About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Soluna JumpStarts Ancillary Services Revenue

Offers November Update on Company and Project Sites

Soluna Holdings, Inc. (“SHI” or the “Company”), (NASDAQ: SLNH), the parent company of Soluna Computing, Inc. (“SCI”), a developer of green data centers for Bitcoin mining and other intensive computing applications, announced today it has completed its registration for Ancillary Services to diversify its revenue streams.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20231129843069/en/

(Graphic: Business Wire)

(Graphic: Business Wire)

John Belizaire, CEO of Soluna Holdings, commented, “Adding Ancillary Services to Project Dorothy is a key milestone in our revenue diversification plan and adds another turn to our business flywheel.”

“Our model is to monetize our data centers in multiple ways to maximize our return on invested capital and deliver superior returns for our (project-level) investors. Ancillary Services expands our model to three drivers,” Belizaire continued.

Belizaire concluded, “Soluna's data center colocation with a wind farm demonstrates responsible energy use and a visionary approach for enhanced grid resilience and increased renewable energy penetration. It’s a win in three important ways: Grid Resilience, Revenue Diversification, and Wind Farm Energy Utilization.”

The Company has provided the following Corporate and Site Updates.

Corporate Highlights:

  • Ancillary Services Adds More Revenue and Lowers Power Cost – Soluna registered for ERCOT's Demand Response Program establishing the company as a key contributor to intelligent and flexible energy solutions, promoting environmental and economic advantages for Texas. Soluna will be able to make over $10/MWh in additional revenue to Project Dorothy providing this grid resilience support and potentially reduce its power costs below $20/MWh, making it among the lowest cost players in the industry.
  • Strong Q3 Results – The company financial results for the third quarter ended September 30, 2023, including a 176% increase in revenue and operating profit milestone.
  • Pivotal Noteholder Amendment – Third Amendment of October Notes completed to allow early payoff of convertible notes.
  • Hosting diversification – New hosting customers signed and deployed at Project Sophie.
  • Advisory Board Establishes Advisory Board, taps AI and data center leadership. Expands pipeline of new candidates with AI expertise.

Key Company Metrics:

  • The following metrics are year-to-date for all project sites.

Metric [All sites]

YTD [Sep]

YTD [Oct]

YTD [Nov]

Installed Hashrate

2.6 EH/s

2.6 EH/s

2.5 EH/s

Total Installed Power Capacity

75 MW

75 MW

75 MW

Average Operating Hashrate

2.2 EH/s

2.3 EH/s

2.3 EH/s

Prop Mining

588 PH/s

660 PH/s

749 PH/s

Hosting

1.6 EH/s

1.6 EH/s

1.5 EH/s

Average Power Cost

$30 / MWh

$30 / MWh

$30 / MWh

Average J/TH (across all sites)

30 J/TH

30 J/TH

30 J/TH

Power Usage Effectiveness

1.01

1.01

1.01

Curtailed Energy Consumed (Project Dorothy 1A & 1B)

1,307 MWh

4,003 MWh

11,664 MWh

Bitcoin Miners Deployed

23,655

23,655

23,571

Key Project Updates

Project Dorothy 1A ( 953 PH/s, 25 MW, Hosting):

Metric

YTD [Sep]

YTD [Oct]

YTD [Nov]

Total Power Consumed

30,284 MWh

44,899 MWh

74,791 MWh

Power Usage Effectiveness (PUE)

1.01

1.01

1.01

Curtailed Energy Consumed YTD*

1,068 MWh

2,501 MWh

6,397 MWh

*Note: Curtailed Energy is energy produced by the wind farm and consumed by Soluna’s Project Dorothy which the grid either could not absorb or did not deem as economically valuable.

  • New triage program and space now online for winter months.
  • Firmware and thermal management optimizations continue for colder Texas months.

