About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Advance Gold Returns High-Grade Lithium-Potassium-Boron from Core Drilling at Saldivar Salar, Mexico

By: Newsfile

Kamloops, British Columbia--(Newsfile Corp. - June 8, 2021) - Advance Gold Corp. (TSXV: AAX) ("Advance Gold" or "the Company") is pleased to announce results from the first four core holes drilled at its Saldivar Salar, which is one of 13 salars it recently acquired in central Mexico.

Allan Barry Laboucan, President and CEO of Advance Gold Corp. commented: "We have recently completed seven core holes at Saldivar with four reported today, and three more pending. The first two holes went to bedrock at 84m and 77m. These two deeper holes were designed to test the depth to bedrock. With the five auger holes and now four core holes we have established widespread lithium, boron and potassium distribution starting at the surface and continuous to bedrock. These early assay results appear to indicate that the Lithium content increases with depth and increases as we move towards the centre of the salar. The surface expression of the Saldivar salar is approximately 2000 metres north to south and 800 metres east to west with a depth of 80 metres. The drilling clearly establishes the Saldivar salar as a bulk tonnage, open pit target. We are also working to optimize our recovery process to prepare our test plant for bulk sampling."

Saldivar Lithium Project, Mexico
Coordinates: 788,600E, 2,586,000N, Elevation 1925m
Hole AG-Li-06

No.INTERVAL SAMPLEDLiBK
FROMTOWIDTHppmppm%
10.001.001.00135.00130.000.96
21.002.001.00126.00220.001.41
32.003.001.00101.50230.001.27
43.004.001.0099.80280.001.27
54.005.001.0093.60280.001.21
65.006.001.00109.50210.001.27
76.007.001.00106.50220.001.28
87.008.001.00106.00200.001.21
98.009.001.00107.00200.001.22
109.0010.001.00101.00210.001.20
1110.0011.001.0089.40230.001.15
1211.0012.001.0091.90270.001.28
1312.0013.001.00102.50290.001.27
1413.0014.001.00103.00310.001.31
1514.0015.001.0089.10260.001.13
1615.0016.001.00102.00300.001.26
1716.0017.001.0094.30260.001.19
1817.0018.001.00109.50270.001.21
1918.0019.001.00104.50280.001.25
2019.0020.001.0095.20260.001.23
2120.0021.001.0092.30260.001.19
2221.0022.001.00101.00260.001.20
2322.0023.001.00119.50310.001.58
2423.0024.001.00131.50310.001.53
2524.0025.001.00114.00290.001.43
2625.0026.001.00122.50310.001.52
2726.0027.001.00117.00280.001.37
2827.0028.001.00108.50260.001.30
2928.0029.001.00102.00260.001.33
3029.0030.001.00133.50290.001.46
3130.0031.001.00132.50280.001.40
3231.0032.001.00116.50250.001.26
3332.0033.001.00119.00250.001.32
3433.0034.001.00120.50250.001.31
3534.0035.001.00138.00280.001.49
3635.0036.001.00143.50260.001.40
3736.0037.001.00155.00260.001.44
3837.0038.001.00150.50270.001.50
3938.0039.001.00141.50270.001.59
4039.0040.001.00132.00270.001.58
4140.0041.001.00138.50260.001.53
4241.0042.001.00137.50260.001.58
4342.0043.001.00139.50260.001.55
4443.0044.001.00127.50230.001.46
4544.0045.001.00131.50250.001.55
4645.0046.001.00135.00230.001.37
4746.0047.001.00161.00230.001.39
4847.0048.001.00174.00230.001.48
4948.0049.001.00181.00210.001.36
5049.0050.001.00146.00190.001.23
5150.0051.001.00194.50230.001.43
5251.0052.001.00220.00250.001.56
5352.0053.001.00183.50210.001.50
5453.0054.001.00177.50210.001.53
5554.0055.001.00169.50220.001.54
5655.0056.001.00174.50220.001.55
5756.0057.001.00174.00220.001.50
5857.0058.001.00198.00210.001.34
5958.0059.001.00210.00210.001.37
6059.0060.001.00231.00200.001.33
6160.0061.001.00232.00190.001.32
6261.0062.001.00173.00160.001.12
6362.0063.001.00173.00160.001.15
6463.0064.001.00161.00160.001.17
6564.0065.001.00149.50160.001.19
6665.0066.001.00173.00160.001.26
6766.0067.001.00166.00170.001.24
6867.0068.001.00200.00190.001.37
6968.0069.001.00167.00170.001.22
7069.0070.001.00146.50150.001.08
7170.0071.001.00149.00160.001.11
7271.0072.001.00147.50170.001.15
7372.0073.001.00132.00160.001.16
7473.0074.001.00116.50160.001.22
7574.0075.001.00133.50180.001.39
7675.0076.001.00112.00170.001.31
7776.0077.001.00126.50170.001.39
7877.0078.001.00147.50180.001.41
7978.0079.001.00118.50170.001.32
8079.0080.001.00127.50170.001.25
8180.0081.001.00112.00130.001.04
8281.0082.001.0098.80130.000.96
8382.0083.001.00112.50160.001.13
8483.0084.001.00113.50200.001.20
AVERAGE136.3143224.88091.3225

