About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Primary Hydrogen Commences Phase 2 Field Exploration at Hopkins Project

CALGARY, AB / ACCESS Newswire / September 2, 2025 / Primary Hydrogen Corp. (TSXV:HDRO)(FRA:83W0)(OTCQB:HNATF) ("Primary" or the "Company") is pleased to announce the commencement of Phase 2 field exploration at its Hopkins Project in Ontario. The Company has engaged Norda Stelo to conduct a focused sampling program comprising approximately 265 soil and soil-gas samples targeting both natural hydrogen and potential rare earth element (REE) mineralization.

The fieldwork is expected to be completed within one to two weeks, with analytical results from gas readings and chemical assays anticipated approximately six weeks thereafter.

"This marks our second exploration campaign at Hopkins and is designed to advance our understanding of both natural hydrogen potential and REE prospectivity," said Peter Lauder, VP Exploration at Primary Hydrogen. "In addition to expanding our earlier soil gas sampling program, this phase will assess the rare earth potential along the Clay-Howells alkali carbonatite intrusive, which is known to host REE, thorium, and iron mineralization[1]."

About Norda Stelo

Norda Stelo is a Canadian engineering and consulting firm specializing in field investigation, environmental assessment, and geotechnical services for early-stage resource projects. With over 50 years of experience, the company supports greenfield exploration through high-quality data collection, regulatory compliance, and integrated technical expertise that informs responsible project development across Canada and internationally.

About Primary Hydrogen Corp.

Primary Hydrogen is dedicated to the exploration and development of natural hydrogen resources. The Company holds over 740 acres of prospective land in the United States and 230 square kilometers across Canada. Its portfolio includes the Blakelock, Hopkins, Mary's Harbour, Point Rosie, Crooked Amphibolite, Coquihalla, and Cogburn projects. Primary also holds an option to acquire a 75% interest in the Wicheeda North hydrogen-REE project in British Columbia.

The technical information in this news release has been reviewed and approved by Mr. Peter Lauder, P.Geo., VP Exploration for Primary Hydrogen. Mr. Lauder is a Qualified Person as defined under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

FOR FURTHER INFORMATION PLEASE CONTACT:

Ben Asuncion
Chief Executive Officer
Primary Hydrogen Corp.
Email: ben@primaryh2.com

CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION

This news release contains forward-looking statements within the meaning of applicable Canadian securities laws. Forward-looking statements in this release include, but are not limited to: (i) the scope, timing, and objectives of the Phase 2 field sampling program at the Hopkins Project; (ii) the potential to identify natural hydrogen and rare earth element mineralization; and (iii) the expected timeline for receiving and interpreting sampling results.

Forward-looking statements are based on various assumptions, including favorable field conditions, the availability of required permits and resources, the accuracy and reliability of sampling methodologies, and the successful completion of the program as planned.

These statements are subject to risks and uncertainties that could cause actual results to differ materially, including: adverse weather or logistical challenges, delays in lab analysis, interpretation uncertainties, or regulatory changes. Additional risk factors can be found in the Company's public disclosure documents available at www.sedarplus.ca.

Readers are cautioned not to place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise such statements, except as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

[1] NI 43-101 Technical Report on the Clay-Howells Fe-REE Project, Ontario, Canada by Tetra Tech Wardrop dated September 26, 2011

SOURCE: Primary Hydrogen Corp.



View the original press release on ACCESS Newswire

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.