Laser Focus World is an industry bedrock—first published in 1965 and still going strong. We publish original articles about cutting-edge advances in lasers, optics, photonics, sensors, and quantum technologies, as well as test and measurement, and the shift currently underway to usher in the photonic integrated circuits, optical interconnects, and copackaged electronics and photonics to deliver the speed and efficiency essential for data centers of the future.

Our 80,000 qualified print subscribers—and 130,000 12-month engaged online audience—trust us to dive in and provide original journalism you won’t find elsewhere covering key emerging areas such as laser-driven inertial confinement fusion, lasers in space, integrated photonics, chipscale lasers, LiDAR, metasurfaces, high-energy laser weaponry, photonic crystals, and quantum computing/sensors/communications. We cover the innovations driving these markets.

Laser Focus World is part of Endeavor Business Media, a division of EndeavorB2B.

Laser Focus World Membership

Never miss any articles, videos, podcasts, or webinars by signing up for membership access to Laser Focus World online. You can manage your preferences all in one place—and provide our editorial team with your valued feedback.

Magazine Subscription

Can you subscribe to receive our print issue for free? Yes, you sure can!

Newsletter Subscription

Laser Focus World newsletter subscription is free to qualified professionals:

The Daily Beam

Showcases the newest content from Laser Focus World, including photonics- and optics-based applications, components, research, and trends. (Daily)

Product Watch

The latest in products within the photonics industry. (9x per year)

Bio & Life Sciences Product Watch

The latest in products within the biophotonics industry. (4x per year)

Laser Processing Product Watch

The latest in products within the laser processing industry. (3x per year)

Get Published!

If you’d like to write an article for us, reach out with a short pitch to Sally Cole Johnson: [email protected]. We love to hear from you.

Photonics Hot List

Laser Focus World produces a video newscast that gives a peek into what’s happening in the world of photonics.

Following the Photons: A Photonics Podcast

Following the Photons: A Photonics Podcast dives deep into the fascinating world of photonics. Our weekly episodes feature interviews and discussions with industry and research experts, providing valuable perspectives on the issues, technologies, and trends shaping the photonics community.

Editorial Advisory Board

  • Professor Andrea M. Armani, University of Southern California
  • Ruti Ben-Shlomi, Ph.D., LightSolver
  • James Butler, Ph.D., Hamamatsu
  • Natalie Fardian-Melamed, Ph.D., Columbia University
  • Justin Sigley, Ph.D., AmeriCOM
  • Professor Birgit Stiller, Max Planck Institute for the Science of Light, and Leibniz University of Hannover
  • Professor Stephen Sweeney, University of Glasgow
  • Mohan Wang, Ph.D., University of Oxford
  • Professor Xuchen Wang, Harbin Engineering University
  • Professor Stefan Witte, Delft University of Technology

Ameresco Announces Landmark $240 Million Hydropower Project, Driving Energy Resiliency and Security in Alaska

The project will help transition local industries to 100% renewable base-load energy and connect remote communities to diversified energy sources

Ameresco, Inc., (NYSE: AMRC), a leading energy solutions provider dedicated to helping customers navigate the energy transition, today announced its partnership with Juneau Hydropower, Inc. a recently Licensed Utility to develop, construct and operate a 19.8 megawatt (MW) hydroelectric facility at Sweetheart Lake, 33 miles south of downtown Juneau and its transmission and distribution assets.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20250708639017/en/

Overview of Area Projects and Transmission Map

Overview of Area Projects and Transmission Map

The Sweetheart Lake Hydroelectric Facility is designed to generate an average of 116,000 megawatt-hours (MWh) annually, providing a 20% increase in baseload clean hydropower over Juneau’s current electrical generation. The project scope also covers the installation of a battery energy storage system (BESS), over 40 miles of high-voltage transmission infrastructure, including eight miles of undersea cable that will cross Gilbert Bay, and an interconnection substation with the existing Snettisham Transmission line adding energy security to Alaska’s capital city.

This utility will connect underserved, remote areas that have previously relied solely on diesel generation to a reliable, renewable energy source. These components will also enhance local grid reliability and resilience in an area with a history of extreme weather events, including a 2008 avalanche that resulted in power outages that lasted as long as two months. The project is anticipated to increase overall energy transmission in the state by 3%.

“This project is the catalyst for Juneau's sustained growth and prosperity, and we’ve used over 40 years of hydrological data to design hydropower operational parameters so that we can reliably produce energy in even the driest of years,” said Duff Mitchell, Managing Director, Juneau Hydropower. “By harnessing the power of Alaska’s waters, we’re investing in a future where unprecedented events can be weathered with confidence. We’ve worked in harmony with local environmental scientists and stakeholders to create the reliable, resilient power needed by our community.”

Sweetheart Lake is located within the territorial limits of the City and Borough of Juneau, Alaska on the east shore of Gilbert Bay. Sweetheart Lake drains into Gilbert Bay (an arm of Port Snettisham) via Sweetheart Creek. The hydroelectric dam is expected to offset 82,012 metric tons of CO2 emissions annually. It will deliver reliable, renewable baseload electricity through a process that does not burn fossil fuels, create pollution, or harm wildlife; and enhances local ecology by utilizing the Sweetheart Lake habitat as a fishery. A true economic and environmental win for Juneau, Alaska, and our Nation.

One of the planned customers is Coeur Alaska, Inc.’s Kensington Mine, located 45 miles north-northwest of Juneau in the Tongass National Forest. The mine is currently powered by onsite diesel generators but is expected to transition to primarily renewable base-load energy to power operations once the Sweetheart Lake Hydroelectric Facility is operational.

“This multi-faceted project is a major milestone for both Alaska, Juneau Power and Ameresco,” said Nicole Bulgarino, President of Federal Solutions and Utility Infrastructure at Ameresco. “We’re proud to be working on this critical hydropower project and major electrical infrastructure that has factored in both community needs and responsible development, in addition to supporting energy reliability and long-term economic growth in line with the vision outlined in the Alaska Executive Order: Unleashing Alaska’s Extraordinary Resource Potential.”

In addition to development and construction, the project includes a long-term Operations and Maintenance (O&M) contract, ensuring sustained performance.

To learn more about the hydropower solutions offered by Ameresco, visit https://www.ameresco.com/hydropower/.

About Ameresco, Inc.

Founded in 2000, Ameresco, Inc. (NYSE: AMRC) is a leading energy solutions provider dedicated to helping customers reduce costs, enhance resilience, and decarbonize to net zero in the global energy transition. Our comprehensive portfolio includes implementing smart energy efficiency solutions, upgrading aging infrastructure, and developing, constructing, and operating distributed energy resources. As a trusted full-service partner, Ameresco shows the way by reducing energy use and delivering diversified generation solutions to Federal, state and local governments, utilities, educational and healthcare institutions, housing authorities, and commercial and industrial customers. Headquartered in Framingham, MA, Ameresco has more than 1,500 employees providing local expertise in North America and Europe. For more information, visit www.ameresco.com.

The announcement of a customer’s entry into a project contract is not necessarily indicative of the timing or amount of revenue from such contract, of Ameresco’s overall revenue for any particular period or of trends in Ameresco’s overall total project backlog. This project was included in Ameresco’s previously reported contracted backlog as of March 31, 2025.

Contacts

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.