About Cabling Installation & Maintenance

Our mission: Bringing practical business and technical intelligence to today's structured cabling professionals

For more than 30 years, Cabling Installation & Maintenance has provided useful, practical information to professionals responsible for the specification, design, installation and management of structured cabling systems serving enterprise, data center and other environments. These professionals are challenged to stay informed of constantly evolving standards, system-design and installation approaches, product and system capabilities, technologies, as well as applications that rely on high-performance structured cabling systems. Our editors synthesize these complex issues into multiple information products. This portfolio of information products provides concrete detail that improves the efficiency of day-to-day operations, and equips cabling professionals with the perspective that enables strategic planning for networks’ optimum long-term performance.

Throughout our annual magazine, weekly email newsletters and 24/7/365 website, Cabling Installation & Maintenance digs into the essential topics our audience focuses on.

  • Design, Installation and Testing: We explain the bottom-up design of cabling systems, from case histories of actual projects to solutions for specific problems or aspects of the design process. We also look at specific installations using a case-history approach to highlight challenging problems, solutions and unique features. Additionally, we examine evolving test-and-measurement technologies and techniques designed to address the standards-governed and practical-use performance requirements of cabling systems.
  • Technology: We evaluate product innovations and technology trends as they impact a particular product class through interviews with manufacturers, installers and users, as well as contributed articles from subject-matter experts.
  • Data Center: Cabling Installation & Maintenance takes an in-depth look at design and installation workmanship issues as well as the unique technology being deployed specifically for data centers.
  • Physical Security: Focusing on the areas in which security and IT—and the infrastructure for both—interlock and overlap, we pay specific attention to Internet Protocol’s influence over the development of security applications.
  • Standards: Tracking the activities of North American and international standards-making organizations, we provide updates on specifications that are in-progress, looking forward to how they will affect cabling-system design and installation. We also produce articles explaining the practical aspects of designing and installing cabling systems in accordance with the specifications of established standards.

Cabling Installation & Maintenance is published by Endeavor Business Media, a division of EndeavorB2B.

Contact Cabling Installation & Maintenance

Editorial

Patrick McLaughlin

Serena Aburahma

Advertising and Sponsorship Sales

Peter Fretty - Vice President, Market Leader

Tim Carli - Business Development Manager

Brayden Hudspeth - Sales Development Representative

Subscriptions and Memberships

Subscribe to our newsletters and manage your subscriptions

Feedback/Problems

Send a message to our general in-box

 

Benjamin Hill Announces Drill Results from El Fierro Exploration Zone

By: Newsfile

Vancouver, British Columbia--(Newsfile Corp. - June 3, 2022) - Benjamin Hill Mining Corp. (CSE: BNN) (OTC Pink: BNNHF) ("BHM" or the "Company") is pleased to announce additional assay results from the Sonora Gold Project. This round of assays focused on mineralized structures in the El Fierro Zone (see Figure 1). The drilling program explored for the presence and continuity of metallic mineralization found in outcroppings at surface in epithermal veins, skarn zones and hydrothermal breccias. BHM also tested for a possible magmatic source of mineralization as indicated by chargeability highs in the recent IP/Resistivity geophysical survey.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/8680/126345_5173c8d6c45f4a2e_001.jpg

Figure 1: Major Vein Structures and Drill Hole Locations in the El Fierro Exploration Zone

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/8680/126345_5173c8d6c45f4a2e_001full.jpg

The El Fierro Zone area encompasses 958 hectares out of a total 6391 hectares on the Project. Eleven exploratory drill holes totalling 1,589 meters were completed to test two vein systems and a skarn occurrence. The first vein system oriented in a northwest - southeast direction, dipping shallowly to the northeast and is mapped at surface approaching 1.2 km in length (see Figure 1 above). These veins are composed of quartz-barite with sulfides and primary oxides. The second vein system contains a sets of parallel vein breccias striking northeast to southwest and dipping steeply to the southeast. The veins are composed of quartz, with primary sulfides, primary oxides, and hydroxides. The second vein system is mapped at surface for 3.9 km. All the veins are hosted in granites and a volcano-sedimentary sequence.

The El Fierro Zone also hosts artisanal pits and shallow shafts, developed for the exploitation of quartz-barite veins-breccias containing copper mineralization.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/8680/126345_5173c8d6c45f4a2e_002.jpg

Figure 2: Geological Map and drill hole cross section showing drill holes and major structures

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/8680/126345_5173c8d6c45f4a2e_002full.jpg

The results of the program are very encouraging with drill holes SGB-22-19, SGB-22-20, SGB-22-21, SGB-22-23, SGB-22-26, SGB-22-27, and SGB-22-31 intersecting mineralized veins of the first vein system. Figure 2 shows a geological map and a projected cross section that illustrates a possible interpretation of vein continuity between boreholes.

