About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

TRU Announces Commencement of Drilling at Golden Rose

TORONTO, ON / ACCESS Newswire / May 6, 2025 / TRU Precious Metals Corp. (TSXV:TRU)(OTCQB:TRUIF)(FSE:706) ("TRU" or the "Company") is pleased to report that drilling has commenced on an approximate 1,800 metres 2025 diamond drilling program at the Golden Rose Project ("Golden Rose"). Golden Rose is strategically located along the gold deposit bearing Cape Ray - Valentine Lake Shear Zones in Central Newfoundland.

The target area for the 2025 drilling program is focused upon a portion of the Mark's Pond to Rich House "exploration fairway." (see News Release dated April 03, 2025). This exploration fairway was selected for the 2025 drill program based upon its interpreted prospectivity and to comply with certain drilling commitments required prior to early July 2025 pursuant to the terms of the Option Agreement with Quadro Resources, as modified, on the Staghorn licenses, which comprise part of the exploration fairway. (see News Releases dated June 16, 2022 and August 18, 2022). The Staghorn licenses represent less than 12% of the total Golden Rose licenses area.

Concurrently, the Company has recently completed its revised and refined geological and structural property-wide synthesis of Golden Rose and is now advancing an assessment of the outcomes of this work. The completed models identify numerous targets with potential for orogenic gold mineralization across the nearly 300 sq. kilometres ("km") land package. This pipeline of quality exploration targets will be validated by field work prior to drilling.

TRU CEO Steve Nicol commented: "We are very pleased to announce the commencement of the 2025 drill program at the Mark's Pond to Rich House exploration fairway which represents the first area to be tested among the multiple prospective targets emerging from our geological and structural site-wide model. I look forward to updating investors on the results of this initial drilling program, and upon our ongoing assessment of other emerging target areas, as results from each become available."

Figure 1: Initial Exploration Fairway at Golden Rose

About TRU Precious Metals Corp.

TRU (TSXV:TRU, OTCQB:TRUIF, FSE:706) is on a mission to build long-term shareholder value through prudent natural resource property development. The company's flagship project is the Golden Rose Project a regional-scale 297.50 km2 land package in Central Western Newfoundland (includes a 33.25 km2 package of claims over which TRU has an option with TSX-listed Quadro Resources to acquire up to an aggregate 65% ownership) which straddles a 45 km strike length along the gold deposit-bearing Cape Ray - Valentine Lake Shear Zone, directly between Calibre Mining's Valentine Project and AuMEGA Metals' Cape Ray Gold Project. TRU is currently focused on efficiently discovering the full gold and copper potential at Golden Rose, targeting continuity along this proven gold bearing trend. The Golden Rose Project is currently subject to an Earn-In Agreement with TSX-listed Eldorado Gold Corporation ("Eldorado"), whereby Eldorado has the option to fund CAD15.25M in cash payments and exploration expenditures over 5 years to earn an 80%-interest in the Golden Rose project. Please refer to the July 30th, 2024 press release for further details of the agreement.

TRU is approximately 36%-owned by European strategic investor Ormonde Mining plc (AQSE:ORM).

For further information about TRU, please contact:

Steve NICOL
CEO
TRU Precious Metals Corp.
Phone: 1-855-760-2TRU (2878)
Email: ir@trupreciousmetals.com

To connect with TRU via social media, below are links:

X (formerly Twitter): https://x.com/metalstru
YouTube: https://www.youtube.com/@TruMetalsCorp
LinkedIn: https://www.linkedin.com/company/tru-precious-metals-corp/
Instagram: https://www.instagram.com/TRUMetals/
Facebook: https://www.facebook.com/TRUMetals/

Acknowledgement

TRU would like to thank the Government of Newfoundland and Labrador for financial support through the Junior Exploration Assistance Program and the Federal Government for its critical mineral assistance funding for the exploration activities at Golden Rose.

Forward-Looking Statements

This press release contains certain forward-looking statements. These statements are based on numerous assumptions regarding Golden Rose, the Company's exploration programs and results, and commodities prices that are believed by management to be reasonable in the circumstances, and are subject to a number of risks and uncertainties, including without limitation: mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on Golden Rose; the exploration potential of Golden Rose and the nature and style of mineralization at Golden Rose; risks inherent in mineral exploration activities; volatility in precious metals and base metals prices; volatility in economic conditions and financial markets; and those other risks described in the Company's continuous disclosure documents. Actual results may differ materially from results contemplated by the forward-looking statements herein. Investors and others should carefully consider the foregoing factors and should not place undue reliance on such forward-looking statements. The Company does not undertake to update any forward-looking statements herein except as required by applicable securities laws.

This press release is solely the responsibility of TRU, and Eldorado is not in any way responsible or liable for the contents hereof.

Neither TSXV nor its Regulation Services Provider (as that term is defined in policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: TRU Precious Metals Corp.



View the original press release on ACCESS Newswire

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.