About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

NEW YORK’S 30 HUDSON YARDS IS A TOWERING TESTAMENT TO KRYTON INTERNATIONAL’S INNOVATIVE CONCRETE WATERPROOFING SOLUTIONS

--News Direct--

NEW YORK – February 4, 2025 – The now iconic 30 Hudson Yards—the crown jewel of New York’s $25-billion Hudson Yards megaproject—is widely recognized for its futuristic architecture that famously reshaped Manhattan’s skyline. Six years after the 103-story office tower opened, Kryton International points out that one of the project’s most enduring feats exists in an unseen location.

Kryton, a global leader in developing cutting-edge advancements in protecting concrete from water’s corrosive effects, assisted architects and engineers in solving a critical underground challenge long before the skyscraper began its vertical ascent to eventually pass the Empire State Building as the 8th tallest U.S. building.

The building is in a 100-year flood plain above a working rail yard, which would be active throughout construction and revealed visual evidence of the water infiltration’s corrosive effect on concrete. The structure’s below-grade foundation, which was already a significant engineering challenge, would have to be 100% watertight for the life of the building.

All architectural triumphs, noted Kryton Vice President for Product Development Kevin Yuers, require three things: great design, quality materials and workmanship. That formula is how Hudson Yards’ subterranean infrastructure, for which Kryton’s materials were critical, maintains stability, resilience and sustainability to the inhospitable building site.

“Most opinions of 30 Hudson Yards’ architecture are formed by looking up, but design excellence also lies beneath our feet,” Yuers said. “The innovation that occurred below the surface was a masterful combination of design, materials, and skilled workmanship that was as much a window to the future as the tower’s striking presence in the New York skyline. Though Kryton has been part of major developments in 50 countries, this project spotlighted the critical role of waterproofing technology in the future of construction.”

Indeed, Kryton’s concrete waterproofing solutions are part of many globally-recognized developments – including construction of the new World Trade Center – but nothing has attracted the public spotlight quite like 30 Hudson Yards’ underground challenges.

The 2012 groundbreaking ceremony was just three months after Hurricane Sandy devastated New York City with catastrophic flooding. The storm underscored the critical importance of protecting foundations from saltwater intrusion.

“Hurricane Sandy was a glaring worst-case scenario of the devastating potential of saltwater flooding, which has a destructive impact on the stability and durability of exposed concrete structures,” said Yuers, noting that concrete is the world’s second most-used substance after water. “This very real threat reinforced the importance and availability of materials that can keep foundations 100% watertight for a building’s entire service life.”

In anticipation of 30 Hudson Yards eventual status as Manhattan’s premier office property for Fortune 500 tenants, flawless structural integrity, durability and long-term sustainability of the foundation was among many non-negotiable expectations.

To meet the rigorous demands of this project, architectural firm Kohn Pedersen Fox Associates and building envelope consultant Wiss, Janney, Elstner Associates, Inc. selected Kryton’s Krystol Internal Membrane™ (KIM®) as the waterproofing solution for the below-grade foundation. The KIM system was applied to key areas including the base slab, elevator pits, flood retention tank, and Amtrak’s underground wheel truer facility.

Kryton’s Krystol T1® was applied to both new and preexisting foundation walls, retail podium slab, and the machine room. Krytonite Swelling Waterstop and Krystol Waterstop Treatment formed watertight construction joints. This was critical where old and new concrete meet, which can be particularly leak prone.

The Krystol technology enables concrete to self-seal cracks and block water indefinitely, while Krytonite Waterstop’s compression sealing power is four times greater than conventional methods to ensure long-lasting prevention against water intrusion.

After six years, 30 Hudson Yards’ foundation remains completely watertight—a testament to the reliable performance that Kryton products consistently deliver. As a result, they have become essential to a growing number of architects, engineers, and builders.

“30 Hudson Yards has literally become a towering testimonial to our concrete technology’s ability to extend the service life, safety and sustainability of concrete structures in even the most difficult conditions. The last six years have proven Kryton’s value to a bigger audience,” emphasized Alain Lok, Kryton Senior Business Manager, Northeast USA, who worked closely with the company’s regional distributor, Dry Concrete CEO Greg Maugeri, to ensure project success. “Together with our partners at Dry Concrete, we supported 30 Hudson Yards as both manufacturer and distributor to provide a superior product, expertise and countless hours of support to make this project a success.”

Since its opening, the ambitious development has remained Manhattan’s premier mixed-use property—attracting a tenant base of Fortune 500 companies and some of the most notable retailers—while commanding the city’s highest office lease rates.

The skyscraper achieved LEED Gold certification and earned the H. Bruce Russell Global Innovator’s Award for its transformative workplace design and smart building environment.

Its foundation is expected to remain watertight and corrosion free for generations.

ABOUT KRYTON

Kryton International Inc. is the inventor of the crystalline waterproofing admixture and has been waterproofing concrete structures with its proprietary Krystol® technology since 1973. Kryton has won awards for innovation, manufacturing, best place to work, and entrepreneurship. Kryton is an active member of the American Concrete Institute, International Concrete Repair Institute, American Shotcrete Association, and many other thought-leading organizations. Kryton exports its products to more than 50 countries globally. www.kryton.com

Contact Details

Kryton International

Leeza Hoyt

+1 310-343-3197

llhoyt@hoytorg.com

Company Website

https://www.kryton.com/

View source version on newsdirect.com: https://newsdirect.com/news/new-yorks-30-hudson-yards-is-a-towering-testament-to-kryton-internationals-innovative-concrete-waterproofing-solutions-398442411

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.