About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Generation Uranium Re-Engages APEX Geoscience Ltd. as Technical Consultants to Advance the Yath Uranium Project

VANCOUVER, British Columbia – July 11, 2024 – Generation Uranium Inc. (the “Company” or “Generation”), (TSXV:GEN) (OTCQB:GENRF) (FRA:W85) is pleased to announce that it has entered into a second professional consulting agreement (the “Agreement”) with APEX Geoscience Ltd. (“APEX”) to provide geological consulting services with respect to the Yath Uranium Project (“Yath”) located in Nunavut, Canada. The Agreement broadens the scope of work to be provided by APEX and announced by Generation on June 13, 2024.

As part of the Agreement, APEX will produce 2D GIS and 3D Micromine digital data compilation for Yath. This compilation will integrate publicly filed Nunavut assessment report data specific to Yath and may extend to include digital data for the surrounding areas, notably the historical LAC 50 trend*, where relevant data has been captured in assessment reports associated with current claims.

APEX will also review multiple assessment reports filed from 2007 through 2016 documenting exploration activities primarily conducted by Kivalliq Energy Corporation, alongside earlier efforts by Noranda and Pan Ocean Oil Ltd. where previous drilling data, surface geochemical, DEM and available geophysical products will be analyzed to form a basis for future drill target development in conjunction with 2D GIS.

The anticipated completion time for the phased work detailed above is approximately 30 days, with a proposed deadline of July 22, 2024.

“We are pleased to engage APEX Geoscience with follow-on consultation work,” stated Anthony Zelen, Generation CEO. “Their expertise in geophysical data analysis will greatly enhance our understanding of Yath and provide important insights needed to prepare for our expected upcoming drill program in the months ahead.”

For additional information on Yath and other company assets, please visit our investor presentation and website.

Derrick Strickland, P. Geo. (L5669), a qualified person as defined by National Instrument 43-101 (Standards of Disclosure for Mineral Projects), has reviewed the scientific information that forms the basis for this news release and has approved the disclosure herein.

*Mineralization on adjacent Properties or Projects many not necessarily indicative of the mineralization on the Yath Project.

FOR FURTHER INFORMATION CONTACT

Anthony Zelen

President and Chief Executive Officer

Anthony@generationuranium.com

778-388-5258

About Generation Uranium

The Company is a natural resource company engaged in the exploration and development of mineral properties. The Company holds a 100% interest in the Yath Uranium Project, located in the Territory of Nunavut.

Forward-Looking Statements

This news release contains certain forward-looking statements, which relate to future events or future performance and reflect management’s current expectations and assumptions. Such forward-looking statements reflect management’s current beliefs and are based on assumptions made by and information currently available to the Company. Readers are cautioned that these forward-looking statements are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results to differ materially from those expected including, but not limited to, market conditions, availability of financing, actual results of the Company’s exploration and other activities, environmental risks, future metal prices, operating risks, accidents, labor issues, delays in obtaining governmental approvals and permits, and other risks in the mining industry. All the forward-looking statements made in this news release are qualified by these cautionary statements and those in our continuous disclosure filings available on SEDAR at www.sedar.com. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances save as required by applicable law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The TSX Venture Exchange has neither approved nor disapproved the contents of this news release.

Featured Image @ Freepik

Read more investing news on PressReach.com.Subscribe to the PressReach RSS feeds:

Follow PressReach on Twitter
Follow PressReach on TikTok
Follow PressReach on Instagram
Subscribe to us on Youtube

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.