About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

HII Begins Topside EMALS Testing on John F. Kennedy (CVN 79) at Newport News Shipbuilding

By: via GlobeNewswire

NEWPORT NEWS, Va., Feb. 21, 2024 (GLOBE NEWSWIRE) -- HII (NYSE: HII) announced today that its Newport News Shipbuilding division (NNS) recently began topside testing of the electromagnetic aircraft launch system (EMALS) on aircraft carrier John F. Kennedy (CVN 79).

EMALS, first integrated into USS Gerald R. Ford (CVN 78), replaces the existing steam catapults currently in use on the U.S. Navy’s Nimitz-class aircraft carriers.

Following successful “no-load” testing on catapults one and two, known as the ‘bow cats,’ the NNS team, alongside the John F. Kennedy crew, has now started “dead-load” testing. In this phase, large, wheeled, car-like structures of graduated weights up to 80,000 pounds to simulate the weight of actual aircraft are launched off the carrier’s bow into the James River. They are then retrieved and relaunched until the conclusion of the test program to ensure the catapults are ready for their primary intended purpose: to launch all carrier-based fixed wing aircraft flown by the U.S. Navy.

The first dead loads used in this testing have special significance. Family members of shipbuilders signed them with messages of congratulations and gratitude during the shipyard’s Family Day held in October.

DCS24-21-108

Photos and video accompanying this release is available at: https://hii.com/news/hii-newport-news-shipbuilding-carrier-cvn-79-dead-load-testing/.

“As we make sustained progress in the construction, testing and turnover of John F. Kennedy, reaching the dead load testing phase is a visual demonstration of how far we’ve come,” said Lucas Hicks, vice president, John F. Kennedy (CVN 79) new construction aircraft carrier program. “It is evident from the thousands of written messages that our shipbuilders and their families appreciate and understand the significance of our work. We are proud of the incredible teamwork that has brought us to this point, and remain committed to delivering this mighty aircraft carrier to the fleet so the crew can carry out the important mission ahead.”

“The first dead-load launch off the flight deck is a historic moment for PCU John F. Kennedy, and a testament to the power of great teamwork between our JFK crew, HII team, and NAVAIR engineers,” said CAPT Colin Day, commanding officer, PCU John F. Kennedy (CVN 79). “I’m particularly proud of our Air Department and the hard-working Aviation Boatswain Mates who worked tirelessly alongside the engineering and testing teams to get us to this critical moment.”

Traveling more than 300 feet down the catapult track at more than 150 miles per hour, EMALS provides expanded operational capability at reduced costs, higher launch-energy capacity, and more accurate end-speed control, with a smooth acceleration at both high and low speeds. The launch profiles have been optimized to reduce stress on the aircraft, in contrast to the sudden acceleration of steam catapults.

Kennedy is the second Gerald R. Ford-class aircraft carrier under construction at NNS, which is the nation’s sole designer, builder and refueler of nuclear-powered aircraft carriers. In addition to Kennedy, two other Ford-class carriers are under construction at NNS: Enterprise (CVN 80) and Doris Miller (CVN 81).

About HII

HII is a global, all-domain defense provider. HII’s mission is to deliver the world’s most powerful ships and all-domain solutions in service of the nation, creating the advantage for our customers to protect peace and freedom around the world.

As the nation’s largest military shipbuilder, and with a more than 135-year history of advancing U.S. national security, HII delivers critical capabilities extending from ships to unmanned systems, cyber, ISR, AI/ML and synthetic training. Headquartered in Virginia, HII’s workforce is 44,000 strong. For more information, visit:

Contact:

Todd Corillo
Todd.T.Corillo@hii-co.com
(757) 688-3220

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/2e040a04-5924-451d-af9d-fba19ea8a160


Primary Logo

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.