To contact Cabling Installation & Maintenance:

About Cabling Installation & Maintenance:

Bringing practical business and technical intelligence to today's structured cabling professionals.

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on:

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Hecla Completes Acquisition of ATAC Resources and Restarts Casa Berardi

Hecla Mining Company (NYSE: HL) (“Hecla”) and ATAC Resources Ltd. (TSX:ATC) (“ATAC”) announced today the completion of the ATAC acquisition.

“With the ATAC acquisition, we continue to execute our strategy of acquiring large land packages with significant exploration potential in favorable mining jurisdictions,” said Phillips S. Baker, Jr., Hecla President & CEO. “The Rackla and Connaught properties in the Yukon are a massive land package of over 700 square miles (1830 square kilometers), almost half the size of Rhode Island, with identified gold, silver, and base metal mineralization. As a result of previous investment in exploration by ATAC, Hecla is not obligated for the next decade to make significant expenditures to maintain control of the land package, so while we will advance the exploration as quickly as possible, we will have flexibility on our pace of spending.”

Baker continued, “The acquisition further cements our position in the Yukon, with our Keno Hill mine going into production in the third quarter. Keno Hill is expected to produce more than 2.5 million ounces of silver in 2023 and to become Canada's largest and highest-grade primary silver mine. We look forward to continuing to build our relationships with the Na-Cho Nyak Dun and Tr’ondek Hwech’in Han First Nations and the Yukon Territory through our work at Keno Hill and the Rackla and Connaught Properties.”

Details of ATAC transaction

Hecla acquired all the outstanding shares of ATAC for total consideration of approximately US$18.8 million in Hecla common stock with the issuance of 3,676,904 shares to ATAC shareholders based on the share exchange ratio of 0.166 of Hecla share for each ATAC common share. As part of the acquisition, Hecla acquired 5,502,956 units consisting of (i) shares of Cascadia Minerals Ltd. (“Cascadia”) representing a 19.9% stake, and (ii) full warrants with a five-year term for a C$2 million cash investment. Cascadia will be managed by the former management of ATAC, who will explore specific properties in the Yukon and British Columbia. Hecla will have the right to appoint two directors to Cascadia’s board.

Restart of Casa Berardi Mine

Hecla also announced that Casa Berardi successfully restarted operations on June 29th following the partial lifting of Quebec’s ban on access to the road to the mine. All mining and processing activities have resumed normally.

The impact of the suspension and restart on Casa Berardi’s production and cost guidance are expected to be updated in the second quarter earnings release.

ABOUT HECLA

Founded in 1891, Hecla Mining Company (NYSE: HL) is the largest silver producer in the United States. In addition to operating mines in Alaska, Idaho, and Quebec, Canada, the Company is developing a mine in the Yukon, Canada, and owns several exploration and pre-development projects in world-class silver and gold mining districts throughout North America.

Cautionary Statements to Investors on Forward-Looking Statements

This news release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbor created by such sections and other applicable laws, including Canadian securities laws. When a forward-looking statement expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such statements are subject to risks, uncertainties, and other factors, which could cause actual results to differ materially from future results expressed, projected, or implied by the forward-looking statements. Forward-looking statements often address our expected future business and financial performance and financial condition and often contain words such as “anticipate,” “intend,” “plan,” “will,” “could,” “would,” “estimate,” “should,” “expect,” “believe,” “project,” “target,” “indicative,” “preliminary,” “potential” and similar expressions. Forward-looking statements in this news release may include, without limitation: (i) Keno Hill silver production is expected to exceed 2.5 million ounces in 2023, (ii) the Keno Hill mine is expected to be the largest and highest grade primary silver mine in Canada and (iii) Casa Berardi’s production and cost guidance are expected to be updated in the second quarter earnings release.

Contacts

For further information, please contact:

Anvita M. Patil

Vice President - Investor Relations and Treasurer

Cheryl Turner

Communications Coordinator

800-HECLA91 (800-432-5291)

Investor Relations

Email: hmc-info@hecla-mining.com

Website: www.hecla-mining.com

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.