Tarcoola Mineral Resources Update (Perseverance Mine)
By:
ACCESSWIRE
July 02, 2024 at 15:19 PM EDT
ⓘ This article is third-party content and does not represent the views of this site. We make no guarantees regarding its accuracy or completeness.
~20koz Au shallow Mineral Resources with further extension potential ADELAIDE, AUSTRALIA / ACCESSWIRE / July 2, 2024 / Barton Gold Holdings Limited HIGHLIGHTS
![]() Barton Gold Holdings Limited (ASX:BGD),(FRA:BGD3),(OTCQB:BGDFF) ( Barton or Company ) is pleased to confirm an updated Mineral Resources Estimate for its South Australian Tarcoola Gold Project ( Tarcoola ). Approximately 1,688m of recent Barton drilling has delivered an updated JORC (2012) Mineral Resources Estimate (MRE) of 19.9koz Au within 60 - 80m of the Perseverance Mine open pit floor. The total Tarcoola MRE is now 29.5koz Au (0.54Mt @ 1.70 g/t Au) , with ~45% classified as ‘Indicated' category, including 9.6koz Au contained in lower-grade existing stockpiles next to the Perseverance Mine. Commenting on the Perseverance Mine's JORC MRE update, Barton MD Alex Scanlon said: "This is an excellent starting point for the second phase of our regional strategy. Tarcoola now holds ~530,000 tonnes of JORC Resources in stockpiles and in the pit floor, with potential extensions, on an existing Mining Lease. "With an existing fully permitted mill, even minor pit extensions can offer high-value ounces. We plan to continue incrementally building these Resources while testing priority regional targets for new Tarcoola mineralisation." Background & Recent Drilling The historical Tarcoola Goldfield produced ~77koz Au at an average grade of ~37.5 g/t during 1893 - 1955 from shallow workings on Barton's Mining Lease 6455, and a small open pit mine (Perseverance) produced ore grading 2 - 4 g/t Au to Barton's Central Gawler Mill during 2016 - 2018. [1] Notwithstanding this ~130 year history, relatively little has been historically invested to evaluate the goldfield's architecture or locating prospective ‘repeats' of shallow, high-grade mineralisation in the surrounding area. Barton's regional development strategy is to establish large-scale, bulk open pit mineralisation combined with nearby higher-grade blending feed to realise the benefits of economies of scale, and to potentially support an early ‘Stage 1' operation leveraging the existing Central Gawler Mill to process these materials. Barton has rapidly grown the neighbouring Tunkillia Gold Project ( Tunkillia ) to a JORC MRE of 1.5Moz Au (51.3Mt @ 0.91 g/t Au) over the past two years. [2] A preliminary Scoping Study is now underway to test a prospective 5Mtpa processing model, and to identify key cost drivers for subsequent optimisation. Barton is now evaluating the Tarcoola Goldfield for potential higher-grade mineralisation. In December 2023 and April 2024 Barton drilled 1,688m (26 holes) in the Perseverance pit floor, confirming high-grade extensions of pit floor mineralisation grading up to ~12 g/t Au, and new structures below the open pit. [3] Barton has remodelled the open pit mineralisation to include these recent drilling results, and has also identified extensions for additional investigation and further potential JORC MRE growth. ![]() Updated Tarcoola Block Model & MRE Updated modelling shows two key areas where mineralisation has been converted to an updated JORC MRE in the north and central open pit floor areas. The updated MRE has been estimated to 25mRL only, with all JORC Resources within 60 - 80 metres of the southern and northern pit floor areas (respectively). Mineralisation also extends below the new MRE, and into the Deliverance zone south of the pit (see Figure 3). These areas are not yet JORC classified and present opportunities for further drilling and MRE growth. ![]() ![]() Updated Tarcoola JORC MRE Statement The Tarcoola JORC MRE was last estimated during November 2020. [5] Further to the updated Perseverance Mine JORC MRE detailed in this announcement, Tarcoola's overall Mineral Resource endowment has grown by ~87% to a total 29.5koz Au (0.54Mt @ 1.70 g/t Au). The updated Tarcoola JORC MRE (as at June 2024) is shown below at Table 1. ![]() Table 1 - Tarcoola MRE (June 2024) The previously reported Tarcoola MRE (as at November 2020) is shown below at Table 2. ![]() Table 2 - Tarcoola MRE (November 2020) 9 Ongoing Tarcoola Goldfield Drilling Barton's December 2023 and April 2024 drilling program was the first since the Company published a new regional architectural map of the Tarcoola Goldfield following two years of geophysical investigation in parallel