrangements that allow our farming tenants to further develop the existing agricultural well-field to supply water for their expanded farming use and also enable the Company to acquire the well-field within a twenty-year period through a call feature in the lease and employ these wells as part of the Water Project. The well-field infrastructure and related improvements are substantially similar, regardless of whether the water is applied for agricultural use or conserved for the Water Project.
 
  See "Narrative Description of Business" below for more detail.

 (b)     Financial Information about Industry Segments
 
  Our primary business is to acquire and develop land with water resources for various uses, including groundwater supply, groundwater storage and agriculture.  As a result, our financial results are reported in a single segment.  See Consolidated Financial Statements.  See also Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations".

(c)     Narrative Description of Business
 
  Our business strategy is to pursue the development of our landholdings for their highest and best uses.  At present, our development activities include water resource, land and agricultural development.

Water Resource Development
 
  Our portfolio of water resources is located in proximity to the Colorado River and the Colorado River Aqueduct ("CRA"), the principal source of imported water for Southern California, and provides us with the opportunity to participate in a variety of water supply, water storage, and conservation programs with public water agencies and other partners.
5
 
  The Cadiz Valley Water Conservation, Recovery and Storage Project
 
  We own approximately 34,000 acres of land and the subsurface strata, inclusive of the unsaturated soils and appurtenant water rights in the Cadiz and Fenner valleys of eastern San Bernardino County (the "Cadiz/Fenner Property").  The aquifer system underlying this property is naturally recharged by precipitation (both rain and snow) within a watershed of approximately 1,300 square miles.  See Item 2, "Properties – The Cadiz/Fenner Valley Property".
 
  The Cadiz Valley Water Conservation, Recovery and Storage Project (the "Water Project" or "Project") is designed to supply, capture and conserve billions of gallons of renewable native groundwater currently being lost annually to evaporation from the aquifer system underlying our Cadiz/Fenner Property, and provide a new, reliable water supply for approximately 400,000 people in Southern California.  The total quantity of groundwater to be recovered and conveyed to Water Project participants will not exceed a long-term annual average of 50,000 acre-feet per year for 50 years.  The Water Project also offers participants the ability to carry-over their annual supply, and store it in the groundwater basin from year to year.  A second phase of the Water Project, Phase II, will offer up to one million acre-feet of underground storage capacity that can be used to hold imported water supplies at the Water Project area.
 
  Water Project facilities required for Phase I primarily include, among other things:

·
High-yield wells designed to efficiently recover available native groundwater from beneath the Water Project area;

·
A water conveyance pipeline to deliver water from the well-field to the CRA for further delivery to Project participants; and

·
An energy source to provide power to the well-field, pipeline and pumping facilities.

If an imported water storage component of the Water Project is ultimately implemented in Phase II, the following additional facilities would be required, among other things:

·
Facilities to pump water through the conveyance pipeline from the CRA to the Water Project well-field and/or through the Company's pipeline from Cadiz to Barstow, CA; and

·
Spreading basins, which are shallow settling ponds that will be configured to efficiently percolate water from the ground surface down to the water table using subsurface storage capacity for the storage of water.
 
  In 2016, the Company focused on completing the remaining steps to implement the Project, including clearance to use an existing railroad right-of-way for its conveyance pipeline and defending the Water Project's CEQA permits in the California Court of Appeal. Prior to construction, the Water Project must (1) complete efforts to secure its pipeline right-of-way, (2) finalize contracts with Project participating agencies and secure transportation arrangements to deliver water into each participant's service area, and (3) secure private construction financing. Below is a discussion of present activities to advance these objectives.
6
 
(1)
 Water Conveyance Pipeline Right-of-Way

Pipeline from Cadiz to CRA
 
  In September 2008, we secured a right-of-way for the Water Project's water conveyance pipeline by entering into a lease agreement with the Arizona & California Railroad Company ("ARZC"), which operates an active shortline railroad extending from Cadiz to Matthie, Arizona.  The agreement allows for the use of a portion of the railroad's right-of-way to construct and operate a water conveyance pipeline for a period up to 99 years.  The buried pipeline would be constructed parallel to the railroad tracks and be used to convey water between our Cadiz/Fenner Property and the CRA in Freda, California.
 
  Our lease agreement with the ARZC also expressly requires that the Project further several railroad purposes and, under the terms of the lease agreement, the ARZC reserved water supplies from the Project for its operational needs as well as access to Project facilities, such as roads and power appurtenances, for the benefit of its railroad operation.  In September 2013, we also entered into a trackage rights agreement with the ARZC that would enable the operation of steam-powered, passenger excursion trains on the line powered by water made available from the pipeline.
 
  The pipeline route was fully analyzed in the Water Project's Final Environmental Impact Report ("EIR") as part of the CEQA environmental review process completed in 2012.  As an existing transportation corridor, the route, which avoids sensitive habitats, was found to be the environmentally preferred route for the pipeline.  In 2009, the federal government stated that no federal environmental review of the pipeline route was required under the National Environmental Policy Act ("NEPA"), because the pipeline was within the scope of the ARZC's right-of-way grant.
 
  Our plan to construct the Project pipeline within the railroad right-of-way is similar to, and modeled after, the thousands of other existing longitudinal uses of rail corridors across the United States today, such as telecommunications lines, natural gas and petroleum product lines and other water lines.  Under the General Railroad Right-of-Way Act of March 3, 1875 ("1875 Act"), according to which many of these railroad corridors were established, a railroad can lease its property for third party uses without permitting of the federal government so long as the use also derives from or furthers railroad purposes, at least in part.  This interpretation of the 1875 Act was confirmed by Memorandum Opinion M-37025 issued by the Solicitor of the US Department of the Interior on November 4, 2011 ("2011 M-Opinion"), which state in relevant part:

"Within an 1875 Act ROW, a railroad's authority to undertake or authorize activities is limited to those activities that derive from or further a railroad purpose, which allows a railroad to undertake, or others to undertake, activities that have both railroad and commercial purposes, but does not permit a railroad to authorize activities that bear no relationship to the construction and operation of a railroad." (Emphasis added, M-37025)
 
  The Project includes the following features, enabled by the conveyance pipeline, provided in furtherance of railroad purposes:
7
 
 
·
A new access road along the entire pipeline route to enable maintenance, emergency access and shorten routes for crew-changes,
·
Remotely operated fire-suppression systems at each of the existing creosote-treated wooden trestles,
·
Inline power generation for crossing operations and lighting, heating and cooling for existing railroad transloading operations,
·
Fiber optic information transmission to convey track-speed and cameras in aid of emergency and to discourage vandalism; and
·
The distribution of water for the operation of a steam-powered locomotive, fire-suppression and other miscellaneous uses.  
 
  In response to inquiries from the BLM beginning in 2012 about these purposes, the Company, the ARZC and Water Project participants had numerous meetings with the BLM and provided several documents over multiple years for background about the railroad purposes that would be furthered by the Project over several years.  In April 2015 BLM California notified the Company that it was analyzing the Project's proposed use of the ARZC right-of-way and expected to provide the results of this evaluation to the BLM Washington D.C. office by the end of summer 2015.
 
  On October 2, 2015, the Director of the California Office of the BLM signed a letter that would later be sent to ARZC and the Company summarizing that the Project pipeline is outside the scope of the ARZC right-of-way, because a water pipeline would not primarily further a railroad purpose or originate from a railroad purpose, and would therefore require a new federal right-of-way permit prior to construction.  We believe this finding disregards federal law and policy and strays from the framework provided for in the binding 2011 M-Opinion, and therefore we immediately pursued steps to rescind the October determination.
 
  Several Members of Congress raised concerns about the 2015 guidance and its inconsistencies with existing federal policy governing third party railroad right-of-way use.  As a result of inquiries from Congress, BLM California's newly appointed Director met with the Company, the ARZC and Project participants in March 2016.  However, BLM representatives at the meeting were not prepared to discuss the framework utilized to evaluate the Water Project's proposed use of the ARZC right-of-way.
 
  Following the production of documents produced via a Freedom of Information Act request in (June) 2016 regarding BLM's evaluation of the Project's use of the railroad right-of-way, we have had no further formal consultation with BLM California. The guidance letter is under investigation by the House of Representatives Oversight & Government Reform Committee and the Interior Department Inspector General.
 
  Meanwhile, numerous United States congressional representatives have worked to clarify the scope of the congressionally granted 1875 Act right-of-way (ROW) for all who rely on them for necessary infrastructure, including, for example, fiber optics and communications lines, energy, electricity, water, wastewater, sewer, and natural gas lines. In July 2016, language that would clarify the scope of railroad ROW was included in the fiscal year 2017 (FY17) House Interior and Environment Appropriations Bill (H.R.5538), an annual funding measure for the Department of the Interior, the Environmental Protection Agency, the US Forest Service, and various related agencies, including the BLM. HR 5538 passed the US House of Representatives in July 2016, but consideration of the bill has been continued until April 2017.   If this language is not considered in April 2017, it could be delayed until the Fall of 2017.  We believe that if signed into law, the language now contained in the House appropriations bill will enable third parties, including the Company, to carry on existing and future activities within existing railroad ROWs over federal lands without the need to secure a separate ROW grant from BLM.
8
 
Northern Pipeline
  We currently own a 96-mile existing idle natural gas pipeline from the Cadiz/Fenner Property to Barstow, California that we intend to convert for the transportation of water. The Barstow area serves as a hub for water delivered from northern and central California to communities in Southern California's High Desert.  In addition, the Company holds an option to purchase a further 124-mile segment of this pipeline from Barstow to Wheeler Ridge, California for $20 million.  This option expires in December 2018.
  Initial feasibility studies indicated that, upon conversion, the 30-inch line could transport between 20,000 and 30,000 acre-feet of water per year between the Water Project area and various points along the Central and Northern California water transportation network. As a result this line could create significant opportunities for our water resource development efforts.

  If this pipeline were to become operational, then the Water Project would link two major water delivery systems in California, providing flexible opportunities for both supply and storage.  The Northern Pipeline could deliver Phase I supplies, either directly or via exchange, to existing and potential customers of Phase I of the Project.  It could also be used to import water to the Project area and provide additional groundwater storage for the region's water providers. Such use is currently being contemplated as part of Phase II of the Water Project.

  
The 96-mile pipeline segment was evaluated in the Water Project's EIR during the CEQA process.  Any use of the pipeline would be conducted in conformity with the Project's GMMMP and is subject to further CEQA evaluation and potentially federal environmental permitting.

  The Northern Pipeline also represents new opportunities for the Company independent of the Water Project to offer water transportation to locations along the pipeline route that are not presently interconnected by existing water infrastructure.  The entire 220-mile pipeline crosses California's major water infrastructure as well as urban and agricultural centers and can be utilized to transport water, independent of the Water Project, between users who presently lack direct interconnections along the pipeline route. We are presently engaged in discussions with parties that may be interested in such transportation.

(2)
Agreements with Public Water Agencies or Private Water Utilities & Conveyance Arrangements
 
  The Company has executed Letters of Intent, option agreements and purchase agreements (collectively, "Agreements") with public water agencies and private water utilities in California during the Project's development. These participating agencies serve more than one million customers in cities throughout California's San Bernardino, Riverside, Los Angeles, Orange, Imperial and Ventura Counties.
9
 
  Santa Margarita Water District ("SMWD") was the first participant to convert its option agreement and adopt resolutions approving a Water Purchase and Sale Agreement for 5,000 acre-feet of water.  The structure of the SMWD purchase agreement calls for an annually adjusted water supply payment, plus a pro rata portion of the capital recovery charge and operating and maintenance costs.  The capital recovery charge is calculated by amortizing the total capital investment by the Company over a 30-year term. 
 
  Agreements entered into prior to the beginning of the CEQA review process provide the right to acquire an annual supply of 5,000 acre-feet of water at $775 per acre-foot (2010 dollars, subject to adjustment), which is competitive with the incremental cost of new water.  In addition, these agencies have options to acquire storage rights in the Water Project to allow for the management of their Water Project supplies in complement with their other water resources.  Up to 150,000 acre-feet of carry-over storage is available for reservation by the agencies prior to construction commencement.  Participants that elect to achieve year-to-year flexibility in their use of Project water by utilizing carry-over storage will reserve storage capacity for $1,500 per acre-foot prior to construction.
 
  Letters of Intent ("LOIs") that have been entered into since completion of the CEQA review process reserve supplies from the Water Project at $960 per acre-foot (2014 dollars, subject to adjustment). These LOIs also include the option to reserve carry-over storage capacity for $1,500 per acre-foot prior to construction.
 
  Presently, total reservations of supplies from the Water Project via these Agreements are in excess of Water Project capacity and we are working collaboratively with the participating water agencies to account for any oversubscription in the final definitive Purchase and Sale Agreements we enter into with these agencies.
 
  In addition, prior to construction of the Water Project, terms for moving water supplies in the CRA must be negotiated with Metropolitan, which owns and controls the CRA.  Water Project supplies entering the CRA will comply with Metropolitan's published engineering, design and water quality standards and will be subject to all applicable fees and charges routinely established by Metropolitan for the conveyance of water within its service territory.  Any agreement as to the terms and conditions of the Water Project's use of the CRA will be negotiated between and entered into by Metropolitan and the Project participating agencies, not the Company. Discussions with Metropolitan regarding conveyance of Project water in the CRA have been led by SMWD.  We expect arrangements would be approved by Metropolitan staff and considered by its Board following resolution of BLM discussions related to the conveyance pipeline, discussed above.  Once arrangements are reached, Metropolitan must take action as a responsible agency under CEQA regarding the terms and conditions of the Water Project's use of the CRA to transport water to its participating agencies.

(3)
Construction Financing
  
 
  As described above, construction of Phase I of the Water Project would primarily consist of wellfield facilities at the Project site, a conveyance pipeline, and an energy source to pump water through the conveyance pipeline between the Project well-field and the CRA.  The construction of these facilities, which we expect would cost approximately $250 million, will require capital financing that we expect will be secured by the proceeds of our definitive Purchase and Sale Agreements and the new facility assets.  The Company's existing corporate term debt provides us the flexibility to incorporate Water Project construction financing up to $300 million within our current debt structure.
10
 
Agricultural Development
 
  Within the Cadiz/Fenner Property, all of the existing 34,000 acres are currently zoned for agriculture.  In 1993, we secured conditional use permits to develop agriculture on up to 9,600 acres of the property and withdraw groundwater from the underlying aquifer system for irrigation.  We have since maintained various levels of crops on the Property as we developed the Water Project.  In 2013, we entered into a lease agreement with a third party to develop up to 1,480 acres of lemons at the site, 520 acres of which have been planted to date.
 
  In February 2016, we entered into a lease agreement with Fenner Valley Farms LLC ("FVF"), a subsidiary of Water Asset Management LLC, a related party, pursuant to which FVF leased, for a 99-year term, 2,100 acres at the Cadiz/Fenner property to be used to plant, grow and harvest agricultural crops ("FVF Lease").  As consideration for the lease, FVF paid the Company a one-time payment of $12,000,000 in February 2016. The acreage that was historically farmed by the Company and the acreage that is leased to a third party to develop lemons was included within the leased acreage and assumed by FVF.  Following entry into this lease, the Company is no longer directly involved in the current agricultural operations at the site and all of our agricultural revenue is derived pursuant to the FVF lease.
 
  As part of the agricultural development to be conducted under the lease arrangements, the groundwater production capacity of the property's existing well-field is expected to be enhanced through infrastructure improvements that are complementary to the Water Project.    While any additional well-field development for agricultural use would be financed by our agricultural partners as provided under our agricultural lease arrangements, the Company retained a call feature that allows us, at any time in the initial 20 years, to acquire the well-field and integrate any new agricultural well-field infrastructure developed into the Water Project's facilities.

Additional Eastern Mojave Properties
 
  We also own approximately 11,000 acres outside of the Cadiz/Fenner Valley area in two locations within the Mojave Desert in eastern San Bernardino County.
 
  Our primary landholding outside of the Cadiz area is approximately 9,000 acres in the Piute Valley.  This landholding is located approximately 15 miles from the resort community of Laughlin, Nevada, and about 12 miles from the Colorado River town of Needles, California.  Extensive hydrological studies, including the drilling and testing of a full-scale production well, have demonstrated that this landholding is underlain by high-quality groundwater.  The aquifer system underlying this property is naturally recharged by precipitation (both rain and snow) within a watershed of approximately 975 square miles and could be suitable for a water supply project, agricultural development or solar energy production.  These properties are located in or adjacent to areas designated by the federal government as National Monument, Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and are suitable candidates for preservation and conservation. (see "Land Conservation Bank" below).
11
 
  Additionally, we own acreage located near Danby Dry Lake in Ward Valley, approximately 30 miles southeast of our Cadiz/Fenner Valley properties.  The Danby Dry Lake property is located approximately 10 miles north of the CRA.  Initial hydrological studies indicate that the area has excellent potential for a water supply project. Certain of the properties in this area may also be suitable for agricultural development, solar energy development and/or preservation and conservation.

Land Conservation Bank
 
  Approximately 10,000 acres of our properties outside of the Cadiz/Fenner Valley area are located within terrain designated by the federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and have limited development opportunities.  In February 2015, the California Department of Fish and Wildlife approved our establishment of the Fenner Valley Desert Tortoise Conservation Bank ("Fenner Bank"), a land conservation bank that makes available approximately 7,500 acres of our properties located within Critical Desert Tortoise Habitat for mitigation of impacts to tortoise and other sensitive species that would be caused by development in the Southern California desert.  Under its enabling documents, the Fenner Bank offers credits that can be acquired by entities that must mitigate or offset impacts linked to planned development.  For example, this bank can service the mitigation requirements of renewable energy, military, residential and commercial development mitigation requirements for projects being considered throughout the desert.  Credits sold by the Fenner Bank will fund our permanent preservation of the land as well as research by outside entities, including San Diego Zoo Global, into desert tortoise health and species protection.

Other Opportunities
 
  Other opportunities in the water and agricultural or related infrastructure business complementary to our current objectives could provide new opportunities for our Company.
 
  Over the longer-term, we believe the population of Southern California, Nevada and Arizona will continue to grow, and that, in time, the economics of commercial and residential development at our properties may become attractive.
 
  We remain committed to the sustainable use of our land and water assets, and will continue to explore all opportunities for environmentally responsible development of these assets.  We cannot predict with certainty which of these various opportunities will ultimately be utilized.

Seasonality
 
  Our water resource development activities are not seasonal in nature.
 
  Our farming operations have been limited to the cultivation of lemons and grapes/raisins and spring and fall plantings of vegetables on the Cadiz Valley properties.  These operations have been subject to the general seasonal trends that are characteristic of the agricultural industry.
12
 
Competition
 
  We face competition for the acquisition, development and sale of our properties from a number of competitors.  We may also face competition in the development of water resources and agriculture associated with our properties.  Since California has scarce water resources and an increasing demand for available water, we believe that location, price and reliability of delivery are the principal competitive factors affecting transfers of water in California.

Employees
 
  As of December 31, 2016, we employed 9 full-time employees (i.e. those individuals working more than 1,000 hours per year).  We believe that our employee relations are good.

Regulation
 
  Our operations are subject to varying degrees of federal, state and local laws and regulations.  As we proceed with the development of our properties, including the Water Project, we will be required to satisfy various regulatory authorities that we are in compliance with the laws, regulations and policies enforced by such authorities.  Groundwater development, and the export of conserved groundwater for sale to entities such as public water agencies, is subject to regulation by specific existing statutes, in addition to general environmental statutes applicable to all development projects.  Additionally, we must obtain a variety of approvals and permits from state and federal governments with respect to issues that may include environmental issues, issues related to special status species, issues related to the public trust, and others.  Because of the discretionary nature of these approvals and concerns, which may be raised by various governmental officials, public interest groups and other interested parties during both the development and the approval process, our ability to develop properties and realize income from our projects, including the Water Project, could be delayed, reduced or eliminated.

