About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Colibri Option Partner Announces Additional Phase III Drilling Results at Pilar Gold & Silver Project in Sonora

By: Newsfile

Dieppe, New Brunswick--(Newsfile Corp. - August 30, 2022) - Colibri Resource Corporation (TSXV: CBI) ("Colibri" or the "Company") is pleased to report that today its option partner Tocvan Ventures (CSE: TOC) has announced further drilling results from the Company's Pilar Gold & Silver Project in Sonora, Mexico.

Tocvan is in year 3 of a 5-year agreement to earn an initial 51% of Colibri's Pilar Gold & Silver Project. For full details of Colibri's agreement with Tocvan please see the Company's news release dated September 24th, 2019.

Tocvan Reports: (August 30th, 2022)

Seven drill holes were completed, totalling 1,382-meters. Results for the final four drill holes are highlighted in this release. All four drill holes were drilled in new areas and intersected alteration and structures known to host gold-silver mineralization at Pilar. Hole JES-22-72, 125-meters southeast of drill hole JES-22-63 (13.7m of 0.6 g/t Au and 13 g/t Ag and 9.2m of 0.6 g/t Au) returned 22.9-meters of 0.3 g/t Au and 19 g/t Ag, including 7.6-meters of 0.8 g/t Au and 51 g/t Ag (Figure 1) Three drill holes intersected low-grade gold and silver values indicating close proximity to significant mineralization. Hole JES-22-70 returned 12.2-meters of 0.3 g/t Au, including 3.1-meters of 0.8 g/t Au and 3.1-meters of 0.5 g/t Au. Hole JES-22-69 intersected 1.5-meters of 0.7 g/t Au at the end of hole, leaving it open at depth for targeting. The Company is extremely encouraged by these reconaissaince results and planning is underway for the next stage of drilling at Pilar.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4269/135363_9c03c0c8a490082e_001.jpg

Figure 1. Plan Map highlighting the results from the latest stage of drilling at Pilar.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4269/135363_9c03c0c8a490082e_001full.jpg

Drill Highlights

JES-22-72

  • 22.9m of 0.3 g/t Au and 19 g/t Ag (0.5 g/t AuEq*), from 27.5m
    • Incl., 10.7m of 0.6 g/t Au and 40 g/t Ag (1.0 g/t AuEq)
    • Incl., 7.6m of 0.8 g/t Au and 51 g/t Ag (1.3 g/t AuEq)
    • Incl., 3.1m of 1.6 g/t Au and 109 g/t Ag (2.8 g/t AuEq)

*Note: AuEq calculated based on metal price assumptions of $1,700/oz gold and $18.00/oz silver

JES-22-70

  • 12.2m of 0.3 g/t Au, from surface
    • Incl., 3.1m of 0.8 g/t Au and 5 g/t Ag
    • And 3.1m of 0.5 g/t Au

JES-22-69

  • 1.5m of 0.7 g/t Au at end of hole, open at depth

"With each progressive stage of reconnaissance drilling along previously untested trends we are uncovering excellent indications that mineralization continues to the southeast and in parallel trends to our Main Zone," commented CEO, Brodie Sutherland. "All seven drill holes intersected alteration, quartz-veining and fault structures know to host significant mineralization at Pilar. All three trends tested during this stage of drilling have shown indications of continued mineralization and warrant follow-up drilling as we believe a much larger system is yet to be defined at Pilar."

Discussion of Results

As part of the ongoing Phase III drill program, a total of seven reverse circulation ("RC") drill holes have been completed, totalling 1,382-meters. Drilling focused on the 4-T Expansion and Extension targets and a new trend discovered during the last stage of drilling (Figure 1 and Table 1).

JES-22-69

This drill hole was targeting the 4-T Extension, where surface sampling of artisanal workings returned 6.6 g/t Au and 433 g/t Ag. Four quartz-sericite veins with pyrite were intersected at 10.7 to 30.5-meters, 82.4 to 86.9-meters, 157.1 to 158.6-meters and 173.9 to 176.9-meters. Low-grade gold mineralization was intersected from surface to 16.8-meters depth. A 1.5-meter interval of 0.7 g/t Au was recorded at the end of the hole with coincident elevated arsenic values (>1500 ppm) which suggest mineralization is open at depth. Follow-up targeting up and down-dip of this drill hole is warranted to test continuation of mineralization.

