About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

White River Energy and BitNile Holdings’ Subsidiary, Ault Energy, Announce Results from Recently Completed Drilling Project in Holmes County, MS

Ault Energy has made commitment to participate in White River’s next drilling project which is currently underway

The partnership expects to jointly drill approximately 100 oil wells over the next five years

BitNile Holdings, Inc. (“BitNile”) (NYSE American: NILE) and White River Energy Corp (“White River”) (OTCQB: WTRV), today announced that the successful drilling project by Ault Energy, LLC (“Ault Energy”), a wholly owned subsidiary of BitNile, and White River Operating LLC (“WRO”), a wholly owned subsidiary of White River, has begun producing at a rate of 78 flowing barrels of oil per day (“BOPD”). The Harry O’Neal 20-9 No. 1 (the “O’Neal No. 1 Well”) is currently producing from the Smackover formation.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20221206005532/en/

BitNile acquired a forty percent (40%) working interest in the O’Neal No. 1 Well, which is the first project in an expected long-term partnership between White River and BitNile, which was previously announced in July 2022 with the intention to drill approximately 100 oil wells over five years. Additionally, Ault Energy has committed to acquire a thirty-seven and one half (37.5%) working interest in the Peabody AMI 12 A No. 18 (the “Peabody No. 18 Well”) drilling project in the Coochie field, Concordia Parish, Louisiana. The Peabody No. 18 Well is a 14,000-foot-deep vertical test well with potential pay zones in the Frio, Wilcox, Lower Tuscaloosa, Austin Chalk, and Tuscaloosa Marine Shale (“TMS”) formations. WRO has currently drilled to a depth of 5,000 feet and expects to reach the total depth in mid-December. The Peabody No. 18 Well has already had significant oil shows logged in the Frio formation between the depths of 2,970 feet and 3,043 feet. Based on these early indications, WRO believes that this drilling project will result in a commercial oil well and several shallow Frio developmental drilling opportunities.

“We are very pleased with the production results from the O’Neal No. 1 Well and the early indications from the Peabody No. 18 Well,” stated Randy May, Executive Chairman of White River. “We recently successfully completed a formation integrity test on the Peabody No. 18 Well to ensure that the well has the ability to withstand higher pressure zones we expect in the Austin Chalk and TMS formations, as we anticipate potentially oil and gas shows at the lowest depths of the well.”

BitNile Founder and Executive Chairman Milton “Todd” Ault, III, who also serves as the Manager of Ault Energy, stated, “We are happy with the BOPD results of the O’Neal No. 1 Well. We are also very encouraged about the initial results being reported on our second drilling project with White River and are looking forward to viewing the well log after the drilling project has been completed.”

About BitNile Holdings, Inc.

BitNile Holdings, Inc. is a diversified holding company pursuing growth by acquiring undervalued businesses and disruptive technologies with a global impact. Through its wholly and majority-owned subsidiaries and strategic investments, BitNile owns and operates a data center at which it mines Bitcoin and provides mission-critical products that support a diverse range of industries, including oil exploration, defense/aerospace, industrial, automotive, medical/biopharma, consumer electronics, hotel operations and textiles. In addition, BitNile extends credit to select entrepreneurial businesses through a licensed lending subsidiary. BitNile’s headquarters are located at 11411 Southern Highlands Parkway, Suite 240, Las Vegas, NV 89141; www.BitNile.com.

About White River Energy Corp

White River is a vertically integrated oil and gas exploration and production company. White River is engaged in oil and gas exploration, production, and drilling operations on over 30,000 cumulative acres of active mineral leases in Louisiana and Mississippi.

Cautionary Note Regarding Forward-looking Statements

This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, including statements regarding the completion of the O’Neal No. 1 Well and its prospects, the plan to drill up to 100 wells and White River’s near-term drilling plans in Louisiana and Mississippi. These forward-looking statements generally include statements that are predictive in nature and depend upon or refer to future events or conditions, and include words such as “believes,” “plans,” “anticipates,” “projects,” “estimates,” “expects,” “intends,” “strategy,” “future,” “opportunity,” “may,” “will,” “should,” “could,” “potential,” or similar expressions. Statements that are not historical facts are forward-looking statements. Forward-looking statements are based on current beliefs and assumptions that are subject to risks and uncertainties. Forward-looking statements speak only as of the date they are made, and neither BitNile nor White River undertakes any obligation to update any of these statements publicly in light of new information or future events. Actual results could differ materially from those contained in any forward-looking statement as a result of various factors. In addition to risks relating to the continuation of high oil prices, enhanced federal regulation of oil and gas drilling mining and efforts led by the federal and certain state governments to favor electric vehicles and eliminate fossil fuel vehicles, investors should review risk factors, that could affect either or both of BitNile’s and White River’s respective businesses and financial results which are included in BitNile’s and White River’s respective filings with the U.S. Securities and Exchange Commission, including, but not limited to, their respective Forms 10-K, 10-Q and 8-K, particularly the Risk Factors contained in White River’s quarterly report on Form 10-Q for the quarter ended September 30, 2022, as filed with the Securities and Exchange Commission on November 14, 2022. All such filings are available at www.sec.gov and on the companies’ websites at www.BitNile.com and https://white-river.com, respectively.

Contacts

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.