About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Guardian Metal Resources PLC - Pilot North: Enlargement Following Assay Results

LONDON, UK / ACCESS Newswire / August 13, 2025 / Guardian Metal Resources plc (LON:GMET)(OTCQB:GMTLF), a strategic development and mineral exploration company focused on tungsten in Nevada, USA, is pleased to provide an update for the Pilot North Tungsten Project ("Pilot North" or the "Project"), located in the Walker Lane Mineral Belt, approximately 15km northwest of the Company's Pilot Mountain Project in Nevada.

Following the acquisition by direct claim staking of Pilot North, announced on 7 July 2025, an additional 42 Bureau of Land Management ("BLM") Lode Claims have now been staked, significantly expanding the overall footprint of the Project and bringing the total number of BLM mining claims to 101, covering an area of ~2,086 acres.1

The claim staking was in response to highly encouraging rock sample assay results from a 22 sample reconnaissance programme. Subsequently, the Company has recently completed a further detailed follow-on rock sampling and geological mapping programme, with the ALS Laboratory assay results pending.

The Project was generated by the Company's ongoing regional exploration programme and now encompasses four World War II era tungsten mines.1

Guardian Metal is focussed on leading the re-establishment of US domestic tungsten production, from both Tempiute and from Pilot Mountain, which is believed to be the largest undeveloped tungsten deposit in the United States. The Company's projects demonstrate Nevada's exceptional mineral potential and the important role the state can play in the national race to secure a stable, affordable supply of critical resources for the United States of America.

TECHNICAL SUMMARY

  • Reconnaissance rock samples have returned high-grade copper, zinc, silver, tungsten and bismuth results.

  • Assay results of up to; 5.71%, 5.09%, 3.41%, 3.34%, 2.02% and 1.23% copper (Cu); 619g/t and 344g/t silver (Ag); 3.45% Zn; 940 ppm tungsten (W) equivalent to 1,185ppm tungsten trioxide (WO3); 2,840ppm bismuth (Bi); and 3,220ppm antimony (Sb).*

  • The reconnaissance sampling results have greatly exceeded original expectations. The rock samples were collected during the staking of the original mining claims in order to provide an indication of the type of mineralisation and alteration present across the newly acquired claims.

  • Based on the reconnaissance results, a further 42 BLM Lode Mining Claims were directly staked across the Pilot North tungsten-copper (W-Cu) Project area.

  • A detailed geological mapping and sampling programme has now been completed with further assay results expected and highly anticipated. Many of the samples displayed visual signs of mineralisation.

  • Following the receipt of the awaited results, final Project maps along with the location of all samples will be presented to the market.

* Tungsten trioxide (WO3) ppm calculated based on W ppm multiplied by 1.2611. W ppm results are from ALS Laboratories' analytical method ME-MS61, which at Pilot Mountain typically delivers materially lower results for calculated WO3 ppm compared to ALS' tungsten trioxide analytical method ME-XRF15c. ME-XRF15c will now be run for all samples returning over 750ppm W byME-MS61. Overlimit silver, copper and zinc results are by ALS' method Ag-OG62, Cu-OG62 and Zn-OG62 respectively.

Oliver Friesen, CEO of Guardian Metal, commented:

"Early results from Pilot North have surpassed our expectations, confirming significant tungsten grades alongside copper, silver, zinc and other critical metals. With the 100% owned, royalty-free footprint now expanded to more than 2,000 acres and encompassing multiple historical tungsten mines, we believe we have added another key building block to our nearby Pilot Mountain tungsten project, advancing our goal of delivering a secure, Mined-in-America source of tungsten to the U.S. industrial base."

BACKGROUND

The Company's broader regional exploration programme continues to generate tungsten-copper skarn targets for further exploration. After reconnaissance results were received from Pilot North, the Company immediately acted to stake a further 42 BLM Lode Mining Claims to augment the original Pilot North Project staking, which included 59 claims. Pilot North is located approximately 15 km northwest of the Company's co-flagship Pilot Mountain project and shares the same road access.

The Company's expert geological consultant, Dr Lawrence Carter, was on site over the last few weeks undertaking detailed geological mapping and sampling across the Project, and developing strategies to advance exploration as a satellite to the flagship Pilot Mountain project. The Company will further report the findings of this detailed geological field work, as well as assay results, once available.

MEDIA

Figure 1: Photo from Pilot North (truck for scale). Red/brown areas represent areas with strong skarn-type mineralisation and alteration.

PROPERTY OWNERSHIP

Guardian Metal holds a 100%, royalty-free interest in the North Pilot Project through its wholly-owned Nevada operating company, Golden Metal Resources LLC.

COMPETENT PERSON STATEMENT

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MIMMM QMR, MAusIMM, FGS), who is a qualified geologist and acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Guardian Metal Resources plc to provide technical support.

References

1 https://www.londonstockexchange.com/news-article/GMET/pilot-north-tungsten-project-acquired-via staking/17121172

2 Ross, D.C., 1961. Geology and Mineral Deposits of Mineral County, Nevada. NBMG Bull 58.

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014 (which forms part of domestic UK law pursuant to the European Union (Withdrawal) Act 2018). The Directors of the Company take responsibility for the contents of this announcement.

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the timing and granting of regulatory and other third party consents and approvals, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events.

Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

For further information visitwww.Guardianmetalresources.comor contact the following:

Guardian Metal Resources plc

Oliver Friesen (CEO)

Tel:+44 (0) 20 7583 8304

Cairn Financial Advisers LLP

Nominated Adviser

Sandy Jamieson/Jo Turner/Louise O'Driscoll

Tel: +44 20 7213 0880

Shard Capital Partners LLP

Lead Broker

Damon Heath/Erik Woolgar

Tel: +44 (0) 20 7186 9000

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

SOURCE: Guardian Metal Resources PLC



View the original press release on ACCESS Newswire

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.