 

SALDIVAR LITHIUM PROJECT, MEXICO
COORDINATES: 788,500E, 2,586,300N, ELEV. 1,925m
HOLE AG-Li-07

No.INTERVAL SAMPLEDLiBK
FROMTOWIDTHppmppm%
10.001.001.00125.00160.001.17
21.002.001.0099.10190.001.19
32.003.001.00102.00210.001.18
43.004.001.00107.00250.001.32
54.005.001.00107.00270.001.29
65.006.001.0098.80210.001.19
76.007.001.0098.80260.001.13
87.008.001.00103.50290.001.23
98.009.001.00108.00280.001.21
109.0010.001.00102.50260.001.16
1110.0011.001.0094.10240.001.09
1211.0012.001.0090.10240.001.08
1312.0013.001.0090.40240.001.06
1413.0014.001.0090.40250.001.11
1514.0015.001.0094.20250.001.18
1615.0016.001.00102.50260.001.28
1716.0017.001.00105.50280.001.38
1817.0018.001.00117.50300.001.50
1918.0019.001.00114.50290.001.53
2019.0020.001.00107.50260.001.27
2120.0021.001.00102.50240.001.22
2221.0022.001.00100.00230.001.19
2322.0023.001.00115.50250.001.32
2423.0024.001.00120.00240.001.20
2524.0025.001.00114.50230.001.16
2625.0026.001.00119.00240.001.26
2726.0027.001.00113.50230.001.24
2827.0028.001.00117.00230.001.30
2928.0029.001.00145.00260.001.40
3029.0030.001.00148.50250.001.36
3130.0031.001.00150.50250.001.43
3231.0032.001.00141.50250.001.51
3332.0033.001.00138.50250.001.50
3433.0034.001.00136.00240.001.44
3534.0035.001.00142.00240.001.46
3635.0036.001.00140.50230.001.42
3736.0037.001.00143.50230.001.48
3837.0038.001.00128.50210.001.38
3938.0039.001.00155.00230.001.50
4039.0040.001.00148.00230.001.51
4140.0041.001.00185.00240.001.65
4241.0042.001.00182.50210.001.47
4342.0043.001.00174.50190.001.34
4443.0044.001.00217.00230.001.55
4544.0045.001.00214.00220.001.56
4645.0046.001.00197.50190.001.56
4746.0047.001.00187.50210.001.61
4847.0048.001.00180.50210.001.58
4948.0049.001.00184.00210.001.59
5049.0050.001.00191.00210.001.45
5150.0051.001.00186.00200.001.31
5251.0052.001.00186.50190.001.27
5352.0053.001.00209.00200.001.29
5453.0054.001.00229.00180.001.28
5554.0055.001.00198.00170.001.17
5655.0056.001.00177.00160.001.08
5756.0057.001.00175.50170.001.19
5857.0058.001.00168.00170.001.16
5958.0059.001.00176.00160.001.20
6059.0060.001.00211.00190.001.30
6160.0061.001.00195.00190.001.30
6261.0062.001.00173.50170.001.16
6362.0063.001.00164.50170.001.14
6463.0064.001.00166.00180.001.17
6564.0065.001.00159.50170.001.20
6665.0066.001.00143.50170.001.20
6766.0067.001.00137.50170.001.28
6867.0068.001.00143.00200.001.43
6968.0069.001.00113.50170.001.28
7069.0070.001.00136.50180.001.38
7170.0071.001.00164.50190.001.44
7271.0072.001.00125.00180.001.29
7372.0073.001.00131.00180.001.34
7473.0074.001.00125.50160.001.16
7574.0075.001.00144.50150.001.16
7675.0076.001.00105.5090.000.69
7776.0077.001.0074.7050.000.39
AVERAGE141.70213.381.29