with its Tunkillia growth drilling programs. [6] This modelling has identified multiple local structures analogous to the structure which hosts the Perseverance Mine and is the first time in the ~130 year history of the Tarcoola Goldfield that all known historical gold occurrences can be put into a consistent structure framework. Following the completion of open pit drilling at the Perseverance Mine, Barton commenced a ~7,000m reverse circulation ( RC ) drilling program as a preliminary test of multiple interpreted priority targets, including Tolmer, Mulgathing and Warburton. [7] The objective of this program is to test for the existence of interpreted structures, validate and refine new methodologies and techniques that Barton is developing for exploration under cover in the region, and to define a new regional structural model. Barton also hopes to identify new potential sources of higher-grade mineralisation similar to that produced in the area of and surrounding the Perseverance Mine. This program was subsequently expanded to ~9,000m and remains ongoing. The program is anticipated to complete during July 2024. Certain priority samples dispatched to Barton lab services provider for fire assay analyses and Barton expects to publish the results of all drilling during July and August 2024. [8] ![]() Updated Global Barton JORC MRE Statement Further to the updated MRE detailed in this announcement for the Perseverance Mine, Barton's total attributable JORC (2012) Mineral Resource endowment has grown by approximately 1% to a total 1,588koz Au (52.3Mt @ 0.94 g/t Au). Table 3 below provides the full details of Barton's global MRE endowment. ![]() Table 3 - Barton Global JORC MRE Inventory (June 2024) Mineral Resource Estimation Methodology and Data The following summary information is provided in accordance with ASX Listing Rule 5.8.1. Further detail is provided in the attached JORC Table 1. Summary The Tarcoola Project is located 70 km NNW of Barton Gold's Tunkillia Project in South Australia, and comprises ~1,640km2 of tenements, including the open pit Perseverance Mine at the brownfields Perseverance Deposit. The mine, which operated during 2017 and 2018, is held within Mineral Lease (ML) 6455 located 3 km west of the Tarcoola Rail Siding in South Australia's Gawler Craton. The Tarcoola Project is 100% owned by Tunkillia 2 Pty Ltd which is a wholly owned subsidiary of Barton Gold Holdings Limited. The Tarcoola Project lies within the north-western Gawler Craton, and centred over the historic Tarcoola goldfield where Archaean and Proterozoic rocks form the basement to an extensive cover of Phanerozoic sediments. Gold mineralisation is hosted within the sedimentary Tarcoola Formation and the Paxton Granite, both of Proterozoic age. A suite of later intrusions (Lady Jane Diorite) cut both the sedimentary rocks and the granite. The resource is reported above a depth of 25 m RL and above a 0.5 g/t gold cut off. 25 m RL is approximately 125 m below the surface and 60 m below the pit floor. ![]() Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. Inferred Resources have less geological confidence than Indicated Resources and should not have modifying factors applied to them. It is reasonable to expect that with further exploration most of the Inferred Resources could be upgraded to Indicated Resources. Geology and geological interpretation The Tarcoola Project lies within the north-western Gawler Craton, centred over the historic Tarcoola Goldfield, where Archaean and Proterozoic rocks form the basement to an extensive cover of Phanerozoic sediments. The Archaean basement has been extensively deformed, whereas the Proterozoic rocks have been weakly to moderately deformed. At the Perseverance Deposit, gold mineralisation is controlled by a sub-vertical NE-NNE trending fault zone within the sedimentary rocks of the Tarcoola Formation and the Paxton Granite, both of Proterozoic age. A suite of later intrusions (Lady Jane Diorite) cut both the sedimentary rocks and the granite. These high level mafic intrusives are associated with the 1590 Ma Hiltaba Magmatic Event, and are considered to control the spatial setting of both gold and base metal mineralisation. Gold has locally been remobilised and enriched in the weathering profile. The base of complete oxidation occurs typically 10-40 m below surface, and the base of partial oxidation occurs at a depth of 20-60 m. Within the primary zone, sericite-quartz-pyrite alteration zones are spatially associated with the mineralisation and overprint earlier hematite-magnetite alteration. An