About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Nevada Silver Corporation Commences Drilling at Its 100% Owned Corcoran Silver-Gold Project, Nevada, USA

NOT FOR DISSEMINATION IN THE UNITED STATES OR THROUGH U.S. NEWS WIRES

TORONTO, ON / ACCESSWIRE / September 7, 2021 / Nevada Silver Corporation ("NSC" or the "Company") (TSXV:NSC) is pleased to announce commencement of a diamond drilling program on its 100% owned Corcoran Silver-Gold Project ("Corcoran" or the "Project") located 22 kilometers east of Kinross's Round Mountain Gold Mine in Nye County, Nevada, USA.

Corcoran includes the Silver Reef near-surface epithermal silver-gold deposit which is a NE-trending mineralized zone 300 meters wide and 1 kilometer long at Silver Reef Hill near the centre of the Project. The Silver Reef deposit is open laterally and at depth and NSC plans to test the mineralization within the area of previous drilling as well as peripheral to the deposit, including a 12 square kilometer zone of prospective rock alteration containing anomalous precious metals.

Initially, eight HQ-sized diamond core verification drill holes are intended to confirm strongly mineralized drill intersections reported by other companies at Silver Reef and will form the first stage of the program (see Figure 1). Historical reported drill intersections to be tested include:

  • CC02 (1.5m @ 3,531g/t Ag) as well as (1.5m @ 4,114g/t Ag and 0.27g/t Au)
  • CC30 (42.7m @ 390g/t Ag and 0.34g/t Au) as well as (4.6m @ 521g/t Ag and 0.45g/t Au)
  • CC38 (6.1m @ 1,874g/t Ag and 2.57g/t Au)
  • CCD04 (7.6m @ 1,150g/t Ag and 1.99g/t Au)
  • CCD09 (1.5m @ 4,103g/t Ag and 4.08g/t Au)
  • CCD15 (23.1m @ 39g/t Ag and 2.15g/t Au) as well as (1.8m of 1,186g/t Ag and 0.89g/t Au)
  • CCD21 (14.9m @ 268g/t Ag and 0.38g/t Au)

Figure 1: Planned Phase One Drill Holes

An immediate follow-on program of approximately 20 HQ holes (total 2,000-3,000 meters) will test for extensions to the Silver Reef mineralization and will also provide considerable in-fill data. This drilling is expected to extend the area of known mineralization and will form both the basis for an updated NI 43-101-compliant resource estimate as well as material for metallurgy and mineralogy studies. Additional drill holes may also be undertaken for groundwater, geotechnical and processing investigations.

Qualified Person

The scientific and technical data contained in this news release was reviewed and approved by Ian James Pringle PhD, who is a Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

For further Information please contact:

Gary Lewis
Group CEO & Director
T: +1 (416) 941 8900
gl@nevadasilvercorp.com

About Nevada Silver Corporation

Nevada Silver Corporation (TSXV:NSC) is a US-based, multi-commodity resource company with two advanced stage exploration projects in the USA. NSC's principal asset is the Corcoran Silver-Gold Project in Nevada. In addition, NSC also owns the Emily Manganese Project in Minnesota which has been the subject of considerable technical studies with US$23 million invested to date. Both Corcoran and Emily are wholly (100%) owned by NSC.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

This news release contains "forward-looking information" and "forward-looking statements" (collectively, "forward-looking information") within the meaning of applicable securities laws. Forward-looking information is generally identifiable by use of the words "believes," "may," "plans," "will," "anticipates," "intends," "could", "estimates", "expects", "forecasts", "projects" and similar expressions, and the negative of such expressions.

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information, including, without limitation, risks as a result of the Company having a limited operating history and may have a wide variance from actual results, risks concerning the ability to raise additional equity or debt capital to continue its business, uncertainty regarding the inclusion of inferred mineral resources in the mineral resource estimate which are too speculative geologically to be classified as mineral reserves, uncertainty regarding the ability to convert any part of the mineral resource into mineral reserves, uncertainty involving resource estimates and the ability to extract those resources economically, or at all, uncertainty involving exploration (including drilling) programs and the Company's ability to expand and upgrade existing resource estimates, risks involved in any future regulatory processes and actions, risks from making a production decision (if any) without any feasibility study completed on the Company's properties, risks applicable to mining exploration, development and/or operations generally, and risk as a result of the Company being subject to certain covenants with respect to its activities by creditors, as well as other risks.

Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management made in light of its experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances at the date such statements are made. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information.

All forward-looking information herein is qualified in its entirety by this cautionary statement, and the Company disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events or developments, except as required by law.

SOURCE: Nevada Silver Corporation



View source version on accesswire.com:
https://www.accesswire.com/662970/Nevada-Silver-Corporation-Commences-Drilling-at-Its-100-Owned-Corcoran-Silver-Gold-Project-Nevada-USA

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.