Access to Our Information
 
  Our annual, quarterly and current reports, proxy statements and other information are filed with the Securities and Exchange Commission ("SEC") and are available free of charge through our web site, www.cadizinc.com, as soon as reasonably practical after electronic filing of such material with the SEC.
 
  Our SEC filings are also available to the public at the SEC website at www.sec.gov.  You may also read and copy any document we file at the SEC's public reference room located at 100 F Street N.E., Washington D.C. 20549.  Please call the SEC at 1-800-SEC-0330 for further information on the operation of the public reference room.


ITEM 1A.  Risk Factors
 
  Our business is subject to a number of risks, including those described below.
13
 
We May Not Be Able To Obtain the Financing We Need To Implement Our Asset Development Programs
 
  We presently have sufficient funds to meet our expected working capital needs through April 2018, but will continue to require additional working capital to meet our cash resource needs until such time as our asset development programs, including the Water Project, produce revenues.  If we cannot raise funds if and when needed, we might be forced to make substantial reductions in our operating expenses, which could adversely affect our ability to implement our current business plan and ultimately our viability as a company.  We cannot assure you that our current lenders, or any other lenders, will give us additional credit should we seek it.  If we are unable to obtain additional credit, we may engage in further financings.  Our ability to obtain financing will depend, among other things, on the status of our asset development programs and general conditions in the capital markets at the time funding is sought.  Any further equity or convertible debt financings would result in the dilution of ownership interests of our current stockholders.

Our Development Activities Have Not Generated Significant Revenues
 
  At present, our development activities include water resource and agricultural development at our San Bernardino County properties.  We have not received significant revenues from our development activities to date and we do not know when, if ever, we will receive operating revenues sufficient to offset the costs of our development activities.  As a result, we continue to incur a net loss from operations.

We May Never Generate Significant Revenues or Become Profitable Unless We Are Able to Successfully Implement Programs to Develop Our Land Assets and Related Water Resources
 
  We do not know the terms, if any, upon which we may be able to proceed with our water and other development programs.  Regardless of the form of our water development programs, the circumstances under which supplies or storage of water can be developed and the profitability of any supply or storage project are subject to significant uncertainties, including the risk of variable water supplies and changing water allocation priorities.  Additional risks include our ability to obtain all necessary regulatory approvals and permits, litigation by environmental or other groups, unforeseen technical difficulties, general market conditions for water supplies, and the time needed to generate significant operating revenues from such programs after operations commence.

The Development of Our Properties Is Heavily Regulated, Requires Governmental Approvals and Permits That Could Be Denied, and May Have Competing Governmental Interests and Objectives
 
  In developing our land assets and related water resources, we are subject to local, state, and federal statutes, ordinances, rules and regulations concerning zoning, resource protection, environmental impacts, infrastructure design, subdivision of land, construction and similar matters.  Our development activities are subject to the risk of adverse interpretations or changes to U.S. federal, state and local laws, regulations and policies.  Further, our development activities require governmental approvals and permits.  If such permits were to be denied or granted subject to unfavorable conditions or restrictions, our ability to successfully implement our development programs would be adversely impacted.  
14
 
  In this regard, federal government appropriations currently direct the U.S. Department of the Interior (the "DOI") to confirm that the Water Project's proposed use of a portion of the railroad right-of-way leased from the ARZC for the Project's conveyance pipeline is within the scope of the original right-of-way grant.  According to existing federal law and direction from the DOI in Memorandum Opinion M-23075, a railroad has the authority to grant third party uses of its right-of-way without BLM permitting if those uses will further, in part, a railroad purpose. The Project and pipeline will further numerous railroad purposes by providing fire suppression, hydropower generation creating additional rail transloading opportunities, fiber optic communications, increased traffic, access to water for business operations, and other benefits. In October 2015, the outgoing Director of the BLM's California State Office notified the Company and the ARZC that, in spite of the railroad purposes furthered by the Project pipeline, he had determined that the Project's pipeline is outside the scope of the ARZC right-of-way because the benefits derive from a pipeline that is not an original railroad purpose.  The letter also stated that if the Project would like to move ahead with the construction of a pipeline within the ARZC right-of-way, then the Company would need to file a new right-of-way application with the BLM.  The October 2015 guidance noted it was not a final determination and could be reconsidered with the presentation of additional information and in the public interest. 
 
  Several Members of Congress have raised concerns about the 2015 guidance and have supported legislative language that would clarify federal policy governing third party use of railroad right-of-way over federal lands.  We believe that if this language were to be signed into law it will enable third parties, including the Company, to carry on existing and future activities within existing railroad ROWs over federal lands without the need to secure a separate ROW grant. The language is expected to be considered as part of a federal appropriations package in April 2017. If this language is not considered in April 2017, it could be delayed until the Fall of 2017.
 
  In addition, prior to construction of the Water Project, terms for moving water supplies in the CRA must be negotiated with Metropolitan, which owns and controls the CRA.  Water Project supplies entering the CRA will comply with Metropolitan's published engineering, design and water quality standards and will be subject to all applicable fees and charges routinely established by Metropolitan for the conveyance of water within its service territory.  Any agreement as to the terms and conditions of the Water Project's use of the CRA will be negotiated between and entered into by Metropolitan and the Project participating agencies, not the Company. Discussions with Metropolitan regarding conveyance of Project water in the CRA have been led by SMWD.  We expect arrangements would be approved by Metropolitan staff and considered by its Board following resolution of BLM discussions related to the conveyance pipeline, discussed above.  Once arrangements are reached, Metropolitan must take action as a responsible agency under CEQA regarding the terms and conditions of the Water Project's use of the CRA to transport water to its participating agencies.
 
  Finally, the statutes, regulations and ordinances governing the approval processes provide third parties the opportunity to challenge proposed plans and approvals.  Opposition from third parties will cause delays and increase the costs of our development efforts or preclude such development entirely.  While we have worked with representatives of various environmental and third party interests and agencies to minimize and mitigate the impacts of our planned projects, certain groups may remain opposed to our development plans and pursue legal action.
15
 
Our Failure to Make Timely Payments of Principal and Interest on Our Indebtedness May Result in a Foreclosure on Our Assets
 
  As of December 31, 2016, we had total indebtedness outstanding to our lenders of approximately $112.5 million.  Approximately $43.5 million of our indebtedness is secured by our assets and is due in September 2019 (see Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations – Liquidity and Capital Resources").  To the extent that we do not make principal and interest payments on the indebtedness when due, or if we otherwise fail to comply with the terms of agreements governing our indebtedness, we may default on our obligations.  

The Conversion of Our Outstanding Convertible Notes into Common Stock Would Dilute the Percentage of Our Common Stock Held by Current Stockholders
 
  In connection with our March 2013 debt refinance (see Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations – Liquidity and Capital Resources"), we issued approximately $53.5 million in convertible notes, under which principal and accrued interest can be converted into common stock at $8.05 per share at the election of our noteholders prior to maturity in March 2018 (the "2018 Convertible Notes").  In December 2015, certain of the noteholders exchanged their 2018 Convertible Notes for new convertible notes under which principal and accrued interest can be converted into common stock at $6.75 per share at the election of the noteholders prior to a maturity date in March 2020 (the "2020 Convertible Notes").  A total of $48.929 million in original principal amount of the 2018 Convertible Notes were exchanged for 2020 Convertible Notes, leaving $3.390 million in original principal amount of the 2018 Convertible Notes outstanding.  In April 2016, we issued an additional $8.0 million in original principal amount of the 2020 Notes.   As of December 31, 2016, our lenders had converted $8.746 million in original principal amount of the notes, leaving a balance of $52.724 million in original principal amount of these notes.  An election by our lenders to convert all or a portion of principal and accrued interest under the 2018 and 2020 Convertible Notes into common stock will dilute the percentage of our common stock held by current stockholders up to 10.2 million shares as of December 31, 2016, and up to an additional 2.5 million shares if held to maturity.

The Issuance of Equity Securities Under Management Equity Incentive Plans Will Impact Earnings
 
     Our compensation programs for management emphasize long-term incentives, primarily through the issuance of equity securities and options to purchase equity securities.  It is expected that plans involving the issuance of shares, options, or both will be submitted from time to time to our stockholders for approval.  In the event that any such plans are approved and implemented, the issuance of shares and options under such plans may result in the dilution of the ownership interest of other stockholders and will, under currently applicable accounting rules, result in a charge to earnings based on the value of our common stock at the time of issue and the fair value of options at the time of their award.  The expense would be recorded over the vesting period of each stock and option grant.
16
 
The Volatility of Our Stock Price Could Adversely Affect Current and Future Stockholders
 
  The market price of our common stock is volatile and fluctuates in response to various factors which are beyond our control.  Such fluctuations are particularly common in companies such as ours, which have not generated significant revenues.  The following factors, in addition to other risk factors described in this section, could cause the market price of our common stock to fluctuate substantially:
 
·
developments involving the execution of our business plan;
·
disclosure of any adverse results in litigation;
·
regulatory developments affecting our ability to develop our properties;
·
the dilutive effect or perceived dilutive effect of additional debt or equity financings;
·
perceptions in the marketplace of our company and the industry in which we operate; and
·
general economic, political and market conditions.
 
  In addition, the stock markets, from time to time, experience extreme price and volume fluctuations that may be unrelated or disproportionate to the operating performance of companies.  These broad fluctuations may adversely affect the market price of our common stock.  Price volatility could be worse if the trading volume of our common stock is low.


ITEM 1B.  Unresolved Staff Comments
 
  Not applicable at this time.


ITEM 2.  Properties
 
  Following is a description of our significant properties.

The Cadiz/Fenner Valley Property
 
  We own approximately 34,000 acres of largely contiguous land in the Cadiz and Fenner valleys of eastern San Bernardino County, California (the "Cadiz/Fenner Property").  This area is located approximately 30 miles north of the Colorado River Aqueduct ("CRA").  We first began acquiring this land in 1983 and shortly thereafter conducted investigations into the feasibility of agricultural development at these lands and overall access to groundwater.  These investigations confirmed the availability of high-quality groundwater in quantities appropriate for agricultural development.
 
  Additional independent geotechnical and engineering studies conducted since 1985 have confirmed that the Cadiz/Fenner Property overlies a significant aquifer system that would not only support agricultural development, but also is ideally suited for the conservation and recovery of indigenous groundwater, as well as the storage of conserved or imported water, as contemplated by the Water Project.  See Item 1, "Business – Narrative Description of Business – Water Resource Development".
17
 
Other Eastern Mojave Properties
 
  In addition to the Cadiz/Fenner Valley property, we also own approximately 11,000 additional acres in the eastern Mojave Desert portion of San Bernardino County, California at two separate properties.
 
  The first property consists of approximately 9,000 acres in the Piute Valley.  This landholding is located approximately 15 miles from the resort community of Laughlin, Nevada, and about 12 miles from the Colorado River town of Needles, California.  Extensive hydrological studies, including the drilling and testing of a full-scale production well, have demonstrated that this landholding is underlain by high-quality groundwater.  The aquifer system underlying this property is naturally recharged by precipitation (both rain and snow) within a watershed of approximately 975 square miles and could be suitable for a water supply project, agricultural development or solar energy production.  Certain of these properties are located in or adjacent to areas designated by the federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and are suitable candidates for preservation and conservation.  In February 2015, the California Department of Fish and Wildlife approved our establishment of the Fenner Valley Desert Tortoise Conservation Bank on approximately 7,500 acres of our Piute Valley properties.  The Fenner Bank, which is the largest land bank in California dedicated to protecting the desert tortoise, offers credits that can be acquired by public and private entities required to mitigate or offset impacts to the desert tortoise linked to planned development. We are presently marketing these credits to a variety of planned developments in the region.
 
  Additionally, we own nearly 2,000 acres near Danby Dry Lake in Ward Valley, approximately 30 miles southeast of our Cadiz/Fenner landholdings.  Our Danby Dry Lake property is located approximately 10 miles north of the Colorado River Aqueduct.  Initial hydrological studies indicate that it has excellent potential for water supply, agricultural development and related uses.  Certain of the properties in this area may also be suitable for agricultural development and/or preservation and conservation.

Executive Offices
 
  We lease approximately 7,200 square feet of office space in Los Angeles, California for our executive offices.  The lease terminates in April 2019.  Current base rent under the lease is approximately $15,500 per month.

Cadiz Real Estate
 
  In December 2003, we transferred substantially all of our assets (with the exception of our office sublease, and certain office furniture and equipment) to Cadiz Real Estate LLC, a Delaware limited liability company ("Cadiz Real Estate").  We hold 100% of the equity interests of Cadiz Real Estate and, therefore, we continue to hold 100% beneficial ownership of the properties that we transferred to Cadiz Real Estate.  The Board of Managers of Cadiz Real Estate currently consists of two managers appointed by us.
 
  Cadiz Real Estate is a co-obligor under our senior secured term loan, for which assets of Cadiz Real Estate have been pledged as security.
18
 
  Because the transfer of our properties to Cadiz Real Estate has no effect on our ultimate beneficial ownership of these properties, we refer throughout this Report to properties owned of record either by Cadiz Real Estate or by us as "our" properties.

Debt Secured by Properties
 
  Our assets have been pledged as collateral for $43.5 million of senior secured debt outstanding as of December 31, 2016.  Information regarding interest rates and principal maturities is provided in Note 6 to the Consolidated Financial Statements.


ITEM 3.  Legal Proceedings

Securities Related Class Action Lawsuit
 
  On April 24, 2015, a putative class action lawsuit, entitled Van Wingerden v. Cadiz Inc., et al., No. 2:15-cv-03080-JAK-JEM, was filed against Cadiz and certain of its directors and officers ("Defendants") in the United States District Court for the Central District of California purporting to assert claims for violation of §§ 10(b) and 20(a) of the Securities Exchange Act of 1934 and Rule 10b-5 promulgated thereunder. The complaint, which was purportedly brought on behalf of all Cadiz shareholders, alleged that the Company's public disclosures were inadequate in relation to the Cadiz Valley Water Conservation, Recovery and Storage Project (the "Water Project").  The complaint sought unspecified monetary damages and other relief.  The Company believed that the claims alleged in the purported class action lawsuit were baseless and without merit.  On December 2, 2015, Defendants filed a Motion to Dismiss the lawsuit and a hearing on the motion was held in late February 2016.  Following court-mandated mediation discussions in April 2016, and notwithstanding that the Company disputes the allegations in the complaint, the parties agreed to settle the case and filed a notice of settlement with the Court on May 6, 2016.  On May 9, 2016, the Court dismissed the case without prejudice.  On June 16, 2016, the plaintiffs filed a motion seeking preliminary approval of the settlement and supplemented such motion on July 14, 2016 at the request of the Court.   On September 30, 2016, the Court issued an order granting preliminary approval of the settlement. In the settlement, the Company made no admission of liability or wrongdoing and did not concede the validity of any of the allegations or legal claims made in the litigation. On February 8, 2017, the Court issued its Order and Final Judgment dismissing the federal class action and finalizing the settlement.  This matter is now closed.  A cash settlement will be paid in accordance with our corporate insurance policy and not from our cash resources.

Shareholder Derivative Lawsuit
 
  On February 6, 2016, a shareholder derivative lawsuit, entitled Herman Boschken v. Keith Brackpool et. al., was filed against certain Cadiz directors and officers ("Derivative Defendants") in the Superior Court of California State of California County of Los Angeles ("Superior Court") purporting to assert claims for breach of fiduciary duty, corporate waste, gross mismanagement, and unjust enrichment.  The Complaint, which purports to be brought on behalf of all Cadiz shareholders, alleges that the Derivative Defendants made false and misleading statements regarding the Company's business and prospects.  This complaint was filed in the wake of Van Wingerden v. Cadiz, Case No. 2:15-cv-03080-JAK-JEM (C.D.C.A. Apr. 24, 2015), described above, and mirrors many of its factual allegations.  Among other things, the Complaint seeks unspecified monetary damages and certain changes to corporate governance policies.  The Company believes that the lawsuit is without merit.  Notwithstanding that the Company disputes the allegations in the complaint, the parties agreed to settle the case and on January 25, 2017, the Superior Court entered an order preliminarily approving a proposed settlement and approving for dissemination the Notice of Derivative Settlement (the "Notice") to our current shareholders. The proposed settlement is subject to final approval by the Superior Court of California.  In the settlement, the Company makes no admission of liability or wrongdoing and does not concede the validity of any of the allegations or legal claims made in the litigation. Subject to final approval of the settlement by the Superior Court, and in exchange for a release of all claims by the plaintiffs and a dismissal of the Derivative Action with prejudice, the Company has agreed to implement certain corporate governance reforms, and pay certain plaintiffs' attorney fees and expenses. The cash portion of the settlement will be paid in accordance with our corporate insurance policy and not from our cash resources. 
19
 
Other Proceedings
 
  There are no other material legal proceedings pending to which we are a party or of which any of our property is the subject.


ITEM 4.  Mine Safety Disclosures

            Not Applicable.
20
 
PART II

ITEM 5.     Market for Registrant's Common Equity, Related Stockholder Matters and Issuer Purchase of Equity Securities
 
  Our common stock is currently traded on The NASDAQ Global Market ("NASDAQ") under the symbol "CDZI."  The following table reflects actual sales transactions for the dates that we were trading on NASDAQ, as reported by NASDAQ.

 
 
High
   
Low
 
Quarter Ended
 
Sales Price
   
Sales Price
 
 
           
2015:
           
March 31
 
$
10.66
   
$
10.21
 
June 30
 
$
8.70
   
$
8.53
 
September 30
 
$
7.37
   
$
7.24
 
December 31
 
$
5.45
   
$
5.15
 
                 
2016:
               
March 31
 
$
5.43
   
$
5.03
 
June 30
 
$
5.93
   
$
5.64
 
September 30
 
$
7.63
   
$
7.04
 
December 31
 
$
12.65
   
$
12.05
 

  On March 10, 2017, the high, low and last sales prices for the shares were $14.20, $13.60, and $14.10, respectively.
 
  As of March 10, 2017, the number of stockholders of record of our common stock was 91.
 
  To date, we have not paid a cash dividend on our common stock and do not anticipate paying any cash dividends in the foreseeable future.  Our senior secured term loan has covenants that prohibit the payment of dividends.
 
  All securities sold by us during the three years ended December 31, 2016, which were not registered under the Securities Act of 1933, as amended, have been previously reported in accordance with the requirements of Rule 12b-2 of the Securities Exchange Act of 1934, as amended.
21
 
STOCK PRICE PERFORMANCE
 
  The stock price performance graph below compares the cumulative total return of Cadiz Inc. common stock against the cumulative total return of the Standard & Poor's Small Cap 600 NASDAQ U.S. index and the Russell 2016® index for the past five fiscal years. The graph indicates a measurement point of December 31, 2011, and assumes a $100 investment on such date in Cadiz Inc. common stock, the Standard & Poor's Small Cap 600 and the Russell 2016® indices. With respect to the payment of dividends, Cadiz Inc. has not paid any dividends on its common stock, but the Standard & Poor's Small Cap 600 and the Russell 2016® indices assume that all dividends were reinvested. The stock price performance graph shall not be deemed incorporated by reference by any general statement incorporating by reference this annual report on Form 10-K into any filing under the Securities Act of 1933, as amended, except to the extent that Cadiz Inc. specifically incorporates this graph by reference, and shall not otherwise be deemed filed under such acts.

 
 
22
 
ITEM 6.  Selected Financial Data
 
  The following selected financial data insofar as it relates to the years ended December 31, 2016, 2015, 2014, 2013, and 2012 has been derived from our audited financial statements.  The information that follows should be read in conjunction with the audited consolidated financial statements and notes thereto for the period ended December 31, 2016 included in Part IV of this Form 10-K.  See also Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations".
 
