About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Caledonia Mining Corporation Plc: Notification of relevant change to significant shareholder

ST HELIER, Jersey, July 25, 2025 (GLOBE NEWSWIRE) -- Caledonia Mining Corporation Plc ("Caledonia" or "the Company") (NYSE American: CMCL; AIM: CMCL; VFEX: CMCL) announces that it has received notification that Baker Steel Resources Trust Ltd has crossed a threshold for notification of a relevant change (as defined by the AIM Rules for Companies).

A copy of the notification is below.

Enquiries:

Caledonia Mining Corporation Plc
Mark Learmonth
Camilla Horsfall
 
Tel: +44 1534 679 800
Tel: +44 7817 841 793

Cavendish Capital Markets Limited (Nomad and Joint Broker)
Adrian Hadden
George Lawson
 

Tel: +44 207 397 1965

Panmure Liberum Limited (Joint Broker)
Scott Mathieson

Tel: +44 20 3100 2000

Camarco, Financial PR (UK)
Gordon Poole
Elfie Kent
 

Tel: +44 20 3757 4980

3PPB (Financial PR, North America)
Patrick Chidley
Paul Durham
 
Tel: +1 917 991 7701
Tel: +1 203 940 2538

Curate Public Relations (Zimbabwe)
Debra Tatenda

Tel: +263 77802131

IH Securities (Private) Limited (VFEX Sponsor - Zimbabwe)
Lloyd Mlotshwa

Tel: +263 (242) 745 119/33/39


TR-1Standard form for notification of major holdings

NOTIFICATION OF MAJOR HOLDINGS
 
1a. Identity of the issuer or the underlying issuer of existing shares to which voting rights are attachedii:Caledonia Mining Corp PLC
1b. Please indicate if the issuer is a non-UK issuer (please mark with an “X” if appropriate)
Non-UK issuerX
2. Reason for the notification (please mark the appropriate box or boxes with an “X”)
An acquisition or disposal of voting rightsX
An acquisition or disposal of financial instruments 
An event changing the breakdown of voting rights 
Other (please specify)iii: 
3. Details of person subject to the notification obligationiv
NameBAKER STEEL CAPITAL MANAGERS LLP
(DISCRETIONARY CLIENTS OF AND ASSOCIATED OR CONNECTED/RELATED PARTIES)
City and country of registered office (if applicable)London, United Kingdom.

4. Full name of shareholder(s) (if different from 3.)v
NameBaker Steel Resources Trust Ltd

City and country of registered office (if applicable)St Peter’s Port, Guernsey
5. Date on which the threshold was crossed or reachedvi:06/09/2023
6. Date on which issuer notified (DD/MM/YYYY):22/07/2025
7. Total positions of person(s) subject to the notification obligation
 % of voting rights attached to shares (total of 8. A)% of voting rights through financial instruments
(total of 8.B 1 + 8.B 2)
Total of both in % (8.A + 8.B)Total number of voting rights held in issuer (8.A + 8.B) vii
Resulting situation on the date on which threshold was crossed or reached2.97% 2.97%570,000
Position of previous notification (if
applicable)
4.4% 4.4% 



8. Notified details of the resulting situation on the date on which the threshold was crossed or reachedviii
A: Voting rights attached to shares
Class/type of
shares
ISIN code (if possible)

Number of voting rightsix% of voting rights
Direct
(Art 9 of Directive 2004/109/EC) (DTR5.1)
Indirect
(Art 10 of Directive 2004/109/EC) (DTR5.2.1)
Direct
(Art 9 of Directive 2004/109/EC) (DTR5.1)
Indirect
(Art 10 of Directive 2004/109/EC) (DTR5.2.1)
JE00BF0XVB15570,000 2.97% 
     
     
SUBTOTAL 8. A570,0002.97%
 
B 1: Financial Instruments according to Art. 13(1)(a) of Directive 2004/109/EC (DTR5.3.1.1 (a))
Type of financial instrumentExpiration
datex
Exercise/
Conversion Periodxi
Number of voting rights that may be acquired if the instrument is
exercised/converted.
% of voting rights
     
     
     
  SUBTOTAL 8. B 1  
 
B 2: Financial Instruments with similar economic effect according to Art. 13(1)(b) of Directive 2004/109/EC (DTR5.3.1.1 (b))
Type of financial instrumentExpiration
datex
Exercise/
Conversion Period xi
Physical or cash
settlementxii
Number of voting rights % of voting rights
      
      
      
   SUBTOTAL 8.B.2  
 


9. Information in relation to the person subject to the notification obligation (please mark the
applicable box with an “X”)
Person subject to the notification obligation is not controlled by any natural person or legal entity and does not control any other undertaking(s) holding directly or indirectly an interest in the (underlying) issuerxiiiX
Full chain of controlled undertakings through which the voting rights and/or the
financial instruments are effectively held starting with the ultimate controlling natural person or legal entityxiv (please add additional rows as necessary)
 
Namexv% of voting rights if it equals or is higher than the notifiable threshold% of voting rights through financial instruments if it equals or is higher than the notifiable thresholdTotal of both if it equals or is higher than the notifiable threshold
    
    
    
    
    
 
10. In case of proxy voting, please identify:
Name of the proxy holder 
The number and % of voting rights held 
The date until which the voting rights will be held 
 
11. Additional informationxvi
 


Place of completionLondon
Date of completion23-July-2025

Primary Logo

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.