outer halo of chlorite (+/- leucoxene and pyrite) is developed. Pyrite, galena and sphalerite are the main associated sulphide minerals, with subordinate amounts of chalcopyrite, bornite and/or arsenopyrite noted. Veins can be discrete or form wider stockwork zones and are surrounded by broader quartz-sericite alteration envelopes, which can host haloes of lower grade background mineralisation. Dispersed supergene mineralisation in the oxide zone can be largely detached from veining. The Perseverance Deposit extends over approximately 500 m from the Southwall Fault to include Last Resource north of the White Hope Fault. Mineralisation has been identified south of Southwall Fault but is not considered in this mineral resource estimate. Drilling techniques A total of 694 RC and diamond drill holes for 77,250 m have been drilled within the area defined by the Tarcoola mineral resource. 694 of these holes are RC (45,468 m), with 50 holes (7,386 m) being either diamond or pre-collared diamond and 986 short RC grade control holes (24,395 m). Barton Gold's drilling since 2020 comprises 4,239 m of RC drilling (42 holes). The Barton Gold RC drilling was undertaken by Egan Drilling using a track mounted Sandvik 400 series with an on-board compressor and an auxiliary booster to provide approximately 2000 cfm ay 1000psi. The drill rig utilised a down hole hammer with a 5 ¾" face sampling bit. Drill holes across the deposit are spaced at nominal 40 m x 40 m centres, with the mined-out areas drilled with grade control drilling on 5 m centres. Drill programmes are orientated perpendicular to strike and on east-west sections, although some grade control holes are drilled on north-south sections. Pierce points below the pit are commonly on 40 m sections. The locations of historical drill holes have been verified by Barton Gold with both surface drill collar pick-ups and by validation of existing mineralisation with recent infill drilling. Sampling and sub-sampling techniques RC drilling by Barton Gold utilised a 5 ¾" face-sampling hammer, with a rig-mounted cone splitter attached to the cyclone providing one-metre sample intervals. Field duplicates were collected at a ratio of 1:30. Sample analysis Two to four kilogram RC splits and half-drill core were sent to Bureau Veritas in Adelaide for preparation and analysis using 40 g fire assay techniques for gold. Bureau Veritas' FA1 method uses a 40 g lead collection fire assay with AAS finish to a 0.01 ppm detection limit. Samples from an earlier phase of Barton Gold drilling were sent to Intertek Genalysis in Adelaide for preparation and analysis using 50 g fire assay techniques for gold and ICPOES/MS for multielement geochemistry. A variety of analytical techniques and laboratories have been utilised over the course of the project's history and are considered suitable for resource estimation purposes. QAQC Barton Gold inserted certified reference materials (CRM's) supplied by OREAS into the sampling sequence every 50 samples. CRM's were selected on the basis of gold levels relevant to the deposit being drilled. Barton Gold's overall QAQC protocols utilised CRM's, field duplicates and certified coarse blanks inserted at an overall ratio of 1:44 routine drill hole samples for the RC drill program. Based on the results of Barton's QA/QC analysis, in addition to the internal QA/QC standards, repeats and blanks run by the laboratory, the laboratory was deemed to provide an acceptable level of accuracy and precision. Estimation methodology The geological interpretations are based on pit mapping and drill hole data. Drill core and RC chip logging has been used to define the main geological units and weathering profile boundaries. Mineralisation above the base of weathering is assumed to be affected by supergene or weathering effects and is interpreted as having been dominantly mined out. Eleven fresh rock mineralised structures were interpreted, based on continuity of grade at a lower cut-off of 0.8 g/t Au at the Perseverance Deposit. Three mineralised structures were orientated along the Perseverance Fault and seven were interpreted to strike N-NNW. Structures were grouped into geostatistical domains based on grade similarities and structural orientation. Several small mafic dykes (Lady Jane Diorites) cross-cut the deposit. The northwest and northeast trending dykes appear to control narrow mineralised zones along the contacts. Due to their small volume and associated mineralisation the Lady Jane Diorites were not depleted from the mineral resource estimate. The Mineral Resource statement reported