($ in thousands, except for per share data)
 
Year Ended December 31,
 
 
2016
   
2015
   
2014
   
2013
   
2012
 
Statement of Operations Data:
                           
Total revenues
$
412
   
$
304
   
$
336
   
$
301
   
$
362
 
Net loss
$
(26,339
)
 
$
(24,013
)
 
$
(18,881
)
 
$
(22,677
)
 
$
(19,574
)
Net loss applicable to common stock
$
(26,339
)
 
$
(24,013
)
 
$
(18,881
)
 
$
(22,677
)
 
$
(19,574
)
Per share:
                                     
Net loss (basic and diluted)
$
(1.41
)
 
$
(1.35
)
 
$
(1.15
)
 
$
(1.46
)
 
$
(1.27
)
Weighted-average common shares outstanding
 
18,719
     
17,782
     
16,370
     
15,570
     
15,438
 
   
 
Year Ended December 31,
 
  2016     2015     2014           2013       2012    
Balance Sheet Data:
                                     
Total assets
$
67,099
   
$
54,790
   
$
67,375
   
$
63,106
   
$
50,437
 
    Long-term debt
$
102,374
   
$
107,592
   
$
103,547
   
$
95,349
   
$
63,169
 
Common stock and additional paid-in capital
$
355,554
   
$
327,034
   
$
319,781
   
$
304,140
   
$
301,193
 
Accumulated deficit
$
(409,871
)
 
$
(383,532
)
 
$
(359,519
)
 
$
(340,638
)
 
$
(317,961
)
Stockholders' (deficit) equity
$
(54,317
)
 
$
(56,498
)
 
$
(39,738
)
 
$
(36,498
)
 
$
(16,768
)

  Common shares issued and outstanding have increased from 15,438,961 at December 31, 2012 to 21,768,864 as of December 31, 2016.  The increase is primarily due to the issuance of shares to investors in registered offerings, private placements, the issuance of shares to investors upon warrant exercises, conversions of notes, debt interest payments in the form of shares and the issuance of shares to employees, vendors and lenders.
23
 
ITEM 7.  Management's Discussion and Analysis of Financial Condition and Results of Operations
 
  In connection with the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995, the following discussion contains trend analysis and other forward-looking statements.  Forward-looking statements can be identified by the use of words such as "intends", "anticipates", "believes", "estimates", "projects", "forecasts", "expects", "plans" and "proposes".  Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements.  These include, among others, our ability to maximize value from our land and water resources and our ability to obtain new financings as needed to meet our ongoing working capital needs.  See additional discussion under the heading "Risk Factors" above.

Overview
 
  We are a land and water resource development company with 45,000 acres of land in three areas of eastern San Bernardino County, California.  Virtually all of this land is underlain by high-quality, naturally recharging groundwater resources, and is situated in proximity to the Colorado River and the Colorado River Aqueduct ("CRA"), California's primary mode of water transportation for imports from the Colorado River into the State.  Our properties are suitable for various uses, including large-scale agricultural development, groundwater storage and water supply projects.  Our main objective is to realize the highest and best use of these land and water resources in an environmentally responsible way.
 
  We believe that the long-term highest and best use of our land and water assets can best be realized through the development of a combination of water supply and storage projects at our properties. Therefore, the Company has been primarily focused on the development of the Cadiz Valley Water Conservation, Recovery and Storage Project ("Water Project" or "Project"), which will capture and conserve millions of acre-feet2 of native groundwater currently being lost to evaporation from the aquifer system beneath our 34,000-acre property in the Cadiz and Fenner valleys of eastern San Bernardino County (the "Cadiz/Fenner Property"), and deliver it to water providers throughout Southern California (see "Water Resource Development")A second phase of the Water Project would offer storage of up to one million acre-feet of imported water in the aquifer system.  We believe that the ultimate implementation of this Water Project will provide a significant source of future cash flow.
 
  The primary factor driving the value of such projects is ongoing pressure on California's traditional water supplies and the resulting demand for new, reliable supply solutions that can meet both immediate and long-term water needs.  Available supply is constrained by environmental and regulatory restrictions on each of the State's three main water sources:  the CRA, the State Water Project, which provides water supplies from Northern California to the central and southern parts of the state, and the Los Angeles Aqueduct which delivers water from the eastern Sierra Nevada mountains to Los Angeles.  Southern California's water providers rely on imports from these systems for a majority of their water supplies, but deliveries from all three into the region have been below capacity over the last several years.
____________________________________________
 
2 One acre-foot is equal to approximately 326,000 gallons or the volume of water that will cover an area of one acre to a depth of one-foot.  An acre-foot is generally considered to be enough water to meet the annual water needs of one average California household.
24
 
  Availability of supplies in California also differs greatly from year to year due to natural hydrological variability.  Over the last several years, California has struggled through an historic drought featuring record-low winter precipitation and reservoir storage levels.  However, following a series of strong storms through the 2016-2017 winter, California has received record amounts of rain and snow, eliminating drought conditions in much of Northern California and easing drought in the South.  The rapid swing from drought to an extremely wet year has challenged California's traditional infrastructure system, and deliveries into Southern California from the State Water Project, Colorado River Aqueduct and Los Angeles Aqueduct remain below capacity.
 
  The Water Project is a local supply option in Southern California that could help address the region's water supply challenges by providing new reliable supply and local groundwater storage opportunities (see "Water Resource Development" below) in both dry and wet years. The Project has received permits in accordance with the California Environmental Quality Act ("CEQA") which allow the capture and conservation of 2.5 million acre-feet of groundwater over 50 years under the terms of a groundwater management plan approved by San Bernardino County, which is responsible for groundwater use at the Project area. 
 
  Our 2017 working capital requirements relate largely to the final development activities associated with the Water Project and those activities consistent with the Water Project related to further development of our land and agricultural assets.  While we continue to believe that the ultimate implementation of the Water Project will provide the primary source of our future cash flow, we also believe there is significant additional value in our underlying agricultural assets.  Demand for agricultural land with water rights is at an all-time high; therefore, in addition to our Water Project proposal, we are engaged in agricultural joint ventures at the Cadiz/Fenner Property that put some of the groundwater currently being lost to evaporation from the underlying aquifer system to immediate beneficial use.  We have farmed portions of the Cadiz/Fenner Property since the late 1980s relying on groundwater from the aquifer system for irrigation and have found the site is well suited for various permanent and seasonal crops. Presently, the property has 2,100 acres leased to third parties for a variety of crops, including citrus, dried-on-the-vine raisins and seasonal vegetables.
 
  We also continue to explore additional uses of our land and water resource assets, including renewable energy development, the marketing of our approved desert tortoise land conservation bank, which is located on our properties outside the Water Project area, and other long-term legacy uses of our properties, such as habitat conservation and cultural development.

Water Resource Development
 
  The Water Project is designed to supply, capture and conserve billions of gallons of renewable native groundwater currently being lost annually to evaporation from the aquifer system underlying our Cadiz/Fenner Property, and provide a new reliable water supply for approximately 400,000 people in Southern California.  The total quantity of groundwater to be recovered and conveyed to Water Project participants will not exceed a long-term annual average of 50,000 acre-feet per year for 50 years.  The Water Project also offers participants the ability to carry-over their annual supply and store it in the groundwater basin from year to year.  A second phase of the Water Project, Phase II, will offer up to one million acre-feet of storage capacity that can be used to hold imported water supplies at the Water Project area.
25
 
  Water Project facilities required for Phase I primarily include, among other things:

·
High-yield wells designed to efficiently recover available native groundwater from beneath the Water Project area;

·
A water conveyance pipeline to deliver water from the well-field to the CRA for further delivery to Project participants; and

·
An energy source to provide power to the well-field, pipeline and pumping facilities.
 
  If an imported water storage component of the Project is ultimately implemented in Phase II, the following additional facilities would be required, among other things:

·
Facilities to pump water through the conveyance pipeline from the CRA to the Water Project well-field and/or through the Company's pipeline from Cadiz to Barstow, CA; and

·
Spreading basins, which are shallow settling ponds that will be configured to efficiently percolate water from the ground surface down to the water table using subsurface storage capacity for the storage of water.
 
  In 2016, the Company focused on completing the remaining steps to implement the Project, including clearance to use an existing railroad right-of-way for its conveyance pipeline and defending the Water Project's CEQA permits in the California Court of Appeal. Prior to construction, the Water Project must (1) complete efforts to secure its pipeline right-of-way, (2) finalize contracts with Project participating agencies and secure transportation arrangements to deliver water into each participant's service area, and (3) secure private construction financing. Below is a discussion of present activities to advance these objectives.

(1)
Water Conveyance Pipeline Right-of-Way

Pipeline from Cadiz to CRA
 
  In September 2008, we secured a right-of-way for the Water Project's water conveyance pipeline by entering into a lease agreement with the Arizona & California Railroad Company ("ARZC"), which operated an active shortline railroad extending from Cadiz to Matthie, Arizona.  The agreement allows for the use of a portion of the railroad's right-of-way to construct and operate a water conveyance pipeline for a period up to 99 years.  The buried pipeline would be constructed parallel to the railroad tracks and be used to convey water between our Cadiz Valley property and the CRA in Freda, California.
 
  Our lease agreement with the ARZC also expressly requires that the Project further several railroad purposes and, under the terms of the lease agreement, the ARZC reserved water supplies from the Project for its operational needs as well as access to Project facilities, such as roads and power appurtenances, for the benefit of its railroad operation.  In September 2013, we also entered into a trackage rights agreement with the ARZC that would enable the operation of steam-powered, passenger excursion trains on the line powered by water made available from the pipeline.
26
 
  The pipeline route was fully analyzed in the Water Project's Final Environmental Impact Report ("EIR") as part of the CEQA environmental review process completed in 2012.  As an existing transportation corridor, the route, which avoids sensitive habitats, was found to be the environmentally preferred route for the pipeline.  In 2009, the federal government stated that no federal environmental review of the pipeline route was required under the National Environmental Policy Act ("NEPA"), because the pipeline was within the scope of the ARZC's right-of-way grant.
 
  Our plan to construct the Project pipeline within the railroad right-of-way is similar to, and modeled after, the thousands of other existing longitudinal uses of rail corridors across the United States today, such as telecommunications lines, natural gas and petroleum product lines and other water lines.  Under the General Railroad Right-of-Way Act of March 3, 1875 ("1875 Act"), according to which many of these railroad corridors were established, a railroad can lease its property for third party uses without permitting of the federal government so long as the use also derives from or furthers railroad purposes, at least in part.  This interpretation of the 1875 Act was confirmed by Memorandum Opinion M-37025 issued by the Solicitor of the US Department of the Interior on November 4, 2011 ("2011 M-Opinion"), which state in relevant part:

"Within an 1875 Act ROW, a railroad's authority to undertake or authorize activities is limited to those activities that derive from or further a railroad purpose, which allows a railroad to undertake, or others to undertake, activities that have both railroad and commercial purposes, but does not permit a railroad to authorize activities that bear no relationship to the construction and operation of a railroad." (Emphasis added, M-37025)
 
  The Project includes the following features, enabled by the conveyance pipeline, provided in furtherance of railroad purposes:

·
A new access road along the entire pipeline route to enable maintenance, emergency access and shorten routes for crew-changes,
·
Remotely operated fire-suppression systems at each of the existing creosote-treated wooden trestles,
·
Inline power generation for crossing operations and lighting, heating and cooling for existing railroad transloading operations,
·
Fiber optic information transmission to convey track-speed and cameras in aid of emergency and to discourage vandalism; and
·
The distribution of water for the operation of a steam powered locomotive, fire-suppression and other miscellaneous uses.  
 
  In response to inquiries from the BLM beginning in 2012 about these purposes, the Company, the ARZC and Water Project participants had numerous meetings with the BLM and provided several documents over multiple years for background about the railroad purposes that would be furthered by the Project over several years.  In April 2015 BLM California notified the Company that it was analyzing the Project's proposed use of the ARZC right-of-way and expected to provide the results of this evaluation to the BLM Washington D.C. office by the end of summer 2015.
27
 
  On October 2, 2015, the Director of the California Office of the BLM signed a letter that would later be sent to ARZC and the Company summarizing that the Project pipeline is outside the scope of the ARZC right-of-way, because a water pipeline would not primarily further a railroad purpose or originate from a railroad purpose, and would therefore require a new federal right-of-way permit prior to construction.  We believe this finding disregards federal law and policy and strays from the framework provided for in the binding 2011 M-Opinion, and therefore we immediately pursued steps to rescind the October determination.
 
  Several Members of Congress raised concerns about the 2015 guidance and its inconsistencies with existing federal policy governing third party railroad right-of-way use.  As a result of inquiries from Congress, BLM California's newly appointed Director met with the Company, the ARZC and Project participants in March 2016.  However, BLM representatives at the meeting were not prepared to discuss the framework utilized to evaluate the Water Project's proposed use of the ARZC right-of-way.
 
  Following the production of documents produced via a Freedom of Information Act request in (June) 2016 regarding BLM's evaluation of the Project's use of the railroad right-of-way, we have had no further formal consultation with BLM California. The guidance letter is under investigation by the House of Representatives Oversight & Government Reform Committee and the Interior Department Inspector General.
 
  Meanwhile, numerous United States congressional representatives have worked to clarify the scope of the congressionally granted 1875 Act right-of-way (ROW) for all who rely on them for necessary infrastructure, including, for example, fiber optics and communications lines, energy, electricity, water, wastewater, sewer, and natural gas lines. In July 2016, language that would clarify the scope of railroad ROW was included in the fiscal year 2017 (FY17) House Interior and Environment Appropriations Bill (H.R.5538), an annual funding measure for the Department of the Interior, the Environmental Protection Agency, the US Forest Service, and various related agencies, including the BLM. HR 5538 passed the US House of Representatives in July 2016, but consideration of the bill has been continued until April 2017.   If this language is not considered in April 2017, it could be delayed until the Fall of 2017.  We believe that if signed into law, the language now contained in the House appropriations bill will enable third parties, including the Company, to carry-on existing and future activities within existing railroad ROWs over federal lands without the need to secure a separate ROW grant from BLM.

Northern Pipeline

  We currently own a 96-mile existing idle natural gas pipeline from the Cadiz/Fenner Property to Barstow, California that we intend to convert for the transportation of water. The Barstow area serves as a hub for water delivered from northern and central California to communities in Southern California's High Desert.  In addition, the Company holds an option to purchase a further 124-mile segment of this pipeline from Barstow to Wheeler Ridge, California for $20 million.  This option expires in December 2018.
  Initial feasibility studies indicated that, upon conversion, the 30-inch line could transport between 20,000 and 30,000 acre-feet of water per year between the Water Project area and various points along the Central and Northern California water transportation network. As a result this line could create significant opportunities for our water resource development efforts.
28
 
  If this pipeline were to become operational, then the Water Project would link two major water delivery systems in California, providing flexible opportunities for both supply and storage.  The Northern Pipeline could deliver Phase I supplies, either directly or via exchange, to existing and potential customers of Phase I of the Project.  It could also be used to import water to the Project area and provide additional groundwater storage for the region's water providers. Such use is currently being contemplated as part of Phase II of the Water Project.

  
The 96-mile pipeline segment was evaluated in the Water Project's EIR during the CEQA process.  Any use of the pipeline would be conducted in conformity with the Project's GMMMP and is subject to further CEQA evaluation and potentially federal environmental permitting.

  The Northern Pipeline also represents new opportunities for the Company independent of the Water Project to offer water transportation to locations along the pipeline route that are not presently interconnected by existing water infrastructure.  The entire 220-mile pipeline crosses California's major water infrastructure as well as urban and agricultural centers and can be utilized to transport water, independent of the Water Project, between users who presently lack direct interconnections along the pipeline route. We are presently engaged in discussions with parties that may be interested in such transportation.
 
(2)
Agreements with Public Water Agencies or Private Water Utilities & Conveyance Arrangements
 
  The Company has executed Letters of Intent, option agreements and purchase agreements (collectively, "Agreements") with public water agencies and private water utilities in California during the Project's development.  These participating agencies serve more than one million customers in cities throughout California's San Bernardino, Riverside, Los Angeles, Orange, Imperial and Ventura Counties.

  Santa Margarita Water District ("SMWD") was the first participant to convert its option agreement and adopt resolutions approving a Water Purchase and Sale Agreement for 5,000 acre-feet of water.  The structure of the SMWD purchase agreement calls for an annually adjusted water supply payment, plus a pro rata portion of the capital recovery charge and operating and maintenance costs.  The capital recovery charge is calculated by amortizing the total capital investment by the Company over a 30-year term.
 
  Agreements entered into prior to the beginning of the CEQA review process provide the right to acquire an annual supply of 5,000 acre-feet of water at a $775 per acre-foot (2010 dollars, subject to adjustment), which is competitive with the incremental cost of new water.  In addition, these agencies have options to acquire storage rights in the Water Project to allow for the management of their Water Project supplies in complement with their own water resources.  Up to 150,000 acre-feet of carry-over storage is available for reservation by the agencies prior to construction commencement.  Participants that elect to achieve year-to-year flexibility in their use of Project water by utilizing carry-over storage will reserve storage capacity for $1,500 per acre-foot prior to construction.
29
 
  Letters of Intent ("LOIs") that have been entered into since completion of the CEQA review process reserve supplies from the Water Project at $960 per acre-foot (2014 dollars, subject to adjustment).  These LOIs also include the option to reserve carry-over storage capacity for $1,500 per acre-foot prior to construction.
 
  Presently, total reservations of supplies from the Water Project via these Agreements are in excess of Water Project capacity and we are working collaboratively with the participating water agencies to account for any oversubscription in the final definitive Purchase and Sale Agreements we enter into with these agencies.
 
  In addition, prior to construction of the Water Project, terms for moving water supplies in the CRA must be negotiated with Metropolitan, which owns and controls the CRA.  Water Project supplies entering the CRA will comply with Metropolitan's published engineering, design and water quality standards and will be subject to all applicable fees and charges routinely established by Metropolitan for the conveyance of water within its service territory.  Any agreement as to the terms and conditions of the Water Project's use of the CRA will be negotiated between and entered into by Metropolitan and the Project participating agencies, not the Company. Discussions with Metropolitan regarding conveyance of Project water in the CRA have been led by SMWD.  We expect arrangements would be approved by Metropolitan staff and considered by its Board following resolution of BLM discussions related to the conveyance pipeline, discussed above.  Once arrangements are reached, Metropolitan must take action as a responsible agency under CEQA regarding the terms and conditions of the Water Project's use of the CRA to transport water to its participating agencies.

(3)
Construction Financing
 
  As described above, construction of Phase I of the Water Project would primarily consist of wellfield facilities at the Project site, a conveyance pipeline, and an energy source to pump water through the conveyance pipeline between the Project well-field and the CRA.  The construction of these facilities, which we expect would cost approximately $250 million, will require capital financing that we expect will be secured by the proceeds of our definitive Purchase and Sale Agreements and the new facility assets.  The Company's existing corporate term debt provides us the flexibility to incorporate Water Project construction financing up to $300 million within our current debt structure (see "Liquidity and Capital Resources", below).

Agricultural Development
 
  Within the Cadiz/Fenner Property, all of the existing 34,000 acres are currently zoned for agriculture.  In 1993, we secured conditional use permits to develop agriculture on up to 9,600 acres of the property and withdraw groundwater from the underlying aquifer system for irrigation.  We have since maintained various levels of crops on the Property as we developed the Water Project.  In 2013, we entered into a lease agreement with a third party to develop up to 1,480 acres of lemons at the site, 520 acres of which have been planted to date.
 
