About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Wesdome Exploration Drilling Continues to Expand High Grade 300 East Zone Down Plunge at the Eagle River Mine Returning 40.7 Grams Per Tonne Gold Cut Over 6.0 Metres True Width

TORONTO, June 14, 2023 (GLOBE NEWSWIRE) -- Wesdome Gold Mines Ltd. (TSX: WDO) (“Wesdome” or the “Company”) today announces results from the ongoing underground exploration drilling program at the Company’s wholly-owned Eagle River Mine in Wawa, Ontario.

Ongoing extension and definition drilling of the 300 East Zone has continued to confirm the continuity of the geometry and the consistency of the high-grade mineralization down plunge. The 300 East Zone, previously defined from the 750 m-level to 1,400 m-level, has now been extended to the 1,600 m-level and remains open down plunge (Figure 1). The width of the quartz veining is typically less than 1.5 metres true width; however, recent drilling along the eastern margin of the 300 East Zone has returned wider widths. This occurs in an area that is interpreted to be at the intersection of several structures having different orientations and/or folding resulting in wider zones of gold mineralization. These wider widths and more complex geometry are similar to that of the previously mined 303 Lens located approximately 400 m up plunge from this area, which was mostly mined in 2019.

Highlights of the recent drilling are found below and are summarized in Table 1.

  • Hole 925-E-231: 77.6 g/t Au over 9.4 m core length (40.7 g/t Au cut, 6.0 m true width)
    • Including 225.1 g/t Au over 3.0 m core length
  • Hole 925-E-233: 42.6 g/t Au over 4.9 m core length (42.3 g/t Au cut, 1.7 m true width)
    • Including 62.8 g/t Au over 3.3 m core length
  • Hole 771-E-33: 150.7 g/t Au over 2.8 m core length (51.7 g/t Au cut, 1.6 m true width)
    • Including 497.8 g/t Au over 0.7 m core length

All assays cut to 140.0 g/t Au. True widths are estimated.

Warwick Morley-Jepson, Board Chair and Interim CEO commented, “These results continue to confirm the geometry and high grades of the 300 East Zone. The objective of drilling this zone is to define a second, higher-grade lens similar to the previously mined 303 Lens that could potentially positively impact gold production. The 303 Lens was mined primarily in 2019 and average muck grade was 46.1 g/t.

Additionally, the drilling of the 300 East Zone confirms the continuity of the mineralization at depth, thus suggesting that many other similar zones, such as 808, 811, 818, 711 and 7 East, have this same potential to continue at depth.

Elsewhere at Eagle River, the Company is following up on multiple encouraging drill intersections last year both west of and along strike of, and subparallel to the Falcon 7 zone, including the western extension of the 311 West and 5 zones in the volcanic rocks. Any resources discovered in this area could meaningfully enhance the future operational flexibility of the asset.

Meanwhile, we remain focused in 2023 on converting a large, inferred base into indicated and measured resources and subsequently reserves.”

TECHNICAL DISCLOSURE AND QA/QC

The sampling of, and assay data, from drill core is monitored through the implementation of a quality assurance - quality control (QA-QC) program designed to follow industry best practice. Underground drill samples are transported in sealed bags to the Eagle River Mine assay office in Wawa, Ontario. Samples are analyzed for gold using standard fire assay technique with gravimetric finish. Wesdome inserts blanks and certified reference standards into the sample sequence for quality control at the laboratory. The QA/QC procedure is described in more detail in the 2022 Technical Report filed on SEDAR on April 22, 2022.

The technical content of this release has been compiled, reviewed, and approved by Aliou Sene, P.Geo., Chief Mine Geologist at Eagle River Complex of the Company a "Qualified Person" as defined in National Instrument 43-101 -Standards of Disclosure for Mineral Projects.

ABOUT WESDOME
Wesdome is a Canadian focused gold producer with two high grade underground assets, the Eagle River mine in Ontario and the recently re-started Kiena mine in Quebec. The Company also retains meaningful exposure to the Moss Lake gold deposit in Ontario through its equity position in Goldshore Resources Inc. The Company’s primary goal is to responsibly leverage this operating platform and high-quality brownfield and greenfield exploration pipeline to build Canada’s next intermediate gold producer. Wesdome trades on the Toronto Stock Exchange under the symbol “WDO,” with a secondary listing on the OTCQX under the symbol “WDOFF.”

For further information, please contact:
    
Warwick Morley-Jepsonor Lindsay Carpenter Dunlop
Board Chair & Interim CEO  VP Investor Relations
416-360-3743 ext. 2029  416-360-3743 ext. 2025
w.morley-jepson@wesdome.com  lindsay.dunlop@wesdome.com
    
220 Bay St, Suite 1200   
Toronto, ON, M5J 2W4   
Toll Free: 1-866-4-WDO-TSX   
Phone: 416-360-3743, Fax: 416-360-7620   
Website : www.wesdome.com   
    

FORWARD-LOOKING INFORMATION

This news release contains “forward-looking information” which may include, but is not limited to, statements with respect to the benefits of achieving commercial production at Kiena, the Company’s expected capital expenditure in 2023, the timing around reaching the Kiena Deep A Zone, the Company’s ability to be cash flow positive and its annual production run rate. Often, but not always, forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management’s estimates or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements.

Table 1 - Drill Hole Composites

HoleZoneFrom (m)To (m)Width (m)True Width (m)Au g/t (Uncapped)Au g/t (Capped at 140 g/t)
771-E-33300981.50984.503.001.507.987.98
771-E-33300996.00998.802.801.61150.6951.68
771-E-38300941.66944.272.611.5036.0335.41
771-E-50300756.50758.842.341.5056.6046.12
771-E-653001050.601053.603.001.5018.2918.29
771-E-653001128.901133.304.401.505.575.57
771-E-663001098.201101.203.001.505.885.88
771-E-673001102.051104.702.651.704.264.26
925-E-205300362.70365.703.001.5010.1510.15
925-E-207300426.10430.504.401.5024.5514.20
925-E-212300547.90553.305.402.2815.2010.48
925-E-213300713.10714.701.601.5013.2413.24
925-E-217300368.40371.403.001.5031.4115.56
925-E-219300336.20339.753.551.5020.8820.88
925-E-220300346.10350.504.401.506.426.42
925-E-221300410.70415.104.401.5010.3910.39
924-E-224300468.70473.304.601.5737.2937.29
925-E-231300447.30456.709.406.0483.2040.68
925-E-232300517.90522.304.401.504.434.43
925-E-233300390.60395.504.901.6842.5642.31
925-E-234300558.00563.705.703.6612.6612.66

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/5a435d3d-09c1-42bc-87f7-a81bab1c055f

PDF available: http://ml.globenewswire.com/Resource/Download/ac4bba6a-82c4-4422-9b05-18575442c45e


Primary Logo

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.