About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

US EV Battery Supply Chain: Talon Metals Hits 29.39 Meters Grading 2.21% Nickel Equivalent at the Tamarack Nickel Project

By: Newsfile

Talon Announces Assay Results from 13 New Drill Holes

Tamarack, Minnesota--(Newsfile Corp. - September 8, 2022) - Talon Metals Corp. (TSX: TLO) (OTC Pink: TLOFF) ("Talon" or the "Company") is pleased to provide an update on the Tamarack Nickel-Copper-Cobalt Project ("Tamarack Nickel Project"), located in central Minnesota.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2443/136305_80ad5192a4e1abe6_001.jpg

Figure 1: 4.89 meters grading 5.30% Ni and 2.27% Cu (6.51% NiEq or 17.37% CuEq) at 204.77 meters in drill hole 21TK0369

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/2443/136305_80ad5192a4e1abe6_001full.jpg

Today, Talon reports assays from fourteen (14) new drill holes in the CGO West area, located outside of the Tamarack Nickel Project's main resource area.

Notable assay results include the following:

Drill hole
#
From
(m)
To
(m)
Length Ni
(%)
Cu
(%)
Co
(%)
Pd
(g/t)
Pt
(g/t)
Au
(g/t)
NiEq
(%)
CuEq
(%)
21TK0368178.71193.1514.441.740.830.050.120.190.112.215.90
including188.73193.154.423.681.690.110.200.260.134.6012.26
21TK0369180.27209.6629.391.710.980.050.100.140.102.215.90
including204.77209.664.895.302.270.150.220.270.196.5117.37
22TK0383142.35150.828.471.350.850.030.200.300.161.854.93
22TK0396204.53213.368.833.661.160.100.250.330.114.3811.68
including209.16213.364.206.701.970.190.490.620.197.9621.24

 

Table 1: Notable Assay Results from New Drill Holes at the Tamarack Nickel Project
*See Table 3 for further technical information

"Today's announcement demonstrates that we continue to find more thick, high-grade nickel-copper mineralization in the CGO West area, which is located outside of the Tamarack Nickel Project's defined resource area. More specifically, drill hole 21TK0369 contains an extremely thick 29.39 meter interval grading 1.71% Ni (2.21% NiEq). This represents one of the thickest intercepts encountered in the CGO West area to date. The fact that this hole is located on the western edge of the CGO West area highlights that CGO West continues to be open to the west. While we had intended to be finished drilling in the CGO West area by now, the high-grade nickel-copper mineralization just seems to keep going; therefore, we feel it is prudent to continue drilling within the CGO West area to further expand our resource," said Brian Goldner, Talon Metals, Chief Exploration Officer.

Henri van Rooyen, CEO of Talon said: "While drilling continues in both the CGO West and Main Zone (the Tamarack Nickel Project's defined resource area) to further expand the Company's resource, our ongoing work towards a feasibility study continues, with the goal of first production in 2026."

Mr. van Rooyen continued: "In addition, we recently deployed two additional drill rigs into the 264 Zone (3 km north of the Company's resource area) and into the 221 Zone (1 km north of the Company's Resource area) to follow-up on various geophysical anomalies to identify potential satellite high-grade nickel-copper deposits. We will provide updates once we have results from these exciting new targets."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2443/136305_80ad5192a4e1abe6_002.jpg

Figure 2. Plan view geological map of the northern portion of the Tamarack Nickel Project (CGO West area) showing the new drill holes (assays) in red

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/2443/136305_80ad5192a4e1abe6_002full.jpg

Table 2: Collar Locations of New Drill Holes Referred to in this Press Release

Drill Hole
#
Easting
(m)
Northing
(m)
Elevation
(masl)
AzimuthDipEnd Depth
(m)
21TK0298491113.15169255.0388.5241.9-72.4203.3
21TK0314491068.65169035.7388.411.8-55.5236.4
21TK0321491077.75169040.0388.521.7-55.1224.9
21TK0338491143.65169174.8388.0241.4-75.8209.7
21TK0347491143.25169173.6388.0125.2-85.0212.8
21TK0368491066.35169120.8388.0135.1-80.1285.9
21TK0374491021.75169140.4388.0293.4-75.6228.0
22TK0383491153.95169303.9388.0260.1-73.0173.1
22TK0384491108.25169253.7388.6320.0-79.0188.4
22TK0386491153.95169304.6388.0123.0-76.0171.0
22TK0388491023.65169140.9388.630.0-71.0216.4
22TK0392491148.75169168.0388.6288.0-70.0178.9
22TK0396491114.75169075.6388.7336.9-81.9246.3