Project Dorothy 1B ( 816 PH/s, 25 MW, Prop-Mining):

Metric

YTD [Sep]

YTD [Oct]

YTD [Nov]

Average Operating Hashrate (PH/s)

588

660

749

Total Bitcoin Mined

53

96

143

Total Power Consumed

9,043 MWh

21,805 MWh

50,515 MWh

Power Usage Effectiveness (PUE)

1.01

1.01

1.01

Curtailed Energy Consumed YTD*

239 MWh

1,502 MWh

5,267 MWh

*Note: Curtailed Energy is energy produced by the wind farm and consumed by Soluna’s Project Dorothy which the grid either could absorb or did not deem as economically valuable.

  • Data center is now fully commissioned and construction is complete.
  • Firmware optimizations continue and thermal management optimizations continue during the colder Texas months.
  • Data center technician team expands.
  • New miner repair partner onboarded to enhance triage and mining operations.

Project Sophie (761 PH/s, 25 MW, Hosting with Profit Share):

Metric

YTD [Sep]

YTD [Oct]

YTD [Nov]

Average Operating Hashrate (PH/s)

817

770

658

Power Usage Effectiveness

1.02

1.02

1.02

Average Power Cost

$31 /MWh

$28 /MWh

$29 /MWh

  • Three new hosting contracts have been signed and deployed since September.
  • The site will experience some degradation in hashrate in October through December related to the turnover in customers.
  • Power infrastructure diagnostics completed with essential upgrades underway to ensure resiliency.

Project Dorothy 2 (50 MW):

  • Final bid packages received from select EPC contractors.
  • Helix design process underway and top design engineering firm identified with the help of the Company’s new advisor.
  • ERCOT model update submission underway.
  • Long-lead equipment identified and sourcing process underway.
  • Potential anchor customers and investors visited the new site.

Project Kati (166 MW):

  • The ERCOT planning process continues.
  • Definitive PPA agreements set to be finalized by the end of the 2023 calendar year.
  • Negotiations set to begin with land owners for land lease agreements.

View Soluna’s Earnings Power Presentation here.

View Soluna’s summary of third-quarter results here.

*Note: November metrics are as of November 26, 2023.

Safe Harbor Statement

This announcement contains forward-looking statements. These statements are made under the "safe harbor" provisions of the U.S. Private Securities Litigation Reform Act of 1995. These forward-looking statements can be identified by terminology such as "will," "expects," "anticipates," "future," "intends," "plans," "believes," "estimates," "confident" and similar statements. Soluna Holdings, Inc. may also make written or oral forward-looking statements in its periodic reports to the U.S. Securities and Exchange Commission, in its annual report to shareholders, in press releases and other written materials and in oral statements made by its officers, directors or employees to third parties. Statements that are not historical facts, including but not limited to statements about Soluna’s beliefs and expectations, are forward-looking statements. Forward-looking statements involve inherent risks and uncertainties, further information regarding which is included in the Company's filings with the Securities and Exchange Commission. All information provided in this press release is as of the date of the press release, and Soluna Holdings, Inc. undertakes no duty to update such information, except as required under applicable law.

In addition to figures prepared in accordance with GAAP, Soluna from time to time presents alternative non-GAAP performance measures, e.g., EBITDA, adjusted EBITDA, adjusted net profit/loss, adjusted earnings per share, free cash flow. These measures should be considered in addition to, but not as a substitute for, the information prepared in accordance with GAAP. Alternative performance measures are not subject to GAAP or any other generally accepted accounting principle. Other companies may define these terms in different ways.

About Soluna Holdings, Inc (SLNH)

Soluna Holdings, Inc. is the leading developer of green data centers that convert excess renewable energy into global computing resources. Soluna builds modular, scalable data centers for computing intensive, batchable applications such as Bitcoin mining, AI, and machine learning. Soluna provides a cost-effective alternative to battery storage or transmission lines. Soluna uses technology and intentional design to solve complex, real-world challenges. Up to 30% of the power of renewable energy projects can go to waste. Soluna’s data centers enable clean electricity asset owners to ‘Sell. Every. Megawatt.’

Contacts

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.