About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

St. Anthony Gold Corp. Drills 42.68 Grams Au over 3.7 Meters at St. Anthony Gold Mine Property

VANCOUVER, BC / ACCESSWIRE / August 24, 2021 / St. Anthony Gold Corp. ("St. Anthony" or the "Company") (CSE:STAG)(Frankfurt:M1N)(OTC PINK:MTEHF) is pleased to announce assay results from its continuing Phase One diamond drilling program on the St Anthony gold mine property located in the Kenora-Patricia Mining District, Ontario.

HIGHLIGHTS:

Hole SA21-18 is the fourth hole of the program and the second twinned hole intersecting:

  • 3.71 grams per tonne Au over 2 m at 183 m down the drill hole,
  • 3.09 grams per tonne Au over 3 m at 210 m down the drill hole and,
  • 42.68 grams per tonne Au over 3.7 m at 327.3 m down the drill hole.
    • Including 314 grams per tonne Au over 0.5 m.
      • 10.6 grams per tonne Au over 1 m at 352 m down the drill hole.

UPDATE ON THE PROGRAM:

  • The company is remobilizing staff and contractors back onto St Anthony gold mine property now that the MNRF Emergency Area Order has been lifted.
  • Going forward the goal is to ensure that drilling operations are conducted in a manner that prevents wildfires from starting by modifying company's activities to minimize the risk.
  • Metallic screen fire assay (Au-SCR21) of the high-grade 314 grams per tonne intercept in SA21-18 is underway at ALS Global Laboratories).

The two main zones t St. Anthony consist of Zone 1 and Zone 2. Zone 1 is broadly defined over a strike length of 350 metres, with a minimum depth of 200 metres and a true width averaging about 8 metres, based on past production. Historical production focused solely on the vein material and not the adjacent mineralized wallrock.

Drilling contract and analytical protocols:

The drilling contract was awarded to Full Force Diamond Drilling Ltd. of Peachland, British Columbia. Drill core samples will be sent to ALS Global of Thunder Bay for gold (Au-AA23) and multi-element (ME-MS61) analysis plus spectral mineralogy data will be collected from selected samples through the mineralized envelope to assist in vectoring to additional gold bearing
structures. St. Anthony Gold Corp. applies industry-standard quality assurance/quality control procedures to the program. Certified reference materials, blanks and field duplicates are included in all drill core batches sent to the laboratory.

ABOUT THE ST. ANTHONY GOLD PROJECT:

The St. Anthony Gold Mine is located in the Kenora-Patricia Mining District of Ontario and encompasses four historical mining operations including the largest past-producing mine in the area, the St. Anthony. The mine produced 63,310 ounces of gold from 332,720 tons for an average grade of 5.95 grams per tonne (or 0.191 ounces per ton) up until World War II when gold production was halted. (source: Technical Report on the St. Anthony and Best/King Bay Properties, prepared by Graeme Evans BSc, PGeo, June 16, 2015). The property consists of 233 contiguous claims totaling 4,224 hectares (42.24 sq. km). In addition to the historical underground workings over 20 gold (-silver) occurrences have been documented, some hosting visible gold, many of which have seen little if any exploration work for several decades. Previous workers in the area include Aubet, Can Con and Falconbridge, companies that carried out work focused on the bulk tonnage potential of a mineralized area hosted within a quartz-feldspar porphyry intrusive located within the property. The St. Anthony Gold Project is located 85 km east of the town of Sioux Lookout, or 13 km south of the smaller town of Savant Lake.

Andrew Tims obtained his B.Sc. in Geology from Carleton University in Ottawa, Ontario, and is a Registered Professional Geologist in Ontario and Manitoba and a Qualified Person under NI 43-101. He has reviewed and approved the technical contents of this news release.

ABOUT ST. ANTHONY GOLD CORP.

St. Anthony Gold Corp, a Canadian-based mineral exploration corporation, is focused on identifying and advancing high-value mineral properties.

FOR ADDITIONAL INFORMATION SEE THE COMPANY'S WEB SITE AT

https://stanthonygoldcorp.com
Email to info@stanthonygoldcorp.com
Contact: Peter Wilson CEO - 604-649-0945

Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

Further information about the Company is available on www.SEDAR.com under the Company's profile.

Certain statements contained in this release may constitute "forward-looking statements" or "forward-looking information" (collectively "forward-looking information") as those terms are used in the Private Securities Litigation Reform Act of 1995 and similar Canadian laws. These statements relate to future events or future performance. The use of any of the words "could", "intend", "expect", "believe", "will", "projected", "estimated", "anticipates" and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on the Company's current belief or assumptions as to the outcome and timing of such future events. Actual future results may differ materially. In particular, this release contains forward-looking information relating to the business of the Company, the Property, financing and certain corporate changes. The forward-looking information contained in this release is made as of the date hereof and the Company is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Certain statements contained in this release may constitute "forward-looking statements" or "forward-looking information" (collectively "forward-looking information") as those terms are used in the Private Securities Litigation Reform Act of 1995 and similar Canadian laws. These statements relate to future events or future performance. The use of any of the words "could", "intend", "expect", "believe", "will", "projected", "estimated", "anticipates" and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on the Company's current belief or assumptions as to the outcome and timing of such future events. Actual future results may differ materially. In particular, this release contains forward-looking information relating to the business of the Company, the Property, financing and certain corporate changes. The forward-looking information contained in this release is made as of the date hereof and the Company is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

SOURCE: St. Anthony Gold Corp.



View source version on accesswire.com:
https://www.accesswire.com/661046/St-Anthony-Gold-Corp-Drills-4268-Grams-Au-over-37-Meters-at-St-Anthony-Gold-Mine-Property

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.