 

SALDIVAR LITHIUM PROJECT, MEXICO
COORDINATES: 788,500E, 2,586,300N, ELEV. 1,925m
HOLE AG-Li-08

INTERVAL SAMPLEDLiBK
FROMTOWIDTHppmppm%
10.001.001.00138.00220.001.22
21.002.001.00117.00270.001.28
32.003.001.00104.00280.001.15
43.004.001.00115.00330.001.32
54.005.001.0098.30300.001.20
65.006.001.0091.90280.001.10
76.007.001.00100.00300.001.17
87.008.001.00113.00260.001.11
98.009.001.0099.70260.001.14
109.0010.001.0093.90240.001.07
1110.0011.001.0096.90240.001.10
1211.0012.001.0098.90250.001.12
1312.0013.001.0086.30230.001.06
1413.0014.001.0096.70250.001.23
1514.0015.001.00103.50260.001.26
1615.0016.001.00104.00270.001.34
1716.0017.001.00105.00260.001.30
1817.0018.001.0095.40230.001.13
1918.0019.001.0087.30220.001.07
2019.0020.001.0091.60210.001.08
2120.0021.001.00112.00240.001.20
2221.0022.001.00109.00230.001.15
2322.0023.001.00103.00220.001.08
2423.0024.001.0094.00220.001.11
2524.0025.001.0094.10210.001.06
2625.0026.001.00109.50220.001.20
2726.0027.001.00130.50250.001.27
2827.0028.001.00135.00230.001.25
2928.0029.001.00130.50240.001.33
3029.0030.001.00127.00240.001.36
3130.0031.001.00114.00230.001.33
3231.0032.001.00124.50230.001.31
3332.0033.001.00124.50220.001.32
3433.0034.001.00127.00230.001.32
3534.0035.001.00123.00210.001.24
3635.0036.001.00117.50210.001.28
3736.0037.001.00127.00210.001.30
3837.0038.001.00144.00230.001.40
3938.0039.001.00157.50220.001.38
4039.0040.001.00193.00230.001.43
4140.0041.001.00179.00210.001.34
4241.0042.001.00214.00230.001.49
4342.0043.001.00180.00190.001.37
4443.0044.001.00200.00200.001.48
4544.0045.001.00163.00190.001.40
4645.0046.001.00162.00200.001.43
4746.0047.001.00158.00200.001.37
4847.0048.001.00173.00190.001.24
4948.0049.001.00174.50200.001.26
5049.0050.001.00190.00180.001.24
5150.0051.001.00211.00190.001.22
5251.0052.001.00210.00170.001.22
5352.0053.001.00167.00140.001.07
AVERAGE130.46229.621.24

 

