About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Appia Announces Assay Results of the Alces Lake Western Anomalies Drilling Campaign

By: Newsfile

Toronto, Ontario--(Newsfile Corp. - April 4, 2023) - Appia Rare Earths & Uranium Corp. (CSE: API) (OTCQX: APAAF) (FSE: A0I0) (FSE: A0I0.F) (FSE: A0I0.MU) (FSE: A0I0.BE) (the "Company" or "Appia") is excited to announce the release of assay results from 2022 diamond drilling of various regional exploration targets at its 100%-owned Alces Lake Rare Earth Elements (REES) Property, Northern Saskatchewan.

Final assays for Appia's 2022 Alces Lake diamond drilling program have been received, compiled, and interpreted zone-by-zone, the third (and final) set of results is reported here. In 2022, The Company completed an extensive diamond drilling campaign of regional exploration targets. Targets were identified primarily through the interpretation of the company's 2021 Airborne Radiometric (U, Th, K) survey in conjunction with its 2021 and 2022 prospecting results. Table 1 below highlights the most significant geochemical assay results from the regional drilling program. Table 2 provides the collar information for all of the drill holes from the 2022 regional diamond drilling program. The complete assays results are available in Table 3 by clicking on this link.

The Magnet Ridge West Target (Figures 1 and 2), first identified and drilled in 2022, returned multiple intervals of a REE (monazite-bearing) mineralization over significant drill widths, including:

  • 15.78m @ 0.201 wt.% TREO from hole 22-MRW-005
  • 6.29m @ 0.253 wt.% TREO from hole 22-MRW-006
  • 10.12m @ 0.145 wt.% TREO from hole 22-MRW-009
  • Follow-up drilling is warranted

The West Limb area (Figures 1 and 3), where Appia recently reported a discovery of massive monazite at surface, returned 2.07m @ 0.447 wt.% TREO from hole 22-WEL-004. And from the large Western Anomaly area (Figures 1 and 4), DDH 22-WES-003 returned 8.31m @ 0.123 wt.% TREO.

"Combined with the recently released results from the WRCB's high-grade Wilson Zone (See March 2nd, 2023 News Release) and the extension of the Magnet Ridge Zone's thick sequences of REES near surface over significant strike length and drilled widths exceeding 28 metres (See March 20th, 2023 News Release), Appia's 2022 work season produced excellent results and further established Alces Lake as the Company's priority project," stated Stephen Burega, President."

He continued, "Follow-up geophysical and geochemical surveys are planned along and across the highest-priority areas of Alces Lake's major structural corridor that extends south-southeast from the main mineralized zones at WRCB to Magnet Ridge and continues for another 20 to 25 km. A highly focussed drilling campaign will test numerous targets to further delineating the continuity of mineralization controlled by this important structural corridor."

Vice President, Exploration Irvine Annesley says, "The scale and extent of regional REE anomalies on the Alces Lake project provides us with numerous targets to test (drill) outside of the WRCB and Magnet Ridge areas. This clearly shows us that the Alces Lake area has a lot more mineralization to discover/uncover from surface to depth. Volume and tonnage is the intended result".

Summary Table of Highlighted Drillhole Composites

Hole IDFrom (m)To (m)Wt.% TREODrilled length (m)ZONE
22-DAN-001126.00127.000.2261.00Danny
22-DAN-00265.9568.620.1362.67Danny
22-DAN-00211.0012.530.1381.53Danny
22-DAN-00232.1633.830.1081.67Danny
22-MRW-00166.8167.880.1261.07Magnet Ridge West
22-MRW-00338.7640.700.2041.94Magnet Ridge West
22-MRW-00467.0268.180.1181.16Magnet Ridge West
22-MRW-005157.07172.850.20115.78Magnet Ridge West
22-MRW-005183.60191.930.1028.33Magnet Ridge West
22-MRW-006168.50174.790.2536.29Magnet Ridge West
22-MRW-006150.81155.160.1144.35Magnet Ridge West
22-MRW-006162.00164.220.1072.22Magnet Ridge West
22-MRW-007167.43170.130.1092.70Magnet Ridge West
22-MRW-00882.9784.540.1881.57Magnet Ridge West
22-MRW-00863.7965.000.121.21Magnet Ridge West
22-MRW-009176.58186.700.14510.12Magnet Ridge West
22-MRW-010159.71161.960.122.25Magnet Ridge West
22-STR-00239.7242.650.1412.93Strocen
22-WEL-0046.728.790.4472.07West Limb
22-WES-001189.69192.470.1462.78Western Anomaly
22-WES-00285.1286.400.1191.28Western Anomaly
22-WES-00312.6120.920.1238.31Western Anomaly
22-WES-00324.9526.250.121.30Western Anomaly

