ETFOptimize | High-performance ETF-based Investment Strategies

Quantitative strategies, Wall Street-caliber research, and insightful market analysis since 1998.


ETFOptimize | HOME
Close Window

Rock Tech Expects Purified Lithium Hydroxide Samples Next Month



Vancouver, BC, Canada – TheNewswire - April 22, 2021 Rock Tech Lithium Inc. (the "Company" or “Rock Tech”) (TSXV:RCK); (Frankfurt:RJIB); (OTC:RCKTF) is pleased to update the market on progress of the Phase 1 pilot plant, metallurgical testwork and engineering development for its Georgia Lake and Converter projects.

 
  • - Phase 1 pilot plant at ALS fully operational.

    - Lithium hydroxide samples from bench scale metallurgical testwork program expected in May.

    - Metallurgical testwork program supports basic engineering development for the Converter Project and the Phase 1 pilot plant.

 

Converter Metallurgical Testwork Program

To support the basic engineering development for the Converter Project and inform the Phase 1 pilot program (previously announced on February 16, 2021), a metallurgical testwork program has been ongoing since December 2020. Nagrom laboratories was appointed to complete a bench scale testwork program under management by Wave International.

 

The program was designed to prove the robustness of the flowsheet to produce Battery Grade Lithium Hydroxide from a range of spodumene sources. Coarse DMS concentrate, low grade DMS concentrate, and combined DMS and flotation concentrate samples from various global sources (including Georgia Lake, and commercially produced concentrates) are part of the testwork program.

 

The testwork program for the conventional sulphation route has progressed through the unit process of calcination, acid roast, water leach and impurity removal, causticisation and glauber’s salt crystallisation on the three different samples. Crude Lithium Hydroxide crystallization is currently in progress and a final purified Lithium Hydroxide sample is anticipated in May.

 

This work informed the Phase 1 pilot underway at ALS and will inform an upcoming stage 2 pilot, as well as providing engineering data for ongoing engineering development.


Click Image To View Full Size

 

Figure 1 - Glauber’s Salt Precipitation Test

  

Nagrom, a privately owned Western Australian company, has been providing metallurgical services to the mining industry for over 30 years. Their Kelmscott facility (Perth, Western Australia) has over 100 processing units and a staff of 120 skilled resources. Nagrom is a recognized brand in the Lithium sector, with extensive spodumene and downstream lithium testwork experience across major and emerging producers.

 

Phase 1 –Lithium Hydroxide Monohydrate Bulk Sample

Work is ongoing with ALS Laboratories, with purification and causticisation works complete. The next stages of the works are glauber’s salt crystallization, followed by crude Lithium Hydroxide crystallization. All testwork to date has performed as expected by the PFS conventional flowsheet, and per the bench scale testwork program. The final purified Lithium Hydroxide sample from the Phase 1 pilot plant is anticipated to be produced by June 2021.

 

The lithium hydroxide samples produced during the metallurgical testwork program and the Phase 1 pilot will be used to intensify offtake discussions with potential customers.

 

Georgia Lake Lithium Project

Heavy Liquid Separation (HLS) and Dense Media Separation (DMS) work has been completed on core samples from Georgia Lake. Nagrom laboratories was appointed to complete this testwork program, under management by Wave International. The testwork program was designed to test composites of different lithological classifications across a range of processing parameters. In addition to contributing to the testwork program for further studies on the Georgia Lake Lithium Project, it generated concentrate for the Converter metallurgical testwork program.

 

The scientific and technical disclosure included in this news release has been reviewed and approved by Christopher John Larder, FAusIMM, an independent Qualified Person under National Instrument 43-101 Standards of Disclosure of Mineral Projects ("NI 43-101").

 

On behalf of the Board of Directors,

 

"Dirk Harbecke"
Dirk Harbecke
Chairman

For further information, please contact:

Brad Barnett
Chief Financial Officer
Rock Tech Lithium Inc.
777 Hornby Street, Suite 600
Vancouver, B.C., V6Z 1S4
Telephone: (778) 358-5200
Facsimile: (604) 670-0033
Email: bbarnett@rocktechlithium.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Statements included in this announcement, including statements concerning our plans, intentions and expectations, which are not historical in nature are intended to be, and are hereby identified as, "forwardlooking statements".  Forwardlooking statements may be identified by words including "anticipates", "believes", "intends", "estimates", "expects" and similar expressions.  The Company cautions readers that forwardlooking statements, including without limitation those relating to the Company's future operations and business prospects, are subject to certain risks and uncertainties that could cause actual results to differ materially from those indicated in the forwardlooking statements.

Copyright (c) 2021 TheNewswire - All rights reserved.

Recent Quotes

View More
Symbol Price Change (%)
AMZN  247.38
+1.09 (0.44%)
AAPL  259.37
+0.33 (0.13%)
AMD  203.17
-1.51 (-0.74%)
BAC  55.85
-0.33 (-0.59%)
GOOG  329.14
+3.13 (0.96%)
META  653.06
+7.00 (1.08%)
MSFT  479.28
+1.17 (0.24%)
NVDA  184.86
-0.18 (-0.10%)
ORCL  198.52
+9.37 (4.95%)
TSLA  445.01
+9.21 (2.11%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.


 

IntelligentValue Home
Close Window

DISCLAIMER

All content herein is issued solely for informational purposes and is not to be construed as an offer to sell or the solicitation of an offer to buy, nor should it be interpreted as a recommendation to buy, hold or sell (short or otherwise) any security.  All opinions, analyses, and information included herein are based on sources believed to be reliable, but no representation or warranty of any kind, expressed or implied, is made including but not limited to any representation or warranty concerning accuracy, completeness, correctness, timeliness or appropriateness. We undertake no obligation to update such opinions, analysis or information. You should independently verify all information contained on this website. Some information is based on analysis of past performance or hypothetical performance results, which have inherent limitations. We make no representation that any particular equity or strategy will or is likely to achieve profits or losses similar to those shown. Shareholders, employees, writers, contractors, and affiliates associated with ETFOptimize.com may have ownership positions in the securities that are mentioned. If you are not sure if ETFs, algorithmic investing, or a particular investment is right for you, you are urged to consult with a Registered Investment Advisor (RIA). Neither this website nor anyone associated with producing its content are Registered Investment Advisors, and no attempt is made herein to substitute for personalized, professional investment advice. Neither ETFOptimize.com, Global Alpha Investments, Inc., nor its employees, service providers, associates, or affiliates are responsible for any investment losses you may incur as a result of using the information provided herein. Remember that past investment returns may not be indicative of future returns.

Copyright © 1998-2017 ETFOptimize.com, a publication of Optimized Investments, Inc. All rights reserved.