About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Peter Bojtos Joins E2GOLD Board, Band-Ore Sampling Records Up to 23.60 Gold G/T

  • Experienced mining sector engineer Peter Bojtos added to E2Gold Board
  • Fall prospecting program at Band-Ore extends high-grade gold occurrences up to 6 km west of the Main Zone
  • Assay results pending from the Fall Band-Ore drill program

TORONTO, ON / ACCESSWIRE / November 30, 2022 / E2Gold Inc. (TSXV:ETU)(OTCQB:ETUGF) (the "Company", "E2Gold") is pleased to announce the addition of Peter Bojtos, P.Eng., to its Board of Directors and also reports on recent exploration activities at its Band-Ore Project west of Thunder Bay. A property-wide prospecting program returned results including 23.60, 12.50, and 9.26 gold g/t in surface grab samples. These and other high-grade samples span a 6 km trend from north of the Main Zone, westward.

Mr. Bojtos is currently Chairman of Avino Silver & Gold Mines Ltd., and brings worldwide experience in all facets of the mining industry, from corporate management and financing to exploration, development and mining. He has previously held the positions of President and CEO at Consolidated Nevada Goldfields Corp., Greenstone Resources Ltd., and RFC Resource Finance Corp., as well as senior roles at Kerr Addison and Pembridge Resources Plc. He has been involved in the technical aspects of a variety of mineral projects across the globe.

Peter commented, "I am excited to join E2Gold's Board as I have been following their story since its inception and I am intrigued by the large-scale potential of the Hawkins Gold Project."

Dr. David Good, Chairman of E2Gold, stated, "We welcome Peter to our team, and look forward to his involvement. He brings added strength and diversity of experience to a knowledgeable and talented group."

On the exploration front, recent prospecting has confirmed high-grade gold occurrences distributed over much of its Band-Ore Project west of Thunder Bay, Ontario (see Figure 1 and Table 1 below). Some 37 of 79 samples taken showed at least anomalous values over 100 ppb. The following summarize some of the high-grade results:

  • 23.60 gold g/t in Trench GSH-11-03, located some 250 m north of the Main Zone;
  • 12.50 gold g/t and 9.26 gold g/t at the Western Powerline prospect, some 6 km west of the Main Zone, hosted in sheared and silicified volcanic rocks with pyrite and copper sulfides, possibly part of the same corridor as the Main Zone;
  • 6.75 gold g/t at the Hag Lake prospect, located 3 km west of the Main Zone, in sheared pyritic and silicified volcanic rocks.

Figure 1. Map of Band-Ore Project showing

E2Gold Inc., Wednesday, November 30, 2022, Press release picture

Table 1: Selected list of assays, Band-Ore Project

Sample

Au (g/t)

Area

B0287202

0.51

Calvert Zone

B0287204

0.49

Calvert Zone

B0287217

9.26

Western Powerline Corridor

B0287218

1.45

Western Powerline Corridor

B0287219

0.43

Western Powerline Corridor

B0287221

12.50

Western Powerline Corridor

B0287228

2.89

Trench GSH-11-03

B0287234

23.60

Trench GSH-11-04

B0287235

1.08

Main Zone West

B0287236

0.81

Main Zone West

B0287238

4.28

Main Zone West

B0287239

3.31

Main Zone West

W1069501

1.41

Carson Point

W1069523

1.19

Western Powerline Corridor

W1069524

0.56

Trench GSH 11-05

W1069525

0.64

Trench GSH 11-06

W1069526

0.71

Trench GSH 11-07

W1069530

2.35

Trench GSH 11-08

W1069531

6.75

Hag Lake

W1069532

1.64

Hag Lake

The Company also completed a shallow drill program testing the Main Zone and the No. 4 Zone, which host historic resources of 706,000 t @ 6.86 gold g/t for 155,726 oz gold and 616,000 t @ 4.84 gold g/t for 95,668 oz gold respectively.1 The drill program consisted of 5 holes in the Main Zone and 2 holes in the No. 4 Zone, for a total of 800 m drilled. Assays are pending for this program.

Elsewhere, E2Gold geologists have been compiling assays and surface exploration data from its 2022 summer field program on its district scale Hawkins Project located in North Central Ontario. The Company is planning for its 2023 Hawkins exploration program and will provide further details as assays and geochemical analysis come in, to further refine the location of drill targets in, and around the McKinnon Zone.

Qualified Person: Eric Owens, Ph.D., P.Geo. acts as a Qualified Person for E2Gold, and has reviewed the content of this press release.

ABOUT E2GOLD INC.

E2Gold Inc. is a Canadian gold exploration company with a large flagship property, the 80 km-long Hawkins Gold Project in North Central Ontario, about 140 km east of the Hemlo Gold Mine, and 75 km north of the Magino and Island Gold Mines. The property is anchored by the McKinnon Zone Inferred Resource of 6.2 Mt grading 1.65 gold g/t, for 328,800 ounces of gold.2 E2Gold is committed to increasing shareholder value through the development of targets at Hawkins and future potential of the Band-Ore property.

Note 1: Historic resources are not compliant with National Instrument 43-101, and should not be relied on. They provide guidance for exploration only and is not intended to imply the presence of an economic deposit.

Note 2: NI 43-101 Technical Report and Updated Mineral Resource Estimate on the Hawkins Gold Project, Ontario, by P&E Mining Consultants, effective date September 10, 2020.

For further information please contact:

Eric Owens
Chief Executive Officer
Tel. (416) 509-5385
Email: eric.owens@e2gold.ca

Ellie Owens
President
Tel. (647) 575-2888
Email: ellie.owens@e2gold.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements - Certain information set forth in this news release may contain forward-looking statements that involve substantial known and unknown risks and uncertainties, certain of which are beyond the control of E2Gold, including with respect to the receipt of all regulatory approvals. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

SOURCE: E2Gold Inc.



View source version on accesswire.com:
https://www.accesswire.com/729470/Peter-Bojtos-Joins-E2GOLD-Board-Band-Ore-Sampling-Records-Up-to-2360-Gold-GT

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.