About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Usha Resources Identifies Ten Key Drill Targets Across 25 Kilometre Strike at the White Willow Lithium Pegmatite Project

Highlights:

  • The Company has completed 5 weeks of fieldwork, expanding the lithium-cesium-tantalum (“LCT”) pegmatite trend on the property to a potential strike length of >25 km open at both ends.
  • A total of 837 samples have now been collected at the Project, highlighting multiple drill targets. Assays for 219 samples are pending receipt and analysis. Highlight results include up to 0.5% Li O, 1,730 ppm cesium, 120,000 ppm tantalum and 3,540 ppm rubidium.
  • Geochemical results indicate the strong potential for spodumene-bearing dykes to be present at the property. Potassium/rubidium ratios (K/Rb), are a key tool in identifying these types of dykes; K/Rb ratios of <30 are indicative of rare-earth pegmatites and <20 of spodumene-subtype pegmatites[i]. To-date, 10 pegmatites have been identified with K/Rb ratios <30 with a low of 7.5. Values below 10 are often associated with economic spodumene pegmatites.
  • The Company intends on drilling each of the 10 target pegmatites as part of its maiden drill program.

 

Vancouver, BC –  September 14, 2023 Usha Resources Ltd. (“USHA” or the “Company”) (TSXV: USHA) (OTCQB: USHAF) (FSE: JO0), a North American mineral acquisition and exploration company, is pleased to provide this update on its on-going field program at the White Willow Lithium Pegmatite Project (“White Willow” or the “Project”) located 170 km west of Thunder Bay, Ontario .

 

The Company has completed 5 weeks of fieldwork this season, with data compilation complete for 618 samples. Assay highlights include:

 

  • Lithium oxide (Li O) values up to 0.5%, with 76 samples containing very anomalous (>300 ppm) concentrations of lithium, including 14 above >1,000 ppm with a sample of the host rock which assayed 1,300 ppm indicating significant lithium-rich fluids are present within the system.
  • Cesium (Cs) values up to 1,730 ppm, with 71 samples containing very anomalous (>100 ppm) concentrations including 10 which are >500 ppm, indicating the samples are being collected from the outer zone of a fertile LCT system, which is where spodumene, if present, will be identified.
  • Tantalum (ta) values up to 120,000 ppm Ta, with 82 samples containing very anomalous (>30 ppm) concentrations including 35 which are >60 ppm, indicative of the presence of a spodumene-bearing pegmatite.
    Of note, a high-grade showing of 14.64% Ta is present at the Maple Leaf Dyke; coarse-grained tantalite is only known to be found at one other locality in Ontario which is the North Aubrey pegmatite at Green Technology Metals (GT1) Seymour Lake Project where GT1 has identified a 9.9 Mt resource at 1.04% Li O.
  • Rubidium values of up to 3,540 ppm, with 94 samples containing very anomalous (>1,000 ppm) concentrations including 24 >2,000 ppm.

 

Geochemical assessment also indicates the strong potential for spodumene-bearing dykes to be present at the property. Per Selway et al., potassium/rubidium ratios (K/Rb), are a key tool in identifying these types of dykes; K/Rb ratios of <30 are indicative of rare-earth pegmatites and <20 of spodumene-subtype pegmatites. To-date, 10 pegmatites have been identified with K/Rb ratios <30 with a low of 7.5. Values below 10 are often associated with economic spodumene pegmatites.

 

Each of these pegmatites are planned to be drilled as part of the maiden drill program scheduled to commence in Q1 of 2024.

 

Figure 1 - Bubble plot of K/Rb ratios for the White Willow project. The Maple Leaf and Bingo Pegmatite Dike Swarms contain highly evolved LCT-pegmatites with excellent geochemical (low K/Rb and Nb/Ta ratios) and mineralogical (spessartine garnets, blue-green apatite, lithium amphiboles) indicators to be potentially spodumene bearing. (PRNewsfoto/Usha Resources Ltd.)

 

The Company will return to Site in October to complete additional prospecting and mapping after which it will proceed with geophysical surveys to outline structures prior to commencing the drill program.