Highlights include:

  • SGB-22-23 - 1.25 m of 0.25% Cu from 18.5 m - 19.75m
  • SGB-22-24 - 1.25 m of 0.67 % Cu from 26.5 m - 27.75 m
  • SGB-22-26 - 0.95 m of 0.39 g/t Au from 4.35 m - 5.3 m, and a 2nd intersection with an additional 1.5 m of 0.25% Cu from 4.35 m - 8.0 m
  • Including 1.45 m of 0.26% Cu from 5.3 m - 6.75 m, 1.5 m of 0.25% Cu from 42.3 m - 43.8 m, and 0.95 m with 0.39 g/t Au.
    • SGB-22-27 - 1.7 m of 0.25 % Cu from 52.85 m to 54.55 m, a second interval of 3.1 m of 0.70% Cu, with 1.1 m of 1.44 % Cu from 90.8 m - 93.9 m
  • Previously reported drill hole SGB-22-21: 3 m of 3.54% Cu in drill hole
    • Including 0.6 m of 10% Cu, 2.11 g/t Au and 52 g/t Ag from 11.5 m - 14.6 m
  • Drill holes SGB-22-28, SGB-22-29 and SGB-22-30 intersected the second vein system which strikes north-east south-west and dips steeply to the southeast. Notably, drill hole SGB-22-30 cut several veins composed of quartz, sulfides, primary oxides and hydroxides.
  • Drill hole SGB-22-24 encountered disseminated copper oxide mineralization in a skarn.
  • SGB-22-30 - 0.4 m of 4.42 g/t Au from 127.8 m -128.2 m and 0.45 m of 0.55 % Cu and 0.4 g/t Au from 184.8 m - 185.25 m
  • SGB-22-31 - 1.8 m of 0.41 % Cu, with 0.5 m with 0.36 g/t Au.

Note: Further work is required to better understand the structural controls on mineralization and the true widths of mineralization.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/8680/126345_5173c8d6c45f4a2e_003.jpg

Table 1. Assay Highlights from the El Fierro Exploration Area

To view an enhanced version of Table 1, please visit:
https://orders.newsfilecorp.com/files/8680/126345_5173c8d6c45f4a2e_003full.jpg

Benjamin Hill Mining President Greg Bronson stated: "The El Fierro area hosts several prospective mineralized veins that have returned encouraging copper and gold assays from near surface intervals. Additionally, good gold assays at depth confirm a metals enriched hydrothermal system that merits further investigation".

Quality Assurance and Control:
Samples from drill holes 001-007 were assayed by Bureau Veritas Laboratories. All rock samples were selected by company geologists. All core was transported from the drill location to the company's core logging facility in Benjamin Hill, Sonora, Mexico. Each core was sawn into two halves. Samples were taken from one half of the cut core. Sample tags were placed into each bag before being sealed and then transported by company truck directly the Bureau Veritas Mineral Laboratories (BVM) in Hermosillo, Sonora, Mexico. At the BVM laboratory, the samples were dried, crushed and pulverized with the sample pulps being sent airfreight for analysis to BVM in Vancouver, B.C. for 45-element ICP-MS analysis after modified 4 acids aqua regia digestion. Gold assays are determined by 30-gram fire assay fusion with an ICP-ES finish. Laboratory control samples comprising certified reference samples, duplicates and blank samples were inserted by the laboratory into the sample stream and analyzed as part of the quality assurance/quality control protocol. Both Hermosillo and Vancouver BVM facilities are ISO 9001 and ISO/IEC 17025 accredited.

A management decision was made to change laboratory partners to SGS de Mexico S.A. de C.V. Laboratories for drill holes 008-034 to ensure the timely delivery of the results to guide the project and provide information to shareholders.

Samples were delivered to SGS de Mexico S.A. de C.V. Laboratories (SGS) in Hermosillo, Sonora, Mexico for sample preparation and pulps were shipped to SGS Laboratories in Durango, Durango, Mexico for analyses. As stated previously, all rock samples were selected by company geologists. All core was transported from the drill location to the company's core logging facility in Benjamin Hill, Sonora, Mexico. Each core was sawn into two halves. Samples were taken from one half of the cut core. Sample tags were placed into each bag before being sealed and then transported by company truck directly to SGS in Hermosillo, Sonora, Mexico for sample preparation. Sample pulps were shipped to SGS in Durango, Durango, Mexico for analyses. At the SGS laboratory, the samples were dried, crushed and pulverized with the sample pulps analysed for 34-element ICP-OES analysis after aqua regia digestion. Gold assays are determined by 50-gram fire assay fusion with an ICP-OES finish. Copper assays that initially ran above 10,000ppm were rerun using ICP-OES analysis to obtain accurate assay values. Laboratory control samples comprising certified reference samples, duplicates and blank samples were inserted by the laboratory into the sample stream and analyzed as part of the quality assurance/quality control protocol. Both Hermosillo and Durango SGS facilities are ISO/IEC 17025:2017 accredited with ISO 17034 certification.

Qualified Person
Greg Bronson, P.Geo, President and Director of the Company is a qualified person as defined by National Instrument 43-101 and has reviewed and approved the scientific and technical disclosure in this news release.

About Benjamin Hill Mining Corp.
Benjamin Hill Mining Corp. is a Canadian-listed junior gold exploration company focused on exploring and developing projects in Mexico. The Company's Sonora Gold project covers 6,000 ha of highly prospective mineral concessions in the Caborca gold belt of Sonora, Mexico in close proximity to Magna Gold Corp's San Francisco mine.

On behalf of the Board of Directors
"Cole McClay", CEO Benjamin Hill Mining Corp.
info@benjaminhillmining.com

Forward-Looking Statements
Certain of the statements made and information contained herein may contain forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking information includes, but is not limited to, information concerning the Company's intentions with respect to the development of its mineral properties. Forward-looking information is based on the views, opinions, intentions and estimates of management at the date the information is made, and is based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated or projected in the forward-looking information (including the actions of other parties who have agreed to do certain things and the approval of certain regulatory bodies). Many of these assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by applicable securities laws, or to comment on analyses, expectations or statements made by third parties in respect of the Company, its financial or operating results or its securities. The reader is cautioned not to place undue reliance on forward-looking information. We seek safe harbor.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/126345

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.