About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Element79 Gold Corp Obtains 2-Year Extension of Drilling Permit for Gold Mountain Project

Element79 Gold Corp.

Vancouver, BC – TheNewswire - September 16, 2025 – Element79 Gold Corp (CSE:ELEM) (FSE:7YS0) (OTC:ELMGF) (the “Company” or “Element79”) is pleased to announce that it has secured a two-year extension of its drilling permit for its 100%-owned Gold Mountain Project (formerly known as Long Peak), located along the prolific Battle Mountain trend in Nevada, USA.

Advancing Nevada Exploration Strategy

The Gold Mountain Project is a cornerstone of Element79’s Nevada portfolio. Historical work and technical studies have highlighted drill-ready targets that will be central to the Company’s exploration focus over the next two years. With the permit extension now secured, Element79 can move forward confidently with its development strategy in one of the world’s most productive gold jurisdictions.

“Securing this two-year permit extension is a crucial step in ensuring continuity of our exploration strategy at Gold Mountain,” commented Michale Smith, CEO of Element79 Gold. “We are now positioned to execute on our drill programs and advance the project toward resource development, with the intent of building long-term value for our shareholders.”

About the Gold Mountain Project

The Gold Mountain Project, located along Nevada’s Battle Mountain trend, is considered drill-ready with multiple high-priority targets already defined. Previous exploration has identified significant gold mineralization potential, with favorable geology consistent with major deposits in the region. Element79 Gold Corp has recently obtained a 43-101 property of merit technical report, compiling historic data, with completion and filing of the NI 43-101 Technical Report on September 3, 2025.  Element79 intends to commence drilling activities under the extended permit to further delineate these targets and unlock the further value in the project.


Click Image To View Full Size

 

Figure 1 - Location map showing the location of the Gold Mountain project.

 


Click Image To View Full Size

 

Figure 2 - Map showing approved, Notice-level disturbance on the Gold Mountain property.

 


Click Image To View Full Size

 

Figure 3 - Maps displaying Au and Ag in rocks. The rock samples originated from a hand-drawn map and are thought to have been collected by Oro Nevada and Gold Ventures Inc.

Qualified Person

The technical information in this release has been reviewed and approved by Kim Kirkland, Fellow of AusIMM #309585, Chief Operating Officer of Element79 Gold Corp, and a "qualified person" as defined by National Instrument 43-101.

 

About Element79 Gold Corp

Element79 Gold Corp is a mining company focused on the exploration and development of high-potential gold and silver projects. The Company’s main focus is its Lucero Project, a past-producing, high-grade gold and silver mine in Arequipa, Peru, with near-term production potential. In Nevada, the Company is advancing its Gold Mountain and Elephant projects along the Battle Mountain trend, a world-class gold district. Element79 is also completing the spin-out of its Dale Property in Ontario into its wholly owned subsidiary, Synergy Metals Corp.

For more information about the Company, please visit www.element79.gold.

Contact Information

For corporate matters and Investor Relations inquiries, please contact:

Michael Smith, Chief Executive Officer

E-mail: ms@element79.gold

Phone: +1.604.319.6953

Cautionary Note Regarding Forward Looking Statements

This press release contains “forward‐looking information” and “forward-looking statements” under applicable securities laws (collectively, “forward‐looking statements”). These statements relate to future events or the Company’s future performance, business prospects, or opportunities and are based on management’s forecasts, estimates, and assumptions. Forward-looking statements include, but are not limited to, statements regarding exploration activities, the timing and scope of planned drill programs, and the potential mineralization of the Gold Mountain Project. Actual results may differ materially from anticipated results. Investors are cautioned not to place undue reliance on forward-looking statements.

Neither the Canadian Securities Exchange nor the Market Regulator accepts responsibility for the adequacy or accuracy of this release.

Copyright (c) 2025 TheNewswire - All rights reserved.

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.