herein is a reasonable representation of the Tarcoola Project's Perseverance Deposit, based on pit exposures and current sampling data. Grade estimation was undertaken using Geovia's Surpac™ software package (v7.7.2). Ordinary Kriging ("OK") was selected for grade estimation. The block model utilises parent blocks measuring 10 m x 20 m x 5 m with sub-blocking to 0.625 x 2.5 x 1.25 m (XYZ) to better define the volumes. Blocks above topography are flagged as air blocks. Estimation resolution was set at the parent block size. Informing samples were composited down hole to one metre intervals. Grade capping was applied to outlier composites. Experimental variograms were generated where possible in Supervisor, (no transformations were attempted). For domains where experimental variograms could not be created, the variogram models were orientated along strike and down dip, composite data was viewed in three dimensions to determine if a plunge should be incorporated into the variogram. A two-pass estimation process was employed, with the first pass (60 m search) requiring a minimum of either 4 or 8 composites and a maximum of between 8 and 12 composites depending on the size of the domain. The second pass (120 m search) reduced the minimum composites required by half and the maximum of composites required by four-fifths. Density values are assigned to blocks based on lithology and weathering; the average density of the mineralisation is 2.64 t/m3. Block model validation consisted of visual checks in plan and section, global comparisons between input and output means and alternative estimation techniques. Cut-off grades The Mineral Resource is reported above a 0.5 g/t gold grade and within 125 m of the surface (25 m RL), approximately 60 m below the pit floor. The following assumptions were considered.
Criteria used for classification The Resource Estimates were classified in accordance with the JORC 2012 code. The Tarcoola resources (Perseverance Deposit) are classified based on data quality, drill density, number of informing samples, kriging efficiency, average distance to informing samples and vein consistency (geological continuity). Geological continuity has been demonstrated at 40 m grid spacing over the entire strike of the deposits. Short range variability has been established with grade control drilling (5 to 10 m spacing) in mined out areas, with grade control drilling extending up to 30 m below the pit floor in the better proportion of the deposit. Areas drilled with at least 20 m sections and including tighter infill drilling may be classified as indicated, predicated on geological confidence. Areas of 40 m x 40 m or greater have been classified as inferred. Areas of limited geological confidence or at a depth beyond a reasonable open pit depth remain unclassified. A Mineral Resource is not an Ore Reserve and does not have demonstrated economic viability. Mining and metallurgical methods and parameters and other material modifying factors considered to data Barton Gold foresees mining via open pit and conventional grinding and leach recovery. The Competent Person notes that this is a reasonable assumption but should not be regarded as rigorous at this stage of the project. The current Mineral Resource does not include any dilution or ore loss associated with practical mining constraints. The Tarcoola mineralisation sampled has been shown to be amenable to direct cyanidation for gold extraction. The Perseverance Deposit was processed at the Challenger CIL plant between 2017 and 2018. Metallurgical work (1988, 1998 and 2013) show good recoveries between 95 and 98% on P80 75µ oxidised and fresh material. Authorised by the Board of Directors of Barton Gold Holdings Limited. For further information, please contact:
Competent Persons Statements The information in this announcement that relates to Exploration Results for the Tarcoola Gold Project (including drilling, sampling, geophysical surveys and geological interpretation) is based upon, and fairly represents, information and supporting documentation compiled by Mr Marc Twining BSc (Hons). Mr Twining is an employee of Barton Gold Holdings Ltd and is a Member of the Australasian Institute of Mining and Metallurgy Geoscientists (AusIMM Member 112811) and has sufficient experience with the style of mineralisation, the deposit type under consideration and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (The JORC Code). Mr Twining consents to the inclusion in this announcement of the matters based upon this information in the form and context in which it appears. The