To contact Cabling Installation & Maintenance:

About Cabling Installation & Maintenance:

Bringing practical business and technical intelligence to today's structured cabling professionals.

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on:

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Kenorland Commences 2025 Winter Drill Program at the Chebistuan Project, Quebec

By: Newsfile

Vancouver, British Columbia--(Newsfile Corp. - February 18, 2025) - Kenorland Minerals Ltd. (TSXV: KLD) (OTCQX: KLDCF) (FSE: 3WQ0) ("Kenorland" or the "Company") is pleased to announce the commencement of the Winter 2025 drill program at the Chebistuan Project (the "Project"), located in the northern Abitibi greenstone belt of Quebec, and held under an exploration agreement with Newmont Corporation ("Newmont").

Q1 2025 Winter Exploration Program

The Winter 2025 exploration program and budget have been approved by Newmont, which will include up to 3,500m of drilling across 9 drill holes at the Deux Orignaux target area. This second phase of drilling, follow-up to the initial program completed in early 2023, will test lateral and down-dip extents of the mineralised syenite intersected in drill hole 23DODD005, which returned 157.20m at 0.41 g/t Au including 20.61m at 0.97 g/t Au (see press release dated June 27, 2023). The program will also test additional targets, identified as potential syenite plugs based on geophysical characteristics. Kenorland remains operator of the Project, and drilling activities are expected to conclude early March.

Figure 1. Plan map of Deux Orignaux drilling highlights (previously reported) and planned drill hole locations

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6489/241050_73a34ce314d579d7_001.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6489/241050_73a34ce314d579d7_001full.jpg

Deux Orignaux Target Area

The Deux Orignaux target area is a grassroots prospect under an earn-in agreement with Newmont. Systematic, property wide geochemical surveys completed in 2020 covering the original 159,690 hectare project and detailed till geochemical surveys in 2021 defined the target area containing anomalous gold and multi-element geochemistry, and gold grains in glacial overburden. The defined target area was followed up with a detailed airborne magnetics survey, and an induced polarization (IP) survey in 2022 ahead of drill targeting.

The mineralised intrusion at Deux Orignaux, defined by coincident resistivity, chargeability, and magnetic anomalies, was intersected along the regional contact between a clastic sedimentary basin (Opemiska Group) and volcanic rocks, marked by a first order basin bounding structure and Timiskaming type polymictic conglomerates. The intrusion is mineralised throughout with minor disseminated pyrite and trace sphalerite associated with pervasive potassic and albite alteration (Kspar-albite-quartz-hematite-carbonate-sericite alteration assemblage).

Figure 2. Cross section of 2023 Deux Orignaux drilling (geology and previously reported assays, looking east)

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6489/241050_73a34ce314d579d7_002.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6489/241050_73a34ce314d579d7_002full.jpg

About the Chebistuan Project

The Chebistuan Project was acquired by Kenorland through map staking in December 2019 and was optioned to Newmont in July 2020. Since completing property wide geochemical surveys in 2020 covering the original 159,690 hectare Project, land tenure has been reduced in size to encompass the Deux Orignaux prospect, regional targets and prospective structures. The property is located along a major east-west trending deformation zone which may represent the continuation of the Sunday Lake Deformation Zone; host to major gold deposits such as Detour Lake (Agnico Eagle Mines Limited) and Fenelon (Wallbridge Mining Company Limited). The Chibougamau and Chapais mining camps, which have produced over 6.5Moz of gold and 1.6 billion pounds of copper historically, are located directly to the east of the Chebistuan property. The Project is largely covered with glacial till and is accessed through a network of logging roads and by helicopter.

Figure 3. Chebistuan Project location

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6489/241050_73a34ce314d579d7_003.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6489/241050_73a34ce314d579d7_003full.jpg

The Project is under an exploration agreement dated July 17, 2020 (the "Exploration Agreement") with a venture option (the "Joint Venture") with Newmont. The Exploration Agreement is currently in the Phase 2 stage since Newmont has completed all requirements to earn a 51% interest in the Project within the initial phase of the Exploration Agreement. Within the Phase 1 earn-in stage, approximately 6,250 B-horizon soils (glacial till substrate) and 190 HMC till samples were collected property wide, which led to high resolution geophysical surveys and an initial drill test at the Deux Orignaux target completed between 2020-2023. Newmont currently has the option to earn an additional 29% interest for a cumulative 80% interest (the "Phase Two Earn-in") in the Project over six years by defining a 1.5Moz Au resource through a pre-feasibility stage study in line with NI 43-101 Standards of Disclosure for Mineral Projects, as well as making certain cash payments to Kenorland. The parties may continue to explore and develop the property through an 80% Newmont, 20% Kenorland Joint Venture or, in the case of a construction decision, Kenorland can elect for Newmont to finance its portion of mine development cost. If Newmont elects not to continue with the Phase Two Earn-in, ownership interest in the Project can switch to 51% Kenorland and 49% Newmont.

Qualified Person

Cédric Mayer, M.Sc., P.Geo. (OGQ #02385), "Qualified Person" under National Instrument 43-101, has reviewed and approved the scientific and technical information in this press release.

About Kenorland Minerals

Kenorland Minerals Ltd. (TSXV: KLD) is a well-financed mineral exploration company focused on project generation and early-stage exploration in North America. Kenorland's exploration strategy is to advance greenfields projects through systematic, property-wide, phased exploration surveys financed primarily through exploration partnerships including option to joint venture agreements. Kenorland holds a 4% net smelter return royalty on the Frotet Project in Quebec which is owned by Sumitomo Metal Mining Canada Ltd. The Frotet Project hosts the Regnault gold system, a greenfields discovery made by Kenorland and Sumitomo Metal Mining Canada Ltd. in 2020. Kenorland is based in Vancouver, British Columbia, Canada.

Further information can be found on the Company's website www.kenorlandminerals.com.

On behalf of the Board of Directors,

Zach Flood
President, CEO & Director

For further information, please contact:

Alex Muir, CFA
Corporate Development and Investor Relations Manager
Tel +1 604 568 6005
info@kenorlandminerals.com

Cautionary Statement Regarding Forward-Looking Statements

This news release contains forward-looking statements and forward-looking information (together, "forward-looking statements") within the meaning of applicable securities laws. All statements, other than statements of historical facts, are forward-looking statements. Generally, forward-looking statements can be identified by the use of terminology such as "plans", "expects", "estimates", "intends", "anticipates", "believes" or variations of such words, or statements that certain actions, events or results "may", "could", "would", "might", "will be taken", "occur" or "be achieved". Forward-Looking statements involve risks, uncertainties and other factors disclosed under the heading "Risk Factors" and elsewhere in the Company's filings with Canadian securities regulators, that could cause actual results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statements. Although the Company believes that the assumptions and factors used in preparing these forward-looking statements are reasonable based upon the information currently available to management as of the date hereof, actual results and developments may differ materially from those contemplated by these statements. Readers are therefore cautioned not to place undue reliance on these statements, which only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed times frames or at all. Except where required by applicable law, the Company disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/241050

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.