To contact Cabling Installation & Maintenance:

About Cabling Installation & Maintenance:

Bringing practical business and technical intelligence to today's structured cabling professionals.

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on:

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Seabridge Gold Files First Quarter Financial Statements and MD&A

By: Newsfile

Toronto, Ontario--(Newsfile Corp. - May 13, 2024) - Seabridge Gold (TSX: SEA) (NYSE: SA) announced today that it has filed its Interim Financial Statements and Management's Discussion and Analysis for the three-month period ended March 31, 2024 on SEDAR+ (www.sedarplus.ca). These statements are also available on Seabridge's website at https://www.seabridgegold.com/investors/financial-reports.

Seabridge's Q1 2024 Report to Shareholders can be found here.

Recent Highlights

  • Submits application to BC government for Substantially Started Status for KSM
  • Issues 2023 report card and 2024 corporate objectives
  • Files NI-43-101 Technical report for an economic Courageous Lake Project
  • Submits permit application to construct balance of the Mitchell Treaty Tunnel
  • Plans 15,000-meter core drill program at Iskut to test for copper-gold source intrusions
  • 2024 drill program at 3 Aces to move the project towards resource estimation

Financial Results

During the three-month period ended March 31, 2024 Seabridge posted a net loss of $8.2 million ($0.09 per share) compared to a net loss of $10.8 million ($0.13 per share) for the same period in 2023. During the 1st quarter, Seabridge invested $39.3 million in mineral interests project spending compared to $48.6 million in the 1st quarter of 2023. At March 31, 2024, net working capital was $43.2 million compared to $54.5 million at December 31, 2023.

Seabridge holds a 100% interest in several North American gold projects. Seabridge's assets include the KSM and Iskut projects located in northwest British Columbia, Canada's "Golden Triangle", the Courageous Lake project located in Canada's Northwest Territories, the Snowstorm project in the Getchell Gold Belt of Northern Nevada and the 3 Aces project set in the Yukon Territory. For a full breakdown of Seabridge's mineral reserves and mineral resources by category please visit Seabridge's website at http://www.seabridgegold.com.

None of the Toronto Stock Exchange, New York Stock Exchange, or their Regulation Services Providers accepts responsibility for the adequacy or accuracy of this release.

ON BEHALF OF THE BOARD
"Rudi Fronk"
Chairman and C.E.O.

For further information please contact:
Rudi P. Fronk, Chairman and C.E.O.
Tel: (416) 367-9292 • Fax: (416) 367-2711
Email: info@seabridgegold.com

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/208977

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.