  In February 2016, we entered into a lease agreement with Fenner Valley Farms LLC ("FVF"), a subsidiary of Water Asset Management LLC, a related party, pursuant to which FVF leased, for a 99-year term, 2,100 acres at the Cadiz/Fenner property to be used to plant, grow and harvest agricultural crops ("FVF Lease"). As consideration for the lease, FVF paid the Company a one-time payment of $12,000,000 in February 2016. The acreage that was historically farmed by the Company and the acreage that is leased to a third party to develop lemons was included within the leased acreage.  Following entry into this lease, the Company is no longer directly involved in the current agricultural operations at the site and all of our agricultural revenue is derived pursuant to the FVF lease.
30
 
  As part of the agricultural development to be conducted under the lease arrangements, the groundwater production capacity of the property's existing well-field is expected to be enhanced through infrastructure improvements that are complementary to the Water Project.  While any additional well-field development for agricultural use would be financed by our agricultural partners as provided under our agricultural lease arrangements, the Company retained a call feature that allows us, at any time in the initial 20 years, to acquire the well-field and integrate any new agricultural well-field infrastructure developed into the Water Project's facilities.

Additional Eastern Mojave Properties
 
  We also own approximately 11,000 acres outside of the Cadiz/Fenner Valley area in two locations within the Mojave Desert in eastern San Bernardino County.
 
  Our primary landholding outside of the Cadiz area is approximately 9,000 acres in the Piute Valley.  This landholding is located approximately 15 miles from the resort community of Laughlin, Nevada, and about 12 miles from the Colorado River town of Needles, California.  Extensive hydrological studies, including the drilling and testing of a full-scale production well, have demonstrated that this landholding is underlain by high-quality groundwater.  The aquifer system underlying this property is naturally recharged by precipitation (both rain and snow) within a watershed of approximately 975 square miles and could be suitable for a water supply project, agricultural development or solar energy production.  These properties are located in or adjacent to areas designated by the federal government as National Monument, Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and are suitable candidates for preservation and conservation (see "Land Conservation Bank" below).
 
  Additionally, we own acreage located near Danby Dry Lake in Ward Valley, approximately 30 miles southeast of our Cadiz/Fenner Valley properties.  The Danby Dry Lake property is located approximately 10 miles north of the CRA.  Initial hydrological studies indicate that the area has excellent potential for a water supply project. Certain of the properties in this area may also be suitable for agricultural development and/or preservation and conservation.

Land Conservation Bank
 
  Approximately 10,000 acres of our properties outside of the Cadiz/Fenner Valley area are located within terrain designated by the federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and have limited development opportunities.  In February 2015, the California Department of Fish and Wildlife approved our establishment of the Fenner Valley Desert Tortoise Conservation Bank ("Fenner Bank"), a land conservation bank that makes available approximately 7,500 acres of our properties located within Critical Desert Tortoise Habitat for mitigation of impacts to tortoise and other sensitive species that would be caused by development in the Southern California desert.  Under its enabling documents, the Fenner Bank offers credits that can be acquired by entities that must mitigate or offset impacts linked to planned development.  For example, this bank can service the mitigation requirements of renewable energy, military, residential and commercial development mitigation requirements for projects being considered throughout the desert. Credits sold by the Fenner Bank will fund our permanent preservation of the land as well as research by outside entities, including San Diego Zoo Global, into desert tortoise health and species protection.
31
 
Other Opportunities
 
  Other opportunities in the water and agricultural or related infrastructure business complementary to our current objectives could provide new opportunities for our Company.
 
  Over the longer-term, we believe the population of Southern California, Nevada and Arizona will continue to grow, and that, in time, the economics of commercial and residential development at our properties may become attractive.
 
  We remain committed to the sustainable use of our land and water assets, and will continue to explore all opportunities for environmentally responsible development of these assets.  We cannot predict with certainty which of these various opportunities will ultimately be utilized.

Results of Operations

(a) 
Year Ended December 31, 2016 Compared to Year Ended December 31, 2015
 
  We have not received significant revenues from our water resource and real estate development activity to date.  Our revenues have been limited to our agricultural operations.  As a result, we have historically incurred a net loss from operations.  We had revenues of $412 thousand for the year ended December 31, 2016, and $304 thousand for the year ended December 31, 2015.  The net loss totaled $26.3 million for the year ended December 31, 2016, compared with a net loss of $24.0 million for the year ended December 31, 2015.  The higher loss in 2016 was primarily related to a $2.25 million loss on extinguishment of debt.  The higher 2016 loss was also related to higher interest expense on additional convertible debt issued and higher amortization expense, offset by a decrease in litigation costs related to the Water Project due to the timing of the appellate litigation.
 
  Our primary expenses are our ongoing overhead costs associated with the development of the Water Project (i.e., general and administrative expense) and our interest expense.  We will continue to incur non-cash expense in connection with our management and director equity incentive compensation plans.
 
  Revenues.  Revenue totaled $412 thousand during the year ended December 31, 2016, compared to $304 thousand during the year ended December 31, 2015.  The 2016 revenue is primarily related to rental income from the FVF Lease (see "Agricultural Development", above).
 
  Cost of Sales.  Cost of sales were zero for the year ended December 31, 2016, compared with $334 thousand during the year ended December 31, 2015.
32
 
  General and Administrative Expenses.  General and administrative expenses during the year ended December 31, 2016, totaled $9.3 million compared with $13.7 million for the year ended December 31, 2015.  Non-cash compensation costs related to stock and option awards are included in general and administrative expenses.
 
  General and administrative expenses, exclusive of stock-based compensation costs, totaled $8.0 million in the year ended December 31, 2016, compared with $12.6 million for the year ended December 31, 2015.  The decrease in general and administrative expense in 2016 was primarily due to lower litigation costs related to the Water Project due to the timing of the appellate litigation (see Item 1. – "Business, (a) General Development of Business", above.)
 
  Compensation costs from stock and option awards for the year ended December 31, 2016, totaled $1.3 million compared with $1.1 million for the year ended December 31, 2015.  The higher 2016 expense was primarily due to higher stock-based non-cash compensation costs related to shares awarded to the Brownstein law firm for certain legal and advisory services to the Company.
 
  Depreciation.  Depreciation expense totaled $292 thousand for the year ended December 31, 2016, and $270 thousand for the year ended December 31, 2015.
 
  Interest Expense, net.  Net interest expense totaled $14.9 million during the year ended December 31, 2016, compared to $10.1 million during 2015.  The following table summarizes the components of net interest expense for the two periods (in thousands):

 
Year Ended
December 31,
 
2016
 
2015
 
     
Interest on outstanding debt
 
$
9,664
   
$
8,237
Amortization of debt discount
   
4,973
     
1,635
Amortization of deferred loan costs
   
238
     
198
 
             
 
 
$
14,875
   
$
10,070
 
  The interest on outstanding debt increased from $8.2 million to $9.7 million due to the compounded interest on the debt facilities resulting in a higher principal balance.  Amortization of debt discount increased from $1.6 million to $5.0 million primarily due to the acceleration of unamortized debt discount related to the conversion of approximately $2.8 million in original principal amount of the 2020 Notes that were issued in April 2016.  See Note 6 to the Consolidated Financial Statements, "Long-Term Debt".
 
  Debt Refinancings.  In April 2016, we entered into a note purchase agreement with new and existing investors (the "Investors").  Pursuant to the agreement, we issued approximately $10.0 million of our 7.00% Convertible Senior Notes due 2020 ("2020 Notes) in aggregate principal and accrued interest.  The proceeds from the issuance of the 2020 Notes (such 2020 Notes, the "New Notes"), are used for general working capital purposes.  The 2020 Notes accrue interest at 7.00% per year, with no principal or interest payments due prior to maturity on March 5, 2020.  The 2020 Notes, including original principal and accrued interest, are convertible at any time into the Company's common stock at a price of $6.75 per share, pursuant to the terms of the Indenture dated as of December 10, 2015, by and between the Company and US Bank National Association (the "Indenture"), under which the New Notes were issued.  As a result of this transaction, we recorded a debt discount in the amount of $2.0 million which is the difference between the proceeds from this transaction and the principal and accrued interest of New Notes on the day of the issuance.  In addition, based on the conversion rate of $6.75 per share, the fair value of the shares receivable on conversion exceed the $8.0 million in net proceeds; therefore, a beneficial conversion feature was recorded in the amount of $1.48 million.  This amount was recorded as additional debt discount with a corresponding amount recorded as additional paid-in capital.  Such debt discount is accreted to the redemption value of the instrument over the remaining term of the loan.  Furthermore, we incurred $400 thousand in placement agent fees which was recorded as additional debt discount and is being amortized over the remaining term of the loan.
33
 
  In November 2016, we entered into an agreement with our senior lenders which (i) extended the maturity date of our secured senior debt from September 2017 to September 2019 and (ii) permits us to satisfy the cash interest payment obligations through the issuance of shares of the Company's common stock.  In connection with the agreement, we issued to our senior lenders an aggregate of 357,500 shares of the Company's common stock and warrants to purchase an aggregate of 357,500 shares of its common stock.  The Company recorded a debt discount in the amount of $3.4 million which is the fair value of the 357,500 shares issued.  Such debt discount is accreted over the remaining term of the loan.  The warrants have a five- year term and an exercise price of $0.01 per share, and become exercisable on May 28, 2017 only if the secured senior debt remains outstanding.  The warrants will be valued at the time they become exercisable which could trigger extinguishment accounting and result in a loss on extinguishment.

(b) 
Year Ended December 31, 2015 Compared to Year Ended December 31, 2014
 
  We had revenues of $304 thousand for the year ended December 31, 2015, and $336 thousand for the year ended December 31, 2014.  The net loss totaled $24.0 million for the year ended December 31, 2015, compared with a net loss of $18.9 million for the year ended December 31, 2014.
 
  Revenues.  Revenue totaled $304 thousand during the year ended December 31, 2015, compared to $336 thousand during the year ended December 31, 2014.
 
  Cost of Sales.  Cost of sales totaled $334 thousand during the year ended December 31, 2015, compared with $357 thousand during the year ended December 31, 2014.
 
  General and Administrative Expenses.  General and administrative expenses during the year ended December 31, 2015, totaled $13.7 million compared with $10.1 million for the year ended December 31, 2014.  Non-cash compensation costs related to stock and option awards are included in general and administrative expenses.
 
  General and administrative expenses, exclusive of stock-based compensation costs, totaled $12.6 million in the year ended December 31, 2015, compared with $9.0 million for the year ended December 31, 2014.  The increase in general and administrative expense in 2015 was primarily due to higher litigation costs related to the Water Project due to the timing of the appellate litigation (see Item 1. – "Business, (a) General Development of Business", above.)and costs related to pre-construction engineering activities in connection with the Water Project.
34
 
  Compensation costs from stock and option awards for the year ended December 31, 2015, totaled $1.1 million compared with $1.1 million for the year ended December 31, 2014.
 
  Depreciation.  Depreciation expense totaled $270 thousand for the year ended December 31, 2015, and $254 thousand for the year ended December 31, 2014.
 
  Interest Expense, net.  Net interest expense totaled $10.1 million during the year ended December 31, 2015, compared to $8.5 million during 2014.  The following table summarizes the components of net interest expense for the two periods (in thousands):

 
Year Ended
December 31,
 
2015
 
2014
 
     
Interest on outstanding debt
 
$
8,237
   
$
7,659
Amortization of debt discount
   
1,635
     
633
Amortization of deferred loan costs
   
198
     
226
 
             
 
 
$
10,070
   
$
8,518
 
  The interest on outstanding debt increased from $7.7 million to $8.2 million due to the compounded interest on the debt facilities resulting in a higher principal balance.  See Note 6 to the Consolidated Financial Statements, "Long-Term Debt".

Prior Debt Refinancings.  In November 2015, we entered into an agreement with our senior lenders which granted us the right to extend the maturity date of an original $30 million first tranche of our secured senior debt from March 2016 to June 2017. We paid our senior lenders an amendment fee of $2.25 million in additional debt for this right to extend the maturity date, which was recorded as additional debt discount and is being amortized over the remaining term of the loan as additional interest expense.

Also in November 2015, we entered into agreements with 94% of our convertible note holders to exchange their outstanding convertible notes, which were due in March 2018 ("2018 Convertible Notes"), for substantially similar convertible notes now due in March 2020 ("2020 Convertible Notes").  In exchange for this maturity extension, the conversion rate on the 2020 Notes was reduced from $8.05 to $6.75 of accreted principal amount per share.  As a result, the change in fair value of the instrument's conversion feature increased by $5.2 million.  This amount was recorded as additional debt discount with a corresponding amount recorded as additional paid-in capital.  Such debt discount is accreted to the redemption value of the instrument over the new term of the loan as additional interest expense.  Furthermore, approximately $400 thousand of remaining unamortized deferred financing costs associated with the 2018 Convertible Notes that were previously recorded is now being amortized over the new term of the 2020 Convertible Notes.
35
 
Liquidity and Capital Resources

(a)     Current Financing Arrangements
 
  As we have not received significant revenues from our development activities to date, we have been required to obtain financing to bridge the gap between the time water resource and other development expenses are incurred and the time that revenue will commence.  Historically, we have addressed these needs primarily through secured debt financing arrangements, private equity placements and the exercise of outstanding stock options and warrants.  We have also worked with our secured lenders to structure our debt in a way which allows us to continue development of the Water Project and minimize the dilution of the ownership interests of common stockholders.

Credit Agreement
 
  In November 2015, we entered into a First Amendment to the Credit Agreement ("First Amendment") with our senior lenders which granted us the right to extend the maturity date of the first tranche of our Senior Secured Debt ("First Mortgage") from March 2016 to June 2017, which was concurrent with the then existing due date of the second tranche of our Senior Secured Debt.  In consideration of this right, we paid our senior lenders an amendment fee of $2.25 million in additional debt.
 
  On February 8, 2016, we entered into a Second Amendment to the Credit Agreement with our senior lenders to (i) provide for the application of $10.5 million of a $12 million payment pursuant to the Amended and Restated Fenner Valley Farm Lease (see "Agricultural Development" above) which satisfied the repayment condition of the First Amendment to extend the maturity date; (ii) to require Cadiz to pay 50% of all future quarterly interest payments in cash, rather than in accretion to principal, beginning with the quarterly interest payment due June 5, 2016; and (iii) to provide for certain related matters.  On February 25, 2016, we exercised our right to extend the maturity date of our First Mortgage and, at that time, incurred an additional extension fee of $2.25 million which is to be paid at the election of the lenders in either additional debt or Cadiz common stock to be issued at a predetermined price.
 
  On March 4, 2016, we entered into a Third Amendment to the Credit Agreement which provided the lenders an additional 90 days to make their election to receive the extension fee in additional debt or Cadiz common stock in exchange for extending the due date of our Senior Secured Debt from June 30, 2017 to September 28, 2017.  In May 2016, the lenders elected to receive the extension fee in Cadiz common stock.
 
  On April 28, 2016, we entered into a Fourth Amendment to the Credit Agreement with our senior lenders to permit the issuance of additional New Convertible Notes (see "Convertible Notes", below).
 
  On November 29, 2016, we entered into a Fifth Amendment to the Credit Agreement with our senior lenders to (i) permit us to satisfy the cash interest payment obligations under the Credit Agreement through the issuance of shares of the Company's common stock, and (ii) extend the maturity date of the Credit Agreement from September 28, 2017 to September 28, 2019.
36
 
Convertible Notes
 
  In November 2015, we entered into agreements with 94% of our convertible note holders to exchange their outstanding 2018 Convertible Notes due in March 2018 for substantially similar convertible notes due in March 2020 ("2020 Convertible Notes"), at a ratio of $1.00 in principal amount of new 2020 Convertible Notes for each $1.00 of accreted principal amount of existing 2018 Convertible Notes exchanged.  Holders of $49.025 million in aggregate original principal amount of the Company's existing 2018 Convertible Notes agreed to exchange them for 2020 Convertible Notes.  In exchange for this maturity extension, the conversion rate on the 2020 Convertible Notes was reduced from $8.05 to $6.75 of accreted principal amount per share.  Interest on the 2020 Convertible Notes will continue to accrue at 7% per annum with no payment due until maturity.  In April 2016, we issued approximately $10.0 million in aggregate principal and accrued interest of our 2020 Convertible Notes.
 
  The Senior Secured Debt and the convertible notes contain representations, warranties and covenants that are typical for agreements of this type, including restrictions that would limit our ability to incur additional indebtedness, incur liens, pay dividends or make restricted payments, dispose of assets, make investments and merge or consolidate with another person.  However, while there are affirmative covenants, there are no financial maintenance covenants and no restrictions on our ability to issue additional common stock to fund future working capital needs.  The debt covenants associated with the new loans were negotiated by the parties with a view towards our operating and financial condition as it existed at the time the agreements were executed.  At December 31, 2016, we were in compliance with our debt covenants.
 
  As we continue to actively pursue our business strategy, additional financing will continue to be required.  See "Outlook" below.  The covenants in the term debt do not prohibit our use of additional equity financing and allow us to retain 100% of the proceeds of any equity financing.  We do not expect the loan covenants to materially limit our ability to finance our water development activities.
 
  At December 31, 2016, we had no outstanding credit facilities other than the Senior Secured Debt and the convertible notes.
 
  Cash Used for Operating Activities.  Cash used for operating activities totaled $9.5 million for the year ended December 31, 2016, $12.6 million for the year ended December 31, 2015, and $10.1 million for the year ended December 31, 2014.  The cash was primarily used to fund general and administrative expenses related to our water development efforts and litigation costs.
 
  Cash Used For Investing Activities.  Cash used for investing activities in the year ended December 31, 2016, was zero, compared with $906 thousand for the year ended December 31, 2015, and $72 thousand for the year ended December 31, 2014.  The 2015 period primarily included additional investments in well-field and environmental work related to progressing the Water Project.
 
  Cash Provided by (Used for) Financing Activities.  Cash provided by financing activities totaled $19.0 million for the year ended December 31, 2016, compared with cash used for financing activities of $42 thousand for the year ended December 31, 2015, and cash provided by financing activities of $14.5 million for the year ended December 31, 2014.  The 2016 results include receipt of approximately $12.0 million related to the FVF Lease (see "Agricultural Development", above), $8.0 million in net proceeds related to the Convertible Note Financing and approximately $10.5 million in proceeds from the issuance of shares under a shelf takedown offering, offset by approximately $960 thousand in recorded debt issuance costs and a principal payment of approximately $10.6 million on the Senior Secured Debt.
37
 
(b)     Outlook
 
  Short-Term Outlook.  Our cash resources of $12.2 million as of December 31, 2016 provide us with sufficient funds to meet our expected working capital needs through April 2018.  Should we require additional working capital to fund operations, we expect to continue our historical practice of structuring our financing arrangements to match the anticipated needs of our development activities.  See "Long-Term Outlook" below.  No assurances can be given, however, as to the availability or terms of any new financing.
 
  Long-Term Outlook. In the longer term, we will need to raise additional capital to finance working capital needs, capital expenditures and any payments due under our Senior Secured Debt or our convertible notes at maturity (see "Current Financing Arrangements" above).  Our future working capital needs will depend upon the specific measures we pursue in the entitlement and development of our water resources and other developments.  Future capital expenditures will depend primarily on the progress of the Water Project.
 
  We are evaluating the amount of cash needed, and the manner in which such cash will be raised, on an ongoing basis.  We plan to meet any future cash requirements through a variety of means, including equity or debt placements.  Limitations on our liquidity and ability to raise capital may adversely affect us.  Sufficient liquidity is critical to meet our resource development activities.  Although we currently expect our cash resources on hand to be sufficient to meet our liquidity needs through April 2018, if we cannot raise needed funds, the Company might default on its debt obligations, and accordingly, there would be substantial doubt about the Company's ability to continue as a going concern.

(c)     Critical Accounting Policies
 
  As discussed in Note 2 to our Consolidated Financial Statements, the preparation of financial statements in conformity with accounting principles generally accepted in the United States requires management to make estimates and assumptions that affect amounts reported in the accompanying consolidated financial statements and related footnotes.  In preparing these financial statements, management has made its best estimates and judgments of certain amounts included in the financial statements based on all relevant information available at the time and giving due consideration to materiality.  We do not believe there is a great likelihood that materially different amounts would be reported related to the accounting policies described below.  However, application of these policies involves the exercise of judgment and use of assumptions as to future uncertainties and, as a result, actual results could differ from these estimates.  Management has concluded that the following critical accounting policies described below affect the most significant judgments and estimates used in the preparation of the consolidated financial statements.
 
