About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Gold Springs Resource Expands Gold Mineralization at South Jumbo Resource

VANCOUVER, BC / ACCESSWIRE / July 29, 2022 / Gold Springs Resource Corp. (TSX:GRC), (OTCQB:GRCAF) (the "Company" or "GRC"), has received drill results from 8 additional holes of its 2022 drilling program around the South Jumbo Resource at its large Gold Springs project located in USA, on the border of Nevada and Utah.

Highlights include:

  • 0.59 g/t gold equivalent over 18.3 meters and
    0.61 g/t gold equivalent over 9.1 meters in hole E-22-007
  • 1.37 g/t gold equivalent over 4.6 meters in hole E-22-009
  • 0.72 g/t gold equivalent over 27.4 meters including
    2.47 g/t gold equivalent over 4.6 meters and
    0.66 g/t gold equivalent over 6.1 meters and
    0.59 g/t gold equivalent over 18.3 meters in hole E-22-012
  • 0.79 g/t gold equivalent over 19.9 meters in hole E-22-014.

Gold equivalent based on US$1,800/oz gold, US$25/oz silver and 50% for silver recovery.

Randall Moore, Executive Vice President of Exploration, stated:
"These new results continue to demonstrate extensions of the South Jumbo gold mineralization as these holes were drilled with the objectives to:

  1. Extend gold values at depth within the northern resource block (E-22-012).
  2. Extend gold values in the gap zone between the two resource blocks

(E-22-007, E-22-008, E-22-009, E-22-0013).

  1. Test for shallow gold extensions to the south (E-22-014).

The results from the first 14 holes at South Jumbo clearly support our GRC resource model as we are demonstrating that gold mineralization does expand into areas predicted by our 2021 updated model. Once we receive the gold assays for the 6 remaining holes at South Jumbo, we will update our resource model to define where we will plan our drill holes to continue expanding our South Jumbo resource"

News from GRC 2022 ongoing drilling program:
The 2022 drilling program is progressing well as the Company completed 2 first holes in the untested Snow target, 13 new holes around the North Jumbo resource and 9 holes looking to expand the Charlie Ross resource discovered by the 2021 drilling program.

The diamond Core Drill is now onsite, and the Company has just completed the first hole on the Tremor target discovered in 2021 and now part of the North Jumbo resource.

The CSAMT ground based geophysical survey is well underway to cover most of the 33 identified targets and will help direct future drilling and identify potential new areas of gold mineralization under shallow post-mineral materials.

GRC has now completed 44 holes for a total of 9,317 meters of the planned 20,100 meters RC drilling program. Assays have been received for the first 14 holes, all from the South Jumbo resource area.

The Gold Springs project encompasses nearly 8,000 ha within the Great Basin of Nevada and Utah. Thus far 6 resources have been developed on outcropping low sulfidation epithermal gold systems which are mostly oxidized, and 33 targets have been already identified on approximately 40% of the property.

The 2022 drilling program was designed to expand the 6 existing resources and to test several new targets including the Snow, Midnight, and the Horseshoe Extension. During the 2021 drill campaign GRC made 3 new discoveries, all of which became new resources or merged with existing ones as reported in the last resource update issued July 11, 2022 (please see the Company's news release dated July 15, 2022).

Summary of drill intercepts:

Hole
Number

Target

From
Meters

To
Meters

Thickness
Meters

Gold
g/t

Silver
g/t

AuEq
g/t

E-22-007

South Jumbo

44.2

62.5

18.3

0.55

5.4

0.59

and

172.2

181.3

9.1

0.58

4.9

0.61

E-22-008

South Jumbo

44.2

64.0

19.8

0.42

2.5

0.44

E-22-009

South Jumbo

50.3

54.9

4.6

1.28

13.5

1.37

E-22-010

South Jumbo

16.8

19.8

3.0

0.60

3.0

0.62

E-22-012

South Jumbo

10.7

38.1

27.4

0.67

7.0

0.72

including

33.5

38.1

4.6

2.32

21.6

2.47

and

67.1

73.2

6.1

0.63

3.8

0.66

and

103.6

121.9

18.3

0.48

16.5

0.59

E-22-013

South Jumbo

83.8

89.9

6.1

0.32

1.4

0.33

E-22-014

South Jumbo

9.1

29.0

19.9

0.60

27.0

0.79

True thickness is estimated to be 70-100% of reported length. Grams per tonne of gold and silver abbreviated as "Au g/t" and "Ag g/t" respectively.

