About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Resource Upgrade Drilling Begins on Tunkillia ‘Starter Pits’

Targeting Ore Reserves, PFS and ML application by the end of 2026

HIGHLIGHTS

  • May 2025 Optimised Scoping Study (OSS) outlined a compelling Tunkillia development project: 1

    • Annual production: ~120,000oz gold + ~250,000oz silver

    • Total LoM operating cash: ~A$2.7 billion (unlevered, pre-tax)

    • Net Present Value (NPV 7.5% ): ~A$1.4 billion (unlevered, pre-tax)

    • Internal Rate of Return (IRR): ~73.2% (unlevered, pre-tax); and

    • Payback period: ~0.8 years (unlevered, pre-tax)

  • ~18,000m reverse circulation (RC) drilling on high value ‘Starter Pits', which are modelled to yield 365koz Au and A$1.3bn cash in first ~2 years, paying back development cost ~3x over 1

  • Barton approached by several prospective development and finance partners following OSS; expediting development drilling programs to support conversion of JORC Mineral Resources to JORC (2012) Ore Reserves, feasibility studies, and a Mining Lease application by end of 2026

ADELAIDE, AU / ACCESS Newswire / September 10, 2025 / Barton Gold Holdings Limited (ASX:BGD)(OTCQB:BGDFF)(FRA:BGD3) (Barton or Company) is pleased to announce the start of JORC upgrade drilling for its South Australian Tunkillia Gold Project (Tunkillia). An initial round of ~18,000m RC drilling is designed to convert Tunkillia's high value ‘Stage 1' and ‘Stage 2' optimised open pits to JORC (2012) ‘Measured' and ‘Indicated' categories, supporting expedited project financing discussions. 1

The current 1 st stage ~18,000m RC drilling program will:

  • target conversion of all of ‘Stage 1' and ‘Stage 2' pit materials to JORC ‘Indicated' category; and

  • target conversion of a high-value subset of ‘Stage 1' pit materials to JORC ‘Measured' category.

A 2 nd stage RC and diamond drilling ( DD ) program planned for March to June 2026 will then:

  • target conversion of all other Tunkillia OSS mineralisation JORC ‘Indicated' category;

  • expand Tunkillia's geotechnical database for further open pit design optimisation; and

  • expand Tunkillia's metallurgical database for detailed recovery and production modelling.

Commenting on Tunkillia's upgrade drilling programs, Barton Managing Director Alex Scanlon said :

"The Tunkillia OSS demonstrated the financial and capital leverage available to large-scale bulk processing operations, with the major advantage of a higher-grade ‘Starter Pit' that can pay back development costs 2x over in the first year.

"Having been approached by multiple prospective development and finance partners, upgrade drilling on Tunkillia's ‘Starter Pits' will expedite development and financing discussions while Barton evaluates the optimal path forward.

"We are aiming to generate maximum optionality for Tunkillia's development, and plan to convert Mineral Resources to Ore Reserves, complete a Pre-Feasibility Study, and submit a Mining Lease application by the end of 2026."

Program background

Tunkillia's May 2025 OSS outlined a compelling development profile, with ‘Starter Pits' modelled to produce: 2

  • ‘Stage 1': ~206,000oz gold and ~491,000oz silver during the first ~13 months of operation; and

  • ‘Stage 2': ~159,000oz gold and ~432,000oz silver during the next ~14 months of operation.

These ‘Starter Pits' are therefore modelled to return: 2

  • ~$825 million operating free cash during the first ~13 months at a cash cost of only A$997/oz Au, paying back up-front capital cost more than 2x over during this time; and

  • a total ~$1.3 billion operating free cash during the first ~27 months at an average cash cost of only A$1,429/oz Au, paying back up-front capital cost more than 3x over during this time.

Figure 1 below shows Tunkillia's key ‘Stage 1' and ‘Stage 2' Starter Pits, with the location of new drill hole collars planned for the initial September to December 2025 JORC Mineral Resource upgrade program.

This stage of development drilling will comprise ~18,270m RC drilling across 209 planned drill holes. The objective is to increase confidence in ‘Stage 1' and ‘Stage 2' mineralisation, validate deposit geostatistics, and test the drill hole spacing required for future upgrade drilling in other Tunkillia mineralisation zones.

The drilling shown below is complementary to a significant number of existing surrounding drill holes, and is expected to convert all ‘Stage 1' and ‘Stage 2' mineralisation to JORC ‘Indicated' category, with the highest-value subset of the ‘Stage 1 Starter Pit' mineralisation converted to JORC ‘Measured' category.

Figure 1 - Tunkillia OSS Optimised Open Pits with planned Stage 1 upgrade drilling

Authorised by the Board of Directors of Barton Gold Holdings Limited.

For further information, please contact:

Alexander Scanlon
Managing Director
a.scanlon@bartongold.com.au
+61 425 226 649

Jade Cook
Company Secretary
cosec@bartongold.com.au
+61 8 9322 1587

About Barton Gold

Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000ozpa with 2.2Moz Au & 3.1Moz Ag JORC Mineral Resources (79.9Mt @ 0.87g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia. *

Challenger Gold Project

  • 313koz Au + fully permitted Central Gawler Mill ( CGM )

Tarcoola Gold Project

  • 20koz Au in fully permitted open pit mine near CGM

  • Tolmer discovery grades up to 84g/t Au & 17,600g/t Ag

Tunkillia Gold Project

  • 1.6Moz Au & 3.1Moz Ag JORC Mineral Resources

  • Competitive 120kozpa gold & 250kozpa silver project

Wudinna Gold Project

  • 279koz Au project located southeast of Tunkillia

  • Significant optionality, adjacent to main highway

Competent Persons Statement & Previously Reported Information

The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 (JORC).

Activity

Competent Person

Membership

Status

Tarcoola Mineral Resource (Stockpiles)

Dr Andrew Fowler (Consultant)

AusIMM

Member

Tarcoola Mineral Resource (Perseverance Mine)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Tarcoola Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tarcoola Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tunkillia Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Mineral Resource

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (above 215mRL)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (below 90mRL)

Mr Dale Sims

AusIMM / AIG

Fellow / Member

Wudinna Mineral Resource (Clarke Deposit)

Ms Justine Tracey

AusIMM

Member

Wudinna Mineral Resource (all other Deposits)

Mrs Christine Standing

AusIMM / AIG

Member / Member

The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted in this announcement, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.

Cautionary Statement Regarding Forward-Looking Information

This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.

1 Refer to ASX announcement dated 5 May 2025

2 Refer to ASX announcement dated 5 May 2025

* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 8 September 2025. Total Barton JORC (2012) Mineral Resources include 1,049koz Au (39.7Mt @ 0.82 g/t Au) in Indicated category and 1,186koz Au (40.2Mt @ 0.92 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.

SOURCE: Barton Gold Holdings Limited



View the original press release on ACCESS Newswire

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.