 

Collar coordinates are UTM Zone 15N, NAD83
Azimuths and dips are taken from survey record at collar unless otherwise noted

Table 3: Assay Results of New Drill Holes Referred to in this Press Release

Drill hole
#
From
(m)
To
(m)
Length Ni
(%)
Cu
(%)
Co
(%)
Pd
(g/t)
Pt
(g/t)
Au
(g/t)
NiEq
(%)
CuEq
(%)
21TK0298138.80150.4311.630.740.430.030.030.040.030.962.57
and157.50166.509.000.750.540.020.110.190.101.062.83
21TK0314197.79198.901.111.070.650.040.090.120.111.433.82
21TK0321204.00207.773.771.111.790.076.240.133.471.589.27
21TK0338173.80174.760.962.800.780.070.260.460.183.399.03
21TK0347152.00157.005.000.690.440.020.110.190.120.972.59
and174.31176.572.261.450.320.040.090.120.041.694.51
21TK0368178.71193.1514.441.740.830.050.120.190.112.215.90
including188.73193.154.423.681.690.110.200.260.134.6012.26
21TK0369180.27209.6629.391.710.980.050.100.140.102.215.90
including204.77209.664.895.302.270.150.220.270.196.5117.37
21TK0374175.25188.7513.500.640.420.020.040.060.060.862.29
22TK0383142.35150.828.471.350.850.030.200.300.161.854.93
22TK0384121.06132.5011.440.960.880.030.040.050.041.373.64
and136.09165.3429.250.810.650.020.140.240.131.203.19
22TK0386121.31128.777.461.030.460.030.120.210.061.333.54
and137.56138.060.501.761.170.060.420.380.262.486.63
and141.75143.091.343.331.720.100.280.370.104.2711.39
22TK0388158.50167.509.000.510.320.020.040.050.040.691.83
and179.93190.7710.841.490.720.040.130.210.141.935.13
including187.79190.772.983.711.340.110.200.310.204.5212.05
22TK0392149.00165.5916.590.670.440.020.050.070.060.902.40
and170.41171.601.195.542.260.170.440.340.296.8518.26
22TK0396158.94169.5010.560.570.320.020.280.530.180.922.44
and204.53213.368.833.661.160.100.250.330.114.3811.68
including209.16213.364.206.701.970.190.490.620.197.9621.24

 

Length refers to drill hole length and not True Width.
True Width is unknown at the time of publication.

All samples were analysed by ALS Minerals. Nickel, copper, and cobalt grades were first analysed by a 4-acid digestion and ICP AES (ME-MS61). Grades reporting greater than 0.25% Ni and/or 0.1% Cu, using ME-MS61, trigger a sodium peroxide fusion with ICP-AES finish (ICP81). Platinum, palladium and gold are initially analyzed by a 50g fire assay with an ICP-MS finish (PGM-MS24). Any samples reporting >1g/t Pt or Pd trigger an over-limit analysis by ICP-AES finish (PGM-ICP27) and any samples reporting >1g/t Au trigger an over-limit analysis by AAS (Au-AA26).

NiEq% = Ni%+ Cu% x $3.00/$8.00 + Co% x $12.00/$8.00 + Pt [g/t]/31.103 x $1,300/$8.00/22.04 + Pd [g/t]/31.103 x $700/$8.00/22.04 + Au [g/t]/31.103 x $1,200/$8.00/22.04

CuEq% = Cu%+ Ni% x $8.00/$3.00 + Co% x $12.00/$3.00 + Pt [g/t]/31.103 x $1,300/$3.00/22.04 + Pd [g/t]/31.103 x $700/$3.00/22.04 + Au [g/t]/31.103 x $1,200/$3.00/22.04

No adjustments were made for recovery or payability.

