About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Granada Gold Mine Estimates a cost of 1,200 US Dollars per Ounce of Gold for Potential 2027 Custom Milling.

Granada Gold Mine Inc.
   

Rouyn Noranda, Q.C. – TheNewswire - December 9, 2024 - Granada Gold Mine Inc. (TSXV: GGM) (OTC: GBBFF) (Frankfurt: B6D) (the "Company" or "Granada") has reviewed a recent updated news release of a mid-tier local gold operator’s production costs.  It is estimated, that upon completion of the Company’s ongoing deep drilling program in 2027, that the potential exists for custom milling with three separate mid-tier gold producers in Quebec along the Cadillac Break in 2027 due to the exhaustion of their resources. Granada Gold Mine’s open pit is fully permitted and shovel ready should the opportunity present itself with 540,000 ounces of gold in the measured and indicated categories.  Historically, the open pit was operated at 3.5 to 5 grams per tonne gold. Two recent 500-tonne bulk samples have returned open-pit average gold grades of 4 grams per tonne gold.

 

Revising the costs from a PFS completed in May 6, 2014 (PFS, SGS Canada Inc.) for custom milling with a local mid-tier gold mine whereby a custom milling agreement was signed and their C of A was amended to receive the Granada ore, it is estimated that cost of production would be 1229.14 US dollars per ounce with a feed gold grade of 4.24 grams per tonne (with 25 percent mining dilution and a 10 percent ore loss) for the first 77,500 ounces of gold from Proven and Probable Reserves.

 

Frank J. Basa, President and CEO, commented, "The Company is well-positioned to deliver the high-grade open pit mineralization to any of the three mid-tier gold mines at any moment. With the gold price at 2657.10 dollars US per ounce (Kitco, Dec. 9, 2024) the profit margin is 1,427.96 dollars US per ounce. The potential profit is over 110 million dollars US for processing 15 percent of the resource”.

 

Qualified person

 

The technical information in this news release was reviewed and approved by Matthew Halliday, P.Geo., Director of Granada Gold Mine Inc., and member of the Ordre des Géologues du Québec, who is a Qualified Person in accordance with National Instrument 43-101.

 

Mineral Resource Estimate

 

On August 22, 2022 the Company filed an updated NI 43-101 technical report supporting the resource estimate update for the Granada Gold project (Please see July 6, 2022 news release) reporting that the Granada deposit contains an updated mineral resource, at a base case cut-off grade of 0.55 g/t Au for pit constrained mineral resources within a conceptual pit shell and at a base case cut-off grade of 2.5 g/t for underground mineral resources within reasonably mineable volumes, of 543,000 ounces of gold (8,220,000 tonnes at an average grade of 2.05 g/t Au) in the Measured and Indicated category, and 456,000 ounces of gold (3,010,000 tonnes at an average grade of 4.71 g/t Au) in the Inferred category. Please see Table 1 below for full details. Report reference: Granada Gold Project Mineral Resource Estimate Update, Rouyn-Noranda, Quebec, Canada authored by Yann Camus, P.Eng. and Maxime Dupéré, B.Sc, P.Geo., SGS Canada Inc. dated August 20th, 2022 and with an effective date of June 23rd, 2022.

 

Table 1: Mineral Resource Estimate Showing Tonnes, Average Grade, and Gold Ounces

 

Cut-Off

(g/t Au)

Classification

Type

Tonnes

Au (g/t)

Gold Ounces

0.55 / 2.5

Measured1

InPit+UG

4,900,000

1.70

269,000

 

Indicated

InPit+UG

3,320,000

2.57

274,000

 

Measured & Indicated

InPit+UG

8,220,000

2.05

543,000

 

Inferred

InPit+UG

3,010,000

4.71

456,000

About Granada Gold Mine Inc.

 

Granada Gold Mine Inc. continues to develop and explore its 100% owned Granada Gold Property near Rouyn-Noranda, Quebec, and is adjacent to the prolific Cadillac Break. The Company owns 14.73 square kilometers of land in a combination of mining leases and claims. The Company is currently undergoing a large drill program with 20,000m out of 120,000m complete. The drills are currently paused to provide the technical team with the necessary time to evaluate, assimilate existing data and wait for improved market conditions. 

 

The Granada Shear Zone and the South Shear Zone contain, based on historical detailed mapping as well as from current and historical drilling, up to twenty-two mineralized structures trending east-west over five and a half kilometers. Three of these structures were mined historically from four shafts and three open pits. Historical underground grades were 8 to 10 grams per tonne gold from two shafts down to 236 m and 498 m with open pit grades from 3.5 to 5 grams per tonne gold.

 

The property includes the former Granada Gold underground mine which produced more than 50,000 ounces of gold at 10 grams per tonne gold in the 1930’s from two shafts before a fire destroyed the surface buildings.  In the 1990s, Granada Resources extracted a bulk sample (Pit #1) of 87,311 tonnes grading 5.17 g/t Au.  They also extracted a bulk sample (Pit # 2) of 22,095 tonnes grading 3.46 g/t Au.  

   

For further information, Contact:

Frank J. Basa, P.Eng. member of Professional Engineers Ontario

Chief Executive Officer

P: 416-625-2342

 

Or:

 

Wayne Cheveldayoff, 

Corporate Communications

P: 416-710-2410 

E: waynecheveldayoff@gmail.com

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements which include, but are not limited to, comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. The Company does not undertake to update any forward-looking information in this news release or other communications unless required by law.

 

Copyright (c) 2024 TheNewswire - All rights reserved.

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.