About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Kenorland Commences Exploration at the South Uchi Project, Ontario

By: Newsfile

Vancouver, British Columbia--(Newsfile Corp. - August 15, 2023) - Kenorland Minerals Ltd. (TSXV: KLD) (OTCQX: KLDCF) (FSE: 3WQ0) ("Kenorland" or the "Company") is pleased to announce that it has commenced a large-scale surface exploration program at its 100% owned South Uchi Project (the "Project"), located in the Red Lake District of northwestern Ontario.

2023 Surface Exploration Program

The 2023 surface exploration program includes detailed glacial till geochemical surveys and prospecting efforts covering several areas targeting gold, nickel-copper, and lithium mineral systems. This program follows the 2021 and 2022 regional property-scale geochemical surveys completed while the Project was under option to Barrick Gold (see press release dated January 19, 2023). The current 2023 survey will include the collection of approximately 3,300 fine-fraction till samples over priority gold and nickel-copper target areas as well as 700 heavy mineral concentrate (HMC) till samples covering multiple lithium target areas. Given the very limited amount of historical exploration across the property, and especially within these target areas, the Company believes there is significant potential to make new discoveries.

Nickel-Copper

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6489/177151_92173fb6d4b39842_001.jpg

Figure 1. Property-wide Glacial Till Geochemistry: Nickel (Ni ppm)

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6489/177151_92173fb6d4b39842_001full.jpg

The results from the previous surveys outlined a large, coherent, and highly anomalous area of coincident nickel and copper, along with coincident cobalt and chromium (Ni-Cu-Co-Cr) in glacial overburden. Sampling returned nickel values up to 674 ppm and copper up to 306 ppm in till, potentially indicating a bedrock source of mineralisation below cover. Elevated levels of sulfur (S) were also observed within the Ni-Cu anomaly, which occurs in an area broadly mapped as mafic-ultramafic rocks, suggesting the potential to host magmatic Ni-Cu sulfide mineralisation. Approximately 1,900 soil (till substrate) samples will be collected on a high-resolution grid (50m x 100m) to define areas for future detailed geophysical surveys and drill targeting.

Gold

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6489/177151_92173fb6d4b39842_002.jpg

Figure 2. Property-wide Glacial Till Geochemistry: Gold (Au ppm)

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6489/177151_92173fb6d4b39842_002full.jpg 

A broad area of regionally anomalous gold-in-till (up to 52 ppb Au) was highlighted in wide-spaced sampling from the previous surveys. This anomalism occurs in the central portion of the property and over seven kilometers along a significant structural corridor expressed as a topographic low marked by a lake. Approximately 1,400 soil (till substrate) samples will be collected on a high resolution (100m x 50m) grid to define areas for future drill targeting.

Lithium

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6489/177151_92173fb6d4b39842_003.jpg

Figure 3. Property-wide Glacial Till Geochemistry: Lithium (Li ppm)

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6489/177151_92173fb6d4b39842_003full.jpg

The results from the previous surveys also highlighted multiple lithium-cesium (Li-Cs) anomalies which could indicate potential sources of lithium-cesium-tantalum (LCT) pegmatite systems along the geological subprovince boundary and margin of the Alison Lake batholith. The high grade McCombe lithium deposit, held by Green Technology Metals, occurs in this setting, directly to the east of the Project, which illustrates the potential for LCT pegmatite mineralisation within the Project area. Approximately 700 heavy mineral concentrate samples (HMCs) will be collected and analyzed for spodumene grain counts.

About the South Uchi Project

The South Uchi Project was first identified and staked by Kenorland based on the prospectivity to host significant gold mineralised systems. The Project covers a portion of Confederation Assemblage volcanic rocks, as well as the boundary between the volcanic-dominated Uchi geological subprovince to the north and the sedimentary-dominated English River geological subprovince to the south. Multiple major east-west striking shear zones associated with the subprovince boundary transect the Project along its 90km strike-length. Deformation associated with these structures has resulted in zones of strong shearing, alteration, and folding of the metavolcanic-clastic and metasedimentary-iron formation stratigraphy, which are favorable settings for orogenic gold mineralisation.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6489/177151_92173fb6d4b39842_004.jpg

Figure 4. South Uchi Project Location

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6489/177151_92173fb6d4b39842_004full.jpg

The majority of gold deposits in the Red Lake District (Red Lake, Madsen, Hasaga, and others) are located on the northern margin of the Confederation Assemblage, however, recent discoveries such as the LP Fault Zone on the Dixie Project by Great Bear Resources Ltd. highlight the prospectivity of the entire Confederation Assemblage along the southern margin of the Uchi subprovince.