 

“We are thrilled with the findings from the initial programs at White Willow,” said Deepak Varshney , CEO of Usha Resources. “As seen at Patriot Battery Metals’ Corvette Project, which has over 20 kilometres of trend, lithium pegmatite swarms occur in clusters, each of which has the potential to become a deposit. We now have 10 primary target areas across our 25 kilometre plus trend that include two highly evolved LCT pegmatite swarms at Bingo and Maple Leaf. With significant ground remaining between Bingo and Maple Leaf for further exploration and follow-up, we intend on maximizing the remaining time in the field season before commencing preparations for maiden winter drill program. The findings thus far strongly validate our belief that Willow is a flagship asset where Ontario’s next major lithium discovery will occur.”

 

Figure 2 - Top, aerial view of the Bingo Dyke where a potentially single large dyke over ~1.2 km in length is present if connected under cover. Bottom left, tantalite crystal with a spessartine garnet inclusion. Bottom right, holmquistite alteration within the country rock. The tantalite, spessartine garnet, and holmquistite indicate that the system is highly evolved and potentially spodumene-bearing. (PRNewsfoto/Usha Resources Ltd.)

 

Quality Assurance/Quality Control

 

All collected rock samples were put in sturdy plastic bags, tagged, and sealed at site. Sample bags were then put in rice bags and kept securely before being sent by road transport or delivered by the crew supervisor to either AGAT Laboratories Ltd. or Activation Laboratories in Thunder Bay, Ontario . All samples are analyzed with Four-Acid Digestion/Combined ICP-AES/MS package (49 elements). The QA/QC protocol included the insertion and monitoring of appropriate reference materials, in this case high concentration and low concentration certified OREAS and CDN lithium standards to validate the accuracy and precision of the assay results.

 

Qualified person

 

The technical content of this news release has been reviewed and approved by Mr. Andrew Tims , P.Geo., a qualified person as defined by National Instrument 43-101.

 

About Usha Resources Ltd.

 

Usha Resources Ltd. is a North American mineral acquisition and exploration company focused on the development of quality lithium metal properties that are drill-ready with high-upside and expansion potential. Based in Vancouver, BC , Usha’s portfolio of strategic properties provides target-rich diversification and includes Jackpot Lake, a lithium brine project in Nevada and White Willow, a lithium pegmatite project in Ontario that is the flagship among its growing portfolio of hard-rock lithium assets. Usha trades on the TSX Venture Exchange under the symbol USHA, the OTCQB Exchange under the symbol USHAF and the Frankfurt Stock Exchange under the symbol JO0.

 

USHA RESOURCES LTD.

 

For more information, please call Tyler Muir , Investor Relations, at 1-888-772-2452, email tmuir@usharesources.com , or visit www.usharesources.com .

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

Forward-looking statements:

 

This news release may include “forward-looking information” under applicable Canadian securities legislation. Such forward-looking information reflects management’s current beliefs and are based on a number of estimates and/or assumptions made by and information currently available to the Company that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors that may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information. Readers are cautioned that such forward-looking information are neither promises nor guarantees and are subject to known and unknown risks and uncertainties including, but not limited to, general business, economic, competitive, political and social uncertainties, uncertain and volatile equity and capital markets, lack of available capital, actual results of exploration activities, environmental risks, future prices of base and other metals, operating risks, accidents, labour issues, delays in obtaining governmental approvals and permits, and other risks in the mining industry.

 

The Company is presently an exploration stage company. Exploration is highly speculative in nature, involves many risks, requires substantial expenditures, and may not result in the discovery of mineral deposits that can be mined profitably. Furthermore, the Company currently has no reserves on any of its properties. As a result, there can be no assurance that such forward-looking statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements.

 

[i] Selway, J. et al. 2005. A Review of Rare-Element (Li-Cs-Ta) Pegmatite Exploration Techniques for the Superior Province, Canada , and Large Worldwide Tantalum Deposits. Exploration and Mining Geology, Vol. 14, Nos. 1-4, pp. 1-30.

 

Photo – https://mma.prnewswire.com/media/2210932/Usha_Resources_1.jpg
Photo – https://mma.prnewswire.com/media/2210931/Usha_Resources_2.jpg
Logo – https://mma.prnewswire.com/media/2210933/Usha_Resources_Logo.jpg

 

Usha Resources Logo (PRNewsfoto/Usha Resources Ltd.)

SOURCE Usha Resources Ltd.

The post Usha Resources Identifies Ten Key Drill Targets Across 25 Kilometre Strike at the White Willow Lithium Pegmatite Project appeared first on Financial News Media.

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.