To contact Cabling Installation & Maintenance:

About Cabling Installation & Maintenance:

Bringing practical business and technical intelligence to today's structured cabling professionals.

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on:

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Indonesia Energy To Commence Drilling of Two Back-To-Back New Wells Within 30 Days and a Third by Mid-Year

New Production Anticipated to Bring IEC to Cash Flow Positive Operations

JAKARTA, INDONESIA and DANVILLE, CA / ACCESSWIRE / January 26, 2022 / Indonesia Energy Corporation Limited (NYSE American:INDO) (IEC), an oil and gas exploration and production company focused on Indonesia, today provided an update on its 2022 drilling plans by announcing that it expects to commence drilling of its next two (2) new wells at IEC's 63,000-acre Kruh Block within 30 days. Additionally; IEC plans to commence drilling of a third new well at Kruh Block before the end of the second quarter.

Drilling operations for these three new wells (named "Kruh 27", "Kruh 28" and "Kruh 29") are being funded from the net proceeds of IEC's recently announced new institutional investor financing.

Last month, IEC announced that its recently completed "Kruh 26" well increased its daily oil production rate by over 50%.

Assuming the drilling campaigns for Kruh 27 and Kruh 28 yield producing wells, IEC's production target is to be producing approximately 450 barrels of oils per day after completion of Kruh 27 and Kruh 28. Based on current oil prices, this production is anticipated to result in IEC having cash flow positive operations. The addition of a producing Kruh 29 well would enhance IEC's cash flow from operations later this year.

The new wells will cost approximately $1.5 million each to drill and complete (matching IEC's planned drilling budget). Based on the terms of IEC's contract with the Indonesian government and an assumed oil price of $80 per barrel, these wells are each expected to generate approximately $1.5 million in net revenue in their first year, which is enough to recover the cost of drilling the wells.

Mr. Frank Ingriselli, IEC's President, commented "We are excited that our recent financing enables us to commence drilling next month and to aggressively move our company towards a potential cash flow positive position, setting the stage for further drilling and growth for our company in 2022 and beyond. We believe Kruh Block is a world class asset that should significantly grow our cash flow as we drill additional wells and seek to maximize returns on our investments and grow shareholder value."

About Indonesia Energy Corporation Limited
Indonesia Energy Corporation Limited (NYSE American:INDO) is a publicly traded energy company engaged in the acquisition and development of strategic, high growth energy projects in Indonesia. IEC's principal assets are its Kruh Block (63,000 acres) located onshore on the Island of Sumatra in Indonesia and its Citarum Block (1,000,000 acres) located onshore on the Island of Java in Indonesia. IEC is headquartered in Jakarta, Indonesia and has a representative office in Danville, California. For more information on IEC, please visit www.indo-energy.com.

Cautionary Statement Regarding Forward-Looking Statements
All statements in this press release of Indonesia Energy Corporation Limited ("IEC") and its representatives and partners that are not based on historical fact are "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995 and the provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended (the "Acts"). In particular, when used in the preceding discussion, the words "estimates," "believes," "hopes," "expects," "intends," "on-track", "plans," "anticipates," or "may," and similar conditional expressions are intended to identify forward-looking statements within the meaning of the Acts and are subject to the safe harbor created by the Acts. Any statements made in this news release other than those of historical fact, about an action, event or development, are forward-looking statements. While management has based any forward-looking statements contained herein on its current expectations, the information on which such expectations were based may change. These forward-looking statements rely on a number of assumptions concerning future events and are subject to a number of risks, uncertainties, and other factors, many of which are outside of the IEC's control, that could cause actual results (including, without limitation, the future prices for oil and the anticipated results of IEC's drilling and production activities and the impact of such activities on IEC's results of operations as descried herein) to materially and adversely differ from such statements. Such risks, uncertainties, and other factors include, but are not necessarily limited to, those set forth in the Risk Factors section of the Company's annual report on Form 20-F for the fiscal year ended December 31, 2020, filed on May 18, 2021, with the Securities and Exchange Commission (SEC). Copies are of such documents are available on the SEC's website, www.sec.gov. IEC undertakes no obligation to update these statements for revisions or changes after the date of this release, except as required by law.

Company Contact:
Frank C. Ingriselli
President, Indonesia Energy Corporation Limited
Frank.Ingriselli@Indo-Energy.com

SOURCE: Indonesia Energy Corporation Limited



View source version on accesswire.com:
https://www.accesswire.com/685542/Indonesia-Energy-To-Commence-Drilling-of-Two-Back-To-Back-New-Wells-Within-30-Days-and-a-Third-by-Mid-Year

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.