  (1)  Intangible and Other Long-Lived Assets.  Property, plant and equipment, intangible and certain other long-lived assets are depreciated or amortized over their useful lives.  Useful lives are based on management's estimates of the period over which the assets will generate revenue.
38
 
  (2) Goodwill. As a result of a merger in May 1988 between two companies, which eventually became known as Cadiz Inc., goodwill in the amount of $7,006,000 was recorded.  Approximately $3,193,000 of this amount was amortized until the adoption of Accounting Standards Codification 350, "Intangibles – Goodwill and Other" ("ASC 350") on January 1, 2002.
 
  (3) Valuation of Goodwill and Long-Lived Assets.  The Company assesses long-lived assets, excluding goodwill, for recoverability whenever events or changes in circumstances indicate that their carrying value may not be recoverable through the estimated undiscounted future cash flows resulting from the use of the assets. If it is determined that the carrying value of long-lived assets may not be recoverable, the impairment is measured by using the projected discounted cash-flow method.
 
  The Company uses a two-step impairment test to identify potential goodwill impairment and measure the amount of a goodwill impairment loss to be recognized (if any) for the Company.  The first step, which is performed at least annually, considers whether there are qualitative factors present such that it is more likely than not a goodwill impairment exists.  If based on qualitative factors it is more likely than not a goodwill impairment exists, the Company performs "Step 2" as described below.
 
  The step 2 calculation of the impairment test compares the implied fair value of the goodwill to the carrying value of goodwill. The implied fair value of goodwill represents the excess of the estimated fair value above the fair value of the Company's identified assets and liabilities.  If the carrying value of goodwill exceeds the implied fair value of goodwill, an impairment loss is recognized in an amount equal to the excess (not to exceed the carrying value of goodwill).  The determination of the fair value of its assets and liabilities is performed as of the measurement date using observable market data before and after the measurement date (if that subsequent information is relevant to the fair value on the measurement date). 
 
  (4)  Deferred Tax Assets and Valuation Allowances.  To date, the Company has not generated significant revenue from its water development programs, and it has a history of net operating losses.  As such, the Company has generated significant deferred tax assets, including large net operating loss carryforwards for federal and state income taxes for which it has recorded a full valuation allowance.  Management is currently working on water storage, water supply, agriculture and solar energy development projects, including the Water Project, that are designed to generate future taxable income, although there can be no guarantee that this will occur.  If taxable income is generated in future years, some portion or all of the valuation allowance will be reversed, and an increase in net income would consequently be reported.
 
  (5)  Stock-Based Compensation.  The Company applies the Black-Scholes valuation model in determining the fair value of options granted to employees and consultants.  For employees, the fair value is then charged to expense on the straight-line basis over the requisite service period.  For consultants, the fair value is remeasured at each reporting period and recorded as a liability until the award is settled.
39
 
  ASC 718 also requires the Company to estimate forfeitures in calculating the expense related to stock-based compensation as opposed to only recognizing forfeitures and the corresponding reduction in expense as they occur.  As of December 31, 2016, all options outstanding are fully vested; therefore, there is no potential impact of forfeitures.

(d)     New Accounting Pronouncements
 
  See Note 2 to the Consolidated Financial Statements, "Summary of Significant Accounting Policies".
 
(e)     Off Balance Sheet Arrangements
 
  The Company does not have any off balance sheet arrangements at this time.
 
(f)     Certain Known Contractual Obligations
 
 
 
Payments Due by Period
Contractual Obligation
 
Total
   
Less than 1 year
   
1-3 years
   
4-5 years
   
After 5 years
(in thousands)
                           
                             
Long-term debt and lease obligations
 
$
125,404
   
$
45
   
$
45,789
   
$
66,815
   
$
12,755
 
                                     
Interest payable
   
103,799
     
1,789
     
8,823
     
16,812
     
76,375
 
                                     
Operating leases
   
1,990
     
524
     
866
     
600
     
-
 
 
$
231,193
   
$
2,358
   
$
55,478
   
$
84,227
   
$
89,130
 
* The above table does not reflect unrecognized tax benefits of $2.8 million, the timing of which is uncertain. See Note 7 to the Consolidated Financial Statements, "Income Taxes".
 
  Long-term debt included in the table above primarily reflects the Senior Secured Term Loan and the convertible notes, which is described above in Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operation; Liquidity and Capital Resources".  Operating  leases include the lease of the Company's executive offices, as described in Item 2, "Properties", and the right-of-way lease with the Arizona & California Railroad Company, as described in Item 1, "Business".


ITEM 7A.     Quantitative and Qualitative Disclosures about Market Risk
 
  As of December 31, 2016, all of our indebtedness bore interest at fixed rates; therefore, we are not exposed to market risk from changes in interest rates on long-term debt obligations.
40
 
ITEM 8.     Financial Statements and Supplementary Data
 
  The information required by this item is submitted in response to Part IV below. See the Index to Consolidated Financial Statements.


ITEM 9.     Changes in and Disagreements with Accountants on Accounting and Financial Disclosure
 
  Not applicable.
 
 
ITEM 9A.  Controls and Procedures
 
Disclosure Controls and Procedures
  We have established disclosure controls and procedures to ensure that material information related to the Company, including its consolidated entities, is accumulated and communicated to senior management, including Chief Executive Officer (the "Principal Executive Officer") and Chief Financial Officer (the "Principal Financial Officer") and to our Board of Directors.  Based on their evaluation as of December 31, 2016, our Principal Executive Officer and Principal Financial Officer have concluded that the Company's disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) are effective to ensure that the information required to be disclosed by the Company in the reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms, and such information is accumulated and communicated to management, including the principal executive and principal financial officers as appropriate, to allow timely decisions regarding required disclosures.
Management's Report on Internal Control Over Financial Reporting
  Our management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rule 13a-15(f).  Under the supervision and with the participation of our management, including our Principal Executive Officer and Principal Financial Officer, we evaluated the effectiveness of our internal control over financial reporting based on the criteria in the Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.  Based on our evaluation under that framework, our management concluded that our internal control over financial reporting was effective as of December 31, 2016.  The effectiveness of our internal control over financial reporting as of December 31, 2016, has been audited by PricewaterhouseCoopers LLP, an independent registered public accounting firm, as stated in their report which is included herein.
41
 
Changes in Internal Control Over Financial Reporting
  In connection with the evaluation required by paragraph (d) of Rule 13a-15 under the Exchange Act, there was no change identified in the Company's internal control over financial reporting that occurred during the last fiscal year that has materially affected, or is reasonably likely to materially affect, the Company's internal control over financial reporting.

ITEM 9B.     Other Information
Not Applicable.
42
 

PART III

ITEM 10.     Directors, Executive Officers and Corporate Governance
 
  The information called for by this item is incorporated herein by reference to the definitive proxy statement involving the election of directors which we intend to file with the SEC pursuant to Regulation 14A under the Securities and Exchange Act of 1934 not later than 120 days after December 31, 2016.


ITEM 11.     Executive Compensation
 
  The information called for by this item is incorporated herein by reference to the definitive proxy statement involving the election of directors which we intend to file with the SEC pursuant to Regulation 14A under the Securities and Exchange Act of 1934 not later than 120 days after December 31, 2016.


ITEM 12.     Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters
 
  The information called for by this item is incorporated herein by reference to the definitive proxy statement involving the election of directors which we intend to file with the SEC pursuant to Regulation 14A under the Securities and Exchange Act of 1934 not later than 120 days after December 31, 2016.


ITEM 13.     Certain Relationships and Related Transactions, and Director Independence
 
  The information called for by this item is incorporated herein by reference to the definitive proxy statement involving the election of directors which we intend to file with the SEC pursuant to Regulation 14A under the Securities and Exchange Act of 1934 not later than 120 days after December 31, 2016.


ITEM 14.     Principal Accounting Fees and Services
 
  The information called for by this item is incorporated herein by reference to the definitive proxy statement involving the election of directors which we intend to file with the SEC pursuant to Regulation 14A under the Securities and Exchange Act of 1934 not later than 120 days after December 31, 2016.
43
 
PART IV

ITEM 15.  Exhibits, Financial Statement Schedules

1. Financial Statements.  See Index to Consolidated Financial Statements.
 
2. Financial Statement Schedule.  See Index to Consolidated Financial Statements.

3. Exhibits.

The following exhibits are filed or incorporated by reference as part of this Form 10-K.

3.1 Cadiz Certificate of Incorporation, as amended (1)

3.2 Amendment to Cadiz Certificate of Incorporation dated November 8, 1996(2)

3.3 Amendment to Cadiz Certificate of Incorporation dated September 1, 1998(3)

3.4 Amendment to Cadiz Certificate of Incorporation dated December 15, 2003(4)

3.5 Certificate of Amendment to the Certificate of Incorporation of Cadiz Inc. effective June 10, 2016 (41)

3.6 Certificate of Elimination of Series D Preferred Stock, Series E-1 Preferred Stock and Series E-2 Preferred Stock of Cadiz Inc. dated December 15, 2003(4)

3.7 Certificate of Elimination of Series A Junior Participating Preferred Stock of Cadiz Inc., dated March 25, 2004(4)

3.8 Amended and Restated Certificate of Designations of Series F Preferred Stock of Cadiz Inc. (5)

3.9 Cadiz Bylaws, as amended (6)

3.10 Amendment to the Bylaws of Cadiz Inc. effective June 10, 2016 (41)

3.11 Second Amended and Restated Certificate of Designations of Series F Preferred Stock of Cadiz Inc. dated June 30, 2006, as corrected by Certificate of Correction dated March 14, 2007(8)

3.12 Certificate of Elimination of Series F Preferred Stock of Cadiz Inc. (as filed August 3, 2007) (9)

4.1 Form of Senior Indenture, between Cadiz Inc. and The Bank of New York Mellon Trust Company, N.A. (27)
44
 
 
4.2 Form of Subordinated Indenture, between Cadiz Inc. and The Bank of New York Mellon Trust Company, N.A. (27)

4.3 First Supplemental Indenture, dated as of October 30, 2013 between Cadiz Inc. and the Bank of New York Mellon Trust Company, N.A. (28)

4.4 Second Supplemental Indenture, dated as of November 23, 2015 between Cadiz Inc. and U.S. Bank National Associations (34)

4.5 Indenture, dated as of December 10, 2015 between Cadiz Inc. and U.S. Bank National Association (35)

4.6 First Supplemental Indenture, dated as of April 28, 2016, by and between Cadiz Inc. and U.S. Bank National Association (40)

4.7 Form of Senior Indenture between Cadiz Inc. and U.S. Bank National Association (42)

4.8 Form of Subordinated Indenture between Cadiz Inc. and U.S. Bank National Association (42)

4.9 MSD Credit Opportunity Master Fund, L.P. Warrant to Purchase Common Stock of Cadiz Inc., Original Issue Date of November 29, 2016 (43)

4.10 MILFAM II L.P. Warrant to Purchase Common Stock of Cadiz Inc., Original Issue Date of November 29, 2016 (43)

4.11 WPI-Cadiz Farm CA, LLC Warrant to Purchase Common Stock of Cadiz Inc., Original Issue Date of November 29, 2016 (43)

10.1 Limited Liability Company Agreement of Cadiz Real Estate LLC dated December 11, 2003(4)

10.2 Amendment No. 1, dated October 29, 2004, to Limited Liability Company Agreement of Cadiz Real Estate LLC (7)

10.3 Amendment No. 2 dated March 5, 2013, to Limited Liability Company Agreement of Cadiz Real Estate LLC (25)

10.4 Amendment No. 2 dated October 1, 2007 to Reorganization Plan and Agreement for Purchase and Sale of Assets dated as of February 18, 1998 among Cadiz Inc. and Mark A. Liggett in his capacity as successor in interest to Exploration Research Associates, Incorporated., a California corporation ("ERA") and in his individual capacity as former sole shareholder of ERA and as the successor in interest to ERA (10)

10.5 Longitudinal Lease Agreement dated September 17, 2008 between Arizona and California Railroad Company and Cadiz Real Estate, LLC  (11)
45
 

10.6 2009 Equity Incentive Plan (12)

10.7 Services and Exclusivity Agreement with Layne Christensen Company dated November 2, 2009, as amended by amendments dated January 4, 2010, January 27, 2010(13)

10.8 Form of Option Agreement with Santa Margarita Water District (14)

10.9 Form of Environmental Processing and Cost Sharing Agreement with Santa Margarita Water District (14)

10.10 Form of Environmental Processing and Cost Sharing Agreement with Three Valleys Municipal Water District (14)

10.11 Option Agreement with Golden State Water Company dated June 25, 2010(15)

10.12 Option Agreement with Suburban Water Systems dated October 4, 2010(16)

10.13 Amendment No. 3 to the Services and Exclusivity Agreement with Layne Christensen Company dated April 8, 2010(17)

10.14 Letter agreement with Scott S. Slater dated April 12, 2011(18)

10.15 Option Agreement with California Water Service Company dated December 1, 2011(19)

10.16 Option Agreement with Questar Southern Trails Pipeline Company dated August 12, 2011(20)

10.17 Form of Memorandum of Understanding by and among Cadiz Inc., County of San Bernardino and Santa Margarita Water District(21)

10.18 First Amended Agreement to Option Agreement with Questar Southern Trails Pipeline Company dated June 29, 2012(22)

10.19 Water Purchase and Sale Agreement among Cadiz Inc., Cadiz Real Estate LLC, Fenner Valley Mutual Water Company and Santa Margarita Water District dated July 31, 2012(23)

10.20 Groundwater Management, Monitoring, and Mitigation Plan for the Cadiz Valley Groundwater Conservation, Recovery and Storage Project approved by the Santa Margarita Water District and the County of San Bernardino Board of Supervisors effective October 1, 2012(23)

10.21 Second Amended Option Agreement with El Paso Natural Gas Company dated December 7, 2012(24)
46
 

10.22 Revised Terms of Engagement with Brownstein Hyatt Farber and Schreck dated January 9, 2013(25)

10.23 Letter agreement with Scott Slater dated January 10, 2013(25)

10.24 Indenture among Cadiz Inc., as Issuer, and The Bank of New York Mellon Trust Company, N.A., as Trustee, dated as of March 5, 2013(25)

10.25 Private Placement Purchase Agreement among Cadiz Inc. and Purchasers (as defined therein) dated as of March 4, 2013(25)

10.26 Exchange Agreement among Cadiz Inc. and Holders (as defined therein) dated March 4, 2013(25)

10.27 Lease Agreement, dated as of July 1, 2013, by and between Cadiz Inc. and Limoneira Company (26)

10.28 Amended and Restated Lease Agreement, dated February 3, 2015, by and between Cadiz Inc. and Limoneira Company (33)

10.29 Amended and Restated Credit Agreement, dated as of October 30, 2013, by and among Cadiz Inc. and Cadiz Real Estate LLC, as the borrowers, the lenders from time to time party thereto, and Wells Fargo Bank, National Association, as administrative agent(28)

10.30 First Amendment to Amended and Restated Credit Agreement, dated as of November 23, 2015, by and among Cadiz Inc. and Cadiz Real Estate LLC, as the borrowers, the lenders from time to time party thereto, and Wells Fargo Bank, National Association, as administrative agent (34)

10.31 Second Amendment to Amended and Restated Credit Agreement, dated as of February 8, 2016, by and among Cadiz Inc. and Cadiz Real Estate LLC, as the borrowers, the lenders from time to time party thereto, and Wells Fargo Bank, National Association, as administrative agent (35)

10.32 Third Amendment to Amended and Restated Credit Agreement, dated as of March 4, 2016, by and among Cadiz Inc. and Cadiz Real Estate LLC, as the borrowers, the lenders from time to time party thereto, and Wells Fargo Bank, National Association, as administrative agent (38)

10.33 Fourth Amendment to Amended and Restated Credit Agreement, dated as of April 28, 2016, by and among Cadiz Inc. and Cadiz Real Estate LLC, as the borrowers, the lenders party thereto, and Wells Fargo Bank, National Association, as administrative agent (40)

10.34 Fifth Amendment to Amended and Restated Credit Agreement, dated as of November 29, 2016, by and among Cadiz Inc. and Cadiz Real Estate LLC, as the borrowers, the lenders party thereto, and Wells Fargo Bank, National Association, as administrative agent (43)
47
 

10.35 Form of Note Exchange Agreement, by and between Cadiz Inc. and the convertible note holder party thereto (34)

10.36 Track Utilization Agreement dated September 16, 2013, between Arizona & California Railroad Company and Cadiz Real Estate LLC (29)

10.37 Amended and Restated Employment Agreement between Keith Brackpool and Cadiz Inc. dated June 13, 2014(30)

10.38 Amended and Restated Employment Agreement between Timothy J. Shaheen and Cadiz Inc. dated June 13, 2014(30)

10.39 Form of Securities Purchase Agreement, dated as of November 7, 2014, by and between Cadiz Inc. and the purchaser party thereto(31)

10.40 Form of Water Purchase and Sale Agreement, dated as of December 29, 2014, by and between Cadiz Inc. and San Luis Water District(32)

10.41 Lease Agreement, dated as of December 23, 2015, by and among Cadiz Real Estate LLC, Cadiz Inc. and Water Asset Management LLC (36)

10.42 Amended and Restated Lease Agreement, dated as of February 8, 2016, by and among Cadiz Real Estate LLC, Cadiz Inc. and Fenner Valley Farm, LLC (37)

10.43 Waiver Agreement under Amended and Restated Credit Agreement, dated as of March 9, 2016, by and among Cadiz Inc., Cadiz Real Estate LLC and the Required Lenders(39)

10.44 Private Placement Purchase Agreement, dated as of April 26, 2016, by and among Cadiz Inc. and the purchasers party thereto (40)

10.45 Placement Agent Agreement, dated as of April 26, 2016, by and between Cadiz Inc. and B. Riley & Co. LLC (40)

10.46 Registration Rights Agreement, dated as of April 28, 2016, by and among Cadiz Inc. and the holders party thereto (40)

10.53 Closing Share and Warrant Issuance Agreement by and between Cadiz Inc. and MSD Credit Opportunity Master Fund, L.P., dated as of November 29, 2016 (43)

10.54 Closing Share and Warrant Issuance Agreement by and between Cadiz Inc. and MILFAM II L.P., dated as of November 29, 2016 (43)

10.55 Closing Share and Warrant Issuance Agreement by and between Cadiz Inc. and WPI-Cadiz Farm CA, LLC, dated as of November 29, 2016 (43)
48
 

10.56 Form of Interest Share Issuance Agreement (43)

21.1 Subsidiaries of the Registrant

23.1 Consent of Independent Registered Public Accounting Firm

31.1 Certification of Scott Slater, Chief Executive Officer of Cadiz Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002

31.2 Certification of Timothy J. Shaheen, Chief Financial Officer and Secretary of Cadiz Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002

32.1 Certification of Scott Slater, Chief Executive Officer of Cadiz Inc. pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

32.2 Certification of Timothy J. Shaheen, Chief Financial Officer and Secretary of Cadiz Inc. pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
________________________________________________________________________
 
(1) Previously filed as an Exhibit to our Registration Statement on Form S-1 (Registration No. 33-75642) declared effective May 16, 1994 filed on February 23, 1994
(2) Previously filed as an Exhibit to our Quarterly Report on Form 10-Q for the quarter ended September 30, 1996 filed on November 14, 1996
(3) Previously filed as an Exhibit to our Quarterly Report on Form 10-Q for the quarter ended September 30, 1998 filed on November 13, 1998
(4) Previously filed as an Exhibit to our Annual Report on Form 10-K for the year ended December 31, 2003 filed on November 2, 2004
(5) Previously filed as an Exhibit to our Current Report on Form 8-K dated November 30, 2004 filed on December 2, 2004
(6) Previously filed as an Exhibit to our Quarterly Report on Form 10-Q for the quarter ended June 30, 1999 filed on August 13, 1999
(7) Previously filed as an Exhibit to our Annual Report on Form 10-K for the fiscal year ended December 31, 2004 filed on March 31, 2005
(8) Previously filed as an Exhibit to our Annual Report on Form 10-K for the fiscal year ended December 31, 2006 filed on March 16, 2007
(9) Previously filed as an Exhibit to our Quarterly Report on Form 10-Q for the quarter ended June 30, 2007 filed on August 6, 2007
 