QUALITY ASSURANCE, QUALITY CONTROL AND QUALIFIED PERSONS

Please see the technical report entitled "NI 43-101 Technical Report Updated Preliminary Economic Assessment (PEA) #3 of the Tamarack North Project - Tamarack, Minnesota" with an effective date of January 8, 2021 prepared by independent "Qualified Persons" (as that term is defined in National Instrument 43-101 ("NI 43-101") Leslie Correia (Pr. Eng), Andre-Francois Gravel (P. Eng.), Tim Fletcher (P. Eng.), Daniel Gagnon (P. Eng.), David Ritchie (P. Eng.), Oliver Peters (P. Eng.), Volodymyr Liskovych (P.Eng.), Andrea Martin (P. E.) and Brian Thomas (P. Geo.) for information on the QA/QC, analytical and testing procedures at the Tamarack Project. Copies are available on the Company's website (www.talonmetals.com) or on SEDAR at (www.sedar.com). The laboratory used is ALS Minerals who is independent of the Company.

Lengths are drill intersections and not necessarily true widths. True widths cannot be consistently calculated for comparison purposes between holes because of the irregular shapes of the mineralized zones. Drill intersections have been independently selected by Talon. Drill composites have been independently calculated by Talon. The geological interpretations in this news release are solely those of the Company. The locations and distances highlighted on all maps in this news release are approximate.

Dr. Etienne Dinel, Vice President, Geology of Talon, is a Qualified Person within the meaning of NI 43-101. Dr. Dinel is satisfied that the analytical and testing procedures used are standard industry operating procedures and methodologies, and he has reviewed, approved and verified the technical information disclosed in this news release, including sampling, analytical and test data underlying the technical information.

Where used in this news release:

NiEq% = Ni%+ Cu% x $3.00/$8.00 + Co% x $12.00/$8.00 + Pt [g/t]/31.103 x $1,300/$8.00/22.04 + Pd [g/t]/31.103 x $700/$8.00/22.04 + Au [g/t]/31.103 x $1,200/$8.00/22.04

CuEq% = Cu%+ Ni% x $8.00/$3.00 + Co% x $12.00/$3.00 + Pt [g/t]/31.103 x $1,300/$3.00/22.04 + Pd [g/t]/31.103 x $700/$3.00/22.04 + Au [g/t]/31.103 x $1,200/$3.00/22.04

ABOUT TALON

Talon is a TSX-listed base metals company in a joint venture with Rio Tinto on the high-grade Tamarack Nickel-Copper-Cobalt Project located in central Minnesota. Talon's shares are also traded in the US over the OTC market under the symbol TLOFF. The Tamarack Nickel Project comprises a large land position (18km of strike length) with high-grade intercepts outside the current resource area. Talon has an earn-in right to acquire up to 60% of the Tamarack Nickel Project, and currently owns 51%. Talon is focused on (i) expanding and infilling its current high-grade nickel mineralization resource prepared in accordance with NI 43-101 to shape a mine plan for submission to Minnesota regulators, (ii) following up on additional high-grade nickel mineralization in the Tamarack Intrusive Complex, and (iii) exploring the prospects for significant carbon storage in the ultra-mafic rocks that comprise the Tamarack Intrusive Complex through carbon mineralization. Talon has an agreement with Tesla Inc. to supply it with 75,000 metric tonnes (165 million lbs) of nickel in concentrate (and certain by-products, including cobalt and iron) from the Tamarack Nickel Project over an estimated six-year period once commercial production is achieved. Talon has well-qualified experienced exploration, mine development, external affairs and mine permitting teams.

For additional information on Talon, please visit the Company's website at www.talonmetals.com or contact:

Media Contact: Investor Contact:

Todd Malan
1 (202) 714-8187
malan@talonmetals.com

Sean Werger
1 (416) 361-9636 x102
werger@talonmetals.com

FORWARD-LOOKING STATEMENTS

This news release contains certain "forward-looking statements". All statements, other than statements of historical fact that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future are forward-looking statements. These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company. Such forward-looking statements include statements relating to the timing and results of the exploration program, including mineralization, assay results, grades, geophysical results and drilling plans; the timing and extent of an expansion of the resource at the Tamarack Nickel Project; the timing and results of a feasibility study; and the goal of first production in 2026. Forward-looking statements are subject to significant risks and uncertainties and other factors that could cause the actual results to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on the Company.

Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/136305

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.