About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Ultra-Fast Charging Without Expanding the Grid – Is That Possible? Yes, as ADS-TEC Energy Is Proving at Hannover Messe

  • Want to charge an electric vehicle in a few minutes and on a limited grid? No problem with ADS-TEC Energy’s battery-buffered, ultra-fast charging solutions
  • Winfried Kretschmann, Minister President of Baden-Württemberg, opened "The Länd" pavilion and talked to ADS-TEC Energy CEO Thomas Speidel
  • ADS-TEC Energy is showcasing its ChargeBox and ChargePost solutions, each with two charging points, at Hannover Messe
  • The 300 kW ChargePost features two 75-inch advertising displays and the ability to feed from the battery into the vehicle and back into the grid

At the opening of the Baden-Württemberg pavilion "The Länd", Minister President Winfried Kretschmann spoke to Thomas Speidel, founder and CEO of ADS-TEC Energy, about developments in ultra-fast charging, even on weak grids. "We have partnered with the Baden-Württemberg state at the Hannover Messe for over 10 years. Our vision for ADS-TEC Energy has now become a reality as a leading listed company," said Thomas Speidel. He explained that there are hurdles that ADS-TEC Energy, partners and infrastructure operators face: the new "German speed" invoked by politicians is still needed. In addition, Speidel believes that sourcing products and services from local companies would help ensure the independence of the critical grid infrastructure.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240423233819/en/

ADS-TEC Energy at Hannover Messe (Photo: Business Wire)

ADS-TEC Energy at Hannover Messe (Photo: Business Wire)

Last week, Stadtwerke Oranienburg GmbH told the Federal Network Agency that the upstream high-voltage grid cannot provide sufficient power for Oranienburg. "This means that the supply options in the town of Oranienburg have been exhausted," said Peter Grabowsky, Managing Director of Stadtwerke Oranienburg. The additional capacity that has been requested for over a year has not been made available and, as a result, applications for charging infrastructure connections are no longer being approved.

"Grid expansion is reaching its limits and cannot grow fast enough to meet the demand for a functioning charging infrastructure," added Thomas Speidel. "We make fast charging possible even on the undeveloped and power-limited grid. The key to this is our integrated battery storage system. It allows us to support the grid for charging at up to 320 or 300 kW. When two EVs are charged at the same time it supports each at 160 or 150 kW."

With a footprint of just 1.95 m2, the ChargePost is particularly suited to urban areas where the grid is limited, and expansion would be costly and time-consuming. The ChargePost supports grid connections from 22 to 87 kW and can charge EVs in just a few minutes thanks to its innovative battery storage technology. But that's not all: the battery also feeds energy back into the grid.

"With this technology, we can not only store renewable energy directly on site, we also make energy trading possible. Electricity is either consumed directly on a decentralized basis or traded when there is no vehicle to charge," added Thomas Speidel. "ChargePost is a sustainable and profitable investment that can support different business models depending on the location. Not only can you charge EVs with this system, but you can also display advertising on the two 75-inch displays, use your own low-cost PV, and participate in electricity trading." In addition, customers can connect multiple ChargePosts to create a virtual power plant that reduces expensive grid peaks.

ADS-TEC Energy will be showcasing its sustainable solutions at the Baden-Württemberg Pavilion. Visit us in Hall 12 on Stand D15 and find out how our customers advance their energy transition with our solutions.

About ADS-TEC Energy

Based on more than ten years of experience with lithium-ion technologies, ADS-TEC Energy develops and produces battery storage solutions and fast charging systems including their energy management systems. Its battery-based fast-charging technology enables electric vehicles to charge ultra-fast even with weak power grids and is characterized by a very compact design. The company, based in Nürtingen, Baden-Württemberg, was nominated for the German Future Prize by the Federal President and was included in the "Circle of Excellence" in 2022. The high quality and functionality of the battery systems is due to a particularly high level of in-depth development and in-house production. With its advanced system platforms, ADS-TEC Energy is a valuable partner for car manufacturers, energy supply companies and charging station operators.

More information at: www.ads-tec-energy.com

Contacts

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.