49
 
 
(10) Previously filed as an Exhibit to our Annual Report on Form 10-K for the fiscal year ended December 31, 2007 filed on March 14, 2008 
(11) Previously filed as an Exhibit to our Quarterly Report on Form 10-Q for the quarter ended September 30, 2008 filed on November 10, 2008 
(12) Previously filed as Appendix A to our definitive proxy dated November 3, 2009, and filed on November 5, 2009
(13) Previously filed as an Exhibit to our Annual Report on Form 10-K for the fiscal year ended December 31, 2009 filed on March 15, 2010
(14) Previously filed as an Exhibit to our Current Report on Form 8-K dated June 23, 2010 and filed on June 24, 2010
(15) Previously filed as an Exhibit to our Current Report on Form 8-K dated June 25, 2010 and filed on June 30, 2010
(16) Previously filed as an Exhibit to our Current Report on Form 8-K dated October 4, 2010 and filed on October 7, 2010
(17) Previously filed as an Exhibit to our Annual Report on Form 10-K for the fiscal year ended December 31, 2011, filed on March 16, 2011
(18) Previously filed as an Exhibit to our Quarterly Report on Form 10-Q for the quarter ended March 31, 2011, filed on May 9, 2011
(19) Previously filed as an Exhibit to our Current Report on Form 8-K dated December 1, 2011, and filed on December 7, 2011
(20) Previously filed as an Exhibit to our Annual Report on Form 10-K for the fiscal year ended December 31, 2011 filed on March 15, 2012
(21) Previously filed as an Exhibit to our Quarterly Report on Form 10-Q for the quarter ended March 31, 2012, filed on May 9, 2012
(22) Previously filed as an Exhibit to our Quarterly Report on Form 10-Q for the quarter ended June 30, 2012, filed on August 9, 2012
(23) Previously filed as an Exhibit to our Quarterly Report on Form 10-Q for the quarter ended September 30, 2012, filed on November 8, 2012
(24) Previously filed as an Exhibit to our Current Report on Form 8-K dated December 7, 2012, and filed on December 12, 2012
(25) Previously filed as an Exhibit to our Annual Report on Form 10-K for the fiscal year ended December 31, 2012, filed on March 15, 2013
(26) Previously filed as an Exhibit to our Current Report on Form 8-K dated July 1, 2013 and filed on July 2, 2013
(27) Previously filed as an Exhibit to our registration statement on Form S-3 (Registration No. 333-190288) filed on July 31, 2013
(28) Previously filed as an Exhibit to our Current Report on Form 8-K dated October 30, 2013 and filed on October 31, 2013
(29) Previously filed as an Exhibit to our Quarterly Report on Form 10-Q for the quarter ended September 30, 2013, filed on November 8, 2013
(30) Previously filed as an Exhibit to our Current Report on Form 8-K dated June 10, 2014 and filed on June 13, 2014
(31) Previously filed as an Exhibit to our Current Report on Form 8-K dated November 7, 2014 and filed on November 10, 2014
(32) Previously filed as an Exhibit to our Current Report on Form 8-K dated December 19, 2014 and filed on December 22, 2014
(33) Previously filed as an Exhibit to our Annual Report on Form 10-K for the fiscal year ended December 31, 2014, filed on March 9, 2015
(34) Previously filed as an Exhibit to our Current Report on Form 8-K dated November 23, 2015 and filed on November 30, 2015
(35) Previously filed as an Exhibit to our Current Report on Form 8-K dated December 10, 2015 and filed on December 16, 2015
(36) Previously filed as an Exhibit to our Current Report on Form 8-K dated December 23, 2015 and filed on December 30, 2015
(37) Previously filed as an Exhibit to our Current Report on Form 8-K dated February 8, 2016 and filed on February 12, 2016
50
 
 
(38) Previously filed as an Exhibit to our Current Report on Form 8-K dated March 4, 2016 and filed on March 10, 2016
(39) Previously filed as an Exhibit to our Annual Report on Form 10-K for the fiscal year ended December 31, 2015, filed on March 14, 2016
(40) Previously filed as an Exhibit to our Current Report on Form 8-K dated April 26, 2016 and filed on April 29, 2016
(41) Previously filed as an Exhibit to our Current Report on Form 8-K dated June 9, 2016 and filed on June 14, 2016
(42) Previously filed as an Exhibit to our registration statement on Form S-3 (Registration No. 333-214318) filed on October 28, 2016
(43) Previously filed as an Exhibit to our Current Report on Form 8-K dated November 29, 2016 and filed on December 1, 2016
51
 
CADIZ INC. CONSOLIDATED FINANCIAL STATEMENTS
 
Page
   
53
   
55
   
56
   
57
   
58
   
59
   
78
   
(Schedules other than those listed above have been omitted since they are either not required, inapplicable, or the required information is included on the financial statements or notes thereto.)
52
 
Report of Independent Registered Public Accounting Firm

To the Board of Directors and Stockholders of Cadiz Inc.:

  In our opinion, the consolidated financial statements listed in the accompanying index present fairly, in all material respects, the financial position of Cadiz Inc. and its subsidiaries at December 31, 2016 and December 31, 2015, and the results of their operations and their cash flows for each of the three years in the period ended December 31, 2016 in conformity with accounting principles generally accepted in the United States of America.  In addition, in our opinion, the financial statement schedule listed in the accompanying index presents fairly, in all material respects, the information set forth therein when read in conjunction with the related consolidated financial statements.  Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2016, based on criteria established in Internal Control - Integrated Framework ( 2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).  The Company's management is responsible for these financial statements and financial statement schedule, for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in Management's Report on Internal Control Over Financial Reporting.  Our responsibility is to express opinions on these financial statements, on the financial statement schedule, and on the Company's internal control over financial reporting based on our integrated audits.  We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States).  Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the financial statements are free of material misstatement and whether effective internal control over financial reporting was maintained in all material respects.  Our audits of the financial statements included examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation.  Our audit of internal control over financial reporting included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and operating effectiveness of internal control based on the assessed risk.  Our audits also included performing such other procedures as we considered necessary in the circumstances. We believe that our audits provide a reasonable basis for our opinions.

  A company's internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles.  A company's internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.
53
 
 
  Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements.  Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.


/s/ PricewaterhouseCoopers LLP
Los Angeles, California
March 16, 2017
54
 
Cadiz Inc.

Consolidated Statements of Operations and Comprehensive Loss
 
 
 
Year Ended December 31,
 
(In thousands, except per share date)    2016     2015     2014  
                         
Total revenues
 
$
412
   
$
304
   
$
336
 
 
                         
Costs and expenses:
                         
Cost of sales (exclusive of depreciation shown below)
   
-
     
334
     
357
 
General and administrative
   
9,330
     
13,709
     
10,084
 
Depreciation
   
292
     
270
     
254
 
 
                         
Total costs and expenses
   
9,622
     
14,313
     
10,695
 
 
                         
Operating loss
   
(9,210
)
   
(14,009
)
   
(10,359
)
 
                         
Interest expense, net
   
(14,875
)
     (10,070    
(8,518
)
 
Loss on extinguishment of debt and debt refinancing
   
(2,250
)
    -      
-
   
Other income, net
   
-
       70      
-
   
 
                       
Loss before income taxes
   
(26,335
)
   
(24,009
)
   
(18,877
)
 
                       
Income tax (benefit) expense
   
4
     
4
     
4
 
 
                       
Net loss and comprehensive loss
 
$
(26,339
)
 
$
(24,013
)
 
$
(18,881
)
 
                       
Basic and diluted net loss per share
 
$
(1.41
)
 
$
(1.35
)
 
$
(1.15
)
 
                       
Weighted-average shares outstanding
   
18,719
     
17,782
     
16,370
 

See accompanying notes to the consolidated financial statements.
55
 
Cadiz Inc.

Consolidated Balance Sheets
 
 
 
December 31,
 
($ in thousands, except per share data)
 
2016
   
2015
 
 
           
ASSETS
           
 
           
Current assets:
           
Cash and cash equivalents
 
$
12,172
   
$
2,690
 
Accounts receivable
   
39
     
187
 
   Prepaid expenses and other
   
3,391
     
309
 
Total current assets
   
15,602
     
3,186
 
 
               
Property, plant, equipment and water programs, net
   
44,182
     
44,474
 
Goodwill
   
3,813
     
3,813
 
Other assets
   
3,502
     
3,317
 
 
               
Total assets
 
$
67,099
   
$
54,790
 
 
               
LIABILITIES AND STOCKHOLDERS' DEFICIT
               
 
               
Current liabilities:
               
Accounts payable
 
$
439
   
$
309
 
Accrued liabilities
   
3,953
     
1,665
 
Current portion of long term debt
   
170
     
49
 
 
               
Total current liabilities
   
4,562
     
2,023
 
 
               
Long-term debt
   
102,374
     
107,592
 
Long-term lease obligations with related party, net
Deferred revenue
   
12,287
750
     
-
750
 
Other long-term liabilities
   
1,443
     
923
 
 
               
      Total liabilities
   
121,416
     
111,288
 
 
               
Commitments and contingencies (Note 11)
               
 
               
Stockholders' deficit:
               
Common stock - $0.01 par value; 70,000,000 shares
               
authorized; shares issued and outstanding: 21,768,864 at December 31, 2016, and 17,876,016 at December 31, 2015
   
218
     
179
 
                 
 
               
Additional paid-in capital
   
355,336
     
326,855
 
Accumulated deficit
   
(409,871
)
   
(383,532
)
Total stockholders' deficit
   
(54,317
)
   
(56,498
)
 
               
Total liabilities and stockholders' deficit
 
$
67,099
   
$
54,790
 

See accompanying notes to the consolidated financial statements.
56
 
Cadiz Inc.

Consolidated Statements of Cash Flows
 
 
 
Year Ended December 31,
 
($ in thousands)
 
2016
   
2015
   
2014
 
 
                 
Cash flows from operating activities:
                 
Net loss
 
$
(26,339
)
 
$
(24,013
)
 
$
(18,881
)
Adjustments to reconcile net loss to net cash
                       
used for operating activities:
                       
Depreciation
   
292
     
270
     
254
 
Amortization of deferred loan costs
   
238
     
198
     
226
 
Amortization of debt discount
   
3,739
     
1,635
     
633
 
Interest expense added to loan principal
   
7,636
     
8,237
     
7,659
 
Interest added to lease liability
   
755
     
-
     
-
 
Loss on debt conversion
   
1,234
     
-
     
-
 
Loss on early extinguishment of debt and debt refinancing
   
2,250
     
-
     
-
 
Compensation charge for stock awards and share options
   
1,296
     
1,116
     
1,077
 
Changes in operating assets and liabilities:
                       
Decrease in accounts receivable
   
148
     
52
     
52
 
(Increase) decrease in prepaid expenses and other
   
(3,082
)
   
37
     
4
 
Increase in other assets
   
(185
)
   
(186
)
   
(186
)
Increase (decrease) in accounts payable
   
130
     
9
     
(533
)
Increase (decrease) in accrued liabilities
   
2,374
     
77
     
(426
)
 
                       
Net cash used for operating activities
   
(9,514
)
   
(12,568
)
   
(10,121
)
 
                       
Cash flows from investing activities:
                       
Additions to property, plant and equipment
   
-
     
(906
)
   
(72
)
 
                       
Net cash used for investing activities
   
-
 
   
(906
)
   
(72
)
 
                       
Cash flows from financing activities:
                       
Net proceeds from issuance of common stock
   
10,510
     
-
     
14,523
 
Up-front payment related to lease liability
   
12,000
     
-
     
-
 
Net proceeds from issuance of long-term debt
   
8,000
     
-
     
-
 
Debt issuance costs
   
(960
)
   
-
     
-
 
Principal payments on long-term debt
   
(10,554
)
   
(42
)
   
(11
)
                         
Net cash provided by (used for) financing activities
   
18,996
     
(42
)
   
14,512
 
 
                       
Net increase (decrease) in cash and cash equivalents
   
9,482
     
(13,516
)
   
4,319
 
 
                       
Cash and cash equivalents, beginning of period
   
2,690
     
16,206
     
11,887
 
 
                       
Cash and cash equivalents, end of period
 
$
12,172
   
$
2,690
   
$
16,206
 

See accompanying notes to the consolidated financial statements.
57
 
Cadiz Inc.

Consolidated Statements of Stockholders' Deficit
 
                               
         
Additional
         
Total
 
 ($ in thousands)
 
Common Stock
   
Paid-in
   
Accumulated
   
Stockholders'
 
 
 
Shares
   
Amount
   
Capital
   
Deficit
   
Deficit
 
 
                             
Balance as of December 31, 2013
   
16,152,756
   
$
161
   
$
303,979
   
$
(340,638
)
 
$
(36,498
)
                                         
Issuance of shares pursuant to stock awards
   
29,327
     
-
     
-
     
-
     
-
 
Issuance of shares pursuant to shelf takedown
   
1,435,713
     
14
     
14,443
     
-
     
14,457
 
Issuance of shares pursuant to warrant exercise
   
24,441
     
-
     
-
     
-
     
-
 
Issuance of stock pursuant to bond conversion
   
39,037
     
1
     
310
     
-
     
311
 
Stock compensation expense
   
-
     
1
     
872
     
-
     
873
 
Net Loss
   
-
     
-
     
-
     
(18,881
)
   
(18,881
)
Balance as of December 31, 2014
   
17,681,274
     
177
     
319,604
     
(359,519
)
   
(39,738
)
                                         
Issuance of shares pursuant to stock awards
   
68,109
     
-
     
-
     
-
     
-
 
Issuance of stock pursuant to bond conversion
   
126,633
     
1
     
1,005
     
-
     
1,006
 
Convertible term loan conversion option
   
-
     
-
     
5,139
     
-
     
5,139
 
Stock compensation expense
   
-
     
1
     
1,107
     
-
     
1,108
 
Net Loss
   
-
     
-
     
-
     
(24,013
)
   
(24,013
)
Balance as of December 31, 2015
   
17,876,016
     
179
     
326,855
     
(383,532
)
   
(56,498
)
                                         
Issuance of shares pursuant to stock  awards
   
207,868
     
-
     
-
     
-
     
-
 
Issuance of shares to lenders
   
1,128,257
     
11
     
6,075
     
-
     
6,086
 
Issuance of shares pursuant to shelf takedown
   
1,150,000
     
12
     
10,498
     
-
     
10,510
 
Issuance of stock pursuant to bond conversion
   
1,406,723
     
14
     
9,566
     
-
     
9,580
 
Beneficial conversion feature
   
-
     
-
     
1,482
     
-
     
1,482
 
Stock compensation expense
   
-
     
2
     
860
     
-
     
862
 
Net Loss
   
-
     
-
     
-
     
(26,339
)
   
(26,339
)
Balance as of December 31, 2016
   
21,768,864
   
$
218
   
$
355,336
   
$
(409,871
)
 
$
(54,317
)
 
See accompanying notes to the consolidated financial statements.
58
 
Cadiz Inc.

Notes To The Consolidated Financial Statements
 
NOTE 1 – DESCRIPTION OF BUSINESS
 
  Cadiz Inc. ("Cadiz" or "the Company") is a land and water resource development company with 45,000 acres of land in three areas of eastern San Bernardino County, California.  Virtually all of this land is underlain by high-quality, naturally recharging groundwater resources, and is situated in proximity to the Colorado River and the Colorado River Aqueduct ("CRA"), California's primary mode of water transportation for imports from the Colorado River into the State.  The Company's properties are suitable for various uses, including large-scale agricultural development, groundwater storage and water supply projects. The Company's main objective is to realize the highest and best use of its land and water resources in an environmentally responsible way.
 
  The Company has been primarily focused on the development of the Cadiz Valley Water Conservation, Recovery and Storage Project ("Water Project" or "Project"), which will capture and conserve millions of acre-feet of native groundwater currently being lost to evaporation from the aquifer system beneath the Company's 34,000-acre property in the Cadiz and Fenner valleys of eastern San Bernardino County (the "Cadiz/Fenner Property"), and deliver it to water providers throughout Southern California.


NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

Basis of Presentation
 
  The Consolidated Financial Statements of the Company have been prepared assuming that the Company will continue as a going concern, which assumed realization of assets and settlement of liabilities in the normal course of business.
 
  The Company incurred losses of $26.3 million, $24.0 million and $18.9 million for the years ended December 31, 2016, 2015 and 2014, respectively.  The Company had working capital of $11.0 million at December 31, 2016, including cash of $12.2 million, and used cash in operations of $9.5 million for the year ended December 31, 2016.  Cash requirements during the year ended December 31, 2016, primarily reflect certain administrative and litigation costs related to the Company's water project development efforts.  Currently, the Company's sole focus is the development of its land and water assets.
 
  In April 2016, the Company issued approximately $10.0 million in aggregate principal and accrued interest of its 7.00% Convertible Senior Notes due 2020 ("2020 Notes"), and in December 2016, the Company raised approximately $10.6 million with the sale of 1,150,000 shares at $9.75 per share by way of takedown from its shelf registration.

  The agreement with its lenders to allow the Company to pay all interest either in-kind or through the issuance of shares combined with the proceeds from the issuance of the 2020 Notes, and from the shelf takedown, provides the Company with sufficient funds to meet its expected working capital needs through April 2018.  In addition, the Company is able to control certain of its costs and can reduce expenditures if needed to coincide with future capital raises.
59
 
  The Company may meet future working capital requirements beyond April 2018 through a variety of means, including equity or debt placements, through the sale or other disposition of assets or reductions in operating costs.  Equity placements may be made using our existing shelf registration.  Equity placements, if made, would be undertaken only to the extent necessary, so as to minimize the dilutive effect of any such placements upon the Company's existing stockholders.
 
  Limitations on the Company's liquidity and ability to raise capital may adversely affect it.  Sufficient liquidity is critical to meet the Company's resource development activities.  Although the Company currently expects its sources of capital to be sufficient to meet its near-term liquidity needs, there can be no assurance that its liquidity requirements will continue to be satisfied.  If the Company cannot raise needed funds, it might be forced to make substantial reductions in its operating expenses, which could adversely affect its ability to implement its current business plan and ultimately its viability as a company.

Principles of Consolidation
 
  The consolidated financial statements include the accounts of Cadiz Inc. and all subsidiaries.  All significant intercompany transactions and balances have been eliminated in consolidation.

Use of Estimates in Preparation of Financial Statements
 
  The preparation of financial statements in conformity with generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period.  In preparing these financial statements, management has made estimates with regard to goodwill and other long-lived assets, stock compensation and deferred tax assets.  Actual results could differ from those estimates.

Revenue Recognition
 
  The Company recognizes agricultural revenue through its lease with Fenner Valley Farms LLC.

Stock-Based Compensation
 
  General and administrative expenses include $1.3 million, $1.1 million and $1.1 million of stock-based compensation expenses in the years ended December 31, 2016, 2015 and 2014, respectively.
 
  The Company applies the Black-Scholes valuation model in determining the fair value of options granted to employees and consultants.  For employees, the fair value is then charged to expense on the straight-line basis over the requisite service period.  For consultants, the fair value is remeasured at each reporting period and recorded as a liability until the award is settled.
60
 
  ASC 718 also requires the Company to estimate forfeitures in calculating the expense related to stock-based compensation as opposed to only recognizing forfeitures and the corresponding reduction in expense as they occur.  As of December 31, 2016, all options outstanding are fully vested; therefore, there is no potential impact of forfeitures. The Company is in a tax loss carryforward position and is not expected to realize a benefit from any additional compensation expense recognized under ASC 718.  See Note 7, "Income Taxes".

