About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

High Grade, Near Surface Discovery of Critical Minerals Scales Hyperion’s Titan Project

 

  • Hyperion Metals Limited (ASX: HYM) is pleased to announce that high grade drill results have confirmed a near surface, high grade critical minerals deposit close to the recently announced Maiden Resource Estimate (“MRE”).
  • The new confirmed discovery, called the Camden Deposit, reaffirms the Titan Project in West Tennessee as a major critical mineral province.
  • The drill results from 30 of 80 holes drilled in the area show thick, near surface and high-grade intercepts of Total Heavy Minerals (“THM”), including:
    • 13.7m @ 4.2% THM within 25.9m @ 2.9% THM (from surface)
    • 7.6m @ 5.2% THM within 24.4m @ 2.6% THM (from 5m below surface)
    • 12.2m @ 4.6% THM within 24.4m @ 2.8% THM (from 6m below surface)
    • 10.7m @ 4.8% THM within 21.3m @ 3.1% THM (from surface)
    • 10.7m @ 4.2% THM within 30.5m @ 2.3% THM (from surface)
  • The Camden Deposit is a near-surface expression of the lower McNairy Sands, with the results to date showing an average depth to mineralization of only ~4.5m and an average thickness of ~20m.
  • The Scoping Study will now be expanded to incorporate these high-grade results and it is now targeted for completion in Q1 2022.
  • Hyperion is only in the early stages of consolidating and exploring this important US critical minerals province and will dynamically deploy resources to drill, evaluate, and progress this discovery and to assess new high potential areas within the larger province.

Anastasios (Taso) Arima, CEO and Managing Director said:

“With a maiden JORC resource of 431mt, and now these shallow, high-grade intercepts, it is quickly becoming apparent that the Titan Project is one of the best undeveloped critical minerals projects globally.

No other development has the Titan Project’s compelling combination of scale, grade, high value critical mineral products, low-cost inputs, world class infrastructure and location.”

Full technical details of the drilling results can be found here.

Contacts

For further information and enquiries please contact:

Anastasios (Taso) Arima, CEO and Managing Director

Dominic Allen, Corporate Development

+1 704 461 8000

info@hyperionmetals.us

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.