 

Table 1. Highlighted assay composites from Alces Lake regional exploration targets. wt.% TREO = ([CeO2 ppm] + [Dy2O3 ppm] + [Pr6O11 ppm] + [La2O3 ppm] + [Nd2O3 ppm] + [Sm2O3 ppm] + [Eu2O3 ppm] + [Gd2O3 ppm] + [Tb4O7 ppm] + [Ho2O3 ppm] [Er2O3 ppm] + [Yb2O3 ppm] + [Lu2O3] ppm + [Y2O3 ppm] ) / 10000

Table 2 - Drill hole collar details for 2022 Regional drilling, including those of reported intercepts.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5416/161213_img_550.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5416/161213_img.jpg

Table 3 - Assay Results for 2022 Regional Diamond Drill Holes - see link at beginning of news release.


Cannot view this image? Visit: https://images.newsfilecorp.com/files/5416/161213_img1_550.jpg

Figure 1. Map of primary REE (monazite-bearing) exploration targets on Appia's Alces Lake property

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5416/161213_img1.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5416/161213_img2_550.jpg

Figure 2. Map of 2022 diamond drillholes at Appia's Magnet Ridge West exploration target, west-southwest of Magnet Ridge.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5416/161213_img2.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5416/161213_img3_550.jpg

Figure 3. Map of 2022 diamond drillholes at Appia's West Limb exploration target.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5416/161213_img3.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/5416/161213_img4_550.jpg

Figure 4. Map of 2022 diamond drill holes at Appia's Western Anomaly exploration target.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5416/161213_img4.jpg

About the Alces Lake Project

The Alces Lake project encompasses some of the highest-grade total and critical* REEs and gallium mineralization in the world, hosted within several surface and near-surface monazite occurrences that remain open at depth and along strike.

* Critical rare earth elements are defined here as those that are in short-supply and high-demand for use in permanent magnets and modern electronic applications such as electric vehicles and wind turbines (i.e: neodymium (Nd), praseodymium (Pr), dysprosium (Dy) and terbium (Tb)).

The Alces Lake project is located in northern Saskatchewan, the same provincial jurisdiction that is developing a "first-of-its-kind" rare earth processing facility in Canada (currently under construction by the Saskatchewan Research Council and scheduled to become fully operational in early 2024). The Alces Lake project area is 38,522.43 contiguous hectares (95,191.00 acres) in size and is 100% owned by Appia.

All lithogeochemical assay results of core samples were provided by Saskatchewan Research Council's Geoanalytical Laboratory, an ISO/IEC 17025:2005 (CAN-P-4E) certified laboratory in Saskatoon, SK. All analytical results reported herein have passed internal QA/QC review and compilation.

The technical content in this news release was reviewed and approved by Dr. Irvine R. Annesley, P.Geo, Vice President, Exploration, and a Qualified Person as defined by National Instrument 43-101.

About Appia Rare Earths and Uranium Corp (Appia)

Appia is a publicly traded Canadian company in the rare earth element and uranium sectors. The Company is currently focusing on delineating high-grade critical rare earth elements and gallium on the Alces Lake property, as well as exploring for high-grade uranium in the prolific Athabasca Basin on its Otherside, Loranger, North Wollaston, and Eastside properties. The Company holds the surface rights to exploration for 113,837.15 hectares (281,297.72 acres) in Saskatchewan. The Company also has a 100% interest in 12,545 hectares (31,000 acres), with rare earth element and uranium deposits over five mineralized zones in the Elliot Lake Camp, Ontario.

Appia has 130.5 million common shares outstanding, 153.8 million shares fully diluted.

Cautionary Note Regarding Forward-Looking Statements: This News Release contains forward-looking statements which are typically preceded by, followed by or including the words "believes", "expects", "anticipates", "estimates", "intends", "plans" or similar expressions. Forward-looking statements are not a guarantee of future performance as they involve risks, uncertainties and assumptions. We do not intend and do not assume any obligation to update these forward- looking statements and shareholders are cautioned not to put undue reliance on such statements.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.

For further information, please contact:

Tom Drivas, CEO and Director: (cell) 416-876-3957, (email) tdrivas@appiareu.com

Stephen Burega, President: (cell) 647-515-3734 or (email) sburega@appiareu.com

Irvine R. Annesley, Ph.D., P.Geo., Vice-President, Exploration: (tel.) (416) 546-2707 or (email) jnrirvine@appiareu.com

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/161213

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.