Net Loss Per Common Share
 
  Basic net loss per share is computed by dividing the net loss by the weighted-average common shares outstanding.  Options, deferred stock units, warrants, and the zero coupon term loan convertible into or exercisable for certain shares of the Company's common stock were not considered in the computation of net loss per share because their inclusion would have been antidilutive.  Had these instruments been included, the fully diluted weighted average shares outstanding would have increased by approximately 11,070,000 shares, 8,453,000 shares and 8,237,000 shares for the years ended December 31, 2016, 2015 and 2014, respectively.

Property, Plant, Equipment and Water Programs
 
  Property, plant, equipment and water programs are stated at cost.  Depreciation is provided using the straight-line method over the estimated useful lives of the assets, generally ten to forty-five years for land improvements and buildings, and five to fifteen years for machinery and equipment.  Leasehold improvements are amortized over the shorter of the term of the relevant lease agreement or the estimated useful life of the asset.
 
  Water rights, storage and supply programs are stated at cost.  Certain costs directly attributable to the development of such programs have been capitalized by the Company.  These costs, which are expected to be recovered through future revenues, consist of direct labor, drilling costs, consulting fees for various engineering, hydrological, environmental and additional feasibility studies, and other professional and legal fees.  While interest on borrowed funds is currently expensed, interest costs related to the construction of project facilities will be capitalized at the time construction of these facilities commences.

Goodwill and Other Assets
 
  As a result of a merger in May 1988 between two companies which eventually became known as Cadiz Inc., goodwill in the amount of $7,006,000 was recorded.  Approximately $3,193,000 of this amount was amortized prior to the adoption of ASC 350 on January 1, 2002.  Since the adoption of ASC 350, there have been no goodwill impairments recorded.
 
  Deferred loan costs represent costs incurred to obtain debt financing.  Such costs are amortized over the life of the related loan using the interest method.  At December 31, 2016, the deferred loan fees relate to the corporate term loan, as described in Note 6, "Long-Term Debt".

Impairment of Goodwill and Long-Lived Assets
 
  The Company assesses long-lived assets, excluding goodwill, for recoverability whenever events or changes in circumstances indicate that their carrying value may not be recoverable through the estimated undiscounted future cash flows resulting from the use of the assets. If it is determined that the carrying value of long-lived assets may not be recoverable, the impairment is measured by using the projected discounted cash-flow method.
61
 
  The Company uses a two-step impairment test to identify potential goodwill impairment and measure the amount of a goodwill impairment loss to be recognized (if any) for the Company.  The first step, which is performed at least annually, considers whether there are qualitative factors present such that it is more likely than not a goodwill impairment exists.  If based on qualitative factors it is more likely than not a goodwill impairment exists, the Company performs "Step 2" as described below.
 
  The step 2 calculation of the impairment test compares the implied fair value of the goodwill to the carrying value of goodwill. The implied fair value of goodwill represents the excess of the estimated fair value above the fair value of the Company's identified assets and liabilities.  If the carrying value of goodwill exceeds the implied fair value of goodwill, an impairment loss is recognized in an amount equal to the excess (not to exceed the carrying value of goodwill).  The determination of the fair value of its assets and liabilities is performed as of the measurement date using observable market data before and after the measurement date (if that subsequent information is relevant to the fair value on the measurement date). 

Income Taxes
 
  Income taxes are provided for using an asset and liability approach which requires the recognition of deferred tax assets and liabilities for the expected future tax consequences of temporary differences between the financial statement and tax bases of assets and liabilities at the applicable enacted tax rates.  A valuation allowance is provided when it is more likely than not that some portion or all of the deferred tax assets will not be realized.

Fair Value of Financial Instruments
 
  Financial assets with carrying values approximating fair value include cash and cash equivalents and accounts receivable.  Financial liabilities with carrying values approximating fair value include accounts payable and accrued liabilities due to their short-term nature.  The carrying value of the Company's debt approximates fair value, based on interest rates available to the Company for debt with similar terms.  See Note 6, "Long-Term Debt", for discussion of fair value of debt.

Supplemental Cash Flow Information
 
  The Company is required to pay 50% of all future quarterly interest payments in cash or stock on the corporate secured debt, rather than in accretion to principal, beginning with the quarterly interest payment due June 5, 2016.  No other payments are due on the corporate secured debt or convertible notes prior to their maturities. During the year ended December 31, 2016, approximately $434 thousand in interest payments on the corporate secured debt was paid in stock.  As a result, 46,236 shares of common stock were issued to the lenders.
 
  In November 2016, the Company issued 357,500 shares of common stock to its lenders in connection to an amendment to the corporate secured debt.  The Company recorded a debt discount in the amount of $3.4 million which is the fair value of the 357,500 shares issued. 
62
 
  In April 2016, the Company recorded a beneficial conversion feature in the amount of $1.48 million in connection with the issuance of approximately $10.0 million in aggregate principal and accrued interest of its convertible notes.
 
  During the year ended December 31, 2016, approximately $9.9 million in convertible notes were converted by certain of the Company's lenders.  As a result, 1,406,723 shares of common stock were issued to the lenders.  
 
  Cash payments for income taxes were $4,000 for each of the years ended December 31, 2016, 2015, and 2014. 
 
Recent Accounting Pronouncements

Accounting Guidance Not Yet Adopted
 
  In May 2014, the FASB issued an accounting standards update on revenue recognition including enhanced disclosures.  Under the new standard, revenue is recognized when (or as) a good or service is transferred to the customer and the customer obtains control of the good or service.  On July 9, 2015, the FASB approved a one-year deferral, updating the effective date to January 1, 2018.  The Company is currently evaluating this new guidance, and expects this new stand will not have a material impact on the consolidated financial statements.
 
  In February 2016, the FASB issued an accounting standards update related to lease accounting including enhanced disclosures.  Under the new standard, a lease is defined as a contract, or part of a contract, that conveys the right to control the use of identified assets for a period of time in exchange for consideration.  Lessees will classify leases with a term of more than one year as either operating or finance leases and will need to recognize a right-of-use asset and a lease liability.  The liability will be equal to the present value of lease payments.  The asset will be based on the liability, subject to adjustment, such as for initial direct costs. Operating leases will result in straight-line expense while finance leases will result in a front-loaded expense pattern.  This guidance is effective January 1, 2019, but early adoption is permitted. The Company is currently evaluating this new guidance and cannot determine the impact of this standard at this time.
 
  In March 2016, the FASB issued an accounting standards update to simplify the accounting for share-based payments.  Under this new guidance, the tax effects related to share based payments will be recorded through the income statement.  Currently, tax benefits in excess of compensation cost ("windfalls") are recorded in equity, and tax deficiencies ("shortfalls") are recorded in equity to the extent of previous windfalls, and then to the income statement.  This guidance is effective January 1, 2017, but early adoption is permitted.  The new standard also revised reporting on the statement of cash flows.  The Company is currently evaluating this new guidance and cannot determine the impact of this standard at this time.
 
  In August 2016, the FASB issued an accounting standards update which eliminates the diversity in practice related to the classification of certain cash receipts and payments in the statement of cash flows, by adding or clarifying guidance on eight specific cash flow issues.  This guidance is effective for fiscal years beginning after December 15, 2017, and interim periods within those fiscal years, but early adoption is permitted.  The Company is currently evaluating this new guidance and cannot determine the impact of this standard at this time.
63
 
  In January 2017, the FASB issued an accounting standards update which eliminates Step 2 from the goodwill impairment test. Entities should perform their goodwill impairment tests by comparing the fair value of a reporting unit with its carrying amount and recognize an impairment charge for the amount by which the carrying amount exceeds the reporting unit's fair value. The amendments in this update are effective prospectively during interim and annual periods beginning after December 15, 2019, with early adoption permitted. The Company is currently evaluating this new guidance and cannot determine the impact of this standard at this time.
 
Accounting Guidance Adopted
 
  In August 2014, the FASB issued an accounting standards update requiring an entity's management to evaluate whether there are conditions or events, considered in aggregate, that raise substantial doubt about the entity's ability to continue as a going concern within one year after the date that the financial statements are issued (or within one year after the date that the financial statements are available to be issued when applicable).  The Company adopted this guidance on December 31, 2016.
 
  In April 2015, the FASB issued an accounting standards update that requires debt issuance costs to be presented in the balance sheet as a direct deduction from the carrying amount of the related debt liability, consistent with debt discounts.  Previously, accounting guidance required these costs to be presented as a deferred charge asset.  The Company adopted this guidance in the first quarter of 2016.  The Amount of debt issuance costs that have been reclassified from "Other long-term assets" as a deduction of "Long-term debt" for December 31, 2015 was $626 thousand.
64
 
NOTE 3 – PROPERTY, PLANT, EQUIPMENT AND WATER PROGRAMS
 
  Property, plant, equipment and water programs consist of the following (dollars in thousands):

 
 
December 31,
 
 
 
2016
   
2015
 
 
           
Land and land improvements
 
$
24,781
   
$
24,781
 
Water programs
   
21,324
     
21,324
 
Buildings
   
1,572
     
1,572
 
Leasehold improvements
   
570
     
570
 
Furniture and fixtures
   
461
     
461
 
Machinery and equipment
   
1,313
     
1,313
 
Construction in progress
   
112
     
112
 
 
   
50,134
     
50,133
 
Less accumulated depreciation
   
(5,951
)
   
(5,659
)
 
               
 
 
$
44,182
   
$
44,474
 
 
 
NOTE 4 – OTHER ASSETS
 
  Other assets consist of the following (dollars in thousands):

 
December 31,
 
2016
 
2015
 
     
Prepaid rent
 
$
3,369
   
$
3,184
Security deposits
   
133
     
133
 
 
$
3,502
   
$
3,317
 
  Prepaid rent primarily consists of fees incurred to obtain the right-of-way for the Water Project.  Amortization of prepaid rent was approximately $115,000, $115,000 and $115,000 in 2016, 2015 and 2014, respectively.
65
 
NOTE 5 – ACCRUED LIABILITIES
 
  At December 31, 2016 and 2015, accrued liabilities consist of the following (dollars in thousands):

 
 
December 31,
 
 
2016
   
2015
 
         
Payroll, bonus, and benefits
 
$
317
   
$
19
Legal and consulting
   
167
     
1,092
Stock-based compensation
   
171
     
283
Litigation settlement
   
3,000
     
-
Other accrued expenses
   
298
     
271
 
 
$
3,953
   
$
1,665
 
 
NOTE 6 – LONG-TERM DEBT AND LEASE OBLIGATION
 
  At December 31, 2016 and 2015, the carrying amount of the Company's outstanding debt is summarized as follows (dollars in thousands):

   
December 31,
 
   
2016
   
2015
 
             
Senior secured debt due September 28, 2019
Interest accrues at 8% per annum
 
$
43,550
   
$
51,815
 
Convertible note instrument due March 5, 2018
    Interest accrues at 7% per annum
   
2,154
     
4,018
 
Convertible note instrument due March 5, 2020
    Interest accrues at 7% per annum
   
66,800
     
59,804
 
Lease Obligation
   
12,755
     
-
 
Other loans
   
144
     
193
 
Debt discount and debt issuance costs, net of accumulated accretion
   
(10,572
)
   
(7,564
)
     
114,831
     
108,266
 
                 
Less current portion
   
170
     
48
 
                 
   
$
114,661
   
$
108,218
 

 
  The carrying value of the Company's debt approximates fair value.  The fair value of the Company's debt (Level 2) is determined based on an estimation of discounted future cash flows of the debt at rates currently quoted or offered to the Company by its lenders for similar debt instruments of comparable maturities by its lenders.
 
  Pursuant to the Company's loan agreements, annual maturities of long-term debt outstanding on December 31, 2016, are as follows:
66
 
Year Ending
December 31
 
 
($ in thousands)
 
   
2017
 
$
45
2018
   
2,195
2019
   
43,593
2020
   
66,815
2021
   
12,755
 
 
$
125,403

Credit Agreement

  In November 2015, the Company entered into a First Amendment to the Credit Agreement ("First Amendment") with its senior lenders which granted it the right to extend the maturity date of the first tranche of its Senior Secured Debt ("First Mortgage") from March 2016 to June 2017, which is concurrent with the existing due date of the second tranche of the Senior Secured Debt.  In consideration of this right, the Company paid its senior lenders an amendment fee of $2.25 million in additional debt.
 
  On February 8, 2016, the Company entered into a lease agreement with Fenner Valley Farms LLC ("FVF") (the "lessee"), a subsidiary of Water Asset Management LLC, a related party, pursuant to which FVF is leasing, for a 99-year term, 2,100 acres owned by Cadiz in San Bernardino County, California, to be used to plant, grow and harvest agricultural crops ("FVF Lease Agreement").  As consideration for the lease, FVF paid the Company a one-time payment of $12.0 million upon closing.
 
  Under the FVF Lease Agreement, the Company has a repurchase option to terminate the lease at any time during the twenty (20) year period following the effective date of the lease ("Termination Option Period") upon (1) repayment of the one-time $12 million lease payment plus a ten percent (10%) compounded annual return (provided that the amount of such payment shall be not less than $14,400,000), (2) reimbursement of water-related infrastructure on the leased property plus 8% per annum as well as the actual costs of any farming-related infrastructure installed on the leased property and (3) reimbursement of certain pipeline-related development expenses, working in coordination with Cadiz, not to exceed $3,000,000 (such payments, the " Termination Payments ").  If (x) Cadiz does not exercise its termination right within such 20-year period or (y) the Agent under Cadiz's credit agreement declares an event of default under Cadiz's Senior Secured Debt and accelerates the indebtedness due and owing thereunder by Cadiz (or such indebtedness automatically accelerates under the terms of Cadiz's Senior Secured Debt), then the lessee may purchase the leased property for $1.00.  The Company has recorded the one-time payment of $12 million, before legal fees, paid by FVF as a long-term lease liability.  The Company's consolidated statement of operations reflects a net charge equal to a 10% finance charge compounding annually over the 20-year Termination Option Period.  The net charge to the consolidated statement of operations reflects (1) rental income associated with the use of the land by FVF over the 20-year termination option period and (2) interest expense at a market rate reflective of a 20-year secured loan transaction. As a result of this transaction, the Company incurred approximately $490 thousand of legal fees which was recorded as a debt discount and is being amortized over the 20-year Termination Option Period.
67
 
  Also on February 8, 2016, the Company entered into a Second Amendment to the Credit Agreement ("Second Amendment") with its senior lenders to (i) provide for the application of $10.5 million of a $12.0 million payment pursuant to the FVF Lease Agreement which satisfied the repayment condition of the First Amendment to extend the maturity date; (ii) to require Cadiz to pay 50% of all future quarterly interest payments in cash, rather than in accretion to principal, beginning with the quarterly interest payment due June 5, 2016; and (iii) to provide for certain related matters.  On February 25, 2016, the Company exercised its right to extend the maturity date of its First Mortgage and, at that time, incurred an additional extension fee of $2.25 million.  The Second Amendment does not constitute a troubled debt restructuring and was accounted for as a debt extinguishment.  The fair value of the credit facility was recorded at face value.  The Company recorded a loss on extinguishment in the amount of $2.25 million which consisted of the additional extension fee.  On March 4, 2016, the Company entered into a Third Amendment to the Credit Agreement which provided the lenders an additional 90 days to make the election to receive the extension fee in additional debt or Cadiz common stock in exchange for extending the due date of its Senior Secured Debt from June 30, 2017 to September 28, 2017.  In May 2016, the lenders elected to receive the extension fee in Cadiz common Stock.
 
  On November 29, 2016, the Company entered into a Fifth Amendment to the Credit Agreement ("Fifth Amendment) with its senior lenders to (i) extended the maturity date of its Secured Senior Debt from September 2017 to September 2019 and (ii) permit the Company to satisfy the cash interest payment obligations through the issuance of shares of the Company's common stock.  In connection with the Fifth Amendment, the Company issued to its senior lenders an aggregate of 357,500 shares of the Company's common stock and warrants to purchase an aggregate of 357,500 shares of its common stock.  The Company recorded a debt discount in the amount of $3.4 million which is the fair value of the 357,500 shares issued.  Such debt discount is accreted over the remaining term of the loan.  The warrants generally have a five-year term and an exercise price of $0.01 per share, and become exercisable on May 28, 2017.  The warrants will be valued at the time they become exercisable which could trigger extinguishment accounting and result in a loss on extinguishment. Interest on the Senior Secured Debt will continue to accrue at 8%

Convertible Notes
 
  On April 26, 2016, the Company entered into a note purchase agreement with new and existing investors (the "Investors").  On April 28, 2016, pursuant to the agreement, the Company issued approximately $10.0 million of its 7.00% Convertible Senior Notes due 2020 ("2020 Notes)in aggregate principal and accrued interest.  The proceeds from the issuance of the 2020 Notes to the Investors (such 2020 Notes, the "New Notes"), approximately $8.0 million before fees and expenses, are being used for general working capital purposes.
68
 
  The 2020 Notes accrue interest at 7.00% per year, with no principal or interest payments due prior to maturity on March 5, 2020. The 2020 Notes, including original principal and accrued interest, are convertible at any time into the Company's common stock at a price of $6.75 per share, pursuant to the terms of the Indenture dated as of December 10, 2015, by and between the Company and U.S. Bank National Association (the "Indenture"), under which the New Notes were issued.  As a result of this transaction, the Company recorded a debt discount in the amount of $2.0 million which is the difference between the proceeds from this transaction and the principal and accrued interest of New Notes on the day of the issuance.  In addition, based on the conversion rate of $6.75 per share, the fair value of the shares receivable on conversion exceed the $8.0 million in net proceeds; therefore, a beneficial conversion feature was recorded in the amount of $1.48 million.  This amount was recorded as additional debt discount with a corresponding amount recorded as additional paid-in capital.  Such debt discount is accreted to the redemption value of the instrument over the remaining term of the loan.  Furthermore, the Company incurred $400 thousand in placement agent fees which was recorded as additional debt discount and is being amortized over the remaining term of the loan.
 
  In connection with issuing the New Notes, the Company entered into a First Supplemental Indenture to the Indenture, dated as of April 28, 2016, by and between the Company and U.S. Bank National Association.
 
  The Senior Secured Debt and the convertible notes contain representations, warranties and covenants that are typical for agreements of this type, including restrictions that would limit the Company's ability to incur additional indebtedness, incur liens, pay dividends or make restricted payments, dispose of assets, make investments and merge or consolidate with another person.  However, while there are affirmative covenants, there are no financial covenants and no restrictions on the Company's ability to issue additional common stock to fund future working capital needs.   At December 31, 2016, the Company was in compliance with its debt covenants.


NOTE 7 – INCOME TAXES
 
  Deferred taxes are recorded based upon differences between the financial statement and tax bases of assets and liabilities and available carryforwards.  Temporary differences and carryforwards which gave rise to a significant portion of deferred tax assets and liabilities as of December 31, 2016 and 2015 are as follows (dollars in thousands):

 
 
December 31,
 
 
 
2016
   
2015
 
 
           
Deferred tax assets:
           
     Net operating losses
 
$
74,195
   
$
71,215
 
     Fixed asset basis difference
   
10,662
     
6,457
 
     Contributions carryover
   
5
     
5
 
     Deferred compensation
   
2,375
     
2,513
 
     Accrued liabilities
   
389
     
315
 
 
               
          Total deferred tax assets
   
87,626
     
80,505
 
 
               
     Valuation allowance for deferred tax assets
   
(87,626
)
   
(80,505
)
 
               
          Net deferred tax asset
 
$
-
   
$
-
 
 
69
 
  The valuation allowance increased $7,121,000 and $8,566,000 in 2016 and 2015, respectively.  The change in deferred tax assets resulted from current year net operating losses and changes to future tax deductions resulting from terms of stock compensation plans, fixed assets, and accrued liabilities.
 