SALDIVAR LITHIUM PROJECT, MEXICO
COORDINATES: 788,500E, 2,586,300N, ELEV. 1,925m
HOLE AG-Li-09

No.INTERVAL SAMPLEDLiBK
FROMTOWIDTHppmppm%
10.001.001.00135.50250.001.23
21.002.001.00119.50280.001.22
32.003.001.00116.50320.001.21
43.004.001.00127.50350.001.37
54.005.001.00121.00250.001.10
65.006.001.00102.50270.001.13
76.007.001.00105.50280.001.17
87.008.001.00107.00260.001.23
98.009.001.0095.80220.001.12
109.0010.001.0099.80230.001.13
1110.0011.001.00100.50230.001.21
1211.0012.001.0097.70220.001.20
1312.0013.001.0094.80220.001.22
1413.0014.001.00109.00250.001.42
1514.0015.001.00105.00250.001.44
1615.0016.001.00107.50240.001.44
1716.0017.001.0095.90220.001.24
1817.0018.001.0097.40210.001.24
1918.0019.001.0099.40220.001.28
2019.0020.001.00121.50240.001.42
2120.0021.001.00105.00210.001.24
2221.0022.001.00115.00220.001.26
2322.0023.001.00104.00210.001.23
2423.0024.001.00104.00210.001.26
2524.0025.001.00113.50210.001.27
2625.0026.001.00127.00230.001.39
2726.0027.001.00126.00230.001.35
2827.0028.001.00138.00230.001.43
2928.0029.001.00136.50230.001.49
3029.0030.001.00136.00230.001.53
3130.0031.001.00138.00220.001.47
3231.0032.001.00131.00210.001.41
3332.0033.001.00140.50220.001.50
3433.0034.001.00132.50210.001.45
3534.0035.001.00142.50210.001.46
3635.0036.001.00151.50200.001.40
3736.0037.001.00186.50220.001.54
3837.0038.001.00163.00200.001.46
3938.0039.001.00161.50190.001.36
4039.0040.001.00173.50200.001.41
4140.0041.001.00211.00220.001.57
4241.0042.001.00199.50200.001.71
4342.0043.001.00179.00200.001.67
4443.0044.001.00171.00210.001.64
4544.0045.001.00174.50210.001.62
4645.0046.001.00188.00200.001.50
4746.0047.001.00196.50200.001.44
4847.0048.001.00198.00190.001.46
4948.0049.001.00220.00200.001.49
5049.0050.001.00231.00190.001.44
AVERAGE137.07226.401.37

 

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5492/86910_bb6ac9add4a00b87_001.jpg
VERTICAL GRADE DISTRIBUTION: HOLE DDH-06, SALDIVAR PROJECT

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5492/86910_bb6ac9add4a00b87_001full.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5492/86910_bb6ac9add4a00b87_002.jpg
VERTICAL GRADE DISTRIBUTION: HOLE AG-LI-7, SALDIVAR PROJECT

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5492/86910_bb6ac9add4a00b87_002full.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5492/86910_bb6ac9add4a00b87_003.jpg
VERTICAL GRADE DISTRIBUTION: HOLE AG-LI-8, SALDIVAR PROJECT

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5492/86910_bb6ac9add4a00b87_003full.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5492/86910_bb6ac9add4a00b87_004.jpg
VERTICAL GRADE DISTRIBUTION: HOLE AG-LI-9, SALDIVAR PROJECT

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5492/86910_bb6ac9add4a00b87_004full.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5492/86910_bb6ac9add4a00b87_005.jpg
Diamond and Auger drill hole locations

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5492/86910_bb6ac9add4a00b87_005full.jpg

Drill core is logged and sampled in a secure core storage facility located near the Saldivar salar. Core samples were delivered to ALS Global in Zacatecas, Mexico, for sample preparation, then concentrates sent to ALS Global in Vancouver, Canada for assaying. Standard rock preparation was done and then aqua regia digestion with multi-element ICP-MS41. The Company relies on ALS Global for QA/QC procedures.

Julio Pinto Linares is a qualified person, doctor in geological sciences with specialty in economic geology and qualified professional No. 01365 by MMSA for Advance Gold and is the qualified person as defined by National Instrument 43-101 responsible for the accuracy of technical information contained in this news release.

About Advance Gold Corp.

Advance Gold is a junior exploration company focused on acquiring and exploring mineral properties containing precious metals, battery metals and fertilizer minerals. The company acquired a 100-per-cent interest in the Tabasquena silver mine in Zacatecas, Mexico, in 2017, and the Venaditas project, also in Zacatecas state, in April, 2018. In addition, Advance Gold holds an 11.45% interest in strategic claims in the Liranda Corridor in Kenya, East Africa. The remaining 88.55% of the Kakamega project is held by Shanta Gold Limited (project previously owned by Barrick Gold Corporation, for details see Advance Gold News Release dated 2020-08-26). In March 2020, the Company moved into the lithium space with a purchase agreement to acquire 13 lithium-potassium boron prospective salars in central Mexico, which also includes a test plant and exclusive rights to a patented proprietary lithium extraction method.

For further information, please contact:

Allan Barry Laboucan,
President and CEO
Mexico Cellular Phone: 492-238-5282
Email: allan@advancegold.ca

This news release contains certain statements that may be deemed "forward-looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. The Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors should change, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/86910

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.