To contact Cabling Installation & Maintenance:

About Cabling Installation & Maintenance:

Bringing practical business and technical intelligence to today's structured cabling professionals.

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on:

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Oroco Engages Whittle Consulting Ltd.

VANCOUVER, Canada, July 02, 2025 (GLOBE NEWSWIRE) -- Oroco Resource Corp. (TSX-V: OCO; OTC: ORRCF) (“Oroco” or the “Company”) is excited to announce that it has retained Whittle Consulting Ltd., based in Melbourne, Australia, to undertake a Strategic Option Study (the “Study”) for Oroco’s Santo Tomás porphyry copper project in northwestern Mexico.

Strategic Option Study Overview

Whittle Consulting Ltd. (“Whittle”) will collaborate with Oroco’s team to evaluate innovative operating strategies and technologies that have the potential to enhance the Project’s value.  Utilizing Whittle’s “Integrated Strategic Planning” methodology, the Study will employ advanced cost modeling and system constraint analysis to optimize all facets of the Santo Tomás mining process, including an expanded North Zone mine plan.  Key areas of focus will include:

  • Alternative power sources
  • Mining fleet electrification
  • Processing technologies
  • Tailings storage options

These analyses will refine pit size, stripping ratios, and cut-off grades, providing critical guidance for the upcoming Pre-Feasibility Study (PFS) by identifying optimal operational structures and technologies for further evaluation.

Data and Expertise

The Study will leverage the existing Mineral Resource Estimate from Oroco’s Q3 2024 Preliminary Economic Assessment (PEA) and the Company’s project database, requiring no additional data collection.  Whittle’s proven track record, with over 120 Enterprise Optimization studies, demonstrates its ability to significantly improve project economics through its proprietary “Prober-F” software.  This advanced tool integrates Linear Programming with a sophisticated Search Algorithm, utilizing over 300 computer cores to tackle complex, multi-variable mining challenges.

Whittle’s team of industry experts brings extensive experience in geology, mining engineering, metallurgy, finance, and operational modeling, ensuring a comprehensive and practical approach to optimization.

Payment Structure

Whittle will receive 60% of its consulting fee in Oroco common shares (“Fee Shares”), to be issued in alignment with the Company’s next equity financing, expected in 2025. The issuance is subject to TSX Venture Exchange approval.

ABOUT OROCO

The Company holds a net 85.5% interest in those central concessions that comprise 1,173 hectares “the Core Concessions” of The Santo Tomas Project, located in northwestern Mexico. The Company also holds an 80% interest in an additional 7,861 hectares of mineral concessions surrounding and adjacent to the Core Concessions (for a total Project area of 9,034 hectares, or 22,324 acres). The Project is situated within the Santo Tomas District, which extends up to the Jinchuan Group’s Bahuerachi Project, approximately 14 km to the northeast. The Project hosts significant copper porphyry mineralization initially defined by prior exploration spanning the period from 1968 to 1994. During that time, the Project area was tested by over 100 diamond and reverse circulation drill holes, totaling approximately 30,000 meters. Commencing in 2021, Oroco conducted a drill program (Phase 1) at Santo Tomas, with a resulting total of 48,481 meters drilled in 76 diamond drill holes.

The drilling and subsequent resource estimates and engineering studies led to a revised MRE and an updated PEA being published and filed in August of 2024, which studies are available at the Company’s website www.orocoresourcecorp.com and by reviewing the Company profile on SEDAR+ at www.sedarplus.ca.

The Santo Tomás Project is located within 170 km of the Pacific deep-water port at Topolobampo and is serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and natural gas) through the city of Los Mochis to the northern city of Choix. The property is reached, in part, by a 32 km access road originally built to service Goldcorp’s El Sauzal Mine in Chihuahua State.

Additional information about Oroco can be found on its website and by reviewing its profile on SEDAR+ at www.sedarplus.ca.

For more information, please contact:

Richard Lock, CEO
Oroco Resource Corp. 
Tel: 604-688-6200 
Email: info@orocoresourcecorp.com 
www.orocoresourcecorp.com

Neither TSXV nor its Regulation Services Provider (as that term is defined in policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release includes certain “forward-looking information” and “forward-looking statements” (collectively “forward-looking statements”) within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact included herein, including, without limitation, statements relating to future events or achievements of the Company, and the use of funds from the Offering, are forward-looking statements. There is no assurance that the proceeds of the Offering will be expended as contemplated. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. Readers should not place undue reliance on the forward-looking statements and information contained in this news release concerning these matters. Oroco does not assume any obligation to update the forward-looking statements should they change, except as required by law.


Christy Fabros
Oroco Resource Corp. 
(604) 688-6200
info@orocoresourcecorp.com
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.