About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Radisson undertakes glacial till sampling on the southern portion of the O'Brien project following the discovery of a sample grading 7.33 g/t gold

ROUYN-NORANDA, Quebec, May 04, 2023 (GLOBE NEWSWIRE) -- Radisson Mining Resources Inc. (TSX-V: RDS, OTC: RMRDF): ("Radisson" or the "Corporation”) is pleased to announce that following the 2022 prospection program on the southern portion of the O'Brien project, (“New Alger” or “New Alger area”) it has identified a geological context similar to the Canadian-Malartic complex where it is planning a large scale till sampling campaign (see figure 1).

Why Pontiac Group sediments (“Pontiac Group”) located south of the prolific Larder-Lake-Cadillac break could host significant deposits?

In proximity to the O’Brien gold project, the Canadian-Malartic complex has produced near 13.7 million ounces of gold to date and is largely located in the Pontiac Group, where gold mineralization is represented by a large volume of disseminated gold and is spatially related to felsic to intermediate porphyritic intrusions and dykes as well as shear-zones (see figure 2). This mining complex highlights the vast potential for gold in the Pontiac Group.

Why does the New Alger area have so much potential?

  • The area represents more than 50 km2 in proximity to multiple major auriferous structures.
  • A sample collected during the 2022 prospection campaign grading 7.33 g/t Au demonstrated the presence of at least one gold-rich zone in the area.
  • With the presence of felsic to intermediate porphyritic intrusions and felsic dykes it has geological characteristics similar to historical and operating mines (figure 2).
  • The area is located in lateral continuity of the AMM mine from which approximately 83,475 tons were extracted at a grade of 4.54 g/t Au from 1939 to 1942 and that had estimated reserves of 219,000 tons grading 4.46 g/t Au.

“I am thrilled to report that we will be conducting this important till sampling program in upcoming weeks. While the impressive O’Brien project remains our top priority and focus, we see an excellent opportunity to start unlocking the value of the New Alger area at a low cost where our vast landholding has potential to yield new gold discoveries,” Commented Denis V. Lachance, Interim President and Chief Executive Officer.

How will the Radisson team attempt to make a new discovery?

After evaluation, Radisson’s geological team determined that a major glacial till sampling campaign (300-400 samples) is the best method to target large zones with disseminated gold potential. Following a successful campaign, stripping, trenching and/or drilling would eventually allow to precisely delineate the strike of a potential discovery.

General geology of the Abitibi greenstone belt demonstrating gold potential in the Pontiac Group sediments

Figure 1: General geology of the Abitibi greenstone belt demonstrating gold potential in the Pontiac Group sediments

Planned glacial till sampling grid

Figure 2: Planned glacial till sampling grid

O’Brien gold project location map

Figure 3 : O’Brien gold project location map

Qualified Person
Vivien Janvier, P.Geo., Ph.D., Director, Geology for Radisson is the Qualified Person pursuant to the requirements of NI 43-101. The Company’s QP has reviewed the technical content of this release.

Radisson mining resources Inc.
Radisson is a gold exploration company focused on its 100% owned O’Brien project, located in the Bousquet-Cadillac mining camp along the world-renowned Larder-Lake-Cadillac Break in Abitibi, Quebec. The Bousquet-Cadillac mining camp has produced over 25,000,000 ounces of gold over the last 100 years. The project hosts the former O’Brien Mine, considered to have been Quebec’s highest-grade gold producer during its production.

For more information on Radisson visit its website www.radissonmining.com or contact:

Denis V. Lachance
Chairman, Interim President and CEO
819-806-3340
dlachance@radissonmining.com

Hubert Parent-Bouchard
Chief Financial Officer
819-763-9969
hpbouchard@radissonmining.com

Forward-Looking Statements

All statements, other than statements of historical fact, contained in this press release including, but not limited to, those relating to the intended use of proceeds of the Offering, the development of the O’Brien project and generally, the above “About Radisson Mining Resources Inc.” paragraph which essentially describes the Corporation’s outlook, constitute “forward-looking information” or “forward-looking statements” within the meaning of applicable securities laws, and are based on expectations, estimates and projections as of the time of this press release. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Corporation as of the time of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates and assumptions may prove to be incorrect. Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, actual results to differ materially from those expressed or implied in any forward-looking statements and future events, could differ materially from those anticipated in such statements. A description of assumptions used to develop such forward-looking information and a description of risk factors that may cause actual results to differ materially from forward looking information can be found in Radisson’s disclosure documents on the SEDAR website at www.sedar.com

By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. Forward-looking statements are provided for the purpose of providing information about management’s endeavours to develop the O’Brien project and, more generally, its expectations and plans relating to the future. Readers are cautioned not to place undue reliance on these forward-looking statements as a number of important risk factors and future events could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. All of the forward-looking statements made in this press release are qualified by these cautionary statements and those made in our other filings with the securities regulators of Canada. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.


Primary Logo

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.