About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Hecla Announces Q2 2022 Production

10% Increase in Silver Production Driven by Record Lucky Friday Throughput

Hecla Mining Company (NYSE: HL) today announced its preliminary production for the second quarter of 2022.1

HIGHLIGHTS

  • Silver production of 3.6 million ounces, an increase of 10% over the first quarter of 2022 due to record throughput at the Lucky Friday Mine.
  • Gold production of 45,718 ounces, an increase of 10% over the first quarter, driven by better performance at the Casa Berardi mine.
  • Zinc production increased 12% over the prior quarter.
  • Lead production increased 23% due to increased production at Lucky Friday.

“All three of Hecla’s operating mines delivered solid performances during the second quarter, driven by expected increased silver production at Lucky Friday and gold production at Casa Berardi, while Greens Creek had a very solid and consistent quarter,” said Phillips S. Baker, Jr., President and CEO. “Lucky Friday’s silver production surpassed the 1-million-ounce mark for the quarter, totaling 1.2 million ounces, a 38% increase over the previous quarter as we see the benefits to throughput resulting from the continuous improvement of the UCB mining method, and increasing grades. Casa Berardi’s production increased by 10% over last quarter due to higher mill recoveries, grades, and throughput.”

Baker continued, “On July 5th we announced the acquisition of Alexco Resource Corp. which owns the Keno Hill silver district in the Yukon Territory of Canada. In addition to being the largest silver producer in the United States, with completion of necessary development at Keno Hill, Hecla has the potential to become the largest silver producer in Canada.”

OPERATIONS

Greens Creek

Greens Creek produced 2.4 million ounces of silver which is consistent with the production in the first quarter. Gold production of 12,413 ounces was 9% higher than prior quarter production of 11,402 ounces due to increased grades. The mill operated at an average of 2,303 tons per day (tpd).

Lucky Friday

At the Lucky Friday mine, 1.2 million ounces of silver were produced compared to 888 thousand ounces in the prior quarter. The increase is attributable to 25% higher throughput at the mill and a 9% increase in grades. The higher throughput was achieved upon improved equipment availability and the commissioning of new underground equipment which is better suited for the UCB mining method. The mill operated at a record average throughput rate of 1,071 tpd for the quarter, highlighted by a record monthly throughput rate in June of 1,140 tpd.

Casa Berardi

Casa Berardi produced 33,306 ounces of gold compared to 30,240 ounces in the prior quarter. The increase in production was the result of higher throughput, recoveries, and grades. The mill operated at an average of 4,413 tpd compared to an average of 4,291 tpd in the prior quarter, having achieved an all-time monthly production record in May of 4,533 tpd.

(1)

See cautionary statement regarding preliminary statements at the end of this release.

 

PRODUCTION SUMMARY

 

 

Three Months Ended

 

 

 

Six Months Ended

 

 

 

June 30, 2022

 

March 31, 2022

 

 

 

June 30, 2022

 

June 30, 2021

 

 

PRODUCTION

 

 

 

 

Increase/

(Decrease)

 

 

 

 

 

Increase/

(Decrease)

Silver

3,645,454

3,324,709

10

%

6,970,163

6,984,229

0

%

Gold (*)

45,718

41,642

10

%

87,360

111,143

(21

)%

Lead

13,331

10,863

23

%

24,194

22,244

9

%

Zinc

16,766

14,947

12

%

31,713

33,318

(5

)%

Greens Creek - Silver

2,410,599

2,429,782

(1

)%

4,840,381

5,143,317

(6

)%

Greens Creek - Gold

12,413

11,402

9

%

23,815

26,125

(9

)%

Lucky Friday - Silver

1,226,477

887,858

38

%

2,114,335

1,777,195

19

%

Casa Berardi - Gold

33,306

30,240

10

%

63,546

67,523

(6

)%

(*)

YTD gold production for the six months ended June 30, 2021, includes production of 17,495 ounces from the Nevada operations, which in 2022 are under care and maintenance.

ABOUT HECLA

Founded in 1891, Hecla Mining Company (NYSE: HL) is the largest silver producer in the United States. In addition to operating mines in Alaska, Idaho and Quebec, Canada, the Company owns a number of exploration and pre-development projects in world-class silver and gold mining districts throughout North America.

Cautionary Statements Regarding Estimates and Forward-Looking Statements

All measures of the Company's second quarter 2022 operating and financial results and conditions contained in this release are preliminary and reflect the Company’s expected results as of the date of this release. Actual reported second quarter 2022 results are subject to management's final review as well as review by the Company's independent registered accounting firm and may vary significantly from current expectations because of a number of factors, including, without limitation, additional or revised information and changes in accounting standards or policies or in how those standards are applied.

Statements made or information provided in this news release that are not historical facts are "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of Canadian securities laws. Words such as “may”, “will”, “should”, “expects”, “intends”, “projects”, “believes”, “estimates”, “targets”, “anticipates” and similar expressions are used to identify these forward-looking statements. The material factors or assumptions used to develop such forward-looking statements or forward-looking information include that the Company’s plans for development and production will proceed as expected and will not require revision as a result of risks or uncertainties, whether known, unknown or unanticipated, to which the Company’s operations are subject.

Forward-looking statements involve a number of risks and uncertainties that could cause actual results to differ materially from those projected, anticipated, expected, or implied. These risks and uncertainties include, but are not limited to, metals price volatility, volatility of metals production and costs, litigation, regulatory and environmental risks, operating risks, project development risks, political risks, labor issues, ability to raise financing and exploration risks and results. Refer to the Company's 2021 Form 10-K filed February 22, 2022, for a more detailed discussion of factors that may impact expected future results. The Company undertakes no obligation and has no intention of updating forward-looking statements other than as may be required by law.

Category: Press Release

Contacts

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.