JES-22-70

This drill hole was targeting the 4-T Trend, 80-meters southeast of where a recent surface trench (T-21-2) returned 19.5-meters of 0.6 g/t Au. Three quartz-sericite veins with pyrite were intersected at 58.0 to 63.0-meters, 132.7 to 143.8-meters, and 163.2 to 164.7-meters. From surface, JES-22-70 returned 12.2-meters of 0.3 g/t Au including, 3.1-meters of 0.8 g/t Au and 3.1-meters of 0.5 g/t Au. Low-grade gold and zinc were recorded further down hole from 77.8-meters (3.1-meters of 0.4 g/t Au and 1.82% Zn). The 4-T Trend remains larger untested down-dip at depth, the indications of mineralization and structure recorded warrant further follow-up of the trend for broad, higher-grade intervals.

JES-22-71

This drill hole was targeting the Discovery Trend, 115-meters southeast of JES-22-72 (see below). Quartz-sericite veins with pyrite were intersected from surface to 36.0-meters, 90.0 to 95.0-meters, 108.7 to 112.9-meters and 154.0 to 158.6-meters. Low-grade silver and zinc were recoded from surface to 6.1-meters (6 g/t Ag and 0.1% Zn). Although no significant mineralization was recorded the structure and alteration intersected indicate potential for significant mineralization continues along this trend.

JES-22-72

This drill hole was targeting the newly identified Discovery Trend, 125-meters southeast of drill hole JES-22-63 which returned, 54.9-meters of 0.3 g/t Au and 5 g/t Ag including, 13.7-meters of 0.6 g/t Au and 13 g/t Ag and 9.2-meters of 0.6 g/t Au). Drill hole JES-22-72 returned 22.9-meters of 0.3 g/t Au and 19 g/t Ag or 0.5 g/t AuEq including, 7.6-meters of 0.8 g/t Au and 51 g/t Ag or 1.3 g/t AuEq. Zinc values are elevated across the upper half of the drill hole with high concentrations (1.97% Zn over 7.6-meters) associated with high Au-Ag values. Quartz-sericite veins with pyrite were intersected at 9.2 to 15.0-meters, 91.5 to 100.7-meters and 120.5 to 129.7-meters. The highest-grade mineralization is hosted with in a silicified andesite with quartz veinlets and moderate iron-oxide alteration. Both JES-22-63 and JES-22-72 remain untested down-dip, mineralization and structure seen in JES-22-71 indicates the system has room to expand further to the southeast. The discovery trend remains open to the northwest.

Table 1. Summary of Results from latest Stage of Drilling at Pilar.

Hole IDFrom (m)To (m)Width (m)*Au (g/t)Ag (g/t)
JES-22-6630.5047.2816.780.1117.6
including30.5036.606.100.2547.4
including35.0836.601.530.55185.0
JES-22-670.00138.78138.780.100.3
including0.0030.5030.500.410.3
including0.001.531.537.610.8
JES-22-68No Significant Values
JES-22-690.0016.7816.780.151.1
including0.007.637.630.191.0
and82.3586.934.580.126.8
and128.10134.206.100.135.8
including128.10129.631.530.3317.2
and187.58189.101.530.702.2
JES-22-700.0018.3018.300.241.4
including0.0012.2012.200.341.8
including0.003.053.050.784.5
and9.1512.203.050.491.8
and77.7885.407.630.180.9
including77.7880.833.050.391.9
and109.80111.331.530.290.3
JES-22-710.006.106.100.076.2
JES-22-720.0050.3350.330.149.6
including0.0038.1338.130.1712.3
or25.9350.3324.400.2718.1
including27.4538.1310.680.5940.4
including30.5038.137.630.7851.0
including35.0838.133.051.64109.0
including36.6038.131.532.39165.0
and106.75128.1021.350.130.9
including106.75109.803.050.490.3
and152.50154.031.530.3816.5

 

Table 2. Collar Data for Latest stage of Drilling at Pilar.