  As of December 31, 2016, the Company had net operating loss (NOL) carryforwards of approximately $252.1 million for federal income tax purposes and $140.9 million for California income tax purposes.  Such carryforwards expire in varying amounts through the year 2035.  Use of the carryforward amounts is subject to an annual limitation as a result of a previous ownership change.
 
  As of December 31, 2016, the Company possessed unrecognized tax benefits totaling approximately $2.8 million.  None of these, if recognized, would affect the Company's effective tax rate because the Company has recorded a full valuation allowance against these assets.
 
  The Company's tax years 2013 through 2016 remain subject to examination by the Internal Revenue Service, and tax years 2012 through 2016 remain subject to examination by the state of California.  In addition, the Company's loss carryforward amounts are generally subject to examination and adjustment for a period of three years for federal tax purposes and four years for California purposes, beginning when such carryovers are utilized to reduce taxes in a future tax year.
 
  A reconciliation of the income tax benefit to the statutory federal income tax rate is as follows (dollars in thousands):

 
 
Year Ended December 31,
 
 
 
2016
   
2015
   
2014
 
 
                 
Expected federal income tax benefit at 34%
 
$
(8,955
)
 
$
(8,163
)
 
$
(6,418
)
Loss with no tax benefit provided
   
6,918
     
7,389
     
5,766
 
State income tax
   
4
     
4
     
4
 
Non-deductible expenses and other
   
2,037
     
774
     
652
 
 
                       
 Income tax expense
 
$
4
   
$
4
   
$
4
 

  Because it is more likely than not that the Company will not realize its net deferred tax assets, it has recorded a full valuation allowance against these assets.  Accordingly, no deferred tax asset has been recorded in the accompanying consolidated balance sheets.


NOTE 8 – COMMON STOCK
 
  As previously disclosed, in January 2013, the Company revised its then existing agreement with the law firm of Brownstein Hyatt Farber Schreck LLP ("Brownstein").  Under this agreement, the Company is to issue up to a total of 400,000 shares of the Company's common stock, with 100,000 shares earned upon the achievement of each of four enumerated milestones as follows:
70
 
 
i.
100,000 shares earned upon the execution of the revised agreement;

ii.
100,000 shares earned upon receipt by the Company of a final judicial order dismissing all legal challenges to the Final Environmental Impact Report for the Project;

iii.
100,000 shares earned upon the signing of binding agreements for more than 51% of the Project's annual capacity; and

iv.
100,000 shares earned upon the commencement of construction of all of the major facilities contemplated in the Final Environmental Impact Report necessary for the completion and delivery of the Project.
 
  All shares earned upon achievement of any of the four milestones will be payable three years from the date earned.  
 
  The first of the four milestones was satisfied in January 2013, and at that time, the Company recorded a stock compensation expense for the first 100,000 shares earned.  In May 2016, the second milestone was earned when a three-judge Appellate judge panel unanimously sustained the six trial court decisions and validated the Project's environmental review and approvals.  As a result, the Company accrued and recognized stock compensation during the third quarter in the amount of $520,000 for the second of the four milestones.  Because the shares are payable three years from the date earned, the fair value of these shares was measured by applying a discount which was determined by using the Finnerty model for discounts for lack of marketability.
 
  As previously disclosed, in June 2014, the Company entered into amended and restated employment agreements with certain senior management that provided for long-term equity incentive milestone awards of 200,000 shares of the Company's common stock in the form of 200,000 Restricted Stock Units ("RSUs").  These RSUs will vest once construction financing necessary for the implementation of the Water Project is secured.  These RSUs were granted on July 1, 2014 and will expire on June 10, 2017, if the milestone has not been achieved by such date.


NOTE 9 – STOCK-BASED COMPENSATION PLANS AND WARRANTS
 
  The Company has issued options and has granted stock awards pursuant to its 2009 Equity Incentive Plan and 2014 Equity Incentive Plan, as described below.

2009 Equity Incentive Plan
 
  The 2009 Equity Incentive Plan was approved by stockholders at the 2009 Annual Meeting.  The plan provides for the grant and issuance of up to 850,000 shares and options to the Company's employees and consultants.  The plan became effective when the Company filed a registration statement on Form S-8 on December 18, 2009.  All options issued under the 2009 Equity Incentive Plan have a ten-year term with vesting periods ranging from issuance date to 24 months.  As of December 31, 2016, 507,500 common stock options remain outstanding under this plan.
71
 
2014 Equity Incentive Plan
 
  The 2014 Equity Incentive Plan was approved by stockholders at the June 10, 2014 Annual Meeting.  The plan provides for the grant and issuance of up to 675,000 shares and options to the Company's employees, directors and consultants.  Upon approval of the 2014 Equity Incentive Plan, all shares of common stock that remained available for award under the 2009 Equity Incentive Plan were cancelled.  Following registration of the 2014 Plan on Form S-8, the Company entered into revised employment agreements with certain senior management that provide for the issuance of up to 162,500 Restricted Stock Units ("RSU's") during the period July 1, 2014 through December 31, 2016 and the issuance of up to 200,000 RSU's in connection with obtaining construction financing for the Water Project.  As of December 31, 2016, 162,500 of the RSUs granted on July 1, 2014 pursuant to these employee agreements are vested.
 
  Under the 2014 Equity Incentive Plan, each outside director receives $30,000 of cash compensation and receives a deferred stock award consisting of shares of the Company's common stock with a value equal to $20,000 on June 30 of each year.  The award accrues on a quarterly basis, with $7,500 of cash compensation and $5,000 of stock earned for each fiscal quarter in which a director serves.  The deferred stock award vests automatically on January 31 in the year following the award date.
 
  All options that have been issued under the above plans have been issued to officers, employees and consultants of the Company.  In total, options to purchase 507,500 shares were unexercised and outstanding on December 31, 2016, under the 2009 and 2014 equity incentive plans.
 
  For consultants of the Company, the fair value of each option granted under the 2009 Equity Incentive Plan is estimated at each reporting period using the Black-Scholes option pricing model and recorded as a liability until the award is settled.
 
  For officers and employees of the Company, the fair value of each option granted under the plans was estimated on the date of grant using the Black-Scholes option pricing model.
 
  The risk-free interest rate is assumed to be equal to the yield of a U.S. Treasury bond of comparable maturity, as published in the Federal Reserve Statistical Release for the relevant date.  The expected life estimate is based on an analysis of the employees receiving option grants and the expected behavior of each employee.  The expected volatility is derived from an analysis of the historical volatility of the trading price per share of the Company's common stock on the NASDAQ Global Market.  The Company does not anticipate that it will pay dividends to common stockholders in the future.
 
  The Company recognized no stock-option-related compensation costs for the years ended December 31, 2014, 2015 and 2016 relating to these options.  No stock options were exercised during 2016.
72
 
  No options were granted in 2016, 2015 and 2014.  A summary of option activity under the plans as of December 31, 2016, and changes during the years ended December 31, 2015 and 2014 are presented below:
 
 
 
             
Average
   
Aggregate
 
 
       
Weighted-
   
Reamining
    Intrinsic  
 
        Average     Contractual Term     Value  
    Shares     Exercise Price     Term     ($000's)  
Outstanding at January 1, 2014     842,500     $ 11.84       4.5     $ 7,316  
     Granted     -     -       -     $ -  
     Forfeited, Expired or canceled     (20,000 )   $ 12.60       -     $ 135  
     Exercised     -     $ -       -     $  -  
                               
Outstanding at December 31, 2014     822,500     $ 11.82       3.4     $ 7,181  
     Granted     -     $ -        -     $  -  
     Forfeited, Expired or canceled      (315,000    12.09        -     $  3,247  
     Exercised      -     $  -        -     $  -  
                                 
Outstanding at December 31, 2015       507,500     $  11.66        4.3     $  3,934  
                                 
     Granted      -     $  -      -     $  -  
      Forfeited, Expired or canceled      -     $  -        -     $  -  
     Exercised      -     $  -      -     $  -  
                                 
Outstanding at December 31, 2016      507,500 (a)    $  11.66        3.3     $  3,934  
                               
Options exercisable at December 31, 2016      507,500     $  11.66        3.3     $  3,934  
                                 
Weighted-average years of remaining contractual life of options outstanding at December 31, 2016    
 
3.3
                         
                                 
 (a) Exercise prices vary from $9.88 to $12.51, and expiration dates vary from January 2020 to December 2021.                           
 
 
Stock Awards to Directors, Officers, Consultants and Employees
 
  The Company has granted stock awards pursuant to its 2009 Equity Incentive Plan and 2014 Equity Incentive Plan.
 
  Of the total 850,000 shares reserved under the 2009 Equity Incentive Plan, 115,000 restricted shares of common stock were granted on January 14, 2010, and 140,000 restricted shares of common stock were granted on January 10, 2011.  Of the remaining 595,000 shares reserved under the 2009 Equity Incentive Plan, 42,265 shares of common stock were awarded to directors and 507,500 were issued as options as described above as of December 31, 2016.  Upon approval of the 2014 Equity Incentive Plan in June 2014, 45,235 shares remaining available for award under the 2009 Equity Incentive Plan were cancelled.
 
  Under the 2014 Equity Incentive Plan, 208,186 shares have been awarded to the Company's directors, consultants and employees.  Of the 208,186 shares awarded, 17,365 shares were awarded for service during the plan year ended June 30, 2016, became effective on that date and vested on January 31, 2017.
73
 
  The accompanying consolidated statements of operations and comprehensive loss include approximately $1,296,000, $1,116,000 and $1,077,000 of stock-based compensation expense related to stock awards in the years ended December 31, 2016, 2015 and 2014, respectively.
 
  A summary of stock awards activity under the plans during the years ended December 31, 2016 and 2015 is presented below:

 
   
Weighted-
 
 
   
Average
 
 
   
Grant-date
 
 
Shares
 
Fair Value
 
 
       
 
       
Nonvested at December 31, 2014
   
144,514
   
$
8.50
 
 Granted
   
87,945
   
$
6.37
 
 Forfeited or canceled
   
-
   
$
-
 
 Vested
   
(155,609
)
 
$
7.27
 
 
               
Nonvested at December 31, 2015
   
76,850
   
$
8.54
 
 Granted
   
84,383
   
$
7.23
 
 Forfeited or canceled
   
-
   
$
-
 
 Vested
   
(143,868
)
 
$
8.11
 
 
               
Nonvested at December 31, 2016
   
17,365
   
$
5.76
 



NOTE 10 – SEGMENT INFORMATION
 
  The primary business of the Company is to acquire and develop land and water resources.  As a result, the Company's financial results are reported in a single segment.


NOTE 11 – COMMITMENTS AND CONTINGENCIES
 
  The Company leases equipment and office facilities under operating leases that expire through April 2019.  Aggregate rental expense under all operating leases was approximately $157,000, $207,000 and $202,000 in the years ended December 31, 2016, 2015 and 2014, respectively.  At December 31, 2016, the future minimum rental commitments under existing non-cancelable operating leases totaled $491,000.
 
  In the normal course of its agricultural operations, the Company handles, stores, transports and dispenses products identified as hazardous materials.  Regulatory agencies periodically conduct inspections and, currently, there are no pending claims with respect to hazardous materials.
74
 
  The Company entered into a Services and Exclusivity Agreement with Layne Christensen Company ("Layne") on November 2009.  The agreement provides that the Company will contract exclusively with Layne for certain water related services, including drilling of boreholes, drilling of monitoring wells, completion of test wells, completion of production wells, and completion of aquifer, storage and recovery wells.  In exchange for the Services and Exclusivity Agreement, Layne has agreed to forego $923,000 for work performed.  This amount continues to be recorded as an other long-term liability as of December 31, 2016, and will be credited toward future work performed during the construction phase of the Water Project.
 
  Pursuant to cost-sharing agreements that have been entered into by participants in the Company's Water Project, $750,000 in funds has offset costs incurred in the environmental analysis of the Water Project.  These funds may either be reimbursed or credited to participants participation in the Water Project and, accordingly, are fully reflected as deferred revenue as of December 31, 2016.
 
  On April 24, 2015, a putative class action lawsuit, entitled Van Wingerden v. Cadiz Inc., et al., No. 2:15-cv-03080-JAK-JEM, was filed against Cadiz and certain of its directors and officers ("Defendants") in the United States District Court for the Central District of California purporting to assert claims for violation of §§ 10(b) and 20(a) of the Securities Exchange Act of 1934 and Rule 10b-5 promulgated thereunder.  The complaint, was purportedly brought on behalf of all Cadiz shareholders, alleged that the Company's public disclosures were inadequate in relation to the Cadiz Valley Water Conservation, Recovery and Storage Project (the "Water Project").  The complaint sought unspecified monetary damages and other relief.  The Company believed that the claims alleged in the purported class action lawsuit were baseless and without merit.  On December 2, 2015, Defendants filed a Motion to Dismiss the lawsuit and a hearing on the motion was held in late February 2016.  Following court-mandated mediation discussions in April 2016, and notwithstanding that the Company disputes the allegations in the complaint, the parties agreed to settle the case and filed a notice of settlement with the Court on May 6, 2016.  On May 9, 2016, the Court dismissed the case without prejudice.  On June 16, 2016, the plaintiffs filed a motion seeking preliminary approval of the settlement and supplemented such motion on July 14, 2016 at the request of the Court.  On September 30, 2016, the Court issued an order granting preliminary approval of the settlement.  In the settlement, the Company made no admission of liability or wrongdoing and did not concede the validity of any of the allegations or legal claims made in the litigation.  On February 8, 2017, the Court issued its Order and Final Judgement dismissing the federal class action and finalizing the settlement.  This matter is now closed.  A cash settlement will be paid in accordance with the Company's insurance policy and not from its cash resources.
 
  On February 6, 2016, a shareholder derivative lawsuit, entitled Herman Boschken v. Keith Brackpool et. Al., was filed against certain Cadiz directors and officers ("Derivative Defendants") in the Superior Court of State of California County of Los Angeles ("Superior Court") purporting to assert claims for breach of fiduciary duty, corporate waste, gross mismanagement, and unjust enrichment.  The complaint, which purports to be brought on behalf of all Cadiz shareholders, alleges that the Derivative Defendants made false and misleading statements regarding the Company's business and prospects.  This complaint was filed in the wake of Van Wingerden v. Cadiz, Case No. 2:15-cv-03080-JAK-JEM (C.D.C.A. Apr. 24, 2015), described above, and mirrors many of its factual allegations.  Among other things, the complaint seeks unspecified monetary damages and certain changes to corporate governance policies.  The Company believes that the lawsuit is without merit.  Notwithstanding that the Company disputes the allegations in the complaint, the parties agreed to settle the case and on January 25, 2017, the Superior Court entered an order preliminarily approving a proposed settlement and approving for dissemination the Notice of Derivative Settlement (the "Notice") to the Company's current shareholders.  The proposed settlement is subject to final approval by the Superior Court of California.  In the settlement, the Company makes no admission of liability or wrongdoing and does not concede the validity of any of the allegations or legal claims made in the litigation.  Subject to final approval of the settlement by the Superior Court, and in exchange for a release of all claims by the plaintiffs and a dismissal of the Derivative Action with prejudice, the Company has agreed to implement certain corporate governance reforms, and pay certain plaintiffs' attorney fees and expenses.  The cash portion of the settlement will be paid in accordance with the Company's corporate insurance policy and not from its cash resources. 
75
 
  There are no other material legal proceedings pending to which the Company is a party or of which any of the Company's property is the subject.

NOTE 12 – QUARTERLY FINANCIAL INFORMATION (UNAUDITED)
 
(in thousands, except per share data)
 
 
 
 
 
Quarter Ended
 
 
 
March 31,
 
 
June 30,
 
 
September 30,
 
 
December 31,
 
 
 
2016
 
 
2016
 
 
2016
 
 
2016
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Revenues
 
$
75
 
 
$
108
 
 
$
120
 
 
$
109
 
Gross profit
 
 
75
 
 
 
108
 
 
 
120
 
 
 
109
 
Operating loss
 
 
(2,353
)
 
 
(2,606
)
 
 
(1,930
)
 
 
(2,321
)
Net loss
 
 
(8,795
)
 
 
(5,645
)
 
 
(5,175
)
 
 
(6,724
)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Basic and diluted net loss per common share
 
$
(0.49
)
 
$
(0.31
)
 
$
(0.28
)
 
$
(0.34
)
 
 
 
 
Quarter Ended
 
 
 
March 31,
 
 
June 30,
 
 
September 30,
 
 
December 31,
 
 
 
2015
 
 
2015
 
 
2015
 
 
2015
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Revenues
 
$
18
 
 
$
38
 
 
$
227
 
 
$
21
 
Gross profit (loss)
 
 
18
 
 
 
38
 
 
 
(64
)
 
 
(22
)
Operating loss
 
 
(2,718
)
 
 
(3,751
)
 
 
(3,651
)
 
 
(3,889
)
Net loss
 
 
(4,842
)
 
 
(5,990
)
 
 
(5,965
)
 
 
(7,216
)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Basic and diluted net loss per common share
 
$
(0.27
)
 
$
(0.34
)
 
$
(0.33
)
 
$
(0.40
)
76
 
NOTE 13 – SUBSEQUENT  EVENTS

  On February 8, 2017, a federal class action lawsuit, entitled Van Wingerden v. Cadiz Inc., et al., No. 2:15-cv-03080-JAK-JEM, which was filed against Cadiz and certain of its directors and officers ("Defendants") in the United States District Court for the Central District of California (see Note 11, "Commitments and Contingencies"), was dismissed and a cash settlement was finalized.  This matter is now closed.  The liability of $3 million recorded by the Company as of December 31, 2016 will be eliminated upon payment by its insurance carrier.
77
 
Cadiz Inc.

Schedule II - Valuation and Qualifying Accounts

 
For the years ended December 31, 2016, 2015 and 2014 ($ in thousands)
 
   
 
 
Balance at
   
Additions Charged to
         
Balance
 
 
 
Beginning
   
Costs and
   
Other
         
at End
 
Year ended December 31, 2016
 
of Period
   
Expenses
   
Accounts
   
Deductions
   
of Period
 
 
                             
Deferred tax asset valuation allowance
 
$
80,505
   
$
7,121
   
$
-
   
$
-
   
$
87,626
 
 
                                       
Year ended December 31, 2015
                                       
 
                                       
Deferred tax asset valuation allowance
 
$
71,939
   
$
8,566
   
$
-
   
$
-
   
$
80,505
 
 
                                       
Year ended December 31, 2014
                                       
 
                                       
Deferred tax asset valuation allowance
 
$
65,272
   
$
6,667
   
$
-
   
$
-
   
$
71,939
 

78
 
SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereto duly authorized.

CADIZ INC.
 
By:
 /s/ Scott Slater 
 
Scott Slater,
 
Chief Executive Officer
   
Date:
March 16, 2017
 
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed by the following persons in the capacities and on the dates indicated.

Name and Position
Date
   
/s/ Keith Brackpool
March 16, 2017
Keith Brackpool, Chairman
 
   
/s/ Scott Slater
March 16, 2017
Scott Slater, Chief Executive Officer, President and Director
(Principal Executive Officer)
 
   
/s/ Timothy J. Shaheen
March 16, 2017
Timothy J. Shaheen, Chief Financial Officer and Director
 
 (Principal Financial and Accounting Officer)
 
   
/s/ Geoffrey Grant
March 16, 2017
Geoffrey Grant, Director
 
   
/s/ Winston H. Hickox
March 16, 2017
Winston H. Hickox, Director
 
   
/s/ Murray H. Hutchison
March 16, 2017
Murray H. Hutchison, Director
 
   
/s/ Raymond J. Pacini
March 16, 2017
Raymond J. Pacini, Director
 
   
/s/ Stephen E. Courter
March 16, 2017
Stephen E. Courter, Director
 
   
/s/ Richard Nevins   
Richard Nevins, Director
March 16, 2017
 
79