About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

NEVADA CANYON ANNOUNCES INITIAL EXPLORATION PROGRAM ON THE BELSHAZZAR PROJECT

Reno, Nevada, Aug. 23, 2023 (GLOBE NEWSWIRE) -- Nevada Canyon Gold Corp. (OTC Markets: NGLD) (The “Company” or “Nevada Canyon”) is pleased to announce that planning is complete on the Company’s Phase I exploration program on the Belshazzar Property, located within the Quartzburg mining district, in Boise County, Idaho, approx. 25 miles north-northeast of Boise ID.

Phase I of the Belshazzar Property exploration program will consist of reconnaissance prospecting, geological mapping, surface trenching, sampling of old workings, mine dumps and the mapping relocation of historical workings on the property. This initial Phase I exploration program is expected to begin this fall (2023) and will provide accurate modern data to assist in the planning of the Phase II exploration program.

The Belshazzar Property consists of 10 unpatented mineral claims and 7 placer mineral claims in a combined area of approx. 200 acres. situated along the upper reaches of Fall Creek within the Quartzburg mining district The Property is accessed via 16 miles of mostly gravel road from Idaho City, with year-round access. The Quartzburg district is in the western part of a larger mining region known as the Boise Basin, which produced over 2.8 million troy ounces of gold from placer and lode mines (Anderson, 1947).

The Belshazzar Property hosts the past producing Belshazzar mine. Approximately 3000 feet of underground workings consisting of several adits at different levels, sub-levels with connecting vertical shafts and milling facilities. By 1914, the Belshazzar mine had its own boarding house, bunk house, barn, assay office, blacksmith shops, sawmill and IO-stamp mill. Construction of a new mill was completed in 1924. A 1,700-foot-long aerial tramway connected ore bins at the No. 2 portal with the mill on Fall Creek (Quinn, 1914) remains of a tram terminal can still be seen at the No. 2 portal and at the site of the original mill (Dan Turmes, Idaho Dept. of Environmental Quality, 2008) The last known production from the Belshazzar mine was reported in 1941 (Mitchell, 2008). Exact production figures for the mine are not available.

As early as 1914, "high grade specimen rock" was reported from the Belshazzar mine (Quinn 1914), this material was found in the drift on the No. 3 level. A reported (Campbell,1927) "nugget" which yielded $245 in gold, equivalent at the time to almost 12 ounces. During 1928, it was noted that "some remarkably rich segregations of native gold" had been found in a section of the vein between the 401 and No. 3 levels. Several hand-sorted lots of this material contained between 48 and 435 ounces of gold, and one single specimen of pure metal reportedly weighed 105 ounces (Mitchell, 2008). Some of the ore was so rich that it was shipped directly to the assay office in Boise without treatment. Most of the specimen gold found at the Belshazzar was probably melted down, as few specimens are known to have survived from the active mining period ending in 1931.  

In recent years, a " waste" rock dump located near the portal of the mine's 401-foot level has, with the aid of modern metal detectors, produced hundreds of wire gold specimens, ranging from microscopic in size to over 20 troy ounces. Total recent gold specimen production to-date is unknown but is probably well in excess of 800 ounces of gold

Held by private interests for most of its history, the Belshazzar Project remains very underexplored with virtually no modern-day exploration programs. The Project has exceptional potential for new discoveries on several exploration targets with multiple zones.

Market Awareness Program

Pursuant to Nevada Canyon’s ongoing strategy of raising its profile in the United States (“U.S.”) and to generate a greater following among U.S. media, retail and institutional investors, the Company entered into an agreement (the “Agreement”) with i2i Marketing Group, LLC., (“i2i”) of Odessa, Florida. Wherein i2i can provide marketing services including content creation, media distribution and market awareness campaigns.

The Agreement contemplates a three-month timeframe, with i2i providing services through November 15, 2023, with a total budget of US$300,000.  Prior to the commencement of services, (“i2i”) will receive a creation budget of US$25,000 (paid) used to develop materials for the campaign. with the balance of US$275,000 directed towards the digital media and investor awareness campaign budgets. The Company will pay i2i an initial media deposit of US$150,000 (paid), with the residual budget being paid in subsequent monthly installments. Thereafter the initial three-month timeframe, the agreement may continue on a month-to-month basis, as agreed to by the parties. The agreement can be terminated by either party, by serving appropriate notice.

i2i has advised that it does not have any equity interest in the securities of the Company, or any right to acquire such an interest. i2i is at arm’s length to the Company. i2i will provide the Company with an opportunity to review all content describing the Company generated on behalf of i2i prior to its publication and i2i will not publish or distribute any content without the prior approval of the Company. 

ON BEHALF OF THE BOARD

Alan Day

Alan Day
President & Director

FOR FURTHER INFORMATION PLEASE CONTACT: Nevada Canyon Gold Corp.
(TEL)- (888) 909-5548, (FAX)-(888) 909-1033
Email: info@nevadacanyongold.com
Website: www. nevadacanyongold.com

Forward-Looking Statements

The information posted in this release may contain forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. You can identify these statements by use of the words "may," "will," "should," "plans," "expects," "anticipates," "continue," "estimate," "project," "intend," and similar expressions. Forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those projected or anticipated. These risks and uncertainties include, but are not limited to, general economic and business conditions, effects of continued geopolitical unrest and regional conflicts, competition, changes in technology and methods of exploration, delays in completing various engineering and exploration programs, and any potential results from such programs. Specifically, forward-looking statements in this news release include statements with respect to the potential mineralization and geological merits of the Company properties and various other factors beyond the Nevada Canyon Gold Corp.'s control. The Company's actual results could differ materially from those discussed in this press release. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events except as required by applicable securities legislation. Nevada Canyon Gold Corp. is neither an underwriter as the term is defined in Section 2(a)(11) of the Securities Act of 1933, nor an investment company pursuant to the Investment Company Act of 1940. Nevada Canyon Gold Corp. is not an investment adviser pursuant to the Investment Advisers Act of 1940. Nevada Canyon Gold Corp. is not registered with FINRA or SIPC. Investors are advised to carefully review the reports and documents that Nevada Canyon Gold Corp. files from time to time with the SEC, including its Annual Form 10K for the fiscal year ended December 31, 2022, Quarterly and Current Reports.


Primary Logo

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.