Hole_IDEastingNorthingElevation (m)DepthAzimuthDip
JES-22-666178733144802409180.0230-50
JES-22-676179763144759420213.5230-55
JES-22-686181043144528460213.5225-55
JES-22-696180443144610448189.1225-55
JES-22-706178333144623437201.3230-55
JES-22-716178403144377445207.4230-55
JES-22-726177833144472447176.9230-50

 

About the Pilar Property

The Pilar Gold-Silver property is interpreted as a structurally controlled low-sulphidation epithermal system hosted in andesite rocks. Three zones of mineralization have been identified in the north-west part of the property from historic surface work and drilling and are referred to as the Main Zone, North Hill and 4-T. Structural features and zones of mineralization within the structures follow an overall NW-SE trend of mineralization. Over 22,000 m of drilling has been completed to date. Significant results are highlighted below:

  • 2022 Phase III Diamond Drilling Highlights include (all lengths are drilled thicknesses):
    • 116.9m @ 1.2 g/t Au, including 10.2m @ 12 g/t Au and 23 g/t Ag
    • 108.9m @ 0.8 g/t Au, including 9.4m @ 7.6 g/t Au and 5 g/t Ag
    • 63.4m @ 0.6 g/t Au and 11 g/t Ag, including 29.9m @ 0.9 g/t Au and 18 g/t Ag
  • 2021 Phase II RC Drilling Highlights include (all lengths are drilled thicknesses):
    • 39.7m @ 1.0 g/t Au, including 1.5m @ 14.6 g/t Au
    • 47.7m @ 0.7 g/t Au including 3m @ 5.6 g/t Au and 22 g/t Ag
    • 29m @ 0.7 g/t Au
    • 35.1m @ 0.7 g/t Au
  • 2020 Phase I RC Drilling Highlights include (all lengths are drilled thicknesses):
    • 94.6m @ 1.6 g/t Au, including 9.2m @ 10.8 g/t Au and 38 g/t Ag;
    • 41.2m @ 1.1 g/t Au, including 3.1m @ 6.0 g/t Au and 12 g/t Ag ;
    • 24.4m @ 2.5 g/t Au and 73 g/t Ag, including 1.5m @ 33.4 g/t Au and 1,090 g/t Ag
  • 15,000 of Historic Core & RC drilling. Highlights include:
    • 61.0m @ 0.8 g/t Au
    • 16.5m @ 53.5 g/t Au and 53 g/t Ag
    • 13.0m @ 9.6 g/t Au
    • 9.0m @ 10.2 g/t Au and 46 g/t Ag

Quality Assurance / Quality Control

RC chips and core samples were shipped for sample preparation to ALS Limited in Hermosillo, Sonora, Mexico and for analysis at the ALS laboratory in North Vancouver. The ALS Hermosillo and North Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Gold was analyzed using 50-gram nominal weight fire assay with atomic absorption spectroscopy finish. Over limits for gold (>10 g/t), were analyzed using fire assay with a gravimetric finish. Silver and other elements were analyzed using a four-acid digestion with an ICP finish. Over limit analyses for silver (>100 g/t) were re-assayed using an ore-grade four-acid digestion with ICP-AES finish. Control samples comprising certified reference samples and blank samples were systematically inserted into the sample stream and analyzed as part of the Company's robust quality assurance / quality control protocol.

Brodie A. Sutherland, P.Geo., CEO for Tocvan Ventures Corp. and a qualified person ("QP") as defined by Canadian National Instrument 43-101, has reviewed and approved the technical information contained in this release."

ABOUT COLIBRI RESOURCE CORPORATION:

Colibri is a Canadian-based mineral exploration company listed on the TSX-V (CBI) and is focused on acquiring and exploring prospective gold & silver properties in Mexico. The Company has six exploration projects of which five currently have exploration programs being executed in 2022. (1) The flagship Evelyn Gold Project is 100% owned and explored by Colibri, (2) the Pilar Gold & Silver Project (optioned to Tocvan Ventures - (CSE: TOC), (3) the El Mezquite Gold & Silver Project , (4) the Jackie Gold & Silver Project, and (5) the Diamante Gold & Silver Project. 3,4, and 5 are subject to earn-in agreements by Silver Spruce Resources) - (TSXV: SSE).

For more information about all Company projects please visit: www.colibriresource.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Notice Regarding Forward-Looking Statements:

This news release contains "forward-looking statements". Statements in this press release which are not purely historical are forward-looking statements and include any statements regarding beliefs, plans, expectations or intentions regarding the future. Actual results could differ from those projected in any forward-looking statements due to numerous factors. These forward-looking statements are made as of the date of this news release, and the Company assumes no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those projected in the forward-looking statements. Although the Company believes that the plans, expectations and intentions contained in this press release are reasonable, there can be no assurance that they will prove to be accurate.

For information contact: Ronald J. Goguen, President, Chairperson and Director, Tel: (506) 383-4274, rongoguen@colibriresource.com

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/135363

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.