About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

West Red Lake Gold (WRLG.V) High Grade Drill Results Confirm Geological Modeling at Rowan

Following on the heels of the highest-grade intercept ever drilled across the Rowan Property, the team successfully intercepted what is believed to be the same high-grade zone approximately 80 metres down-dip

Global Stocks News – In a press release dated October 11, 2023, West Red Lake Gold Mines (TSXV:WRLG) (OTC:WRLGF) reported additional drill results from its 100% owned Rowan Property located in the prolific Red Lake Gold District of Northwestern Ontario, Canada. 

The company’s flagship asset - The Madsen Gold Mine – is debt free, fully permitted, with a brand-new 800+ tonne per day mill, a tailings and water treatment facility. [1.]

Their 100% wholly owned Rowan Gold Project is the company’s other asset, located approximately 15 kilometers as the crow flies from the Madsen mill. WRLG believes there are synergies between the high-grade resources at Rowan and the Madsen mill.

October 11, 2023 Drilling Highlights:

  • ·Hole RLG-23-166B Intersected 2 metres @ 45.20 g/t Au, from 297m to 299m; and 4 metres @ 6.78 g/t Au, from 191m to 195m.
  • ·Hole RLG-23-164 Intersected 0.5 metres @ 101.60 g/t Au, from 204.5m to 205m; and 1.35 metres @ 33.47 g/t Au, from 131m to 132.35m.
  • ·Hole RLG-23-159 Intersected 2.3 metres @ 12.81 g/t Au, from 262.85m to 265.15m; and 2.1 metres @ 12.43 g/t Au, from 247.4m to 249.5 m.
  • Hole RLG-23-169 Intersected 1.5m @ 14.61 g/t Au, from 506m to 507.5m, Including 0.5m @ 42.62 g/t Au from 506m to 506.5m.

WRLG CEO Shane Williams has designed, built and operated mines (open pit and underground) in Greece, Turkey and Canada - for Skeena Resources, Eldorado Gold and Rio Tinto. He has a stellar track record of moving mineral assets into production.

“We are seeing continuation of the mineralization at Rowan,” Williams told Guy Bennett, CEO of Global Stocks News (GSN). “From Veins 100 and 101 in particular, we are getting good hits. My geological team is excited about the potential of these veins as we move forward.”

“Following on the heels of the highest-grade intercept ever drilled across the Rowan Property, the team successfully intercepted what is believed to be the same high-grade zone approximately 80 metres down-dip,” stated Williams.

“This represents one of the deepest holes drilled within the high-grade East Zone and bodes well for future expansion opportunity at Rowan as the team continues to extend this highly prospective mineralized vein zone at depth and along strike.”

“The drilling completed at the Rowan Mine Target in 2023 has been focused on validating historical data across the Inferred Resource, and also infilling apparent gaps in the analytical data set which was a product of very selective sampling techniques implemented during previous drilling campaigns,” stated WRLG.

“Assay results received from the 2023 drilling program continue to confirm our thesis that quartz veining and gold mineralization continue at depth and along strike, with grades consistent with, or higher than those outlined in the current Inferred Mineral Resource which remains open in all directions”.

“For example, the 100 Vein Zone – which is the furthest north vein currently modeled within the overall Rowan vein corridor – was previously interpreted to be a lower grade portion of the block model. Recent drilling has confirmed that higher grades are present within the 100 Vein Zone below 150 metre elevation, suggesting that gold grades are increasing at depth within this zone which is a trend that has been observed elsewhere in the Red Lake district”

Drilling at the Rowan Mine Target area will continue with an emphasis on infill and expansion of the existing high-grade mineral resource.

“Originally, Rowan started as an early-stage exploration project,” Williams told GSN. “It was a narrow vein, high grade deposit. As we advance the drill program, we're getting deeper into the system. It's opening up and exceeding our initial expectations. We've drilled good holes higher in the deposit. The October 11, 2023 press release reports good gold values deeper down.”.

“We are seeing continuation of mineralization,” continued Williams. “We believe it is growing into a bigger deposit. We no longer think of it as a small satellite deposit, but potentially a significant feed source for our Madsen project.”

A total of 42 diamond drill holes for 15,772m have been completed so far in 2023 at the Rowan Mine target. Fire and metallic screen assays have been returned for 35 out of 42 holes completed, with 2 holes having partial assay results and 5 holes pending assays and QAQC.

“I have enjoyed working on greenfield projects, but my deepest expertise and passion is building bridges between advanced exploration and production,” Williams told GSN. “Financing, permitting, mine design, mine optimisation - that’s my bread and butter. We have a assembled a world class team. That is what we are all focused on: putting the Madsen Gold Project back into production.”

References:

1. SRK Consulting. (2021). Independent NI 43-101 Technical Report and Updated Mineral Resource Estimate for the PureGold Mine, Canada (West Red Lake Gold Mines, Ed.) [Review of Independent NI 43-101 Technical Report and Updated Mineral Resource Estimate for the PureGold Mine, Canada. https://www.globenewswire.com/en/news-release/2022/08/10/2495601/0/en/PureGold-Announces-Updated-Mineral-Resource-Estimate-for-PureGold-Mine.html

guy.bennett@globalstocksnews.com

Full Disclaimer

Contact Info:
Name: Guy Bennett
Email: Send Email
Organization: Global Stocks News
Website: http://www.globalstocksnews.com

Release ID: 89110141

If there are any problems, discrepancies, or queries related to the content presented in this press release, we kindly ask that you notify us immediately at error@releasecontact.com. Our responsive team will be available round-the-clock to address your concerns within 8 hours and take necessary actions to rectify any identified issues or support you with press release takedowns. Ensuring accurate and trustworthy information is our unwavering commitment.

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.