About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

San Lorenzo Intersects 4.5 Meters of 6.52 g/t Gold Including 1.23 Meters Grading 9.54 g/t Gold in Arco De Oro Hole 2

San Lorenzo Gold Corp.

 

 

CALGARY – TheNewswire - April 9, 2025 - San Lorenzo Gold Corp. ("San Lorenzo" or the "Company") (TSXV: SLG) is pleased to announce assay results from the second hole on its Arco de Oro target gold target.  San Lorenzo also provides an update on preliminary results from the third hole drilled on the target. Arco de Oro is located within San Lorenzo’s flagship Salvadora property in Chile.

SAL 02–25

The table below provides the assay results from Hole SAL 02-25:

 

Intercept

From (m)

To (m)

Width (m)

Au g/t

Ag g/t

Cu %

SAL 02-25

A

99.0

103.4

4.4

6.52

13.7

0.1

including

99.0

100.2

1.2

9.54

25.2

0.17

 

San Lorenzo’s VP Exploration, Terence Walker commented on the assay results from the Hole SAL 02-25: “we are pleased that the gold values returned from the main vein system fit well into our model and yet again extends the strike length of the Arco de Oro system - by approximately 250 metres to the south-east.  San Lorenzo drilling has now intercepted significant gold grades over 1.3 kilometers of strike length and at depths up to 300 metres.  The vein system remains open in all directions”.

SAL 03 – 25

San Lorenzo has also received preliminary results from hole SAL 03-25 – the third hole recently drilled on the Arco de Oro trend.   Significant and anomalous gold values were returned over an unexpectedly wide interval.  However, those values were wide spaced and intermittent.  As a result, San Lorenzo has decided to initiate a detailed field investigation prior to releasing assay information which may be unreliable.  Preliminary indications are that SAL 03-25 was drilled within and across a fault zone which has caused the system, visible from surface workings to extend for at least another 2 kilometers, to have been laterally displaced in the vicinity of hole SAL 03-25.  A coherent vein, like those in surface and underground workings and all other Arco de Oro drill holes, was not intercepted in hole SAL 03-25.

San Lorenzo will start an IP survey to expand geophysical coverage at both Arco de Oro and Cerro Blanco immediately, which will be closely followed up by the next phase of drilling.  Details will be provided in an upcoming news release.

Sample Acquisition, Handling, Analysis and Qualified Person

All drill core logging, sample selection and cutting, followed by bagging and delivery of 50% of the HQ core to the ALS lab in Copiapó, was carried out by San Lorenzo staff under the on-site supervision of Eric Hanson P. Geo. or Terence Walker, P. Geo., each a “qualified person” for purposes of NI 43-101.  All assays were conducted by ALS Patagonia Limited.  Samples were crushed and screened to -80 mesh and analyzed using their multi-element ICP after aqua-regia digestion.  Gold was analyzed by fire assay atomic adsorption.  ALS included standard check sampling techniques including blank and duplicate insertions.

Terence Walker, P. Geo. and QP, has reviewed and approved the contents of this release.

About San Lorenzo

San Lorenzo is focused on advancing its flagship Salvadora property located in Chile’s mega-porphyry belt.  Results obtained from drilling programs already conducted on 4 different targets have convinced management that several significant gold and copper enriched epithermal and porphyry style systems lie within the boundaries of the Salvadora property.

For further information, please contact:

Terence (Terry) Walker, VP Exploration

Email: twalker@goldenrock.cl

Ph: + 56 9 5179 5902

Or:

Roger Blair or Jeff Wilson, Acuity Advisory Corp.

Email: info@acuityadvisorycorp.com

Ph: +1 604 351 0025 or +1 604 837 5440

Or:

Al Kroontje

Email: al@slgold.ca

Ph: +1 403 607 4009

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Not for distribution to United States newswire services or for release, publication, distribution or dissemination directly, or indirectly, in whole or in part, in or into the United States

Cautionary Note Regarding Forward-Looking Information

This news release may contain forward-looking information that involves substantial known and unknown risks and uncertainties, most of which are beyond the control of San Lorenzo.  All statements included herein other than statements of historical fact are forward-looking information. Such forward-looking information involves various risks and uncertainties. This is especially true of statements related to geological interpretations, IP and drilling programs.  There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. Any forward-looking statements are made as of the date of this release and, other than as required by applicable securities laws, San Lorenzo does not assume any obligation to update or revise them to reflect new events or circumstances.

Copyright (c) 2025 TheNewswire - All rights reserved.

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.