Drill Hole Table

Hole ID

Target

Easting
UTM NAD 27

Northing

Azimuth

Inclination

TD (ft)

TD (m)

E-22-007

South Jumbo

760660

4196090

110

-45

660

201.2

E-22-008

South Jumbo

760648

4196207

90

-65

600

182.9

E-22-009

South Jumbo

760616

4196301

90

-65

580

176.8

E-22-010

South Jumbo

760590

4196434

90

-55

600

182.9

E-22-011

South Jumbo

760505

4196726

60

-65

650

198.1

E-22-012

South Jumbo

760573

4196714

0

-90

780

237.7

E-22-013

South Jumbo

760671

4196348

90

-50

720

219.5

E-22-014

South Jumbo

760783

4195887

270

-65

378

115.2

Qualified Person
Randall Moore, Executive Vice-President Exploration, Gold Springs Resource Corp., is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed and validated that the information contained in the release is accurate.

Quality Assurance and Quality Control
Approximately 7 kg of RC chips were sent to the laboratory for each 1.52 meters drill interval. Standards and blanks are submitted into the sample stream at the rate of 15% for QA/QC purposes. In addition, the laboratory also includes duplicates of samples, standards and blanks. The results of these check assays are reviewed prior to the release of data. All RC sample assays are also reviewed for their geological context and checked against the drill logs.

Assay Method
Assays were performed in Reno, Nevada by ALS Geochemical, an ISO 9001:2000 certified and independent laboratory. Gold was analyzed by fire assay of a 30-gram sample with an AAS finish with samples assaying greater than 5 g/t re-assayed using a 30-gram sample and a gravity finish. Silver is analyzed by a four-acid leach ICP method.

About Gold Springs Resource Corp.
Gold Springs Resource Corp. (TSX:GRC and OTCQB:GRCAF) is focused on the exploration and expansion of the gold and silver resources of its Gold Springs project located on the border of Nevada and Utah, USA. The project is situated in the prolific Great Basin of Western USA, one of the best mining jurisdictions in the world.

Gold Springs Resource Corp. Contact:
Antonio Canton, President and CEO
acanton@goldspringsresource.com

Forward-Looking Statements
Certain statements contained herein constitute "forward-looking information" under applicable Canadian securities laws ("forward-looking statements"). Forward-looking statements look into the future and provide an opinion as to the effect of certain events and trends on the business. Forward-looking statements herein include the Company's plan to update its resource model upon receiving the assay results of the remaining 6 drill holes at South Jumbo and may also include words such as "creating", "believe", "would", "continue", "will", "promising", "should", and similar expressions. These forward-looking statements are based on current expectations and entail various risks and uncertainties. Actual results may materially differ from expectations if known and unknown risks or uncertainties affect our business or if our estimates or assumptions prove inaccurate. Factors that could cause results or events to differ materially from current expectations expressed or implied by the forward-looking statements, include, but are not limited to, risks of the mineral exploration industry which may affect the advancement of the Gold Springs project, including possible variations in mineral resources, grade, recovery rates, metal prices, capital and operating costs, and the application of taxes; availability of sufficient financing to fund planned or further required work in a timely manner and on acceptable terms; availability of equipment and qualified personnel, failure of equipment or processes to operate as anticipated, changes in project parameters, including water requirements for operations, as plans continue to be refined; regulatory, environmental and other risks of the mining industry more fully described in the Company's Annual Information Form and continuous disclosure documents, which are available on SEDAR at www.sedar.com. The assumptions made in developing the forward-looking statements include: the accuracy of current resource estimates and the interpretation of drill, metallurgical testing and other exploration results; the continuing support for mining by local governments in Nevada and Utah; the availability of equipment and qualified personnel to advance the Gold Springs project; execution of the Company's existing plans and further exploration and development programs for Gold Springs, which may change due to changes in the views of the Company or if new information arises which makes it prudent to change such plans or programs. Readers are cautioned not to place undue reliance on the forward-looking statements contained in this press release. Except as required by law, the Company assumes no obligation to update or revise any forward-looking statement, whether as a result of new information, future events or any other reason. Unless otherwise indicated, forward-looking statements in this press release describe the Company's expectations as of the date hereof

SOURCE: Gold Springs Resources Corporation



View source version on accesswire.com:
https://www.accesswire.com/710316/Gold-Springs-Resource-Expands-Gold-Mineralization-at-South-Jumbo-Resource

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.