Search
Enter a search term.

File a claim

Need to file an insurance claim? We’ll make the process as supportive, simple and swift as possible.

Action Teams

If you want to make an impact in your community but aren't sure where to begin, we're here to help.

Contact support

Can’t find what you’re looking for? Need to discuss a complex question? Let us know—we’re happy to help.
Use the search bar above to find information throughout our website. Or choose a topic you want to learn more about.

STV Launches Power Practice

By: via GlobeNewswire
ⓘ This article is third-party content and does not represent the views of this site. We make no guarantees regarding its accuracy or completeness.

New York, NY, May 07, 2026 (GLOBE NEWSWIRE) -- STV today announced the launch of a Power practice to help public agencies, utilities and private owners respond to accelerating demand for reliable, resilient power across the nation’s infrastructure. The Power practice is a priority under STV’s 2026–2028 Strategic Plan, which emphasizes focused growth, strengthening the expertise behind the firm’s work and stronger outcomes for clients and communities.   

Power becomes STV’s fourth infrastructure vertical, alongside Transportation, Buildings and Water, reflecting the firm’s strategic focus on long-term trends driving infrastructure investment. Demand from electrified mobility, data centers and modern facilities is already changing how transportation systems, buildings and water infrastructure are planned, designed, built and delivered.   

"Power demand is fundamentally reshaping every part of the infrastructure ecosystem,” said Greg Kelly, CEO at STV. “Our Power practice reflects how we’re scaling our capabilities to help clients meet urgent energy needs across transportation, buildings, water systems and industrial facilities.” 

STV’s power capabilities span front-of-the-meter and behind-the-meter infrastructure, including utility-coordinated grid and substation upgrades; traction power systems for transit; and resilient facility and campus power solutions. The firm applies a practical approach shaped by how power systems are built, maintained and operated in live environments where continuity of service, safety and scalability are essential.  

STV’s power work includes substation and grid infrastructure upgrades for Con Edison in New York, where the firm is helping prevent oil spills while keeping substations running reliably, as well as leading the replacement of aging traction power substations along TriMet’s MAX Blue Line in Portland. STV has also supported traction power improvements for Bay Area Rapid Transit, strengthening system reliability across one of the nation’s largest transit networks, and delivered data center power replacement services at Fairfax County’s Operations Center in Virginia, supporting continuous, mission critical operations.  

# # #  

About STV  
STV is one of the top infrastructure-focused professional services firms in North America. Founded in 1912, STV advises, plans, designs, engineers and delivers the infrastructure that powers local economies, including transportation systems, buildings, water and other facilities. Headquartered in New York City, the company has more than 65 offices and 3,300 employees who reimagine the solutions and structures that connect our communities. The firm is ranked 32nd in Engineering News-Record’s Top 500 Design Firms survey and is 10th in its transportation category. Learn more at stvinc.com


Aaron Jones
STV
6462542432
aaron.jones@stvinc.com
Report this content

If you believe this article contains misleading, harmful, or spam content, please let us know.

Report this article

Recent Quotes

View More
Symbol Price Change (%)
AMZN  232.69
+5.68 (2.50%)
AAPL  283.78
+8.63 (3.14%)
AMD  521.58
-10.99 (-2.06%)
BAC  57.88
-0.31 (-0.53%)
GOOG  334.69
-7.50 (-2.19%)
META  550.25
+7.38 (1.36%)
MSFT  372.97
+20.14 (5.71%)
NVDA  192.53
-3.21 (-1.64%)
ORCL  148.53
-3.93 (-2.58%)
TSLA  379.71
+4.59 (1.22%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.