information in this announcement that relates to the estimate of open pit Mineral Resources for the Tarcoola Gold Project geological interpretation and resource estimates) is based upon, and fairly represents, information and supporting documentation compiled by Mr Ian Taylor BSc (Hons). Mr Taylor is an employee of Mining Associates Pty Ltd and has acted as an independent consultant on Barton Gold's Tarcoola Gold Project, South Australia. Mr Taylor is a Fellow and certified Professional of the Australian Institute of Mining and Metallurgy (FAusIMM (CP Geo) 110090) and has sufficient experience with the style of mineralisation, the deposit type under consideration and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (The JORC Code). Mr Taylor consents to the inclusion in this announcement of the matters based upon this information in the form and context in which it appears. The information in this announcement that relates to the estimate of stockpile Mineral Resources for the Tarcoola Project is based upon, and fairly represents, information and supporting documentation compiled by Dr Andrew Fowler MAusIMM CP (Geo). Dr Fowler is an employee of Mining Plus Pty Ltd and has acted as an independent consultant on Barton Gold's Tarcoola Project, South Australia. Dr Fowler is a Member of the Australian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience with the style of mineralisation, the deposit type under consideration and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (The JORC Code). The Company confirms it is not aware of any new information or data that materially affects the information included in the relevant market announcement and in the case of estimates of mineral resources all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. About Barton Gold Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000oz annually, with ~1.6Moz Au JORC Mineral Resources (52.3Mt @ 0.94 g/t Au), multiple advanced exploration projects and brownfield mines, and 100% ownership of the only regional gold mill in the renowned central Gawler Craton of South Australia. * ![]() Competent Persons Statement & Previously Reported Information The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 ( JORC ).
The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted in this announcement, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au . The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the Prospectus continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements. Cautionary Statement Regarding Forward-Looking Information This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof. JORC Table 1 - Tarcoola Gold Project Section 1 Sampling Techniques and Data
Section 2 Reporting of Exploration Results (Criteria listed in the preceding section also apply to this section.)
Section 3 Estimation and Reporting of Mineral Resources (Criteria listed in the preceding section also apply to this section.)
*RC=Reverse Circulation, DD=Diamond Core, RCD=RC precollar with Diamond Core tail. Table 3: Significant Intersections for Historical Drilling Mentioned in this Announcement 1,2,3
1 Note - Not true widths. 2 Note - Calculated applying a 0.5g/t Au cut-off and allowing up to 2m internal dilution. 3 Note - presented intersections are spatially located within a +/-30m window of the modelled position of the Deliverance target . [1] Refer to Prospectus dated 14 May 2021 [2] Refer to ASX announcement dated 4 March 2024 [3] Refer to ASX announcements dated 22 April and 30 May 2024 [4] Refer to ASX announcement dated 30 May 2024 [5] Refer to Prospectus dated 14 May 2021 [6] Refer to ASX announcements dated 28 November 2023, and 22 April and 30 May 2024 [7] Refer to ASX announcement dated 14 May 2024 [8] Refer to ASX announcement dated 20 June 2024 [9] Refer to ASX announcement dated 28 November 2023 * Refer to Barton Prospectus dated 14 May 2021 and ASX announcement of today's date. Total Barton attributable JORC (2012) Mineral Resources include 833koz Au (26.9Mt @ 0.96 g/t Au) in Indicated and 754koz Au (25.4Mt @ 0.92 g/t Au) in Inferred categories. SOURCE: Barton Gold Holdings Limited View the original press release on accesswire.com
Report this content
If you believe this article contains misleading, harmful, or spam content, please let us know. Report this articleMore NewsView MoreRecent QuotesView More
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes. By accessing this page, you agree to the Privacy Policy and Terms Of Service.
© 2025 FinancialContent. All rights reserved.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||