About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

PPX Subscribes Engineering Procurement and Construction Agreement With Sertecpet

TORONTO, ON / ACCESSWIRE / October 21, 2024 / PPX Mining Corp. (the "Company" or "PPX", including its Peruvian subsidiaries) announces that on October 19, 2024 it subscribed an Engineering Procurement and Construction ("EPC") agreement with Sertecpet de Peru S.A. ("Sertecpet") to build most of PPX's 350 tpd CIL and Flotation plant (the "Plant") for its Igor Project, located in La Libertad, Peru.

Sertecpet will carry out the following activities:

  • Additional detailed engineering.

  • Site preparation and all civil works for crushing, grinding, leaching and flotation systems, including all concrete construction.

  • Equipment purchasing as specified by PPX, including all logistics and customs clearance.

  • Construction materials purchasing, including all logistics.

  • Mechanical installation of equipment, crushing, grinding and flotation units, including electrical and piping works. A qualified subcontractors will supply and install the carbon treatment (desorption plant).

Office buildings, workshop and accommodation will be built by other contractors, as well as, leaching tanks, tailings storage area, water supply and power supply.

The budget of the EPC contract is US$5.7 million, plus applicable sales taxes. The contract contemplates construction completion guarantees and daily penalties for late delivery.

Construction is scheduled to conclude in 12 months (turnkey basis).

About SERTECPET

SERTECPET is a multinational company with more than 33 years of experience in Projects, Operations and Maintenance. In Latin America has strong presence in Ecuador, Peru, Colombia, Brazil and Argentina at the Oil & Gas, Mining, Energy and Infrastructure sectors. It manufactures process equipment and executes electromechanical assemblies; as well builds and maintains storage tanks. Finally, it specializes in turnkey projects (Engineering, Procurement & Construction) for the start-up of industrial plants.

Has successfully completed several projects in both the private and public sectors. Among these projects, there are several works such as the construction of crude oil production plants throughout the Amazon region, prioritizing environmental care and local communities. All this has been possible thanks to SERTECPET's strong corporate culture, which considers its people and their safety as its main organizational asset.

It has developed a solid Integrated Quality, Environmental, Occupational Health and Safety Management System that accredits it to perform under international standards: ISO 9001, ISO 14001, ISO 45001. It has also established an Anti-Bribery Management System, certified under ISO 37001.

SERTECPET has modern industrial plants, with processes and continuous improvement, whose best practices have allowed it to contribute directly to productivity and to the improvement of competitiveness indexes in the international energy market. Its standards are based on the API Q1 and Q2 norms of the American Petroleum Institute and the ASME stamp.

About PPX Mining Corp:

PPX Mining Corp. (TSX.V: PPX.V, BVL: PPX) is a Canadian-based mining company with assets in northern Peru. Igor, the Company's 100%-owned flagship gold and silver project, is located in the prolific Northern Peru gold belt in eastern La Libertad Department.

On behalf of the Board of Directors

John Thomas
Chief Executive Officer

82 Richmond Street East
Toronto, Ontario M5C 1P1
Canada
416-361-0737

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement:

This press release contains forward-looking information and forward-looking statements (collectively, "forward-looking statements") as such terms are defined by applicable securities laws, including, but not limited to statements regarding test results, future plans or management estimates. Forward-looking statements are statements that relate to future events. In this context, forward-looking statements often address expected future business plans and financial performance and often contain words such as "anticipate," "believe," "plan," "estimate," "expect," and "intend,", statements that an action or event "may," "might," "could," "should," "would" or "will" be taken or occur, or other similar expressions. Forward-looking statements are subject to a number of known and unknown risks and uncertainties, many of which involve factors or circumstances that are beyond the Company's control, and the Company's actual results could differ materially from those stated or implied in forward-looking statements due to many various factors. Such uncertainties and risks include, among others, delays in obtaining or inability to obtain any required regulatory approvals, if applicable. Although the Company believes that the expectations reflected in the forward-looking statements are reasonable, the Company cannot guarantee that the events and circumstances reflected in the forward-looking statements will be achieved or occur. The timing of events and circumstances and actual results could differ materially from those projected in the forward-looking statements. Accordingly, one should not place undue reliance on forward- looking statements. All forward-looking statements contained in this press release are made as of today's date, and the Company undertakes no obligation to update or publicly revise any forward-looking statements, whether as a result of new information, future events or otherwise, unless required by law.

SOURCE: PPX Mining Corp.



View the original press release on accesswire.com

More News

View More

Recent Quotes

View More
Symbol Price Change (%)
AMZN  216.48
+3.44 (1.61%)
AAPL  262.24
+9.95 (3.94%)
AMD  240.56
+7.48 (3.21%)
BAC  52.04
+0.76 (1.48%)
GOOG  257.02
+3.23 (1.27%)
META  732.17
+15.26 (2.13%)
MSFT  516.79
+3.21 (0.63%)
NVDA  182.64
-0.58 (-0.32%)
ORCL  277.18
-14.13 (-4.85%)
TSLA  447.43
+8.12 (1.85%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.