The Project occurs in the western Superior Craton which hosts numerous magmatic Ni-Cu ± PGE deposits such as the world class Eagle's Nest Deposit (11.1 Mt @1.68% Ni, 1.14% Cu; Ring of Fire Metals). Magmatic Ni-Cu ± PGE deposits of the western Superior typically occur in Archean aged mafic to ultramafic greenstone rocks, such as those mapped within the Project. At the broad regional scale there is a spatial correlation between Ni-Cu ± PGE deposits of the western Superior and a prominent gravity trend identified by Kenorland geoscientists as a plausible paleo-rift axis within the Superior Craton. Rift axes within Archean cratons represent a 1st order control on magmatic Ni-Cu camps globally (e.g. Kambalda Camp of Western Australia). This gravity trend transects the Project further highlighting the prospectivity of the area for magmatic Ni-Cu ± PGE potential.

The Project also meets many of the criteria for potential lithium pegmatite deposits, including the presence of the large Alison Lake batholith (a fertile peraluminous granite), which is partly covered by the Project. Numerous lithium pegmatite occurrences are located in the region, including the McCombe and Root Lake deposits (Green Technology Metals) located immediately to the east of the Project.

Qualified Person

Mr. Jan Wozniewski, B. Sc., P. Geo., OGQ (#2239), "Qualified Person" under National Instrument 43-101, has reviewed and approved the scientific and technical information in this press release.

About Kenorland Minerals Ltd.

Kenorland Minerals Ltd. (TSXV: KLD) is a mineral exploration Company incorporated under the laws of the Province of British Columbia and based in Vancouver, British Columbia, Canada. Kenorland's focus is early to advanced stage exploration in North America. The Company currently holds five projects in Quebec where work is being completed under joint venture and earn-in agreements from third parties. The Frotet Project and Chicobi Project are held under joint venture with Sumitomo Metal Mining Canada Ltd. ("Sumitomo"), the O'Sullivan Project is optioned to Sumitomo, the Chebistuan Project is optioned to Newmont Corporation and the Hunter Project is held under option to Centerra Gold Inc. In Alaska, the Company holds the advanced stage Tanacross porphyry Cu-Au-Mo project, optioned to Antofagasta, as well as a 70% interest in the Healy Project, held under joint venture with Newmont Corporation.

Further information can be found on the Company's website www.kenorlandminerals.com

Kenorland Minerals Ltd.
Zach Flood
President, CEO and Director
Tel: +1 604 568 6005
info@kenorlandminerals.com

Cautionary Statement Regarding Forward Looking Statements

This news release contains forward-looking statements and forward-looking information (together, "forward-looking statements") within the meaning of applicable securities laws. All statements, other than statements of historical facts, are forward-looking statements. Generally, forward-looking statements can be identified by the use of terminology such as "plans", "expects', "estimates", "intends", "anticipates", "believes" or variations of such words, or statements that certain actions, events or results "may", "could", "would", "might", "will be taken", "occur" or "be achieved". Forward looking statements involve risks, uncertainties and other factors disclosed under the heading "Risk Factors" and elsewhere in the Company's filings with Canadian securities regulators, that could cause actual results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statements. Although the Company believes that the assumptions and factors used in preparing these forward-looking statements are reasonable based upon the information currently available to management as of the date hereof, actual results and developments may differ materially from those contemplated by these statements. Readers are therefore cautioned not to place undue reliance on these statements, which only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed times frames or at all. Except where required by applicable law, the Company disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/177151

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.