About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Wesdome Announces 2022 Third Quarter Production Results

TORONTO, Oct. 13, 2022 (GLOBE NEWSWIRE) -- Wesdome Gold Mines Ltd. (TSX: WDO) (“Wesdome” or the “Company”) today announces third quarter (“Q3”) 2022 production results. All figures are in Canadian dollars unless otherwise stated.

Duncan Middlemiss, President and CEO commented, “Eagle River production for the quarter was in line with revised guidance. During Q3, there was a planned shut down in July to complete mill upgrades and refurbishment work, which went according to plan and has already yielded operational gains such as reduced reagents consumption.

At Kiena, the mine also had a planned shutdown in July for necessary hoist upgrades. As well, the critical components of the paste fill plant were delivered and installed in Q3, with plant commissioning on track for later in Q4. Once the paste fill system is fully operational, we will have the ability to focus on mine development which will result in increased operational flexibility, and be better positioned to operate successfully in the challenging ground conditions encountered in Kiena Deep. We are currently tracking to produce towards the lower end of the 120,000 – 140,000 combined guidance range this year.”

Amounts are denominated in Canadian dollarsThird QuarterYear-to-Date
  2022 2021Variance % +/(-) 2022 2021Variance % +/(-)
         
Ore milled (tonnes)        
Eagle River 52,247 56,003 (3,756)(7%) 165,428 172,600 (7,172)(4%)
Mishi 3,595 3,727 (132)(4%) 23,153 30,293 (7,140)(24%)
Kiena 16,112 30,470 (14,358)(47%) 63,752 30,470 33,282 109%
  71,954 90,200 (18,246)(20%) 252,333 233,363 18,970 8%
         
Head grade (grams per tonne, “g/t”)        
Eagle River 10.7 13.4 (2.7)(20%) 10.6 13.8 (3.2)(23%)
Mishi 2.8 2.3 0.5 22% 3.2 2.4 0.8 33%
Kiena 10.2 5.8 4.4 76% 9.5 5.8 3.7 64%
         
Gold production (ounces)        
Eagle River 17,405 23,621 (6,216)(26%) 54,495 74,853 (20,358)(27%)
Mishi 270 212 58 27% 2,005 1,920 85 4%
Kiena 5,208 5,511 (303)(5%) 19,234 5,511 13,723 249%
Total Gold Production 22,883 29,344 (6,461)(22%) 75,734 82,284 (6,550)(8%)
         
Production sold (ounces)3 27,500 30,000 (2,500)(8%) 81,500 80,957 543 1%
         
Revenue from gold sales ($ millions)4$61.8$67.5($5.7)(8%)$190.2$177.2$13.0 7%
         
Average realized price per ounce2$2,246$2,249 (3)(0%)$2,334$2,239 95 4%
         

Notes:

  1. Numbers may not add due to rounding.
  2. Average realized price per ounce is a non-IFRS measure and is calculated by dividing the reported revenue from gold sales by the number of ounces sold for a given period. Please reference the Company's interim management discussion and analysis for the period ended June 30, 2022 filed on SEDAR for their calculations.
  3. YTD 2021 production sold includes 1,793 ounces of gold sold from the Kiena bulk sample which was processed in Q4 2020 and sold in Q1 2021.
  4. YTD 2021 revenue excludes $3.9 million of revenue from the Kiena bulk sample, which was processed in Q4 2020 and sold in Q1 2021. The incidental revenue was credited against the cost of the Kiena exploration asset.

Technical Disclosure

The technical content of this release has been compiled, reviewed and approved by Frederic Langevin, Eng, Chief Operating Officer, a "Qualified Person" as defined in National Instrument 43-101 -Standards of Disclosure for Mineral Projects.

ABOUT WESDOME

Wesdome is a Canadian focused gold producer with two high grade underground assets in Canada, the Eagle River mine in Ontario and the recently re-started Kiena mine in Quebec. The Company also retains meaningful exposure to the Moss Lake gold deposit in Ontario through its equity position in Goldshore Resources Inc. The Company’s primary goal is to responsibly leverage this operating platform and high-quality brownfield and greenfield exploration pipeline to build Canada’s next intermediate gold producer. Wesdome trades on the Toronto Stock Exchange under the symbol “WDO,” with a secondary listing on the OTCQX under the symbol “WDOFF.”

This news release contains “forward-looking information”, which may include, but is not limited to, statements with respect to the future financial or operating performance of the Company and its projects. Often, but not always, forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or statements that certain actions, events or results “may”, “could”, “would”, “might”, or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties, and other factors, which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance, or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this press release, and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management’s estimates or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements. The Company has included in this news release certain non-IFRS performance measures, including, but not limited to, mine operating profit, mining and processing costs and cash costs. Cash costs per ounce reflect actual mine operating costs incurred during the fiscal period divided by the number of ounces produced. These measures are not defined under IFRS and therefore should not be considered in isolation or as an alternative to or more meaningful than, net income (loss) or cash flow from operating activities as determined in accordance with IFRS as an indicator of the Company’s financial performance or liquidity. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company's performance and ability to generate cash flow.

For further information, please contact:

Duncan Middlemiss
President and CEO
416-360-3743 ext. 2029
duncan.middlemiss@wesdome.com
or Lindsay Carpenter Dunlop
VP Investor Relations
416-360-3743 ext. 2025
lindsay.dunlop@wesdome.com 
   
220 Bay St, Suite 1200
Toronto, ON, M5J 2W4
Toll Free: 1-866-4-WDO-TSX
Phone: 416-360-3743, Fax: 416-360-7620
Website: www.wesdome.com
  


PDF available: http://ml.globenewswire.com/Resource/Download/a324bc95-6f43-4ef0-b34c-f152d4b53074


Primary Logo

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.